Analisis de Costos Unitarios San Gaban

38
RELACION DE MATERIALES MINISTERIO DE EDUCACION INSTITUCIONES EDUCATIVAS: RED YATIQAÑA FECHA : 2012 MANO DE OBRA TOPOGRAFO hh S/. 16.08 OPERARIO hh S/. 16.08 OFICIAL hh S/. 13.79 PEON hh S/. 12.43 MATERIALES BOLSA DE YESO DE 25 KG bls S/. 8.50 OCRE ROJO kg S/. 10.50 AGUA m3 S/. 13.00 CLAVOS kg S/. 5.80 AFIRMADO m3 S/. 35.20 CEMENTO PORTLAND TIPO I (42.5 kg) bls S/. 19.65 ACERO CORRUGADO FY=4200KG/CM2 kg S/. 4.60 LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und S/. 1.30 BLOQUE DE CONCRETO 20 X 20 X 40 cm und S/. 2.30 ARENA FINA m3 S/. 45.50 ARENA GRUESA m3 S/. 42.30 MADERA TORNILLO p2 S/. 5.95 CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg S/. 4.00 CLAVOS PARA MADERA CON CABEZA DE 2" kg S/. 4.00 CLAVOS PARA MADERA CON CABEZA DE 4" kg S/. 4.00 PIEDRA ZARANDEADA 1/2" m3 S/. 51.00 PIEDRA ZARANDEADA 1/4" m3 S/. 55.00 HORMIGON m3 S/. 30.00 PIEDRA GRANDE 8" m3 S/. 30.00 PIEDRA MEDIANA 4" m3 S/. 30.00 PIEDRA GRANDE m3 S/. 30.00 COMBUSTIBLE (GASOLINA) gln S/. 11.10 ADITIVO CURADO QUIMICO gln S/. 48.00 ALAMBRE N° 16 kg S/. 3.81 ALAMBRE N° 8 kg S/. 3.81 ASFALTO m3 S/. 30.00 GRASS bls S/. 10.17 TIERRA DE CHACRA m3 S/. 17.00 PINTURA ESMALTE SINTETICO EN GALON und S/. 30.00 PINTURA ESMALTE SINTETICO ANTICORROSIVO EN GALON und S/. 33.00 PLANCHA NEGRA LAF 0.50X920X2400mm und S/. 125.30 TRIPLAY 6mm m2 S/. 12.00 PERNO INC. TUERCA 3/4"X6" und S/. 3.20 PLANTONES und S/. 15.00 JUEGOS INFANTILES METALICOS und S/. 1,250.00 ANGULO FIERRO NEGRO 1"X1"X3/16"X6m und S/. 22.44 PUNTO AZUL E-6011 1/8" 25 Kg kg S/. 13.50 TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und S/. 68.00 MALLA GALVANIZADA DE #10 DE 2"x2" m2 S/. 19.00 TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und S/. 415.51 ELECTROBOMBA DE 0.5HP und S/. 575.20 TUBERIA PVC SAP C-10 C/R 1'' ml S/. 2.47 TUBERIA PVC SAP C-10 C/R 3/4'' ml S/. 1.62 REDUCCION PVC SAP S/P 3/4"-1/2" und S/. 0.55 REDUCCION PVC SAP S/P 1"-3/4" und S/. 0.77 TEE DESAGUE SANITARIA 2" PVC und S/. 3.75 CINTA TEFLON DE MEDIA und S/. 2.00 NIPLE F°G° 1/2" x 1½" und S/. 1.50 VALVULA ESFERICA REDGAL CIM. 1/2" und S/. 17.50 VALVULA CHECK SWING 1/2" und S/. 43.63 CODOS PVC SP 1/2"x90° und S/. 1.10 ADAPTADOR PVC PR 1/2" und S/. 1.25 REDUCC. CAMP GALV 3/4"x1/2" und S/. 2.38 UNION PVC R 3/4" PU und S/. 1.63 REDUCC. PVC-P 3/4"x1/2" C/R und S/. 0.88 PEGAMENTO PVC 32 ONZ. und S/. 28.13 FORMADOR DE EMPAQUETADURAS 3-H und S/. 7.75 TEE DESAGUE 4"x2" PVC und S/. 5.63 SOMBRERO DE VENTILACION DESAGUE 2" PVC und S/. 5.63 CODO DESAGUE 2"x90° PVC und S/. 1.50 CODO DESAGUE 2"x45° PVC und S/. 1.50 TUBO DESAGUE 2"x 3m. PVC und S/. 10.25 CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb S/. 5,000.00 VALV.PASO TERMOP. C/NIPLE TELESCOPICO und S/. 21.00 VALV.PASO TERMOP. C/SAL. AUX. 15N und S/. 16.56 UNION PRESION ROSCA 1/2" und S/. 0.60 NIPLE REEMPLAZO MEDIDOR 3/4" und S/. 2.14 CAJA DE REGISTRO DE CONCRETO PARA AGUA (INC. CUERPO Y SOLADO) und S/. 35.30 CAJA DE CONCRETO PARA REGISTRO DE DESAGUE (INC. BASE, INTERMEDIO,MARCO Y TAPA) und S/. 42.50 BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und S/. 1,395.25 BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und S/. 4,796.30 RED INTERNA DE AGUA HASTA 25m. glb S/. 1,000.00 RED INTERNA DE DESAGUE HASTA 25m. glb S/. 2,000.00 RED INTERNA DE AGUA HASTA 50m. glb S/. 2,000.00 RED INTERNA DE DESAGUE HASTA 50m. glb S/. 4,000.00 RED INTERNA DE AGUA HASTA 80m. glb S/. 3,200.00 RED INTERNA DE DESAGUE HASTA 80m. glb S/. 6,400.00 ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb S/. 3,000.00 ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb S/. 6,000.00 ACONDICIONAMIENTO BIOCLIMATICO PARA 05 AULAS A MAS DE 3600msnm glb S/. 15,000.00 EQUIPOS

Transcript of Analisis de Costos Unitarios San Gaban

Page 1: Analisis de Costos Unitarios San Gaban

RELACION DE MATERIALESMINISTERIO DE EDUCACION

INSTITUCIONES EDUCATIVAS: RED YATIQAÑA

FECHA : 2012

MANO DE OBRA

TOPOGRAFO hh S/. 16.08

OPERARIO hh S/. 16.08

OFICIAL hh S/. 13.79

PEON hh S/. 12.43

MATERIALES

BOLSA DE YESO DE 25 KG bls S/. 8.50

OCRE ROJO kg S/. 10.50

AGUA m3 S/. 13.00

CLAVOS kg S/. 5.80

AFIRMADO m3 S/. 35.20

CEMENTO PORTLAND TIPO I (42.5 kg) bls S/. 19.65

ACERO CORRUGADO FY=4200KG/CM2 kg S/. 4.60

LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und S/. 1.30

BLOQUE DE CONCRETO 20 X 20 X 40 cm und S/. 2.30

ARENA FINA m3 S/. 45.50

ARENA GRUESA m3 S/. 42.30

MADERA TORNILLO p2 S/. 5.95

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg S/. 4.00

CLAVOS PARA MADERA CON CABEZA DE 2" kg S/. 4.00

CLAVOS PARA MADERA CON CABEZA DE 4" kg S/. 4.00

PIEDRA ZARANDEADA 1/2" m3 S/. 51.00

PIEDRA ZARANDEADA 1/4" m3 S/. 55.00

HORMIGON m3 S/. 30.00

PIEDRA GRANDE 8" m3 S/. 30.00

PIEDRA MEDIANA 4" m3 S/. 30.00

PIEDRA GRANDE m3 S/. 30.00

COMBUSTIBLE (GASOLINA) gln S/. 11.10

ADITIVO CURADO QUIMICO gln S/. 48.00

ALAMBRE N° 16 kg S/. 3.81

ALAMBRE N° 8 kg S/. 3.81

ASFALTO m3 S/. 30.00

GRASS bls S/. 10.17

TIERRA DE CHACRA m3 S/. 17.00

PINTURA ESMALTE SINTETICO EN GALON und S/. 30.00

PINTURA ESMALTE SINTETICO ANTICORROSIVO EN GALON und S/. 33.00

PLANCHA NEGRA LAF 0.50X920X2400mm und S/. 125.30

TRIPLAY 6mm m2 S/. 12.00

PERNO INC. TUERCA 3/4"X6" und S/. 3.20

PLANTONES und S/. 15.00

JUEGOS INFANTILES METALICOS und S/. 1,250.00

ANGULO FIERRO NEGRO 1"X1"X3/16"X6m und S/. 22.44

PUNTO AZUL E-6011 1/8" 25 Kg kg S/. 13.50

TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und S/. 68.00

MALLA GALVANIZADA DE #10 DE 2"x2" m2 S/. 19.00

TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und S/. 415.51

ELECTROBOMBA DE 0.5HP und S/. 575.20

TUBERIA PVC SAP C-10 C/R 1'' ml S/. 2.47

TUBERIA PVC SAP C-10 C/R 3/4'' ml S/. 1.62

REDUCCION PVC SAP S/P 3/4"-1/2" und S/. 0.55

REDUCCION PVC SAP S/P 1"-3/4" und S/. 0.77

TEE DESAGUE SANITARIA 2" PVC und S/. 3.75

CINTA TEFLON DE MEDIA und S/. 2.00

NIPLE F°G° 1/2" x 1½" und S/. 1.50

VALVULA ESFERICA REDGAL CIM. 1/2" und S/. 17.50

VALVULA CHECK SWING 1/2" und S/. 43.63

CODOS PVC SP 1/2"x90° und S/. 1.10

ADAPTADOR PVC PR 1/2" und S/. 1.25

REDUCC. CAMP GALV 3/4"x1/2" und S/. 2.38

UNION PVC R 3/4" PU und S/. 1.63

REDUCC. PVC-P 3/4"x1/2" C/R und S/. 0.88

PEGAMENTO PVC 32 ONZ. und S/. 28.13

FORMADOR DE EMPAQUETADURAS 3-H und S/. 7.75

TEE DESAGUE 4"x2" PVC und S/. 5.63

SOMBRERO DE VENTILACION DESAGUE 2" PVC und S/. 5.63

CODO DESAGUE 2"x90° PVC und S/. 1.50

CODO DESAGUE 2"x45° PVC und S/. 1.50

TUBO DESAGUE 2"x 3m. PVC und S/. 10.25

CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb S/. 5,000.00

VALV.PASO TERMOP. C/NIPLE TELESCOPICO und S/. 21.00

VALV.PASO TERMOP. C/SAL. AUX. 15N und S/. 16.56

UNION PRESION ROSCA 1/2" und S/. 0.60

NIPLE REEMPLAZO MEDIDOR 3/4" und S/. 2.14

CAJA DE REGISTRO DE CONCRETO PARA AGUA (INC. CUERPO Y SOLADO) und S/. 35.30

CAJA DE CONCRETO PARA REGISTRO DE DESAGUE (INC. BASE, INTERMEDIO,MARCO Y TAPA) und S/. 42.50

BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und S/. 1,395.25

BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und S/. 4,796.30

RED INTERNA DE AGUA HASTA 25m. glb S/. 1,000.00

RED INTERNA DE DESAGUE HASTA 25m. glb S/. 2,000.00

RED INTERNA DE AGUA HASTA 50m. glb S/. 2,000.00

RED INTERNA DE DESAGUE HASTA 50m. glb S/. 4,000.00

RED INTERNA DE AGUA HASTA 80m. glb S/. 3,200.00

RED INTERNA DE DESAGUE HASTA 80m. glb S/. 6,400.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb S/. 3,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb S/. 6,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 05 AULAS A MAS DE 3600msnm glb S/. 15,000.00

EQUIPOS

Page 2: Analisis de Costos Unitarios San Gaban

NIVEL TOPOGRAFICO hm S/. 3.00

MIRA TOPOGRAFICA hm S/. 0.50

CAMION VOLQUETE 12M3 hm S/. 77.00

CARGADOR FRONTAL 200HP hm S/. 150.00

ANDAMIO METAL TABLAS ALQUILER d S/. 9.00

VIBRADOR DE CONCRETO 4 HP 2.5" hm S/. 6.60

MEZCLADORA DE CONCRETO 12 P3 hm S/. 7.00

COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP hm S/. 6.00

CARTEL DE OBRA DE 3.60 X 2.40 und S/. 900.00

BOLETINES INFORMATIVOS glb S/. 480.00

LETRINA SANITARIA INC. SERV MANTENIMIENTO und S/. 3,000.00

CONTENEDORES DE RESIDUOS SOLIDOS und S/. 150.00

LETREROS INFORMATIVOS PREVENTIVOS Y DE REGLAMENTACION und S/. 800.00

MITIGACION DE IMPACTO AMBIENTAL DURANTE LA EJECUCION

FLETE TERRESTRE P/TRANSPORTE DE MATERIALES glb S/. 9,000.00

FLETE TERRESTRE P/TRANSPORTE DE MATERIALES glb S/. 10,000.00

SUBCONTRATO

SC. REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m ml S/. 180.00

SC CORTE DE ROCA CON MAQUINARIA PESADA hm S/. 300.00

SC. ELABORACION JUEGOS INFANTILES METALICOS und S/. 1,250.00

SC. TRANSPORTE DE JUEGOS INFANTILES vje S/. 500.00

SC. M.O. COLOCACION DE MALLA GALVANIZADA m2 S/. 30.00

SC. COLOCACION DE REJA METALICA m2 S/. 67.80

SC. ELABORACION Y COLOCACION PUERTA METALICA 2.65X3.00 und S/. 4,770.00

SC. ELABORACION Y COLOCACION PUERTA METALICA 0.90X3.00 und S/. 1,620.00

SC. INSTALACION Y COLOC. POZO A TIERRA Y PARARRAYOS glb S/. 3,000.00

SC. M.O. ELABORACION E INSTALACION DE ARMAZON METALICO DE 1.00mX1.00m Y H=3.00m glb S/. 720.00

SC. PRUEBA DE CALIDAD DE CONCRETO A LA COMPRESION und S/. 25.50

SC. INSTALACION Y COLOC. DE 10 PANELES SOLARES FOTOVOLATICOS 100W und S/. 19,305.00

SUBPARTIDAS DE RAHABILITACION, REFACCION Y DEMOLICION

PINTADO DE MUROS m2 S/. 6.78

TARRAJEO DE MUROS m2 S/. 15.10

COLOCACION DE CERAMICO m2 S/. 47.30

DEMOLICION DE MODULO ESTRUCTURA EXSISTENTE m2 S/. 17.00

DEMOLICION DE CERCO PERIMETRICO ml S/. 7.50

PINTADO DE LOSA DEPORTIVA m2 S/. 2.00

PINTADO DE ARCOS METALICOS und S/. 60.00

DEMOLICION DE COLUMNETAS DE CONCRETO und S/. 7.50

DEMOLICION DE PORTICO DE INGRESO DE CONCRETO (EXISTENTE) und S/. 150.00

RELLENO COMPACTADO CON MATERIAL PROPIO m3 S/. 35.22

COLOCACION PUERTA METALICA PARA VIVIENDA DOCENTE und S/. 750.50

ANALISIS DE PRECIOS UNITARIOS

PARTIDAS

CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb S/. 5,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 5,000.00

CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb 1.0000 S/. 5,000.00 S/. 5,000.00

CARTEL DE IDENTIFICACION DE OBRA 3.60X2.40m und S/. 1,667.46

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 309.20

OFICIAL hh 1.000 8.0000 S/. 13.79 S/. 110.32

PEON hh 2.000 16.0000 S/. 12.43 S/. 198.88

MATERIALES S/. 1,348.99

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.9000 S/. 19.65 S/. 17.69

CARTEL DE OBRA DE 3.60 X 2.40 und 1.00 S/. 900.00 S/. 900.00

CLAVOS PARA MADERA CON CABEZA DE 2" kg 1.0000 S/. 4.00 S/. 4.00

HORMIGON m3 0.3600 S/. 30.00 S/. 10.80

MADERA TORNILLO p2 70.0000 S/. 5.95 S/. 416.50

EQUIPOS Y HERRAMIENTAS S/. 9.28

HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 3.09 S/. 9.28

PUERTA PRINCIPAL DE INGRESO METALICA L=4.00m INC. PORTICO DE C.A. Y MURO DE BLOQUES DE C° L=13.66m und S/. 15,034.52

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 15,034.52

EXCAVACION ZANJA PARA CIMENTACION m3 9.7200 S/. 34.14 S/. 331.84

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 7.2900 S/. 208.80 S/. 1,522.15

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.6120 S/. 292.11 S/. 178.77

Page 3: Analisis de Costos Unitarios San Gaban

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 363.3553 S/. 5.72 S/. 2,078.39

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 0.3065 S/. 414.72 S/. 127.11

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 0.3600 S/. 377.90 S/. 136.04

CONCRETO F'c = 175 Kg/cm2 LOSA MACIZA m3 0.7680 S/. 377.90 S/. 290.23

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 34.2600 S/. 56.62 S/. 1,939.80

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 26.5200 S/. 76.93 S/. 2,040.18

SC. ELAVORACION Y COLOCACION PUERTA METALICA 2.65X3.00 und 1.0000 S/. 4,770.00 S/. 4,770.00

SC. ELAVORACION Y COLOCACION PUERTA METALICA 0.90X3.00 und 1.0000 S/. 1,620.00 S/. 1,620.00

INST. Y COLOC. POZO A TIERRA Y PARARRAYOS und S/. 3,000.00

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 3,000.00

SC. INSTALACION Y COLOC. POZO A TIERRA Y PARARRAYOS glb 1.0000 S/. 3,000.00 S/. 3,000.00

SC. INSTALACION Y COLOC. DE 10 PANELES SOLARES FOTOVOLATICOS 100W glb S/. 19,305.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 19,305.00

SC. INSTALACION Y COLOC. DE 10 PANELES SOLARES FOTOVOLATICOS 100W und 1.0000 S/. 19,305.00 S/. 19,305.00

Page 4: Analisis de Costos Unitarios San Gaban

INST. Y COLOC. DE TANQUE DE POLIETILENO DE AGUA 1100 lt. SOBRE ARMAZON METALICO H=3.00 und S/. 1,564.62

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 1,564.62

EXCAVACION ZANJA PARA CIMENTACION m3 0.5120 S/. 34.14 S/. 17.48

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.3200 S/. 56.62 S/. 18.12

CONCRETO SIMPLE 1:8+25%PM PARA DADOS DE CIMENTACION 0.40X0.40 m3 0.1600 S/. 292.11 S/. 46.74

ELABORAC. Y COLOC. DE ARMAZON METALICO PARA TANQUE DE POLIETILENO DE H=3.00 und 1.0000 S/. 834.71 S/. 834.71

INST. Y COLOC. DE TANQUE DE POLIETILENO DE AGUA 1100 lt. und 1.0000 S/. 647.57 S/. 647.57

INST. Y COLOC. DE TANQUE CISTERNA DE POLIETILENO DE AGUA 1100 lt. INC. ELECTROBOMBA DE 0.5HP und S/. 1,612.32

REND 3 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 142.32

OPERARIO hh 1.000 2.6667 S/. 16.08 S/. 42.88

PEON hh 3.000 8.0000 S/. 12.43 S/. 99.44

MATERIALES S/. 1,465.73

TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und 1.0000 S/. 415.51 S/. 415.51

ELECTROBOMBA DE 0.5HP und 1.0000 S/. 575.20 S/. 575.20

TUBERIA PVC SAP C-10 C/R 1'' ml 3.0000 S/. 2.47 S/. 7.41

TUBERIA PVC SAP C-10 C/R 3/4'' ml 18.0000 S/. 1.62 S/. 29.16

REDUCCION PVC SAP S/P 3/4"-1/2" und 3.0000 S/. 0.55 S/. 1.65

REDUCCION PVC SAP S/P 1"-3/4" und 2.0000 S/. 0.77 S/. 1.54

CINTA TEFLON DE MEDIA und 1.0000 S/. 2.00 S/. 2.00

LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und 324.0000 S/. 1.30 S/. 421.20

ARENA FINA m3 0.2650 S/. 45.50 S/. 12.06

EQUIPOS Y HERRAMIENTAS S/. 4.27

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.42 S/. 4.27

CERCO PERIMETRICO CON BLOQUE DE CONCRETO CONFINADO H=3.00 m ml S/. 635.36

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 635.36

EXCAVACION ZANJA PARA CIMENTACION m3 0.7200 S/. 34.14 S/. 24.58

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.5400 S/. 208.80 S/. 112.75

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.0800 S/. 292.11 S/. 23.37

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 14.8679 S/. 5.72 S/. 85.04

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 0.0370 S/. 414.72 S/. 15.34

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 0.1800 S/. 377.90 S/. 68.02

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.0800 S/. 56.62 S/. 117.77

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 2.4500 S/. 76.93 S/. 188.48

CERCO PERIMETRICO DE PAÑOS MIXTOS CON BLOQUE DE CONCRETO CONFINADO Y REJA METALICA H=3.00 m ml S/. 632.90

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 632.90

EXCAVACION ZANJA PARA CIMENTACION m3 0.7200 S/. 34.14 S/. 24.58

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.5400 S/. 208.80 S/. 112.75

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.0800 S/. 292.11 S/. 23.37

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 14.8679 S/. 5.72 S/. 85.04

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 0.0370 S/. 414.72 S/. 15.34

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 0.1800 S/. 377.90 S/. 68.02

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.0800 S/. 56.62 S/. 117.77

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 2.1800 S/. 76.93 S/. 167.71

COLOCACION DE REJA METALICA m2 0.2700 S/. 67.80 S/. 18.31

Page 5: Analisis de Costos Unitarios San Gaban

VEREDAS DE CONCRETO 140Kg/cm2, E= 4" m2 S/. 85.32

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 85.32

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.40 S/. 56.62 S/. 22.65

CONCRETO PARA VEREDAS F'=140KG/CM2 , e=4" m2 1.20 S/. 33.98 S/. 40.78

PATIO DE CONCRETO FROTACHADO Y BRUÑADO ml S/. 74.10

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 74.10

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.28 S/. 56.62 S/. 15.85

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.07 S/. 33.98 S/. 36.36

JUNTA DE DILATACION e=1" ml 1.33 S/. 1.99 S/. 2.65

LOSA DE CONCRETO FROTACHADO Y BRUÑADO m2 S/. 74.10

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 74.10

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.28 S/. 56.62 S/. 15.85

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.07 S/. 33.98 S/. 36.36

JUNTA DE DILATACION e=1" ml 1.33 S/. 1.99 S/. 2.65

CUNETA 0.30X0.30 PARA DRENAJE PLUVIAL INC. REG. METALICA ANCHO 0.30m ml S/. 272.40

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 272.40

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.03 S/. 41.21 S/. 1.24

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.95 S/. 56.62 S/. 53.79

REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m ml 1.00 S/. 180.00 S/. 180.00

CONCRETO CANALETA DE DRENAJE PLUVIAL INC. REGILLA METALICA m2 1.10 S/. 33.98 S/. 37.38

RAMPAS DE CONCRETO 140Kg/cm2, E= 4" m2 S/. 85.32

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 85.32

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.40 S/. 56.62 S/. 22.65

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.20 S/. 33.98 S/. 40.78

MURO DE CONTENCION CºCº H=0.80m ml S/. 500.97

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 500.97

EXCAVACION ZANJA PARA CIMENTACION m3 0.9000 S/. 34.14 S/. 30.73

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.9000 S/. 208.80 S/. 187.92

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 0.4000 S/. 309.46 S/. 123.78

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.8000 S/. 56.62 S/. 158.54

Page 6: Analisis de Costos Unitarios San Gaban

MURO DE MAMPOSTERIA DE PIEDRA H=0.80 ml S/. 500.97

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 500.97

EXCAVACION ZANJA PARA CIMENTACION m3 0.9000 S/. 34.14 S/. 30.73

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.9000 S/. 208.80 S/. 187.92

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 0.4000 S/. 309.46 S/. 123.78

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.8000 S/. 56.62 S/. 158.54

MURO DE CONTENCION CºCº H=2.00m ml S/. 1,106.09

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 1,106.09

EXCAVACION ZANJA PARA CIMENTACION m3 1.8000 S/. 34.14 S/. 61.45

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 1.8000 S/. 208.80 S/. 375.84

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 1.1000 S/. 309.46 S/. 340.41

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 5.8000 S/. 56.62 S/. 328.40

MURO DE CONTENCION DE PIRCA DE PIEDRA H=1.20 ml S/. 214.00

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 214.00

MURO DE PIRCA DE PIEDRA H=1.20 m2 1.200 S/. 161.62 S/. 193.94

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.300 S/. 56.62 S/. 16.99

EXCAVACION ZANJA PARA CIMENTACION m3 0.090 S/. 34.14 S/. 3.07

CERCO DE PIRCA DE PIEDRA A=0.50m, H=0.80m ml S/. 207.85

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 207.85

MURO DE PIRCA DE PIEDRA H=0.80 m2 1.2000 S/. 156.49 S/. 187.79

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.3000 S/. 56.62 S/. 16.99

EXCAVACION ZANJA PARA CIMENTACION m3 0.0900 S/. 34.14 S/. 3.07

PLAN DE MANEJO AMBIENTAL DURANTE LA EJECUCION und S/. 7,880.00

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 7,880.00

BOLETINES INFORMATIVOS glb 1.000 S/. 480.00 S/. 480.00

LETRINA SANITARIA INC. SERV MANTENIMIENTO und 2.000 S/. 3,000.00 S/. 6,000.00

CONTENEDORES DE RESIDUOS SOLIDOS und 4.000 S/. 150.00 S/. 600.00

LETREROS INFORMATIVOS PREVENTIVOS Y DE REGLAMENTACION und 1.000 S/. 800.00 S/. 800.00

PATIO DE JUEGOS AREA=118.26m2 INC. SARDINEL DE CONCRETO 0.10X0.30m Y 04 UNID DE JUEGOS METALICOS und S/. 7,373.87

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 1,873.87

SARDINEL DE CONCRETO 0.10X0.30m ml 43.7000 S/. 20.34 S/. 888.86

ACARREO, COLOCACION Y TENDIDO DE PIEDRA CONFITILLO PARA JUEGOS INFANTILES m2 110.8000 S/. 8.89 S/. 985.01

SUBCONTRATO S/. 5,500.00

SC. ELABORACION JUEGOS INFANTILES METALICOS und 4.0000 S/. 1,250.00 S/. 5,000.00

SC. TRANSPORTE DE JUEGOS INFANTILES vje 1.0000 S/. 500.00 S/. 500.00

Page 7: Analisis de Costos Unitarios San Gaban

PRUEBAS DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION) und S/. 25.50

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 25.50

SC. PRUEBA DE CALIDAD DE CONCRETO A LA COMPRESION und 1.0000 S/. 25.50 S/. 25.50

COLOCACION CAJA REGISTRO Y CONECCION A RED DE AGUA und S/. 104.21

REND 10 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 27.78

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.500 1.2000 S/. 12.43 S/. 14.92

MATERIALES S/. 75.60

VALV.PASO TERMOP. C/NIPLE TELESCOPICO und 1.0000 S/. 21.00 S/. 21.00

VALV.PASO TERMOP. C/SAL. AUX. 15N und 1.0000 S/. 16.56 S/. 16.56

UNION PRESION ROSCA 1/2" und 1.0000 S/. 0.60 S/. 0.60

NIPLE REEMPLAZO MEDIDOR 3/4" und 1.0000 S/. 2.14 S/. 2.14

CAJA DE REGISTRO DE CONCRETO PARA AGUA (INC. CUERPO Y SOLADO) und 1.0000 S/. 35.30 S/. 35.30

EQUIPOS Y HERRAMIENTAS S/. 0.83

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.28 S/. 0.83

COLOCACION CAJA REGISTRO Y CONECCION A BIODIGESTOR und S/. 71.11

REND 10 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 27.78

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.500 1.2000 S/. 12.43 S/. 14.92

MATERIALES S/. 42.50

CAJA DE CONCRETO PARA REGISTRO DE DESAGUE (INC. BASE, INTERMEDIO,MARCO Y TAPA) und 1.0000 S/. 42.50 S/. 42.50

EQUIPOS Y HERRAMIENTAS S/. 0.83

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.28 S/. 0.83

INSTALACION Y COLOCACION DE BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und S/. 1,663.46

REND 2 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 213.48

OPERARIO hh 1.000 4.0000 S/. 16.08 S/. 64.32

PEON hh 3.000 12.0000 S/. 12.43 S/. 149.16

MATERIALES S/. 1,443.57

BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und 1.0000 S/. 1,395.25 S/. 1,395.25

ARENA FINA m3 1.0620 S/. 45.50 S/. 48.32

EQUIPOS Y HERRAMIENTAS S/. 6.40

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 2.13 S/. 6.40

INSTALACION Y COLOCACION DE BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und S/. 5,064.51

REND 2 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 213.48

OPERARIO hh 1.000 4.0000 S/. 16.08 S/. 64.32

PEON hh 3.000 12.0000 S/. 12.43 S/. 149.16

MATERIALES S/. 4,844.62

BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und 1.0000 S/. 4,796.30 S/. 4,796.30

ARENA FINA m3 1.0620 S/. 45.50 S/. 48.32

EQUIPOS Y HERRAMIENTAS S/. 6.40

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 2.13 S/. 6.40

Page 8: Analisis de Costos Unitarios San Gaban

CONSTRUCCION DE CERCO PERIMETRICO DE ADOBE H=1.80m ml S/. 180.73

REND 3 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 175.47

OPERARIO hh 1.000 2.6667 S/. 16.08 S/. 42.88

PEON hh 4.000 10.6667 S/. 12.43 S/. 132.59

EQUIPOS Y HERRAMIENTAS S/. 5.26

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.75 S/. 5.26

CONSTRUCCION DE CERCO PERIMETRICO DE TAPIAL H=1.50m ml S/. 54.22

REND 10 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 52.64

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 4.000 3.2000 S/. 12.43 S/. 39.78

EQUIPOS Y HERRAMIENTAS S/. 1.58

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.53 S/. 1.58

REHABILITACION DE CERCO PERIMETRICO DE ADOBE H=1.80m ml S/. 45.18

REND 8 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 45.18

CONSTRUCCION DE CERCO PERIMETRICO DE ADOBE H=1.80m ml 0.25 S/. 180.73 S/. 45.18

REHABILITACION DE CERCO PERIMETRICO DE TAPIAL H=1.50m ml S/. 13.56

REND 8 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 13.56

CONSTRUCCION DE CERCO PERIMETRICO DE TAPIAL H=1.50m ml 0.25 S/. 54.22 S/. 13.56

REHABILITACION DE LOSA DEPORTIVA EXISTENTE DE C° f'c=140kg/cm2 e=4" m2 S/. 49.83

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 49.83

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.28 S/. 56.62 S/. 15.85

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.00 S/. 33.98 S/. 33.98

JUNTA DE DILATACION e=1" ml 1.33 S/. 1.99 S/. 2.65

REHABILITACION DE LOSA DEPORTIVA Y ARCOS METALICOS EXISTENTE : PINTADO m2 S/. 2.90

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 2.90

PINTADO DE LOSA DEPORTIVA m2 1.0000 S/. 2.00 S/. 2.00

PINTADO DE ARCOS METALICOS und 0.0150 S/. 60.00 S/. 0.90

DESMONTAJE DE PUERTA TIPO REJA Y DEMOLICION DE COLUMNETAS DE CONCRETO und S/. 48.73

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 48.73

DESMONTAJE DE PUERTA TIPO REJA m2 1.0000 S/. 33.73 S/. 33.73

DEMOLICION DE COLUMNETAS DE CONCRETO und 2.0000 S/. 7.50 S/. 15.00

Page 9: Analisis de Costos Unitarios San Gaban

DEMOLICION DE VEREDAS m2 S/. 16.39

REND 25 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 15.91

PEON hh 4.000 1.2800 S/. 12.43 S/. 15.91

EQUIPOS Y HERRAMIENTAS S/. 0.48

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.16 S/. 0.48

DEMOLICION DE COLUMNETAS DE CONCRETO und S/. 7.50

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 7.50

DEMOLICION DE COLUMNETAS DE CONCRETO und 1.00 S/. 7.50 S/. 7.50

DEMOLICION DE PORTICO DE INGRESO DE CONCRETO (EXISTENTE) und S/. 150.00

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 150.00

DEMOLICION DE PORTICO DE INGRESO DE CONCRETO (EXISTENTE) und 1.00 S/. 150.00 S/. 150.00

DEMOLICION MODULO m2 S/. 17.00

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 17.00

DEMOLICION DE MODULO ESTRUCTURA EXSISTENTE ml 1.00 S/. 17.00 S/. 17.00

DEMOLICION DE CERCO PERIMETRICO ml S/. 7.50

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 7.50

DEMOLICION DE CERCO PERIMETRICO ml 1.00 S/. 7.50 S/. 7.50

RED INTERNA DE AGUA HASTA 25m. glb S/. 1,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 1,000.00

RED INTERNA DE AGUA HASTA 25m. glb 1.0000 S/. 1,000.00 S/. 1,000.00

RED INTERNA DE DESAGUE HASTA 25m. glb S/. 2,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 2,000.00

RED INTERNA DE DESAGUE HASTA 25m. glb 1.0000 S/. 2,000.00 S/. 2,000.00

RED INTERNA DE AGUA HASTA 50m. glb S/. 2,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 2,000.00

RED INTERNA DE AGUA HASTA 50m. glb 1.0000 S/. 2,000.00 S/. 2,000.00

Page 10: Analisis de Costos Unitarios San Gaban

RED INTERNA DE DESAGUE HASTA 50m. glb S/. 4,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 4,000.00

RED INTERNA DE DESAGUE HASTA 50m. glb 1.0000 S/. 4,000.00 S/. 4,000.00

RED INTERNA DE AGUA HASTA 80m. glb S/. 3,200.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 3,200.00

RED INTERNA DE AGUA HASTA 80m. glb 1.0000 S/. 3,200.00 S/. 3,200.00

RED INTERNA DE DESAGUE HASTA 80m. glb S/. 6,400.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 6,400.00

RED INTERNA DE DESAGUE HASTA 80m. glb 1.0000 S/. 6,400.00 S/. 6,400.00

REFACCION MODULO A EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS, COLOCACION DE CERAMICO m2 S/. 78.56

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 78.56

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

COLOCACION DE CERAMICO m2 1.1000 S/. 47.30 S/. 52.03

REFACCION MODULO A EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS m2 S/. 26.53

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 26.53

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

REFACCION MODULO B EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS m2 S/. 26.53

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 26.53

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

REFACCION MODULO C EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS m2 S/. 26.53

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 26.53

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb S/. 3,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 3,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb 1.0000 S/. 3,000.00 S/. 3,000.00

Page 11: Analisis de Costos Unitarios San Gaban

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb S/. 6,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 6,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb 1.0000 S/. 6,000.00 S/. 6,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 05 AULAS A MAS DE 3600msnm glb S/. 15,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 15,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb 1.0000 S/. 15,000.00 S/. 15,000.00

RELLENO COMPACTADO CON MATERIAL PROPIO m3 S/. 35.22

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDA S/. 35.22

RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.0000 S/. 35.22 S/. 35.22

COLOCACION PUERTA METALICA PARA VIVIENDA DOCENTE und S/. 750.50

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 750.50

PINTADO DE MUROS und 1.0000 S/. 750.50 S/. 750.50

REHABILITACION DE CERCO PERIMETRICO CON BLOQUES DE CONCRETO 20x20x40 : CIERRE DE VANOS m2 S/. 70.53

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.29

OPERARIO hh 1.000 1.0000 S/. 16.08 S/. 16.08

PEON hh 0.500 0.5000 S/. 12.43 S/. 6.22

MATERIALES S/. 38.57

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.5200 S/. 19.65 S/. 10.22

BLOQUE DE CONCRETO 20 X 20 X 40 cm und 11.0000 S/. 2.30 S/. 25.30

ARENA GRUESA m3 0.0620 S/. 42.30 S/. 2.62

MADERA TORNILLO p2 0.0580 S/. 5.95 S/. 0.35

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg 0.0200 S/. 4.00 S/. 0.08

EQUIPOS Y HERRAMIENTAS S/. 9.67

ANDAMIO METAL TABLAS ALQUILER d 1.0000 S/. 9.00 S/. 9.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.22 S/. 0.67

SUBPARTIDAS

EXCAVACION ZANJA PARA CIMENTACION m3 S/. 34.14

REND 3 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 33.15

PEON hh 1.000 2.6667 S/. 12.43 S/. 33.15

EQUIPOS Y HERRAMIENTAS S/. 0.99

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.33 S/. 0.99

Page 12: Analisis de Costos Unitarios San Gaban

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 S/. 41.21

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.81

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.000 0.8000 S/. 12.43 S/. 9.94

MATERIALES S/. 17.71

AGUA m3 0.0126 S/. 13.00 S/. 0.16

MADERA TONILLO p2 2.9400 S/. 5.95 S/. 17.49

CLAVOS KG 0.0100 S/. 5.80 S/. 0.06

EQUIPOS Y HERRAMIENTAS S/. 0.68

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.23 S/. 0.68

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg S/. 5.72

REND 400 kg/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 0.85

OPERARIO hh 1.000 0.0200 S/. 16.08 S/. 0.32

OFICIAL hh 1.000 0.0200 S/. 13.79 S/. 0.28

PEON hh 1.000 0.0200 S/. 12.43 S/. 0.25

MATERIALES S/. 4.85

ACERO CORRUGADO FY=4200KG/CM2 kg 1.0300 S/. 4.60 S/. 4.74

ALAMBRE N° 16 kg 0.0289 S/. 3.81 S/. 0.11

EQUIPOS Y HERRAMIENTAS S/. 0.03

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.01 S/. 0.03

INST. Y COLOC. DE TANQUE DE POLIETILENO DE AGUA 1100 lt. und S/. 647.57

REND 4 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 57.02

OPERARIO hh 1.000 2.0000 S/. 16.08 S/. 32.16

PEON hh 1.000 2.0000 S/. 12.43 S/. 24.86

MATERIALES S/. 588.84

TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und 1.0000 S/. 415.51 S/. 415.51

TEE DESAGUE SANITARIA 2" PVC und 1.0000 S/. 3.75 S/. 3.75

CINTA TEFLON DE MEDIA und 1.0000 S/. 2.00 S/. 2.00

NIPLE F°G° 1/2" x 1½" und 1.0000 S/. 1.50 S/. 1.50

VALVULA ESFERICA REDGAL CIM. 1/2" und 1.0000 S/. 17.50 S/. 17.50

VALVULA CHECK SWING 1/2" und 2.0000 S/. 43.63 S/. 87.26

CODOS PVC SP 1/2"x90° und 2.0000 S/. 1.10 S/. 2.20

ADAPTADOR PVC PR 1/2" und 6.0000 S/. 1.25 S/. 7.50

REDUCC. CAMP GALV 3/4"x1/2" und 1.0000 S/. 2.38 S/. 2.38

UNION PVC R 3/4" PU und 1.0000 S/. 1.63 S/. 1.63

REDUCC. PVC-P 3/4"x1/2" C/R und 1.0000 S/. 0.88 S/. 0.88

PEGAMENTO PVC 32 ONZ. und 0.2500 S/. 28.13 S/. 7.03

FORMADOR DE EMPAQUETADURAS 3-H und 0.2500 S/. 7.75 S/. 1.94

TEE DESAGUE 4"x2" PVC und 1.0000 S/. 5.63 S/. 5.63

SOMBRERO DE VENTILACION DESAGUE 2" PVC und 1.0000 S/. 5.63 S/. 5.63

CODO DESAGUE 2"x90° PVC und 3.0000 S/. 1.50 S/. 4.50

CODO DESAGUE 2"x45° PVC und 1.0000 S/. 1.50 S/. 1.50

TUBO DESAGUE 2"x 3m. PVC und 2.0000 S/. 10.25 S/. 20.50

EQUIPOS Y HERRAMIENTAS S/. 1.71

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.57 S/. 1.71

ELABORAC. Y COLOC. DE ARMAZON METALICO PARA TANQUE DE POLIETILENO DE H=3.00 und S/. 834.71

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 114.71

MADERA TORNILLO p2 16.4042 S/. 5.95 S/. 97.60

TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und 0.2480 S/. 68.00 S/. 16.86

PUNTO AZUL E-6011 1/8" 25 Kg kg 0.0176 S/. 13.50 S/. 0.24

SUBCONTRATOS S/. 720.00

SC. M.O. ELABORACION E INSTALACION DE ARMAZON METALICO DE 1.00mX1.00m Y H=3.00m glb 1.0000 S/. 720.00 S/. 720.00

Page 13: Analisis de Costos Unitarios San Gaban

CONCRETO SIMPLE 1:8+25%PM PARA DADOS DE CIMENTACION 0.40X0.40 m3 S/. 292.11

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 120.19

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 3.8000 S/. 19.65 S/. 74.67

HORMIGON m3 0.8500 S/. 30.00 S/. 25.50

PIEDRA MEDIANA 4" m3 0.5000 S/. 30.00 S/. 15.00

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.0500 S/. 11.10 S/. 0.56

MADERA TORNILLO p2 0.0260 S/. 5.95 S/. 0.15

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 11.80

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

MURO DE SOGA LADRILLO KK DE ARCILLA 18 HUECOS m2 S/. 96.01

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.29

OPERARIO hh 1.000 1.0000 S/. 16.08 S/. 16.08

PEON hh 0.500 0.5000 S/. 12.43 S/. 6.22

MATERIALES S/. 64.05

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.2600 S/. 19.65 S/. 5.11

LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und 44.0000 S/. 1.30 S/. 57.20

ARENA GRUESA m3 0.0310 S/. 42.30 S/. 1.31

MADERA TORNILLO p2 0.0580 S/. 5.95 S/. 0.35

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg 0.0200 S/. 4.00 S/. 0.08

EQUIPOS Y HERRAMIENTAS S/. 9.67

ANDAMIO METAL TABLAS ALQUILER d 1.0000 S/. 9.00 S/. 9.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.22 S/. 0.67

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 S/. 76.93

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 28.51

OPERARIO hh 1.000 1.0000 S/. 16.08 S/. 16.08

PEON hh 1.000 1.0000 S/. 12.43 S/. 12.43

MATERIALES S/. 38.57

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.5200 S/. 19.65 S/. 10.22

BLOQUE DE CONCRETO 20 X 20 X 40 cm und 11.0000 S/. 2.30 S/. 25.30

ARENA GRUESA m3 0.0620 S/. 42.30 S/. 2.62

MADERA TORNILLO p2 0.0580 S/. 5.95 S/. 0.35

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg 0.0200 S/. 4.00 S/. 0.08

EQUIPOS Y HERRAMIENTAS S/. 9.86

ANDAMIO METAL TABLAS ALQUILER d 1.0000 S/. 9.00 S/. 9.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.29 S/. 0.86

COLOCACION DE REJA METALICA m2 S/. 67.80

REND 20 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBCONTRATO S/. 67.80

SC. COLOCACION DE REJA METALICA m2 1.0000 S/. 67.80 S/. 67.80

m2 S/. 62.29

REND 20 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 32.29

MALLA GALVANIZADA DE #10 DE 2"x2" m2 0.7994 S/. 19.00 S/. 15.19

PUNTO AZUL E-6011 1/8" 25 Kg kg 0.0176 S/. 13.50 S/. 0.24

TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und 0.2480 S/. 68.00 S/. 16.86

SUBCONTRATO S/. 30.00

SC. M.O. COLOCACION DE MALLA GALVANIZADA m2 1.0000 S/. 30.00 S/. 30.00

COLOCACION DE MALLA GALVANIZADA #10 DE 2" INC MARCO TUBO ELECTROSOLDADO Ø 2"

Page 14: Analisis de Costos Unitarios San Gaban

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 S/. 208.80

REND 20 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 78.96

OPERARIO hh 3.000 1.2000 S/. 16.08 S/. 19.30

PEON hh 12.000 4.8000 S/. 12.43 S/. 59.66

MATERIALES S/. 119.39

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 3.6000 S/. 19.65 S/. 70.74

HORMIGON m3 0.8300 S/. 30.00 S/. 24.90

PIEDRA GRANDE 8" m3 0.5000 S/. 30.00 S/. 15.00

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 10.45

VIBRADOR DE CONCRETO 4 HP 2.5" hm 2.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.4000 S/. 7.00 S/. 2.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.79 S/. 2.37

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 S/. 292.11

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 120.19

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 3.8000 S/. 19.65 S/. 74.67

HORMIGON m3 0.8500 S/. 30.00 S/. 25.50

PIEDRA MEDIANA 4" m3 0.5000 S/. 30.00 S/. 15.00

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.0500 S/. 11.10 S/. 0.56

MADERA TORNILLO p2 0.0260 S/. 5.95 S/. 0.15

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 11.80

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 S/. 414.72

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 236.20

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.5000 S/. 11.10 S/. 5.55

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 18.40

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 1.0000 S/. 6.60 S/. 6.60

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 S/. 377.90

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 128.09

OPERARIO hh 3.000 2.4000 S/. 16.08 S/. 38.59

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 235.09

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 14.72

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.8000 S/. 7.00 S/. 5.60

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.28 S/. 3.84

Page 15: Analisis de Costos Unitarios San Gaban

CONCRETO F'c = 175 Kg/cm2 LOSA MACIZA m3 S/. 377.90

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 128.09

OPERARIO hh 3.000 2.4000 S/. 16.08 S/. 38.59

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 235.09

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 14.72

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.8000 S/. 7.00 S/. 5.60

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.28 S/. 3.84

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 S/. 56.62

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.81

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.000 0.8000 S/. 12.43 S/. 9.94

MATERIALES S/. 33.13

ALAMBRE N° 8 kg 0.3000 S/. 3.81 S/. 1.14

CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.1600 S/. 4.00 S/. 0.64

CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.1600 S/. 4.00 S/. 0.64

MADERA TORNILLO p2 5.1600 S/. 5.95 S/. 30.70

EQUIPOS Y HERRAMIENTAS S/. 0.68

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.23 S/. 0.68

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 S/. 33.98

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 19.72

OPERARIO hh 3.000 0.3429 S/. 16.08 S/. 5.51

PEON hh 10.000 1.1429 S/. 12.43 S/. 14.21

MATERIALES S/. 13.66

CEMENTO PORTLAND bls 0.5460 S/. 19.65 S/. 10.73

HORMIGON m3 0.0252 S/. 30.00 S/. 0.76

AGUA m3 0.0200 S/. 13.00 S/. 0.26

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 0.59

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1143 S/. 7.00 S/. 0.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.20 S/. 0.59

CONCRETO PARA VEREDAS F'=140KG/CM2 , e=4" m2 S/. 33.98

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 19.72

OPERARIO hh 3.000 0.3429 S/. 16.08 S/. 5.51

PEON hh 10.000 1.1429 S/. 12.43 S/. 14.21

MATERIALES S/. 13.66

CEMENTO PORTLAND TIPO I bls 0.5460 S/. 19.65 S/. 10.73

HORMIGON m3 0.0252 S/. 30.00 S/. 0.76

AGUA m3 0.0200 S/. 13.00 S/. 0.26

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 0.59

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1143 S/. 7.00 S/. 0.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.20 S/. 0.59

JUNTA DE DILATACION e=1" ml S/. 1.99

REND 100 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 1.78

OPERARIO hh 1.000 0.0800 S/. 16.08 S/. 1.29

PEON hh 0.500 0.0400 S/. 12.43 S/. 0.50

MATERIALES S/. 0.16

ASFALTO m3 0.0052 S/. 30.00 S/. 0.16

EQUIPOS Y HERRAMIENTAS S/. 0.05

Page 16: Analisis de Costos Unitarios San Gaban

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.02 S/. 0.05

Page 17: Analisis de Costos Unitarios San Gaban

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 S/. 15.71

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 8.94

OPERARIO hh 1.000 0.1143 S/. 16.08 S/. 1.84

PEON hh 5.000 0.5714 S/. 12.43 S/. 7.10

MATERIALES S/. 5.81

AGUA m3 0.1000 S/. 13.00 S/. 1.30

AFIRMADO m3 0.1250 S/. 35.20 S/. 4.40

COMBUSTIBLE (GASOLINA) gln 0.0100 S/. 11.10 S/. 0.11

EQUIPOS Y HERRAMIENTAS S/. 0.95

COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP hm 1.000 0.11 S/. 6.00 S/. 0.69

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.09 S/. 0.27

ml S/. 180.00

REND 60 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBCONTRATO S/. 180.00

SC. REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m ml 1.0000 S/. 180.00 S/. 180.00

CONCRETO CANALETA DE DRENAJE PLUVIAL INC. REGILLA METALICA m2 S/. 33.98

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 19.72

OPERARIO hh 3.000 0.3429 S/. 16.08 S/. 5.51

PEON hh 10.000 1.1429 S/. 12.43 S/. 14.21

MATERIALES S/. 13.66

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.5460 S/. 19.65 S/. 10.73

HORMIGON m3 0.0252 S/. 30.00 S/. 0.76

AGUA m3 0.0200 S/. 13.00 S/. 0.26

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 0.59

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1143 S/. 7.00 S/. 0.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.20 S/. 0.59

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 S/. 309.46

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 137.55

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 4.2000 S/. 19.65 S/. 82.53

HORMIGON m3 0.8500 S/. 30.00 S/. 25.50

PIEDRA MEDIANA 4" m3 0.6500 S/. 30.00 S/. 19.50

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.5000 S/. 11.10 S/. 5.55

MADERA TORNILLO p2 0.0260 S/. 5.95 S/. 0.15

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 11.80

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

MURO DE PIRCA DE PIEDRA H=0.80 m2 S/. 156.49

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 102.36

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 51.06

CEMENTO PORTLAND TIPO I (42.5 kg) bls 1.5000 S/. 19.65 S/. 29.47

PIEDRA GRANDE m3 0.3300 S/. 30.00 S/. 9.90

ARENA GRUESA m3 0.2000 S/. 42.30 S/. 8.46

AGUA m3 0.1000 S/. 13.00 S/. 1.30

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 3.07

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.02 S/. 3.07

REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m

Page 18: Analisis de Costos Unitarios San Gaban

MURO DE PIRCA DE PIEDRA H=1.20 m2 S/. 161.62

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 102.36

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 56.18

CEMENTO PORTLAND TIPO I (42.5 kg) bls 1.5000 S/. 19.65 S/. 29.47

PIEDRA GRANDE m3 0.3600 S/. 30.00 S/. 10.80

ARENA GRUESA m3 0.3000 S/. 42.30 S/. 12.69

AGUA m3 0.1000 S/. 13.00 S/. 1.30

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 3.07

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.02 S/. 3.07

ACARREO, COLOCACION Y TENDIDO DE PIEDRA CONFITILLO PARA JUEGOS INFANTILES m2 S/. 8.89

REND 80 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 3.29

OPERARIO hh 0.500 0.0500 S/. 16.08 S/. 0.80

PEON hh 2.000 0.2000 S/. 12.43 S/. 2.49

MATERIALES S/. 5.50

PIEDRA ZARANDEADA 1/4" m3 0.1000 S/. 55.00 S/. 5.50

EQUIPOS Y HERRAMIENTAS S/. 0.10

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.03 S/. 0.10

SARDINEL DE CONCRETO 0.10X0.30m ml S/. 20.34

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 20.34

EXCAVACION ZANJA PARA CIMENTACION m3 0.02 S/. 34.14 S/. 0.68

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 1.43 S/. 5.72 S/. 8.16

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.0200 S/. 292.11 S/. 5.84

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.1000 S/. 56.62 S/. 5.66

DESMONTAJE DE PUERTA TIPO REJA und S/. 33.73

REND 10 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 32.75

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 2.000 1.6000 S/. 12.43 S/. 19.89

EQUIPOS Y HERRAMIENTAS S/. 0.98

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.33 S/. 0.98

Page 19: Analisis de Costos Unitarios San Gaban

RELACION DE MATERIALESMINISTERIO DE EDUCACION

INSTITUCIONES EDUCATIVAS: RED YATIQAÑA

FECHA : 2012

MANO DE OBRA

CAPATAZ hh S/. 19.30

TOPOGRAFO hh S/. 16.08

OPERARIO hh S/. 16.08

OFICIAL hh S/. 13.79

PEON hh S/. 12.43

MATERIALES

BOLSA DE YESO DE 25 KG bls S/. 8.50

OCRE ROJO kg S/. 10.50

AGUA m3 S/. 13.00

CLAVOS kg S/. 5.80

AFIRMADO m3 S/. 35.20

CEMENTO PORTLAND TIPO I (42.5 kg) bls S/. 19.65

ACERO CORRUGADO FY=4200KG/CM2 kg S/. 4.60

LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und S/. 1.30

BLOQUE DE CONCRETO 20 X 20 X 40 cm und S/. 2.30

ARENA FINA m3 S/. 45.50

ARENA GRUESA m3 S/. 42.30

MADERA TORNILLO p2 S/. 5.95

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg S/. 4.00

CLAVOS PARA MADERA CON CABEZA DE 2" kg S/. 4.00

CLAVOS PARA MADERA CON CABEZA DE 3" kg S/. 4.00

CLAVOS PARA MADERA CON CABEZA DE 4" kg S/. 4.00

PIEDRA ZARANDEADA 1/2" m3 S/. 51.00

PIEDRA ZARANDEADA 1/4" m3 S/. 55.00

HORMIGON m3 S/. 30.00

PIEDRA GRANDE 8" m3 S/. 30.00

PIEDRA MEDIANA 4" m3 S/. 30.00

PIEDRA GRANDE m3 S/. 30.00

COMBUSTIBLE (GASOLINA) gln S/. 11.10

ADITIVO CURADO QUIMICO gln S/. 48.00

ALAMBRE N° 16 kg S/. 3.81

ALAMBRE N° 8 kg S/. 3.81

ASFALTO m3 S/. 30.00

GRASS bls S/. 10.17

TIERRA DE CHACRA m3 S/. 17.00

PINTURA ESMALTE SINTETICO EN GALON und S/. 30.00

PINTURA ESMALTE SINTETICO ANTICORROSIVO EN GALON und S/. 33.00

PLANCHA NEGRA LAF 0.50X920X2400mm und S/. 125.30

TRIPLAY 6mm m2 S/. 12.00

PERNO INC. TUERCA 3/4"X6" und S/. 3.20

PLANTONES und S/. 15.00

JUEGOS INFANTILES METALICOS und S/. 1,250.00

ANGULO FIERRO NEGRO 1"X1"X3/16"X6m und S/. 22.44

PUNTO AZUL E-6011 1/8" 25 Kg kg S/. 13.50

TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und S/. 68.00

MALLA GALVANIZADA DE #10 DE 2"x2" m2 S/. 19.00

TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und S/. 415.51

ELECTROBOMBA DE 0.5HP und S/. 575.20

TUBERIA PVC SAP C-10 C/R 1'' ml S/. 2.47

TUBERIA PVC SAP C-10 C/R 3/4'' ml S/. 1.62

REDUCCION PVC SAP S/P 3/4"-1/2" und S/. 0.55

REDUCCION PVC SAP S/P 1"-3/4" und S/. 0.77

TEE DESAGUE SANITARIA 2" PVC und S/. 3.75

CINTA TEFLON DE MEDIA und S/. 2.00

NIPLE F°G° 1/2" x 1½" und S/. 1.50

VALVULA ESFERICA REDGAL CIM. 1/2" und S/. 17.50

VALVULA CHECK SWING 1/2" und S/. 43.63

CODOS PVC SP 1/2"x90° und S/. 1.10

ADAPTADOR PVC PR 1/2" und S/. 1.25

REDUCC. CAMP GALV 3/4"x1/2" und S/. 2.38

UNION PVC R 3/4" PU und S/. 1.63

REDUCC. PVC-P 3/4"x1/2" C/R und S/. 0.88

PEGAMENTO PVC 32 ONZ. und S/. 28.13

FORMADOR DE EMPAQUETADURAS 3-H und S/. 7.75

TEE DESAGUE 4"x2" PVC und S/. 5.63

SOMBRERO DE VENTILACION DESAGUE 2" PVC und S/. 5.63

CODO DESAGUE 2"x90° PVC und S/. 1.50

CODO DESAGUE 2"x45° PVC und S/. 1.50

TUBO DESAGUE 2"x 3m. PVC und S/. 10.25

CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb S/. 5,000.00

VALV.PASO TERMOP. C/NIPLE TELESCOPICO und S/. 21.00

VALV.PASO TERMOP. C/SAL. AUX. 15N und S/. 16.56

UNION PRESION ROSCA 1/2" und S/. 0.60

NIPLE REEMPLAZO MEDIDOR 3/4" und S/. 2.14

CAJA DE REGISTRO DE CONCRETO PARA AGUA (INC. CUERPO Y SOLADO) und S/. 35.30

CAJA DE CONCRETO PARA REGISTRO DE DESAGUE (INC. BASE, INTERMEDIO,MARCO Y TAPA) und S/. 42.50

BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und S/. 1,395.25

BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und S/. 4,796.30

RED INTERNA DE AGUA HASTA 25m. glb S/. 1,000.00

RED INTERNA DE DESAGUE HASTA 25m. glb S/. 2,000.00

RED INTERNA DE AGUA HASTA 50m. glb S/. 2,000.00

RED INTERNA DE DESAGUE HASTA 50m. glb S/. 4,000.00

RED INTERNA DE AGUA HASTA 80m. glb S/. 3,200.00

RED INTERNA DE DESAGUE HASTA 80m. glb S/. 6,400.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb S/. 3,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb S/. 6,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 05 AULAS A MAS DE 3600msnm glb S/. 15,000.00

Page 20: Analisis de Costos Unitarios San Gaban

EQUIPOSNIVEL TOPOGRAFICO hm S/. 3.00

MIRA TOPOGRAFICA hm S/. 0.50

CAMION VOLQUETE 12M3 hm S/. 77.00

CARGADOR FRONTAL 200HP hm S/. 150.00

ANDAMIO METAL TABLAS ALQUILER d S/. 9.00

VIBRADOR DE CONCRETO 4 HP 2.5" hm S/. 6.60

MEZCLADORA DE CONCRETO 12 P3 hm S/. 7.00

COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP hm S/. 6.00

CIZALLA ELECTRICA DE FIERRO hm S/. 22.60

CARTEL DE OBRA DE 3.60 X 2.40 und S/. 900.00

BOLETINES INFORMATIVOS glb S/. 480.00

LETRINA SANITARIA INC. SERV MANTENIMIENTO und S/. 3,000.00

CONTENEDORES DE RESIDUOS SOLIDOS und S/. 150.00

LETREROS INFORMATIVOS PREVENTIVOS Y DE REGLAMENTACION und S/. 800.00

MITIGACION DE IMPACTO AMBIENTAL DURANTE LA EJECUCION

FLETE TERRESTRE P/TRANSPORTE DE MATERIALES glb S/. 9,000.00

FLETE TERRESTRE P/TRANSPORTE DE MATERIALES glb S/. 10,000.00

SUBCONTRATO

SC. REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m ml S/. 180.00

SC CORTE DE ROCA CON MAQUINARIA PESADA hm S/. 300.00

SC. ELABORACION JUEGOS INFANTILES METALICOS und S/. 1,250.00

SC. TRANSPORTE DE JUEGOS INFANTILES vje S/. 500.00

SC. M.O. COLOCACION DE MALLA GALVANIZADA m2 S/. 30.00

SC. COLOCACION DE REJA METALICA m2 S/. 67.80

SC. ELABORACION Y COLOCACION PUERTA METALICA 2.65X3.00 und S/. 4,770.00

SC. ELABORACION Y COLOCACION PUERTA METALICA 0.90X3.00 und S/. 1,620.00

SC. INSTALACION Y COLOC. POZO A TIERRA Y PARARRAYOS glb S/. 3,000.00

SC. M.O. ELABORACION E INSTALACION DE ARMAZON METALICO DE 1.00mX1.00m Y H=3.00m glb S/. 720.00

SC. PRUEBA DE CALIDAD DE CONCRETO A LA COMPRESION und S/. 25.50

SUBPARTIDAS DE RAHABILITACION, REFACCION Y DEMOLICION

PINTADO DE MUROS m2 S/. 6.78

TARRAJEO DE MUROS m2 S/. 15.10

COLOCACION DE CERAMICO m2 S/. 47.30

DEMOLICION DE MODULO ESTRUCTURA EXSISTENTE m2 S/. 17.00

DEMOLICION DE CERCO PERIMETRICO ml S/. 7.50

PINTADO DE LOSA DEPORTIVA m2 S/. 2.00

PINTADO DE ARCOS METALICOS und S/. 60.00

DEMOLICION DE COLUMNETAS DE CONCRETO und S/. 7.50

DEMOLICION DE PORTICO DE INGRESO DE CONCRETO (EXISTENTE) und S/. 150.00

RELLENO COMPACTADO CON MATERIAL PROPIO m3 S/. 35.22

COLOCACION PUERTA METALICA PARA VIVIENDA DOCENTE und S/. 750.50

ANALISIS DE PRECIOS UNITARIOS

PARTIDAS

CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb S/. 5,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 5,000.00

CONSTRUCCION DE ALMACEN, CAMPAMENTO Y OFICINA PROVISIONAL glb 1.0000 S/. 5,000.00 S/. 5,000.00

CARTEL DE IDENTIFICACION DE OBRA 3.60X2.40m und S/. 1,667.46

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 309.20

OFICIAL hh 1.000 8.0000 S/. 13.79 S/. 110.32

PEON hh 2.000 16.0000 S/. 12.43 S/. 198.88

MATERIALES S/. 1,348.99

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.9000 S/. 19.65 S/. 17.69

CARTEL DE OBRA DE 3.60 X 2.40 und 1.00 S/. 900.00 S/. 900.00

CLAVOS PARA MADERA CON CABEZA DE 2" kg 1.0000 S/. 4.00 S/. 4.00

HORMIGON m3 0.3600 S/. 30.00 S/. 10.80

MADERA TORNILLO p2 70.0000 S/. 5.95 S/. 416.50

EQUIPOS Y HERRAMIENTAS S/. 9.28

HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 3.09 S/. 9.28

PUERTA PRINCIPAL DE INGRESO METALICA L=4.00m INC. PORTICO DE C.A. Y MURO DE BLOQUES DE C° L=13.66m und S/. 15,034.52

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 15,034.52

EXCAVACION ZANJA PARA CIMENTACION m3 9.7200 S/. 34.14 S/. 331.84

Page 21: Analisis de Costos Unitarios San Gaban

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 7.2900 S/. 208.80 S/. 1,522.15

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.6120 S/. 292.11 S/. 178.77

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 363.3553 S/. 5.72 S/. 2,078.39

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 0.3065 S/. 414.72 S/. 127.11

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 0.3600 S/. 377.90 S/. 136.04

CONCRETO F'c = 175 Kg/cm2 LOSA MACIZA m3 0.7680 S/. 377.90 S/. 290.23

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 34.2600 S/. 56.62 S/. 1,939.80

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 26.5200 S/. 76.93 S/. 2,040.18

SC. ELAVORACION Y COLOCACION PUERTA METALICA 2.65X3.00 und 1.0000 S/. 4,770.00 S/. 4,770.00

SC. ELAVORACION Y COLOCACION PUERTA METALICA 0.90X3.00 und 1.0000 S/. 1,620.00 S/. 1,620.00

LIMPIEZA MANUAL DE TERRENO NATURAL m2 S/. 2.56

REND 80 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 2.49

PEON hh 2.000 0.2000 S/. 12.43 S/. 2.49

EQUIPOS Y HERRAMIENTAS S/. 0.07

HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.02 S/. 0.07

TRAZO Y REPLANTEO GENERAL DE OBRA m2 S/. 1.68

REND 350 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 0.98

CAPATAZ hh 0.1 0.0023 S/. 19.30 S/. 0.04

TOPOGRAFO hh 1.000 0.0229 S/. 16.08 S/. 0.37

PEON hh 2.000 0.0457 S/. 12.43 S/. 0.57

MATERIALES S/. 0.59

BOLSA DE YESO DE 25 KG bls 0.0500 S/. 8.50 S/. 0.43

OCRE ROJO kg 0.0040 S/. 10.50 S/. 0.04

MADERA TORNILLO p2 0.0200 S/. 5.95 S/. 0.12

EQUIPOS Y HERRAMIENTAS S/. 0.11

NIVEL TOPOGRAFICO hm 1.000 0.0229 S/. 3.00 S/. 0.07

MIRA TOPOGRAFICA hm 1.000 0.0229 S/. 0.50 S/. 0.01

HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.01 S/. 0.03

MOVIMIENTO DE TIERRASEXCAVACION ZANJA PARA CIMENTACION m3 S/. 34.14

REND 3 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 33.15

PEON hh 1.000 2.6667 S/. 12.43 S/. 33.15

EQUIPOS Y HERRAMIENTAS S/. 0.99

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.33 S/. 0.99

EXCAVACION PARA ZAPATAS m3 S/. 36.41

REND 3.25 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIOS (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 35.35

CAPATAZ hh 0.100 0.2462 S/. 19.30 S/. 4.75

PEON hh 1.000 2.4615 S/. 12.43 S/. 30.60

EQUIPO, HERRAMIENTAS S/. 1.06

HERRRAMIENTAS MANUALES % M.O. %mo 3.0000 S/. 0.35 S/. 1.06

ACARREO DE MATERIAL EXEDENTE m3 S/. 23.66

REND 5 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIOS (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.98

CAPATAZ hh 0.100 0.1600 S/. 19.30 S/. 3.09

PEON hh 1.000 1.6000 S/. 12.43 S/. 19.89

EQUIPO, HERRAMIENTAS S/. 0.69

HERRRAMIENTAS MANUALES % M.O. %mo 3.0000 S/. 0.23 S/. 0.69

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 S/. 41.21

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.81

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.000 0.8000 S/. 12.43 S/. 9.94

MATERIALES S/. 17.71

AGUA m3 0.0126 S/. 13.00 S/. 0.16

MADERA TONILLO p2 2.9400 S/. 5.95 S/. 17.49

CLAVOS KG 0.0100 S/. 5.80 S/. 0.06

Page 22: Analisis de Costos Unitarios San Gaban

EQUIPOS Y HERRAMIENTAS S/. 0.68

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.23 S/. 0.68

CONCRETO SIMPLE

SOLADO PARA ZAPATAS DE 3" DE ESPESOR m3 S/. 19.60

REND 80 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 10.81

CAPATAZ hh 0.2 0.0200 S/. 19.30 S/. 0.39

OFICIAL hh 1.000 0.1000 S/. 13.79 S/. 1.38

OPERARIO hh 2.000 0.2000 S/. 16.08 S/. 3.22

PEON hh 5.000 0.5000 S/. 12.43 S/. 6.22

MATERIALES S/. 3.92

HORMIGON m3 0.0900 S/. 8.50 S/. 0.77

CEMENTO PORTLAND TIPO I (42.5Kg) bol 0.3000 S/. 10.50 S/. 3.15

EQUIPOS Y HERRAMIENTAS S/. 4.87

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1000 S/. 45.50 S/. 4.55

HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.11 S/. 0.32

CONCRETO ARMADO

ZAPATA DE f'c = 175 kg/cm2 m3 S/. 285.28

REND 25 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 52.17CAPATAZ hh 0.200 0.0640 S/. 19.30 S/. 1.23

OPERARIO hh 2.000 0.6400 S/. 16.08 S/. 10.29

OFICIAL hh 2.000 0.6400 S/. 13.79 S/. 8.83

PEON hh 8.000 2.5600 S/. 12.43 S/. 31.82

MATERIALES S/. 227.19CEMENTO PORTLAND TIPO I (42.5Kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

EQUIPOS Y HERRAMIENTAS S/. 5.92MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.3200 S/. 7.00 S/. 2.24

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 0.3200 S/. 6.60 S/. 2.11

HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.52 S/. 1.57

ENCONFRADO Y DESENCOFRADO DE ZAPATA m2 S/. 62.06

REND 40 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 14.09CAPATAZ hh 0.1000 0.0200 S/. 19.30 S/. 0.39

OPERARIO hh 1.0000 0.2000 S/. 16.08 S/. 3.22

OFICIAL hh 2.0000 0.4000 S/. 13.79 S/. 5.52

PEON hh 2.0000 0.4000 S/. 12.43 S/. 4.97

MATERIALES S/. 47.55MADERA TORNILLO p2 7.8900 S/. 5.95 S/. 46.95

CLAVOS DE 3" kg 0.1500 S/. 4.00 S/. 0.60

EQUIPOS Y HERRAMIENTAS S/. 0.42HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.14 S/. 0.42

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 S/. 411.25

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 232.74

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.5000 S/. 11.10 S/. 5.55

EQUIPOS Y HERRAMIENTAS S/. 18.40

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 1.0000 S/. 6.60 S/. 6.60

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

ENCONFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 S/. 34.15

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 25.44

Page 23: Analisis de Costos Unitarios San Gaban

CAPATAZ hh 0.1000 0.0800 S/. 19.30 S/. 1.54

OPERARIO hh 1.0000 0.8000 S/. 16.08 S/. 12.86

OFICIAL hh 1.0000 0.8000 S/. 13.79 S/. 11.03

MATERIALES S/. 7.94ALAMBRE N° 8 kg 0.3000 S/. 3.81 S/. 1.14

MADERA TORNILLO p2 5.3200 S/. 1.25 S/. 6.65

CLAVOS DE 3" kg 0.1700 S/. 0.88 S/. 0.15

EQUIPOS Y HERRAMIENTAS S/. 0.76HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.25 S/. 0.76

ENCONFRADO Y DESENCOFRADO NORMAL EN COLUMNAS kg S/. 8.11

REND 216 kg

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 2.10CAPATAZ hh 0.1000 0.0037 S/. 19.30 S/. 0.07

OPERARIO hh 1.0000 0.0370 S/. 16.08 S/. 0.60

OFICIAL hh 1.0000 0.0370 S/. 13.79 S/. 0.51

PEON hh 2.0000 0.0741 S/. 12.43 S/. 0.92

MATERIALES S/. 5.11ALAMBRE N°16 kg 0.0500 S/. 3.81 S/. 0.19

ACERO CORRUGADO FY=4200KG/CM2 kg 1.0700 S/. 4.60 S/. 4.92

EQUIPOS Y HERRAMIENTAS S/. 0.90HERRAMIENTAS MANUALES %M.O. %mo 3.0000 S/. 0.02 S/. 0.06

CIZALLA ELECTRICA DE FIERRO hm 1.0000 0.0370 S/. 22.60 S/. 0.84

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 S/. 377.90

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 128.09

OPERARIO hh 3.000 2.4000 S/. 16.08 S/. 38.59

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 235.09

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 14.72

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.8000 S/. 7.00 S/. 5.60

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.28 S/. 3.84

Page 24: Analisis de Costos Unitarios San Gaban

INST. Y COLOC. POZO A TIERRA Y PARARRAYOS und S/. 3,000.00

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 3,000.00

SC. INSTALACION Y COLOC. POZO A TIERRA Y PARARRAYOS glb 1.0000 S/. 3,000.00 S/. 3,000.00

INST. Y COLOC. DE TANQUE DE POLIETILENO DE AGUA 1100 lt. SOBRE ARMAZON METALICO H=3.00 und S/. 1,564.62

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 1,564.62

EXCAVACION ZANJA PARA CIMENTACION m3 0.5120 S/. 34.14 S/. 17.48

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.3200 S/. 56.62 S/. 18.12

CONCRETO SIMPLE 1:8+25%PM PARA DADOS DE CIMENTACION 0.40X0.40 m3 0.1600 S/. 292.11 S/. 46.74

ELABORAC. Y COLOC. DE ARMAZON METALICO PARA TANQUE DE POLIETILENO DE H=3.00 und 1.0000 S/. 834.71 S/. 834.71

INST. Y COLOC. DE TANQUE DE POLIETILENO DE AGUA 1100 lt. und 1.0000 S/. 647.57 S/. 647.57

INST. Y COLOC. DE TANQUE CISTERNA DE POLIETILENO DE AGUA 1100 lt. INC. ELECTROBOMBA DE 0.5HP und S/. 1,612.32

REND 3 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 142.32

OPERARIO hh 1.000 2.6667 S/. 16.08 S/. 42.88

PEON hh 3.000 8.0000 S/. 12.43 S/. 99.44

MATERIALES S/. 1,465.73

TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und 1.0000 S/. 415.51 S/. 415.51

ELECTROBOMBA DE 0.5HP und 1.0000 S/. 575.20 S/. 575.20

TUBERIA PVC SAP C-10 C/R 1'' ml 3.0000 S/. 2.47 S/. 7.41

TUBERIA PVC SAP C-10 C/R 3/4'' ml 18.0000 S/. 1.62 S/. 29.16

REDUCCION PVC SAP S/P 3/4"-1/2" und 3.0000 S/. 0.55 S/. 1.65

REDUCCION PVC SAP S/P 1"-3/4" und 2.0000 S/. 0.77 S/. 1.54

CINTA TEFLON DE MEDIA und 1.0000 S/. 2.00 S/. 2.00

LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und 324.0000 S/. 1.30 S/. 421.20

ARENA FINA m3 0.2650 S/. 45.50 S/. 12.06

EQUIPOS Y HERRAMIENTAS S/. 4.27

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.42 S/. 4.27

CERCO PERIMETRICO CON BLOQUE DE CONCRETO CONFINADO H=3.00 m ml S/. 635.36

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 635.36

EXCAVACION ZANJA PARA CIMENTACION m3 0.7200 S/. 34.14 S/. 24.58

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.5400 S/. 208.80 S/. 112.75

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.0800 S/. 292.11 S/. 23.37

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 14.8679 S/. 5.72 S/. 85.04

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 0.0370 S/. 414.72 S/. 15.34

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 0.1800 S/. 377.90 S/. 68.02

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.0800 S/. 56.62 S/. 117.77

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 2.4500 S/. 76.93 S/. 188.48

CERCO PERIMETRICO DE PAÑOS MIXTOS CON BLOQUE DE CONCRETO CONFINADO Y REJA METALICA H=3.00 m ml S/. 632.90

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 632.90

EXCAVACION ZANJA PARA CIMENTACION m3 0.7200 S/. 34.14 S/. 24.58

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.5400 S/. 208.80 S/. 112.75

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.0800 S/. 292.11 S/. 23.37

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 14.8679 S/. 5.72 S/. 85.04

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 0.0370 S/. 414.72 S/. 15.34

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 0.1800 S/. 377.90 S/. 68.02

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.0800 S/. 56.62 S/. 117.77

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 2.1800 S/. 76.93 S/. 167.71

COLOCACION DE REJA METALICA m2 0.2700 S/. 67.80 S/. 18.31

Page 25: Analisis de Costos Unitarios San Gaban

VEREDAS DE CONCRETO 140Kg/cm2, E= 4" m2 S/. 85.32

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 85.32

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.40 S/. 56.62 S/. 22.65

CONCRETO PARA VEREDAS F'=140KG/CM2 , e=4" m2 1.20 S/. 33.98 S/. 40.78

PATIO DE CONCRETO FROTACHADO Y BRUÑADO ml S/. 74.10

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 74.10

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.28 S/. 56.62 S/. 15.85

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.07 S/. 33.98 S/. 36.36

JUNTA DE DILATACION e=1" ml 1.33 S/. 1.99 S/. 2.65

LOSA DE CONCRETO FROTACHADO Y BRUÑADO m2 S/. 74.10

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 74.10

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.28 S/. 56.62 S/. 15.85

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.07 S/. 33.98 S/. 36.36

JUNTA DE DILATACION e=1" ml 1.33 S/. 1.99 S/. 2.65

CUNETA 0.30X0.30 PARA DRENAJE PLUVIAL INC. REG. METALICA ANCHO 0.30m ml S/. 272.40

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 272.40

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.03 S/. 41.21 S/. 1.24

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.95 S/. 56.62 S/. 53.79

REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m ml 1.00 S/. 180.00 S/. 180.00

CONCRETO CANALETA DE DRENAJE PLUVIAL INC. REGILLA METALICA m2 1.10 S/. 33.98 S/. 37.38

RAMPAS DE CONCRETO 140Kg/cm2, E= 4" m2 S/. 85.32

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 85.32

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 0.15 S/. 41.21 S/. 6.18

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 1.00 S/. 15.71 S/. 15.71

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.40 S/. 56.62 S/. 22.65

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.20 S/. 33.98 S/. 40.78

MURO DE CONTENCION CºCº H=0.80m ml S/. 500.97

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 500.97

EXCAVACION ZANJA PARA CIMENTACION m3 0.9000 S/. 34.14 S/. 30.73

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.9000 S/. 208.80 S/. 187.92

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 0.4000 S/. 309.46 S/. 123.78

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.8000 S/. 56.62 S/. 158.54

Page 26: Analisis de Costos Unitarios San Gaban

MURO DE MAMPOSTERIA DE PIEDRA H=0.80 ml S/. 500.97

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 500.97

EXCAVACION ZANJA PARA CIMENTACION m3 0.9000 S/. 34.14 S/. 30.73

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 0.9000 S/. 208.80 S/. 187.92

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 0.4000 S/. 309.46 S/. 123.78

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 2.8000 S/. 56.62 S/. 158.54

MURO DE CONTENCION CºCº H=2.00m ml S/. 1,106.09

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 1,106.09

EXCAVACION ZANJA PARA CIMENTACION m3 1.8000 S/. 34.14 S/. 61.45

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 1.8000 S/. 208.80 S/. 375.84

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 1.1000 S/. 309.46 S/. 340.41

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 5.8000 S/. 56.62 S/. 328.40

PLAN DE MANEJO AMBIENTAL DURANTE LA EJECUCION und S/. 7,880.00

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 7,880.00

BOLETINES INFORMATIVOS glb 1.000 S/. 480.00 S/. 480.00

LETRINA SANITARIA INC. SERV MANTENIMIENTO und 2.000 S/. 3,000.00 S/. 6,000.00

CONTENEDORES DE RESIDUOS SOLIDOS und 4.000 S/. 150.00 S/. 600.00

LETREROS INFORMATIVOS PREVENTIVOS Y DE REGLAMENTACION und 1.000 S/. 800.00 S/. 800.00

PATIO DE JUEGOS AREA=118.26m2 INC. SARDINEL DE CONCRETO 0.10X0.30m Y 04 UNID DE JUEGOS METALICOS und S/. 7,373.87

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 1,873.87

SARDINEL DE CONCRETO 0.10X0.30m ml 43.7000 S/. 20.34 S/. 888.86

ACARREO, COLOCACION Y TENDIDO DE PIEDRA CONFITILLO PARA JUEGOS INFANTILES m2 110.8000 S/. 8.89 S/. 985.01

SUBCONTRATO S/. 5,500.00

SC. ELABORACION JUEGOS INFANTILES METALICOS und 4.0000 S/. 1,250.00 S/. 5,000.00

SC. TRANSPORTE DE JUEGOS INFANTILES vje 1.0000 S/. 500.00 S/. 500.00

Page 27: Analisis de Costos Unitarios San Gaban

PRUEBAS DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION) und S/. 25.50

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 25.50

SC. PRUEBA DE CALIDAD DE CONCRETO A LA COMPRESION und 1.0000 S/. 25.50 S/. 25.50

COLOCACION CAJA REGISTRO Y CONECCION A RED DE AGUA und S/. 104.21

REND 10 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 27.78

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.500 1.2000 S/. 12.43 S/. 14.92

MATERIALES S/. 75.60

VALV.PASO TERMOP. C/NIPLE TELESCOPICO und 1.0000 S/. 21.00 S/. 21.00

VALV.PASO TERMOP. C/SAL. AUX. 15N und 1.0000 S/. 16.56 S/. 16.56

UNION PRESION ROSCA 1/2" und 1.0000 S/. 0.60 S/. 0.60

NIPLE REEMPLAZO MEDIDOR 3/4" und 1.0000 S/. 2.14 S/. 2.14

CAJA DE REGISTRO DE CONCRETO PARA AGUA (INC. CUERPO Y SOLADO) und 1.0000 S/. 35.30 S/. 35.30

EQUIPOS Y HERRAMIENTAS S/. 0.83

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.28 S/. 0.83

COLOCACION CAJA REGISTRO Y CONECCION A BIODIGESTOR und S/. 71.11

REND 10 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 27.78

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.500 1.2000 S/. 12.43 S/. 14.92

MATERIALES S/. 42.50

CAJA DE CONCRETO PARA REGISTRO DE DESAGUE (INC. BASE, INTERMEDIO,MARCO Y TAPA) und 1.0000 S/. 42.50 S/. 42.50

EQUIPOS Y HERRAMIENTAS S/. 0.83

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.28 S/. 0.83

INSTALACION Y COLOCACION DE BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und S/. 1,663.46

REND 2 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 213.48

OPERARIO hh 1.000 4.0000 S/. 16.08 S/. 64.32

PEON hh 3.000 12.0000 S/. 12.43 S/. 149.16

MATERIALES S/. 1,443.57

BIODIGESTOR AUTOLIMPIABLE 1300LT, INC. ACCESORIOS und 1.0000 S/. 1,395.25 S/. 1,395.25

ARENA FINA m3 1.0620 S/. 45.50 S/. 48.32

EQUIPOS Y HERRAMIENTAS S/. 6.40

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 2.13 S/. 6.40

INSTALACION Y COLOCACION DE BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und S/. 5,064.51

REND 2 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 213.48

OPERARIO hh 1.000 4.0000 S/. 16.08 S/. 64.32

PEON hh 3.000 12.0000 S/. 12.43 S/. 149.16

MATERIALES S/. 4,844.62

BIODIGESTOR AUTOLIMPIABLE 3000LT, INC. ACCESORIOS und 1.0000 S/. 4,796.30 S/. 4,796.30

ARENA FINA m3 1.0620 S/. 45.50 S/. 48.32

EQUIPOS Y HERRAMIENTAS S/. 6.40

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 2.13 S/. 6.40

Page 28: Analisis de Costos Unitarios San Gaban

REHABILITACION DE LOSA DEPORTIVA EXISTENTE DE C° f'c=140kg/cm2 e=4" m2 S/. 49.83

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 49.83

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.28 S/. 56.62 S/. 15.85

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 1.00 S/. 33.98 S/. 33.98

JUNTA DE DILATACION e=1" ml 1.33 S/. 1.99 S/. 2.65

REHABILITACION DE LOSA DEPORTIVA Y ARCOS METALICOS EXISTENTE : PINTADO m2 S/. 2.90

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 2.90

PINTADO DE LOSA DEPORTIVA m2 1.0000 S/. 2.00 S/. 2.00

PINTADO DE ARCOS METALICOS und 0.0150 S/. 60.00 S/. 0.90

DESMONTAJE DE PUERTA TIPO REJA Y DEMOLICION DE COLUMNETAS DE CONCRETO und S/. 48.73

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 48.73

DESMONTAJE DE PUERTA TIPO REJA m2 1.0000 S/. 33.73 S/. 33.73

DEMOLICION DE COLUMNETAS DE CONCRETO und 2.0000 S/. 7.50 S/. 15.00

Page 29: Analisis de Costos Unitarios San Gaban

DEMOLICION DE VEREDAS m2 S/. 16.39

REND 25 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 15.91

PEON hh 4.000 1.2800 S/. 12.43 S/. 15.91

EQUIPOS Y HERRAMIENTAS S/. 0.48

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.16 S/. 0.48

DEMOLICION DE COLUMNETAS DE CONCRETO und S/. 7.50

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 7.50

DEMOLICION DE COLUMNETAS DE CONCRETO und 1.00 S/. 7.50 S/. 7.50

DEMOLICION DE PORTICO DE INGRESO DE CONCRETO (EXISTENTE) und S/. 150.00

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 150.00

DEMOLICION DE PORTICO DE INGRESO DE CONCRETO (EXISTENTE) und 1.00 S/. 150.00 S/. 150.00

DEMOLICION MODULO m2 S/. 17.00

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 17.00

DEMOLICION DE MODULO ESTRUCTURA EXSISTENTE ml 1.00 S/. 17.00 S/. 17.00

DEMOLICION DE CERCO PERIMETRICO ml S/. 7.50

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 7.50

DEMOLICION DE CERCO PERIMETRICO ml 1.00 S/. 7.50 S/. 7.50

RED INTERNA DE AGUA HASTA 25m. glb S/. 1,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 1,000.00

RED INTERNA DE AGUA HASTA 25m. glb 1.0000 S/. 1,000.00 S/. 1,000.00

RED INTERNA DE DESAGUE HASTA 25m. glb S/. 2,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 2,000.00

RED INTERNA DE DESAGUE HASTA 25m. glb 1.0000 S/. 2,000.00 S/. 2,000.00

RED INTERNA DE AGUA HASTA 50m. glb S/. 2,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 2,000.00

RED INTERNA DE AGUA HASTA 50m. glb 1.0000 S/. 2,000.00 S/. 2,000.00

Page 30: Analisis de Costos Unitarios San Gaban

RED INTERNA DE DESAGUE HASTA 50m. glb S/. 4,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 4,000.00

RED INTERNA DE DESAGUE HASTA 50m. glb 1.0000 S/. 4,000.00 S/. 4,000.00

RED INTERNA DE AGUA HASTA 80m. glb S/. 3,200.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 3,200.00

RED INTERNA DE AGUA HASTA 80m. glb 1.0000 S/. 3,200.00 S/. 3,200.00

RED INTERNA DE DESAGUE HASTA 80m. glb S/. 6,400.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 6,400.00

RED INTERNA DE DESAGUE HASTA 80m. glb 1.0000 S/. 6,400.00 S/. 6,400.00

REFACCION MODULO A EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS, COLOCACION DE CERAMICO m2 S/. 78.56

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 78.56

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

COLOCACION DE CERAMICO m2 1.1000 S/. 47.30 S/. 52.03

REFACCION MODULO A EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS m2 S/. 26.53

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 26.53

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

REFACCION MODULO B EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS m2 S/. 26.53

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 26.53

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

REFACCION MODULO C EXISTENTE :PINTADO DE MUROS,TARRAJEADO MUROS m2 S/. 26.53

REND 1 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 26.53

PINTADO DE MUROS m2 2.8000 S/. 6.78 S/. 18.98

TARRAJEO DE MUROS m2 0.5000 S/. 15.10 S/. 7.55

ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb S/. 3,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 3,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 01 AULA A MAS DE 3600msnm glb 1.0000 S/. 3,000.00 S/. 3,000.00

Page 31: Analisis de Costos Unitarios San Gaban

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb S/. 6,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 6,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb 1.0000 S/. 6,000.00 S/. 6,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 05 AULAS A MAS DE 3600msnm glb S/. 15,000.00

REND 1 glb/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 15,000.00

ACONDICIONAMIENTO BIOCLIMATICO PARA 02 AULAS A MAS DE 3600msnm glb 1.0000 S/. 15,000.00 S/. 15,000.00

RELLENO COMPACTADO CON MATERIAL PROPIO m3 S/. 35.22

REND 1 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDA S/. 35.22

RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.0000 S/. 35.22 S/. 35.22

COLOCACION PUERTA METALICA PARA VIVIENDA DOCENTE und S/. 750.50

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 750.50

PINTADO DE MUROS und 1.0000 S/. 750.50 S/. 750.50

REHABILITACION DE CERCO PERIMETRICO CON BLOQUES DE CONCRETO 20x20x40 : CIERRE DE VANOS m2 S/. 70.53

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.29

OPERARIO hh 1.000 1.0000 S/. 16.08 S/. 16.08

PEON hh 0.500 0.5000 S/. 12.43 S/. 6.22

MATERIALES S/. 38.57

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.5200 S/. 19.65 S/. 10.22

BLOQUE DE CONCRETO 20 X 20 X 40 cm und 11.0000 S/. 2.30 S/. 25.30

ARENA GRUESA m3 0.0620 S/. 42.30 S/. 2.62

MADERA TORNILLO p2 0.0580 S/. 5.95 S/. 0.35

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg 0.0200 S/. 4.00 S/. 0.08

EQUIPOS Y HERRAMIENTAS S/. 9.67

ANDAMIO METAL TABLAS ALQUILER d 1.0000 S/. 9.00 S/. 9.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.22 S/. 0.67

SUBPARTIDAS

EXCAVACION ZANJA PARA CIMENTACION m3 S/. 34.14

REND 3 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 33.15

PEON hh 1.000 2.6667 S/. 12.43 S/. 33.15

EQUIPOS Y HERRAMIENTAS S/. 0.99

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.33 S/. 0.99

Page 32: Analisis de Costos Unitarios San Gaban

NIVELACION Y COMP. DE TERRENO CON MATERIAL DE PRESTAMO m3 S/. 41.21

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.81

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.000 0.8000 S/. 12.43 S/. 9.94

MATERIALES S/. 17.71

AGUA m3 0.0126 S/. 13.00 S/. 0.16

MADERA TONILLO p2 2.9400 S/. 5.95 S/. 17.49

CLAVOS KG 0.0100 S/. 5.80 S/. 0.06

EQUIPOS Y HERRAMIENTAS S/. 0.68

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.23 S/. 0.68

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg S/. 5.72

REND 400 kg/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 0.85

OPERARIO hh 1.000 0.0200 S/. 16.08 S/. 0.32

OFICIAL hh 1.000 0.0200 S/. 13.79 S/. 0.28

PEON hh 1.000 0.0200 S/. 12.43 S/. 0.25

MATERIALES S/. 4.85

ACERO CORRUGADO FY=4200KG/CM2 kg 1.0300 S/. 4.60 S/. 4.74

ALAMBRE N° 16 kg 0.0289 S/. 3.81 S/. 0.11

EQUIPOS Y HERRAMIENTAS S/. 0.03

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.01 S/. 0.03

INST. Y COLOC. DE TANQUE DE POLIETILENO DE AGUA 1100 lt. und S/. 647.57

REND 4 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 57.02

OPERARIO hh 1.000 2.0000 S/. 16.08 S/. 32.16

PEON hh 1.000 2.0000 S/. 12.43 S/. 24.86

MATERIALES S/. 588.84

TANQUE ETERNIT 1.100 LT C/FILTRO INC. ACCESORIOS und 1.0000 S/. 415.51 S/. 415.51

TEE DESAGUE SANITARIA 2" PVC und 1.0000 S/. 3.75 S/. 3.75

CINTA TEFLON DE MEDIA und 1.0000 S/. 2.00 S/. 2.00

NIPLE F°G° 1/2" x 1½" und 1.0000 S/. 1.50 S/. 1.50

VALVULA ESFERICA REDGAL CIM. 1/2" und 1.0000 S/. 17.50 S/. 17.50

VALVULA CHECK SWING 1/2" und 2.0000 S/. 43.63 S/. 87.26

CODOS PVC SP 1/2"x90° und 2.0000 S/. 1.10 S/. 2.20

ADAPTADOR PVC PR 1/2" und 6.0000 S/. 1.25 S/. 7.50

REDUCC. CAMP GALV 3/4"x1/2" und 1.0000 S/. 2.38 S/. 2.38

UNION PVC R 3/4" PU und 1.0000 S/. 1.63 S/. 1.63

REDUCC. PVC-P 3/4"x1/2" C/R und 1.0000 S/. 0.88 S/. 0.88

PEGAMENTO PVC 32 ONZ. und 0.2500 S/. 28.13 S/. 7.03

FORMADOR DE EMPAQUETADURAS 3-H und 0.2500 S/. 7.75 S/. 1.94

TEE DESAGUE 4"x2" PVC und 1.0000 S/. 5.63 S/. 5.63

SOMBRERO DE VENTILACION DESAGUE 2" PVC und 1.0000 S/. 5.63 S/. 5.63

CODO DESAGUE 2"x90° PVC und 3.0000 S/. 1.50 S/. 4.50

CODO DESAGUE 2"x45° PVC und 1.0000 S/. 1.50 S/. 1.50

TUBO DESAGUE 2"x 3m. PVC und 2.0000 S/. 10.25 S/. 20.50

EQUIPOS Y HERRAMIENTAS S/. 1.71

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.57 S/. 1.71

ELABORAC. Y COLOC. DE ARMAZON METALICO PARA TANQUE DE POLIETILENO DE H=3.00 und S/. 834.71

REND 1 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 114.71

MADERA TORNILLO p2 16.4042 S/. 5.95 S/. 97.60

TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und 0.2480 S/. 68.00 S/. 16.86

PUNTO AZUL E-6011 1/8" 25 Kg kg 0.0176 S/. 13.50 S/. 0.24

SUBCONTRATOS S/. 720.00

SC. M.O. ELABORACION E INSTALACION DE ARMAZON METALICO DE 1.00mX1.00m Y H=3.00m glb 1.0000 S/. 720.00 S/. 720.00

Page 33: Analisis de Costos Unitarios San Gaban

CONCRETO SIMPLE 1:8+25%PM PARA DADOS DE CIMENTACION 0.40X0.40 m3 S/. 292.11

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 120.19

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 3.8000 S/. 19.65 S/. 74.67

HORMIGON m3 0.8500 S/. 30.00 S/. 25.50

PIEDRA MEDIANA 4" m3 0.5000 S/. 30.00 S/. 15.00

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.0500 S/. 11.10 S/. 0.56

MADERA TORNILLO p2 0.0260 S/. 5.95 S/. 0.15

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 11.80

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

MURO DE SOGA LADRILLO KK DE ARCILLA 18 HUECOS m2 S/. 96.01

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.29

OPERARIO hh 1.000 1.0000 S/. 16.08 S/. 16.08

PEON hh 0.500 0.5000 S/. 12.43 S/. 6.22

MATERIALES S/. 64.05

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.2600 S/. 19.65 S/. 5.11

LADRILLO KING KONG DE ARCILLA 18 HUECOS HECHO A MAQUINA 9 X 14 X 24 cm und 44.0000 S/. 1.30 S/. 57.20

ARENA GRUESA m3 0.0310 S/. 42.30 S/. 1.31

MADERA TORNILLO p2 0.0580 S/. 5.95 S/. 0.35

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg 0.0200 S/. 4.00 S/. 0.08

EQUIPOS Y HERRAMIENTAS S/. 9.67

ANDAMIO METAL TABLAS ALQUILER d 1.0000 S/. 9.00 S/. 9.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.22 S/. 0.67

MURO DE SOGA CON BLOQUES DE CONCRETO 20x20x40 m2 S/. 76.93

REND 8 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 28.51

OPERARIO hh 1.000 1.0000 S/. 16.08 S/. 16.08

PEON hh 1.000 1.0000 S/. 12.43 S/. 12.43

MATERIALES S/. 38.57

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.5200 S/. 19.65 S/. 10.22

BLOQUE DE CONCRETO 20 X 20 X 40 cm und 11.0000 S/. 2.30 S/. 25.30

ARENA GRUESA m3 0.0620 S/. 42.30 S/. 2.62

MADERA TORNILLO p2 0.0580 S/. 5.95 S/. 0.35

CLAVOS PARA MADERA CON CABEZA DE 2" A 4" kg 0.0200 S/. 4.00 S/. 0.08

EQUIPOS Y HERRAMIENTAS S/. 9.86

ANDAMIO METAL TABLAS ALQUILER d 1.0000 S/. 9.00 S/. 9.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.29 S/. 0.86

COLOCACION DE REJA METALICA m2 S/. 67.80

REND 20 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBCONTRATO S/. 67.80

SC. COLOCACION DE REJA METALICA m2 1.0000 S/. 67.80 S/. 67.80

m2 S/. 62.29

REND 20 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MATERIALES S/. 32.29

MALLA GALVANIZADA DE #10 DE 2"x2" m2 0.7994 S/. 19.00 S/. 15.19

PUNTO AZUL E-6011 1/8" 25 Kg kg 0.0176 S/. 13.50 S/. 0.24

TUBO ACERO NEGRO ELECTROSOLDADO REDONDO 2"X2mmX6m und 0.2480 S/. 68.00 S/. 16.86

SUBCONTRATO S/. 30.00

SC. M.O. COLOCACION DE MALLA GALVANIZADA m2 1.0000 S/. 30.00 S/. 30.00

COLOCACION DE MALLA GALVANIZADA #10 DE 2" INC MARCO TUBO ELECTROSOLDADO Ø 2"

Page 34: Analisis de Costos Unitarios San Gaban

CONCRETO 1:10+30%PG CIMIENTO CORRIDO m3 S/. 208.80

REND 20 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 78.96

OPERARIO hh 3.000 1.2000 S/. 16.08 S/. 19.30

PEON hh 12.000 4.8000 S/. 12.43 S/. 59.66

MATERIALES S/. 119.39

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 3.6000 S/. 19.65 S/. 70.74

HORMIGON m3 0.8300 S/. 30.00 S/. 24.90

PIEDRA GRANDE 8" m3 0.5000 S/. 30.00 S/. 15.00

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 10.45

VIBRADOR DE CONCRETO 4 HP 2.5" hm 2.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.4000 S/. 7.00 S/. 2.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.79 S/. 2.37

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 S/. 292.11

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 120.19

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 3.8000 S/. 19.65 S/. 74.67

HORMIGON m3 0.8500 S/. 30.00 S/. 25.50

PIEDRA MEDIANA 4" m3 0.5000 S/. 30.00 S/. 15.00

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.0500 S/. 11.10 S/. 0.56

MADERA TORNILLO p2 0.0260 S/. 5.95 S/. 0.15

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 11.80

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

CONCRETO F'c = 175 Kg/cm2 COLUMNAS m3 S/. 414.72

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 236.20

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.5000 S/. 11.10 S/. 5.55

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 18.40

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 1.0000 S/. 6.60 S/. 6.60

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

CONCRETO F'c = 175 Kg/cm2 VIGAS m3 S/. 377.90

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 128.09

OPERARIO hh 3.000 2.4000 S/. 16.08 S/. 38.59

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 235.09

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 14.72

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.8000 S/. 7.00 S/. 5.60

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.28 S/. 3.84

Page 35: Analisis de Costos Unitarios San Gaban

CONCRETO F'c = 175 Kg/cm2 LOSA MACIZA m3 S/. 377.90

REND 10 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 128.09

OPERARIO hh 3.000 2.4000 S/. 16.08 S/. 38.59

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 235.09

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 8.8500 S/. 19.65 S/. 173.90

ARENA GRUESA m3 0.5400 S/. 42.30 S/. 22.84

PIEDRA ZARANDEADA 1/2" m3 0.5500 S/. 51.00 S/. 28.05

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.4000 S/. 11.10 S/. 4.44

MADERA TORNILLO p2 0.2600 S/. 5.95 S/. 1.55

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 14.72

VIBRADOR DE CONCRETO 4 HP 2.5" hm 1.000 0.8000 S/. 6.60 S/. 5.28

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.8000 S/. 7.00 S/. 5.60

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.28 S/. 3.84

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 S/. 56.62

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 22.81

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 1.000 0.8000 S/. 12.43 S/. 9.94

MATERIALES S/. 33.13

ALAMBRE N° 8 kg 0.3000 S/. 3.81 S/. 1.14

CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.1600 S/. 4.00 S/. 0.64

CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.1600 S/. 4.00 S/. 0.64

MADERA TORNILLO p2 5.1600 S/. 5.95 S/. 30.70

EQUIPOS Y HERRAMIENTAS S/. 0.68

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.23 S/. 0.68

PISO CEMENTO FROTACHADO Y BRUÑADO E=4" m2 S/. 33.98

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 19.72

OPERARIO hh 3.000 0.3429 S/. 16.08 S/. 5.51

PEON hh 10.000 1.1429 S/. 12.43 S/. 14.21

MATERIALES S/. 13.66

CEMENTO PORTLAND bls 0.5460 S/. 19.65 S/. 10.73

HORMIGON m3 0.0252 S/. 30.00 S/. 0.76

AGUA m3 0.0200 S/. 13.00 S/. 0.26

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 0.59

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1143 S/. 7.00 S/. 0.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.20 S/. 0.59

CONCRETO PARA VEREDAS F'=140KG/CM2 , e=4" m2 S/. 33.98

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 19.72

OPERARIO hh 3.000 0.3429 S/. 16.08 S/. 5.51

PEON hh 10.000 1.1429 S/. 12.43 S/. 14.21

MATERIALES S/. 13.66

CEMENTO PORTLAND TIPO I bls 0.5460 S/. 19.65 S/. 10.73

HORMIGON m3 0.0252 S/. 30.00 S/. 0.76

AGUA m3 0.0200 S/. 13.00 S/. 0.26

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 0.59

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1143 S/. 7.00 S/. 0.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.20 S/. 0.59

JUNTA DE DILATACION e=1" ml S/. 1.99

REND 100 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 1.78

OPERARIO hh 1.000 0.0800 S/. 16.08 S/. 1.29

PEON hh 0.500 0.0400 S/. 12.43 S/. 0.50

MATERIALES S/. 0.16

ASFALTO m3 0.0052 S/. 30.00 S/. 0.16

EQUIPOS Y HERRAMIENTAS S/. 0.05

Page 36: Analisis de Costos Unitarios San Gaban

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.02 S/. 0.05

Page 37: Analisis de Costos Unitarios San Gaban

CONFORMACION DE BASE AFIRMADA EN VEREDAS H=0.10 m2 S/. 15.71

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 8.94

OPERARIO hh 1.000 0.1143 S/. 16.08 S/. 1.84

PEON hh 5.000 0.5714 S/. 12.43 S/. 7.10

MATERIALES S/. 5.81

AGUA m3 0.1000 S/. 13.00 S/. 1.30

AFIRMADO m3 0.1250 S/. 35.20 S/. 4.40

COMBUSTIBLE (GASOLINA) gln 0.0100 S/. 11.10 S/. 0.11

EQUIPOS Y HERRAMIENTAS S/. 0.95

COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP hm 1.000 0.11 S/. 6.00 S/. 0.69

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.09 S/. 0.27

ml S/. 180.00

REND 60 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBCONTRATO S/. 180.00

SC. REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m ml 1.0000 S/. 180.00 S/. 180.00

CONCRETO CANALETA DE DRENAJE PLUVIAL INC. REGILLA METALICA m2 S/. 33.98

REND 70 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 19.72

OPERARIO hh 3.000 0.3429 S/. 16.08 S/. 5.51

PEON hh 10.000 1.1429 S/. 12.43 S/. 14.21

MATERIALES S/. 13.66

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.5460 S/. 19.65 S/. 10.73

HORMIGON m3 0.0252 S/. 30.00 S/. 0.76

AGUA m3 0.0200 S/. 13.00 S/. 0.26

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 0.59

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 0.1143 S/. 7.00 S/. 0.80

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.20 S/. 0.59

CONCRETO 1:8+25%PM MURO DE CONTENCION m3 S/. 309.46

REND 8 m3/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 160.11

OPERARIO hh 3.000 3.0000 S/. 16.08 S/. 48.24

PEON hh 9.000 9.0000 S/. 12.43 S/. 111.87

MATERIALES S/. 137.55

CEMENTO PORTLAND SOL TIPO I (42.5 kg) bls 4.2000 S/. 19.65 S/. 82.53

HORMIGON m3 0.8500 S/. 30.00 S/. 25.50

PIEDRA MEDIANA 4" m3 0.6500 S/. 30.00 S/. 19.50

AGUA m3 0.1840 S/. 13.00 S/. 2.39

COMBUSTIBLE (GASOLINA) gln 0.5000 S/. 11.10 S/. 5.55

MADERA TORNILLO p2 0.0260 S/. 5.95 S/. 0.15

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 11.80

MEZCLADORA DE CONCRETO 12 P3 hm 1.000 1.0000 S/. 7.00 S/. 7.00

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.60 S/. 4.80

MURO DE PIRCA DE PIEDRA H=0.80 m2 S/. 156.49

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 102.36

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 51.06

CEMENTO PORTLAND TIPO I (42.5 kg) bls 1.5000 S/. 19.65 S/. 29.47

PIEDRA GRANDE m3 0.3300 S/. 30.00 S/. 9.90

ARENA GRUESA m3 0.2000 S/. 42.30 S/. 8.46

AGUA m3 0.1000 S/. 13.00 S/. 1.30

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 3.07

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.02 S/. 3.07

REGILLA METALICA BORDE DE ANGULOS1"X1" Y PLATINA 1" A=0.30m

Page 38: Analisis de Costos Unitarios San Gaban

MURO DE PIRCA DE PIEDRA H=1.20 m2 S/. 161.62

REND 10 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 102.36

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 9.000 7.2000 S/. 12.43 S/. 89.50

MATERIALES S/. 56.18

CEMENTO PORTLAND TIPO I (42.5 kg) bls 1.5000 S/. 19.65 S/. 29.47

PIEDRA GRANDE m3 0.3600 S/. 30.00 S/. 10.80

ARENA GRUESA m3 0.3000 S/. 42.30 S/. 12.69

AGUA m3 0.1000 S/. 13.00 S/. 1.30

ADITIVO CURADO QUIMICO gln 0.0400 S/. 48.00 S/. 1.92

EQUIPOS Y HERRAMIENTAS S/. 3.07

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 1.02 S/. 3.07

ACARREO, COLOCACION Y TENDIDO DE PIEDRA CONFITILLO PARA JUEGOS INFANTILES m2 S/. 8.89

REND 80 m2/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 3.29

OPERARIO hh 0.500 0.0500 S/. 16.08 S/. 0.80

PEON hh 2.000 0.2000 S/. 12.43 S/. 2.49

MATERIALES S/. 5.50

PIEDRA ZARANDEADA 1/4" m3 0.1000 S/. 55.00 S/. 5.50

EQUIPOS Y HERRAMIENTAS S/. 0.10

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.03 S/. 0.10

SARDINEL DE CONCRETO 0.10X0.30m ml S/. 20.34

REND 1 ml/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

SUBPARTIDAS S/. 20.34

EXCAVACION ZANJA PARA CIMENTACION m3 0.02 S/. 34.14 S/. 0.68

CORTE Y HABILITACION DE ACERO CORRUGADO FY=4200kg/cm2 kg 1.43 S/. 5.72 S/. 8.16

CONCRETO 1:8+25%PM SOBRECIMIENTO m3 0.0200 S/. 292.11 S/. 5.84

ENCOFRADO Y DESENCOFRADO DE MADERA TORNILLO EN BRUTO m2 0.1000 S/. 56.62 S/. 5.66

DESMONTAJE DE PUERTA TIPO REJA und S/. 33.73

REND 10 und/dia

DESCRIPCION UND CUADRILLA CANTIDAD PRECIO (S/.) PARCIAL (S/.)

MANO DE OBRA S/. 32.75

OPERARIO hh 1.000 0.8000 S/. 16.08 S/. 12.86

PEON hh 2.000 1.6000 S/. 12.43 S/. 19.89

EQUIPOS Y HERRAMIENTAS S/. 0.98

HERRAMIENTAS MANUALES %M.O. %mo 3.00 S/. 0.33 S/. 0.98