Impact of LNG fuel in Marine Market

Cesar Corcuera 

Station Manager

DNV Panama and South Caribbean

Wartsila LNG Summit

18 January 2011

Page 2: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 2/22

 © Det Norske Veritas AS. All rights reserved Slide 211 October 2007

AGENDA

Air Emission Regulations

Benefits

LNG fuelled Ferries in operation

LNG Distribution System & local Resources

Other Benefits & Conclusion

Page 3: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 3/22

 © Det Norske Veritas AS. All rights reserved Slide 311 October 2007

Emission regulations -

ECA requirements

Switch to Low sulphur fuel

Install exhaust gas cleaning system

Switch to LNG

Ship-owners have three choices

Sulphur (all ships)

- Today Marpol Annex VI: 4.5% Sulphur

- 2012 (august) : max 1.0% Sulphur fuel

- 2015: max 0.1% Sulphur fuel

NOx (newbuilds)

- Tier II: 2011, 20% NOx reduction- Tier III: 2016, 80% NOx reduction

Puerto Rico and US Virgin Islands

within 20 to 40 Nm from coasts

These proposals were adopted by

(MEPC) IMO to be ECA by mid

2011.

Page 4: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 4/22

 © Det Norske Veritas AS. All rights reserved Slide 411 October 2007

LNG Emissions compared to Diesel engines

CO2-20 to 25%

NOX-80 to 90%

SOX-100 %

PM-100 %

Diesel Engine Exhaust

LNG Engine Exhaust

Page 5: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 5/22

 © Det Norske Veritas AS. All rights reserved Slide 511 October 2007

Economical benefits

Abundance of Gas in US with 100+ years supply

Page 6: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 6/22

 © Det Norske Veritas AS. All rights reserved Slide 611 October 2007

1

st

Gas fuelled Ferry, January 2000Prototype for Short Sea Shipping Capacity: 300 pax and 96 cars

Builder: Aker Langsten, Norway

System: Gas / Electric

Engines: 4 Mitsubishi gas in

separate spaces (lean burn with gas

pre-chambers @ 2 bars & sparkignited)

Speed: 12 knots

Passenger/car ferry “GLUTRA”

Growth in Norway since 2000:

21 trading + more on order

Page 7: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 7/22

 © Det Norske Veritas AS. All rights reserved Slide 711 October 2007

“GLUTRA”

Arrgt: Bridge, Pax, Control

Rm opposite side to E/Rs

Fuel Tanks: 2 x 1000 cu ft.

Type: SS vacuum insulated.

Refueling: 6 days

Bunkering time: 2 hrs

Trade: 19 hrs, 7 days per wk 

Lesser of B/5 or 38 ft.

Min 2.5 ftLesser of B/15 or 6.6 ft.

Min 2.5 ft

Page 8: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 8/22

 © Det Norske Veritas AS. All rights reserved Slide 811 October 2007

6 more Ferries ordered from 2007

Builder: Aker yards, Romania & Norway

Capacity: 587 pax / 212 cars

Speed: 21 knots with 2x16 cyl, 3530kW +

2x12cyl, 2650KW

Plan: 12 Ferries by 2011

Page 9: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 9/22

 © Det Norske Veritas AS. All rights reserved Slide 911 October 2007

3 Tide, Passenger Ferries, 2009

Yard: Aker Lorient France

Capacity: 600 passengers

LNG Engines: 2 x 6 cylinder, 380KW Mitsubishi

Max Speed: 12 knots

Tank Size: 1000 cu ft

Refueling: 7 days

Refueling time: 1 hour

Page 10: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 10/22

 © Det Norske Veritas AS. All rights reserved Slide 1011 October 2007

Reduction in NOx emission = 20,000 cars

OSVs with Wartsila DF Engines, 2003

LADY VIKINGVIKING ENERGY

STRIL PIONEER

“LADY VIKING” “VIKING ENERGY” “STRIL PIONEER”

Page 11: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 11/22

 © Det Norske Veritas AS. All rights reserved Slide 1111 October 2007

“Energy Viking”

Engine: Wartsila Dual Fuel

Tank: Stainless Steel vacuum insulated

Refuel: Every 10th day

Volume: 7500 ft3

Pressure: 5 bar

Temp: -162 C

Page 12: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 12/22

 © Det Norske Veritas AS. All rights reserved Slide 1211 October 2007

Builder: Myklebust yard, Norway

3 LNG fuelled Coast Guard vessels contracted

Power Generation: DF (Gas + Diesel)

Norwegian Coast Guard patrol craft, 2008

Page 13: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 13/22

 © Det Norske Veritas AS. All rights reserved Slide 1311 October 2007

Further Developments Norwegian Research Council (2006 – 2007) => Funding

Goal: Develop ship concepts for BIG ships using LNG

9 Project Participants:

DNV

Color Line (Cruise ferry owner)

SeaTrans (Cargo vsl owner)

GasNor (LNG plant)

Marintek (Maritime Research)

Chart Ferrox (cryogenic tank producer)

Aker Yards (STX)

Rolls Royce

Wartsila

Passenger Ship

RoRo Ship

Page 14: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 14/22

 © Det Norske Veritas AS. All rights reserved Slide 1411 October 2007

4 RoRo ship on Order, 2008

Yard: Bharati, India

L: 433ft, Dwt: 5600, Type: RoRo/Containers Range: 3500 miles

Main Engine: Bergen 35:40, V12, 5250 KW, 15 knots, 6m draught

4 Rolls Royce design LNG fuelled vessels

Delivery: 2011, Trade: Norway / UK / W.Europe

Capacity: 94 TEU, Fuel Tanks: 15,000 cu ft = 4 TEU

Page 15: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 15/22

 © Det Norske Veritas AS. All rights reserved Slide 1511 October 2007

LNG fuelled HarbourTug

Project development: Crowley, Glosten & Rolls Royce

Page 16: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 16/22

 © Det Norske Veritas AS. All rights reserved Slide 1611 October 2007

Energy efficient design - including LNG fuel

Product carrier (15,000 dwt) with gas fuelled engines

LNG fuel tanks on deck 

Fuel capacity: 22 days of operation

Page 17: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 17/22

 © Det Norske Veritas AS. All rights reserved Slide 1711 October 2007

Distribution System in Norway

14 Trucks

2 Gas + 2 Diesel eng.

Unmanned Terminal

14,000 tpa

1750 cu ft

35,000 cu ft

Page 18: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 18/22

 © Det Norske Veritas AS. All rights reserved Slide 1811 October 2007

Local LNG Terminals

UNDER CONSTRUCTION

1. Sabine, TX:

(ExxonMobil - Golden Pass)

2. Elba Island, GA:(El Paso - Southern LNG Expansion)

3. Pascagoula, MS:

(ElPaso/Crest/Sonangol - Gulf LNG Energy)

Caribbean

Trinidad

Puerto Rico

Mexico (Altamira)

Plans to supply to: Jamaica & DominicanRepublic from US

Some US Gulf Terminals

converting to Export Terminals

Page 19: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 19/22

Page 20: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 20/22

 © Det Norske Veritas AS. All rights reserved Slide 2011 October 2007

Health and other Benefits

In USA, EPA estimates: Annual benefits in 2020 will include- Preventing bet 5,500 and 14,000 premature deaths,- 3,800 emergency room visits- 4,900,000 cases of acute respiratory symptoms

Page 21: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 21/22

 © Det Norske Veritas AS. All rights reserved Slide 2111 October 2007

How can DNV help?

DNV Rules since 2001 => IMO Interim Guidelines

Knowledge

Experience based on many significant projects Advisory / FSA / Concept design / Approve / Supervise / Train / Support

Worked closely with Norwegian Maritime Directorate

USCG Washington and DNV in dialogue

Page 22: 12 C Corcuera

8/12/2019 12 C Corcuera

http://slidepdf.com/reader/full/12-c-corcuera 22/22

 © Det Norske Veritas AS. All rights reserved Slide 2211 October 2007

Questions?

LNG Fuel

The Best Green Shipping solution for

fixed routes: Ferries, Liners, OSVs,

Crewboats, Tugs, Workboats

www.dnv.com