Post on 27-Oct-2015
description
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SUNRISE SYSTEMS and
Nor-Par a.s
PRESENTATION
PIPENET SOFTWARE
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
Standard Module• General purpose flow analysis applications. Utility
systems and HVAC systems
Spray/Sprinkler Module• Design of fire protection systems in compliance with
NFPA rules
Transient Module• Dynamic analysis of pipe networks, along with the
calculation of hydraulic transient forces.
THE MODULES OF PIPENET
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
TRANSIENT MODULE APPLICATIONS
• Transient Analysis of Pipelines
• Firewater Systems
• Water Injection Systems
• Cooling Water Systems
• Loading and Unloading Systems
• Generating Loads for Pipe Stress Analysis
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
TRANSIENT MODULE APPLICATIONSURGE ANALYSIS OF A LARGE COOLING WATER
SYSTEMPETROCHEMICAL PLANT, CHINA
4849 50515253 5455 56575859
6465 9091(6263 omitted)
Cooling Tower Basin
Valve closes in 240 secs(2000 mm diameter)
Both pumps running
2000 mm return line
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
TRANSIENT MODULE APPLICATION OFFSHORE FIREWATER SYSTEM
NOWROOZ OFFSHORE PLATFORM COMPLEX, IRAN
Fire pump 20-P-4510B
20-A-4502
NPP2 Platform
NLQ Platform
20-A-4503
20-A-4504
Weather deck
Closed
Closed
Closed
Vac Brkr
Vac Brkr
Vac Brkr
Vac Brkr
Vac Brkr
Runs constantly
Caisson modelled as pipe
Monitor closes5 - 10 secs
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
TRANSIENT MODULE APPLICATION SUBSEA PIPELINE SYSTEM – ARABIAN GULF
ZADCO, ABU DHABI
Subsea Pipeline System
Tank farm
Off shore platform
Location of leak
Subsea Pipeline System
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
TRANSIENT MODULE APPLICATION JETTY LOADING SYSTEMLG ENGINEERING, KOREA
Surge Relief Valve
Pi peli ne
Shut off valve
ERC valve
Jetty
Pe trochemic al plant
Tanker(C loses)
(Remains open)
Su rge Relief Valve
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
TRANSIENT MODULE APPLICATION CANADIAN TRANS MOUNTAIN OIL PIPELINE
TRANSCO, CANADA
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATIONS
• Deluge systems
• Firewater ring mains
• Foam solution systems
• Sprinkler systems
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATION REFINERY FIREWATER RINGMAIN SYSTEM
M W KELLOGG, UNITED KINGDOM
Bu l le t M an i fo ld
D/ V 05 -X-6 0 8
Foa m pu m p s k id
D/V 0 5 -X-6 0 4
D/V 0 5 -X-6 0 3
D/V 0 0 -X-6 0 1
D/V 0 0 -X-6 0 2
D/V 0 1 -X-6 0 1
D/V 0 2 -X-6 0 1
D/V 0 3 -X-6 0 1
Die s e l
Die s e l
Ele c tri c
Ele c tri c
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATION REFINERY FIREWATER RINGMAIN SYSTEM
ZOOMED VIEW
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATION OFFSHORE PLATFORM FIRE PROTECTION SYSTEM
DAN FC
helideck m onit or s
DAN FB
DAN FA
DAN FE
LARG E M O NI TO R
XV- 035202XV- 035204
XV- 035201
XV- 035203
XV- 035352
XV- 035256
XV- 035255
XV- 035354
XV- 035353
XV- 035351
XV- 035206
XV- 035205
X- 0322
X- 0323
X- 0327
X- 0325
X- 0328
X- 0326
X- 0316X- 0318
X- 0315
X- 0317
X- 0313X- 0312
X- 0314
X- 0301
DAN FF
P- 0303
P- 0304
P- 0303LARG E M O NI TO R
P- 0301
P- 0302
P- 0305
P- 0306
X- 0328
X- 0322
DAN FF SYSTEM L DAN FF SYSTEM G
DAN FF SYSTEM H
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATION OFFSHORE PLATFORM FIRE PROTECTION SYSTEM
ZOOMED VIEW
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATIONAIRPORT HANGAR DELUGE SYSTEM
SINGAPORE INTERNATIONAL AIRPORT
891 PIPES730 NOZZLES
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
SPRAY/SPRINKLER MODULE APPLICATIONAIRPORT HANGAR FIREWATER SYSTEM
ZOOMED VIEW
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONS
• Cooling Water Systems
• Steam Distribution Systems
• Ventilation Systems
• Compressed Air Systems
• Seawater Systems
• Closed Loop Systems
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONREFINERY STEAM DISTRIBUTION SYSTEM
RELIANCE INDUSTRIES, INDIA
38
40
13
61
7474
76
7878
10
81
2742
14
11
9
1
12
19
1818
24
11
26
31
34 20111
112
21
21
21
21
15
55
16
56
22 29
57
33
58
35 37
62
45
63
64
3232
46
47 107
108
48 49
82
50 109
110
51
5253
54
5959
97
4160
60
7
7
99
43 39
39
65
666770
36
6869
105
106
71
72737517
104
79 4
84 85 86 87 88
23 3
5
5
2825
30
89
92
9090
93
91
94 69698 95
77
101
102
103
23
23
2323
23
232323
2323
8
4480
83
8383
100
113
114
MP/LP
TO REFINERY
DEAERATOR
TZ-621
Steam Turbine
PRDS
951-PV-603
STGDrainsPump
UtilityStation
UtilityStation
LLPLETDOWN
VALVE
FROMMP/LP
LETDOWN
Desuperheater
DeminWater
Preheater
Deaerator
FuelOil TankArea
Aux Boiler / BFW Pump Return
LLP DEARATOR HEADER LLP DEAERATOR HEADER
LP TURBINE RETURN HEADER
MAIN 771/951 LP STEAM HEADER
LP TURBINE RETURN HEADER
Fuel ForwardPump
771-P065A/B
DeaeratorFeedPump
Aux Boiler
771-S011A/B
LPBFWPump
MPBFWPump
Aux Boiler
771-S010A/B
HPBFWPump
BFWPumpTurbine
771-PV-605771-PV-606951-PV-605
CPP Deaerator CPP Deaerator CPP Deaerator Process Deaerator Process Deaerator Process Deaerator Process Deaerator
951-V002 951-V001 771-V001 771-V002 771-V301 771-V302 771-V303
Aux Boiler
FanFan
Fan951-S011A/B
Aux BoilerFan
951-S010A/B
BFW PumpTurbine
Deaerator FeedPump
951-S074C
Arm Tkr Heavy SlopDay Tk771-V003
Boiler F.O Tk 771-V011
CPP
F.O Tank771-V010
771-PV-603MP/LP PRDS
771-S001771-S301C771-S302C771-S303C
CPP
DeaeratorFeedPump
771-S075B
771-S074C
951-S001
F.O Unloading
From CondFlash Drum
Steam Tracing
VENTTO ATMOS
MP/LPPRDS
VENT
20"
30"
30"
30"
30"30"30"
SCAPH SCAPH
SCAPH
SCAPH
SCAPH
NEW MP/LP PRDS
NEW PIPING
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONREFINERY STEAM DISTRIBUTION SYSTEM
ZOOMED VIEW
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONREFINERY WATER DISTRIBUTION SYSTEM
38 92
92
39
515256
53
606465
66
7778
78
78
83
84 88
88
37
93
94
40 40
40
1
2
89
90
91
54
67
4146
47
49
4950
31
5
6
913
14
10
15
161617
32
11
12
25
2628
27
30
29
31
35 33
36
34
55
6873 69
70
74
75
76
76
71
72 72
48
Firewater Booster Pump
Tie-inTie-inTie-in
System #3: Sprinklers / Switch Deck
System #4: Sprinklers / Elctr. Treys
System #2: Sprinklers / Un-Heading Deck
System #7: Elevated FW Monitors / Switch Deck
System #7: Hose Reels / Cutting Deck System #1: Sprinklers / Cutting Deck
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONREFINERY WATER DISTRIBUTION SYSTEM
ZOOMED VIEW
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONVENTILATION SYSTEM
1
9
9
3
4
5
6
8
17
11
12
13
14
16
16
39
39
181
9
21
30
20
23
24
25
26
28
34
353
6
37
31
40
40
AHU 1
AHU 2
AHU 3
AHU 4 (Standby)
Return FlowSupply Flow
PIPENETTM - Leading the Way in Fluid Flow Analysis
SUNRISE SYSTEMS LIMITED
Flint BridgeBusiness CentreEly RoadWaterbeach Cambridge CB5 9QZUnited Kingdom
Nordstrandveien 76N-1164 Oslo, Norway
Phone: +47 22 28 69 00e-mail: admin@norpar.com Fax: +47 22 28 69 81
STANDARD MODULE APPLICATIONVENTILATION SYSTEM
ZOOMED VIEW