ABOUT COMPANY

Location: Klaipeda, Naujoji Uosto g. 3

Capacity 100 - 120 t per month

Production premises are 1200m²

Possibility to load the production directly onto a ship or a

barge

Page 4: BPS presentation 2016

ABOUT COMPANY

Steel structure manufacture

Production of steel structures

Production of heavyweight and oversized steel structures

Production of small scale structures

Page 5: BPS presentation 2016

CERTIFICATES

EN 1090 ISO 9001

Page 6: BPS presentation 2016

EQUIPMENT

CNC plasma cutting

Cranes 2 x 10 tones

Vertical milling machine

Bending machine

MIG/MAG, TIG, MMA welding equipment

Sand and grid blasting equipmen

Cutting, drilling and other equipment

Page 7: BPS presentation 2016

WOOD BAY TERMINAL

KLAIPEDA, LITHUANIA

Customer: UAB “Malkų Įlankos Terminalas”

prefabrication and erection of load bearing steel

structures, stairs, railings

erection of elevator

Page 8: BPS presentation 2016

RADVILISKIS TRAIN STATION

LITHUANIA

Customer: AB “Lietuvos Geležinkeliai”

prefabrication and erection of steel structures for

railway station

Page 9: BPS presentation 2016

SPICES WAREHOUSE

KLAIPEDA, LITHUANIA

Customer: UAB “Moguntija Baltija”

prefabrication and erection of steel structures

erection of sandwich panels and roof sheet

Page 10: BPS presentation 2016

PIENO ŽVAIGŽDĖS MAZEIKIAI

LITHUANIA

Customer: UAB „Mažeikių Varduva“

prefabrication and erection of steel structures

erection of sandwich panels and roof sheet

Page 11: BPS presentation 2016

RAILWAY BRIDGE

LITHUANIA

Customer: AB „Panevėžio keliai“

Total quantity 4 pcs. Each weight 30 tons

Total weight 120 tons

Page 12: BPS presentation 2016

KLAIPEDA, LITHUANIA

Customer: UAB „Viadukas“

Repairing and manufacturing lifting bridges frame

and manufacturing railings ower Dane river

Page 13: BPS presentation 2016

SPORT HALL

PALANGA, LITHUANIA

Customer: UAB „Rudupis“

Prefabrication and erection of steel structures

Erection of glulam structures and roof sheet

Page 14: BPS presentation 2016

LITHUANIA

Customer: UAB „Agro containers“

Open / closed 5-10 m3 containers production

Total quantity - 27 pcs

Page 15: BPS presentation 2016

LULEA, SWEDEN

Customer: Henrik Björklund (HBES AB)

Manufacturing and delivery of steel trusses for

Betonic L500.

Page 16: BPS presentation 2016

LKAB IRON ORE MINING

SWEDEN

Rorbrygga

Stallverk

Sllurybyggnad

KA3 Servis

S200 and V008

ESP

Trapp and Hiss

Stallverk & Trafobas

Page 17: BPS presentation 2016

SWEDEN

Customer: Peab Sverige AB

Manufacturing and assembling of metal beams

Total weight 137 tons

Page 18: BPS presentation 2016

LKAB LABORATORY

KIRUNA, SWEDEN

Customer: PEAB Sverige AB

Prefabrication and erection of steel structures

Erection of sandwich panels, roof sheet and prefab

concrete hollow core slabs

Page 19: BPS presentation 2016

FIRE STATION

VARBY, SWEDEN

Customer: PEAB Sverige AB

Prefabrication and erection of steel structures

Erection of prefab concrete hollow core slabs and

glulam structures

Page 20: BPS presentation 2016

NORWAY

Customer: Mekanisk Service Halden AS

Kabelbane Øst, Stage 2 - gallery 345 m, 102t

Reel – 37t

Page 21: BPS presentation 2016

SAS INSTITUTET

SWEDEN

Customer: Concent AB

Prefabrication and erection of stairs, railings

Page 22: BPS presentation 2016

APARTMENTS

STOCKHOLM, SWEDEN

Customer: Richard Frisk

Prefabrication and erection of steel structures

Page 23: BPS presentation 2016

DIFFICULT EQUIPMENT

Bunker

Elevator

OTHER PRODUCTS

Page 24: BPS presentation 2016

SWEDEN

Project - Stockby Returpark

Galvanized steel railings

Total - 600 m of railings

Page 25: BPS presentation 2016

SWEDEN

Project - Stigbergsgaraget

Galvanized steel products

Total weight 17,282 tones

Page 26: BPS presentation 2016

THANK YOU FOR YOUR ATTENTION

More about us:

www.bpsistemos.eu