INDICE
1. INTRODUCCION.............................................................................................2
2. RESULTADO DE INFORME DE PRÁCTICAS...........................................3
2.1 MEMORIA DESCRIPTIVA..............................................................................4
2.2 ESPECIFICACIONES TECNICAS:.............................................................12
2.3 EVALUACION DE IMPACTO AMBIENTAL:..............................................18
2.4 ESTUDIO MECANICA DE SUELOS:.........................................................20
2.5 DISEÑO DE MEZCLA...................................................................................28
2.6 MEMORIA DE CÁLCULO.............................................................................30
2.7 METRADOS....................................................................................................38
2.8 PRESUPUESTO............................................................................................65
3. DISCUSION DE LOS RESULTADOS DEL INFORME DE PRÁCTICAS
Y/O APORTE DEL PRACTICANTE..........................................................................70
3.1 DESCRIPCION DE LAS ACTIVIDADES DEL PROYECTO..................71
3.2 CRONOGRAMA VALORIZADO DE OBRA...............................................71
3.3 PRECIOS Y CANTIDADES DE RECURSOS REQUERIDOS...............72
3.4 CRONOGRAMA DE ADQUISICION DE MATERIALES..........................76
4. CONCLUSIONES..........................................................................................79
5. RECOMENDACIONES.................................................................................80
6. BIBLIOGRAFIA...............................................................................................81
7. ANEXOS..........................................................................................................82
2
1. INTRODUCCION
El presente informe final de prácticas pre profesionales se efectúa con la
finalidad de obtener el grado académico de bachiller en la carrera profesional
de Ingeniería Civil, es preciso informar que dichas prácticas fueron realizadas
en la Empresa CONSULTORA CONSTRUCTORA MONTALVAN K&M S.A.C.
por el lapso de tres meses, específicamente en la obra “CREACION DE
INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE LA COMUNIDAD DE
PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES –
HUANCAVELICA”, en el cual se desempeñó el cargo de Asistente de
Residente, realizando trabajos de control de ejecución de las partidas indicadas
en el expediente técnico, informes mensuales y elaboración de metrados
según avance de obra.
En el periodo de los tres meses de realización de prácticas pre profesionales,
se puso en práctica todos los conocimientos teóricos adquiridos en las aulas
universitarias de la Universidad Peruana Los Andes sucediendo así una serie
de inquietudes y actualizaciones, producto del desempeño en las labores
encomendadas, por el cual se superó las dificultades según la experiencia
acumulada en dicha obra.
3
2. RESULTADO DE INFORME DE PRÁCTICAS
Se consideró como código básico para el diseño de las estructuras
existentes, el reglamento Nacional de Edificaciones donde se incluye las
consideraciones para la carga muerta, carga viva, carga de sismo,
métodos aceptados de análisis y diseño, factores de carga y coeficientes
de seguridad para cada uno de los elementos estructurales y materiales.
Se consideró algunas especificaciones de la estructura:
Resistencia del concreto: f´c = 210 kg/cm2
Resistencia del acero: f´y = 4200 kg / cm2
Presión admisible del suelo: Variable de acuerdo al terreno
Albañilería: f´m = 65 kg/cm2
E albañilería: E = 500 * f´m = 35000 kg / cm2
G Albañilería: G = 0.4 * E = 14000 kg / cm2
La estructura se realizó según la configuración estructural del Módulo de
la construcción de la vivienda Médico familiar, está definida por un
sistema de pórticos de concreto y muros de albañilería.
El análisis de la estructura se ha realizado mediante métodos elásticos y
lineales, realizando un análisis matricial efectuado por programas de
análisis estructural.
Se realizó un análisis sísmico para determinar los esfuerzo producidos
por un movimiento sísmico se realizó un análisis sísmico por el método
estático considerando que en la estructura actúa una fuerza horizontal
equivalente a una porción de las cargas permanentes, para ellos se
consideró los lineamientos de la Norma Peruana de Diseño Sismo
Resistente.
4
2.1 MEMORIA DESCRIPTIVA
PROYECTO:
CREACION DE INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE
LA COMUNIDAD DE PIRCAPAHUANA, DISTRITO DE LIRCAY,
PROVINCIA DE ANGARAES – HUANCAVELICA”
UBICACIÓN POLÍTICA:
LUGAR : PIRCAPAHUANA
DISTRITO : LIRCAY
PROVINCIA : ANGARAES
DEPARTAMENTO : HUANCAVELICA
ALTITUD : 3390 m.s.n.m.
2.1.1 GENERALIDADES
2.1.1.1 ANTECEDENTES:
La Municipalidad Provincial de Angaraes - Lircay,
con la finalidad de cumplir, con los Proyectos programados
en el Presupuesto Participativo 2011, frente a la necesidad
de disponer de una mejor calidad de vida en atención al
sector público de la comunidad campesina de
Pircapahuana se determina realizar el proyecto
denominado “CREACION DE LA INFRAESTRUCTURA
PUBLICA CENTRO CIVICO DE LA COMUNIDAD
CAMPESINA DE PIRCAPAHUANA, DISTRITO DE
LIRCAY, PROVINCIA DE ANGARAES, HUANCAVELICA”
5
, siendo importante prestar servicio de calidad con una
mejor infraestructura pública.
2.1.1.2 DESCRIPCION DE LA INFRAESTRUCTURA
EXISTENTE.
El local comunal existente tiene como tiempo de su
construcción hace más de veinte años y es de material
rustico, con muros de tapial o gaveras, a la fecha dicha
construcción presenta fisuras en sus muros así como el
techo de la cobertura de teja andina a punto de
desplomarse, las autoridades comunales atienden sus
despachos en otros ambientes improvisados carente de
infraestructura.
2.1.1.3 SÍNTESIS DEL PROYECTO
El Presente proyecto “CREACION DE LA INFRAESTRUCTURA
PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA
DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE
ANGARAES, HUANCAVELICA”, consta de realizar la ejecución
de la infraestructura pública de material noble de dos pisos y
azotea para el funcionamiento de ambientes de las autoridades
comunales y el planteamiento de una sala de usos múltiples que
servirá para las diferentes actividades socioculturales de la
comunidad campesina de Pircapahuana.
6
2.1.1.4 JUSTIFICACIÓN:
El Centro Cívico la más relevante de la comunidad de
Pircapahuana requiere la construcción de una infraestructura
nueva, toda vez que el local comunal existente ha colapsado por
el tiempo de uso y por estar deteriorados los muros y techo, se
requiere renovar para brindar calidad de atención a la población
de Pircapahuana.
2.1.1.5 OBJETIVOS Y METAS DEL PROYECTO:
El Objetivo general del Proyecto es: “ADECUADA
PRESTACION DE SERVICIOS DE GESTION EN LA
COMUNIDAD CAMPESINA DE PIRCAPAHUANA”, que se
podrá apreciar en el desarrollo social de la zona.
El presente proyecto tiene como finalidad la disponibilidad de
infraestructura del local comunal para el servicio de gestión
administrativa de la población. Esto contribuirá a mejorar la
calidad de la asistencia social en la Comunidad Campesina y
mejorando los servicios a la colectividad en general.
2.1.1.6 METAS Y ACCIONES
Proyecto alternativo 2:
CONSTRUCCIÓN DEL CENTRO CÍVICO DE MATERIAL
NOBLE CON COBERTURA DE TECHO ALIGERADO DE 02
NIVELES Y CAPACITACION A AUTORIDADES LOCALES
Componentes:
7
I. Construcción del Centro Cívico, con cobertura de
techo aligerado.
Construcción del Centro Cívico de 106.25 m2 dividido
en los siguientes ambientes: En el primer piso Salón
de usos Múltiples y SS.HH; en el segundo piso Sala
de Autoridades Comunales, Presidente Comunal,
Secretaria, Teniente Gobernador, Hall y SS.HH, de
Material noble con estructuras a porticadas de
concreto armado, albañilería de ladrillo corriente,
cobertura de techo aligerado de 02 niveles, 01 pozo
de percolador y tanque séptico.
II. Capacitación y Asistencia Técnica
Capacitación en organización y funciones de
autoridades
Capacitación en gestión
Capacitación en manejo administrativo
2.1.2 ANÁLISIS SITUACIONAL DEL PROYECTO:
UBICACIÓN DEL PROYECTO Y CARACTERISTICAS
GENERALES DE LA LOCALIDAD.
La Comunidad de Pircapahuana se ubica a una altura de 3390
msnm. margen derecha del rio Locclo (Pircapahuana), Distrito de
Lircay, Provincia de Angaraes, departamento de Huancavelica, a
10 Km al Sur-Oeste de la ciudad de Lircay. Limita por el Norte con
el Centro Poblado de Rumichaca, por el Este con los riachuelos
8
Locclo y el centro Poblado de Ccollpampa por el sur con
Pircapahuana.
La temperatura varía de acuerdo a las estaciones del año, siendo
14ºC la máxima y -8ºC la mínima. Las precipitaciones varían de
590 mm a 830 mm anuales, con una Humedad Relativa de 62%.
Los vientos predominantes tienen dirección de Sur–Este a Nor-
Oeste, alcanzando la velocidad de 1.9 m/s. Su relieve es semi
accidentado, con muchos cambios de pendiente y pocas áreas
planas.
La población de lacomunidad de Pircapahuana, según el censo
de 2007 es de 332 habitantes; con una tasa de crecimiento para
el periodo 1993-2007 de 1.5%.
El uso predominante es el agro urbano rural.
El terreno se ubica en la plaza principal de la Comunidad
campesina de Pircapahuana en la Av. Tambraico como acceso
principal hacia el recinto de la construcción, así mismo por el Sur
colinda con la iglesia católica, por el Norte con propiedad
particular y por el Este fondo con propiedad particular.
2.1.3 MEDIDAS DEL PROYECTO
9
2.1.4 VÍAS DE COMUNICACIÓN Y ACCESOS:
El acceso Principal a la comunidad principal es por una vía
afirmada con una distancia de 12 Km de la ciudad de lircay cuya
vía tiene acceso pasando las comunidades de Ccollpapampa,
Hatumpata, por el suroeste, a su vez tiene acceso por la vía de
la comunidad de Rumichaca por una vía afirmada hasta Pahuana
y de allí nos conduce por una trocha hacia el cerro tambraico.
ACCESOS A LA COMUNIDAD CAMPESINA DE
PIRCAPAHUANA
RECORRIDO
(KM)
TIEMPO
(horas)
TIPO DE
VÍA
Por el frente Este (Av. Tambraico) 20.00 ml
Derecha por Norte ( Con prop. De la
Comunidad de Pircapahuana8.00 ml
Izquierda por el Sur ( Con prop. De la
comunidad de Pircapahuan8.00 ml
Fondo por el Oeste ( Con prop.de la
Comunidad de Pircapahuana )20.00 ml
10
HUANCAYO -
HUANCAVELICA
157.00 5.00 Asfaltada
HUANCAVELICA -
LIRCAY
76.00 2.50 Afirmada
LIRCAY -
PIRCAPAHUANA
12.00 0.20 Afirmada
2.1.5 CARACTERÍSTICAS DEL PROYECTO:
Es un sistema Arquitectónico, que servirá para mejorar la
infraestructura pública planteando el proyecto de la construcción
del Centro Cívico para la comunidad de Pircapahuana dos barrios
que requieren de un recinto moderno que se construirá de
material noble de dos pisos con ambientes en el primer nivel con
una sala de usos múltiples que cuenta con un escenario y sus
respectivos servicios higiénicos, así como una circulación vertical
por una caja de escalera hacia el segundo nivel, donde se plantea
ambientes para el funcionamiento administrativo de las
autoridades comunales que cuenta con una sala de autoridades
comunales, ambiente para el presidente comunal, teniente
gobernador, secretaria, hall de recepción y pasillo de circulación
que nos conduce a las diferentes oficinas, el servicio higiénico
publico indirectamente ubicado. Dicha construcción con columnas
rectangulares, muro de albañilería confinada en los dos niveles,
una losa aligerada en el primero, segundo nivel y techo de la caja
de escalera de losa maciza.
11
2.1.6 CRONOGRAMA DE EJECUCIÓN
El tiempo de Ejecución del Proyecto “CREACION DE LA
INFRAESTRUCTURA PUBLICA CENTRO CIVICO DE LA
COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE
LIRCAY, PROVINCIA DE ANGARAES, HUANCAVELICA”, está
programado para un Plazo de 120 días calendarios (4 meses).
2.1.7 FUENTES DE FINANCIAMIENTO
El proyecto de “CREACION DE LA INFRAESTRUCTURA
PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA
DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE
ANGARAES, HUANCAVELICA” se efectuara con la fuente de
financiamiento de Foncomun.
2.1.8 MODALIDAD DE EJECUCIÓN
La modalidad de Ejecución, será por Contrata (suma alzada).
RESUMEN DE PRESUPUESTO
ALTERNATIVA 2
DESCRIPCION SUBTOTAL TOTALES
01. Construcción del Centro Cívico,
con cobertura de techo aligerado.301406.93 301406.93
02. Capacitación y Asistencia
Técnica7,000.00 7,000.00
03. Mitigación ambiental 5,000.00 5,000.00
12
COSTO DIRECTO 313406.93
GASTOS GENERALES 9.84345% 30,850.05 30,850.05
TOTAL PRESUPUESTO 344,256.98
SON: Trecientos cuarenta y cuatro mil
doscientos cincuenta y seis con 98/100 Nuevos
Soles
2.2 ESPECIFICACIONES TECNICAS:
2.2.1 ALCANCES DE LAS ESPECIFICACIONES
Las presentes especificaciones describen el trabajo que
deberá realizarse para la ejecución de las Obras Civiles del
proyecto arriba indicado, estas tienen carácter general y
donde sus términos no lo precisen, será el SUPERVISOR
DE LA OBRA en la especialidad quien defina, para las
presentes especificaciones técnicas, en adelante para todo
los casos se le denominará “Supervisor” quien determine
respecto a la calidad de los materiales, procedimientos y
métodos de trabajo.
Todos los trabajos sin excepción se desenvolverán dentro
de las mejores prácticas constructivas y estarán sujetos a
la aprobación y plena satisfacción del Supervisor estable a
fin de asegurar su correcta ejecución.
2.2.2 VALIDEZ DE ESPECIFICACIONES, PLANOS Y METRADOS
13
En caso de existir divergencia entre la validez de los
documentos del proyecto, los planos tienen supremacía
sobre las especificaciones técnicas. Los metrados son
referenciales y complementarios y la omisión parcial o total
de una partida no dispensará al Residente de Obra, de su
ejecución, si está prevista en los planos y/o
especificaciones técnicas.
2.2.3 GENERALIDADES
Este documento técnico ha sido elaborado teniendo en
consideración los siguientes criterios:
a) Consideraciones Generales
Conllevan a tomar y asumir criterios dirigidos al aspecto
netamente constructivo al nivel de indicación, materiales y
metodología de dosificación, procedimientos constructivos y
otros, los cuales por su carácter general capacita el documento
a constituirse como auxiliar técnico en el proceso de
construcción.
b) Consideraciones Particulares
Como su nombre lo indica, incluyen la gama de variaciones en
cuanto a tratamiento y aplicación de las partidas, por su
naturaleza son susceptibles a cambio debido que:
El nivel estratigráfico y las distintas variaciones del mismo,
de acuerdo a una localización geográfica determinada,
sugieren técnicas diversas en cuanto al tratamiento de la
14
cimentación que el proyectista tendrá que definir de acuerdo
al estudio de suelos.
El clima y las variaciones atmosféricas inciden notablemente
en el comportamiento de los materiales encauzando a un
tratamiento especial en cuanto al proceso constructivo y
dosificaciones en sí.
2.2.4 ALCANCES DE LAS ESPECIFICACIONES
Las presentes especificaciones describen el trabajo que
deberán realizarse para las obras diseñadas con los
módulos de espacios educativos del Proyecto Rural –
Sierra. Estas tienen un carácter general y donde sus
términos no lo precisen, el Residente tiene autoridad en la
obra respecto a los procedimientos, calidad de los
materiales y método de trabajo.
Todos los trabajos sin excepción se desenvolverán dentro
de las mejores prácticas constructivas a fin de asegurar su
correcta ejecución y estarán sujetos a la aprobación y plena
satisfacción del Supervisor.
2.2.5 VALIDEZ DE ESPECIFICACIONES, PLANOS Y METRADOS
En caso de existir divergencia entre los documentos del
proyecto, los planos tienen primacía sobre las
Especificaciones Técnicas.
Los metrados son referenciales y complementarios y la
omisión parcial o total de una partida no dispensara al
15
residente de su ejecución, si está prevista en los planos
y/o especificaciones técnicas.
2.2.6 CONSULTAS
Todas las consultas relativas a la construcción serán
efectuadas por el Residente al Supervisor, quien de
considerarlo necesario podrá solicitar el apoyo de los
proyectistas.
Cuando en los planos y/o especificaciones técnicas se
indique: “igual o similar”, solo el Residente y en consulta al
Supervisor decidirán sobre la igualdad o semejanza.
2.2.7 MATERIALES
Todos los materiales a usarse serán de reconocida calidad,
debiendo cumplir con todos los requerimientos indicados en
las presentes especificaciones técnicas. Se deberá
respetar todas las indicaciones en cuanto a la forma de
emplearse, almacenamiento y protección de los mismos.
Los materiales que vinieran envasados, deberán entrar en
la obra en sus recipientes originales, intactos y
debidamente sellados.
Además, el Residente tomara especial previsión en lo
referente al aprovisionamiento de materiales nacionales o
importados, sus dificultades no podrán excusarlo del
incumplimiento de su programación.
El almacenamiento de los materiales debe hacerse de tal
manera que este proceso no desmejore las propiedades de
16
estos, ubicándolos en lugares adecuados, tanto para su
protección, como para su despacho.
El Supervisor está autorizado a rechazar el empleo de
materiales, pruebas, análisis o ensayos que no cumplan
con las normas mencionadas o con las especificaciones
técnicas.
Cuando exista duda sobre la calidad, características o
propiedades de algún material, el Supervisor podrá solicitar
muestras, análisis, pruebas o ensayos del material que
crea conveniente, el que previa aprobación podrá usarse
en la obra.
2.2.8 PROGRAMACION DE LOS TRABAJOS
El Residente, de acuerdo al estudio de los planos y
documentos del proyecto programará su trabajo de obra en
forma tal que su avance sea sistemático y pueda lograr su
terminación en forma ordenada, armónica y en el tiempo
previsto.
Si existiera incompatibilidad en los planos de las diferentes
especialidades, el Residente deberá hacer de conocimiento
por escrito al Supervisor, con la debida anticipación y quién
deberá resolver sobre el particular a la brevedad.
El Residente deberá hacer cumplir todas las Normas de
Seguridad en construcción vigentes, siendo este el
responsable de cualquier daño material o personal que
ocasione la ejecución de la obra.
17
a) SUPERVISION DE OBRA
La Municipalidad, nombrará a un Ingeniero o Arquitecto de
amplia experiencia en obras de esta naturaleza y
profesionalmente calificado, quien lo representará en obra,
el cual velará por el cumplimiento de una buena práctica de
los procesos constructivos, reglamentos y correcta
aplicación de las normas establecidas.
b) EQUIPO DE OBRA
El equipo a utilizar en la obra, estará en proporción a la
magnitud de la obra y debe ser el suficiente para que la
obra no sufra retrasos en su ejecución. Comprende la
maquinaria necesaria para la obra, así como el equipo
auxiliar.
c) PROYECTO
En caso de discrepancias en dimensiones del proyecto,
deben respetarse las dimensiones dadas en el proyecto de
Arquitectura.
d) GUARDIANIA DE OBRA
La obra en ejecución contará con una guardianía durante
las 24 horas del día, siendo su responsabilidad el cuidado
de los materiales, equipos, herramientas y muebles que
están en obra.
e) LIMPIEZA FINAL
Al terminar los trabajos y antes de entregar la obra, el
Residente procederá a la demolición de las obras
18
provisionales, eliminando cualquier área deteriorada por él,
dejándola limpia y conforme a los planos.
2.3 EVALUACION DE IMPACTO AMBIENTAL:
2.3.1 DESCRIPCION DEL PROBLEMA
a. Antecedentes del área de influencia
El Proyecto “Creación de Infraestructura Centro Cívico en la
comunidad campesina de Pircapahuana, Distrito de Lircay –
Provincia De Angaraes - Huancavelica” requería de
acciones de adecuación ambiental para compatibilizar los
efectos producidos durante su etapa constructiva y prever la
ocurrencia de potenciales impactos en la etapa operativa.
Dentro de éste contexto de demandas del Proyecto, se
establece la necesidad de contar con una Declaración de
Impacto Ambiental del Proyecto, a su vez el municipio, dentro
del marco de responsabilidad ambiental que le compete ratificó
este requerimiento.
Las Declaraciones de Impacto Ambiental constituyen un tipo
de análisis ambiental, destinado a permitir que un proyecto
dado se ejecute y que permiten demostrar antes de su
ejecución que sus impactos no tienen repercusiones negativas
relevantes o significativas, el análisis ambiental se reduce
en comparación a los Estudios de Impacto Ambiental de
Proyectos que tienen impactos manifiestamente adversos y
19
que demandan un análisis detallado de cada componente
ambiental.
b. Finalidad
La finalidad del Proyecto es proporcionar mejores condiciones
de expendio de sus productos y/o animales, propósito que
coadyuva a mejorar el funcionamiento de manera ordena el
expendio de la ya mencionados.
c. Objetivos
General
Determinar el balancea ambiental de los impactos (positivos y
negativos) del Proyecto, con la construcción de las obras y
actividades del mismo.
Específicos
Conocer los impactos producto de las acciones del
proyecto en su fase de ejecución (construcción de obras
civiles) y de operación.
Proporcionar medidas de control ambiental (prevención,
mitigación y/o correctivas) que compatibilicen la operación
del Proyecto y el ambiente.
Proporcionar una propuesta de plan de manejo y monitoreo
ambiental
d. Resultados esperados
No causar ningún impacto ambiental en la zona:
20
La protección de los componentes ambientales (abióticos, bióticos
y socioeconómicos) que podrían verse afectados por la
ejecución de la etapa deconstrucción del Proyecto.
Lograr la mínima afectación de los componentes ambientales
durante el desarrollo del proceso constructivo de las obras.
Las áreas intervenidas, donde se observen impactos
ambientales, tendrán que ser rehabilitadas y/o restauradas
para que estas vuelvan a ser como eran antes del inicio de las
obras.
e. Ubicación
Ubicación Política
Región : Huancavelica
Provincia : Angaraes
Distrito : Licay
Localidad : Pircapahuana
Región Natural : Sierra
Altitud de Suni : 3390 m.s.n.m
Accesos
El acceso Principal a la comunidad principal es por una vía
afirmada con una distancia de 12 Km de la ciudad de lircay cuya
vía tiene acceso pasando las comunidades de Ccollpapampa,
Jatumpata, por el suroeste, a su vez tiene acceso por la vía de la
comunidad de Rumichaca por una vía afirmada hasta
Pircapahuana – plaza principal donde se ubica el recinto.
21
2.4 ESTUDIO MECANICA DE SUELOS:
2.4.1 GENERALIDADES
Todo estudio de Mecánica de Suelos, tiene un objetivo el mismo
que viene a representar los detalles de los tipos de suelo que
abarca la zona, como meta principal está en cubrir necesidades
de evaluación económica y técnica que inicialmente fueron
planteadas en las diferentes alternativas consideradas durante el
estudio del mismo.
Es necesario tener en claro que los estudios de mecánica de
suelos, se plantean a partir de trabajos que se desarrollan tanto
en campo como en gabinete, es decir trabajos de laboratorio y el
procesamiento de los resultados.
Esta cuantificación de las propiedades de los suelos ya sean
físicas o mecánicas, viene a representar puntos de interés para
nuestro proyecto por el mismo hecho de tener una idea clara del
tipo de material sobre la cual estará emplazado el Proyecto.
2.4.2 COMPORTAMIENTO DE LOS SUELOS
Del análisis del perfil estratigráfico de los suelos evaluados, nos
conducen a tener una idea clara de la formación superficial con
características adecuadas para poder soportar todo una
estructura que se planeta, el material que predomina dentro de
los grupos ML - CL, en el sistema de clasificación SUCS de
suelos y se nota que Limo inorgánico con ligante Arcillosa, según
los Limites de Atterberg tenemos el Limite Liquido de 27.00, Índice
22
de Plasticidad de 6.8, Limite Plástico de 20.02 y una Humedad de
10.30%.
2.4.3 . ESTUDIO PARA EL PERFIL ESTRATIGRÁFICO.
Las perforaciones y muestreos para el perfil estratigráfico del estudio
del proyecto “ CREACION DE INFRAESTRUCTURA PUBLICA
CENTRO CIVICO DE LA COMUNIDAD CAMPESINA DE
PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE
ANGARAES - HUANCAVELICA “, se efectuaron hasta una
profundidad de 1.50 m., por debajo del nivel del terreno, se
efectuaron en la modalidad de pozos a cielo abierto o calicatas.
23
24
25
26
27
28
2.5 DISEÑO DE MEZCLA
29
30
2.6 MEMORIA DE CÁLCULO
METRADO DE CARGAS
PROYECTO
ENTIDAD : MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAYLUGAR : PIRCAPAHUANADISTRITO : LIRCAYPROVINCIA : ANGARAESREGION : HUANCAVELICAFECHA : JUNIO DEL 2012
Las cargas que se consideraron para el analisis y diseño de la estructura son las siguientes: 1. CARGAS PERMANENTES O PESO MUERTO (CP) 1.1. Losa aligerada de 20cm de espesor en camerinos : 300 Kg/m2 1.2. escaleras : 350 Kg/m2
1.3. Albañileria con ladrillo artesanal inc. Acabado en muros : 180 Kg/m2
1.4. Concreto : 2400 Kg/m3 2. CARGAS TEMPORALES O PESO VIVO (CT) 2.1 Sala de Usos Multiples : 350 Kg/m2 2.2 Oficinas : 250 Kg/m2 3.2 Servicios Higienicos : 280 kg/m2 3. CARGAS SISMICAS (CS) 3.1. Fuerzas horizontales • Factor de zona
Departamento de Huancavelica (Zona 2) : Z = 0.30
• Categoría de la edificación
Edificaciones comunes (Categoria A) : U = 1.00
• Factor de ampliación sismica
Según lo establecido en el RNE : C = 2.50 • Factor de suelo
Suelo Limo inorganico con ligante arcilloso (ML-CL) : S = 1.40
• Sistema estructural Estructura de concreto armado : R = 8.00 • Periodo de la estructura
Según analisis dinamico : T = 0.03352 s
• Peso de la edificacion
Sala de Usos Multiples 27.2 Ton
Oficinas 10.23 Ton Total 37.43 Con todos estos datos se determina la fuerza cortante en la
31
base • Fuerza cortante en la base : V = 3.16 Ton
• Distribucion de la fuerza sismica en la estructura
sala de reuniones y auditorio : F1 = 1.56 Ton
oficinas : F2 = 0.98 Ton 3.2. Momentos torsores
Sala de Usos Múltiples : M1 = 1.75 Ton.m
Oficinas : M2 = 0.64 Ton.m4. COMBINACIONES DE CARGA
4.1. La resistencia requeria se determinara según lo establecido por el RNE
• 1.40CP + 1.70CT • 1.25CP + 1.25CT ± 1.00CS • 0.90CP ± 1.00CS
DISEÑO DE CIMIENTO AISLADO
CIMIENTO (ZAPATA CENTRICA)
EXP. TEC.
ENTIDAD
: MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAY
LUGAR
: PIRCAPAHUANA
DISTRITO
: LIRCAY
PROVINCIA
: ANGARAES
REGION
: HUANCAVELICA
FECHA
: JUNIO DEL 2012
Los datos necesarios para determinar las dimensiones del cimiento corrido son los siguientes
Resistencia del concreto
f'c = 210.00 Kg/cm2
Resistencia del acero
f'y = 4200.00 Kg/cm2
Carga axial CP CP = 7.34 Ton
32
Carga axial CT CT = 3.54 Ton
Factor mayoracion CP
φCP = 1.40
Factor mayoracion CT
φCT = 1.70
Carga axial máxima Pu = 16.29 Ton
Cortante ultima Vu = 696.87 kg
Sobrecarga
S/C = 250.00 Kg/m2
Factor de seguridad por flexión
φ = 0.90
Factor de seguridad por cortante
φ = 0.85
Resistencia del suelo
σt = 1.00 Kg/cm2
Densidad del concreto armado
γc = 2500.00 Kg/m3
Densidad del suelo γs = 1800.00 Kg/m3
Peralto asumido de la zapata
h = 0.60 m
Dimensión 1 de la columna
d1 = 0.25 m
Dimensión 2 de la columna
d2 = 0.25 m
Longitud libre de la columna
Lc = 3.15 m
Profundidad de cimentación
hf = 0.90 m
Módulo de reacción del suelo
ks1 = 2.50
Recubrimiento lateral e inferior de la zapata
r1 = 7.00 cm
Recubrimiento de la columna
r2 = 4.00 cm
Se asumirá un peralto mínimo de 60cm, según el RNE, se determinara las dimensiones de la zapata, conel esfuerzo neto del terreno, como sigue:
σn = 8.67 Ton/m2
Por lo tanto, las dimensiones de la zapata son:
Az = b(b) = 1.25 m2
b = 1.10 m
Se trabajara con las siguientes dimensiones:
33
b = 1.50 m
T = 1.50 m
Lv = 0.63 m
Se revisara la condición de puzonamiento de la zapata:
Vu/φ = 15.85
Vc =
254.01
Cumple por punzonamiento
1. Diseño longitudinal
d = 0.51 m
Wnu = 7.24 Ton/m
Mu max = 2.12 Ton.m
a = 0.10 m
As = 1.22 cm2
As min = 13.80 cm2
Utilizando acero de: 1/2 " con un área de: 1.27cm2
La cantidad de barras comerciales: 11.00 unidades
Con un espaciamiento (@) de: 0.140 m
2. Dirección transversal
d = 0.51 m
wNU = 7.24 Ton/m
Mu max = 1.41 Ton.m
a = 0.10 m
As = 0.81 cm2
34
As min = 13.80 cm2
Utilizando acero de: 1/2 " con una area de: 1.27cm2
La cantidad de barras comerciales: 11.00 unidads
Con un espaciamiento (@) de: 0.140 m
3. Resistencia de aplastamiento sobre la columna
Pn = 25.07 Ton
Pnb = 111.56 Ton
Cumple
4. Resistencia de aplastamiento sobre la cimentacion
Xo = 1.50 m
Pn = 25.07 Ton
Pnb = 223.125
Cumple
1.5m
11 φ 0.5 inch @ 0.14 m
1.5m
11 φ 0.5 inch @ 0.14 m
35
DISEÑO DE CIMIENTO CORRIDO
MUROS INTERIORES
EXP. TEC.
ENTIDAD : MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAY
LUGAR : PIRCAPAHUANA
DISTRITO : LIRCAY
PROVINCIA : ANGARAES
REGION : HUANCAVELICA
FECHA : MAYO DEL 2012
Los datos necesarios para determinar las dimensiones del cimiento corrido son los siguientes
Resistencia del suelo σt = 1.00Kg/cm2
Altura del muro h1 = 3.50 m
Altura de la columna h2 = 3.50 m
Dim. 1 de la col. de confinamiento
b1 = 0.20 m
Dim. 2 de la col. de confinamiento
b2 = 0.15 m
Dim. 1 de la viga de confinamiento
c1 = 0.25 m
Dim. 2 de la viga de confinamiento
c2 = 0.15 m
Ancho del muro d = 0.15 m
Espesor del tarrajeo e = 1.50 cm
Peralto de la cimentacion corrida
h = 0.60 m
Altura del sobrecimiento
a = 0.30 m
Densidad del muro de mamposteria
γa = 1800.00Kg/m3
36
Densidad del concreto ciclopeo
γc1 = 2200.00Kg/m3
Densidad del concreto armado
γc2 = 2500.00Kg/m3
Factor de mayoracion para las cargas
= 1.40
Se determinara el peso del: muro, columna, tarrajeo y sobrecimiento:
P1 = 2.12 Ton
La determinacion del peso del cimiento se obtiene en funcion del ancho del cimiento corrido:
P2 = 1.85 B Ton
Teniendo en cuenta los peso que se generan en el suelo, se llega a una ecuación de 1er grado de donde
se obtiene el ancho del cimiento corrido:
B = 0.26 m
El ancho mínimo del cimiento corrido es dos veces el ancho del muro:
B ≥ 0.35M
DISEÑO ESTRUCTURAL VIGA TIPO VP - 101
DISEÑO POR CORTANTE EXP.
TEC.
: "CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES
HUANCAVELICA
ENTIDAD
: MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAY
LUGAR : PIRCAPAHUANA
DISTRITO
: LIRCAY
PROVIN : ANGARAES
37
CIA REGION : HUANCAVELICA FECHA : MAYO DEL 2012 Los datos de cortantes corresponden a la viga analizada
Ancho de la viga b= 0.25 m
Preralte de la viga
h= 0.45 m
Peralte efectivo d= 0.41 m
Recubrimiento r= 0.04 m
Resistencia del concreto f'c= 21.00 MPa
Resistencia del acero
f'y= 420.00 MPa
Cortante Carga temporal Vct= 12.25 kN.m
Cortante Carga permanente Vcp= 38.52 kN.m
Factor de amliacion para la CT
Øct= 1.70
Factor de amliacion para la CP
Øcp= 1.40
Cortante ultimo Vu= 74.75 kN.m
Factor de reduccion de resistencia
Ø= 0.85
Longitud de la viga
L= 2.520 m
Para que el elemento cumpla con los requisitos de resistencia a la cortante se tiene la siguiente
expresión:
Vu ≤ ØVn Exp. 10
Donde la Vu es la fuerza cortante amplificada en la seccion considerada y Vn es la resistencia nominal
al cortante calculada según la Exp.
Vn=Vc+Vs Exp. 11
La Vc es la resistencia a la cortante que aporta el concreto y la Vs es la resistencia que aporta el acero.
El aporte del concreto a la resistencia por cortante se determina con la Exp. 12
ØVc=Ø*0.17*b*d*√f'c Exp. 12
ØVc= 67.87 kN
38
Alrededor de los apoyos se toma la cortante a una distancia b/2 + 3d/4
0.4325 m
Por lo tanto, la cortante que se utilizara para realizar los calculos sera
49.09 kN
Es necesario el acero de refuerzo por calculo en la zona comprendida desde el apoyo de
la viga hasta la longitud
L1 = 0.12 m
El acero de refuerzo no es necesario desde L2 = 0.69 m
El cálculo del espaciamiento del acero de refuerzo para la cortante se determina mediante la Exp. 13
sx=Ø*Av*f'y*d/(Vx-ØVc) Exp. 13
Utilizando acero de Ø 3/8" para el cerco se tiene un Av= 1.42 cm2
Resolviendo la Exp. 13 se llega a la relacion que existe entre la cortante y el espaciamiento de los estribos
que se refleja en la siguiente tabla
sx(m) 0.5 1 1.5 2
Vux(k
N)45.09 15.43 -14.24
-43.9
0
sx(m) 1.86 -1.12 -0.43-
0.27
Según el RNE el espaciamiento maximo no debe de exceder los siguientes limites d/2 = 0.205 m
esp. Max
=0.20 m
Teniendo en cuenta los datos obtenidos según la tabla y los limites maximos para el espaciamiento
del acero de refuerzo por cortante se tiene el siguiente espaciamiento:
1 @ 0.05m, Rto. @ 0.20m
39
2.7 METRADOS
40
H O J A D E M E T R A D O S
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
COMPONENTE
01 CONSTRUCCION DE INFRAESTRUCTURA
FORMULA 01.01 OBRAS PROVISIONALES
UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA FECHA
08/06/2012
PARTIDA DESCRIPCION
ELEMENTO DIMENSIONES METRADOS
UNDCANT
.LARGO ANCHO
ALTO
PARCIAL TOTAL
01CONSTRUCCION DEL CENTRO CIVICO CON
COBERTURA DE TECHO ALIGERADO
01.01 OBRAS PROVISIONALES
01.01.01 ADECUACION DE ALMACEN Y OFICINA DE OBRA GLB
1.00
AREA DE 50 M2 1.00 1.00
01.01.02 CARTEL DE IDENTIFICACION DE LA OBA DE 3.60x2.40M UND
1.00
1.00 1.00
01.01.03 CERCO PERIMETRICO CON TELA ARPILLERA M
56.00
PERIMETRO DE LA CONSTRUCCION
1 56.00
01.01.04 PAGO DE DERECHO DE CONEXIÓN DE ENERGIA ELECTRICA UND
1.00
1.00 1.00
01.01.05FLETE TERRESTRE GLB
1.00
TRANSPORTE DE MATERIALES DE CONSTRUCCION 1
1.00
01.01.06 PLACA RECORDATORIA SEGÚN DISEÑO UND
1.00
1 1.00
H O J A D E M E T R A D O S
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
41
COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURAFORMULA 01.02 ESTRUCTURAS
UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA FECHA 08/06/2012
PART. DESCRIPCIONUND DIMENCIONES PARCIAL
Largo Ancho Alto
01.02 ESTRUCTURAS 01.02.01 TRABAJOS PRELIMINARES 01.02.01.01 LIMPIEZA DE TERRENO MANUAL m² 1 18.00 8.00 144.00 144.00
2.01.02TRAZO NIVELACION Y REPLANTEO PRELIMINAR m² 1 17.00 7.50 127.50 127.50
2.01.03TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE OBRA m² 2 17.00 7.50 255.00 255.00
01.02.02 MOVIMIENTO DE TIERRA 02.02.01 EXCAVACION MASIVAS DE TERRENO m³ 1 17.00 7.50 0.20 25.50 25.50
02.02.02EXCAVACION ZANJAS PARA ZAPATAS DE 2.00 MT. DE PROFUNDIDAD m³ 36.74
Z - 1 10 1.50 1.50 1.30 29.25 Z - 2 4 1.20 1.20 1.30 7.49
02.02.03EXCAVACION PARA CIMIENTO CORRRIDO m³ 7.33
EJE 3-3' DE A a F 3 2.20 0.35 0.70 1.62 1 1.18 0.35 0.70 0.29 1 0.83 0.35 0.70 0.20 EJE 1-1' DE A a F 3 2.20 0.35 0.70 1.62 1 1.18 0.35 0.70 0.29 1 0.83 0.35 0.70 0.20 EJE A-A' DE 1 a 3 2 1.18 0.35 0.70 0.58 EJE F-F' DE 1 a 3 2 0.70 0.35 0.70 0.34 EJE E-E' DE 1 a 3 1 3.25 0.35 0.70 0.80 EJE E,F ENTRE 1,2 1 2.20 0.35 0.70 0.54 1 0.83 0.35 0.70 0.20 Base de Escalera m³ 1 1.20 0.60 0.90 0.65
02.02.04RELLENO COMPACTADO CON MATERIAL AFIRMADO C-EQUIPO 9.94
LIVIANO m³ 1 16.70 5.95 0.10 9.94
02.02.05
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 1 KM m³ 1.25 vol= 62.24 77.80 77.80
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01SOLADO DE ZAPATAS DE E=4"MEZCLA 1:12 m2 28.26
Z - 1 10 1.50 1.50 22.50 Z - 2 4 1.20 1.20 5.76
02.03.02CIMIENTOS CORRIDOS MEZCLA 1:10 C.H. +30% P.G. m³ 7.33
EJE 3-3' DE A a F 3 2.20 0.35 0.70 1.62 1 1.18 0.35 0.70 0.29 1 0.83 0.35 0.70 0.20 EJE 1-1' DE A a F 3 2.20 0.35 0.70 1.62 1 1.18 0.35 0.70 0.29 1 0.83 0.35 0.70 0.20 EJE A-A' DE 1 a 3 2 1.18 0.35 0.70 0.58 EJE F-F' DE 1 a 3 2 0.70 0.35 0.70 0.34 EJE E-E' DE 1 a 3 1 3.25 0.35 0.70 0.80 EJE E,F ENTRE 1,2 1 2.20 0.35 0.70 0.54 1 0.83 0.35 0.70 0.20 Base de Escalera m³ 1 1.20 0.60 0.90 0.65
02.03.03SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M. m³ 2.01
EJE 3-3' DE A a F 2 3.45 0.15 0.30 0.31 1 1.39 0.15 0.30 0.06 1 2.75 0.15 0.30 0.12 EJE 1-1' DE A a E 3 3.45 0.15 0.30 0.47 1 2.40 0.15 0.30 0.11 1 2.75 0.15 0.30 0.12 EJE A-A' DE 1 a 3 2 2.53 0.15 0.30 0.23 EJE E-E' DE 1 a 3 2 2.53 0.15 0.30 0.23 EJE D-D' DE 1 a 3 1 2.55 0.15 0.30 0.11 1 0.40 0.15 0.30 0.02
42
EJE D,E ENTRE 1,2 2 2.50 0.15 0.30 0.23
02.03.04ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS. m² 48.65
EJE 3-3' DE A a E 2 1.75 0.75 2.63 2 9.92 0.30 5.95 menos columnas -4 0.25 0.30 -0.30 EJE 1-1' DE A a E 2 1.75 0.75 2.63 2 13.77 0.30 8.26 menos columnas 6 0.25 0.30 0.45 EJE A-A' DE 1 a 3 2 3.23 0.75 4.85 2 3.22 0.75 4.83 EJE E-E' DE 1 a 3 2 3.23 0.30 1.94 2 3.22 0.30 1.93 EJE D-D' DE 1 a 3 2 3.22 0.30 1.93 menos columnas 2 1.43 0.30 0.86 EJE 1,3 ENTRE A,B 4 1.00 0.75 3.00 4 1.50 0.75 4.50 EJE C,D ENTRE 1,2 2 2.05 0.30 1.23 4 2.90 0.30 3.48 4 0.30 0.30 0.36 2 0.23 0.30 0.14
02.03.05FALSO PISO DE 4" DE CONCRETO 1:10. m² 92.56
SALA DE USOS MULTIPLES, HALL, SS.HH. DAMAS Y VARONES 1 CAD = 92.56 92.56
02.03.06CONCRETO FC= 140 KG/CM2 EN VEREDA m² 50.40
Parte frontal 1 17.00 1.20 20.40 Parte lateral dereco e izquierdo 2 6.50 1.00 13.00 Parte posterior 1 17.00 1.00 17.00
02.03.07ENCOFRADO Y DESENCOFRADO DE VEREDA m² 50.40
Parte frontal 1 17.00 1.20 20.40 Parte lateral dereco e izquierdo 2 6.50 1.00 13.00 Parte posterior 1 17.00 1.00 17.00 01.02.04 OBRAS DE CONCRETO ARMADO 01.02.04.01 ZAPATAS
02.04.01.01CONCRETO EN ZAPATAS F'C=210KG/CM2 m3 16.96
Z - 1 10 1.50 1.50 0.60 13.50 Z - 2 4 1.20 1.20 0.60 3.46 02.04.01.02 ACERO EN ZAPATAS FY=4200 KG/CM2 kg 284.33 (ver hoja de metrado de acero) 01.02.04.02 COLUMNAS
02.04.02.01CONCRETO EN COLUMNAS F'C=210 KG/CM2 m³ 15.83
PRIMER PISO C1 14 7.88 0.25 0.4 11.03 AZOTEA 3 2.3 0.25 0.4 0.69 10% de concreto en Ladrillos 11.032 1.10
02.04.02.02ACERO EN COLUMNAS FY=4200 kg/cm2 kg 2177.39 2177.39
(ver hoja de metrado de acero)
02.04.02.03ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNA m² 73.12
PRIMER NIVEL C1 14 1.00 2.43 34.02 SEGUNDO NIVEL C1 14 1.00 2.30 32.20 AZOTEA C1 3 1.00 2.30 6.90 02.04.03 VIGAS
43
02.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m³ 17.85 PRIMER PISO VA 6 3.45 0.25 0.20 1.04 2 2.40 0.25 0.20 0.24 2 2.75 0.25 0.20 0.28 VP 4 2.53 0.25 0.45 1.14 4 5.45 0.25 0.45 2.45 volado 1 0.90 0.25 0.20 0.05 3 1.20 0.25 0.20 0.18 VIGA ESCALERA 1 2.40 0.25 0.20 0.12 doble viguetas 1 2.40 0.15 0.20 0.07 3 3.45 0.15 0.2 0.31 SEGUNDO PISO VA 6 3.45 0.25 0.20 1.04 2 2.40 0.25 0.20 0.24 2 2.75 0.25 0.20 0.28 VP 4 2.53 0.25 0.40 1.01 4 5.45 0.25 0.40 2.18 volado 2 1.50 0.25 0.20 0.15 doble viguetas 1 2.40 0.15 0.20 0.07 3 3.45 0.15 0.2 0.31 AZOTEA VA - 202 (0.20x0.25) 2 2.90 0.25 0.20 0.29 VA - 203 (0.20x0.25) 2 4.25 0.25 0.20 0.43 02.04.03.02 ACERO EN VIGAS FY=4200 KG/CM2 kg 1476.61 1476.61 (ver hoja de metrado de acero)
02.04.03.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m² 126.85
EJE A-A, F-F 2 6.25 1.00 12.50 EJE B, C,D y E 4 6.25 1.15 28.75 EJE 1, 3 2 17.00 0.65 22.10 menos -1 12.55 0.15 -1.88 -1 1.85 0.15 -0.28 SEGUNDO PISO EJE 1-1 EJE A-A, F-F 2 6.25 0.95 11.88 EJE B, C,D y E 4 6.25 1.10 27.50 EJE 1, 3 2 17.00 0.65 22.10 menos -1 12.55 0.15 -1.88 -1 3.05 0.15 -0.46 AZOTEA EJE E-E, F-F 4 4.25 0.20 3.40 EJE 2-2,3-3 4 3.90 0.20 3.12 01.02.04.04 ESCALERAS
02.04.04.01CONCRETO EN ESCALERAS FC=210 KG/CM2 m³ 4.12
Cimiento 1 1.20 0.60 1.00 0.72 Losa 1 5.93 1.20 0.18 1.28 Gradas 16 1.20 0.25 0.18 0.43 Losa 1 5.93 1.20 0.18 1.28 Gradas 15 1.20 0.25 0.18 0.41
02.04.04.02ACERO EN ESCALERAS FY=4200 KG/CM2 kg 325.84 325.84
(ver hoja de metrado de acero)
02.04.04.03ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m² 118.19
EJE A-A, F-F 2 6.25 1.00 12.50 EJE B, C,D y E 8 6.25 1.15 57.50 EJE 1, 3 4 17.00 0.65 44.20 01.02.04.05 LOSA ALIGERADA
02.04.05.01CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 45.00
PRIMER NIVEL Losa m³ 3 5.75 3.45 0.05 2.98 1 5.75 2.75 0.05 0.79 1 2.40 1.85 0.05 0.22 1 2.40 1.15 0.05 0.14 voladizo 2 3.45 0.75 0.05 0.26 1 3.45 1.05 0.05 0.18
VIGUETAS 45.0
0 3.45 0.10 0.15 2.33
44
5.00 2.40 0.10 0.15 0.18 3 2.40 0.10 0.15 0.11 3 2.75 0.10 0.15 0.12 voladizo 15 3.45 0.10 0.15 0.78 SEGUNDO NIVEL 3 5.75 3.45 0.05 2.98 1 5.75 2.75 0.05 0.79 1 2.40 1.85 0.05 0.22 1 2.40 1.15 0.05 0.14 voladizo 2 3.45 0.75 0.05 0.26 1 3.45 1.05 0.05 0.18
VIGUETAS 45.0
0 3.45 0.10 0.15 2.33 5.00 2.40 0.10 0.15 0.18 3 2.40 0.10 0.15 0.11 3 2.75 0.10 0.15 0.12 voladizo 15 3.45 0.10 0.15 0.78
02.04.05.02ACERO EN LOSA ALIGERADA FY=4200 KG/CM2 kg 3110.71 3110.71
(ver hoja de metrado de acero)
02.04.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m² 216.36
PRIMER NIVEL Area 1 1 16.50 2.05 33.83 1 16.50 1.15 18.98 Area 2 1 13.85 2.75 38.09 Area 3 1 10.85 1.40 15.19 SEGUNDO NIVEL Area 1 1 16.50 2.05 33.83 1 16.50 1.15 18.98 Area 2 1 13.85 2.75 38.09 1 13.85 1.40 19.39
02.04.05.04LADRILLO HUECO DE ARCILLA h = 15 CM PARA TECHO ALIGERADO
Und. 1604.96
PRIMER NIVEL Losa m³ 3 5.75 3.45 495.74 1 2.40 1.85 36.99 1 5.75 2.75 131.72 1 2.40 1.15 22.99 voladizo 1 3.45 0.75 21.55 2 3.45 1.20 68.97 SEGUNDO NIVEL Losa m³ 3 5.75 3.45 495.74 1 2.40 1.85 36.99 1 5.75 2.75 131.72 1 2.40 1.15 22.99 voladizo 2 3.45 0.75 43.11 2 3.45 1.20 68.97 1 2.75 1.20 27.49 01.02.04.06 LOSA MACIZA
02.04.06.01CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2 1.23
AZOTEA TRAMO 01 m³ 1 4.25 2.90 0.10 1.23
02.04.06.02ACERO EN LOSA MACIZA FY=4200 KG/CM2 kg 135.33 135.33
(ver hoja de metrado de acero)
02.04.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACIZA m² 12.33
Area 1 1 4.25 2.90 12.33 01.02.05 CONTROL DE CALIDAD 02.05.01 DISEÑO DE MEZCLAS Und 1 1.00 1.0002.05.02 ROTURA DE PROBETAS Und 10 10.00 10.00
45
PLANILLA DE METRADOS ACERO
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY,
PROVINCIA DE ANGARAES - HUANCAVELICA”
COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA
FORMULA 01.02 ESTRUCTURAS
UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY LOCALIDAD DE PIRCAPAHUANA FECHA
Set. Del 2012
PART. DESCRIPCIONUND
ØCANT.
Nº DE PIEZAS
LONGUITUD
Kg/mlPARCIAL
TOTAL
METRADO DE ACERO 01.02.04.01.02 Zapatas
Armadura de acero Kg 284.3
3
Z-1 1/2 10 8 1.45 0.99 114.84 1/2 10 8 1.45 0.99 114.84 Z-2 1/2 4 6 1.15 0.99 27.32 1/2 4 6 1.15 0.99 27.32 01.02.04.02.02 Columnas
Armadura de acero Kg 1177.
39 C-1 5/8 12 4 8.15 1.550 606.36 1/2 12 2 8.15 0.99 193.64 1/4 14 42 1.35 0.260 206.39 1/2 2 4 8.15 0.99 64.55 5/8 7 4 1.10 1.550 47.74 1/2 7 2 1.10 0.99 15.25 1/4 9 11 1.35 0.260 34.75 1/2 2 4 1.10 0.99 8.71 01.02.04.03.02 Vigas
Armadura de acero Kg 1476.
61
PRIMER Y SEGUNDO NIVEL
VA 1/2 4 5 17.40 0.99 344.52 escalera 1/2 2 5 3.30 0.99 32.67 1/4 2 207 1.00 0.260 107.64 VP 5/8 10 5 6.65 1.550 515.38 positivo 5/8 12 1 4.65 1.550 86.49 negativo 5/8 26 1 2.00 1.550 80.60
1/4 1034.7
5 1.40 0.260 126.49 doble vigueta primer nivel 1/2 1 2 3.30 0.99 6.53 1/2 1 2 11.75 0.99 23.27 doble vigueta segundo nivel 1/2 1 2 17.40 0.99 34.45 volado primer nivel 5/8 2 5 1.30 1.550 20.15 5/8 2 5 1.60 1.550 24.80 volado segundo nivel 5/8 5 5 1.90 1.550 73.63 VA Azotea 1/2 2 4 4.25 0.99 33.66 1/2 2 4 3.90 0.99 30.89
01.02.04.04.02 Escalera 325.8
4
Armadura de acero primer piso 1/2 1 8 10.00 0.99 79.20
1/2 1 9 9.00 0.99 80.19 3/8 1 30 1.20 0.560 20.16
46
3/8 1 30 1.73 0.560 29.06
Armadura de acero segundo piso
1/2 1 8 9.00 0.99 71.28 3/8 1 28 1.20 0.560 18.82 3/8 1 28 1.73 0.560 27.13
H O J A D E M E T R A D O S
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA
FORMULA 01.03 ARQUITECTURA
UBICACIÓN PROVINCIA DE ANGARAES, DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA
PARTIDA DESCRIPCIONELEMENTO DIMENSIONES METRADOS
UNDCANT
.LARGO ANCHO ALTO PARCIAL TOTAL
01.03 ARQUITECTURA
01.03.01MUROS Y TABIQUES DE ALBAÑILERIA
01.03.01.01MURO DE SOGA LADRILLO DE ARCILLA C.A 1:4
m2 267.33
PRIMER PISO
Eje A 2 2.525 2.43 12.27
Eje F 2 2.525 2.43 12.27
Eje E 1 2.73 2.43 6.63
1 0.40 2.43 0.97
Eje 1 3 3.45 1.78 18.42
1 2.75 1.78 4.90
1 2.40 1.78 4.27
Eje 3 2 3.45 1.78 12.28
2 0.73 1.78 2.58
1 2.75 1.78 4.90
1 1.40 1.78 2.49
Eje E,F entre 1,2 1 2.40 2.68 6.43
1 2.40 2.00 4.80
2 0.30 2.00 1.20
SEGUNDO PISO
Eje 1 m2 2 3.45 0.80 5.52
2 2.75 0.80 4.40
1 0.40 2.50 1.00
1.00 3.05 0.80 2.44
1.00 2.40 1.60 3.84
Eje E, F entre 1,2 1.00 2.52 1.80 4.54
1.00 2.52 2.50 6.30
2.00 0.30 1.80 1.08
Eje 2' 1.00 4.30 2.50 10.75
1.00 3.95 0.60 2.37
47
Eje 3 1.00 2.40 0.80 1.92
Closet 3.00 0.65 2.50 4.88
1.00 0.88 1.00 0.88
1.00 2.75 2.50 6.88
1.00 1.45 2.50 3.63
Eje 3' 1 4.30 0.80 3.44
1.00 3.87 0.80 3.10
1.00 3.30 0.80 2.64
1.00 1.05 0.80 0.84
Eje A 2.00 2.53 2.10 10.61
Eje C 1.00 1.90 0.80 1.52
1.00 0.75 2.50 1.88
Closet 1.00 2.50 2.50 6.25
1.00 1.04 2.50 2.60
Eje D,E, entre 1,2 1.00 2.70 2.50 6.75
Eje E 1.00 0.40 2.20 0.88
Eje F 2.00 2.23 1.60 7.14
AZOTEA
Parapeto en perimetro de la azotea
m2 1.00 45.21 1.0045.21
Muro de caja de escalera en azotea
1.00 2.80 0.651.82
AREA 01 2.00 AREA 7.24 14.48
1.00 2.40 1.40 3.36
01.03.01.02MAMPARA CON PERFILES DE ALUMINIO INC. VIDRIOS
m2 18.56
SEGUNDO PISO
Eje C 1 1.90 1.50 2.85
Eje 1,2 1.00 4.32 1.90 8.21
Eje 2,3 1.00 3.95 1.90 7.51
01.03.02REVOQUES, ENLUCIDOS Y MOLDURAS
01.03.02.01TARRAJEO EN INTERIORES ACABADO CON CEMENTO - ARENA
m2 327.24
PRIMER PISO
Eje A 2 2.525 2.43 12.27
Eje F 1 3.195 2.43 7.76
1 1.72 1.38 2.37
Eje E 2 2.73 2.43 13.27
2 0.40 2.43 1.94
Eje 1 3 3.45 1.78 18.42
1 2.40 1.78 4.27
1 2.75 1.78 4.90
Eje 3 2 3.45 1.78 12.28
2 0.73 1.78 2.58
1 2.75 1.78 4.90
1 1.40 1.78 2.49
Eje E,F entre 1,2 1 2.40 1.38 3.31
2 2.40 1.10 5.28
4 0.30 1.10 1.32
derrames 1 56.28 0.15 8.44
SEGUNDO PISO
Eje 1 2 3.45 0.80 5.52
48
2 2.75 0.80 4.40
1 0.40 2.50 1.00
1.00 3.05 0.80 2.44
1.00 2.40 0.20 0.48
Eje E, F entre 1,2 1.00 2.52 0.50 1.26
1.00 2.52 1.20 3.02
4.00 0.30 0.50 0.60
Eje 2' 2.00 4.30 2.50 21.50
2.00 3.95 0.60 4.74
Eje 3 1.00 2.40 0.80 1.92
Closet 6.00 0.65 2.50 9.75
2.00 0.88 1.00 1.76
1.00 2.75 2.50 6.88
1.00 1.55 2.50 3.88
Eje 3' 1 4.30 0.80 3.44
1.00 3.87 0.80 3.10
1.00 3.30 0.80 2.64
1.00 1.05 0.80 0.84
Eje A 2.00 2.53 1.42 7.17
Eje C 2.00 1.90 0.80 3.04
2.00 0.75 2.50 3.75
Closet 2.00 2.50 2.50 12.50
2.00 1.04 2.50 5.20
Eje D,E, entre 1,2 2.00 2.70 2.50 13.50
Eje E 2.00 0.40 2.20 1.76
2.00 2.50 2.20 11.00
Eje F 2.00 2.23 1.60 7.14
derrames 1 79.05 0.15 11.86
AZOTEA
Parapeto en perimetro de la azotea
m2 1.00 45.21 1.0045.21
Muro de caja de escalera en azotea
1.00 2.80 0.651.82
AREA 01 2.00 AREA 7.24 14.48
1.00 2.40 1.40 3.36
derrames 1.00 3.20 0.15 0.48
01.03.02.02TARRAJEO EN EXTERIORES ACABADOS CON CEMENTO ARENA
m2 133.63
PRIMER PISO
Eje 3 2 3.45 1.78 12.28
2 0.73 1.78 2.58
1 2.75 1.78 4.90
1 1.40 1.78 2.49
Eje A 2 2.525 2.43 12.27
Eje F 2 2.525 2.43 12.27
SEGUNDO PISO
Eje 3 1.00 2.40 0.80 1.92
1.00 2.75 2.50 6.88
Eje 3' 1 4.30 0.80 3.44
1.00 3.87 0.80 3.10
1.00 3.30 0.80 2.64
1.00 1.05 0.80 0.84
49
Eje B 1.00 0.75 0.80 0.60
Eje B 1.00 0.45 0.80 0.36
Eje E 1.00 1.20 0.80 0.96
Eje D 1.00 0.95 0.80 0.76
AZOTEA
Parapeto en perimetro de la azotea
m2 1.00 45.21 1.0045.21
Muro de caja de escalera en azotea
1.00 2.80 0.651.82
AREA 01 2.00 AREA 7.24 14.48
1.00 2.40 1.40 3.36
derrames 1.00 3.20 0.15 0.48
01.03.02.03TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5
m2 37.99
PRIMER NIVEL
Eje F 1 1.60 1.30 2.08
1 0.35 1.30 0.46
Eje E 2 0.25 1.30 0.65
Eje 1 2 2.25 1.20 5.40
Eje E,F entre 1,2 1 2.25 1.20 2.70
1 2.40 1.20 2.88
1 2.40 1.20 2.88
4 0.30 1.30 1.56
2 0.15 1.30 0.39
SEGUNDO NIVEL
Eje F 1 1.60 1.30 2.08
1 0.35 1.30 0.46
Eje E 2 0.25 1.30 0.65
Eje 1 2 2.25 1.20 5.40
Eje E,F entre 1,2 1 2.25 1.20 2.70
1 2.40 1.20 2.88
1 2.40 1.20 2.88
4 0.30 1.30 1.56
2 0.15 1.30 0.39
01.03.02.04TARRAJEO DE SUPERFICIE COLUMNAS CON CEMENTO ARENA
m2 56.96
PRIMER NIVEL
Superficies
Interior
SUM 8 0.75 2.68 16.08
4 0.35 2.68 3.75
2 0.60 2.68 3.22
Exterior
SUM 12 0.25 2.68 8.04
SEGUNDO NIVEL
Superficies
Interior
3 0.75 2.30 5.18
5 0.35 2.30 4.03
1 4.85 2.30 11.16
AZOTEA
Interior 3 0.40 2.30 2.76
50
3 0.40 2.30 2.76
01.03.02.05TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO ARENA
m2 63.71
PRIMER NIVEL
Superficies
Eje 1, 3 6 3.45 0.10 2.07
2 2.40 0.10 0.48
2 2.75 0.10 0.55
Eje A, F 4 2.53 0.35 3.54
Eje B, D 3 5.45 0.75 12.26
Eje E 1 5.45 0.60 3.27
SEGUNDO NIVEL
Superficies
Eje 1 3 3.45 0.30 3.11
1 2.40 0.30 0.72
1 2.75 0.30 0.83
Eje 3 2 3.45 0.65 4.49
1 3.45 0.50 1.73
1 2.40 0.50 1.20
1 2.75 0.50 1.38
Eje A, E 4 2.53 0.70 7.07
1 0.90 0.50 0.45
Eje B, C, D, E 4 5.45 0.70 15.26
4 1.50 0.65 3.90
AZOTEA
Eje 2-2,3-3 1 2.90 0.20 0.58
Eje E-E, F-F 1 4.25 0.20 0.85
01.03.02.06VESTIDURA DE DERRAMES EN PUERTAS VENTANAS Y VANOS
m 70.00
PUERTAS 1 18.00 18.00
VENTANAS 1 52.00 52.00
01.03.02.07TARRAJEO DE BRUÑAS DE 1 CM
m 128.00
PRIMERO, SEGUNDO PISO Y AZOTEA 1 128.00 128.00
01.03.03 CIELORRASOS
01.03.03.01CIELORRASOS CON MEZCLA CEMENTO - ARENA
m2 226.05
PRIMER NIVEL
SUM 3 5.75 3.45 59.51
1 5.75 2.40 13.80
1 5.75 2.75 15.81
VOLADIZO 1 CAD = 17.80 17.80
SEGUNDO NIVEL
SUM 3 5.75 3.45 59.51
1 5.75 2.40 13.80
1 5.75 2.75 15.81
VOLADIZO 1 CAD = 21.00 21.00
AZOTEA
1 3.75 2.40 9.00
51
01.03.04 PISOS Y PAVIMENTOS
01.03.04.01 CONTRAPISO DE 25 mm. m2 9.32
PRIMER NIVEL
SS.HH 1 CAD = 2.32 2.32
1 CAD = 2.34 2.34
SEGUNDO NIVEL
SS.HH 1 CAD = 2.32 2.32
1 CAD = 2.34 2.34
01.03.04.02PISO DE CERAMICO 30X30 CM, DE COLOR 1RA
m2 9.32
PRIMER NIVEL
SS.HH 1 CAD = 2.32 2.32
1 CAD = 2.34 2.34
SEGUNDO NIVEL
SS.HH 1 CAD = 2.32 2.32
1 CAD = 2.34 2.34
01.03.04.03PISO DE CONCRETO COLOREADO ACABADO FROTACHADO E=1.5CM
m2 209.18
PRIMER NIVEL
1 CAD = 93.93 93.93
SEGUNDO NIVEL
1 CAD = 111.60 111.60
AZOTEA
1 CAD = 3.65 3.65
01.03.05 CONTRAZOCALOS
01.03.05.01ZOCALO DE LOSETA CORRIENTE DE 10X20
M 33.61
PRIMER PISO
Eje A 2 2.53 0.30 1.52
Eje E 1 2.53 0.30 0.76
1 0.68 0.30 0.20
Eje D 1 0.40 0.30 0.12
1 2.55 0.30 0.77
1 2.40 0.30 0.72
Eje 1 3 3.45 0.30 3.11
Eje D,E entre 1,2 1 2.50 0.30 0.75
Eje 3 4 3.45 0.30 4.14
4 0.73 0.30 0.87
SEGUNDO PISO
Eje 1 2 3.45 0.30 2.07
1.00 3.05 0.30 0.92
Eje 2' 1.00 0.65 0.30 0.20
2.00 4.30 0.30 2.58
1.00 3.95 0.30 1.19
1.00 3.80 0.30 1.14
Eje 3 1 2.40 0.30 0.72
Eje 3' 1.00 3.55 0.30 1.07
1.00 7.35 0.30 2.21
Eje A 2.00 2.53 0.30 1.52
1.00 0.75 0.30 0.23
Eje B 1.00 1.90 0.30 0.57
1.00 1.75 0.30 0.53
52
1.00 0.75 0.30 0.23
1.00 0.90 0.30 0.27
1.00 0.15 0.30 0.05
closet 1.00 1.17 0.30 0.35
1.00 1.44 0.30 0.43
Eje C closet 2.00 0.65 0.30 0.39
1.00 0.25 0.30 0.08
1.00 0.85 0.30 0.26
Eje C' 2.00 0.88 0.30 0.53
2.00 2.70 0.30 1.62
Eje D 1.00 0.40 0.30 0.12
1.00 2.50 0.30 0.75
1.00 1.05 0.30 0.32
1.00 1.25 0.30 0.38
01.03.06 ZOCALOS
01.03.06.01ZOCALO DE CERAMICO 20X30 CM BLANCO DE 1RA
m2 40.30
PRIMER NIVEL
Eje F 1 1.60 1.30 2.08
1 0.35 1.30 0.46
Eje E 2 0.25 1.30 0.65
Eje 1 2 2.25 1.30 5.85
Eje E,F entre 1,2 1 2.25 1.30 2.93
1 2.40 1.30 3.12
1 2.40 1.30 3.12
4 0.30 1.30 1.56
2 0.15 1.30 0.39
SEGUNDO NIVEL
Eje F 1 1.60 1.30 2.08
1 0.35 1.30 0.46
Eje E 2 0.25 1.30 0.65
Eje 1 2 2.25 1.30 5.85
Eje E,F entre 1,2 1 2.25 1.30 2.93
1 2.40 1.30 3.12
1 2.40 1.30 3.12
4 0.30 1.30 1.56
2 0.15 1.30 0.39
01.03.07 REVESTIMIENTOS
01.03.07.01REVESTIMIENTO DE GRADERIA C/MORTERO 1:4x2CM + PULIDO 1:2x1CM
M2 39.85
Eje E, F 4 3.20 1.10 14.08
4 1.50 1.10 6.60
2 2.52 1.10 5.54
01.03.08 CARPINTERIA DE MADERA
01.03.08.01PUERTA DE MADERA APANELADA
m2 28.54
PRIMER PISO
1 2.00 2.68 5.36
1 1.00 2.43 2.43
1 1.00 2.68 2.68
2 0.65 2.43 3.16
SEGUNDO PISO
53
1 0.80 2.30 1.84
1 0.80 2.50 2.00
1 0.90 2.10 1.89
1 0.90 2.50 2.25
1 1.10 2.10 2.31
2 0.65 2.10 2.73
AZOTEA
1 0.90 2.10 1.89
01.03.09 CARPINTERIA METALICA
01.03.09.01BARANDA METALICA DE FºNº PASAMANO Ø 2"
m 22.00
Escalera 1 22.00 22.00
01.03.10 CERRAJERIA
01.03.10.10BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4"
pza 33.00
1 33.00 33.00
01.03.10.02CERRADURA PESADA DE TRES GOLPES
pza 6.00
1 6.00 6.00
01.03.10..03CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA O MANIJA
und 4.00
1 4.00 4.00
01.03.11VIDRIOS, CRISTALES Y SIMILARES
01.03.11.01VENTANA CON EL SITEMA NOVA INCLUYE INSTALACION
m2 70.56
PRIMER PISO
3 3.45 0.90 9.32
1 2.40 0.90 2.16
2 3.45 1.10 7.59
1 2.75 1.10 3.03
1 2.75 0.90 2.48
1 1.40 1.10 1.54
2 0.73 1.10 1.60
SEGUNDO PISO
2 3.45 1.40 9.66
1 3.05 1.40 4.27
1 2.40 0.60 1.44
1 2.40 1.70 4.08
1 4.35 1.70 7.40
1 3.85 1.70 6.55
1 4.30 1.70 7.31
AZOTEA
1 2.40 0.90 2.16
01.03.12 PINTURA
01.03.12.01PINTURA LATEX EN MUROS INTERIORES
m2 330.67
PRIMER PISO
Eje A 2 2.525 2.43 12.27
Eje F 1 3.195 2.43 7.76
1 1.72 1.38 2.37
54
Eje E 2 2.73 2.43 13.27
2 0.40 2.43 1.94
Eje 1 3 3.45 1.78 18.42
1 2.40 1.78 4.27
1 2.75 1.78 4.90
Eje 3 2 3.45 1.78 12.28
2 0.73 1.78 2.58
1 2.75 1.78 4.90
1 1.40 1.78 2.49
Eje E,F entre 1,2 1 2.40 1.38 3.31
2 2.40 1.10 5.28
4 0.30 1.10 1.32
derrames 1 56.28 0.15 8.44
SEGUNDO PISO
Eje 1 2 3.45 0.80 5.52
2 2.75 0.80 4.40
1 0.40 2.50 1.00
1.00 3.05 0.80 2.44
1.00 2.40 0.20 0.48
Eje E, F entre 1,2 1.00 2.52 0.50 1.26
1.00 2.52 1.20 3.02
4.00 0.30 0.50 0.60
Eje 2' 2.00 4.30 2.50 21.50
2.00 3.95 0.60 4.74
Eje 3 1.00 2.40 0.80 1.92
Closet 6.00 0.65 2.50 9.75
2.00 0.88 1.00 1.76
1.00 2.75 2.50 6.88
1.00 1.55 2.50 3.88
Eje 3' 1 4.30 0.80 3.44
1.00 3.87 0.80 3.10
1.00 3.30 0.80 2.64
1.00 1.05 0.80 0.84
Eje A 2.00 2.53 2.10 10.61
Eje C 2.00 1.90 0.80 3.04
2.00 0.75 2.50 3.75
Closet 2.00 2.50 2.50 12.50
2.00 1.04 2.50 5.20
Eje D,E, entre 1,2 2.00 2.70 2.50 13.50
Eje E 2.00 0.40 2.20 1.76
2.00 2.50 2.20 11.00
Eje F 2.00 2.23 1.60 7.14
derrames 1 79.05 0.15 11.86
AZOTEA
Parapeto en perimetro de la azotea
m2 1.00 45.21 1.0045.21
Muro de caja de escalera en azotea
1.00 2.80 0.651.82
AREA 01 2.00 AREA 7.24 14.48
1.00 2.40 1.40 3.36
derrames 1.00 3.20 0.15 0.48
01.03.12.02PINTADURA AL OLEO MATE EN MURO EXTERIORES
m2 133.63
55
PRIMER PISO
Eje 3 2 3.45 1.78 12.28
2 0.73 1.78 2.58
1 2.75 1.78 4.90
1 1.40 1.78 2.49
Eje A 2 2.525 2.43 12.27
Eje F 2 2.525 2.43 12.27
SEGUNDO PISO
Eje 3 1.00 2.40 0.80 1.92
1.00 2.75 2.50 6.88
Eje 3' 1 4.30 0.80 3.44
1.00 3.87 0.80 3.10
1.00 3.30 0.80 2.64
1.00 1.05 0.80 0.84
Eje B 1.00 0.75 0.80 0.60
Eje B 1.00 0.45 0.80 0.36
Eje E 1.00 1.20 0.80 0.96
Eje D 1.00 0.95 0.80 0.76
AZOTEA
Parapeto en perimetro de la azotea
m2 1.00 45.21 1.0045.21
Muro de caja de escalera en azotea
1.00 2.80 0.651.82
AREA 01 2.00 AREA 7.24 14.48
1.00 2.40 1.40 3.36
derrames 1.00 3.20 0.15 0.48
01.03.12.03PINTURA LATEX EN SUPERFICIE DE COLUMNAS
m2 56.96
PRIMER NIVEL
Superficies
Interior
SUM 8 0.75 2.68 16.08
4 0.35 2.68 3.75
2 0.60 2.68 3.22
Exterior
SUM 12 0.25 2.68 8.04
SEGUNDO NIVEL
Superficies
Interior
3 0.75 2.30 5.18
5 0.35 2.30 4.03
1 4.85 2.30 11.16
AZOTEA
Interior 3 0.40 2.30 2.76
3 0.40 2.30 2.76
01.03.12.04PINTADO LATEX SUPERFICIE DE VIGAS
m2 63.71
PRIMER NIVEL
Superficies
Eje 1, 3 6 3.45 0.10 2.07
2 2.40 0.10 0.48
2 2.75 0.10 0.55
Eje A, F 4 2.53 0.35 3.54
Eje B, D 3 5.45 0.75 12.26
Eje E 1 5.45 0.60 3.27
56
SEGUNDO NIVEL
Superficies
Eje 1 3 3.45 0.30 3.11
1 2.40 0.30 0.72
1 2.75 0.30 0.83
Eje 3 2 3.45 0.65 4.49
1 3.45 0.50 1.73
1 2.40 0.50 1.20
1 2.75 0.50 1.38
Eje A, E 4 2.53 0.70 7.07
1 0.90 0.50 0.45
Eje B, C, D, E 4 5.45 0.70 15.26
4 1.50 0.65 3.90
AZOTEA
Eje 2-2,3-3 1 2.90 0.20 0.58
Eje E-E, F-F 1 4.25 0.20 0.85
01.03.12.05PINTURA LATEX EN CIELORRASO DE CEMENTO
m2 226.05
PRIMER NIVEL
SUM 3 5.75 3.45 59.51
1 5.75 2.40 13.80
1 5.75 2.75 15.81
VOLADIZO 1 CAD = 17.80 17.80
SEGUNDO NIVEL
SUM 3 5.75 3.45 59.51
1 5.75 2.40 13.80
1 5.75 2.75 15.81
VOLADIZO 1 CAD = 21.00 21.00
AZOTEA
1 3.75 2.40 9.00
01.03.12.06PINTURA AL OLEO MATE EN ZOCALOS DE CEMENTO
m2 7.61
PRIMER PISO
Eje 3-3 3 3.45 0.30 3.11
1 2.75 0.30 0.83
1 0.75 0.30 0.23
1 1.40 0.30 0.42
Eje F-F 2 2.53 0.30 1.52
Eje A-A 2 2.53 0.30 1.52
01.03.12.07 PINTADO DE BRUÑAS m2 128.00
1 128.00 128.00
H O J A D E M E T R A D O S
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA
FORMULA 04 INSTALACIONES SANITARIAS
UBICACIÓN
PROVINCIA DE ANGARAES DISTRITO DE LIRCAY - COMUNIDAD DE PIRCAPAHUANA
FECHA
08/06/2012
57
PARTIDA DESCRIPCIONELEMENTO DIMENSIONES METRADOS
UND CANT. LARGO ANCHO ALTO PARCIALTOTAL
01.04 INSTALACIONES SANITARIAS
01.04.01 SISTEMA DE DESAGUE
01.04.01.01 SALIDA DE DESAGUE
01.04.01.0101 SALIDA DE DESAGUE EN PVC Ø 4" pto
4.00
PRIMER PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
01.04.01.01.02 SALIDA DE DESAGUE EN PVC Ø 2" pto
4.00
PRIMER PISO
S.S.H.H. VARONES
LAVADERO 1.00 1.00
S.S.H.H. DAMAS
LAVADERO 1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES
LAVADERO 1.00 1.00
S.S.H.H. DAMAS
LAVADERO 1.00 1.00
01.04.01.01.03 SALIDA DE VENTILACION PVC Ø 2" pto
1.00
S.S.H.H. VARONES 1.00 1.00
01.04.01.02 REDES DISTRIBUCION
01.04.01.02.01
RED DE DERIVACION PVC SAL PARA DESAGUE DE Ø4" m
47.80
PRIMER PISO
COLECTOR 1.00 5.00 5.00
RAMALES 1.00 2.00 2.00
SEGUNDO PISO
S.S.H.H. VARONES 1.00 5.00 5.00
S.S.H.H. DAMAS 1.00 2.00 2.00
BAJA A PRIMER NIVEL 1.00 3.80 3.80
CAJA DE REGISTRO 01- TANQUE SEPTICO
1.00 30.00 30.00
01.04.01.02.02
RED DE DERIVACION PVC SAL PARA DESAGUE DE Ø2" m
39.40
PRIMER PISO
S.S.H.H. VARONES 1.00 5.00 5.00
S.S.H.H. DAMAS 1.00 5.00 5.00
SUBE VENTILACION 2.00 7.20 14.40
58
SEGUNDO PISO
S.S.H.H. VARONES 1.00 5.00 5.00
BAJA A PRIMER NIVEL 1.00 5.00 5.00
HACIA CAJA DE REGISTRO 1.00 5.00 5.00
01.04.01.02.03 EXCAVACION DE ZANJAS m
35.00
DE BAJADA - CAJA DE REGISTRO 01 1.00 5.00 5.00
CAJA DE REGISDTRO 01- TANQUE SEPTICO
1.00 30.00 30.00
01.04.01.02.04 RELLENO DE ZANJAS m
35.00
DE BAJADA - CAJA DE REGISTRO 01 1.00 5.00 5.00
CAJA DE REGISTRO 01- TANQUE SEPTICO
1.00 30.00 30.00
01.04.01.03 ACCESORIOS DE REDES
01.04.01.03.01 CODO PVC SAL 2"X45° pza
4.00
PRIMER PISO
S.S.H.H. DAMAS, VARONES 2.00 2.00
SEGUNDO PISO
S.S.H.H. DAMAS, VARONES 2.00 2.00
01.04.01.03.02 CODO PVC SAL 4"X45° pza
2.00
PRIMER PISO
PARA BAJADA DE SEGUNDO NIVEL 2.00 2.00
01.04.01.03.03 CODO PVC SAL 2"X90° pza
13.00
PRIMER PISO
PARA BAJADA DE SEGUNDO NIVEL 13.00 13.00
01.04.01.03.04 CODO PVC SAL 4"X90° pza
1.00
PRIMER PISO
PARA BAJADA DE SEGUNDO NIVEL 1.00 1.00
01.04.01.03.05 YEE PVC SAL Ø2" pza
4.00
PRIMER PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
01.04.01.03.06 YEE PVC SAL 4" x 2" pza
4.00
PRIMER PISO
S.S.H.H. VARONES 4.00 4.00
01.04.01.03.07 REDUCCION DE PVC SAL DE 4"-2" und
4.00
PRIMER PISO
59
S.S.H.H. VARONES, DAMAS 2.00 2.00
SEGUNDO PISO
S.S.H.H. DAMAS, DAMAS 2.00 2.00
01.04.01.03.08 TEE PVC SAL 4"X90° und
6.00
PRIMER PISO
S.S.H.H. VARONES, DAMAS 3.00 3.00
SEGUNDO PISO
S.S.H.H. DAMAS, DAMAS 3.00 3.00
01.04.01.04 ADITAMIENTO VARIOS
01.04.01.04.01
SUMIDEROS DE BRONCE DE 2", PROVISION Y COLOCACION und
4.00
PRIMER PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
01.04.01.04.02 REGISTRO DE BRONCE Ø 4" pza
2.00
PRIMER PISO
S.S.H.H. VARONES 1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES 1.00 1.00
01.04.01.04.03 REGISTRO DE BRONCE Ø 2" pza
4.00
PRIMER PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
SEGUNDO PISO
S.S.H.H. DAMAS 1.00 1.00
S.S.H.H. VARONES 1.00 1.00
01.04.01.04.04
SOMBRERO PARA VENTILACION PVC DE Ø 2" pza
1.00
S.S.H.H. VARONES 1.00 1.00
01.04.01.05 CAMARAS DE INSPECCION
01.04.01.05.01
CAJA DE REGISTRO DE DESAGUE 12" X 24" pza
1.00
CAJA Nº 01 1.00 1.00
01.04.01.06APARATOS Y ACCESORIOS SANITARIOS
01.04.01.06.01 INODORO TANQUE BAJO BLANCO pza 4
4.004.00
60
01.04.01.06.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 4
4.004.00
01.04.01.06.03
URINARIO DE LOZA DE PICO COLOR BLANCO pza 2
2.002.00
01.04.02 SISTEMA DE AGUA FRIA
01.04.02.01 SALIDA DE AGUA FRIA
01.04.02.01.01
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto
8.00
PRIMER PISO
S.S.H.H. VARONES
INODORO 1.00 1.00
LAVADERO 1.00 1.00
S.S.H.H. MUJERES
INODORO 1.00 1.00
LAVADERO 1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES
INODORO 1.00 1.00
LAVADERO 1.00 1.00
S.S.H.H. MUJERES
INODORO 1.00 1.00
LAVADERO 1.00 1.00
01.04.02.02 REDES DE DISTRIBUCION
01.04.02.02.01 TUBERIA PVC SAP C - 10 SP DE 1/2" m
31.00
PRIMER PISO
S.S.H.H. VARONES
MEDIDOR - PRIMER NUDO 1.00 8.00 8.00
PRIMER NUDO SS.HH. VARONES 1.00 5.00 5.00
S.S.H.H. MUJERES
PRIMER NUDO SS.HH. MUJERES 1.00 5.00 5.00
SEGUNDO PISO
S.S.H.H. VARONES
LLEGADA A SS.HH. VARONES 1.00 5.00 5.00
S.S.H.H. DAMAS
LLEGADA A SS.HH. MUJERES 1.00 5.00 5.00
DE PRIMER NIVEL A SEGUNDO NIVEL 1.00 3.00 3.00
01.04.02.02.02 EXCAVACION DE ZANJAS m
15.00
MEDIDOR - PRIMER NUDO 1.00 15.00 15.00
01.04.02.02.03 RELLENO DE ZANJAS m
15.00
MEDIDOR - PRIMER NUDO 1.00 15.00 15.00
61
01.04.02.03 ACCESORIOS DE REDES
01.04.02.03.01 CODO PVC SAP 1/2" *90° pza
13.00
PRIMER PISO
S.S.H.H. VARONES 2.00 2.00
S.S.H.H. DAMAS 4.00 4.00
SEGUNDO PISO
S.S.H.H. VARONES 3.00 3.00
S.S.H.H. DAMAS 4.00 4.00
01.04.02.03.02 TEE PVC-SAP 1/2" und
5.00
PRIMER PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
1.00 1.00
SEGUNDO PISO
S.S.H.H. VARONES 1.00 1.00
S.S.H.H. DAMAS 1.00 1.00
01.04.02.04 LLAVES VALVULAS
01.04.02.04.01
VALVULA COMPUERTA DE BRONCE DE 1/2" pza
4.00
PRIMER PISO
S.S.H.H. VARONES 2.00 2.00
SEGUNDO PISO
S.S.H.H. VARONES 2.00 2.00
04.02.05 PIEZAS VARIAS
04.02.05.01CAJAS PARA VALVULAS INC TAPAS 12" X 12" und
5.00
PRIMER PISO
S.S.H.H. VARONES 2.00 2.00
SEGUNDO PISO
S.S.H.H. VARONES 2.00 2.00
01.04.02.06 PRUEBA HIDRAULICA
01.04.02.06.01
PRUEBA HIDRAULICA C/ EMPLEO DE EQ. DE BOMBEO PARA RELLENO und
1.00
1.00 1.00
falta
04.03.00 SISTEMA DE DESAGUE PLUVIAL
04.03.01 SALIDA DE DESAGUE PLUVIAL PVC 3" Pto 2.00
2.00 2.00
04.03.02RED DE DERIVACION PVC SAL PARA DESAGUE DE 3" M
38.50
DESDE TECHO A PISO 38.50 38.50
04.03.03SOPORTE METALICA T/ABRAZADERA P/TUB. DE DIAM.DE 3" M
4.00
4.00 4.00
62
04.03.04 CANALETA GALVANIZADA DIAMETRO 4" M 35.00
35.00 35.00
H O J A D E M E T R A D O S
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA
FORMULA 05 INSTALACIONES ELECTRICAS
UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY - COMUNIDAD CAMPESINA DE PIRCAPAHUANA FECHA JUNIO DEL 2012
PARTIDA DESCRIPCION U.M. Nº VEC.DIMENSIONES METRADO
LARGO ANCHO ALTO PARCIAL TOTAL
01.05.01 INSTALACIONES ELECTRICAS
01.05.01SALIDA PARA ELECTRICIDAD Y FUERZA
01.05.01 SALIDA DE CENTROS DE LUZ pto 35.00
1ER NIVEL
SALA DE USO MULTIPLE 10.00 10.00
SS.HH. 2.00 2.00
HALL 1.00 1.00
VOLADIZO 6.00 6.00
2DO NIVEL
SALA DE AUTORIDADES COMUNALES 5.00 5.00
TENIENTE GOBERNADOR 2.00 2.00
PRESIDENTE COMUNAL 1.00 1.00
SECRETARIA 1.00 1.00
SS.HH. 2.00 2.00
GRADERIAS 1.00 1.00
PASADIZO 4.00 4.00
05.01.02 SALIDA PARA BRAQUETS
b pto 1.00 1.00
01.05.01.02SALIDA PARA INTERRUPTOR SIMPLE pto 12.00
63
1ER NIVEL
SALA DE USO MULTIPLE 2.00 2.00
SS.HH. 2.00 2.00
HALL 1.00 1.00
2DO NIVEL
ALCALDIA 1.00 1.00
SECRETARIA 1.00 1.00
SS.HH. 2.00 2.00
PASADIZO 2.00 2.00
SALA DE REGIDORES 1.00 1.00
01.05.01.03SALIDA PARA INTERRUPTOR DOBLE pto 6.00
1ER NIVEL
SALA DE USO MULTIPLE 2.00 2.00
2DO NIVEL
SALA DE REGIDORES 1.00 1.00
ADMINISTRACION 2.00 2.00
HALL 1.00 1.00
01.05.01.04SALIDA PARA INTERRUPTOR DE CONMUTACION pto 2.00
1ER NIVEL
CAJA DE ESCALERA 1.00 1.00
2DO NIVEL
CAJA DE ESCALERA 1.00 1.00
01.05.02.01SALIDA PARA TOMACORRIENTES
01.05.03SALIDA PARA TOMACORRIENTE DOBLE pto 28.00
1ER NIVEL
SALA DE USO MULTIPLE 10.00 10.00
2DO NIVEL
SALA DE REGIDORES 8.00 8.00
ADMINISTRACION 4.00 4.00
ALCALDIA 3.00 3.00
SECRETARIA 2.00 2.00
64
PASADIZO 1.00 1.00
01.05.03CANALIZACIONES Y/O TUBERIAS
01.05.03.01 TUBERIAS EMPOTRADAS
01.05.03.01.TUBERIA PVC SAP D=1" (ELECTRICAS) m 25.00
1.00 25.00 25.00
01.05.03.01.02TUBERIA PVC SAP D=3/4" (ELECTRICAS) m 550.00
1.00 550.00 550.00
01.05.04 CONDUCTORES Y CABLES
01.05.04.01CABLE ELECTRICO NYY 4x6 MM2 m 25.80
1ER NIVEL 1.00 25.80 25.80
01.05.04.02CABLE ELECTRICO TW AWG N° 12 m 640.00
1ER NIVEL 1.00 320.00 320.00
2DO NIVEL 1.00 320.00 320.00
01,05.04.03CABLE ELECTRICO TW AWG N° 14 m 460.00
1ER NIVEL 1.00 220.00 220.00
2DO NIVEL 1.00 240.00 240.00
01.05.05TABLEROS Y CUCHILLAS (LLAVES)
01.05.06.01
TABLERO ELECTRICO GAB. METALICO P/DISTRIBUCION DE 4 CIRCUITOS und 1.00 1.00 1.00
05.05.02TABLERO DE DISTRIBUCION CAJA METALICA DE 12 POLOS und 2.00
TD 01 1.00 1.00
TD 02 1.00 1.00
01.05.05,03
INTERRUPTOR THERMOMAGNETICO MONOFASICO DE 2x30 A und 1.00
1.00 1.00
01.05.05.04
INTERRUPTOR THERMOMAGNETICO MONOFASICO DE 2x15 A und 2.00
65
1.00 1.00
01.05.05.05
POZO CONEXIÓN A TIERRA EN SISTEMA E/EQ ALUMBRADO, TOM und 1.00
1.00 1.00
01.05.06 ARTEFACTOS ELECTRICOS
01.05.06.02
FLUORESCENTE RECTO 2X40 W INCLUYE EQUIPO Y PANTALLA und 19.00
1ER NIVEL
SALA DE USO MULTIPLE 10.00 10.00
2DO NIVEL
SALA DE REGIDORES 5.00 5.00
ADMINISTRACION 2.00 2.00
ALCALDIA 1.00 1.00
SECRETARIA 1.00 1.00
01.05.06.02
FLUORESCENTE CIRCULAR ISPE 1X36w INCLUYE EQUIPO Y PANTALLA und 16.00
1ER NIVEL
SS.HH. 2.00 2.00
HALL 1.00 1.00
VOLADIZO 6.00 6.00
2DO NIVEL
SS.HH. 2.00 2.00
GRADERIAS 1.00 1.00
PASADIZO 4.00 4.00
01.05.06.03LAMPARA TIPO ANTORCHA BRAGUET und 6.00
CAJA DE ESCALERA
6.00 6.00
HOJA DE METRADOS
PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA DE
PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”
COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA
FORMUL 06 SISTEMA DE TRATAMIENTO DE AGUA
66
A RESIDUALESUBICACIÓN
PROVINCIA DE ANGARAES DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA
ITEM DESCRIPCIÓN UNID CANT
MEDIDAS PARCIAL TOTALLARG
O ANCHO ALTO
1.06SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES
01.06.01 TANQUE SEPTICO 01.06.01.01 OBRAS PRELIMINARES 06.01.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m² 13.33
PARA TANQUE SEPTICO 4.90 1.95 9.56
PARA POZO PERCOLADOR AREA CAD 3.77 3.77
01.06.01.02 MOVIMIENTO DE TIERRAS 01.06.01.02.01 EXCAVACION DE ESTRUCTURAS 20.54
PARA TANQUE SEPTICO m³ 4.90 1.95 2.15 20.54
01.06.01.02.02
ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJ. 25.68
PRODUCTO DE ECAVACION m³ 1.25 20.54 25.68
01.06.01.03 CONCRETO SIMPLE 01.06.01.03.01 SOLADO DE ZAPATAS E=4" MEZCLA 1:12 m2 4.00 1.55 6.20 6.20
01.06.01.04 CONCRETO ARMADO 01.05.01.04.01
CONCRETO EN MUROS REFORZADOS F'C= 175 KG/CM2 m³ 5.64
Paredes 2.00 4.65 0.15 1.80 2.51
3.00 1.15 0.15 1.80 1.53
Losa Superior 1.00 3.90 1.45 0.10 0.57
CORONA 2.00 2.45 0.05 0.05 0.01
TAPAS DE CONCRETO 2.00 0.90 0.90 0.05 0.08
UÑAS DE TAPA 2.00 3.20 0.10 0.05 0.03
DADOS DE CONCRETO 2.00 0.30 0.20 0.40 0.05
MENOS ABERTURA DE TAPA -2.00 0.60 0.60 0.10 -0.07
Losa Inferior 1.00 4.00 1.55 0.15 0.93
01.06.01.04.03
ENCOFRADO Y DESENCOF MUROS REFORZADOS m2 44.45
MUROS INTERIORES 1.00 6.70 1.80 12.06
1.00 4.40 1.80 7.92
MUROS EXTERIORES 1.00 10.70 1.80 19.26
Losa Superior 1.00 3.60 1.15 4.14
1.00 10.70 0.10 1.07
01.06.01.04.03 ACERO FY=4200 kg/cm2 Kg 190.41
PISO
Horizontal 9.00 4.25 0.58 22.19
Vertical 21.00 1.65 0.58 20.10
MURO
67
Horizontal 8.00 10.50 0.58 48.72
horizontal intermedio 8.00 1.65 0.58 7.66
Vertical 45.00 2.55 0.58 66.56
LOSA
Horizontal 2.00 3.70 0.58 4.29
horizontal intermedio 5.00 1.65 0.58 4.79
verticales 10.00 1.40 0.58 8.12
Tapas
Horizontal 8.00 0.75 0.58 3.48
Vertical 8.00 0.75 0.58 3.48
ganchos 4.00 0.45 0.58 1.04
01.06.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 01.06.01.05.02
TARRAJEO EN INTERIORES C/MORTERO 1:5X1.5 CM m2 24.12
MUROS INTERIORES 1.00 6.70 1.80 12.06
1.00 4.40 1.80 7.92
PISO 1.00 3.60 1.15 4.14
01.06.01.05.02
TARRAJEO EN EXTERIORES C/MORTERO 1:5X1.5 CM m2 4.00
Losa Superior 1.00 3.60 1.00 3.60
1.00 1.00 0.40 0.40 01,05.01.06 INSTALACIONES SANITARIAS 01.06.01.06.01 SALIDA DE VENTILACION PVC 2" pto 1.00 1.00 1.00
ITEM DESCRIPCIÓNUNID
.CANT
.
MEDIDAS
PARCIAL TOTALLARG
O ANCHO ALTO
01.06.02 POZO PERCOLADOR 01 01.06.02.01 OBRAS PRELIMINARES 01.06.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m² 4.84
1.00 2.20 2.20 4.84
01.06.02.02 MOVIMIENTO DE TIERRAS 01.06.02.02.01 EXCAVACION DE ESTRUCTURAS m³ 14.37
PARA POZO PERCOLADOR AREA CAD 3.77 3.55 13.38
PARA CIMIENTO CORRIDO 5.50 0.45 0.40 0.99
01.06.02.02.02
ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJ. m³ 1.00 0.78 1.25 0.97 0.97
01.06.02.02.03 FILTRO DE GRAVA O CASCAJO m³ 0.94
(Area Circular Diam.= 2.20 m.) 1.00 0.38 0.60 0.23
Longitud de circunferencia Diam. 2.20 m 1.00 1.06 0.25 2.70 0.72
01.06.02.03 CONCRETO SIMPLE 01.06.02.03.01
CONCRETO F'C=175 KG/CM2 EN ANILLO DE CONCRETO m³ 1.00
VOL CAD= 0.57 0.57
01.06.02.04 CONCRETO ARMADO
68
01.06.02.04.02 Concreto en muros reforzados F`c 175 kg/cm2 m³ 0.67
(Area Circular Diam.= 2.20 m.) 1.00 4.44 0.15 0.67
01.06.02.04.02 Encofrado y desencofrado muros reforzados m2 1.00 0.80 0.80 0.80
01.06.02.04.03 Acero FY=4200 Kg/cm2 Kg 1.00 20.00 2.00 0.58 23.20 23.20
01.06.02.05 MUROS Y TABIQUES DE ALBAÑILERIA 01.06.02.05.01 Muro de ladrillo KK de arcilla de cabeza C:A 1:4 m2
Longitud de circunferencia Diam. 2.20 m) 1.00 2.20 3.85 8.47 8.47
01.06.02.06 REVOQUES ENLUCIDOS Y MOLDURAS 01.06.02.06.01
TARRAJEO MUROS EN INTERIORES C/MORTERO 1:5 X 1.5 CM m2 1.0 AREA 2.6 2.60 2.60
01.06.02.07 INSTALACIONES SANITARIAS 01.06.02.07.01 SALIDA DE DESAGUE PVC 4" pto 1.00 1.00 1.0001.06.02.07.02 CODO PVC SAL 4"X90° pza 1.00 1.00 1.00
2.8 PRESUPUESTO
S10 Página 1
Presupuesto
Presupuesto 0302001 " CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUAN, DISTRITO DE LIRCAY, PROV. DE ANGARAES - HUANCAVELICA PIRCAPAHUANA "
Subpresupuesto 001 " CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROV. DE ANGARAES - HUANCAVELICA"
Cliente MUNICIPALIDAD PROVINCIAL DE ANGARAES - LIRCAY Costo al 26/04/2012
69
Lugar HUANCAVELICA - ANGARAES - LIRCAY
Item Descripción Und. Metrado Precio S/. Parcial S/.
01 CONSTRUCCION DEL CENTRO CIVICO CON COBERTURA DE TECHO ALIGERADO
301,406.93
01.01 OBRAS PROVISIONALES 8,247.16
01.01.01 ADECUACION DE ALMACEN Y OFICINA DE OBRA glb 1.00 300.00 300.00
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 761.47 761.47
01.01.03 CERCO PERIMETRICO CON TELA ARPILLERA m 56.00 12.87 720.72
01.01.04 PAGO DE DERECHO DE CONEXION DE ENERGIA ELECTRICA glb 1.00 300.00 300.00
01.01.05 FLETE TERRESTRE glb 1.00 5,564.97 5,564.97
01.01.06 PLACA RECORDATORIA SEGUN DISEÑO u 1.00 600.00 600.00
01.02 ESTRUCTURAS 155,590.44
01.02.01 TRABAJOS PRELIMINARES 899.66
01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 144.00 1.67 240.48
01.02.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 127.50 1.33 169.58
01.02.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE OBRA
m2 255.00 1.92 489.60
01.02.02 MOVIMIENTO DE TIERRAS 1,917.44
01.02.02.01 EXCAVACION MASIVA DE TERRENO m3 25.50 2.71 69.11
01.02.02.02 EXCAVACION ZANJAS PARA ZAPATAS 2M DE PROFUNDIDAD m3 36.74 17.82 654.71
01.02.02.03 EXCAVACION PARA CIMIENTO CORRIDO m3 7.33 17.82 130.62
01.02.02.04 RELLENOS COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO
m3 9.94 86.20 856.83
01.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 1 km
m3 77.80 2.65 206.17
01.02.03 OBRAS DE CONCRETO SIMPLE 13,663.50
01.02.03.01 SOLADO DE ZAPATAS, E=4" MEZCLA 1:12 m2 28.26 22.63 639.52
01.02.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PG m3 7.33 253.97 1,861.60
01.02.03.03 SOBRECIMIENTOS CONCRETO 1:8 + 25% PM m3 2.01 286.32 575.50
01.02.03.04 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS m2 48.65 34.96 1,700.80
01.02.03.05 FALSO PISO DE 4" DE CONCRETO 1:10 m2 92.56 30.76 2,847.15
01.02.03.06 CONCRETO f'c=140 kg/cm2 EN VEREDA m2 50.40 88.14 4,442.26
01.02.03.07 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 50.40 31.68 1,596.67
70
01.02.04 OBRAS DE CONCRETO ARMADO 138,559.84
01.02.04.01 ZAPATAS 9,175.91
01.02.04.01.01 CONCRETO EN ZAPATAS f'c= 210 kg/cm2 m3 16.96 412.95 7,003.63
01.02.04.01.02 ACERO fy=4200 kg/cm2 kg 284.33 7.64 2,172.28
01.02.04.02 COLUMNAS 20,641.12
01.02.04.02.01 CONCRETO EN COLUMNAS f'c= 210 kg/cm2 m3 15.83 423.73 6,707.65
01.02.04.02.02 ACERO EN COLUMNAS fy=4200 kg/cm2 kg 1,477.39 7.64 11,287.26
01.02.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 73.12 36.19 2,646.21
01.02.04.03 VIGAS 23,456.11
01.02.04.03.01 CONCRETO EN VIGAS f'c= 210 kg/cm2 m3 17.85 446.91 7,977.34
01.02.04.03.02 ACERO EN VIGAS fy=4200 kg/cm2 kg 1,476.61 7.64 11,281.30
01.02.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 126.85 33.09 4,197.47
01.02.04.04 ESCALERAS 11,090.82
01.02.04.04.01 CONCRETO EN ESCALERAS f'c= 210 kg/cm2 m3 4.12 425.60 1,753.47
01.02.04.04.02 ACERO EN ESCALERAS fy=4200 kg/cm2 kg 325.84 7.64 2,489.42
01.02.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 118.19 57.94 6,847.93
01.02.04.05 LOSA ALIGERADA 71,465.73
01.02.04.05.01 CONCRETO EN LOSA ALIGERADA f'c= 210 kg/cm2 m3 45.00 458.40 20,628.00
01.02.04.05.02 ACERO fy=4200 kg/cm2 kg 3,110.71 7.64 23,765.82
01.02.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
m2 216.36 96.12 20,796.52
01.02.04.05.04 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO
u 1,604.96 3.91 6,275.39
01.02.04.06 LOSA MACIZA 2,730.15
01.02.04.06.01 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 m3 1.23 421.41 518.33
01.02.04.06.02 ACERO EN LOSA MACIZA fy=4200 kg/cm2 kg 105.33 7.64 804.72
01.02.04.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 12.33 114.12 1,407.10
01.02.05 CONTROL DE CALIDAD 550.00
01.02.05.01 DISEÑO DE MEZCLAS u 1.00 300.00 300.00
01.02.05.02 ROTURA DE PROBETAS u 10.00 25.00 250.00
01.03 ARQUITECTURA 109,069.01
01.03.01 MUROS Y TABIQUES DE ALBAÑILERIA 29,888.87
71
01.03.01.01 MURO DE SOGA LADRILLO DE ARCILLA C:A 1:4 m2 367.33 73.56 27,020.79
01.03.01.02 MAMPARA CON PERFILES DE ALUMINIO INC. VIDRIOS m2 18.56 154.53 2,868.08
01.03.02 REVOQUES ENLUCIDOS Y MOLDURAS 15,422.59
01.03.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO - ARENA m2 327.24 21.22 6,944.03
01.03.02.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA m2 133.63 25.91 3,462.35
01.03.02.03 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 m2 37.99 18.33 696.36
01.03.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
m2 56.96 24.47 1,393.81
01.03.02.05 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO ARENA m2 63.71 24.76 1,577.46
01.03.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 70.00 13.03 912.10
01.03.02.07 TARRAJEO DE BRUÑAS DE 1 CM m 128.00 3.41 436.48
01.03.03 CIELORRASOS 8,431.67
01.03.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 226.05 37.30 8,431.67
01.03.04 PISOS Y PAVIMENTOS 11,161.20
01.03.04.01 CONTRAPISO DE 25 mm m2 9.32 20.17 187.98
01.03.04.02 PISO DE CERAMICO 30X30 cm DE COLOR DE 1RA m2 9.32 149.44 1,392.78
01.03.04.03 PISO DE CONCRETO COLOREADO ACABADO FROTACHADO E=1.5CM
m2 209.18 45.80 9,580.44
01.03.05 CONTRAZOCALOS 893.02
01.03.05.01 CONTRAZOCALO DE LOSETA CORRIENTE CLARA DE 10X20 cm m 33.61 26.57 893.02
01.03.06 ZOCALOS 5,825.77
01.03.06.01 ZOCALO DE CERAMICO 20X30 cm BLANCA DE 1RA m2 40.30 144.56 5,825.77
01.03.07 REVESTIMIENTOS 842.03
01.03.07.01 REVESTIMIENTO DE GRADERIA C/MORTERO MEZCLA 1:4 X 2 cm PULIDO 1:2 X 1 cm
m2 39.85 21.13 842.03
01.03.08 CARPINTERIA DE MADERA 13,436.35
01.03.08.01 PUERTA DE MADERA APANELADA m2 28.54 470.79 13,436.35
01.03.09 CARPINTERIA METALICA 621.28
01.03.09.01 BARANDA DE METALICA DE FºNº PASAMANO Ø 2" m 22.00 28.24 621.28
01.03.10 CERRAJERIA 1,078.58
01.03.10.01 BISAGRA CAPUCHINA DE 4" X 4" pza 33.00 11.06 364.98
01.03.10.02 CERRADURA PESADA DE TRES GOLPES pza 6.00 84.18 505.08
72
01.03.10.03 CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA O MANIJA
u 4.00 52.13 208.52
01.03.11 VIDRIOS, CRISTALES Y SIMILARES 16,473.64
01.03.11.01 VENTANA CON EL SISTEMA NOVA INCLUYE INSTALACION m2 70.56 233.47 16,473.64
01.03.12 PINTURA 4,994.01
01.03.12.01 PINTURA LATEX EN MUROS INTERIORES m2 330.67 5.34 1,765.78
01.03.12.02 PINTURA AL OLEO MATE EN MUROS EXTERIORES m2 133.63 7.14 954.12
01.03.12.03 PINTURA LATEX EN SUPERFICIE DE COLUMNAS m2 56.96 5.81 330.94
01.03.12.04 PINTURA LATEX EN SUPERFICIE DE VIGAS m2 63.71 5.81 370.16
01.03.12.05 PINTURA LATEX EN CIELORRASO DE CEMENTO m2 226.05 6.17 1,394.73
01.03.12.06 PINTURA AL OLEO MATE EN ZOCALO DE CEMENTO m2 7.61 7.28 55.40
01.03.12.07 PINTADO DE BRUÑAS m 128.00 0.96 122.88
01.04 INSTALACIONES SANITARIAS 7,646.34
01.04.01 SISTEMA DE DESAGUE 5,777.06
01.04.01.01 SALIDAS DE DESAGUE 358.03
01.04.01.01.01 SALIDA DE DESAGUE EN PVC 4" pto 4.00 51.21 204.84
01.04.01.01.02 SALIDA DE DESAGUE EN PVC 2" pto 4.00 30.96 123.84
01.04.01.01.03 SALIDA DE VENTILACION PVC 2" pto 1.00 29.35 29.35
01.04.01.02 REDES DE DISTRIBUCION 2,473.98
01.04.01.02.01 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m 47.80 31.24 1,493.27
01.04.01.02.02 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 39.40 17.90 705.26
01.04.01.02.03 EXCAVACION DE ZANJAS m 35.00 5.24 183.40
01.04.01.02.04 RELLENO DE ZANJAS m 35.00 2.63 92.05
01.04.01.03 ACCESORIOS DE REDES 525.91
01.04.01.03.01 CODO PVC SAL 2"X45° pza 4.00 13.04 52.16
01.04.01.03.02 CODO PVC SAL 4"X45° pza 2.00 17.15 34.30
01.04.01.03.03 CODO PVC SAL 2"X90° pza 13.00 11.46 148.98
01.04.01.03.04 CODO PVC SAL 4"X90° pza 1.00 17.15 17.15
01.04.01.03.05 YEE PVC SAL 2" pza 4.00 11.99 47.96
01.04.01.03.06 YEE PVC SAL 4"x 2" pza 4.00 14.40 57.60
01.04.01.03.07 REDUCCION PVC SAL SP DE 4" A 2" u 4.00 14.16 56.64
73
01.04.01.03.08 TEE PVC-SAL 4"*90° u 6.00 18.52 111.12
01.04.01.04 ADITAMIENTO VARIOS 277.12
01.04.01.04.01 SUMIDEROS DE BRONCE DE 2" PROVISION Y COLOCACION u 4.00 28.73 114.92
01.04.01.04.02 REGISTROS DE BRONCE DE 4" pza 2.00 31.20 62.40
01.04.01.04.03 REGISTROS DE BRONCE DE 2" pza 4.00 23.70 94.80
01.04.01.04.04 SOMBRERO PARA VENTILACION DE PVC DE 2" u 1.00 5.00 5.00
01.04.01.05 CAMARAS DE INSPECCION 658.02
01.04.01.05.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 1.00 658.02 658.02
01.04.01.06 APARATOS Y ACCESORIOS SANITARIOS 1,484.00
01.04.01.06.01 INODORO TANQUE BAJO BLANCO pza 4.00 173.50 694.00
01.04.01.06.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 4.00 60.00 240.00
01.04.01.06.03 URINARIOS DE LOZA DE PICO COLOR BLANCO pza 2.00 275.00 550.00
01.04.02 SISTEMA DE AGUA FRIA 1,869.28
01.04.02.01 SALIDA DE AGUA FRIA 305.84
01.04.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 8.00 38.23 305.84
01.04.02.02 REDES DE DISTRIBUCION 365.12
01.04.02.02.01 TUBERIA DE PVC SAP C-10 SP DE 1/2" m 31.00 7.97 247.07
01.04.02.02.02 EXCAVACION DE ZANJAS m 15.00 5.24 78.60
01.04.02.02.03 RELLENO DE ZANJAS m 15.00 2.63 39.45
01.04.02.03 ACCESORIOS DE REDES 183.03
01.04.02.03.01 CODO PVC SAP 1/2"x90° pza 13.00 10.36 134.68
01.04.02.03.02 TEE PVC-SAP 1/2" u 5.00 9.67 48.35
01.04.02.04 LLAVES Y VALVULAS 287.96
01.04.02.04.01 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 4.00 71.99 287.96
01.04.02.05 PIEZAS VARIAS 200.20
01.04.02.05.01 CAJAS PARA VALVULAS INCLUIDOS TAPAS 12"X12" u 2.00 100.10 200.20
01.04.02.06 PRUEBA HIDRAULICA 527.13
01.04.02.06.01 PRUEBA HIDRAULICA glb 1.00 527.13 527.13
01.05 INSTALACIONES ELECTRICAS 12,117.10
74
01.05.01 SALIDA PARA ELECTRICIDAD Y FUERZA 1,079.49
01.05.01.01 SALIDA DE CENTRO DE LUZ pto 35.00 20.04 701.40
01.05.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 12.00 17.37 208.44
01.05.01.03 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 18.85 113.10
01.05.01.04 SALIDA PARA INTERRUPTOR CONMUTACION pto 3.00 18.85 56.55
01.05.02 SALIDA PARA TOMACORRIENTE 791.56
01.05.02.01 SALIDA PARA TOMACORRIENTE DOBLE pto 28.00 28.27 791.56
01.05.03 CANALIZACIONES Y/O TUBERIAS 2,437.75
01.05.03.01 TUBERIAS EMPOTRADAS 2,437.75
01.05.03.01.01 TUBERIA DE PVC SAP D= 1" (ELECTRICAS) m 25.00 7.97 199.25
01.05.03.01.02 TUBERIA DE PVC SAP D=3/4" (ELECTRICAS) m 550.00 4.07 2,238.50
01.05.04 CONDUCTORES Y CABLES 4,352.28
01.05.04.01 CABLE ELECTRICO NYY 4 X6 mm2 m 25.80 12.60 325.08
01.05.04.02 CABLE ELECTRICO THW # 12 m 640.00 3.59 2,297.60
01.05.04.03 CABLE ELECTRICO THW # 14 m 460.00 3.76 1,729.60
01.05.05 TABLEROS CUCHILLAS (LLAVES) 847.34
01.05.05.01 TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 3 CIRCUITOS
u 1.00 38.36 38.36
01.05.05.02 TABLERO DE DISTRIBUCION CAJA METALICA DE 12 POLOS u 2.00 143.99 287.98
01.05.05.03 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 1.00 18.00 18.00
01.05.05.04 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A pza 2.00 16.00 32.00
01.05.05.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 60A pza 1.00 21.00 21.00
01.05.05.06 POZO CONEXION A TIERRA EN SISTEMA CON EQUIPO BOMBEO ALUMBRAD0 TOMACORRIENTE
u 1.00 450.00 450.00
01.05.06 ARTEFACTOS ELECTRICOS 2,608.68
01.05.06.01 FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYE EQUIPO Y PANTALLA
u 19.00 84.60 1,607.40
01.05.06.02 FLUORESCENTE CIRCULAR 1x36w INCLUYE EQUIPO Y PANTALLA
u 16.00 59.88 958.08
01.05.06.03 LAMPARA TIPO ANTORCHA BRAQUET u 2.00 21.60 43.20
01.06 SISTEMA DE TRATAMIENTO DE AGUA RESIDUALES 8,736.88
01.06.01 TANQUE SEPTICO 6,623.44
01.06.01.01 OBRAS PRELIMINARES 11.60
75
01.06.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.33 0.87 11.60
01.06.01.02 MOVIMIENTO DE TIERRAS 597.40
01.06.01.02.01 EXCAVACION DE ESTRUCTURAS m3 20.54 17.82 366.02
01.06.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJAMIENTO
m3 25.68 9.01 231.38
01.06.01.03 CONCRETO SIMPLE 140.31
01.06.01.03.01 SOLADO DE ZAPATAS, E=4" MEZCLA 1:12 m2 6.20 22.63 140.31
01.06.01.04 CONCRETO ARMADO 5,229.31
01.06.01.04.01 CONCRETO EN MUROS REFORZADOS f'c= 175 kg/cm2 m3 5.64 384.03 2,165.93
01.06.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 44.45 36.19 1,608.65
01.06.01.04.03 ACERO fy=4200 kg/cm2 kg 190.41 7.64 1,454.73
01.06.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 615.47
01.06.01.05.01 TARRAJEO EN INTERIORES C/MORTERO 1:5X1.5CM m2 24.12 21.22 511.83
01.06.01.05.02 TARRAJEO EN EXTERIORES C/MORTERO 1:5 1.5CM m2 4.00 25.91 103.64
01.06.01.06 INSTALACIONES SANITARIAS 29.35
01.06.01.06.01 SALIDA DE VENTILACION PVC 2" pto 1.00 29.35 29.35
01.06.02 POZO PERCOLADOR 2,113.44
01.06.02.01 OBRAS PRELIMINARES 4.21
01.06.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.84 0.87 4.21
01.06.02.02 MOVIMIENTO DE TIERRAS 354.97
01.06.02.02.01 EXCAVACION DE ESTRUCTURAS m3 14.37 17.82 256.07
01.06.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJAMIENTO
m3 0.97 9.01 8.74
01.06.02.02.03 FILTRO DE GRAVA O CASCAJO m3 0.94 95.92 90.16
01.06.02.03 CONCRETO SIMPLE 202.67
01.06.02.03.01 CONCRETO f'c=175 kg/cm2 m3 0.57 355.56 202.67
01.06.02.04 CONCRETO ARMADO 463.50
01.06.02.04.01 CONCRETO EN MUROS REFORZADOS f'c= 175 kg/cm2 m3 0.67 384.03 257.30
01.06.02.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 0.80 36.19 28.95
01.06.02.04.03 ACERO fy=4200 kg/cm2 kg 23.20 7.64 177.25
01.06.02.05 MUROS Y TABIQUES DE ALBAÑILERIA 964.56
01.06.02.05.01 MURO DE LADRILLO DE ARCILLA DE CABEZA C:A 1:4 m2 8.47 113.88 964.56
76
01.06.02.06 REVOQUES ENLUCIDOS Y MOLDURAS 55.17
01.06.02.06.01 TARRAJEO EN INTERIORES C/MORTERO 1:5X1.5CM m2 2.60 21.22 55.17
01.06.02.07 INSTALACIONES SANITARIAS 68.36
01.06.02.07.01 SALIDA DE DESAGUE EN PVC 4" pto 1.00 51.21 51.21
01.06.02.07.02 CODO PVC SAL 4"X90° pza 1.00 17.15 17.15
02 CAPACITACION Y ASISTENCIA TECNICA 7,000.00
02.01 CAPACITACION A AUTORIDADES Y COMUNEROS glb 1.00 7,000.00 7,000.00
03 MITIGACION AMBIENTAL 5,000.00
03.01 MITIGACION AMBIENTAL glb 1.00 5,000.00 5,000.00
Costo Directo 313,406.93
GASTOS GENERALES (9.84345)% 30,850.05
--------------------------
TOTAL PRESUPUESTO 344,256.98
SON : TRESCIENTOS CUARENTICUATRO MIL DOSCIENTOS CINCUENTISEIS Y 98/100 NUEVOS SOLES
3. DISCUSION DE LOS RESULTADOS DEL INFORME DE
PRÁCTICAS Y/O APORTE DEL PRACTICANTE
Durante el desarrollo de las prácticas pre profesionales, se me designo
responsable de la ejecución de la construcción de la“CREACION DE
INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE LA
COMUNIDAD DE PIRCAPAHUANA, DISTRITO DE LIRCAY,
PROVINCIA DE ANGARAES – HUANCAVELICA”, donde se me encargo
las siguientes actividades:
Control de calidad de los materiales
Supervisión de Obra
Control de seguridad
77
3.1 DESCRIPCION DE LAS ACTIVIDADES DEL PROYECTO
Se realizaron los aportes necesarios para la ejecución de obra
basados en el expediente técnico y planos generados del expediente
Se hizo los metrados de acuerdo al avance de obra con ayuda de las
herramientas manuales realizadas in situ.
Se elaboró las valorizaciones mensuales
La experiencia fue real, efectiva y activa en los trabajos tanto en
campo como en gabinete, siendo capaz de poder enfrentar con
seriedad casos similares en mi futura vida profesional.
3.2 CRONOGRAMA VALORIZADO DE OBRA
3.3 PRECIOS Y CANTIDADES DE RECURSOS REQUERIDOS
PRESUPUESTO
Código
Descripción Und. Cantidad Precio S/.
Parcial
MANO DE OBRA
0147010002
OPERARIO hh4,587.2099 8.91 40,872.04
0147010003
OFICIAL hh1,246.2333 7.03 8,761.02
0147010004
PEON hh4,874.2523 5.47 26,662.16
78
MATERIALES0202000007
ALAMBRE NEGRO RECOCIDO # 16 kg483.9383 6.00 2,903.63
0202000008
ALAMBRE NEGRO RECOCIDO # 8 kg140.5181 6.00 843.11
0202010003
CLAVOS PARA MADERA CON CABEZA DE 2" kg1.8560 6.00 11.14
0202010005
CLAVOS PARA MADERA CON CABEZA DE 3" kg152.3883 6.00 914.33
0202010022
CLAVOS C/CABEZA P/CONSTRUCCION D/PROMEDIO kg5.6000 6.00 33.60
0202100010
PERNO HEXAGONAL DE 3/4" X 3 1/2" pza9.0000 7.00 63.00
0202620002
PLACA RECORDATORIA SEGUN DISEÑO u1.0000 600.00 600.00
0203020003
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg7,833.0784 6.00 46,998.47
0204000000
ARENA FINA m322.9107 90.00 2,061.96
0205000003
PIEDRA CHANCADA DE 1/2" m31.0455 90.00 94.10
0205000009
PIEDRA GRANDE DE 8" m34.5093 75.00 338.20
0205010000
AFIRMADO m311.9280 30.00 357.84
0205010004
ARENA GRUESA m318.8109 85.00 1,598.93
0205510001
GRAVA GRUESA PARA DRENAJE m31.0340 75.00 77.55
0207030000
CABLE THW # 14 AWG m640.0000 1.40 896.00
0207030001
CABLE THW # 12 AWG m659.2000 1.60 1,054.72
0210020011
INODORO TANQUE BAJO NORMAL BLANCO INCLUYE ACCESORIOS
u4.0000 173.50 694.00
0210040088
LAVATORIO 23"X17" PARA GRIFERIA 4" BLANCO CON ACCESORIOS
u4.0000 60.00 240.00
0210050008
URINARIO PICO BLANCO u2.0000 275.00 550.00
0210230001
REGISTRO DE BRONCE DE 2" u4.0000 4.50 18.00
0210230003
REGISTRO DE BRONCE DE 4" u2.0000 12.00 24.00
0211000024
LAMPARA TIPO ANTORCHA BRAQUET u2.0000 12.00 24.00
0211800002
POZO CONEXION A TIERRA INCLUYE MATERIAL E INSTALACION
glb1.0000 450.00 450.00
0212000024
TABLERO ELECTRICO METAL - 3 CIRCUITOS u1.0000 38.00 38.00
0212010022
TOMACORRIENTE DOBLE pza28.0000 3.50 98.00
0212020088
INTERRUPTOR TERMOMAGNETICO DE 2 X 30A u1.0000 12.00 12.00
0212020100
INTERRUPTOR TERMOMAGNETICO DE 2 X 20A u2.0000 10.00 20.00
0212030038
INTERRUPTOR SIMPLE pza12.0000 3.50 42.00
0212030039
INTERRUPTOR DOBLE pza6.0000 4.80 28.80
0212030045
INTERRUPTOR CONMUTACION pza3.0000 4.80 14.40
0212090034
CAJA RECTANGULAR DE 58 mm X 93 mm u49.0000 2.00 98.00
0212090046
CAJA OCTOGONAL GALVANIZADA LIVIANA 100 mm X 40 mm u35.0000 2.20 77.00
0212140043
FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA u19.0000 75.00 1,425.00
0212140044
FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA u16.0000 48.00 768.00
0212400081
INTERRUPTOR TERMOMAGNETICO 2 X 60 A pza1.0000 15.00 15.00
0212700025
TABLERO DE DISTRIBUCION T-5 u2.0000 65.00 130.00
02170 LADRILLO DE ARCILLA PARA TECHO h=15 cm u 1,685.2080 3.50 5,898.23
79
100040217070003
LADRILLO CORRIENTE 6 X 12 X 24 cm u17,156.630
00.95 16,298.80
0219010031
CABLE ELECTRICO NYY 4 X 4 mm2 m27.0900 12.00 325.08
0221000001
CEMENTO PORTLAND TIPO I (42.5 kg) bls1,532.3008 25.00 38,307.52
0226070010
CERRADURA DE TRES GOLPES u6.0000 75.00 450.00
0226160017
BISAGRA CAPUCHINA 4" u33.0000 8.00 264.00
0226310057
CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA u4.0000 45.00 180.00
0229040001
CINTA AISLANTE rll16.4500 3.50 57.58
0229050001
CINTA TEFLON rll6.4000 1.00 6.40
0229060001
YESO kg200.3350 0.50 100.17
0229120051
YUTE kg56.0000 3.00 168.00
0229150009
OCRE kg107.1400 12.00 1,285.68
0229180002
FRAGUA GRIS CLARO kg26.2986 8.00 210.39
0229200010
THINNER CORRIENTE gal7.0620 18.00 127.12
0229720002
ACCESORIOS DIVERSOS ( INCLUYE ALUMINIO ) u18.5600 50.00 928.00
0230460010
PEGAMENTO DE MAYOLICA gal396.9600 10.50 4,168.08
0230460011
PEGAMENTO PARA PVC AGUA FORDUIT gal1.9546 60.00 117.28
0230460019
PEGAMENTO PLASTICO PARA PVC CCP gal0.1860 60.00 11.16
0230460035
PEGAMENTO PARA PVC 1/4 gl u1.1616 20.00 23.23
0230480032
CINTA TEFLON pza0.4000 1.00 0.40
0230990104
DISEÑO DE MEZCLAS u1.0000 300.00 300.00
0230990105
ROTURA DE PROBETAS u10.0000 25.00 250.00
0231700002
CURVAS PVC SEL 3/4" pza105.0000 0.80 84.00
0232000053
FLETE TERRESTRE glb1.0000 5,564.9
75,564.97
0232040002
PAGO DE DERECHO DE CONEXION DE ENRGIA ELECTRICA glb1.0000 300.00 300.00
0238000000
HORMIGON (PUESTO EN OBRA) m313.4366 75.00 1,007.75
0238000002
HORMIGON DE RIO m3133.4538 85.00 11,343.57
0239020027
LIJA DE FIERRO # 80 pza193.3600 2.50 483.40
0239050000
AGUA m330.0000 0.01 0.30
0239900100
VENTANA EN SISTEMA NOVA S/DISEÑO CON VIDRIO 6 MM, PERFIL DE ALUMINIO
m274.0880 200.00 14,817.60
0239990052
PUERTA DE MADERA APANELADA EN MADERA TORNILLO INC. BISAGRAS, CHAPA FORTE 2 GOLPES, JALADOR, ENTRE OTROS
m228.5400 350.00 9,989.00
0240020008
CONTRAZOCALO DE LOSETA CORRIENTE CLARO 10 X 20 cm
m35.2905 20.00 705.81
0240130051
CERAMICO ANTIDESLIZANTE 30X30 CM, COLOR BLANCO m29.7860 35.00 342.51
0240130052
CERAMICO 20X30 CM, COLOR BLANCO m242.3150 35.00 1,481.03
0243040000
MADERA TORNILLO p2606.1000 4.50 2,727.45
0243920002
MADERA NACIONAL P/ENCOFRADO p23,142.4605 3.80 11,941.35
0243920004
ROLLIZO DE EUCALIPTO DE 3"x2.80 m. pza698.4000 18.00 12,571.20
80
0244030024
TRIPLAY DE 8 mm m28.6400 8.00 69.12
0245010001
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2864.0106 4.80 4,147.25
0250010000
TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24"
u1.0000 240.00 240.00
0250010005
TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X 24" pza1.0000 240.00 240.00
0254010001
PINTURA ESMALTE SINTETICO gal1.7120 38.00 65.06
0254030000
PINTURA LATEX gal37.2603 25.00 931.51
0254120002
PINTURA AL OLEO MATE gal8.5125 28.00 238.35
0254130001
PINTURA IMPRIMANTE PARA MUROS gal25.6892 22.00 565.16
0254190003
PINTURA ESMALTE gal0.7650 38.00 29.07
0265020110
BARANDA METALICA DE FIERRO NEGRO Ø 2" m24.2000 15.00 363.00
0265050011
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" u8.0000 6.00 48.00
0265130064
NIPLE DE FIERRO GALVANIZADO DE 1/2" X 1 1/2" u8.0000 10.00 80.00
0268030012
ADECUACION DE ALMACEN Y OFICINA DE OBRA glb1.0000 300.00 300.00
0268040000
SUMIDERO DE BRONCE DE 2" u4.0000 4.50 18.00
0272000104
TUBERIA PVC SAP A-10 DE 1/2" m76.1600 1.80 137.09
0272130009
TUBERIA PVC SAL PARA DESAGUE DE 2" m42.4420 12.00 509.30
0272130011
TUBERIA PVC SAL PARA DESAGUE DE 4" m51.7340 22.00 1,138.15
0272210001
SOMBRERO DE VENTILACION PVC SAL DE 2" u1.0000 5.00 5.00
0272320002
YEE PVC SAL 2" u4.2000 2.50 10.50
0273110002
CODO PVC SAL 2" X 90° pza19.6500 2.00 39.30
0273110004
CODO PVC SAL 4" X 90° pza7.1022 4.50 31.96
0273110052
CODO PVC SAL 2" X 45° pza4.2000 3.50 14.70
0273110054
CODO PVC SAL 4" X 45° pza2.1000 4.50 9.45
0273110057
CODO PVC SAP 1/2" pza29.0000 1.00 29.00
0273130021
TEE PVC SAP 1/2" pza5.0000 1.50 7.50
0273130022
TEE PVC SAL 4" X90° u6.0000 8.00 48.00
0273160005
YEE PVC SAL DE 4" X 2" pza4.2000 4.80 20.16
0273180003
REDUCCION PVC SAL 4" X 2" pza4.0000 4.80 19.20
0273230001
SOMBRERO DE VENTILACION PVC SAL 2" pza2.0000 6.50 13.00
0274010032
TUBO PVC SAP 3/4" ELECTRICA m566.5000 2.00 1,133.00
0274020027
CURVA PVC SEL 3/4" pza49.0000 0.80 39.20
0277000002
VALVULA COMPUERTA DE BRONCE DE 1/2" u4.0000 18.00 72.00
0279000053
VIDRIO DOBLE p2213.4400 2.90 618.98
0298010184
MITIGACION AMBIENTAL glb1.0000 5,000.0
05,000.00
0298010185
CAPACITACION A AUTORIDADES Y COMUNEROS glb1.0000 7,000.0
07,000.00
0337020043
BALDE PRUEBA TAPON ABRAZADERA Y ACCESORIOS hm8.0000 25.00 200.00
MAQUINARIA
03480 MEZCLADORA DE CONCRETO DE 9 -11p3 hm 105.9065 20.00 2,118.13
81
100110348040027
CAMION VOLQUETE 6 X 4 330 HP 10 m3 hm2.4896 30.00 74.69
0348090002
ANDAMIO METAL TABLAS ALQUILER est10.2400 5.00 51.20
0349030001
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm19.8800 10.00 198.80
0349040008
CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3 hm0.7469 140.00 104.57
0349070001
VIBRADOR DE CONCRETO 4 HP 1.35" hm47.1950 10.00 471.95
0349070004
VIBRADOR DE CONCRETO 4 HP 2.40" hm0.6560 10.00 6.56
0349100007
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm31.6456 20.00 632.91
0349190003
NIVEL TOPOGRAFICO CON TRIPODE he0.2295 6.00 1.38
0349880003
TEODOLITO hm0.3180 10.00 3.18
TOTALS/.
309,838.44
3.4 CRONOGRAMA DE ADQUISICION DE MATERIALES
N° DESCRIPCION DE MATERIALES UND.
MES 1 MES2 MES 3 Total
ALAMBRE NEGRO RECOCIDO # 16 kg 2,903.6300 2,903.63 ALAMBRE NEGRO RECOCIDO # 8 kg 843.1100 843.11
82
CLAVOS PARA MADERA CON CABEZA DE 2" kg 11.1400 11.14 CLAVOS PARA MADERA CON CABEZA DE 3" kg 914.3400 914.34 CLAVOS C/CABEZA P/CONSTRUCCION D/PROMEDIO kg 33.6000 33.60 PERNO HEXAGONAL DE 3/4" X 3 1/2" pza 63.0000 63.00 PLACA RECORDATORIA SEGUN DISEÑO u 600.00 600.00 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 46,998.4700 46,998.47 ARENA FINA m3 2,061.95 2,061.95 PIEDRA CHANCADA DE 1/2" m3 94.1000 94.10 PIEDRA GRANDE DE 8" m3 338.2000 338.20 AFIRMADO m3 357.84 357.84 ARENA GRUESA m3 1,598.9300 1,598.93 GRAVA GRUESA PARA DRENAJE m3 77.55 77.55 CABLE THW # 14 AWG m 896.00 896.00 CABLE THW # 12 AWG m 1,054.72 1,054.72 INODORO TANQUE BAJO NORMAL BLANCO INCLUYE
ACCES u 694.00 694.00
LAVATORIO 23"X17" PARA GRIFERIA 4" BLANCO CON ACCES u 240.00 240.00
URINARIO PICO BLANCO u 550.00 550.00 REGISTRO DE BRONCE DE 2" u 18.00 18.00 REGISTRO DE BRONCE DE 4" u 24.00 24.00 LAMPARA TIPO ANTORCHA BRAQUET u 24.00 24.00
POZO CONEXION A TIERRA INCLUYE MATERIAL E INSTALACI glb 450.00 450.00
TABLERO ELECTRICO METAL - 3 CIRCUITOS u 38.00 38.00 TOMACORRIENTE DOBLE pza 98.00 98.00 INTERRUPTOR TERMOMAGNETICO DE 2 X 30A u 12.00 12.00 INTERRUPTOR TERMOMAGNETICO DE 2 X 20A u 20.00 20.00
INTERRUPTOR SIMPLE pza 42.00 42.00 INTERRUPTOR DOBLE pza 28.80 28.80
INTERRUPTOR CONMUTACION pza 14.40 14.40 CAJA RECTANGULAR DE 58 mm X 93 mm u 98.00 98.00 CAJA OCTOGONAL GALVANIZADA LIVIANA 100 mm X 40 mm u 77.00 77.00 FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA u 1,425.00 1,425.00 FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA u 768.00 768.00 INTERRUPTOR TERMOMAGNETICO 2 X 60 A pza 15.00 15.00 TABLERO DE DISTRIBUCION T-5 u 130.00 130.00 LADRILLO DE ARCILLA PARA TECHO h=15 cm u 5,898.23 5,898.23 LADRILLO CORRIENTE 6 X 12 X 24 cm u 16,298.8000 16,298.80 CABLE ELECTRICO NYY 4 X 4 mm2 m 325.08 325.08 CEMENTO PORTLAND TIPO I (42.5 kg) bls 38,307.5200 38,307.52 CERRADURA DE TRES GOLPES u 450.00 450.00 BISAGRA CAPUCHINA 4" u 264.00 264.00 CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA u 180.00 180.00 CINTA AISLANTE rll 57.58 57.58 CINTA TEFLON rll 6.40 6.40 YESO kg 100.1700 100.17 YUTE kg 168.0000 168.00 OCRE kg 1,285.68 1,285.68 FRAGUA GRIS CLARO kg 210.39 210.39 THINNER CORRIENTE gal 127.12 127.12 ACCESORIOS DIVERSOS ( INCLUYE ALUMINIO ) u 928.00 928.00 PEGAMENTO DE MAYOLICA gal 4,168.08 4,168.08 PEGAMENTO PARA PVC AGUA FORDUIT gal 117.28 117.28 PEGAMENTO PLASTICO PARA PVC CCP gal 11.16 11.16 PEGAMENTO PARA PVC 1/4 gl u 23.23 23.23 CINTA TEFLON pza 0.40 0.40 DISEÑO DE MEZCLAS u 300.0000 300.00 ROTURA DE PROBETAS u 250.00 250.00 CURVAS PVC SEL 3/4" pza 84.00 84.00 FLETE TERRESTRE glb 5,564.9700 5,564.97 PAGO DE DERECHO DE CONEXION DE ENRGIA ELECTRICA glb 300.0000 300.00
83
N°
DESCRIPCION DE MATERIALES UND.
MES 1
MES 3 Total
HORMIGON (PUESTO EN OBRA) m3 1,007.7500 1,007.75 HORMIGON DE RIO m3 11,343.5600 11,343.56 LIJA DE FIERRO # 80 pza 483.40 483.40 AGUA m3 0.31 0.31 VENTANA EN SISTEMA NOVA S/DISEÑO CON VIDRIO 6 MM, PERFIL m2
14,817.80
14,817.80
PUERTA DE MADERA APANELADA EN MADERA TORNILLO INC. BISAG m2 9,989.00 9,989.00
CONTRAZOCALO DE LOSETA CORRIENTE CLARO 10 X 20 cm m
705.81 705.81
CERAMICO ANTIDESLIZANTE 30X30 CM, COLOR BLANCO m2 342.51 342.51 CERAMICO 20X30 CM, COLOR BLANCO m2 1,481.03 1,481.03 MADERA TORNILLO p2 2,727.4500 2,727.45 MADERA NACIONAL P/ENCOFRADO p2 11,941.3500 11,941.35 ROLLIZO DE EUCALIPTO DE 3"x2.80 m. pza
12,571.20
12,571.20
TRIPLAY DE 8 mm m2 69.12 69.12 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 4,147.25 4,147.25 TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24" u 240.00 240.00 TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X
24" pza 240.00 240.00
PINTURA ESMALTE SINTETICO gal 65.06 65.06
PINTURA LATEX gal 931.51 931.51 PINTURA AL OLEO MATE gal 238.35 238.35 PINTURA IMPRIMANTE PARA MUROS gal 565.16 565.16 PINTURA ESMALTE gal 29.07 29.07 BARANDA METALICA DE FIERRO NEGRO Ø 2" m 363.00 363.00 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" u 48.00 48.00 NIPLE DE FIERRO GALVANIZADO DE 1/2" X 1 1/2" u 80.00 80.00 ADECUACION DE ALMACEN Y OFICINA DE OBRA glb 100.0000 100.00 100.00 300.00 SUMIDERO DE BRONCE DE 2" u 18.00 18.00 TUBERIA PVC SAP A-10 DE 1/2" m 137.09 137.09 TUBERIA PVC SAL PARA DESAGUE DE 2" m 509.30 509.30 TUBERIA PVC SAL PARA DESAGUE DE 4" m 1,138.15 1,138.15 SOMBRERO DE VENTILACION PVC SAL DE 2" u 5.00 5.00 YEE PVC SAL 2" u 10.50 10.50 CODO PVC SAL 2" X 90° pza 39.30 39.30 CODO PVC SAL 4" X 90° pza 31.95 31.95 CODO PVC SAL 2" X 45° pza 14.70 14.70 CODO PVC SAL 4" X 45° pza 9.45 9.45 CODO PVC SAP 1/2" pza 29.00 29.00 TEE PVC SAP 1/2" pza 7.50 7.50 TEE PVC SAL 4" X90° u 48.00 48.00 YEE PVC SAL DE 4" X 2" pza 20.16 20.16 REDUCCION PVC SAL 4" X 2" pza 19.20 19.20 SOMBRERO DE VENTILACION PVC SAL 2" pza 13.00 13.00 TUBO PVC SAP 3/4" ELECTRICA m 1,133.00 1,133.00 CURVA PVC SEL 3/4" pza 39.20 39.20 VALVULA COMPUERTA DE BRONCE DE 1/2" u 72.00 72.00 VIDRIO DOBLE P2 618.98 618.98
11,628.1
1217,680.0
4
84
4. CONCLUSIONES
Se debe informar que no siempre podemos encontrar los metrados del
expediente técnico en la obra, definitivamente existen diferencias que
tenemos que asumirlas con el menor gasto posible así como problemas
que nos conllevaran a un retraso pero para esas malas eventualidades
estamos nosotros quienes somos los encargados de resolverlos sin
tardar mucho tiempo.
85
Se logró aplicar los conocimientos en estructuras, concreto armado,
cimentaciones y diseño sismo resistente adquiridos en la Universidad
Peruana los Andes
Se verifico el cumplimiento de los requisitos de control de calidad
durante el proceso constructivo, respetando los planos, especificaciones
técnicas del expediente técnico basados en las normativas y
reglamentos de construcción vigentes
En las practicas pre profesionales en la obra: “CREACION DE
INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE LA
COMUNIDAD DE PIRCAPAHUANA, DISTRITO DE LIRCAY,
PROVINCIA DE ANGARAES – HUANCAVELICA”, adquirí una
experiencia real y efectiva enfrentado en campo y en gabinete,
permitiéndome conocer, manejar y controlar con ética profesional al
personal de campo, aportar y sugerir al personal profesional existente.
5. RECOMENDACIONES
Es indispensable que se conozcan cada uno de los materiales a usarse
como, el cemento, fierros, etc. Ya que si estas se encuentran en mal
estado las partidas que se ejecuten con éstos materiales serán
defectuosas.
Se recomienda ejecutar la obra según los planos especificados en el
expediente técnico y hacer uso de los equipos y herramientas
necesarios durante el proceso constructivo
86
Es necesario hacer uso de los instrumentos de seguridad durante las
horas de trabajo.
Es de vital necesidad cumplir todas las especificaciones técnicas del
Expediente Técnico pues de no seguir éstas nos podemos encontrar con
muchos inconvenientes que pueden ocasionar el aumento de
presupuesto y del plazo de ejecución de la obra.
La “UNIVERSIDAD PERUANA LOS ANDES”, facultad de Ingeniería,
carrera profesional de Ingeniería Civil, a través de la coordinación de
Practicas Pre profesionales y del docente Asesor, espero revise y
apruebe favorablemente el presente informe
6. BIBLIOGRAFIA
REGLAMENTO NACIONAL DE EDIFICACIONES
DISEÑO DE ESTRUCTURAS DE CONCRETO ARMADO – Ing. Jorge
Alva Jurado
REGLAMENTO NACIONAL DE CONSTRUCCIONES – CAPECO
CIMENTACIONES – ZavenDavidian
REGLAMENTO DE METRADOS PARA OBRAS DE EDIFICACION
SUPERVISION DE OBRAS DE CONCRETO – American Concrete
Institute
87
TECNOLOGIA DEL CONCRETO – Ing Jorge Alva Jurado
ESTRUCTURACION Y DISEÑO DE EDIFICACIONES DE CONCRETO
ARMADO – Blasco Blasco Antonio
COSTOS Y PRESUPUESTOS EN EDIFICACIONES – CAPECO
ESTRUCTURA DE CONCRETO – Gaylord y Robinson
COSTO Y TIEMPO EN EDIFICACION – Ing. Carlos Suarez Salazar
7. ANEXOS