CALCULO DE CANTERA.xlsx

3
FILTRO PIEDRA ARENA Tam año Rend m 3/m 3 o >2" 0.19 1"<o <2" 0.29 3/4"<o <1" 0.10 1/2"<o <3/4" 0.17 3/8"<o <1/2" 0.02 Nº4<o <3/8" 0.08 Nº10<o <Nº4 0.04 Nº20<o <Nº10 0.08 Nº200<o <Nº20 0.02 o <Nº200 0.01 1.00

Transcript of CALCULO DE CANTERA.xlsx

Hoja1REND M3/M3REQUIMIENTOVOL ZARAND TANTE 01ZARANDEO V=52413.79ZARANDEO V=27500ZARANDEO V=31667

0.199,958.625,225.00SOBRA6,016.73FILTRO0.2915,200.0052,413.7915,200.007,975.00FALTA9,183.43PIEDRA0.000.276,500.0024,074.0714,151.727,425.008,550.090.021,048.28550.00633.34ARENA0.000.000.25,500.0027,500.0010,482.765,500.006,333.400.021,048.28550.00633.340.01524.14275.00316.671.00027,200.0052,413.7931,667.00

COVERTURA2620.68952620.689555,034.4834,287.69REND49.42%79.33%