Post on 06-Feb-2016
description
PRESUPUESTO
ITEM DESCRIPCION UNIDAD
01.00.0 LIMPIEZA DE TERRENO01.01.00 LIMPIEZA DE TERRENO MANUAL M202.00.00 TRAZO, NIVELES Y REPLANTEO02.01.00 NIVELACION, TRAZO Y REPLANTEO PRELIMINAR M202.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA M203.00.00 MOVIMIENTOS DE TIERRAS03.01.00 EXCAVACION MANUAL SDE ZANJAS EN TERRENO NORMAL H<=1.50M M303.02.00 EXCAVACION MANUAL SDE ZANJAS EN TERRENO NORMAL H>1.50M M3
ACARREO DE MATERIAL EXCEDENTE M3ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO HASTA 5 KMOBRAS DE CONCRETO SIMPLESOLADOS Y SUBZAPATASSOLADOS CONCRETO
PRESUPUESTO
METRADO
155.82
155.82155.82
17.35126.58187.11
PRECIO UNITARIO $/.
PARCIAL $/.
PLANILLAS DE METRADOSPROYECTO MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. PILLONE, DISTRITO DE UBINAS,PROVINCIA SANCHEZ CERRO, MOQUEGUA
ITEM DESCRIPCION UND.
01.00.0 LIMPIEZA DE TERRENO01.01.00 LIMPIEZA DE TERRENO MANUAL M2
02.00.00 TRAZO, NIVELES Y REPLANTEO02.01.00 NIVELACION, TRAZO Y REPLANTEO PRELIMINAR M202.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA M2
03.00.00 MOVIMIENTOS DE TIERRAS03.01.00 EXCAVACION MANUAL SDE ZANJAS EN TERRENO NORMAL H<=1.50M M3
AULAS 01,02,03EJE 1 DESDE EJE C HASTA EJE F M3EJE 3 DESDE EJE C HASTA EJE F M3EJE F DESDE EJE 1 HASTA EJE 3 M3EJE E DESDE EJE 1 HASTA EJE 3 M3EJE D DESDE EJE 1 HASTA EJE 3 M3EJE C DESDE EJE 1 HASTA EJE 3 M3
AULA 4EJE 1 DESDE EJE A HASTA EJE B M3EJE 3 DESDE EJE A HASTA EJE B M3EJE B DESDE EJE 1 HASTA EJE 3 M3EJE A DESDE EJE 1 HASTA EJE 3 M3
03.02.00 EXCAVACION MANUAL SDE ZANJAS EN TERRENO NORMAL H>1.50M M3AULA 1,2 Y 3Z1 M3Z2 M3Z3 M3Z4 M3Z5 M3Z6 M3
AULA 4Z3 M3Z4 M3
03.03.00 ACARREO DE MATERIAL EXCEDENTE Dprom=30m.
03.04.00 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO HASTA 5 KM M3
METRADO TOTAL DE EXCAVACION
OBRAS DE CONCRETO SIMPLESOLADO Y SUB ZAPATASSOLADOS CONCRETO F'C=100 Kg/cm^2 E=10 cm M3AULA 01 ,02 Y 03Z1 M3Z2 M3Z3 M3Z4 M3Z5 M3Z6 M3AULA 4Z3 M3Z4 M3
04.01.02 SUB ZAPATA CONCRETO F'C=210Kg/cm^2 E=10 cmAULA 01,02 Y 03 SZ1 M3SZ2 M3SZ3 M3SZ4 M3SZ5 M3SZ6 M3AULA 4SZ3 M3SZ4 M3CIMIENTO Y SOBRECIMIENTOCIMIENTO CORRIDOS M3AULA 01,02 Y 03 EJE 1 DESDE EJE C HASTA EJE F M3EJE 3 DESDE EJE C HASTA EJE F M3EJE F DESDE EJE 1 HASTA EJE 3 M3EJE E DESDE EJE 1 HASTA EJE 3 M3EJE D DESDE EJE 1 HASTA EJE 3 M3EJE C DESDE EJE 1 HASTA EJE 3 M3AULA 4EJE 1 DESDE EJE A HASTA EJE B M3EJE 3 DESDE EJE A HASTA EJE B M3EJE B DESDE EJE 1 HASTA EJE 3 M3EJE A DESDE EJE 1 HASTA EJE 3 M3
PLANILLAS DE METRADOSMEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. PILLONE, DISTRITO DE UBINAS,PROVINCIA SANCHEZ CERRO, MOQUEGUA
CANT.MEDIDAS
PARCIAL TOTALLARGO(L) ANCHO(A) ALTURA(H)
21.2 7.35 155.82 155.82
21.2 7.35 155.8221.2 7.35 155.82 311.64
LARGO(L) ANCHO(A) ALTURA(H) 17.35
5.95 0.50 1.10 3.275.20 0.50 1.10 2.862.60 0.50 1.10 1.432.65 0.50 1.10 1.462.65 0.50 1.10 1.462.60 0.50 1.10 1.43
2.35 0.50 1.10 1.292.35 0.50 1.10 1.292.60 0.50 1.10 1.432.60 0.50 1.10 1.43
CANT. LARGO(L) ANCHO(A) ALTURA(H) 126.58
2 2.15 1.8 2.5 19.352 2.35 1.75 2.5 20.564 1.15 1.15 2.5 13.232 1.65 1.8 2.5 14.851 2.45 1.8 2.5 11.031 2.5 1.8 2.5 11.25
2 1.15 1.15 2.5 6.614 1.65 1.8 2.5 29.70
143.93 187.11Mas 30% de esponjamiento= 43.17825
187.11
MAS 30 % DE EPONJAMIENTO= 143.9343.18
CANT LARGO (L) ANCHO(A) ALTO(A) 5.06
2 2.15 1.8 0.1 0.77 2 2.35 1.75 0.1 0.82 4 1.15 1.15 0.1 0.53 2 1.65 1.8 0.1 0.59 1 2.45 1.8 0.1 0.44 1 2.5 1.8 0.1 0.45
2 1.15 1.15 0.1 0.264 1.65 1.8 0.1 1.19
40.504
2 2.15 1.8 0.8 6.1922 2.35 1.75 0.8 6.584 1.15 1.15 0.8 4.2322 1.65 1.8 0.8 4.7521 2.45 1.8 0.8 3.5281 2.5 1.8 0.8 3.6
2 1.15 1.15 0.8 2.1164 1.65 1.8 0.8 9.504
CANT. LARGO (L) ANCHO(A) ALTO(A) 12.35
8.27 0.24 1.98 8.12 0.24 1.95
4.9 0.24 1.18 4.9 0.24 1.18 4.9 0.24 1.18 4.9 0.24 1.18
2.99 0.24 0.72 2.99 0.24 0.72
4.6 0.24 1.10 4.9 0.24 1.18