CRONOGRAMA FISICO AGUA (IMP EN A0).pdf

Post on 28-Feb-2018

231 views 0 download

Transcript of CRONOGRAMA FISICO AGUA (IMP EN A0).pdf

  • 7/25/2019 CRONOGRAMA FISICO AGUA (IMP EN A0).pdf

    1/1

    N

    CAMAMEN IINAL DE LABA

    CAELDE IDENIFICACIN DE LA BADE 4.803.60M

    DIE DE MECLA

    LIMIEA DEFEACIN MANAL

    A ELANE ELIMINA

    ENCAAMIEN DE I

    FLEE EEE DE HANC AJE

    FLEE EN NAAL CAACIN

    ECAACIN MANALEN MAEIALEL

    ELLEN CN MA.I CMAC. C/EI IBAI

    ELIMINACINDE MAEIAL EEDENE ( 30 )

    EFINE NIELACIN CMACAD

    LAD MECLA C:H, 1:10, E = 4 "

    MAMEIADE IEDA E=0.40 A. C.F'=175 /2, .

    CNCE F'C= 210 KG/CM2 EN M

    ENCFAD DEENCFADCAAIA

    ACE F = 4200 KG/CM2

    CNCE F'C= 210 KG/CM2 EN ENE MANIBA

    ENCFAD DEENCF E. MANIBA

    ACE F = 4200 KG/CM2 EN E. MANIBA

    M. CLC. DE CMEA IAMC C/MAC MEALIC EN BAAJEMIL DE 1.800.90 M

    EJILLA DE ECCIN ENENANADE CAACIN

    BAANDA DE ECCIN DE FG 2 "0.8 .

    JNA AFALICAE=1 "

    ENA EIENCIA CMEIN DE CNCE BEA

    LIMIEADELEEN

    A ELANE ELIMINA

    ECAACIN MANALDE MAEIAL EL

    ELLEN CN MAEIALIHAA NIELEDE EENCN EI

    ELIMINACINMAEIAL ECEDENE

    CNCE F'C= 175 KG/CM2 EN CANAL DE ALIDA

    ENCFAD DEENCF CANAL DE ALIDA

    LIMIEADELEEN

    A ELANE ELIMINA

    ECAACIN MANALDE MAEIAL EL

    ELLEN CN MAEIALIHAA NIELEDE EENCN EI

    ELIMINACINMAEIAL ECEDENE

    CNCE F'C= 175 KG/CM2 EN CANAL DEMAIA

    ENCFAD DEENCF CANAL DE DEMAIA

    LIMIEADELEEN

    A ELANE ELIMINA

    ECAACIN MANALDE MAEIAL EL

    ELLEN CN MAEIALIHAA NIELEDE EENCN EI

    ELIMINACINMAEIAL ECEDENE

    CNCE F'C= 175 KG/CM2 EN DEAENAD

    ENCFAD DEENCF DEAENAD

    JNADE DILAACIN AE E=4 "

    CANAILLADE BNCE 4 "

    LIMIEADELEEN

    A ELANE ELIMINA

    ECAACIN MANALDE MAEIAL EL

    ELLEN CN MAEIALIHAA NIELEDE EENCN EI

    ELIMINACINMAEIAL ECEDENE

    CNCE F'C= 175 KG/CM2 EN CLMNEA

    ENCFAD DEENCF CLMNEA

    ACE F = 4200 KG/CM2 EN CLMNEA

    CLCACINDE ALAMBE DE A

    EADE MADEACN CALAMINA GALANIADA

    ,

    LIMIEADE EEN MANAL

    A, NIELACIN ELANE

    ECA. MANAL E. CMACC/IEDAANJA0.601.10M

    EFINE NIELACIN ANJA A=0.60M 0.70M

    CAMADEA FND/ B.C, A = 0.60.0.70 H=0.10

    ECCINDE BEIA C/AENA,/CLAE H=0.25

    ELLEN C/MA. I CMAC. C/EI IBAI

    ELIMINACIN DE MA. ECED., E=25%, D. 2 KM

    MINIE IN.DE BEIA DE CFI4422 110 MM C7.50

    DBLE EBAHIDALICA, BEIA DE .110 MM

    MINIE INALACIN CDCF 110MM 22.5C7.5

    MINIE INALACIN CDCF 110MM 45C7.5

    MINI CLC.ALLA DE GAINC/AN 75 MM

    MINI CLC.ALLA DE AIE 75MM

    EGI /ALLA DE CNL, GA, AIE

    LIMIEA DEFEACIN MANAL

    A NIELACIN ELANE

    ECAACINMANAL ENMAEIAL EL

    ELLEN CNMAEIAL I HAA NIELE DE EENCN EI

    ELIMINACIN DE MAEIAL ECEDENE

    EFINE NIELACIN CMACAD

    LAD MECLA C:H, 1:10, E =4 "

    CNCE F'C= 210 KG/CM2 EN AAA

    ACE F = 4200 KG/CM2 EN AAA

    CNCE ENCLMNAF'C=210 KG/CM2

    ENCFAD DEENCFAD EN CLMNA

    ACE F = 4200 KG/CM2 EN CLMNA

    IGA MEALICA L=16 ML

    MINI CLCACIN DE AANDELA

    BEIA DE F G 4 "

    MINIE INALACIN DE ACCEI

    EBA DE CALIDADDELCNCE (EBAALACMEIN)

    DEBCE DE MALEA

    LIMIEADELEEN

    A ELANE ELIMINA

    FLEE EEE DE HANC A EDIMENAD

    CE NIELACINDE EEN

    EFINE NIELACIN EN EENNMAL

    ELIMINACIN DE MA. ECED., E=25%, D. 2 KM

    LAD MECLA C:H, 1:10, E =4 "

    CNCE F'C=140 KG/CM2 EN CAJADE ALIDA

    ENCFAD DEENCFAD

    CNCE F'C= 210 KG/CM2

    ENCFAD DEENCF M EFAD

    CAD DE CNCE

    ACE F = 4200 KG/CM2

    AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE

    AAJE EEI MECLA C:A,1:4 =2.00 .

    MINIE INALACIN DE ACCEIEN EDIMENAD

    MINIE IN.DE CMEADE EACACINDE LD

    LIMIEADELEEN

    A ELANE ELIMINA

    FLEE EEE DE HANC A FIL LEN

    ECAACINMAIA MANALEN IEAELACN EENCIADE AICE

    EFINE NIELACIN EN EENNMAL

    EI+ACMD DE DEMNE EN NAALEDAA, F.E.=1.25

    LAD MECLA C:H, 1:10, E =4 "

    CNCE FC=210 KG/CM2

    ENCFAD DEENCFAD DE M

    CAD DE CNCE

    ACE F = 4200 KG/CM2

    AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE

    AAJE EEI MECLA C:A,1:4 =2.00 .

    AENAD DE LADILL KK 18 HC91424 CNCEMENAENA,1.:5 AAFIL LEN

    FIL DE AENA

    FIL DE GAA1

    FIL DE GAA2

    FIL DE GAA3

    MINI CLCACIN DE CMEAEN CAMAA DE INECNEIN

    MINIE INALACIN DE ACCEIEN FIL

    A ELANE ELIMINA,INC. CAEA DE ALLA

    FLEE EEE DE HANC A EEI

    ECAACINMAIA MANALEN CA ELA CN EENCIA DE AICE

    EFINE, NIELACIN CMACACIN CAELA

    EI+ACMD DE DEMNE EN NAALEDAA, F.E.=1.25

    LAD MECLA C:H, 1:10, E =4 "

    CNCE F'=175 KG/CM2 EN AAA LADE FND

    ACE F=4200 KG/CM2, GAD60 EN AAA LA

    CNCE F'=280 KG/CM2 EN M

    ENCFAD DEENCFAD DE MCILINDIC

    ACE F=4200 KG/CM2, GAD60 EN M CILINDIC

    CNCE FC=280 KG/CM2 EN IGAANILLENCFAD DEENCFAD DE IGAANILL

    ACE F=4200 KG/CM2, GAD60 IGAANILL

    CNCE F'=280 KG/CM2 EN CLA

    ENCFAD DEENCFAD DE CLA

    ACE F=4200 KG/CM2, GAD60 CLA

    AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE

    AAJE EEI MECLA C:A,1:4 =2.00 .

    M. CLC.DE MAC AA, LANCHA 1/4 " DE D" =0.60 M2,C/MECANIMDE

    ABEAEG./DIE

    M. CLC.DE ECALEADE ACCE CN B DE FG DE 2 " 3 " , EGN DIE

    INADDE M EEI AL LAE

    M. E IN. DE ACCEI DE ENILACINCN B.+CD DE FF 90 DE 6 "

    M. E IN. DE EGLA GADADA DE MADEAMEDID DEALA

    M. E IN. DE HICLAD

    CEC EIMEICALAMBE A+E MADEA

    DEINFECCIN DEL EEI

    ECAACIN MAIAMANAL EN CA ELA CN EENCIA DE AICE

    EFINE, NIELACIN CMACACIN CA ELA

    EI+ACMD DE DEMNE EN NAALEDAA, F.E.=1.25

    LAD MECLA C:H, 1:10, E = 4 "

    CNCE EN CIMIEN BECIMIENF'=175 KG/CM2 + 20 .M.

    ENCFAD DEENCFADDE BECIMIEN

    CNCE F'C=140 KG/CM2 +20 %.M.

    ENCFAD DEENCFADEN DADDE A

    CNCE EN CLMNAF'=175 KG/CM2, ENCAEA DE ALLA

    ENCFAD DEENCFADDE CLMNA, ENCAEADE ALLA

    ACE F=4200 KG/CM2, GAD 60 EN CLMNA, EN CAEA DE ALLA

    CNCE EN IGA F'=175 KG/CM2, EN CAEADE ALLA

    ENCFAD DEENCFADDE IGA, EN CAEADE ALLA

    ACE F=4200 KG/CM2, GAD 60 EN IGA, ENCAEADE ALLA

    CNCE EN LAALIGEADAF'=175 KG/CM2,DE CAEA DE ALLA

    ENCFAD DEENCFADEN LA ALIGEADA, EN CAEADE ALLA

    ACE F=4200 KG/CM2, GAD 60 EN LA ALIGEADA, EN CAEADE ALLA

    IIN CLCACINDE LADILL HEC DE ACILLA CCIDA DE 303015 CM3

    CNCE FC=175 KG/CM2 EN CAJADE EBE

    ENCFAD DEENCFADEN CAJA DE EBE

    ACE F=4200 KG/CM2, GAD 60 EN CAJA DE EBE

    M DE GALADILL KINGKNG CN CEMENAENA, 1: 4,E=1.5 CM

    AAJE INEI FACHAD C/ME 1:51.5 (INC.CLMNAEM)

    AAJE EEI FACHAD C/ME 1:51.5 (INC.CLMNAEM)

    EIDADE DEAME EN EA,ENANA AN

    CIEL A INCL. IGAEMADA LADI C/ME 1:51.5

    I DE 5 CM, C/ME 1:5, FACHAD

    CBIEALAD.AELE AEN.DE BA 3CM.+FAGA C/M. 1:5

    EEDADE CNCE F'=140 KG/CM2 =10 ACABAD FACHADBAD, INCENCF.

    ENANA DE FIE MAC LAINA DE 2 "1/16 "

    EAMEAL LAC 1/16 " C/MAC 2 " 2 " 1/4 " EFE

    M.E IN.DE MAC AA, LANCHA 1/4 " DE 0.60 0.60 M2,C/MECANIMDE ABEAEG. /DIE

    M.E IN.DE MAC AADE EJILLA MEALICA DE LAINADE 1 " 1/16 "

    M. CLC.DE ECALEADE ACCECN B DE FG DE 2 " 3 " , EGN DIE

    CEADAAAEEI C/LLAEINE. EEI DE 2 GLE

    CANDADAAAA MEALICA

    INAD DE CIEL A AL LAE

    INAD DE M INEI AL LAE

    INAD DE M EEI AL LAEINAD DE ENANAMEALICA(2 MAN ANIC. +2 EMALE)

    INAD DE EAMEALICA LAC (2 MANANIC. + 2 EMALE)

    JNADE CNCCIN CNEKN

    IDI EMIDIBLE INCL DE 3 MM

    M. E IN. DE MEDID DE CADAL DE 6 "

    M. E IN. DE CD DE FF 45 DE 6 "

    M. E IN. DE EE DE FF 45DE 6 "

    M. E IN. DE NIN FLEIBLE IDEE DE 6 "

    M. E IN. DE CD DE FF 90 DE 6 "

    M. E IN. DE LLA DE CMEADE 6 "

    M. E IN. DE BIDAME AGA

    MINI E IN.DE BEIADE FF, D=6 "

    ,

    LIMIEADE EEN MANAL

    A, NIELACIN ELANE

    ECA. ANJA,EEN IEA ELA,A= 0.60 /B , H=1.00 M.

    EFINE NIELACIN ANJA A=0.60M 0.70M

    CAMADEA FND/ B.C, A = 0.60.0.70 H=0.10

    ECCINDE BEIA C/AENA,/CLAE H=0.25

    ELLEN C/MA. I CMAC. C/EI IBAI

    ELIMINACIN DE MA. ECED., E=25%, D. 2 KM

    MINIE IN.DE BEIA DE CFI4422 110 MM C7.50

    DBLE EBAHIDALICA, BEIA DE .110 MM

    MINIE INALACIN CDCF 110MM 22.5C7.5

    MINIE INALACIN CDCF 110MM 45C7.5

    MINI CLC.ALLA DE GAINC/AN 75 MM

    MINI CLC.ALLA DE AIE 75MM

    EGI /ALLA DE CNL, GA, AIE

    ( )

    LIMIEADELEEN

    A ELANE ELIMINA

    ECAACINMANAL DE MAEIAL EL

    ELIMINACIN DE MA. ECED., E=25%, D. 2 KM

    ENCFAD DEENCFAD CAJADE ALLA

    CNCE F'C=175 KG/CM2 EN CAJADE ALLA

    DAD DE CNCE0.200.200.20 M C:AN 2 " EFAD.

    ENCFAD DEENCFAD M LADE FND C7

    ENCFAD DEENCFAD LAEI C 7

    CNCE F'C=210 KG/CM2 FND, M ECHC07

    ACE F = 4200 KG/CM2 FND,M ECH C07

    AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE

    AAJE EEI MECLA C:A,1:4 =2.00 .

    AAMEALICADE 60 60 CM

    MINI CLC.ALLA ACCEI DE INGEDD =3/4 "

    ACCEIDE ALIDA DEAGE D =1 "

    ACCEIDE ALIDA DEAGE D=3/4 "

    IEMADE ENILACIN C/AN EFAD C2 "

    FIL DE GAADE CAJADE ALLA

    ,

    DEMLICIN DE AIMEN DE CNCEDE 8 "

    LIMIEADE EEN MANAL

    A, NIELACIN ELANE

    FLEE EEE DE HANC A ED DE DIIBCIN

    ECAACINMAIA A MAINAENEEN NMAL/E .53

    EFINE NIELACIN ANJA A=0.60M 0.70M

    CAMADEA FND/ B.C, A = 0.60.0.70 H=0.10

    ECCINDE BEIA C/AENA,/CLAE H=0.25

    ELLEN C/MA. I CMAC. C/EI IBAI

    ELIMINACIN DE MA. ECED., E=25%, D. 2 KM

    CNCE F'C= 210 KG/CM2 EN EICINDE AIMEN

    MINIE IN.DE BEIA DE CFI 4422 75 MM C7.5

    MINIE IN.DE BEIA DE CFI 4422 63 MM C7.5

    DBLE EBAHIDALICABEIAC AGA 75 MM, 63 MM

    MINIE INALACIN CDCF 75MM 22.5C7.5

    MINIE INALACIN CDCF 75MM 45C7.5

    MINIE INALACIN CDCF 75MM 90C7.5

    MINIE INALACIN CDCF 63MM 90C75

    MINI CLC.ALLA DE GAINC/AN 75 MM

    MINI CLC.ALLA DE AIE 75MM

    EGI /ALLA DE CNL, GA, AIE

    A ELANE ELIMINA

    ECA. MANAL E. EL C/IEDA4 "10 " 30%ANJA0.501.10M

    EFINE NIELACIN ANJA A=0.50M

    CAMADEA FND/ B.C, A = 0.50.H=0.10

    ELLEN C/MA. EAM50%. C/EI IBAI

    ECCINDE BEIA C/AENA,/CLAE H=0.25

    ELIMINACIN DE MA. ECED., E=25%, D. 2 KM

    MINIE IN.DE BEIADE CFI 4422 25 MM C7.5

    CNEIN DMICILIAIA AGA1/2 "INC.ACCEIB 63MM A 75MM

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %%

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %%

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    %

    2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36M1 M2 M3 M4 M5 M6 M7 M8

    D

    H

    , ,