C shea 21 ctto presentaion
-
Upload
colin-shea -
Category
Technology
-
view
113 -
download
0
Transcript of C shea 21 ctto presentaion
![Page 1: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/1.jpg)
Vehicle ExtricationHollis Fire
![Page 2: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/2.jpg)
Currently● Lecture
● Skills Review
● Full-Scale Scenario
● 6 Hours (3 - 2 hour
sessions)
● Line Officers
● Firefighters
![Page 3: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/3.jpg)
Challenges with Current Format❏ One class is devoted to lecture.❏ All JPRs are not completed due to time
constraints.❏ Officers are only able to assess a
single incident.
![Page 4: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/4.jpg)
Benefits of Change● Reduce lecture
time.
● Ensure consistent comprehension of SOGs and Protocols.
● Allow for more hands on time.
● Ensures we complete all JPRs.
● More flexiblity in training dates.
![Page 5: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/5.jpg)
Where are We HeadedPre-Training Work
Company level skills review
More in-depth Scenario
Evaluation/Review of Training
![Page 6: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/6.jpg)
Pre-Training Work
![Page 7: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/7.jpg)
Skills Review● Short discusion (30 min) to review
Pre-Training Work● All basic hands on skills are reviewed
at the company level training (no change)
![Page 8: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/8.jpg)
Full Scale Scenario
![Page 9: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/9.jpg)
Evaluation/Review of Training
❏ Using an online polling software.
❏ Ensures objectives are meet.❏ Provides feedback for making the next
training better.
![Page 10: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/10.jpg)
1. Resistant to change.2. Learning curve for some members.3. Information will be available outside
the Station.4. Timeliness of pre-training and
evaluation completion.5. Deviation from regular schedule.
Implementation Challenges
Education
Password Protected SiteEnsure sufficient lead time
with follow-up remindersSmaller groups allow for more flexibility
![Page 11: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/11.jpg)
NFPA Objective Old New10.1.1 Plan for an incident X X
6.4.1 The ability to operate hand and power tools used for forcible entry and rescue as designed X X
10.1.2 Establish "scene" Safety zones X X
10.1.3 Establish Fire Protection X X
10.1.4 Stabilize a common passenger vehicle X X
6.4.1 Use cribbing and shoring material; X X
10.1.5 Isolate potentially harmful energy sources * X
10.1.6 Determine the common passenger vehicle or small machinery access and egress points X
10.1.7 Create access and egress openings X X
6.4.1Choose and apply appropriate techniques for moving or removing vehicle roofs, doors, windshields, windows, steering wheels or columns, and the dashboard. * X
10.1.8 Disentangle victims X
10.1.9 Remove a packaged victim - In accordance with NH EMS Protocols X X
10.1.10 Terminate an incident X X
![Page 12: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/12.jpg)
Safety• Pre-Training– NIOSH/Near-Miss– UTC
• PPE• Hose line• Weather Conditions
![Page 13: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/13.jpg)
Summary and Needs
![Page 14: C shea 21 ctto presentaion](https://reader035.fdocuments.co/reader035/viewer/2022070510/58a992fa1a28abc2518b4673/html5/thumbnails/14.jpg)