Post on 03-Mar-2016
S10 CALCULO DEL FLETE AULAS
Obra:
Ubicacin : Localidad: San Lorenzo Distrito: Barranca Provincia: Datem del Maraon Regin: LoretoNoviembre del 2012
INSUMOS Unidad Cantidad PESO PARCIALACEITE PARA MOTOR GRADO 30 gln 2.59 4.60 11.91ALAMBRE NEGRO N16 kg 275.5500 4.50 1239.98ALAMBRE NEGRO N8 kg 1,071.6400 4.50 4822.38ASFALTO RC-250 gln 1,034.8800 14.00 14488.32CARTEL DE OBRA DE GIGANTOGRAFIA 3.60X7.20 M und 2.00 20.00 40.00CEMENTO PORTLAND TIPO I (42.5KG) BOL 37,387.0000 42.50 1588947.50CLAVOS PARA MADERA C/C 2 1/2" kg 117.1600 1.00 117.16CLAVOS PARA MADERA C/C 3" kg 1,210.2600 1.00 1210.26CURADOR ANTISOL gln 604.2700 4.00 2417.08FIERRO CORRUGADO PROMEDIO kg 2,760.4900 1.00 2760.49GASOLINA 84 OCTANOS gln 227.7000 4.60 1047.42KEROSENE gln 115.8400 0.01 1.16PINTURA DE TRAFICO gln 162.5300 4.60 747.64PINTURA ESMALTE gln 25.4000 4.80 121.92PINTURA ESMALTE PARA TRAFICO gln 97.8200 4.80 469.54SELLADOR gln 2.4500 4.60 11.27TEKNOPOR DE 1" x 4' x 8' pln 603.8300 4.50 2717.24THINER gln 393.4800 4.60 1810.01YESO DE 28 Kg BOL 273.9200 28.00 7669.76
TOTAL DE LA CARGA EN KG 1630651.02TOTAL DE LA CARGA EN TONELADAS 1630.65
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR I SAN LORENZO
PLANILLA DE METRADOS
MUNICIPALIDAD PROVINCIAL DE DATEM DEL MARAON
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
01.00.00 OBRAS PRELIMINARES01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO MET
MESAlmacen de obra 1.00 1.00TOTAL
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIGANTOGRAFIAITEM MEDIDAS
LARGO ANCHOCARTEL DE OBRATOTAL
01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM MET. N
VECESDESPUES DE PROCESAR EL PRESUPUESTO
1.00 1.00TOTAL
02.00.00 TRABAJOS PRELIMINARES02.01.00 LIMPIEZA DE TERRENO MANUAL
ITEM MEDIDASLARGO ANCHOcalle maronal desde av. Oleoducto 101.28 9.06
calle pachacutec desde av. Oleoducto 100.17 11.59calle inca roca desde av. Oleoducto 99.86 10.97
calle tnte. Pinglo a desde av. Oleoducto 94.23 11.80
calle palcazu desde av. Oleoducto 195.43 12.92
calle juan ramirez desde av. Oleoducto 534.81 15.83
calle requena desde av. Oleoducto 388.99 15.57
calle manco capac desde av. Oleoducto 404.65 14.71
calle venezuela desde calle tacna 184.93 12.05
424.55 12.60
PROYECTO: CREACION DE PISTAS, VEREDAS y SARDINELES DEL SECTOR - A - SAN LORENZO, DISTRITO BARRANCA - PROVINCIA DE DATEM DEL MARAN - REGIN LORETO.
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
699.86 11.83
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 10.86
calle costa rica desde juan ramirez hasta jose olaya 390.18 11.53
calle borja desde calle juan ramirez hasta jose olaya 397.66 11.48
TOTAL
02.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO
ITEMMEDIDAS
REA ANCHO
se tomar todo el rea del terreno (02.01.00) 59,878.49
TOTAL
03.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
ITEMMEDIDAS
Largo ANCHOcalle maronal desde av. Oleoducto 101.28 7.50
calle pachacutec desde av. Oleoducto 100.17 7.50calle inca roca desde av. Oleoducto 99.86 7.50calle tnte. Pinglo a desde av. Oleoducto 94.23 7.50
area 73.82calle palcazu desde av. Oleoducto 195.43 7.50
area 73.82
calle juan ramirez desde av. Oleoducto 534.81 7.50
area 73.82calle requena desde av. Oleoducto 388.99 7.50
area 221.46
calle manco capac desde av. Oleoducto 404.65 7.50
area 221.46
calle venezuela desde calle tacna 184.93 7.50
area 147.64
424.55 7.50
area 147.64
calle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
699.86 7.50
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 7.50
calle costa rica desde juan ramirez hasta jose olaya 390.18 7.50
calle borja desde calle juan ramirez hasta jose olaya 397.66 7.50
calle garcilazo desde calle maronal hasta manco calle capac
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
TOTAL
03.02.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 7.50
calle costa rica desde juan ramirez hasta jose olaya 390.18 7.50
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle borja desde calle juan ramirez hasta jose olaya 397.66 7.50
TOTAL
03.04.00
ITEM
ES LA MISMA AREA de PARTIDA DE LA CONFORMACION(03.03.00)
TOTAL
03.05.00
ITEM
RELLENO CON MATERIAL OVER Dmax=4", H=30 cm INC COMPACTACION EQUIPO PESADO(INC CONFORMACIN)
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMACION)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
ES LA MISMA AREA de PARTIDA DE LA CONFORMACION(03.04.00)TOTAL
04.00.00 PAVIMENTO DE CONCRETO
04.01.00 ENCOFRADO Y DESENCOFRADO DE LOSA
ITEMMEDIDAS
LARGO ANCHODE LA LONGITUDcalle maronal desde av. Oleoducto 101.28 0.20
7.50 0.20
calle pachacutec desde av. Oleoducto 100.17 0.20
7.50 0.20
calle inca roca desde av. Oleoducto 99.86 0.20
7.50 0.20
calle tnte. Pinglo a desde av. Oleoducto 94.23 0.20
7.50 0.20
6.27 0.20
calle palcazu desde av. Oleoducto 195.43 0.20
7.50 0.20
6.27 0.20
calle juan ramirez desde av. Oleoducto 534.81 0.20
7.50 0.206.27 0.20
calle requena desde av. Oleoducto 388.99 0.20
7.50 0.206.27 0.20
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle manco capac desde av. Oleoducto 404.65 0.20
7.50 0.20
6.27 0.20
calle venezuela desde calle tacna 184.93 0.20
7.50 0.20
6.27 0.20
424.55 0.20
7.50 0.206.27 0.20
699.86 0.20
7.50 0.20
calle tacna desde calle tnte. Pinglo hasta jose olaya 390.18 0.20
7.50 0.20
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.20
7.50 0.20
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.20
7.50 0.20
TOTAL
04.02.00
ITEM MEDIDAS
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
calle jose olaya desde av. Oleoducto hasta la calle borjaTRANSVERSAL( Sale de la division entera del largo entre 3.60)
calle garcilazo desde calle maronal hasta manco calle capacTRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
CONCRETO f'c= 210 kg/cm2., PARA LOSA
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETOITEM LARGO/REA ANCHO
calle maronal desde av. Oleoducto 101.28 7.50calle pachacutec desde av. Oleoducto 100.17 7.50calle inca roca desde av. Oleoducto 99.86 7.50calle tnte. Pinglo a desde av. Oleoducto 94.23 7.50
areacalle palcazu desde av. Oleoducto 195.43 7.50
areacalle juan ramirez desde av. Oleoducto 534.81 7.50
areacalle requena desde av. Oleoducto 388.99 7.50
calle manco capac desde av. Oleoducto 404.65 7.50
calle venezuela desde calle tacna 184.93 7.50
424.55 7.50
699.86 7.50
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 7.50
calle costa rica desde juan ramirez hasta jose olaya 390.18 7.50
calle borja desde calle juan ramirez hasta jose olaya 397.66 7.50
TOTAL
04.03.00 JUNTA CON ASFALTO e= 1"
ITEMMEDIDAS MET
LARGO/REA UND
calle jose olaya desde av. Oleoducto hasta la calle borja
calle garcilazo desde calle maronal hasta manco calle capac
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle maronal desde av. Oleoducto 101.28 1.00
7.50 1.00
calle pachacutec desde av. Oleoducto 100.17 1.00
7.50 1.00
calle inca roca desde av. Oleoducto 99.86 1.00
7.50 1.00
calle tnte. Pinglo a desde av. Oleoducto 94.23 1.00
7.50 1.00
6.27 1.00
calle palcazu desde av. Oleoducto 195.43 1.00
7.50 1.00
6.27 1.00
calle juan ramirez desde av. Oleoducto 534.81 1.00
7.50 1.00
6.27 1.00
calle requena desde av. Oleoducto 388.99 1.00
7.50 1.00
6.27 1.00
calle manco capac desde av. Oleoducto 404.65 1.00
7.50 1.00
6.27 1.00
calle venezuela desde calle tacna 184.93 1.00
7.50 1.00
6.27 1.00
424.55 1.00
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
7.50 1.00
6.27 1.00
699.86 1.00
7.50 1.00
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.00
7.50 1.00
calle costa rica desde juan ramirez hasta jose olaya 390.18 1.00
7.50 1.00
calle borja desde calle juan ramirez hasta jose olaya 397.66 1.00
7.50 1.00TOTAL
04.04.00 CURADO DE CONCRETO
ITEM
AREA DE PAVIMENTO
TOTAL
05.00.00 SARDINELES Y VEREDAS
05.01.00 EXCAVACION PARA SARDINELES
ITEM MEDIDASLargo ANCHOcalle maronal desde av. Oleoducto 101.28 0.30calle pachacutec desde av. Oleoducto 100.17 0.30calle inca roca desde av. Oleoducto 99.86 0.30calle tnte. Pinglo a desde av. Oleoducto 94.23 0.30calle palcazu desde av. Oleoducto 195.43 0.30calle juan ramirez desde av. Oleoducto 534.81 0.30calle requena desde av. Oleoducto 388.99 0.30calle manco capac desde av. Oleoducto 404.65 0.30calle venezuela desde calle tacna 184.93 0.30
424.55 0.30
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
calle garcilazo desde calle maronal hasta manco calle capacTRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
TRANSVERSAL( Sale de la division entera del largo entre 3.60)
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
699.86 0.30
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.30
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.30
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.30
TOTAL
05.02.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)
ITEMMEDIDAS
LARGO ALTO
calle maronal desde av. Oleoducto 101.28 0.40
cara interna 101.28 0.20
rampa 0.50
calle pachacutec desde av. Oleoducto 100.17 0.40
cara interna 100.17 0.20
rampa 0.50
calle inca roca desde av. Oleoducto 99.86 0.40
cara interna 99.86 0.20
rampa 0.50
calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40
cara interna 94.23 0.20
rampa 0.42
calle palcazu desde av. Oleoducto 195.43 0.40
cara interna 195.43 0.20
rampa 0.75
calle juan ramirez desde av. Oleoducto 534.81 0.40
cara interna 534.81 0.20
rampa 2.10
calle requena desde av. Oleoducto 388.99 0.40
calle garcilazo desde calle maronal hasta manco calle capac
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
cara interna 388.99 0.20
rampa 0.50
calle manco capac desde av. Oleoducto 404.65 0.40
cara interna 404.65 0.20
rampa 1.00
calle venezuela desde calle tacna 184.93 0.40cara interna 184.93 0.20
rampa 1.55
424.55 0.40
cara interna 424.55 0.20
rampa 0.50
699.86 0.40
cara interna 699.86 0.20
rampa 0.50
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40
cara interna 618.04 0.20
0.50
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40
cara interna 390.18 0.20
rampa 0.88
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40
cara interna 397.66 0.20
rampa 0.50
TOTAL 9279.48
05.03.00
ITEMMEDIDAS
LARGO ALTO
DE LA LONGITUD DE SARDINELES 4634.64 0.40
DEL PIE DE SARDINEL 4634.64 0.10
calle jose olaya desde av. Oleoducto hasta la calle borja
calle garcilazo desde calle maronal hasta manco calle capac
SARDINELES-CONCRETO fc= 140 Kg/cm2 C/ MEZCLADORA INCLUYE CURADO.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
TOTAL
05.04.00
ITEM MEDIDASAREA ANCHOcalle maronal desde av. Oleoducto 101.28 1.00calle pachacutec desde av. Oleoducto 100.17 1.00calle inca roca desde av. Oleoducto 99.86 1.00calle tnte. Pinglo a desde av. Oleoducto 94.23 1.00calle palcazu desde av. Oleoducto 195.43 1.00
calle juan ramirez desde av. Oleoducto 534.81 1.00
calle requena desde av. Oleoducto 388.991.00
calle manco capac desde av. Oleoducto 404.65 1.00
calle venezuela desde calle tacna 184.931.00
424.551.00
699.861.00
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.00calle costa rica desde juan ramirez hasta jose olaya 390.18 1.00calle borja desde calle juan ramirez hasta jose olaya 397.66 1.00
MARTILLOS CALLE CANTIDADcalle tnte. Pinglo a desde av. Oleoducto 1 5.00calle palcazu desde av. Oleoducto 1 4.00calle juan ramirez desde av. Oleoducto 1 11.00calle requena desde av. Oleoducto 1 14.00calle manco capac desde av. Oleoducto 1 10.00calle venezuela desde calle tacna 1 8.00
1 14.00TOTAL
05.05.00 COMPACTACIN DE TERRENO (PARA VEREDAS).
ITEMMEDIDAS
AREA ANCHO
calle maronal desde av. Oleoducto 101.28
CORTE DE TERRENO MANUAL PARA VEREDAS, E
calle jose olaya desde av. Oleoducto hasta la calle borja
calle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle pachacutec desde av. Oleoducto 100.17calle inca roca desde av. Oleoducto 99.86calle tnte. Pinglo a desde av. Oleoducto 94.23calle palcazu desde av. Oleoducto 195.43calle juan ramirez desde av. Oleoducto 534.81calle requena desde av. Oleoducto 388.99calle manco capac desde av. Oleoducto 404.65calle venezuela desde calle tacna 184.93
424.55
699.86
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04
calle costa rica desde juan ramirez hasta jose olaya 390.18
calle borja desde calle juan ramirez hasta jose olaya 397.66
MARTILLOS CALLE CANTIDAD
calle tnte. Pinglo a desde av. Oleoducto 1 5.00
calle palcazu desde av. Oleoducto 1 4.00calle juan ramirez desde av. Oleoducto 1 11.00calle requena desde av. Oleoducto 1 14.00calle manco capac desde av. Oleoducto 1 10.00calle venezuela desde calle tacna 1 8.00
1 14.00
TOTAL
05.06.00 RELLENO CON MATERIAL GRANULAR e=4"ITEM MEDIDASAREA ALTO
DEL AREA DE VEREDAS 5268.16 0.10TOTAL
05.07.00 ENCOFRADO Y DESENCOFRADO PARA VEREDA
ITEMMEDIDAS
LARGO ALTO/AREADEL AREA DE VEREDAS
calle maronal desde av. Oleoducto 101.28 0.20
1.00 0.20calle pachacutec desde av. Oleoducto 100.17 0.20
1.00 0.20calle inca roca desde av. Oleoducto 99.86 0.20
1.00 0.20calle tnte. Pinglo a desde av. Oleoducto 94.23 0.20
calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 0.20calle palcazu desde av. Oleoducto 195.43 0.20
1.00 0.20calle juan ramirez desde av. Oleoducto 534.81 0.20
1.00 0.20calle requena desde av. Oleoducto 388.99 0.20
1.00 0.20calle manco capac desde av. Oleoducto 404.65 0.20
1.00 0.20calle venezuela desde calle tacna 184.93 0.20
1.00 0.20424.55 0.20
1.00 0.20
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
699.86 0.201.00 0.20
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.201.00 0.20
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.201.00 0.20
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.201.00 0.20
TOTAL
05.08.00 ENCOFRADO DE MARTILLOS DE VEREDASMARTILLOS LONGITUD CANTIDADcalle tnte. Pinglo a desde av. Oleoducto 6.26 5.00calle palcazu desde av. Oleoducto 6.25 4.00calle juan ramirez desde av. Oleoducto 6.23 11.00calle requena desde av. Oleoducto 6.3 14.00calle manco capac desde av. Oleoducto 6.25 10.00calle venezuela desde calle tacna 6.76 8.00
6.12 14.00TOTAL 15.83
05.09.00ITEM MEDIDASLARGO ALTO/AREA
LA MISMA QUE EL AREA DE LAS VEREDAS (05.06.00) 5268.16UAS 5268.16 0.043
TOTAL
05.10.00 JUNTA CON ASFALTO E=1"ITEM MEDIDASLONGITUD LONGITUD
DE LAS VEREDAS, CADA 3 METROS (4518.71/3.00) 1.00DE LOS SARDINELES, CADA 3.00 m(3572.00/3) 0.15
TOTAL
05.11.00 CURADO DE CONCRETO VEREDASITEM
AREA DE VEREDASTOTAL
07.00.00 CUNETAS07.01.00 CORTE DE TERRENO MANUAL PARA CUNETAS
ITEM MEDIDASLargo ANCHOcalle maronal desde av. Oleoducto 101.28 0.40calle pachacutec desde av. Oleoducto 100.17 0.40calle inca roca desde av. Oleoducto 99.86 0.40
calle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
CONCRETO fc=140 kg/cm2. VEREDA
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40calle palcazu desde av. Oleoducto 195.43 0.40calle juan ramirez desde av. Oleoducto 534.81 0.40calle requena desde av. Oleoducto 388.99 0.40calle manco capac desde av. Oleoducto 404.65 0.40calle venezuela desde calle tacna 184.93 0.40
424.55 0.40
699.86 0.40
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40martillocalle tnte. Pinglo a desde av. Oleoducto 6.26 0.40calle palcazu desde av. Oleoducto 6.25 0.40calle juan ramirez desde av. Oleoducto 6.23 0.40calle requena desde av. Oleoducto 6.3 0.40calle manco capac desde av. Oleoducto 6.25 0.40calle venezuela desde calle tacna 6.76 0.40
6.12 0.40TOTAL
calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
07.02.00 COMPACTACIN DE TERRENO (PARA CUNETAS).
ITEM MEDIDASLargo ANCHOcalle maronal desde av. Oleoducto 101.28 0.40calle pachacutec desde av. Oleoducto 100.17 0.40calle inca roca desde av. Oleoducto 99.86 0.40calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40calle palcazu desde av. Oleoducto 195.43 0.40calle juan ramirez desde av. Oleoducto 534.81 0.40calle requena desde av. Oleoducto 388.99 0.40calle manco capac desde av. Oleoducto 404.65 0.40calle venezuela desde calle tacna 184.93 0.40
424.55 0.40
699.86 0.40
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40
martillo 0.40calle tnte. Pinglo a desde av. Oleoducto 6.26 0.40calle palcazu desde av. Oleoducto 6.25 0.40calle juan ramirez desde av. Oleoducto 6.23 0.40
calle requena desde av. Oleoducto 6.3 0.40
calle manco capac desde av. Oleoducto 6.25 0.40calle venezuela desde calle tacna 6.76 0.40
6.12 0.40TOTAL
07.03.00 ENCOFRADO Y DESENCOFRADO PARA CUNETAS
ITEM MEDIDASLARGO ANCHO
DE LA LONGITUDcalle maronal desde av. Oleoducto 101.28 0.20
0.40 0.20calle pachacutec desde av. Oleoducto 100.17 0.20
0.40 0.20calle inca roca desde av. Oleoducto 99.86 0.20
0.40 0.20calle tnte. Pinglo a desde av. Oleoducto 94.23 0.20
0.40 0.20calle palcazu desde av. Oleoducto 195.43 0.20
calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
0.40 0.20calle juan ramirez desde av. Oleoducto 534.81 0.20calle requena desde av. Oleoducto 388.99 0.20calle requena desde av. Oleoducto 388.99 0.20
0.40 0.20calle manco capac desde av. Oleoducto 404.65 0.20
0.40 0.20calle venezuela desde calle tacna 184.93 0.20
0.40 0.20
424.55 0.20
0.40 0.20
699.86 0.20
0.40 0.20
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.20
0.40 0.20
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.20
0.40 0.20
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.20
martillocalle tnte. Pinglo a desde av. Oleoducto 6.26 0.20
0.40 0.20calle palcazu desde av. Oleoducto 6.25 0.20
0.40 0.20calle juan ramirez desde av. Oleoducto 6.23 0.20
0.40 0.20calle requena desde av. Oleoducto 6.3 0.20
0.20calle manco capac desde av. Oleoducto 6.25 0.20
0.40 0.20calle venezuela desde calle tacna 6.76 0.20
0.40 0.20
6.12 0.20
0.40 0.20TOTAL
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)calle jose olaya desde av. Oleoducto hasta la calle borjaTRANSVERSAL( Sale de la division entera del largo entre 3.0)calle garcilazo desde calle maronal hasta manco calle capacTRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)
TRANSVERSAL( Sale de la division entera del largo entre 3.0)calle jose olaya desde av. Oleoducto hasta la calle borjaTRANSVERSAL( Sale de la division entera del largo entre 3.0)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
07.04.00 SOLADO MEZCLA C:H 1:12, E=10 cm
ITEM MEDIDAS
Largo ANCHO
calle maronal desde av. Oleoducto 101.28 0.40
calle pachacutec desde av. Oleoducto 100.17 0.40calle inca roca desde av. Oleoducto 99.86 0.40calle tnte. Pinglo a desde av. Oleoducto 94.23 0.40
calle palcazu desde av. Oleoducto 195.43 0.40
calle juan ramirez desde av. Oleoducto 534.81 0.40calle requena desde av. Oleoducto 388.99 0.40calle manco capac desde av. Oleoducto 404.65 0.40calle venezuela desde calle tacna 184.93 0.40
424.55 0.40
699.86 0.40
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.40
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.40
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.40martillocalle tnte. Pinglo a desde av. Oleoducto 6.26 0.40calle palcazu desde av. Oleoducto 6.25 0.40calle juan ramirez desde av. Oleoducto 6.23 0.40calle requena desde av. Oleoducto 6.3 0.40
calle manco capac desde av. Oleoducto 6.25 0.40
calle venezuela desde calle tacna 6.76 0.40
6.12 0.40
TOTAL
07.05.00 CONCRETO fC= 140 kg/cm2 PARA CUNETAS
ITEM MEDIDASLargo AREAcalle maronal desde av. Oleoducto 101.28 0.06calle pachacutec desde av. Oleoducto 100.17 0.06calle inca roca desde av. Oleoducto 99.86 0.06calle tnte. Pinglo a desde av. Oleoducto 94.23 0.06calle palcazu desde av. Oleoducto 195.43 0.06calle juan ramirez desde av. Oleoducto 534.81 0.06calle requena desde av. Oleoducto 388.99 0.06calle manco capac desde av. Oleoducto 404.65 0.06calle venezuela desde calle tacna 184.93 0.06
424.55 0.06
calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
699.86 0.06
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 0.06
calle costa rica desde juan ramirez hasta jose olaya 390.18 0.06
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.06martillo 0.06
calle tnte. Pinglo a desde av. Oleoducto 6.26 0.06
calle palcazu desde av. Oleoducto 6.25 0.06
calle juan ramirez desde av. Oleoducto 6.23 0.06
calle requena desde av. Oleoducto 6.3 0.06calle manco capac desde av. Oleoducto 6.25 0.06calle venezuela desde calle tacna 6.76 0.06
6.12 0.06TOTAL
07.06.00 JUNTA CON ASFALTO E=1"
ITEM
MEDIDAS MET
LARGO/REA UND
DE LAS CALLES
calle maronal desde av. Oleoducto 101.28 1.00TRANSVERSAL 0.40 1.00calle pachacutec desde av. Oleoducto 100.17 1.00TRANSVERSAL 0.40 1.00calle inca roca desde av. Oleoducto 99.86 1.00TRANSVERSAL 0.40 1.00calle tnte. Pinglo a desde av. Oleoducto 94.23 1.00TRANSVERSAL 0.40 1.00calle palcazu desde av. Oleoducto 195.43 1.00TRANSVERSAL 0.40 1.00calle juan ramirez desde av. Oleoducto 534.81 1.00TRANSVERSAL 0.40 1.00calle requena desde av. Oleoducto 388.99 1.00TRANSVERSAL 0.40 1.00calle manco capac desde av. Oleoducto 404.65 1.00TRANSVERSAL 0.40 1.00calle venezuela desde calle tacna 184.93 1.00TRANSVERSAL 0.40 1.00
424.55 1.00TRANSVERSAL 0.40 1.00
699.86 1.00TRANSVERSAL 0.40 1.00
calle garcilazo desde calle maronal hasta manco calle capac
calle jose olaya desde av. Oleoducto hasta la calle borja
calle jose olaya desde av. Oleoducto hasta la calle borja
calle garcilazo desde calle maronal hasta manco calle capac
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.00TRANSVERSAL 0.40 1.00calle costa rica desde juan ramirez hasta jose olaya 390.18 1.00TRANSVERSAL 0.40 1.00calle borja desde calle juan ramirez hasta jose olaya 397.66 1.00TRANSVERSAL 0.40 1.00martillocalle tnte. Pinglo a desde av. Oleoducto 1.00TRANSVERSAL 6.26 1.00calle palcazu desde av. Oleoducto 0.40 1.00TRANSVERSAL 6.25 1.00calle juan ramirez desde av. Oleoducto 0.40 1.00TRANSVERSAL 6.23 1.00calle requena desde av. Oleoducto 0.40 1.00TRANSVERSAL 6.3 1.00calle manco capac desde av. Oleoducto 1.00TRANSVERSAL 6.25 1.00calle venezuela desde calle tacna 0.40 1.00TRANSVERSAL 6.76 1.00
0.40 1.00TRANSVERSAL 6.12 1.00TOTAL
08.00.00 SEALIZACIN
08.01.00 PINTADO DE PAVIMENTO
ITEM MEDIDASLARGO ANCHOarea del pavimentocalle maronal desde av. Oleoducto Linea Discontinua, central 101.28 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle pachacutec desde av. Oleoducto Linea Discontinua, central 100.17 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle inca roca desde av. Oleoducto Linea Discontinua, central 99.86 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle tnte. Pinglo a desde av. Oleoducto Linea Discontinua, central 94.23 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle palcazu desde av. Oleoducto Linea Discontinua, central 195.43 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle juan ramirez desde av. Oleoducto Linea Discontinua, central 534.81 0.10Lineas de pase peatonal 3.00 0.5
calle jose olaya desde av. Oleoducto hasta la calle borja
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
Linea Transversal 7.50 0.5calle requena desde av. Oleoducto Linea Discontinua, central 388.99 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle manco capac desde av. Oleoducto Linea Discontinua, central 404.65 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle venezuela desde calle tacnaLinea Discontinua, central 184.93 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5
Linea Discontinua, central 424.55 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5
Linea Discontinua, central 699.86 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle tacna desde calle tnte. Pinglo hasta jose olayaLinea Discontinua, central 618.04 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle costa rica desde juan ramirez hasta jose olayaLinea Discontinua, central 390.18 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5calle borja desde calle juan ramirez hasta jose olayaLinea Discontinua, central 397.66 0.10Lineas de pase peatonal 3.00 0.5Linea Transversal 7.50 0.5TOTAL
08.02.00 PINTADO DE SARDINELES ITEM MEDIDASLONGITUD ANCHO
LONG. TOTAL DE sardineles 4634.64 0.35TOTAL
09.00.00 MANTENIMIENTO DE TRANSITO
09.01.00 MANTENIMIENTO DE TRANSITOITEM MET. MET.Glb. TOTAL
MANTENIMIENTO DE TRANSITO 1.00 1.00TOTAL 1.00
10.00.00 FLETE
calle jose olaya desde av. Oleoducto hasta la calle borja
calle garcilazo desde calle maronal hasta manco calle capac
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
10.01.00 ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
11.02.00 SEMBRADO DE GRASS EN JARDINERAS
ITEM MEDIDASLARGO ANCHODEL SEMBRADO DE GRASScalle maronal desde av. Oleoducto 101.28 0.84calle pachacutec desde av. Oleoducto 100.17 0.47
calle inca roca desde av. Oleoducto 99.86 0.00
calle tnte. Pinglo a desde av. Oleoducto 94.23 0.48
calle palcazu desde av. Oleoducto 195.43 1.20
calle juan ramirez desde av. Oleoducto 534.81 2.50
calle requena desde av. Oleoducto 388.99 0.64
calle manco capac desde av. Oleoducto 404.65 2.55
calle venezuela desde calle tacna 184.93 0.94
424.55 0.69
699.86 0.49
calle tacna desde calle tnte. Pinglo hasta jose olaya 618.04 1.65
calle costa rica desde juan ramirez hasta jose olaya 390.18 1.60
calle borja desde calle juan ramirez hasta jose olaya 397.66 0.65
TOTAL
11.03.00 SEMBRADO DE PLANTONES
ITEM MET. NCALLEScalle costa rica desde juan ramirez hasta jose olaya 2.00
2.00
2.00
12.00TOTAL
11.04.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET. NVECES
Acondicionamiento de botaderos1.00 1.00Programacin de sealizacin ambiental
Capacitacin en operacin y mantenimiento
calle jose olaya desde av. Oleoducto hasta la calle borjacalle garcilazo desde calle maronal hasta manco calle capac
calle requena capac desde av. Oleoducto entre calle costa rica y calle tacnacalle manco capac desde av. Oleoducto entre calle costa rica y calle tacnacalle costa rica desde calle venezuela hasta calle jose olaya
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
TOTAL
11.05.00 MANTENIMIENTO DE TRANSITOITEM MET. NVECES
Cinta de sealizacion de peligro1.00 6.00Cartel de sealizacion
TranquerasTOTAL
11.06.00 LIMPIEZA FINAL DE OBRAITEM MET. NM2 VECES
LIMPIEZA FINAL DE LA OBRA 59878.49 1.00TOTAL
RESUMEN DE METRADOS01.00.00 OBRAS PRELIMINARES01.01.00 ALQUILER DE LOCAL PARA LA OBRA
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIG01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPO
02.00.00 TRABAJOS PRELIMINARES02.01.00 LIMPIEZA DE TERRENO MANUAL 02.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO
03.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
03.02.00
03.03.00 CONFORMACION Y COMPACTACION DE SUBRASANTE
03.04.00
03.05.00
04.00.00 PAVIMENTO DE CONCRETO04.01.00 ENCOFRADO Y DESENCOFRADO DE LOSA04.02.0004.03.00 JUNTA CON ASFALTO e= 1"04.04.00 CURADO DE CONCRETO
05.00.00 SARDINELES Y VEREDAS05.01.00 EXCAVACION PARA SARDINELES05.02.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)05.03.00
05.04.0005.05.00 COMPACTACIN DE TERRENO (PARA VEREDAS).05.06.00 RELLENO CON MATERIAL GRANULAR e=4"05.07.00 ENCOFRADO Y DESENCOFRADO PARA VEREDA05.08.00 ENCOFRADO DE MARTILLOS DE VEREDAS05.09.0005.10.00 JUNTA CON ASFALTO E=1"05.11.00 CURADO DE CONCRETO VEREDAS
06.00.00 CUNETAS06.01.00 CORTE DE TERRENO MANUAL PARA CUNETAS06.02.00 COMPACTACIN DE TERRENO (PARA CUNETAS).06.03.00 ENCOFRADO Y DESENCOFRADO PARA CUNETAS06.04.00 SOLADO MEZCLA C:H 1:12, E=10 cm06.05.00 CONCRETO fC= 140 kg/cm2 PARA CUNETAS06.06.00 JUNTA CON ASFALTO E=1"
07.00.00 SEALIZACIN07.01.00 PINTADO DE PAVIMENTO 07.02.00 PINTADO DE SARDINELES
08.00.00 FLETE08.01.00 ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
PLANILLA DE METRADOS
MUNICIPALIDAD PROVINCIAL DE DATEM DEL MARAON
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
METTOTAL
1.00
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIGANTOGRAFIAN MET METREP Glb TOTAL
2.002.00 Und.
MOVILIZACION Y DEZMOVILIZACION DE EQUIPOMETTOTAL
1.001.00
N MET METREP TOTAL
1.00 917.60 917.60
1.00 1160.97 1160.971.00 1095.46 1095.46
1.00 1111.91 1111.9173.82 73.82
1.00 2524.96 2524.96
73.82 73.82
1.00 8466.04 8466.04
73.82 73.82
1.00 6056.57 6056.57
221.46 221.46
1.00 5952.40 5952.40
221.46 221.46
1.00 2228.41 2228.41
147.64 147.64
1.00 5349.33 5349.33
PROYECTO: CREACION DE PISTAS, VEREDAS y SARDINELES DEL SECTOR - A - SAN LORENZO, DISTRITO BARRANCA - PROVINCIA DE DATEM DEL MARAN - REGIN LORETO.
m2.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
147.64 147.64
1.00 8279.34 8279.34
1.00 6711.91 6711.91
1.00 4498.78 4498.78
1.00 4565.14 4565.14
59,878.49
TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPON MET MET
VECES TOTAL1.00 59,878.49 59,878.49
59,878.49
MOVIMIENTO DE TIERRAS PAVIMENTOCORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
MEDIDAS N VOLALTO VOLUMEN
0.90 1.00 683.64
0.90 1.00 676.150.90 1.00 674.060.90 1.00 636.050.90 1.00 66.440.90 1.00 1319.15
0.90 1.00 66.44
0.90 1.00 3609.97
0.90 1.00 66.440.90 1.00 2625.68
0.90 1.00 199.31
0.90 1.00 2731.39
0.90 1.00 199.31
0.90 1.00 1248.28
0.90 1.00 132.88
0.90 1.00 2865.71
0.90 1.00 132.88
m2.
(m3)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
0.90 1.00 4724.06
0.90 1.00 4171.77
0.90 1.00 2633.72
0.90 1.00 2684.21m3
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
32,147.51
ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 4635.30 4635.30
1.00 2926.35 2926.35
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 2982.45 2982.45
35,719.46
CANTIDAD ESPESOR VOL
e=
35,719.46 0.30 10715.84
10,715.84
CANTIDAD ESPESOR VOL
e=
RELLENO CON MATERIAL OVER Dmax=4", H=30 cm INC COMPACTACION EQUIPO PESADO(INC CONFORMACIN)
(m3)
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC
(m3)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
35,719.46 35719.46 35,719.46
ENCOFRADO Y DESENCOFRADO DE LOSA
CANTIDADN MET.
REP
3.00 1.00 60.7727.75 1.00 41.63
3.00 1.00 60.10
27.44 1.00 41.16
3.00 1.00 59.92
27.74 1.00 41.61
3.00 1.00 56.54
26.18 1.00 39.27
4.00 1.00 5.02
3.00 1.00 117.26
54.29 1.00 81.44
6.00 1.00 7.52
3.00 1.00 320.89
54.29 1.00 81.4412.00 1.00 15.05
3.00 1.00 233.39
54.29 1.00 81.4414.00 1.00 17.56
m2.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
3.00 1.00 242.79
54.29 1.00 81.44
12.00 1.00 15.05
3.00 1.00 110.96
54.29 1.00 81.44
8.00 1.00 10.03
3.00 1.00 254.73
54.29 1.00 81.4414.00 1.00 17.56
3.00 1.00 419.92
54.29 1.00 81.44
3.00 1.00 234.11
54.29 1.00 81.44
3.00 1.00 234.11
54.29 1.00 81.44
3.00 1.00 238.60
54.29 1.00 81.44
3,709.86
AREA ESPESOR MET.., PARA LOSA
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
m2. m. m3.759.60 0.20 151.92751.28 0.20 150.26748.95 0.20 149.79706.73 0.20 141.35
73.82 0.20 14.761465.73 0.20 293.15
73.82 0.20 14.764011.08 0.20 802.22
73.82 0.20 14.762917.43 0.20 583.49
221.46 0.20 44.293034.88 0.20 606.98
221.46 0.20 44.291386.98 0.20 277.40
147.64 0.20 29.53
3184.13 0.20 636.83
147.64 0.20 29.53
5248.95 0.20 1049.79
4635.30 0.20 927.06
2926.35 0.20 585.27
2982.45 0.20 596.49
35719.46 7,143.89
N CANTIDAD
VECES m.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
3.00 303.84
27.75 208.13
3.00 300.51
27.44 205.80
3.00 299.58
27.74 208.05
3.00 282.69
26.18 196.35
4.00 25.08
3.00 586.29
54.29 407.18
6.00 37.62
3.00 1604.43
54.29 407.18
12.00 75.24
3.00 1166.97
54.29 407.18
14.00 87.78
3.00 1213.95
54.29 407.18
12.00 75.24
3.00 554.79
54.29 407.18
8.00 50.16
3.00 1273.65
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
54.29 407.18
14.00 87.78
3.00 2099.58
54.29 407.18
3.00 1854.12
54.29 407.18
3.00 1170.54
54.29 407.18
3.00 1192.98
54.29 407.18 19,232.90 m.
CANTIDADN MET.
VECES
35719.460 1.00 35719.46
35,719.46
MEDIDAS N VOLALTO VECES
0.50 2.00 30.380.50 2.00 30.050.50 2.00 29.960.50 2.00 28.270.50 2.00 58.630.50 2.00 160.440.50 2.00 116.700.50 2.00 121.400.50 2.00 55.480.50 2.00 127.37
m2.
(m3)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
0.50 2.00 209.96
0.50 2.00 185.41
0.50 2.00 117.05
0.50 2.00 119.30
1,390.39
SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)
N N MET
VECES REPETICIONES TOTAL
1.00 1.00 40.51
1.00 2.00 40.51
1.00 2.00 1.00
1.00 1.00 40.07
1.00 2.00 40.07
1.00 2.00 1.00
1.00 1.00 39.94
1.00 2.00 39.94
1.00 2.00 1.00
1.00 1.00 37.69
1.00 2.00 37.69
1.00 2.00 0.84
1.00 1.00 78.17
1.00 2.00 78.17
1.00 2.00 1.50
1.00 1.00 213.92
1.00 2.00 213.92
1.00 2.00 4.20
1.00 1.00 155.60
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 2.00 155.60
1.00 2.00 1.00
1.00 1.00 161.86
1.00 2.00 161.86
1.00 2.00 2.00
1.00 1.00 73.971.00 2.00 73.97
1.00 2.00 3.10
1.00 1.00 169.82
1.00 2.00 169.82
1.00 2.00 1.00
1.00 1.00 279.94
1.00 2.00 279.94
1.00 2.00 1.00
1.00 1.00 247.22
1.00 2.00 247.22
1.00 2.00 1.00
1.00 1.00 156.07
1.00 2.00 156.07
1.00 2.00 1.76
1.00 1.00 159.06
1.00 2.00 159.06
1.00 2.00 1.00
3,729.11
MEDIDAS N N VOL. TOTAL
ANCHO VECES REPETICIONES m3
0.15 1.00 1.00 278.078
0.30 1.00 1.00 139.039
SARDINELES-CONCRETO fc= 140 Kg/cm2 C/ MEZCLADORA INCLUYE CURADO.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
417.12
MEDIDAS N VOLALTO VECES0.20 1.00 20.260.20 1.00 20.030.20 1.00 19.97
0.20 1.00 18.85
0.20 1.00 39.09
0.20 1.00 106.96
0.201.00 77.80
0.20 1.00 80.93
0.201.00 36.99
0.201.00 84.91
0.201.00 139.97
0.20 1.00 123.61
0.20 1.00 78.04
0.20 1.00 79.53
AREA ALTURA CORTE 0.008.19 0.20 8.199.41 0.20 7.53
11.97 0.20 26.339.89 0.20 27.699.28 0.20 18.568.81 0.20 14.10
8.68 0.20 24.30 1,053.63
COMPACTACIN DE TERRENO (PARA VEREDAS).
N MET METREP TOTAL
1.00 101.28
CORTE DE TERRENO MANUAL PARA VEREDAS, EPROM.=0.20m.
(m3)
m2.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 100.171.00 99.861.00 94.231.00 195.431.00 534.811.00 388.991.00 404.651.00 184.931.00 424.55
1.00 699.86
1.00 618.04
1.00 390.18
1.00 397.66
AREA ALTURA CORTE 0.00
8.19 1.00 40.95
9.41 1.00 37.6411.97 1.00 131.67
9.89 1.00 138.469.28 1.00 92.808.81 1.00 70.488.68 1.00 121.52
5,268.16
RELLENO CON MATERIAL GRANULAR e=4"N VOL. MET
VECES m3 TOTAL1.00 526.82 526.82
526.82
ENCOFRADO Y DESENCOFRADO PARA VEREDAN N MET
VECES REPETICIONES TOTAL
2.00 1.00 40.512
33.76 1.00 6.7522.00 1.00 40.068
33.39 1.00 6.6782.00 1.00 39.944
33.28 1.00 6.6562.00 1.00 37.692
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
31.41 1.00 6.2822.00 1.00 78.172
65.15 1.00 13.0302.00 1.00 213.924
178.27 1.00 35.6542.00 1.00 155.596
129.66 1.00 25.9322.00 1.00 161.860
134.88 1.00 26.9762.00 1.00 73.972
61.64 1.00 12.3282.00 1.00 169.820
141.52 1.00 28.304
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
2.00 1.00 279.944233.29 1.00 46.658
2.00 1.00 247.216206.01 1.00 41.202206.00 1.00 16075.416
2.00 1.00 0.4002.00 1.00 159.064
132.55 1.00 26.510 18,056.56
ENCOFRADO DE MARTILLOS DE VEREDASALTURA 0.00
0.20 6.260.20 5.000.20 13.710.20 17.640.20 12.500.20 10.820.20 17.14
83.06
MEDIDAS N METANCHO REPETICIONES TOTAL
0.10 1.00 526.821.00 226.53
753.35
JUNTA CON ASFALTO E=1"N MET MET
VECES m. TOTAL1756.00 1756.00 1756.001545.00 231.75 231.75
1987.75
CANTIDAD N METVECES TOTAL
5268.16 1.00 5268.16 5,268.16
CORTE DE TERRENO MANUAL PARA CUNETASMEDIDAS N VOL
ALTO VECES0.50 2.00 40.510.50 2.00 40.070.50 2.00 39.94
. VEREDA
(m3)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
0.50 2.00 37.690.50 2.00 78.170.50 2.00 213.920.50 2.00 155.600.50 2.00 161.860.50 2.00 73.970.50 2.00 169.82
0.50 2.00 279.94
0.50 2.00 247.22
0.50 2.00 156.070.50 2.00 159.06
0.50 5.00 6.260.50 4.00 5.000.50 11.00 13.710.50 14.00 17.640.50 10.00 12.500.50 8.00 10.820.50 14.00 17.14
1,936.91
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
COMPACTACIN DE TERRENO (PARA CUNETAS).MEDIDAS N AREA
ALTO VECES2.00 81.022.00 80.142.00 79.892.00 75.382.00 156.342.00 427.852.00 311.192.00 323.722.00 147.942.00 339.64
2.00 559.89
2.00 494.43
2.00 312.14
2.00 318.13
0.005.00 12.524.00 10.00
11.00 27.41
14.00 35.28
10.00 25.008.00 21.63
14.00 34.27 3,873.83
ENCOFRADO Y DESENCOFRADO PARA CUNETAS
CANTIDAD N MET.REP
2.00 1.00 40.512.00 1.00 0.162.00 1.00 40.072.00 1.00 0.162.00 1.00 39.942.00 1.00 0.162.00 1.00 37.692.00 1.00 0.162.00 1.00 78.17
(m2)
m2.
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
2.00 1.00 0.162.00 1.00 213.922.00 1.00 155.602.00 1.00 155.602.00 1.00 0.162.00 1.00 161.862.00 1.00 0.162.00 1.00 73.972.00 1.00 0.16
2.00 1.00 169.82
2.00 1.00 0.16
2.00 1.00 279.94
2.00 1.00 0.16
2.00 1.00 247.22
2.00 1.00 0.16
2.00 1.00 156.07
2.00 1.00 0.16
2.00 1.00 159.06
0.002.00 1.00 2.505.00 1.00 0.402.00 1.00 2.504.00 1.00 0.322.00 1.00 2.49
11.00 1.00 0.882.00 1.00 2.52
14.00 1.00 0.002.00 1.00 2.50
10.00 1.00 0.802.00 1.00 2.708.00 1.00 0.64
2.00 1.00 2.45
14.00 1.00 1.12 3,281.31
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
MEDIDAS N AREA
ALTO VOLUMEN
0.00 1.00 40.51
0.00 1.00 40.070.00 1.00 39.940.00 1.00 37.69
0.00 1.00 78.17
0.00 1.00 213.920.00 1.00 155.600.00 1.00 161.860.00 1.00 73.970.00 1.00 169.82
0.00 1.00 279.94
0.00 1.00 247.22
0.00 1.00 156.07
0.00 1.00 159.06
0.00 1.00 2.500.00 1.00 2.500.00 1.00 2.490.00 1.00 2.52
0.00 1.00 2.50
0.00 1.00 2.70
0.00 1.00 2.45
1,871.52
CONCRETO fC= 140 kg/cm2 PARA CUNETAS
MEDIDAS N VOLUMENALTO VOLUMEN
0.00 1.00 6.080.00 1.00 6.010.00 1.00 5.990.00 1.00 5.650.00 1.00 11.730.00 1.00 32.090.00 1.00 23.340.00 1.00 24.280.00 1.00 11.100.00 1.00 25.47
(m2)
(m3)
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
0.00 1.00 41.99
0.00 1.00 37.08
0.00 1.00 23.41
0.00 1.00 23.860.00 1.00 0.00
0.00 1.00 0.38
0.00 1.00 0.38
0.00 1.00 0.37
0.00 1.00 0.380.00 1.00 0.380.00 1.00 0.410.00 1.00 0.37
280.73
N CANTIDAD
VECES m.
2.00 202.562.00 0.802.00 200.342.00 0.802.00 199.722.00 0.802.00 188.462.00 0.802.00 390.862.00 0.802.00 1069.622.00 0.802.00 777.982.00 0.802.00 809.302.00 0.802.00 369.862.00 0.802.00 849.102.00 0.802.00 1399.722.00 0.80
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
2.00 1236.082.00 0.802.00 780.362.00 0.802.00 795.322.00 0.80
2.00 0.005.00 31.302.00 0.804.00 25.002.00 0.80
11.00 68.532.00 0.80
14.00 88.202.00 0.00
10.00 62.502.00 0.808.00 54.080.00 0.00
14.00 85.68 9,698.97
N N METVECES CANTIDAD
1.00 1.00 10.1289.00 1.00 13.51.00 1.00 3.75
1.00 1.00 10.0179.00 1.00 13.51.00 1.00 3.75
1.00 1.00 9.9869.00 1.00 13.51.00 1.00 3.75
1.00 1.00 9.4239.00 3.00 40.51.00 3.00 11.25
1.00 1.00 19.5439.00 3.00 40.51.00 3.00 11.25
1.00 1.00 53.4819.00 7.00 94.5
m2
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 7.00 26.25
1.00 1.00 38.8999.00 7.00 94.51.00 7.00 26.25
1.00 1.00 40.4659.00 7.00 94.51.00 7.00 26.25
1.00 1.00 18.4939.00 4.00 541.00 4.00 15
1.00 1.00 42.4559.00 7.00 94.51.00 7.00 26.25
1.00 1.00 69.9869.00 14.00 1891.00 14.00 52.5
1.00 1.00 61.8049.00 12.00 1621.00 12.00 45
1.00 1.00 39.0189.00 8.00 1081.00 8.00 30
1.00 1.00 39.7669.00 7.00 94.51.00 7.00 26.25
1877.96
N MET METVECES m.2 TOTAL
1.00 1622.12 1622.124 1,622.12
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
SEMBRADO DE GRASS EN JARDINERASN MET MET
REP TOTAL
85.0847.08
0.00
45.23
234.52
1337.03
248.95
1031.86
173.83
292.94
342.93
1019.77
624.29
258.48
5,741.98
N MET.PLANTAS TOTAL
20 40
10 20
20 40
20 240 340.00 UND
MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALMET.
TOTAL
m2.
m2
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
1.00 GLB
MET.TOTAL
6.00 GLB
LIMPIEZA FINAL DE OBRAMET.
TOTAL59878.49
59,878.49 M2
RESUMEN DE METRADOS
1.00 mesCARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 7.20 m CON GIG 2.00 und.MOVILIZACION Y DEZMOVILIZACION DE EQUIPO 1.00 und.
59878.49 m2TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO 59878.49 m2
MOVIMIENTO DE TIERRAS PAVIMENTO
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO 32147.51 m3
42077.24 m3CONFORMACION Y COMPACTACION DE SUBRASANTE 35719.46 m2
10715.84 m3
35719.46 m2
ENCOFRADO Y DESENCOFRADO DE LOSA 3709.86 m37143.89 m2
19232.90 m35719.46 m2
1390.39 m3SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M) 3729.11 m2
417.12 m3
1053.63 m3COMPACTACIN DE TERRENO (PARA VEREDAS). 5268.16 m2RELLENO CON MATERIAL GRANULAR e=4" 526.82 m3ENCOFRADO Y DESENCOFRADO PARA VEREDA 18056.56 m2ENCOFRADO DE MARTILLOS DE VEREDAS 83.06 m2
753.35 m31987.75 m5268.16 m2
3.00CORTE DE TERRENO MANUAL PARA CUNETAS 1936.91 m3COMPACTACIN DE TERRENO (PARA CUNETAS). 3873.83 m2ENCOFRADO Y DESENCOFRADO PARA CUNETAS 3281.31 m2
1871.52 m2CONCRETO fC= 140 kg/cm2 PARA CUNETAS 280.73 m3
9698.97 m
1877.96 m21622.12 m2
ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
PLANILLA DE METRADOS SECTOR - A - PAVIMENTO DE CONCRETO
PLANILLA DE METRADOS
MUNICIPALIDAD PROVINCIAL DE DATEN DEL MARAON
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR I SAN LORENZO1.00.00 OBRAS PRELIMINARES
01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO N MET
MESAlmacen de obra 6 6.00TOTAL
01.02.00 CARTEL DE OBRA EN MADERA DE 3.60M X 2.40M
ITEM MEDIDAS N METLARGO ANCHO REP Glb
CARTEL DE OBRA 2.00TOTAL
01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM VOL FACTOR DE VOL. TOTAL
ESPONJAMIE (m3)DESPUES DE PROCESAR EL PRESUPUESTOPIEDRA PARA ADOQUIN 1.000 1.00 1.00TOTAL 1.00
2.00.00 TRABAJOS PRELIMINARES
2.01.00 LIMPIEZA DE TERRENO MANUAL
ITEM MEDIDAS N METLARGO ANCHO REP M2
502.337.80 1.00 3918.17
629.607.80 1.00 4910.88
246.21 7.80 1.00 1920.44
1114.117.80 1.00 8690.06
TOTAL 2492.25 31.20
2.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPOITEM MEDIDAS N MET
area ANCHO VECES M219439.55 1.00 19439.55
(m3)
calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta MaraonCalle Maraon, desde Huallaga hasta Sargento LouresCalle Tigre, desde Oleoducto hasta Amazonas
se tomara todo el area de la obra
PLANILLA DE METRADOS
TOTALobra
PLANILLA DE METRADOS
2.03.00 Reparacion y Reposicion de cajas de agua, incluye instalacionITEM MEDIDAS N MET
cantidad VECES M2
Para nivelar las cajas de agua150.00 1 150.00
TOTAL
2.04.00 Reparacion y Reposicion de cajas de desague ITEM MEDIDAS N MET
cantidad ANCHO VECES M2
Para nivelar las cajas de desague150.00 1 150.00
TOTAL
3.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO
03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
ITEM MEDIDAS NLargo ANCHO ALTO VECES
para el pavimento y veredas
502.33 7.80 0.60 1.00
629.60 7.80 0.60 1.00
246.21 7.80 0.601.00
1114.11 7.80 0.601.00
TOTAL
03.02.00 DEMOLICIN DE VEREDAS
ITEMMEDIDAS VOL FACTOR DE
AREA (m2) EXPANSIN
DEMOLICION DE VEREDAS 1800.00 1800.00 1.12
TOTAL
03.03.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
2016.00 0.15
TOTAL
DEL MATERIAL QUE ES ACAREADO A UN A ESQUINA DE LA OBRA, PARA LUEGO SER ELIMINADO CON VOLQUETE Y EQUIPO
PLANILLA DE METRADOS
03.04.00 CONFORMACION Y COMPACATACION DE SUBRASANTE
ITEMMEDIDAS N MET
LARGO ancho REP M2
502.33 7.80 1.00 3918.17
629.6 7.80 1.00 4910.88
246.21 7.80 1.00 1920.44
1114.11 7.80 1.00 8690.06
TOTAL
03.05.00 COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)
ITEM MEDIDAS N MET
LARGO/area ANCHO REP M2
502.33 1.00 1.00 502.33
629.601.00 1.00 629.60
246.211.00 1.00 246.21
1114.111.00 1.00 1114.11
0 0.001.00 1.00 0.00
TOTAL
03.06.00
ITEMCANTIDAD ESPESOR
E
ES LA MISMA AREA QUE LA CONFORMACION 19439.55 0.20TOTAL
03.07.00
ITEMCANTIDAD ESPESOR
E
ES LA MISMA AREA QUE LA CONFORMACION 19439.55
TOTAL
calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta MaraonCalle Maraon, desde Huallaga hasta Sargento LouresCalle Tigre, desde Oleoducto hasta Amazonas
calle Huallaga, desde Oleducto hasta Maraon
calle Napo, desde Oleducto hasta Maraon
Calle Maraon, desde Huallaga hasta Sargento Loures
Calle Tigre, desde Oleoducto hasta Amazonas
RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)
PLANILLA DE METRADOS
04.00.00 PAVIMENTO DE CONCRETO
04.01.00 ENCOFRADO Y DESENCOFRADO DE LOSA
ITEM MEDIDASCANTIDAD
N
LARGO/area ANCHO REP
DE LA LONGITUD
502.33 0.20 1.00 3.00
TRANSVERSAL 7.00 0.20 11.00 1.00
629.60 0.20 1.00 1.00TRANSVERSAL 7.00 0.20 210.00 1.00
246.21 0.20 1.00 3.00
TRANSVERSAL 7.00 0.20 82.00 1.00
1114.11 0.20 1.00 1.00TRANSVERSAL 7.00 0.20 371.00 1.00
0 0.00 0.20 1.00 3.00TRANSVERSAL 7.00 0.20 0.00 1.00CRUCE DE CALLES 5.00 0.20 15.00 2.00TOTAL
04.02.00 CONCRETO F'C= 210 KG/CM2, LOSA
ITEMCANTIDAD espesor
m
LA MISMA AREA QUE LA CONFORMACION 19439.550 0.20
TOTAL
04.03.00 JUNTA CON ASFALTO E= 1"
ITEM MEDIDAS MET N CANTIDAD
LARGO/area UND VECES UND
DE LAS CALLES
502.33 1.00 1.00 502.33
629.60 1.00 1.00 629.60
calle Huallaga, desde Oleducto hasta Maraon
calle Napo, desde Oleducto hasta Maraon
Calle Maraon, desde Huallaga hasta Sargento Loures
Calle Tigre, desde Oleoducto hasta Amazonas
calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta Maraon
PLANILLA DE METRADOS
246.211.00
1.00246.21
1114.111.00
1.001114.11
transversales 7.00 1.00 623.00 4361.00TOTAL 6,853.25
04.04.00 CURADO DE CONCRETO
ITEMCANTIDAD N
VECES
AREA DE PAVIMENTO 19439.550 1.00TOTAL
05.00.00 SARDINELES Y VEREDAS
05.01.00 RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOITEM MEDIDAS N VOLUMEN
AREA ALTO VECES TOTALDEL AREA DE VEREDAS 2492.25 0.10 1.00 249.23TOTAL
05.02.00 VEREDAS ENCOFRADO Y DESENCOFRADOITEM MEDIDAS N N REPECICIONES
LARGO alto/AREA VECESDEL AREA DE VEREDAS
502.330.20 1.00 2.00
629.600.20 1.00 2.00
246.210.20 1.00 2.00
1114.110.20 1.00 2.00
TRANSERSALES 1.00 0.20 2492.00 0.00TOTAL
05.03.00 CONCRETO PARA VEREDAS FC= 140 KG/ CM2ITEM MEDIDAS N REPECICIONES
LARGO alto/AREA anchola misma que la conformacion 2492.25 0.10 1.00DE LAS UAS 1318.26 0.4 0.20 1.00
Calle Maraon, desde Huallaga hasta Sargento Loures
Calle Tigre, desde Oleoducto hasta Amazonas
calle Huallaga, desde Oleducto hasta Maraoncalle Napo, desde Oleducto hasta MaraonCalle Maraon, desde Huallaga hasta Sargento LouresCalle Tigre, desde Oleoducto hasta Amazonas
PLANILLA DE METRADOS
TOTAL
05.04.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)ITEM MEDIDAS N N REPECICIONES
LARGO alto VECESDE LOS OCHAVOS 6.00 0.50 25.00 1.00TOTAL
PLANILLA DE METRADOS
05.05.00 SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADOITEM MEDIDAS N
LARGO alto ancho VECESDE LOS OCHAVOS 6.00 0.50 0.15 25.00TOTAL
05.06.00 JUNTA CON ASFALTO E=1"
ITEMMEDIDAS N MET
CANTIDAD LONGITUD VECES Mde las veredas 1.00 831.00 1.00 831.00TOTAL
05.07.00 CURADO DE CONCRETO CON ADITIVO
ITEMCANTIDAD N
VECES
AREA DE VEREDAS 2492.25 1.00TOTAL
06.00.00 PINTURA
06.01.00 PINTADO DE PAVIMENTO LETRAS Y SIMBOLOSITEM MEDIDAS N N MET
LARGO VECES CALLES M2area del pavimento 3.00 10 25.00 750.00
3.00 75 1.00 225.00TOTAL
06.02.00 PINTADO DE SARDINELES Y VEREDASITEM longitud N MET
m REP mla longitud total de veredas 2493.00 1.00 2493.00TOTAL 2,493.00
07.00.00 CONTROL DE CALIDAD Y ENSAYOS
07.01.00 ENSAYO DE CBR ITEM metrado UNIDAD
und undDE LA SUB RASANTE, UNA POR CALLE 25.0 25.0DE LOS MATERIALES 4.0 4.0TOTAL 29.00
07.02.00 ENSAYO DE DENSIDAD DE CAMPOITEM metrado UNIDAD
und und
PLANILLA DE METRADOS
se efectuarn cada 500 m2 39.0 39.00DE LAS VEREDS 5.0 5.00TOTAL 44.00
PLANILLA DE METRADOS
07.03.00 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETOITEM metrado UNIDAD
und undse efectuarn cada 500 m2 39 39DE LAS VEREDAS 5 5TOTAL 44.00
07.04.00 PRUEBA DE DISEO DE MEZCLAS DEL CONCRETOITEM metrado UNIDAD
und und3 3
TOTAL 3.00
08.00.00 ACARREOS
08.01.00 ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
09.00.00 VARIOS
09.01.00 PLACA RECORDATORIAITEM MET CANTIDAD
M3 M3INCLUYE COLOCACION Y PEDESTAL
1.000 1.00TOTAL 1.00
09.02.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET CANTIDAD
UND UNDMITIGACION DEL IMPACTO AMBIENTAL
1.000 1.00 1.00TOTAL 1.00
PLANILLA DE METRADOS
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR I SAN LORENZO
METTOTAL
6
UNDMET
TOTAL
2
METTOTAL
3918.17
4910.88
1920.44
8690.06
19439.55 m2
METTOTAL
19439.55
PLANILLA DE METRADOS
19439.550
PLANILLA DE METRADOS
METTOTAL
150.00
150.000
METTOTAL
150.00
150.000
CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
VOLM3
2350.90
2946.53
1152.26
5214.03
11663.73
VOL. TOTAL(m2)
2016.00
2,016.00
ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
181.44
7,179.68
PLANILLA DE METRADOS
CONFORMACION Y COMPACATACION DE SUBRASANTE
MET M2TOTAL
19439.55
COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)
MET M2
TOTAL
2492.25
VOLM3
3887.91 3,887.91
M2VOLM3
19439.55
19,439.55
RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC
PLANILLA DE METRADOS
METR
M2
301.40
15.40
125.92294.00
147.73
114.80
222.82519.40
0.000.00
30.00 1,771.47
METRM2
3887.91
3,887.91
ML
PLANILLA DE METRADOS
METRM2
19439.55 19,439.550
RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOMET
TOTAL249.23249.23
MET METTOTAL TOTAL
200.93 200.932
251.84 251.840
98.48 98.484
445.64 445.644
0.00 0.000996.90
m3MET MET
TOTAL TOTAL249.23 249.225105.46 105.461
PLANILLA DE METRADOS
354.69
MET METTOTAL TOTAL
75.00 75.00075.00
PLANILLA DE METRADOS
SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADON VOL. TOTAL
REPETICIONES (m3)1.00 11.250
11.25
JUNTA CON ASFALTO E=1"MET
TOTAL831.00
831.00
METRM2
2492.25 2,492.25
METTOTAL
975.00
PLANILLA DE METRADOS
PLANILLA DE METRADOS
UND
TN
DESCARGUIO Y CARGUIO DE MATERIALES EN PUERTO SAN LORENZO TN
TN
PLANILLA DE METRADOS
UND
PLANILLA DE METRADOS
MUNICIPALIDAD PROVINCIAL DE DATEN DEL MARAON
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR III SAN LORENZO1.00.00 OBRAS PRELIMINARES
01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO N MET
MESAlmacen de obra 6 6.00TOTAL
01.02.00 CARTEL DE OBRA EN MADERA DE 3.60M X 2.40M
ITEM MEDIDAS N METLARGO ANCHO REP Glb
CARTEL DE OBRA 2.00TOTAL
01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM VOL FACTOR DE VOL. TOTAL
ESPONJAMIEN (m3)DESPUES DE PROCESAR EL PRESUPUESTOPIEDRA PARA ADOQUIN 1.000 1.00 1.00TOTAL 1.00
2.00.00 TRABAJOS PRELIMINARES
2.01.00 LIMPIEZA DE TERRENO MANUAL
ITEM MEDIDAS N METLARGO ANCHO REP M2
692.49 7.80 1.00 5401.42
438.81 7.80 1.00 3422.72
109.28 7.80 1.00 852.38
109.28 7.80 2.00 1704.77
217.30 7.80 1.00 1694.94
TOTAL 1567.16 39.00
2.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPOITEM MEDIDAS N MET
(m3)
Calle Amazonas, desde Putumayo hasta Sargento Lores
Jr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza
PLANILLA DE METRADOS
area ANCHO VECES M213076.23 1.00 13076.23
TOTAL
se tomara todo el area de la obra
PLANILLA DE METRADOS
2.03.00 Reparacion y Reposicion de cajas de agua, incluye instalacionITEM MEDIDAS N MET
cantidad VECES M2
Para nivelar las cajas de agua150.00 1 150.00
TOTAL
2.04.00 Reparacion y Reposicion de cajas de desague ITEM MEDIDAS N MET
cantidad ANCHO VECES M2
Para nivelar las cajas de desague150.00 1 150.00
TOTAL
3.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO
03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
ITEM MEDIDAS NLargo ANCHO ALTO VECES
para el pavimento y veredas
692.49 7.80 0.601.00
438.81 7.80 0.60 1.00
109.28 7.80 0.60 2.00
109.28 7.80 0.601.00
217.30 7.80 0.60 1.00
TOTAL
03.02.00 DEMOLICIN DE VEREDAS
ITEMMEDIDAS VOL FACTOR DE
AREA (m2) EXPANSIN
DEMOLICION DE VEREDAS 800.00 800.00 1.12
TOTAL
03.03.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
ITEM e=7845.74 1.00
896.00 0.15
TOTAL
(m3)
DEL MATERIAL QUE ES ACAREADO A UN A ESQUINA DE LA OBRA, PARA LUEGO SER ELIMINADO CON VOLQUETE Y EQUIPO
PLANILLA DE METRADOS
03.04.00 CONFORMACION Y COMPACATACION DE SUBRASANTE
ITEMMEDIDAS N MET
LARGO ancho REP M2
692.49 7.8 1.00 5401.42
438.81 7.8 1.00 3422.72
109.28 7.8 2.00 1704.77
109.28 7.8 2.00 1704.77
217.3 7.8 3.00 5084.82
0 0 0TOTAL
03.05.00 COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)
ITEM MEDIDAS N MET
LARGO/area ANCHO REP M2
692.49 1.00 1.00 692.49
438.811.00 1.00 438.81
109.281.00 1.00 109.28
109.281.00 1.00 109.28
217.301.00 1.00 217.30
0 0.001.00 1.00 0.00
TOTAL
03.06.00
ITEMCANTIDAD ESPESOR
E
ES LA MISMA AREA QUE LA CONFORMACION 17318.50 0.20TOTAL
03.07.00
ITEMCANTIDAD ESPESOR
E
ES LA MISMA AREA QUE LA CONFORMACION
Calle Amazonas, desde Putumayo hasta Sargento LoresJr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza
Calle Amazonas, desde Putumayo hasta Sargento Lores
Jr Maraon, desde Morona hasta Huallaga
Calle Pastaza, desde Amazonas Hasta Maraon
Calle Tigre, desde Amazonas Hasta Maraon
Calle Jorge Chavez, desde Putumayo hasta Pastaza
RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)
PLANILLA DE METRADOS
ES LA MISMA AREA QUE LA CONFORMACION 17318.50
TOTAL
PLANILLA DE METRADOS
04.00.00 ADOQUINADO
04.01.00 Colocacin de Cama de Arena E=0.10m para asentado de adoquines
ITEMCANTIDAD N
REP
ES LA MISMA AREA QUE LA CONFORMACION 17318.50 1.00TOTAL
04.02.00 Conformacin de cama de arena para asentado de adoquines e=0.05m
ITEMCANTIDAD N
REP
ES LA MISMA AREA QUE LA CONFORMACION 17318.50 1.00TOTAL
04.03.00 Acarreo de adoquines de concretoITEM MET N CANTIDAD
UND VECES UNDDESPUES DE PROCESAR EL PRESUPUESTO
917880.000 1.00 917880.00TOTAL 917,880.00
04.04.00
ITEMCANTIDAD N
REP
ES LA MISMA AREA QUE LA CAMA DE ARENA 17318.50 1.00TOTAL
04.05.00 Corte de Adoquines de concreto de 0.21x0.105x0.06ITEM MEDIDAS N N VECES
LARGO ANCHO REP
692.49 2.00 1.00
438.81 2.00 1.00
109.28 2.00 1.00
109.28 2.00 1.00
217.30 2.00 1.00
Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado, no inc. cama de arena grue)
Calle Amazonas, desde Putumayo hasta Sargento Lores
Jr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza
PLANILLA DE METRADOS
TOTAL
PLANILLA DE METRADOS
04.06.00 ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N MET
ANCHO ALTO REP M2
8.00 0.20 4.00 6.40
8.00 0.20 4.00 6.40
8.00 0.20 4.00 6.40
8.000.20 4.00 6.40
8.000.20 4.00 6.40
TOTAL 40.00
04.07.00 CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N
LARGO alto ancho VECESCALLES 40.00 0.20 0.20 4.00TOTAL
05.00.00 SARDINELES Y VEREDAS
05.01.00 RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOITEM MEDIDAS N VOLUMEN
AREA ALTO VECES TOTALDEL AREA DE VEREDAS 1567.16 0.10 1.00 156.72TOTAL
05.02.00 VEREDAS ENCOFRADO Y DESENCOFRADOITEM MEDIDAS N N REPECICIONES
LARGO alto/AREA VECESDEL AREA DE VEREDAS
692.490.20 1.00 2.00
438.810.20 1.00 2.00
109.280.20 1.00 2.00
109.280.20 1.00 2.00
Calle Amazonas, desde Putumayo hasta Sargento LoresJr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta MaraonCalle Tigre, desde Amazonas Hasta MaraonCalle Jorge Chavez, desde Putumayo hasta Pastaza
Calle Amazonas, desde Putumayo hasta Sargento LoresJr Maraon, desde Morona hasta HuallagaCalle Pastaza, desde Amazonas Hasta Maraon
Calle Tigre, desde Amazonas Hasta Maraon
PLANILLA DE METRADOS
217.300.20 1.00 2.00
TRANSERSALES 1.00 0.20 1567.00 2.00TOTAL
Calle Jorge Chavez, desde Putumayo hasta Pastaza
PLANILLA DE METRADOS
05.03.00 CONCRETO PARA VEREDAS FC= 140 KG/ CM2ITEM MEDIDAS N REPECICIONES
LARGO alto/AREA anchola misma que la conformacion 1567.16 0.10 1.00DE LAS UAS 1318.26 0.4 0.20 1.00TOTAL
05.04.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)ITEM MEDIDAS N N REPECICIONES
LARGO alto VECESDE LOS OCHAVOS 6.00 0.50 15.00 1.00TOTAL
05.05.00 SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADOITEM MEDIDAS N
LARGO alto ancho VECESDE LOS OCHAVOS 6.00 0.50 0.15 15.00TOTAL
05.06.00 JUNTA CON ASFALTO E=1"
ITEMMEDIDAS N MET
CANTIDAD LONGITUD VECES Mde las veredas 1.00 522.00 1.00 522.00TOTAL
05.07.00 CURADO DE CONCRETO CON ADITIVO
ITEMCANTIDAD N
VECES
AREA DE VEREDAS 1567.16 1.00TOTAL
06.00.00 PINTURA
06.01.00 PINTADO DE PAVIMENTO LETRAS Y SIMBOLOSITEM MEDIDAS N N MET
LARGO VECES CALLES M2area del pavimento 3.00 10 15.00 450.00
3.00 45 1.00 135.00TOTAL
06.02.00 PINTADO DE SARDINELES Y VEREDASITEM longitud N MET
m REP mla longitud total de veredas 1566.00 1.00 1566.00
PLANILLA DE METRADOS
TOTAL 1,566.00
PLANILLA DE METRADOS
07.00.00 CONTROL DE CALIDAD Y ENSAYOS
07.01.00 ENSAYO DE CBR ITEM metrado UNIDAD
und undDE LA SUB RASANTE, UNA POR CALLE 15.0 15.0DE LOS MATERIALES 4.0 4.0TOTAL 19.00
07.02.00 ENSAYO DE DENSIDAD DE CAMPOITEM metrado UNIDAD
und undse efectuarn cada 500 m2 35.0 35.00DE LAS VEREDS 3.0 3.00TOTAL 38.00
07.03.00 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETOITEM metrado UNIDAD
und undse efectuarn cada 500 m2 35 35DE LAS VEREDAS 3 3TOTAL 38.00
07.04.00 PRUEBA DE DISEO DE MEZCLAS DEL CONCRETOITEM metrado UNIDAD
und und3 3
TOTAL 3.00
08.00.00 ACARREOS
08.01.00 ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
ITEM MET CANTIDADUND UND
CARGUIO DE MATERIALES EN YURIMAGUAS2923.000 1.00 2923.00
TOTAL 2,923.00
PLANILLA DE METRADOS
08.04.00 TRANSPORTE FLUVIAL DE MATERIALES ITEM MET CANTIDAD
UND UNDTRANSPORTE FLUVIAL DE MATERIALES
2923.000 1.00 2923.00TOTAL 2,923.00
09.00.00 VARIOS
09.01.00 PLACA RECORDATORIAITEM MET CANTIDAD
M3 M3INCLUYE COLOCACION Y PEDESTAL
1.000 1.00TOTAL 1.00
09.02.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET CANTIDAD
UND UNDMITIGACION DEL IMPACTO AMBIENTAL
1.000 1.00 1.00TOTAL 1.00
PLANILLA DE METRADOS
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR III SAN LORENZO
METTOTAL
6
UNDMET
TOTAL
2
METTOTAL s
5401.42
3422.72
852.38
1704.77
1694.94
13076.23 m2
MET
PLANILLA DE METRADOS
TOTAL13076.23
13076.232
PLANILLA DE METRADOS
METTOTAL
150.00
150.000
METTOTAL
150.00
150.000
CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
VOLM3
3240.85
2053.63
1022.86
511.43
1016.96
7845.74
VOL. TOTAL(m2)
896.00
896.00
ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
(m3)4707.44
80.64
4,788.08
PLANILLA DE METRADOS
CONFORMACION Y COMPACATACION DE SUBRASANTE
MET M2TOTAL
17318.50
COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)
MET M2
TOTAL
1567.16
VOLM3
3463.70 3,463.70
M2VOLM3
RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC
PLANILLA DE METRADOS
17318.50 17,318.50
PLANILLA DE METRADOS
METRM2
17318.50 17,318.50
METRM2
17318.50 17,318.50
UND
METRM2
17318.50 17,318.50
METTOTAL
1384.980
877.620
218.560
218.560
434.600
Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado,
ES EL PERIMETRO A PAVIMENTAR
PLANILLA DE METRADOS
3134.32
PLANILLA DE METRADOS
ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOMET
TOTAL
6.400
6.400
6.400
6.400
6.400
32.00
CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTON VOL. TOTAL
REPETICIONES (m3)1.00 6.400
6.400
RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOMET
TOTAL156.72156.72
MET METTOTAL TOTAL
277.00 276.996
175.52 175.524
43.71 43.712
43.71 43.712
PLANILLA DE METRADOS
86.92 86.920
626.80 626.8001253.66
PLANILLA DE METRADOS
m3MET MET
TOTAL TOTAL156.72 156.716105.46 105.461
262.18
MET METTOTAL TOTAL
45.00 45.00045.00
SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADON VOL. TOTAL
REPETICIONES (m3)1.00 6.750
6.75
JUNTA CON ASFALTO E=1"MET
TOTAL522.00
522.00
METRM2
1567.16 1,567.16
METTOTAL
585.00
PLANILLA DE METRADOS
PLANILLA DE METRADOS
UND
TN
DESCARGUIO Y CARGUIO DE MATERIALES EN PUERTO SAN LORENZO TN
PLANILLA DE METRADOS
PLANILLA DE METRADOS
TN
UND
PLANILLA DE METRADOS
MUNICIPALIDAD PROVINCIAL DE DATEN DEL MARAON
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR IIII SAN LORENZO1.00.00 OBRAS PRELIMINARES
01.01.00 ALQUILER DE LOCAL PARA LA OBRAITEM TIEMPO N MET
MESAlmacen de obra 6 6.00TOTAL
01.02.00 CARTEL DE OBRA EN MADERA DE 3.60M X 2.40M
ITEM MEDIDAS N METLARGO ANCHO REP Glb
CARTEL DE OBRA 2.00TOTAL
01.03.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPOITEM VOL FACTOR DE VOL. TOTAL
ESPONJAMIEN (m3)DESPUES DE PROCESAR EL PRESUPUESTOPIEDRA PARA ADOQUIN 1.000 1.00 1.00TOTAL 1.00
2.00.00 TRABAJOS PRELIMINARES
2.01.00 LIMPIEZA DE TERRENO MANUAL
ITEM MEDIDAS N METLARGO ANCHO REP M2
371.78 7.80 1.00 2899.88
387.00 7.80 1.00 3018.60
375.31 7.80 1.00 2927.42
507.90 7.80 2.00 7923.24
TOTAL 1641.99 31.20
2.02.00 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO
(m3)
Calle Ucayali, desde Tigre hasta Sargento Lores
Calle Calletano Ardanza, desde Oleoducto hasta MaraonCalle Sargento Loures, desde Oleoducto hasta MaraonCalle Maraon , desde Sargento Loures hasta Bolognesi
PLANILLA DE METRADOS
ITEM MEDIDAS N METarea ANCHO VECES M2
16769.14 1.00 16769.14
TOTAL
se tomara todo el area de la obra
PLANILLA DE METRADOS
2.03.00 Reparacion y Reposicion de cajas de agua, incluye instalacionITEM MEDIDAS N MET
cantidad VECES M2
Para nivelar las cajas de agua150.00 1 150.00
TOTAL
2.04.00 Reparacion y Reposicion de cajas de desague ITEM MEDIDAS N MET
cantidad ANCHO VECES M2
Para nivelar las cajas de desague150.00 1 150.00
TOTAL
3.00.00 MOVIMIENTO DE TIERRAS PAVIMENTO
03.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
ITEM MEDIDAS NLargo ANCHO ALTO VECES
para el pavimento y veredas
371.78 7.80 0.601.00
387.00 7.80 0.601.00
375.31 7.80 0.602.00
507.90 7.80 0.601.00
0 0.00 7.80 0.60 1.00
TOTAL
03.02.00 DEMOLICIN DE VEREDAS
ITEMMEDIDAS VOL FACTOR DE
AREA (m2) EXPANSIN
DEMOLICION DE VEREDAS 1200.00 1200.00 1.12
TOTAL
03.03.00 ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
ITEM e=9440.96 1.001344.00 0.15
TOTAL
(m3)
DEL MATERIAL QUE ES ACAREADO A UN A ESQUINA DE LA OBRA, PARA LUEGO SER ELIMINADO CON VOLQUETE Y EQUIPO
PLANILLA DE METRADOS
03.04.00 CONFORMACION Y COMPACATACION DE SUBRASANTE
ITEMMEDIDAS N MET
LARGO ancho REP M2
371.78 7.8 1.00 2899.88
387 7.8 1.00 3018.60
375.31 7.8 2.00 5854.84
507.9 7.8 2.00 7923.24
0 0 7.8 3.00 0.00
0 0 0TOTAL
03.05.00 COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)
ITEM MEDIDAS N MET
LARGO/area ANCHO REP M2
371.78 1.00 1.00 371.78
387.001.00 1.00 387.00
375.311.00 1.00 375.31
507.901.00 1.00 507.90
0 0.001.00 1.00 0.00
0 0.001.00 1.00 0.00
TOTAL
03.06.00
ITEMCANTIDAD ESPESOR
E
ES LA MISMA AREA QUE LA CONFORMACION 19696.56 0.20TOTAL
03.07.00
ITEMCANTIDAD ESPESOR
E
ES LA MISMA AREA QUE LA CONFORMACION
Calle Ucayali, desde Tigre hasta Sargento LoresCalle Calletano Ardanza, desde Oleoducto hasta MaraonCalle Sargento Loures, desde Oleoducto hasta MaraonCalle Maraon , desde Sargento Loures hasta Bolognesi
Calle Ucayali, desde Tigre hasta Sargento Lores
Calle Calletano Ardanza, desde Oleoducto hasta Maraon
Calle Sargento Loures, desde Oleoducto hasta Maraon
Calle Maraon , desde Sargento Loures hasta Bolognesi
RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC CONFORMA)
PLANILLA DE METRADOS
ES LA MISMA AREA QUE LA CONFORMACION 19696.56
TOTAL
PLANILLA DE METRADOS
04.00.00 ADOQUINADO
04.01.00 Colocacin de Cama de Arena E=0.10m para asentado de adoquines
ITEMCANTIDAD N
REP
ES LA MISMA AREA QUE LA CONFORMACION 19696.56 1.00TOTAL
04.02.00 Conformacin de cama de arena para asentado de adoquines e=0.05m
ITEMCANTIDAD N
REP
ES LA MISMA AREA QUE LA CONFORMACION 19696.56 1.00TOTAL
04.03.00 Acarreo de adoquines de concretoITEM MET N CANTIDAD
UND VECES UNDDESPUES DE PROCESAR EL PRESUPUESTO
1.00 0.00TOTAL -
04.04.00
ITEMCANTIDAD N
REP
ES LA MISMA AREA QUE LA CAMA DE ARENA 19696.56 1.00TOTAL
04.05.00 Corte de Adoquines de concreto de 0.21x0.105x0.06ITEM MEDIDAS N N VECES
LARGO ANCHO REP
371.78 2.00 1.00
387.00 2.00 1.00
375.31 2.00 1.00
507.90 2.00 1.00
0 0.00 2.00 1.00
Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado, no inc. cama de arena grue)
Calle Ucayali, desde Tigre hasta Sargento Lores
Calle Calletano Ardanza, desde Oleoducto hasta MaraonCalle Sargento Loures, desde Oleoducto hasta Maraon
Calle Maraon , desde Sargento Loures hasta Bolognesi
PLANILLA DE METRADOS
TOTAL
04.06.00 ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N MET
ANCHO ALTO REP M2
8.000.20 4.00 6.40
8.000.20 4.00 6.40
8.000.20 4.00 6.40
8.000.20 4.00 6.40
0 8.000.20 4.00 6.40
TOTAL 40.00
04.07.00 CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTOITEM MEDIDAS N
LARGO alto ancho VECESCALLES 40.00 0.20 0.20 4.00TOTAL
05.00.00 SARDINELES Y VEREDAS
05.01.00 RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOITEM MEDIDAS N VOLUMEN
AREA ALTO VECES TOTALDEL AREA DE VEREDAS 1641.99 0.10 1.00 164.20TOTAL
05.02.00 VEREDAS ENCOFRADO Y DESENCOFRADOITEM MEDIDAS N N REPECICIONES
LARGO alto/AREA VECESDEL AREA DE VEREDAS
371.780.20 1.00 2.00
387.000.20 1.00 2.00
Calle Ucayali, desde Tigre hasta Sargento Lores
Calle Calletano Ardanza, desde Oleoducto hasta Maraon
Calle Sargento Loures, desde Oleoducto hasta MaraonCalle Maraon , desde Sargento Loures hasta Bolognesi
Calle Ucayali, desde Tigre hasta Sargento Lores
Calle Calletano Ardanza, desde Oleoducto hasta Maraon
PLANILLA DE METRADOS
375.310.20 1.00 2.00
507.900.20 1.00 2.00
00.00
0.20 1.00 2.00TRANSERSALES 1.00 0.20 1642.00 2.00TOTAL
Calle Sargento Loures, desde Oleoducto hasta Maraon
Calle Maraon , desde Sargento Loures hasta Bolognesi
PLANILLA DE METRADOS
05.03.00 CONCRETO PARA VEREDAS FC= 140 KG/ CM2ITEM MEDIDAS N REPECICIONES
LARGO alto/AREA anchola misma que la conformacion 1641.99 0.10 1.00DE LAS UAS 1318.26 0.4 0.20 1.00TOTAL
05.04.00 SARDINELES ENCOFRADO Y DESENCOFRADO (H=0.20M)ITEM MEDIDAS N N REPECICIONES
LARGO alto VECESDE LOS OCHAVOS 6.00 0.50 17.00 1.00TOTAL
05.05.00 SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADOITEM MEDIDAS N
LARGO alto ancho VECESDE LOS OCHAVOS 6.00 0.50 0.15 17.00TOTAL
05.06.00 JUNTA CON ASFALTO E=1"
ITEMMEDIDAS N MET
CANTIDAD LONGITUD VECES Mde las veredas 1.00 547.00 1.00 547.00TOTAL
05.07.00 CURADO DE CONCRETO CON ADITIVO
ITEMCANTIDAD N
VECES
AREA DE VEREDAS 1641.99 1.00TOTAL
06.00.00 PINTURA
06.01.00 PINTADO DE PAVIMENTO LETRAS Y SIMBOLOSITEM MEDIDAS N N MET
LARGO VECES CALLES M2area del pavimento 3.00 10 17.00 510.00
3.00 51 1.00 153.00TOTAL
06.02.00 PINTADO DE SARDINELES Y VEREDASITEM longitud N MET
m REP mla longitud total de veredas 1641.00 1.00 1641.00
PLANILLA DE METRADOS
TOTAL 1,641.00
PLANILLA DE METRADOS
07.00.00 CONTROL DE CALIDAD Y ENSAYOS
07.01.00 ENSAYO DE CBR ITEM metrado UNIDAD
und undDE LA SUB RASANTE, UNA POR CALLE 17.0 17.0DE LOS MATERIALES 4.0 4.0TOTAL 21.00
07.02.00 ENSAYO DE DENSIDAD DE CAMPOITEM metrado UNIDAD
und undse efectuarn cada 500 m2 39.0 39.00DE LAS VEREDS 3.0 3.00TOTAL 42.00
07.03.00 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETOITEM metrado UNIDAD
und undse efectuarn cada 500 m2 39 39DE LAS VEREDAS 3 3TOTAL 42.00
07.04.00 PRUEBA DE DISEO DE MEZCLAS DEL CONCRETOITEM metrado UNIDAD
und und3 3
TOTAL 3.00
08.00.00 ACARREOS
08.01.00 ACARREO DE CEMENTO D max
PLANILLA DE METRADOS
ITEM MET CANTIDADUND UND
CARGUIO DE MATERIALES EN YURIMAGUAS1.000 1.00 1.00
TOTAL 1.00
PLANILLA DE METRADOS
08.04.00 TRANSPORTE FLUVIAL DE MATERIALES ITEM MET CANTIDAD
UND UNDTRANSPORTE FLUVIAL DE MATERIALES
1.000 1.00 1.00TOTAL 1.00
09.00.00 VARIOS
09.01.00 PLACA RECORDATORIAITEM MET CANTIDAD
M3 M3INCLUYE COLOCACION Y PEDESTAL
1.000 1.00TOTAL 1.00
09.02.00 MEDIDAS DE MITIGACION DE IMPACTO AMBIENTALITEM MET CANTIDAD
UND UNDMITIGACION DEL IMPACTO AMBIENTAL
1.000 1.00 1.00TOTAL 1.00
PLANILLA DE METRADOS
CREACION CON PAVIMENTO, CONSTRUCCION DE VEREDAS Y SARDINELES DEL SECTOR IIII SAN LORENZO
METTOTAL
6
UNDMET
TOTAL
2
METTOTAL
2899.88
3018.60
2927.42
7923.24
16769.14 m2
PLANILLA DE METRADOS
METTOTAL
16769.14
16769.142
PLANILLA DE METRADOS
METTOTAL
150.00
150.000
METTOTAL
150.00
150.000
CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO
VOLM3
1739.93
1811.16
3512.90
2376.97
0.00
9440.96
VOL. TOTAL(m2)
1344.00
1,344.00
ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE DE 6 M3 CARGUIO EQUIPO D
PLANILLA DE METRADOS
(m3)5664.58120.96
5,785.54
PLANILLA DE METRADOS
CONFORMACION Y COMPACATACION DE SUBRASANTE
MET M2TOTAL
19696.56
COMPACTACION DE TERRENO(PARA PISOS Y VEREDAS)
MET M2
TOTAL
1641.99
VOLM3
3939.31 3,939.31
M2VOLM3
RELLENO CON BASE OVER E=8" INC COMPACTACION EQUIPO PESADO(INC
RELLENO CON MATERIAL GRANULAR E=8" INC COMPACTACION EQUIPO PESADO(INC
PLANILLA DE METRADOS
19696.56 19,696.56
PLANILLA DE METRADOS
METRM2
19696.56 19,696.56
METRM2
19696.56 19,696.56
UND
METRM2
19696.56 19,696.56
METTOTAL
743.560
774.000
750.620
1015.800
0.000
Pavimentacin de Vias c/ Adoquines f'c>245 20X10X8CM Comp plancha (adoq prefabricado,
ES EL PERIMETRO A PAVIMENTAR
PLANILLA DE METRADOS
3283.98
ENCOFRADO Y DESENCOFRADO PARA LOSA DE CONFINAMIENTOMET
TOTAL
6.400
6.400
6.400
6.400
6.400
32.00
CONCRETO Fc= 210 Kg/CM2 S/ PARA LOSA DE CONFINAMIENTON VOL. TOTAL
REPETICIONES (m3)1.00 6.400
6.400
RELLEO CON MATERIAL GRANULAR E=4", INCLUYE COMPACTACION EQUIPO LIVIANOMET
TOTAL164.20164.20
MET METTOTAL TOTAL
148.71 148.712
154.80 154.800
PLANILLA DE METRADOS
150.12 150.124
203.16 203.160
0.00 0.000
656.80 656.8001313.60
PLANILLA DE METRADOS
m3MET MET
TOTAL TOTAL164.20 164.199105.46 105.461
269.66
MET METTOTAL TOTAL
51.00 51.00051.00
SARDINELES-CONCRETO Fc= 140 Kg/CM2 S/ MEZCLADORA INCL CURADON VOL. TOTAL
REPETICIONES (m3)1.00 7.650
7.65
JUNTA CON ASFALTO E=1"MET
TOTAL547.00
547.00
METRM2
1641.99 1,641.99
METTOTAL
663.00
PLANILLA DE METRADOS
PLANILLA DE METRADOS
UND
TN
DESCARGUIO Y CARGUIO DE MATERIALES EN PUERTO SAN LORENZO TN
PLANILLA DE METRADOS
PLANILLA DE METRADOS
TN
UND
MUNICIPALIDAD PROVINCIAL DE DATEM DEL MARAONObra : CREACION CON PAVIMENTO RIGIDO, VEREDAS, SARDINELES DEL SECTOR I Lugar : SAN LORENZODistrito : BARRANCAProvincia : DATEM DEL MARAONDepartamento : LORETOFecha : DICIEMBRE DEL 2012
MOVILIZACIN Y DESMOVILIZACIN DE EQUIPO Y MAQUINARIA
A. Mquinas pesadas trasladadas sobre plataforma (equipo transportado), desde Cix - Km. 22.Nmero
Descripcin Peso (Tn) Total ObservacionesUnidades
1 CAMION CISTERNA 4x2(AGUA)178-210HP 2000G 20.00 140.00 3.00 420.00 Autopropulsado
1 CAMION VOLQUETE 6x4 330 HP 10 M3. 26.00 100.00 3.00 300.00 Autopropulsado1 CAMION VOLQUETE 10 M3. 26.00 100.00 3.00 300.00 Autopropulsado1 CARGADOR S/LLA