Post on 15-Apr-2017
Contract No. 09-24859/1
1
JV Egis International & IRD Engineering
SUPERVISION OF THE REMAINING LINK
ALONG CORRIDOR X TO THE LEVEL OF MOTORWAY
SECTION DEMIR KAPIJA – SMOKVICA
AT THE FIRST 4 KM
BRIDGE B1
B1 – Placing of reinforcement cage for pile P25 on Abutment A0R B1 – Checking of formwork before concreting for piles C13 and C14 on Pier P1R
B1 – Placing of reinforcement on Abutment A0L B1 – Apply Asphalt coating of pile cap on Abutment A0L
3
BRIDGE B1
B1 – Placing of bearings on Abutment A0Left B1 – Checking of reinforcement on Pier head P1R
B1 – View on Bridge B1 with Abutment A0R B1 – View on Abutment A5 – reinforcement checked and start with formwork(1st stage)
4
BRIDGE B1
B1 – Concreting of Abutment A4Left – 2nd stage B1 – Placing of reinforcement on Abutment A4Left – 3rd stage
B1 – Reinforcement of Main Girder and ducts for prestressing ready for check(1st phase) B1 – Placing of concrete for main girder No.1(Span A0L-P1L)
5
BRIDGE B1
B1 – Pre-stressing the first five Main Girders (No.1,2,3,4 and 5), Span A0L-P1L B1 – Erection and transportation the first Main Girder No.1(Span A0L-P1L)
B1 – Erection and transportation the sixth Main Girder No.6(Span P1L-P2L) B1 – View on the first two span (A0L-P1L,P1L-P2L) from basket
3/11/2016 6
BRIDGE B1
B1 – Placing of metal sheet between Main girders in the first span, AOLeft-P1Left B1 – View on the concreting of Main Girder No.23 with pump
B1 – Placing reinforcement of Cross Beam on Abutment A4Left B1 – Connection of bearing with Main girder and placing on bearing plinth(Abutment A0Right)
3/11/2016 7
BRIDGE B1
B1 – View on Bridge deck slab(span P3L - A4L) – ready for concreting B1 – Concreting and curing of Bridge deck slab - span P3L - A4L
B1 – Curing of Bridge deck slab - span A0L – P1L B1 – Placing of reinforcement for Cross beam on Abutment A0 (R.B.)
3/11/2016 8
BRIDGE B1
B1 – Placing of concrete for Crossbeam on Abutment A0 (R.B.) B1 – Placing of concrete for Crossbeam on Pier P1 (R.B.)
B1 – Placing of reinforcement for Sidewalk(right side) (L.B.) B1 – Placing of concrete for Sidewalk(left side) (L.B.)
9
BRIDGE B1
B1 – View on Bridge B1
10
BRIDGE B1
B1 – View on Bridge B1
11
TUNNEL T1
T1 –Mechanical Opening South portal Tunnel T1: Gorge area NRP starting excavation in the underground installation 1st arches LG.
Tunnel T1-Right Branch excavation works at bench. Tunnel T1: Gorge area NRP excavation works jumbo drilling in the bench.
12
TUNNEL T1
Tunnel T1: North Right Bore (Gorge) excavation works at the Tunnel face . Tunnel T1: Gorge NRP(North Right Portal ) placement layer of wire mesh in support of the tunnel.
Tunnel T1: Gorge NRP (North Right Portal) spraying shotcrete in support of the tunnel. Tunnel T1: Southern Portal Left bore spraying smoothing shotcrete before the waterproofing works
3/11/2016 13
TUNNEL T1
Tunnel T1: SP L.B: installation of the scaffolding for the placement of geotextile and PVC membrane. Tunnel T1: Southern Portal Left Bore installation of geotextile.
Tunnel T1: Left Bore waterproofing works (placement of PVC membrane). Tunnel T1:South Left Bore cast of concrete for the final lining Block L033
3/11/2016 14
TUNNEL T1
Tunnel T1: Northern Portal Left Bore casting sub-base concrete. Tunnel T1: Southern Portal Left Bore drainage works( cast permeable drain rock).
Tunnel T1: Northern Portal Left Bore casting concrete in abutment. Tunnel T1-Left Bore casting concrete (final lining) in tunnel vault.
15
TUNNEL T1
Tunnel T1: Southern Portal Left bore view from the final lining. Tunnel T1-Left Bore laying of geotextile at the bottom of the Tunnel.
Tunnel T1-L.B. placement geotextile and backfilling with rocky material the bottom floor of the Tunnel . Tunnel T1-Left Bore installation of formwork at Tunnel vault Northern Portal cut&cover .
16
TUNNEL T1
Tunnel T1-Left Bore casting concrete at Tunnel vault Northern Portal cut&cover . Tunnel T1-Left Bore reinforcement works at Tunnel vault Northern Portal cut&cover .
Tunnel T1-Left Bore view from cut&cover. Tunnel T1-Right Bore view from cut&cover Northern Portal.
17
BRIDGE B2
Placing of protect reinforced and unreinforced piles for foundation of Pier P2R B2 – Concreting of main pile P4 on Pier P2R
Placing 2nd part of reinforcement for pile P5 on Pier P1L temporary retaining structure B2 – Concreting of pile cap on Pier P2R temporary retaining structure
18
BRIDGE B2
B2 – Excavation for foundation(pile cap) P3R B2 – Reinforcement of Pile Cap (1st stage),ready for check, Pier P3(R.B.)
B2 – Concreting of pile cap on P2R
B2 – Concreting of Pilecap(2nd stage),Pier P3(L.B)
19
BRIDGE B2
B2 – Placing of reinforcement on Pier P2R(5th stage)
B2 – Reinforcement of Pier P3Right(3rd stage),ready for check, Pier P2(R.B.)
B2 – Concreting of Pier P3Right(4th stage),Pier P3(R.B)
B2 – Concreting of Pier P3Right (2nd stage)
20
BRIDGE B2
B2 –Reinforcement of Side Walls on Pierhead P2,ready for check(L.B.)
B2 – Placing of reinforcement for Segment P2-5R/P2-5L(Bottom slab) on Pier P2, (L.B.) - ready for concreting
Placing of concrete for Segment P2-5R/P2-5L(Side Walls/Upper slab) on Pier P2, (L.B.)
Placing of reinforcement on Pierhead(Upper slab) on Pier P1, (L.B.)- ready for concreting -
3/11/2016 21
BRIDGE B2
B2 – View on Pierhead on Pier P3(R.B) after concreting and start with curing
B2 – Placing of concrete on Segments P2-5R/P2-5L(Side Walls/Upper Slab),Pier P2(R.B)
B2 – View on Bridge B2 with access road B2 – Concreting of Segments P3-5R/P3-5L(Side Walls/Upper Slab),Pier P3(R.B)
22
BRIDGE B2
B2 – View on Bridge B2 with access road
23
R.E.W.
Drilling for anchor bolts at Reinforced Earth Wall (near rear abutment A5L) R.E.W. – Placing of RC panels (TW 2)
Installation of face panels layer at Reinforced Earth Wall (bottom wall 1&2) Installed face panels at Reinforced Earth Wall (bottom wall 1)
24
R.E.W
Installed face panels at Reinforced Earth Wall (bottom wall 2)
Installation of GeoStrap-5 type strips at Reinforced Earth Wall (bottom wall 1&2)
Installation of GeoStrap-5 type strips at Reinforced Earth Wall (bottom wall 1&2)
Installation of drainage layer at Reinforced Earth Wall (bottom wall 1&2)
3/11/2016 25
R.E.W.
Foundation area of R.E.W.4 R.E.W.– Foundation of Top Wall 4
R.E.W.(bottom walls 3&4) R.E.W. – Placing of strips 65 KN
26
R.E.W.
R.E.W. – Formation of embankment (TW 3, 4) Layer 2 R.E.W. – Formation of embankment (BW 3, 4) Layer 29/35
R.E.W.- Wall 2 R.E.W.- Wall 3
27
R.E.W.
R.E.W. R.E.W.– view from distance
28
EMBANKMENT E1
View of Embankment 1 Placement of geogrid at embankment E1
Geogrid installation at Embankment E1 Placement od subgrade layer at Embankment 1
29
EMBANKMENT E1
Placement od subgrade layer at Embankment 1 Embankment 1 – Subgrade layer
View of Bridge B2, REW, E1, C1 30
B2, R.E.W., E1,C1
31
CUT 1
CUT 1 Excavation at Cut 1
Cut C1 – Excavation CUT 1 – Wide earth excavation
32
CUT 1
CUT 1 – Wide earth excavation CUT 1 – Wide earth excavation
CUT 1 – Trench on the 3-rd bench R Shotcrete C15/20 CUT 1 – Wide earth excavation
33
CUT 1
Cut C1 excavation Cut C1 excavation
CUT C1 Excavation CUT C1