  • CRONOGRAMA DE EJECUCION VALORIZADO DE OBRA (8 MESES)PROYECTO : CONSTRUCCION E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA PENDENCIA

    CONSULTOR :

    UBICACIN: LOC: PENDENCIA DIST: DANIEL ALOMIA ROBLES

    ITEM DESCRIPCION PARCIALTIEMPO DE EJECUCION OBRAS CIVILES - OCHO MESES CALENDARIOS

    PRIMER MES SEGUNDO MESSEM. 1 SEM. 2 SEM. 3 SEM. 4 SEM. 5 SEM. 6

    1,223,707.29

    I. MODULO DE 06 AULAS Y MODULO DE 03 AULAS 848,578.5601 OBRAS PRELIMINARES Y COMPLEMENTARIAS 59,048.92

    1.01 OBRAS PRELIMINARES 56,448.92 56,448.92

    01.09 CONTROL DE CALIDAD 2,600.00

    02 COSTRUCCION DE MODULO 01 - (05 AULAS+LABORATORIO+CENTRO 618,954.75

    02.01 TRABAJOS PRELIMINARES 874.85 874.85

    02.02 MOVIMIENTO DE TIERRAS 32,880.00 10,864.11 18,106.85

    02.03 OBRAS DE CONCRETO SIMPLE 25,099.45

    02.04 OBRAS DE CONCRETO ARMADO 275,881.06

    02.05 ESTRUCTURAS DE MADERA Y COBERTURA 34,944.35

    02.06 MUROS Y TABIQUES DE ALBAILERIA 46,919.21

    02.07 REVOQUES ENLUCIDOS Y MOLDURAS 41,460.33

    02.08 CIELORASOS 26,638.63

    02.09 PISOS Y VEREDAS 21,558.71

    02.10 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS 6,003.44

    02.11 CARPINTERIA DE MADERA 31,826.29

    02.12 CERRAJERIA 830.28

    02.13 PINTURA 13,970.84

    02.14 SISTEMA DE AGUA DE LLUVIA 17,648.11

    02.15 INSTALACIONES ELECTRICAS 26,953.06

    02.16 APARATOS SANITARIOS 1,270.16

    02.17 INSTALACIONES SANITARIAS 3,917.28

    02.18 OTROS 10,278.70

    03 MODULO 02 - 03 AULAS EN PRIMER NIVEL 170,574.89

    03.01 TRABAJOS PRELIMINARES 545.91

    03.02 MOVIMIENTO DE TIERRAS 12,911.86

    03.03 OBRAS DE CONCRETO SIMPLE 12,431.45

    03.04 OBRAS DE CONCRETO ARMADO 45,706.37

    03.05 ESTRUCTURAS DE MADERA Y COBERTURA 21,936.36

    03.06 MUROS Y TABIQUES DE ALBAILERIA 12,341.13

    03.07 REVOQUES ENLUCIDOS Y MOLDURAS 11,667.17

    03.08 CIELORASOS 9,882.07

    03.09 PISOS Y VEREDAS 9,140.18

    03.10 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS 1,631.96

    03.11 CARPINTERIA DE MADERA 11,527.34

    03.12 CERRAJERIA 226.44

    03.13 PINTURA 4,973.29

    03.14 SISTEMA DE AGUA DE LLUVIA 8,838.30

    03.15 INSTALACIONES ELECTRICAS 6,375.77

    03.16 OTROS 439.29

    II. MODULO DE SERVICIOS HIGIENICOS Y SISTEMA DE TRATAMI 84,289.2901 SERVICIOS HIGIENICOS 77,252.80

    01.01 TRABAJOS PRELIMINARES 2,275.62

    01.02 MOVIMIENTO DE TIERRAS 1,987.50

    01.03 OBRAS DE CONCRETO SIMPLE 8,106.72

    01.04 OBRAS DE CONCRETO ARMADO 13,062.37

    01.05 ESTRUCTURAS DE MADERA Y COBERTURA 7,065.59

    01.06 MUROS Y TABIQUES DE ALBAILERIA 8,128.35

    01.07 REVOQUES ENLUCIDOS Y MOLDURAS 6,668.81

    01.08 CIELORRASOS 2,955.38

    01.09 PISOS Y PAVIMENTOS 4,221.53

    01.10 ZOCALOS 5,298.64

    PRE EJECUCION

    CONSTRUCCION E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SANTA LUCIA

  • 01.11 REVESTIMIENTO EN LAVADERO Y URINARIO 702.00

    01.12 CARPINTERIA DE MADERA 3,021.30

    01.13 CARPINTERIA METALICA 1,211.16

    01.14 VIDRIOS, CRISTALES Y SIMILARES 297.67

    01.15 PINTURA 1,857.98

    01.16 APARATOS SANITARIOS Y ACCESORIOS 1,794.16

    01.17 INSTALACIONES SANITARIAS 2,243.19

    01.18 SISTEMA DE AGUA FRIA 1,293.85

    01.19 SISTEMA DE AGUA DE LLUVIA 4,029.11

    01.20 INSTALACIONES ELECTRICAS 1,031.87

    02 SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS 7,036.4902.01 TANQUE SEPTICO 5,406.57

    02.01.01 TRABAJOS PRELIMINARES 13.56

    02.01.02 MOVIMIENTO DE TIERRAS 571.98

    02.01.03 OBRAS DE CONCRETO ARMADO 4,061.17

    02.01.04 REVOQUES ENLUCIDOS 632.17

    02.01.05 INSTALACIONES SANITARIAS 86.97

    02.01.06 OTROS 40.72

    02.02 POZO DE ABSORCION 1,629.92

    02.02.01 TRABAJOS PRELIMINARES 8.83

    02.02.02 MOVIMIENTO DE TIERRAS 231.61

    02.02.03 OBRAS DE CONCRETO ARMADO 432.77

    02.02.04 MUROS Y TABIQUES DE ALBAILERIA 562.86

    02.02.05 INSTALACIONES SANITARIAS 315.08

    02.02.06 FILTROS 78.77

    III. CERCO PERIMETRICO, INGRESO PRINCIPAL Y VEREDAS 203,760.2701 CERCO PERIMETRICO 181,488.55

    01.01 TRABAJOS PRELIMINARES 7,463.36

    01.02 MOVIMIENTO DE TIERRAS 6,543.57

    01.03 OBRAS DE CONCRETO SIMPLE 13,265.16

    01.04 OBRAS DE CONCRETO ARMADO 93,098.80

    01.05 MUROS Y TABIQUES DE ALBAILERIA 42,640.77

    01.06 REVOQUES ENLUCIDOS Y MOLDURAS 14,573.64

    01.07 PINTURA 3,903.25

    02 INGRESO PRINCIPAL 16,739.20

    02.01 MOVIMIENTO DE TIERRAS 337.95

    02.02 OBRAS DE CONCRETO SIMPLE 1,267.45

    02.03 OBRAS DE CONCRETO ARMADO 7,505.54

    02.04 MUROS Y TABIQUES DE ALBAILERIA 2,265.93

    02.05 REVOQUES ENLUCIDOS Y MOLDURAS 2,947.34

    02.06 CARPINTERIA METALICA 1,822.41

    02.07 PINTURA 592.58

    03 VEREDAS DE ACESO PRINCIPAL 5,532.52

    03.01 MOVIMIENTO DE TIERRAS 929.81

    03.02 OBRAS DE CONCRETO SIMPLE 4,602.71

    IV. LOSA DEPORTIVA, VEREDAS INTERIORES Y EXTERIORES 87,079.1701 LOSA MULTIDEPORTIVA 49,733.13

    01.01 TRABAJOS PRELIMINARES 4,193.80

    01.02 MOVIMIENTO DE TIERRAS 8,379.00

    01.03 OBRAS DE CONCRETO SIMPLE 28,473.40

    01.04 JUNTAS DE DILATACION 2,980.32

    01.05 PINTURA 997.39

    01.06 CARPINTERIA METALICA 3,986.06

    01.07 OTROS 723.16

    02 VEREDAS EXTERIORES E INTERIORES 37,346.04

    02.01 TRABAJOS PRELIMINARES 831.94

    02.02 MOVIMIENTO DE TIERRAS 5,320.37

    02.03 OBRAS DE CONCRETO SIMPLE 25,649.57

    02.04 OBRAS DE CONCRETO ARMADO 2,863.87

    02.05 JUNTAS 1,733.76

    02.06 ASTA DE BANDERA 946.53

    V. DECLARACION DE IMPACTO AMBIENTAL 25,912.3501 PLAN DE MANEJO AMBIENTAL 806.72 100.84 100.84

    02 BOTADEROS 1,436.00 718.00 718.00

    03 MANEJO DE AREAS VERDES 8,834.60

    04 SEALIZACION 924.70 272.58

    05 SEGURIDAD AMBIENTAL ESCOLAR 8,527.84 1265.76

    06 MANEJO DE CAMPAMENTO 2,452.77 1914.59

    07 EDUCACION ABIENTAL 2,129.90 526.10 526.10

  • 08 PROGARMA DE ABANDONO 471.43

    09 REFUERZO A LA ORGANIZACION COMUNAL 108.39

    10 PROGRAMA DE CONTINGENCIA 220.00 27.50 27.50

    COSTO DIRECTO S/.1,223,707.29 S/. 68,187.88 S/. 71,873.86Gastos Generales (8.5%) S/.104,015.12 S/. 5,795.97 S/. 6,109.28Gastos de Supervision de Obra S/.61,185.36 S/. 7,648.17 S/. 7,648.17

    SUB TOTAL (VALORIZACION PARCIAL) S/.1,388,907.77 S/. 81,632.02 S/. 85,631.31VALORIZACION ACUMULADA S/. 81,632.02 S/. 167,263.33% DE AVANCE MENSUAL 5.8774% 6.1654%% DE AVANCE ACUMULADO MENSUAL 5.8774% 12.0428%

    IMPLEMENTACION CAPACITACION Y ORGANIZACIN S/.35,733.33MEDIDAS DE MITIGACION AMBIENTAL (EIA) S/.25,912.35 S/. 4,552.790 S/. 1,645.020GASTOS GENERALES DE MED. DE MITIG. AMBIENTAL (EIA) S/.9,600.00 S/. 1,200.000 S/. 1,200.000COMISION DE RECEPCION DE OBRA S/.985.00PROCESO DE LICITACION DE SUPERVISOR DE OBRA S/.1,200.00 S/.1,200.00EXPEDIENTE TECNICO S/.40,493.00 S/.40,493.00GASTOS DE PUBLICIDAD S/.2,000.00 S/.2,000.00

    TOTAL PRESUPUESTADO (VALORIZACION PARCIAL) S/.1,504,831.45 S/. 43,693.00 S/. 87,384.81 S/. 88,476.33VALORIZACION ACUMULADA S/. 43,693.00 S/. 131,077.81 S/. 219,554.14% DE AVANCE MENSUAL 2.9035% 5.8070% 5.8795%% DE AVANCE ACUMULADO MENSUAL 2.9035% 8.7105% 14.5899%

  • CRONOGRAMA DE EJECUCION VALORIZADO DE OBRA (8 MESES)CONSTRUCCION E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA PENDENCIA

    PROV: LEONCIO PRADO DEP: HUANUCO REGION: HUANUCO

    TIEMPO DE EJECUCION OBRAS CIVILES - OCHO MESES CALENDARIOSSEGUNDO MES TERCER MES CUARTO MES QUINTO MES SEXTO MES SEPTIMO MES

    SEM. 7 SEM. 8 SEM. 9 SEM. 10 SEM. 11 SEM. 12 SEM. 13 SEM. 14 SEM. 15 SEM. 16 SEM. 17 SEM. 18 SEM. 19 SEM. 20 SEM. 21 SEM. 22 SEM. 23 SEM. 24 SEM. 25 SEM. 26 SEM. 27

    672.26 642.58 642.58 642.58

    18,106.85 3,909.04

    18,063.71 7,035.74

    34,485.13 91,960.35 91,960.35 57,475.22

    34,944.35

    ### ### 23,459.61

    19,348.15 22,112.18

    13,319.32 13,319.32

    6,814.14 14,744.57

    3,001.72 3,001.72

    31,826.29

    830.28

    6,985.42 6,985.42

    12,868.16 4,779.95

    3,525.82 23,427.24

    1,270.16

    1,460.19 2,457.09

    ###

    545.91

    7,308.21 5,603.65

    8,102.52 4,328.93

    13,394.81 32,311.56

    21,936.36

    6,170.57 6,170.57

    3,889.06 7,778.11

    9,882.07

    2,933.33 6,206.85

    1,631.96

    ###

    226.44

    4,973.29

    8,838.30

    2,442.26 3,933.51

    439.29

    2,275.62

    1,987.50

    8,106.72

    2,647.76 ###

    7,065.59

    4,064.18 4,064.18

    3,334.41 3,334.41

    2,955.38

    4,221.53

    5,298.64

  • 702.00

    3,021.30

    1,211.16

    297.67

    1,857.98

    1,794.16

    2,243.19

    1,293.85

    4,029.11

    1,031.87

    13.56

    571.98

    2,707.45 1,353.72

    632.17

    86.97

    40.72

    8.83

    231.61

    432.77

    562.86

    315.08

    78.77

    7,463.36

    6,543.57

    13,265.16

    16,271.18 24,406.77 20,968.34 31,452.51

    30,457.69 12,183.08

    14,573.64

    3,903.25

    337.95

    1,267.45

    2,148.79

    2,265.93

    4,193.80

    8,379.00

    100.84 100.84 100.84 100.84 100.84 100.84

    718.00

    230.20 4302.20

    272.58

    526.10 551.60 526.10

  • 54.20

    27.50 27.50 27.50 27.50 27.50 27.50

    S/. 71,873.86 S/. 165,204.76 S/. 234,666.63 S/. 348,524.21 S/. 126,019.37 S/. 155,607.31S/. 6,109.28 S/. 14,042.40 S/. 19,946.66 S/. 29,624.56 S/. 10,711.65 S/. 13,226.62

    S/. 7,648.17 S/. 7,648.17 S/. 7,648.17 S/. 7,648.17 S/. 7,648.17 S/. 7,648.17

    S/. 85,631.31 S/. 186,895.33 S/. 262,261.47 S/. 385,796.94 S/. 144,379.19 S/. 176,482.10S/. 167,263.33 S/. 354,158.66 S/. 616,420.13 S/. 1,002,217.07 S/. 1,146,596.25 S/. 1,323,078.35

    6.1654% 13.4563% 18.8826% 27.7770% 10.3952% 12.7065%12.0428% 25.4991% 44.3816% 72.1586% 82.5538% 95.2603%

    S/. 1,645.020 S/. 679.940 S/. 654.440 S/. 128.340 S/. 358.540 S/. 4,484.735

    S/. 1,200.000 S/. 1,200.000 S/. 1,200.000 S/. 1,200.000 S/. 1,200.000 S/. 1,200.000

    S/. 88,476.33 S/. 188,775.27 S/. 264,115.91 S/. 387,125.28 S/. 145,937.73 S/. 182,166.83S/. 219,554.14 S/. 408,329.41 S/. 672,445.32 S/. 1,059,570.60 S/. 1,205,508.32 S/. 1,387,675.16

    5.8795% 12.5446% 17.5512% 25.7255% 9.6979% 12.1055%14.5899% 27.1346% 44.6858% 70.4112% 80.1092% 92.2147%

  • CRONOGRAMA DE EJECUCION VALORIZADO DE OBRA (8 MESES)

    TIEMPO DE EJECUCION OBRAS CIVILES - OCHO MESES CALENDARIOSSEPTIMO MES OCTAVO MES

    SEM. 27 SEM. 28 SEM. 29 SEM. 30 SEM. 31 SEM. 32

    1,249,619.64 25,912.35

    848,578.56 0.0059,048.92 0.00

    56,448.92 0.00

    2,600.00 0.00

    618,954.75 0.00

    874.85 0.00

    32,880.00 0.00

    25,099.45 0.00

    275,881.06 0.00

    34,944.35 0.00

    46,919.21 0.00

    41,460.33 0.00

    26,638.63 0.00

    21,558.71 0.00

    6,003.44 0.00

    31,826.29 0.00

    830.28 0.00

    13,970.84 0.00

    17,648.11 0.00

    26,953.06 0.00

    1,270.16 0.00

    3,917.28 0.00

    10,278.70 0.00

    170,574.89 0.00

    545.91 0.00

    12,911.86 0.00

    12,431.45 0.00

    45,706.37 0.00

    21,936.36 0.00

    12,341.13 0.00

    11,667.17 0.00

    9,882.07 0.00

    9,140.18 0.00

    1,631.96 0.00

    11,527.34 0.00

    226.44 0.00

    4,973.29 0.00

    8,838.30 0.00

    6,375.77 0.00

    439.29 439.29 0.00

    84,289.29 0.0077,252.80 0.00

    2,275.62 0.00

    1,987.50 0.00

    8,106.72 0.00

    13,062.37 0.00

    7,065.59 0.00

    8,128.35 0.00

    6,668.81 0.00

    2,955.38 0.00

    4,221.53 0.00

    5,298.64 0.00

    RECEPCION DE OBRA

  • 702.00 0.00

    3,021.30 0.00

    1,211.16 0.00

    297.67 0.00

    1,857.98 0.00

    1,794.16 0.00

    2,243.19 0.00

    1,293.85 0.00

    4,029.11 0.00

    1,031.87 0.00

    7,036.49 0.005,406.57 0.00

    13.56 0.00

    571.98 0.00

    4,061.17 0.00

    632.17 0.00

    86.97 0.00

    40.72 0.00

    1,629.92 0.00

    8.83 0.00

    231.61 0.00

    432.77 0.00

    562.86 0.00

    315.08 0.00

    78.77 78.77 0.00

    203,760.27 0.00181,488.55 0.00

    7,463.36 0.00

    6,543.57 0.00

    13,265.16 0.00

    93,098.80 0.00

    42,640.77 0.00

    14,573.64 0.00

    3,903.25 0.00

    16,739.20 0.00

    337.95 0.00

    1,267.45 0.00

    5,356.75 7,505.54 0.00

    2,265.93 2,265.93 0.00

    982.45 1,964.89 2,947.34 0.00

    1,822.41 1,822.41 0.00

    592.58 592.58 0.00

    5,532.52 0.00929.81 929.81 0.00

    4,602.71 4,602.71 0.00

    87,079.17 0.0049,733.13 0.00

    4,193.80 0.00

    8,379.00 0.00

    28,473.40 28,473.40 0.00

    1,490.16 1,490.16 2,980.32 0.00

    997.39 997.39 0.00

    3,986.06 3,986.06 0.00

    723.16 723.16 0.00

    37,346.04 0.00831.94 831.94 0.00

    5,320.37 5,320.37 0.00

    25,649.57 25,649.57 0.00

    2,863.87 2,863.87 0.00

    1,733.76 1,733.76 0.00

    946.53 946.53 0.00

    25,912.35 0.00100.84 100.84 806.72 0.00

    1,436.00 0.00

    4302.20 4302.20 8,834.60 0.00

    652.12 924.70 0.00

    7262.08 8,527.84 0.00

    538.18 2,452.77 0.00

    2,129.90 0.00

  • 471.43 471.43 0.00

    54.20 54.20 108.39 0.00

    27.50 27.50 220.00 0.00

    S/. 155,607.31 S/. 53,623.27 1,223,707.29 0.00S/. 13,226.62 S/. 4,557.98 104,015.12 0.00

    S/. 7,648.17 S/. 7,648.17

    S/. 176,482.10 S/. 65,829.42 1,388,907.77 0.00S/. 1,323,078.35 S/. 1,388,907.77

    12.7065% 4.7397%95.2603% 100.0000%

    S/. 35,733.33 35,733.33 0.00

    S/. 4,484.735 S/. 13,408.545 25,912.35 0.00

    S/. 1,200.000 S/. 1,200.000

    S/.985.00 985.00 0.001,200.00 0.00

    40,493.00 0.002,000.00 0.00

    S/. 182,166.83 S/. 116,171.30 S/. 985.00 1,504,831.45 0.00S/. 1,387,675.16 S/. 1,503,846.45 S/. 1,504,831.45

    12.1055% 7.7199% 0.0655%92.2147% 99.9345% 100.00%

  • Item0 010 01.010 01.020 01.030 01.040 01.050 01.060 01.070 01.080 01.090 01.09.010 01.09.020 01.09.030 020 02.010 02.01.010 02.01.020 02.020 02.02.010 02.02.020 02.02.030 02.02.040 02.02.050 02.02.060 02.02.070 02.02.080 02.030 02.03.010 02.03.01.010 02.03.020 02.03.02.010 02.03.02.020 02.03.030 02.03.03.010 02.040 02.04.010 02.04.01.010 02.04.01.020 02.04.020 02.04.02.010 02.04.02.020 02.04.030 02.04.03.010 02.04.03.020 02.04.03.030 02.04.040 02.04.04.010 02.04.04.020 02.04.04.030 02.04.050 02.04.05.010 02.04.05.020 02.04.05.030 02.04.05.040 02.04.060 02.04.06.01

  • 0 02.04.06.020 02.04.06.030 02.04.06.040 02.04.06.050 02.04.070 02.04.07.010 02.04.07.020 02.04.07.030 02.04.07.040 02.04.080 02.04.08.010 02.04.08.020 02.04.08.030 02.04.090 02.04.09.010 02.04.09.020 02.04.09.030 02.04.100 02.04.10.010 02.04.10.020 02.04.10.030 02.050 02.05.010 02.05.01.010 02.05.01.020 02.05.01.030 02.05.01.040 02.05.01.050 02.05.020 02.05.02.010 02.05.02.020 02.060 02.06.010 02.06.020 02.06.030 02.070 02.07.010 02.07.020 02.07.030 02.07.040 02.07.050 02.07.060 02.07.070 02.080 02.08.010 02.08.020 02.08.030 02.090 02.09.010 02.09.01.010 02.09.020 02.09.02.010 02.09.02.020 02.09.02.030 02.100 02.10.010 02.10.01.01

  • 0 02.10.020 02.10.02.010 02.10.030 02.10.03.010 02.10.03.020 02.10.03.030 02.10.03.040 02.110 02.11.010 02.11.01.010 02.11.01.020 02.11.020 02.11.02.010 02.11.030 02.11.03.010 02.11.03.020 02.120 02.12.010 02.12.020 02.130 02.13.010 02.13.01.010 02.13.01.020 02.13.01.030 02.13.020 02.13.02.010 02.13.02.020 02.13.02.030 02.13.02.040 02.13.030 02.13.03.010 02.13.03.020 02.13.040 02.13.04.010 02.13.04.020 02.13.04.030 02.13.04.040 02.140 02.14.010 02.14.01.010 02.14.01.020 02.14.01.030 02.14.020 02.14.02.010 02.14.02.020 02.14.030 02.14.03.010 02.14.03.020 02.14.03.030 02.14.03.040 02.150 02.15.010 02.15.01.010 02.15.01.020 02.15.01.030 02.15.020 02.15.02.01

  • 0 02.15.02.020 02.15.02.030 02.15.030 02.15.03.010 02.15.040 02.15.04.010 02.15.04.020 02.15.050 02.15.05.010 02.15.05.020 02.15.060 02.15.06.010 02.15.06.020 02.15.06.030 02.15.06.040 02.160 02.16.010 02.16.020 02.170 02.17.010 02.17.01.010 02.17.01.01.00 02.17.01.020 02.17.01.02.00 02.17.01.02.00 02.17.01.02.00 02.17.01.030 02.17.01.03.00 02.17.01.03.00 02.17.01.03.00 02.17.01.03.00 02.17.01.040 02.17.01.04.00 02.17.01.04.00 02.17.01.050 02.17.01.05.00 02.17.01.05.00 02.17.01.060 02.17.01.06.00 02.17.01.06.00 02.17.020 02.17.02.010 02.17.02.01.00 02.17.02.020 02.17.02.02.00 02.17.02.02.00 02.17.02.030 02.17.02.03.00 02.17.02.03.00 02.17.02.03.00 02.17.02.03.00 02.17.02.040 02.17.02.04.00 02.17.02.04.00 02.17.02.050 02.17.02.05.00 02.18

  • 0 02.18.010 02.18.020 02.18.030 02.18.040 02.18.050 02.18.060 02.18.070 030 03.010 03.01.010 03.01.020 03.020 03.02.010 03.02.020 03.02.030 03.02.040 03.02.050 03.02.060 03.02.070 03.02.080 03.030 03.03.010 03.03.01.010 03.03.020 03.03.02.010 03.03.02.020 03.03.030 03.03.03.010 03.03.03.020 03.03.040 03.03.04.010 03.040 03.04.010 03.04.01.010 03.04.01.020 03.04.020 03.04.02.010 03.04.02.020 03.04.02.030 03.04.030 03.04.03.010 03.04.03.020 03.04.03.030 03.04.03.040 03.04.040 03.04.04.010 03.04.04.020 03.04.04.030 03.04.04.040 03.050 03.05.010 03.05.01.010 03.05.01.020 03.05.01.030 03.05.01.040 03.05.020 03.05.02.01

  • 0 03.05.02.020 03.060 03.06.010 03.06.020 03.070 03.07.010 03.07.020 03.07.030 03.07.040 03.07.050 03.07.060 03.07.070 03.080 03.08.010 03.08.020 03.090 03.09.010 03.09.01.010 03.09.020 03.09.02.010 03.09.02.020 03.09.02.030 03.100 03.10.010 03.10.01.010 03.10.020 03.10.02.010 03.110 03.11.010 03.11.01.010 03.11.01.020 03.11.020 03.11.02.010 03.11.02.020 03.11.030 03.11.040 03.11.050 03.120 03.12.010 03.12.020 03.130 03.13.010 03.13.01.010 03.13.01.020 03.13.01.030 03.13.020 03.13.02.010 03.13.02.020 03.13.02.030 03.13.030 03.13.03.010 03.13.040 03.13.04.010 03.140 03.14.010 03.14.01.010 03.14.01.02

  • 0 03.14.01.030 03.14.020 03.14.02.010 03.14.02.020 03.14.030 03.14.03.010 03.14.03.020 03.14.03.030 03.14.03.040 03.150 03.15.010 03.15.01.010 03.15.01.020 03.15.01.030 03.15.020 03.15.02.010 03.15.02.020 03.15.030 03.15.03.010 03.15.03.020 03.15.040 03.15.04.010 03.15.04.020 03.15.04.030 03.160 03.16.010 03.16.020 03.16.030 010 01.010 01.01.010 01.01.020 01.01.030 01.020 01.02.010 01.02.020 01.02.030 01.02.040 01.02.050 01.030 01.03.010 01.03.01.010 01.03.01.020 01.03.020 01.03.02.010 01.03.02.020 01.03.030 01.03.03.010 01.03.040 01.03.04.010 01.03.04.020 01.03.04.030 01.040 01.04.010 01.04.01.010 01.04.01.020 01.04.01.03

  • 0 01.04.020 01.04.02.010 01.04.02.020 01.04.02.030 01.04.030 01.04.03.010 01.04.03.020 01.04.03.030 01.04.040 01.04.04.010 01.04.04.020 01.04.04.030 01.050 01.05.010 01.05.01.010 01.05.01.020 01.05.01.030 01.05.01.040 01.05.01.050 01.05.020 01.05.02.010 01.05.02.020 01.060 01.06.010 01.070 01.07.010 01.07.020 01.07.030 01.07.040 01.07.050 01.07.060 01.07.070 01.07.080 01.07.090 01.080 01.08.010 01.08.020 01.090 01.09.010 01.09.01.010 01.09.020 01.09.02.010 01.09.02.020 01.09.02.030 01.100 01.10.010 01.10.020 01.10.030 01.110 01.11.010 01.11.020 01.120 01.12.010 01.12.01.010 01.12.01.020 01.12.01.030 01.13

  • 0 01.13.010 01.13.01.010 01.13.01.020 01.13.020 01.13.02.010 01.13.02.020 01.13.02.030 01.140 01.14.010 01.150 01.15.010 01.15.01.010 01.15.01.020 01.15.020 01.15.02.010 01.15.02.020 01.15.02.030 01.15.030 01.15.03.010 01.15.040 01.15.04.010 01.15.04.020 01.160 01.16.010 01.16.020 01.16.030 01.16.040 01.170 01.17.010 01.17.01.010 01.17.01.020 01.17.01.030 01.17.020 01.17.02.010 01.17.02.020 01.17.02.030 01.17.030 01.17.03.010 01.17.03.020 01.17.03.030 01.17.03.040 01.17.03.050 01.17.03.060 01.17.03.070 01.17.03.080 01.17.040 01.17.04.010 01.17.04.020 01.17.04.030 01.17.04.040 01.17.04.050 01.17.050 01.17.05.010 01.180 01.18.010 01.18.01.010 01.18.02

  • 0 01.18.02.010 01.18.02.020 01.18.030 01.18.03.010 01.18.03.020 01.18.03.030 01.18.03.040 01.18.040 01.18.04.010 01.18.04.020 01.18.050 01.18.05.010 01.18.05.020 01.190 01.19.010 01.19.01.010 01.19.01.020 01.19.01.030 01.19.020 01.19.02.010 01.19.02.020 01.19.030 01.19.03.010 01.19.03.020 01.19.03.030 01.19.03.040 01.200 01.20.010 01.20.01.010 01.20.01.020 01.20.020 01.20.02.010 01.20.030 01.20.03.010 01.20.03.020 020 02.010 02.01.010 02.01.01.010 02.01.01.020 02.01.020 02.01.02.010 02.01.02.020 02.01.02.030 02.01.030 02.01.03.010 02.01.03.020 02.01.03.030 02.01.03.040 02.01.03.050 02.01.03.060 02.01.03.070 02.01.03.080 02.01.040 02.01.04.010 02.01.050 02.01.05.01

  • 0 02.01.05.020 02.01.05.030 02.01.060 02.01.06.010 02.020 02.02.010 02.02.01.010 02.02.01.020 02.02.020 02.02.02.010 02.02.02.020 02.02.030 02.02.03.010 02.02.03.020 02.02.03.030 02.02.040 02.02.04.010 02.02.050 02.02.05.010 02.02.05.020 02.02.05.030 02.02.05.040 02.02.060 02.02.06.010 010 01.010 01.01.010 01.01.020 01.01.030 01.020 01.02.010 01.02.020 01.02.030 01.030 01.03.010 01.040 01.04.010 01.04.01.010 01.04.01.020 01.04.01.030 01.04.020 01.04.02.010 01.04.02.020 01.04.02.030 01.04.030 01.04.03.010 01.04.03.020 01.04.03.030 01.04.040 01.04.04.010 01.04.04.020 01.04.04.030 01.050 01.05.010 01.060 01.06.010 01.06.02

  • 0 01.06.030 01.070 01.07.010 020 02.010 02.01.010 02.01.020 02.01.030 02.020 02.02.010 02.02.020 02.030 02.03.010 02.03.01.010 02.03.01.020 02.03.020 02.03.02.010 02.03.02.020 02.03.02.030 02.03.030 02.03.03.010 02.03.03.020 02.03.03.030 02.03.040 02.03.04.010 02.03.04.020 02.03.04.030 02.03.050 02.03.05.010 02.03.05.020 02.03.05.030 02.040 02.04.010 02.050 02.05.010 02.05.020 02.05.030 02.05.040 02.05.050 02.060 02.06.010 02.06.020 02.06.030 02.06.040 02.06.050 02.070 02.07.010 030 03.010 03.01.010 03.01.020 03.020 03.02.010 03.02.020 03.02.030 03.02.040 01

  • 0 01.010 01.01.010 01.01.020 01.01.030 01.020 01.02.010 01.02.020 01.02.030 01.030 01.03.010 01.03.020 01.03.030 01.040 01.04.010 01.04.020 01.050 01.05.010 01.05.01.010 01.05.01.020 01.05.01.030 01.060 01.06.010 01.06.020 01.06.030 01.070 01.07.010 01.07.020 01.07.030 020 02.010 02.01.010 02.01.020 02.020 02.02.010 02.02.020 02.02.030 02.030 02.03.010 02.03.020 02.03.030 02.040 02.04.010 02.04.020 02.04.030 02.050 02.05.010 02.060 02.06.010 02.06.020 02.06.03

  • Descripcin Und.OBRAS PRELIMINARES Y COMPLEMENTARIAS CARTEL DE OBRA CON PLANCHA METALICA Y BASTIDORES DE MADERA DE 2.40 x 3.60 M. SEGUN DISEO Pza DESMONTAJE DE COBERTURA DE CALAMINA M2 DEMOLICION DE ESTRUCTURA EXISTENTE M2 DEMOLICION DE VEREDAS M2 LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 REMOSION Y ELIMINACION DE ESTRUCTURAS DEMOLIDAS CON MAQUINARIA DIST.= 2 KM. M3 TRANSPORTE DE MATERIALES A OBRA Kg CONTROL DE CALIDAD ENSAYO DE RESISTENCIA A LA COMPRESION DEL CONCRETO UND DISEO DE MEZCLAS F'C=175 KG/CM2 UND DISEO DE MEZCLAS F'C=210 KG/CM2 UNDCOSTRUCCION DE MODULO 01 - (05 AULAS+LABORATORIO+CENTRO DE COMPUTO + AMBIENTES ADMINISTRATIVOS Y ESCALERAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 MOVIMIENTO DE TIERRAS CORTE Y NIVELACION DE TERRENO CON MAQUINARIA M3 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 M. EN TERRENO NORMAL M3 EXCAVACION DE ZANJAS PARA ZAPATAS DE 1.40 M. A 2.15 M. DE PROFUNDIDAD M3 RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON MATERIAL PROPIO) M3 RELLENO Y COMPACTADO CON EQUIPO PESADO CON MATERIAL DE PRESTAMO DE CANTERA CAPAS E= C/0.20 M. M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E= 4" C/EQUIPO LIVIANO CON MATERIAL PROPIO M2 AFIRMADO DE 4" PARA VEREDAS CON EQUIPO LIVIANO M2 OBRAS DE CONCRETO SIMPLE FALSA ZAPATA FALSA ZAPATA CONCRETO 1:12 CEMENTO HORMIGON + 30% DE PIEDRA GRANDE M3 CIMIENTO FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRANDE M3 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE M3 FALSO PISO CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:8 PARA PISO PULIDO M2 OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS f'c=210 kg/cm2 M3 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 Kg CIMIENTOS REFORZADOS CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 M3 ACERO EN CIMIENTO REFORZADO F'Y=4,200 KG/CM2 GRADO 60 Kg SOBRECIMIENTO REFORZADO CONCRETO F'C=210 KG/CM2 EN SOBRECIMIENTO M3 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS M2 ACERO EN SOBRECIMIENTO F'Y=4,200 KG/CM2 GRADO60 Kg VIGAS DE CIMENTACION CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 M3 ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION M2 ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60 Kg COLUMNAS CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS RELLENO DE CONCRETO F'C=175 KG/CM2 ENTRE CORREAS SOBRE VIGA M3

  • CONCRETO EN VIGUETAS F'C=175 KG/CM2 M3 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 Kg LOSA ALIGERADA H=0.20 M. CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 ACERO EN LOSAS ALIGERADAS F'Y=4,200 KG/CM2 GRADO 60 Kg LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALIGERADO h=20 cm UND ESCALERAS CONCRETO EN ESCALERAS F'c= 210 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 Kg GARGOLAS CONCRETO EN GARGOLAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAS M2 ACERO EN GARGOLAS F'Y=4,200 KG/CM2 GRADO 60 Kg MESA DE TRABAJO EN LABORATORIO (04) CONCRETO EN MESA DE TRABAJO F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO EN MESA DE TRABAJO M2 ACERO EN MESA DE TRABAJO F'Y=4,200 KG/CM2 Kg ESTRUCTURAS DE MADERA Y COBERTURA ESTRUCTURAS DE MADERA TIJERALES DE MADERA TORNILLO DE 2"x6" SEGUN DISEO P2 CORREAS DE MADERA TORNILLO DE 2"x3" P2 CORREAS DE MADERA TORNILLO DE 3"x3" EN ESCALERAS P2 FRISOS DE MADERA TORNILLO CEPILLADO BARNIZADO DE e=1"X8" P2 FRISOS DE MADERA TORNILLO CEPILLADO BARNIZADO DE e=1"X3" P2 COBERTURA COBERTURA CON FIBRAFORTE TIPO FLEXIFORTE DE 1.83 x 1.10 e=2.70 MM. M2 CUMBRERA CON FIBRAFORTE TIPO FLEXIFORTE ONDA 100 e=1.60 MM. L=0.60M. A=0.40 Ml MUROS Y TABIQUES DE ALBAILERIA MURO DE CABEZA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 MURO DE CANTO LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA 1:5 (FACHADA HASTA 2do PISO) M2 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 TARRAJEO PULIDO BOLEADO GRIS EN PARAPETO M2 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO 0.15 M. Ml BRUAS E= 1 CM. Ml CIELORASOS CIELORASOS CON MEZCLA DE CEMENTO-ARENA 1:4 M2 CIELORASO SUSPENDIDO CON TRIPLEY DE 4' x 8' x 4 mm. M2 RODON DE MADERA TORNILLO CEPILLADO LAQUEADO DE 1/4 DE CIRCULO DIAMETRO 3/4" Ml PISOS Y VEREDAS PISOS PISO DE CEMENTO PULIDO E=2" BRUADO M2 VEREDAS VEREDA DE CONCRETO DE 4" CON BRUAS DE CANTO Y TRANSVERSALES (INCLUYE ENCOFRADO) M2 CONCRETO PARA SARDINEL EN VEREDAS CEMENTO HORMIGON 1:8 M3 JUNTA DE CONSTRUCCION EN VEREDA e=1" Ml ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS ZOCALOS ZOCALO DE CEMENTO FROTACHADO FINO EN EXTERIOR - CEMENTO ARENA 1:4 H=0.20 m. e=1.5 CM. Ml

  • CONTRAZOCALOS CONTRAZOCALO DE CEMENTO DE 4" FROTACHADO Ml REVESTIMIENTOS DE ESCALERA FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO PULIDO Ml FORJADO Y REVESTIMIENTO DE DESCANZO DE ESCALERAS DE CEMENTO PULIDO M2 BARANDAS AISLADOS DE TUBERIA FIERRO GALVANIZADO DE 2" SEGUN DISEO Ml CANTONERAS METALICAS CON PLANCHAS ESTRIADAS SEGUN DISEO Pza CARPINTERIA DE MADERA PUERTAS PUERTA DE MADERA CEDRO TABLERO REBAJADO SEGUN DISEO M2 COLOCACION DE PUERTAS UND PIZARRA PIZARRA TIPO ACRILICO DE 1.20 X 4.50 M. INCLUYE MARCO Y PORTAPLUMON DE ALUMINIO S/DISEO Pza VENTANAS VENTANAS DE MADERA TORNILLO SEGUN DISEO M2 COLOCACION DE VENTANAS UND CERRAJERIA CERRADURA DE 02 GOLPES TIPO FORTE Pza MANIJA DE BRONCE DE 4" PARA PUERTAS UND PINTURA PINTURA EN INTERIORES PINTURA LATEX EN MUROS INTERIORES COLOR VERDE NILO M2 PINTURA LATEX EN INTERIORES COLUMNA Y VIGA COLOR VERDE NILO M2 PINTURA LATEX EN MUROS INTERIORES COLOR MARFIL M2 PINTURA EN EXTERIORES PINTURA LATEX EN MUROS EXTERIORES COLOR CERAMICO M2 PINTURA LATEX EN EXTERIORES VIGAS Y COLUMNAS COLOR BLANCO HUMO M2 PINTURA LATEX EN EXTERIORES EN GARGOLA COLOR BLANCO HUMO M2 PINTURA EN ZOCALO CON ESMALTE H=0.20 COLOR GRIS NIEBLA Ml PINTURA EN CIELORRASOS PINTURA EN CIELORRASO SOBE CEMENTO ARENA COLOR BLANCO M2 PINTURA EN CIELORASO SOBRE TRIPLEY COLOR BLANCO M2 PINTURA EN ESTRUCTURA METALICA PINTURA CON ANTICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO EN BARANDAS AISLADOS COLOR Ml PINTURA CON ESMALTE ANTICORROSIVO ZINCROMATO EN CANTONERAS METALICAS COLOR NEGRO Ml PINTURA CON ESMALTE Y ANTICORROSIVO EN TAPAJUNTAS METALICAS COLOR BAYO Ml PINTURA ESPECIAL EN CANALETA GALVANIZADA CON ESMALTE COLOR ROJO TEJA ML SISTEMA DE AGUA DE LLUVIA CANALETA DE PLANCHA GALVANIZADA CANALETA DE PLANCHA GALVANIZADA 1/32" SEGUN DISEO Ml TUBERIA DE BAJADA PVC SAP DIAMETRO 4" Ml CODOS PVC SAP DE 4"x90 Pza COLUMNETA PARA SOPORTE DE TUBERIA CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOCOFRADO NORMAL EN COLUMNETAS M2 CANAL PLUVIAL DE CONCRETO EXCAVACION DE ZANJAS PARA CANAL PLUVIAL M3 CONCRETO EN CANAL PLUVIAL CEMENTO HORMIGON 1:8 M3 ENCOFRADO Y DESENCOFRADO PARA CANAL PLUVIAL M2 JUNTA DE DILATACION EN CANAL PLUVIAL e=1" Ml INSTALACIONES ELECTRICAS SALIDA DE LUZ Y FUERZA SALIDA DE TECHO - CENTROS DE LUZ Pto SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA Pto SALIDA PARA CAJA DE PASE Pto TABLEROS Y CAJAS TABLERO DE DISTRIBUCION TERMOMAGNETICO (3)2x20A + (4)2x15A MONOFASICO + CAJA TIPO GABINETE Pza

  • TABLERO DE DISTRIBUCION TERMOMAGNETICO (3)2x30A + (1)2x60A MONOFASICO + CAJA TIPO GABINETE Pza SALIDA PARA CAJA DE PASE GALVANIZADA DE 100x50 mm CON TAPA Pza POZO DE TOMA A TIERRA POZO DE TIERRA INCLUIDO INSTALACION GLB ARTEFACTOS FLUORESCENTE RECTO 2 x 40 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEO Pza FLUORESCENTE RECTO 2 x 20 W CON EQUIPO COMPLETO PARA EMPOTRAR SEGUN DISEO Pza INSTALACION DE REDES PARA SISTEMA DE INFORMATICA TABLERO GENERAL TIPO GABINETE PARA INSTALACION DE REDES PARA EL SISTEMA DE COMPUTO UND PUNTOS DE SALIDA DOBLE P/INSTALACION DE CABLEADO ESTRUCTURADO CAT. 5E PARA INSTALACION DE REDES Pto CONEXIONES INTERNAS CONEXION SUBTERRANEA DEL TG AL TD1,TD2 CON CABLE DE 2x16 MM2 + 1x6 MM2 THW Ml CONEXION INTERNA SUBTERRANEA DEL MEDIDOR AL TABLERO GENERAL CON CABLE NYY DE 2X50 MM2 Ml EXCAVACION DE ZANJAS PARA CONEXION INTERNA DE 0.40x0.60 M3 RELLENO Y COMPACTADO CON MATERIAL PROPIO (TIERRA CERNIDA) PARA CONEXIONES EXTERNAS - MANUAL M3 APARATOS SANITARIOS LAVADERO DE ACERO INOXIDABLE 1 POZA+ESCURRIDOR S/DISEO Pza COLOCACION DE APARATOS SANITARIOS Pza INSTALACIONES SANITARIAS SISTEMA DE DESAGUE SALIDA DE DESAGUE SALIDA DE DESAGUE CON PVC DE 2" Pto RED COLECTORA RED DE DISTRIBUCION TUBERIA UF DE 110 MM Ml EXCAVACION DE ZANJAS DE 0.40x1.00 PARA TUBERIA DE DESAGUE DE 2", 3", 4" Y 6" Ml RELLENO Y COMPACTADO DE ZANJAS DE 0.40x1.00 PARA TUBERIA DE DESAGUE DE 2", 3", 4" Y 6" CON MATERIAL Ml REDES DE DISTRIBUCION RED DE DISTRIBUCION TUBERIA PVC SAL DE 2" Ml RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" Ml EXCAVACION DE ZANJAS DE 0.40x0.50 PARA TUBERIA DE DESAGUE DE 2", 3", 4" Y 6" Ml RELLENO Y COMPACTADO DE ZANJAS DE 0.40x0.50 PARA TUBERIA DE DESAGUE DE 2", 3", 4" Y 6" CON MATERIAL Ml ACCESORIOS DE REDES CODO PVC SAL PARA DESAGUE 2"X90 Pza TEE PVC SAL PARA DESAGUE 2"x2" Pza ADITAMENTOS VARIOS REGISTRO ROSCADO DE BRONCE DE 2" Pza REGISTRO ROSCADO DE BRONCE DE 4" Pza CAMARAS DE INSPECCION CAJA DE REGISTRO DE 12"x24 Pza CAJA CIEGA DE REGISTRO DE DESAGUE DE 12"x24 (H=0.30) Pza SISTEMA DE AGUA FRIA SALIDA DE AGUA FRIA SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" Pto REDES DE DISTRIBUCION RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP Ml RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP Ml ACCESORIOS DE REDES TEE PVC - SAP 3/4" PARA AGUA UND REDUCCION PVC - SAP 3/4" A 1/2" PARA AGUA UND CODO PVC - SAP 1/2" PARA AGUA UND TEE PVC - SAP 1/2" PARA AGUA UND LLAVES Y VALVULAS LLAVES TIPO ESFERICOS METALICOS DE 1/2" Pza VALVULAS DE COMPUERTA DE BRONCE DE 3/4" Pza PIEZAS VARIAS CAJA CON TAPA METALICA PARA VALVULAS DE 12" x 12" Pza OTROS

  • JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" M2 JUNTA SELLADA CON POLIURETANO Ml TAPAJUNTAS METALICAS DE 1/8" X 6" SEGUN DISEO Ml JUNTA METALICA EN PISO DE 1/8" X 6" SEGUN DISEO EN SEGUNDO NIVEL Ml INSTALACION DE LA RED PUBLICA DE AGUA INCLUIDO MEDIDOR UND INSTALACION DE LA RED PUBLICA DE ELECTRIFICACION INCLUIDO MEDIDOR UND LIMPIEZA FINAL DE OBRA GLBMODULO 02 - 03 AULAS EN PRIMER NIVEL TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 MOVIMIENTO DE TIERRAS CORTE Y NIVELACION DE TERRENO CON MAQUINARIA M3 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 M. EN TERRENO NORMAL M3 EXCAVACION DE ZANJAS PARA ZAPATAS DE 1.40 M. A 2.15 M. DE PROFUNDIDAD M3 RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON MATERIAL PROPIO) M3 RELLENO Y COMPACTADO CON EQUIPO PESADO CON MATERIAL DE PRESTAMO DE CANTERA CAPAS E= C/0.20 M. M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E= 4" C/EQUIPO LIVIANO CON MATERIAL PROPIO M2 AFIRMADO DE 4" PARA VEREDAS CON EQUIPO LIVIANO M2 OBRAS DE CONCRETO SIMPLE FALSA ZAPATA FALSA ZAPATA CONCRETO 1:12 CEMENTO HORMIGON + 30% DE PIEDRA GRANDE M3 CIMIENTO FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRANDE M3 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE M3 SOBRECIMIENTO CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO HORMIGON + 25% PIEDRA MEDIANA M3 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40 M. M2 FALSO PISO CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:8 PARA PISO PULIDO M2 OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS F'C=175 KG/CM2 M3 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS DE CIMENTACION CONCRETO EN VIGAS DE CIMENTACION F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION M2 ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60 Kg COLUMNAS PRINCIPALES CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS RELLENO DE CONCRETO F'C=175 KG/CM2 ENTRE CORREAS SOBRE VIGA M3 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 Kg ESTRUCTURAS DE MADERA Y COBERTURA ESTRUCTURAS DE MADERA TIJERALES DE MADERA TORNILLO DE 2"x6" SEGUN DISEO P2 CORREAS DE MADERA TORNILLO DE 2"x3" P2 FRISOS DE MADERA TORNILLO CEPILLADO BARNIZADO DE e=1"X8" P2 FRISOS DE MADERA TORNILLO CEPILLADO BARNIZADO DE e=1"X3" P2 COBERTURA COBERTURA CON FIBRAFORTE TIPO FLEXIFORTE DE 1.83 x 1.10 e=2.70 MM. M2

  • CUMBRERA CON FIBRAFORTE TIPO FLEXIFORTE ONDA 100 e=1.60 MM. L=0.60M. A=0.40 Ml MUROS Y TABIQUES DE ALBAILERIA MURO DE CABEZA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA 1:5 (FACHADA HASTA 2do PISO) M2 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 TARRAJEO DE PIZARRA ACABADO CON CEMENTO-ARENA 1:4 M2 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO 0.15 M. Ml BRUAS E= 1 CM. Ml CIELORASOS CIELORASO SUSPENDIDO CON TRIPLEY DE 4' x 8' x 4 mm. M2 RODON DE MADERA TORNILLO CEPILLADO LAQUEADO DE 1/4 DE CIRCULO DIAMETRO 3/4" Ml PISOS Y VEREDAS PISOS PISO DE CEMENTO PULIDO E=2" BRUADO M2 VEREDAS VEREDA DE CONCRETO DE 4" CON BRUAS DE CANTO Y TRANSVERSALES (INCLUYE ENCOFRADO) M2 CONCRETO PARA SARDINEL EN VEREDAS CEMENTO HORMIGON 1:8 M3 JUNTA DE CONSTRUCCION EN VEREDA e=1" Ml ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS ZOCALOS ZOCALO DE CEMENTO FROTACHADO FINO EN EXTERIOR - CEMENTO ARENA 1:4 H=0.30 m. e=1.5 CM. Ml CONTRAZOCALOS CONTRAZOCALO DE CEMENTO DE 4" FROTACHADO Ml CARPINTERIA DE MADERA PUERTAS PUERTA DE MADERA CEDRO TABLERO REBAJADO SEGUN DISEO M2 COLOCACION DE PUERTAS UND PIZARRA TICERO DE MADERA CEDRO CEPILLADO LAQUEADO L=4.50 M. SEGN DISEO Ml MARCO DE MADERA CEDRO CEPILLADO LAQUEADO PARA PIZARRA DE 3" X 1/2" Ml VENTANAS VENTANAS DE MADERA TORNILLO SEGUN DISEO M2 COLOCACION DE VENTANAS UND CERRAJERIA CERRADURA DE 02 GOLPES TIPO FORTE Pza MANIJA DE BRONCE DE 4" PARA PUERTAS UND PINTURA PINTURA EN INTERIORES PINTURA LATEX EN MUROS INTERIORES COLOR VERDE NILO M2 PINTURA LATEX EN INTERIORES COLUMNA Y VIGA COLOR VERDE NILO M2 PINTURA EN PIZARRA - ESMALTE COLOR VERDE PIZARRA M2 PINTURA EN EXTERIORES PINTURA LATEX EN MUROS EXTERIORES COLOR CERAMICO M2 PINTURA LATEX EN EXTERIORES VIGAS Y COLUMNAS COLOR BLANCO HUMO M2 PINTURA EN ZOCALO CON ESMALTE H=0.30 COLOR GRIS NIEBLA M2 PINTURA EN CIELORASOS PINTURA EN CIELORASO SOBRE TRIPLEY COLOR BLANCO M2 PINTURA EN ESTRUCTURA METALICA PINTURA ESPECIAL EN CANALETA GALVANIZADA CON ESMALTE COLOR ROJO TEJA ML SISTEMA DE AGUA DE LLUVIA CANALETA DE PLANCHA GALVANIZADA CANALETA DE PLANCHA GALVANIZADA 1/32" SEGUN DISEO Ml TUBERIA DE BAJADA PVC SAP DIAMETRO 4" Ml

  • CODOS PVC SAP DE 4"x90 Pza COLUMNETA PARA SOPORTE DE TUBERIA CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOCOFRADO NORMAL EN COLUMNETAS M2 CANAL PLUVIAL DE CONCRETO EXCAVACION DE ZANJAS PARA CANAL PLUVIAL M3 CONCRETO EN CANAL PLUVIAL CEMENTO HORMIGON 1:8 M3 ENCOFRADO Y DESENCOFRADO PARA CANAL PLUVIAL M2 JUNTA DE DILATACION EN CANAL PLUVIAL e=1" Ml INSTALACIONES ELECTRICAS SALIDA DE LUZ Y FUERZA SALIDA DE TECHO - CENTROS DE LUZ Pto SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA Pto SALIDA PARA CAJA DE PASE Pto TABLEROS Y CAJAS TABLERO DE DISTRIBUCION TERMOMAGNETICO (3)2x20A + (4)2x15A MONOFASICO + CAJA TIPO GABINETE Pza SALIDA PARA CAJA DE PASE GALVANIZADA DE 100x50 mm CON TAPA Pza ARTEFACTOS FLUORESCENTE RECTO 2 x 40 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEO Pza FLUORESCENTE RECTO 2 x 20 W CON EQUIPO COMPLETO PARA EMPOTRAR SEGUN DISEO Pza CONEXIONES INTERNAS CONEXION SUBTERRANEA DEL TG AL TD1,TD2 CON CABLE DE 2x16 MM2 + 1x6 MM2 THW Ml EXCAVACION DE ZANJAS PARA CONEXION INTERNA DE 0.40x0.60 M3 RELLENO Y COMPACTADO CON MATERIAL PROPIO (TIERRA CERNIDA) PARA CONEXIONES EXTERNAS - MANUAL M3 OTROS JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" M2 LIMPIEZA FINAL DE OBRA GLB PLACA RECORDATORIA DE OBRA ACRILICO DE 0.55x0.45 SEGUN DISEO PzaSERVICIOS HIGIENICOS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 TRANSPORTE DE MATERIALES A OBRA Kg MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.50 M. EN TERRENO NORMAL M3 RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON MATERIAL PROPIO) M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E= 5" C/EQUIPO LIVIANO CON MATERIAL PROPIO M2 AFIRMADO DE 4" PARA VEREDAS CON EQUIPO LIVIANO M2 OBRAS DE CONCRETO SIMPLE CIMIENTOS CORRIDOS FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRANDE M3 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE M3 SOBRECIMIENTO CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO HORMIGON + 25% PIEDRA MEDIANA M3 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40 M. M2 FALSO PISO CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:8 ACABADO PARA PISO CERAMICO M2 MUROS DE CONCRETO EN LAVADERO Y URINARIO ENCOFRADO Y DESENCOFRADO NORMAL EN LAVADERO Y URINARIO M2 MUROS DE CONCRETO PARA LAVADERO F'C=140 KG/CM2 M3 MUROS DE CONCRETO PARA URINARIO F'C=175 KG/CM2 M3 OBRAS DE CONCRETO ARMADO VIGAS DE CIMENTACION CONCRETO EN VIGAS DE CIMENTACION F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION M2 ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60 Kg

  • COLUMNAS PRINCIPALES CONCRETO EN COLUMNAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS CONCRETO EN VIGAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 Kg LAVADERO CORRIDO DE CONCRETO CONCRETO EN LAVADERO CORRIDO F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO EN LAVADERO CORRIDO M2 ACERO EN LAVADERO DE CONCRETO F'C=4,200 KG/CM2 GRADO 60 Kg ESTRUCTURAS DE MADERA Y COBERTURA ESTRUCTURAS DE MADERA CORREAS DE MADERA TORNILLO DE 3"x3" EN TIMPANO P2 CORREAS DE MADERA TORNILLO DE 3"x4" EN COBERTURA P2 CHAPAS DE EMPALME EN CORREAS P2 FRISOS DE MADERA TORNILLO CEPILLADO BARNIZADO DE e=1"X8" P2 FRISOS DE MADERA TORNILLO CEPILLADO BARNIZADO DE e=1"X3" P2 COBERTURA COBERTURA CON FIBRAFORTE TIPO FLEXIFORTE DE 1.83 x 1.10 e=2.70 MM. M2 CUMBRERA CON FIBRAFORTE TIPO FLEXIFORTE ONDA 100 e=1.60 MM. L=0.60M. A=0.40 Ml MUROS Y TABIQUES DE ALBAILERIA MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO PRIMARIO RAYADO CON C:A 1:5 M2 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 EN MUROS DE LAVADERO CORRIDO M2 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA 1:5 M2 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO0.15 M. Ml BRUAS INTERIORES E= 1 CM. Ml BRUAS EXTERIORES E= 1 CM. Ml CIELORRASOS CIELORASO SUSPENDIDO CON TRIPLEY DE 4' x 8' x 4 mm. M2 RODON DE MADERA TORNILLO CEPILLADO LAQUEADO DE 1/4 DE CIRCULO DIAMETRO 3/4" Ml PISOS Y PAVIMENTOS PISO DE CONCRETO PISO CERAMICA NACIONAL DE 0.30x0.30 CM COLOR CELESTE M2 VEREDAS VEREDA DE CONCRETO DE 4" CON BRUAS DE CANTO Y TRANSVERSALES (INCLUYE ENCOFRADO) M2 CONCRETO PARA SARDINEL EN VEREDAS CEMENTO HORMIGON 1:8 M3 JUNTA DE CONSTRUCCION EN VEREDA e=1" Ml ZOCALOS ZOCALO DE CEMENTO FROTACHADO FINO EN EXTERIOR - CEMENTO ARENA 1:4 H=0.20 m. e=1.5 CM. Ml ZOCALO DE CERAMICA TIPO AZULEJO DE 20x20 Cm. COLOR CELESTE CIELO M2 ZOCALO DE CERAMICA TIPO AZULEJO DE 20x20 Cm. COLOR BLANCO M2 REVESTIMIENTO EN LAVADERO Y URINARIO REVESTIMIENTO EN LAVADERO CORRIDO CON CERAMICA TIPO AZULEJO DE 20x20 CM. COLOR CELESTE CIELO M2 REVESTIMIENTO EN URINARIO CORRIDO CON CERAMICA TIPO AZULEJO DE 20x20 CM. COLOR CELESTE CIELO M2 CARPINTERIA DE MADERA PUERTAS PUERTA DE MADERA CEDRO TABLERO REBAJADO SEGUN DISEO M2 PUERTA DE MADERA TORNILLO TABLERO REBAJADO SEGUN DISEO M2 COLOCACION DE PUERTAS UND CARPINTERIA METALICA

  • VENTANAS VENTANA METALICA CON SEGURIDAD SEGUN DISEO M2 COLOCACION DE VENTANAS UND CERRAJERIA CERRADURA DE 02 GOLPES TIPO FORTE Pza CERRADURA DE SOBREPONER PARA PUERTAS INTERIORES EN SS.HH. Pza MANIJA DE BRONCE DE 4" PARA PUERTAS UND VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE NACIONAL COLOCADO CON SILICONA P2 PINTURA PINTURA EN INTERIORES PINTURA LATEX EN INTERIORES COLUMNA Y VIGA COLOR BLANCO HUMO M2 PINTURA LATEX EN MUROS INTERIORES COLOR AZUL CALIPSO M2 PINTURA EN EXTERIORES PINTURA LATEX EN MUROS EXTERIORES COLOR CERAMICO M2 PINTURA LATEX EN EXTERIORES VIGAS Y COLUMNAS COLOR BLANCO HUMO M2 PINTURA EN ZOCALO CON ESMALTE H=0.20 COLOR GRIS NIEBLA Ml PINTURA EN CIELORRASOS PINTURA EN CIELORRASO SOBRE TRIPLEY COLOR BLANCO M2 PINTURA EN ESTRUCTURA METALICA PINTURA ESPECIAL EN CANALETA GALVANIZADA CON ESMALTE COLOR ROJO TEJA Ml PINTURA EN VENTANAS METALICAS CON ESMALTE Y ANTICORROSIVO M2 APARATOS SANITARIOS Y ACCESORIOS INODORO TANQUE BAJO BLANCO CON ACCESORIOS Pza PAPELERA DE LOZA COLOR CELESTE CIELO DE 15 x 15 Pza COLOCACION DE APARATOS SANITARIOS Pza COLOCACION DE ACCESORIOS SANITARIOS Pza INSTALACIONES SANITARIAS SALIDA DE DESAGUE SALIDA DE DESAGUE CON PVC DE 4" Pto SALIDA DE DESAGUE CON PVC DE 3" Pto SALIDA DE DESAGUE CON PVC DE 2" Pto REDES DE DISTRIBUCION RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" Ml RED DE DISTRIBUCION TUBERIA PVC SAL DE 3" Ml RED DE DISTRIBUCION TUBERIA PVC SAL DE 2" Ml ACCESORIOS DE REDES CODO PVC SAL PARA DESAGUE 4"x2"x45 Pza CODO PVC SAL PARA DESAGUE 2"X45 Pza CODO PVC SAL PARA DESAGUE 2"X90 Pza TEE PVC SAL PARA DESAGUE 4"x4" Pza YEE PVC SAL CON REDUCCION PARA DESAGUE 4"x3" Pza YEE PVC SAL PARA DESAGUE 3"x2" Pza TEE PVC SAL PARA DESAGUE 2"x2" Pza REDUCCION PVC SAL PARA DESAGUE DE 4"x2" Pza ADITAMENTOS VARIOS SUMIDERO CROMADO DE 3" EN PISO Pza SUMIDERO CROMADO DE 2" EN LAVADERO Pza SUMIDERO CROMADO DE 2" EN URINARIO Pza SUMIDERO CROMADO DE 2" PARA VENTILACION Pza REGISTRO ROSCADO DE BRONCE DE 4" Pza CAMARAS DE INSPECCION CAJA DE REGISTRO DE DESAGUE 12" X 24" Pza SISTEMA DE AGUA FRIA SALIDA DE AGUA FRIA SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" Pto REDES DE DISTRIBUCION

  • RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP Ml RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP Ml ACCESORIOS DE REDES TEE PVC - SAP 3/4" PARA AGUA UND REDUCCION PVC - SAP 3/4" A 1/2" PARA AGUA UND CODO PVC - SAP 1/2" PARA AGUA UND TEE PVC - SAP 1/2" PARA AGUA UND LLAVES Y VALVULAS VALVULA DE PASO TIPO ESFERICO METALICO DE 1/2" Pza LLAVES TIPO ESFERICOS METALICOS PARA LAVADERO DE CONCRETO Pza PIEZAS VARIAS CAJA CON TAPA METALICA PARA VALVULAS DE 12" x 12" Pza TUBO DE FIERRO GALVANIZADO DE 3/4" SEGUN DISEO EN URINARIO Ml SISTEMA DE AGUA DE LLUVIA CANALETA DE PLANCHA GALVANIZADA CANALETA DE PLANCHA GALVANIZADA 1/32" SEGUN DISEO Ml TUBERIA DE BAJADA PVC SAP DIAMETRO 4" Ml CODOS PVC SAP DE 4"x90 Pza COLUMNETA PARA SOPORTE DE TUBERIA CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOCOFRADO NORMAL EN COLUMNETAS M2 CANAL PLUVIAL DE CONCRETO EXCAVACION DE ZANJAS PARA CANAL PLUVIAL M3 CONCRETO EN CANAL PLUVIAL CEMENTO HORMIGON 1:8 M3 ENCOFRADO Y DESENCOFRADO PARA CANAL PLUVIAL M2 JUNTA DE DILATACION EN CANAL PLUVIAL e=1" Ml INSTALACIONES ELECTRICAS SALIDA DE LUZ Y FUERZA SALIDA DE TECHO - CENTROS DE LUZ Pto SALIDA PARA CAJA DE PASE Pto CONEXIONES INTERNAS CONEXION INTERNA DEL TD-03 A LA CAJA DE PASE CON CABLE TW DE 2.5 MM2 Ml ARTEFACTOS FLUORESCENTE RECTO 2 x 40 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEO Pza FLUORESCENTE RECTO 2 x 20 W CON EQUIPO COMPLETO PARA EMPOTRAR SEGUN DISEO PzaSISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS TANQUE SEPTICO TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA TANQUE SEPTICO EN TERRENO NORMAL - MANUAL M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 NIVELACION INTERIOR Y APISONADO EN FONDO DE TANQUE SEPTICO E= 4" C/EQUIPO LIVIANO M2 OBRAS DE CONCRETO ARMADO CONCRETO F'C=175 KG/CM2 EN FONDO DE TANQUE SEPTICO M3 ACERO F'Y=4,200 KG/CM2 GRADO 60 EN FONDO DE TANQUE SEPTICO Kg CONCRETO F'C=175 KG/CM2 EN MURO DE TANQUE SEPTICO M3 ENCOFRADO Y DESENCOFRADO EN MURO DE TANQUE SEPTICO M2 ACERO F'Y=4,200 KG/CM2 GRADO 60 EN MURO DE TANQUE SEPTICO Kg CONCRETO F'C=175KG/CM2 EN LOSA MACIZA DE TANQUE SEPTICO M3 ENCOFRADO Y DESENCOFRADO EN LOSA MACISA DE TANQUE SEPTICO M2 ACERO F'Y=4,200 KG/CM2 GRADO 60 EN LOSA MACISA DE TANQUE SEPTICO Kg REVOQUES ENLUCIDOS TARRAJEO CON IMPERMEABILIZANTES EN LOSA Y MUROS DE TANQUE SEPTICO M2 INSTALACIONES SANITARIAS RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" Ml

  • TEE PVC SAL PARA DESAGUE 4"x4" Pza SOMBRERO VENTILACION PVC DE 2" Pza OTROS ESCALERA DE GATO CON ELEMENTOS TIPO "C" CON FIERRO LISO DE 3/8" DE 0.35x0..20 UND POZO DE ABSORCION TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 MOVIMIENTO DE TIERRAS EXCAVACION MASIVA MANUAL EN POZO PERCOLADOR M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 OBRAS DE CONCRETO ARMADO CONCRETO F'C=175KG/CM2 EN ANILLO, TECHO Y TAPA DE POZO PERCOLADOR M3 ENCOFRADO Y DESENCOFRADO EN ANILLO, TAPA Y TECHO DE POZO PERCOLADOR M2 ACERO F'Y=4,200 KG/CM2 GRADO 60 EN TAPA Y TECHO DE POZO PERCOLADOR Kg MUROS Y TABIQUES DE ALBAILERIA MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 EN TANQUE PERCOL M2 INSTALACIONES SANITARIAS RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" Ml CODO PVC SAL PARA DESAGUE 4"X90 Pza TEE PVC SAL PARA DESAGUE 4"x4" Pza CAJA DE REGISTRO DE 12"x24 Pza FILTROS RELLENO CON GRAVA DE 1/2" a 3/4" PARA FILTRO EN POZO PERCOLADOR M3CERCO PERIMETRICO TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 TRANSPORTE DE MATERIALES A OBRA Kg MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 M. EN TERRENO NORMAL M3 RELLENO Y COMPACTADO CON MATERIAL PROPIO EN MURO DE CONTENCION M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 OBRAS DE CONCRETO SIMPLE CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE M3 OBRAS DE CONCRETO ARMADO VIGAS DE CIMENTACION CONCRETO EN VIGAS DE CIMENTACION F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION M2 ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60 Kg SOBRECIMIENTO REFORZADO CONCRETO EN SOBRECIMIENTO CORRIDO F'C=140 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS M2 ACERO EN SOBRECIMIENTO F'Y=4,200 KG/CM2 GRADO60 Kg COLUMNAS PRINCIPALES CONCRETO EN COLUMNAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS CONCRETO EN VIGAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 Kg MUROS Y TABIQUES DE ALBAILERIA MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 - CARAVISTA M2 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN SOBRECIMIENTOS ACABADO CON CEMENTO ARENA 1:5 M2 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 M2

  • TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 PINTURA PINTURA LATEX EN EXTERIORES VIGAS, COLUMNAS Y SOBRECIMIENTO COLOR TABACO M2INGRESO PRINCIPAL MOVIMIENTO DE TIERRAS EXCAVACION PARA CIMIENTOS EN PORTON DE INGRESO M3 RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON MATERIAL PROPIO) M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 OBRAS DE CONCRETO SIMPLE CIMIENTOS CORRIDOS F'C=140 KG/CM2 + 30% DE PIEDRA GRANDE M3 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEM-HOR M2 OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS F'C=175 KG/CM2 + 30% P.M. M3 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS DE CIMENTACION CONCRETO EN VIGAS DE CIMENTACION F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION M2 ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60 Kg SOBRECIMIENTO REFORZADO CONCRETO EN SOBRECIMIENTO CORRIDO F'C=140 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS M2 ACERO EN SOBRECIMIENTO F'Y=4,200 KG/CM2 GRADO60 Kg COLUMNAS PRINCIPALES CONCRETO EN COLUMNAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 Kg VIGAS CONCRETO EN VIGAS F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 Kg MUROS Y TABIQUES DE ALBAILERIA MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN MUROS DE LADRILLO EN EXTERIORES ACABADO CON CEMENTO ARENA 1:5 M2 TARRAJEO EN SOBRECIMIENTOS ACABADO CON CEMENTO ARENA 1:5 M2 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 M2 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 BRUAS E= 1 CM. Ml CARPINTERIA METALICA PUERTA METALICA SEGUN DISEO DE 3.00 x 2.40 M. UND PUERTA METALICA SEGUN DISEO DE 1.00 x 2.40 M. UND BISAGRA ALUMINIZADA DE 4" CAPUCHINA, PARA PUERTAS Pza CERROJO ALUMINIZADO PARA PUERTAS Pza COLOCACION DE PUERTAS METALICAS UND PINTURA PINTURA LATEX EN EXTERIORES VIGAS, COLUMNAS, MUROS Y SOBRECIMIENTO COLOR TABACO M2VEREDAS DE ACESO PRINCIPAL MOVIMIENTO DE TIERRAS EXCAVACION MASIVA MANUAL PARA VEREDAS M3 AFIRMADO DE 4" PARA VEREDAS CON EQUIPO LIVIANO M2 OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 CONCRETO EN UAS DE VEREDAS F'C=175 KG/CM2 M3 VEREDA DE CONCRETO F'C=175 KG/CM2 DE 4" CON BRUAS DE CANTO Y TRANSVERSALES M2 JUNTA DE CONSTRUCCION EN VEREDA e=1" MlLOSA MULTIDEPORTIVA

  • TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 TRANSPORTE DE MATERIALES A OBRA Kg MOVIMIENTO DE TIERRAS CORTE Y NIVELACION DE TERRENO MANUAL M3 RELLENO CON MATERIAL AFIRMADO DE PRESTAMO, NIVELACION Y APISONADO e=0.20 M. M2 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 OBRAS DE CONCRETO SIMPLE CONCRETO F'C=140 KG/CM2 EN LOSA DEPORTIVA M2 CONCRETO DE SARDINEL F'C=140 KG/CM2 EN LOSA DEPORTIVA M3 ENCOFRADO Y DESENCOFRADO PARA LOSA DEPORTIVA M2 JUNTAS DE DILATACION JUNTAS DE DILATACION EN LOSA DEPORTIVA E=1" - H=0.10 M. Ml JUNTAS DE CONTRACCION EN LOSA DEPORTIVA E=1" - H=0.05 M. Ml PINTURA LINEAS DEMARCATORIAS PINTADO DE LINEAS DE FULBITO COLOR BLANCO Ml PINTADO DE LINEAS DE VOLEY COLOR AMARILLO Ml PINTADO DE LINEAS DE BASQUET COLOR ANARANJADO Ml CARPINTERIA METALICA ARCO DE FULBITO Y TABLERO DE BASQUET SEGUN DISEO Pza PARANTE DE FIERRO GALVANIZADO DE 2" h=2.65 M. PARA NET DE VOLEY SEGUN DISEO Pza COLOCACION DE ARCOS DE FULBITO Pza OTROS REGISTRO ROSCADO DE BRONCE DE 3" Pza NET DE VOLEY SEGUN REGLAMENTO Pza PREPARACION Y ELIMINACION DE ARROCERAS EN LOSA MULTIDEPORTIVA M2VEREDAS EXTERIORES E INTERIORES TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 MOVIMIENTO DE TIERRAS EXCAVACION MASIVA MANUAL PARA VEREDAS M3 RELLENO Y COMPACTADO CON MATERIAL PROPIO M3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 OBRAS DE CONCRETO SIMPLE VEREDA DE CONCRETO DE 4" CON BRUAS DE CANTO Y TRANSVERSALES (INCLUYE ENCOFRADO) M2 CONCRETO PARA SARDINEL EN VEREDAS CEMENTO HORMIGON 1:8 M3 SOLADO PARA BASE CAJA DE CANAL F'C= 140 KG/CM2 M3 OBRAS DE CONCRETO ARMADO CONCRETO EN F'C=175 KG/CM2 M3 ENCOFRADO Y DESENCOFRADO NORMAL M2 ACERO F'Y=4,200 KG/CM2 GRADO 60 Kg JUNTAS JUNTAS DE DILATACION E=1" Ml ASTA DE BANDERA CONCRETO F'C= 175 KG/CM2 EN ASTA DE BANDERA M3 ENCOFRADO Y DESENCOFRADO EN MURETE DE ASTA DE BANDERA M2 ASTA DE BANDERA DE TUBO DE FIERRO NEGRO SEGUN DISEO INCLUYE PINTADO Y ACCESORIOS UND

  • Metrado Precio (S/.) Parcial (S/.)59,048.92

    1.00 800.00 800.00204.72 2.21 452.43490.48 50.35 24,695.67611.93 4.26 2,606.82

    1,660.76 0.71 1,179.141,660.76 1.33 2,208.81

    551.20 7.54 4,156.05407,000.00 0.05 20,350.00

    2,600.0072.00 25.00 1,800.00

    1.00 400.00 400.001.00 400.00 400.00

    COSTRUCCION DE MODULO 01 - (05 AULAS+LABORATORIO+CENTRO DE COMPUTO + AMBIENTES ADMINISTRATIVOS Y ESCALERAS 618,954.75874.85

    428.85 0.71 304.48428.85 1.33 570.37

    32,880.0042.89 5.62 241.04

    132.56 24.36 3,229.16184.91 34.10 6,305.43112.57 52.66 5,927.94214.43 53.68 11,510.60309.73 7.54 2,335.36271.65 7.34 1,993.91115.92 11.53 1,336.56

    25,099.454,402.64

    30.82 142.85 4,402.6412,851.56

    35.77 142.85 5,109.7449.17 157.45 7,741.82

    7,845.25271.65 28.88 7,845.25

    275,881.0637,616.63

    82.18 301.96 24,815.072,672.56 4.79 12,801.56

    10,525.8726.20 293.76 7,696.51

    590.68 4.79 2,829.3612,484.73

    12.31 344.63 4,242.40135.16 38.63 5,221.23630.71 4.79 3,021.10

    25,902.539.56 311.19 2,974.98

    64.23 38.92 2,499.834,264.66 4.79 20,427.72

    80,986.485.03 341.97 1,720.11

    33.45 393.86 13,174.62492.63 39.87 19,641.16

    9,697.41 4.79 46,450.5967,249.84

    1.40 298.21 417.49

  • 2.22 285.60 634.0342.49 309.06 13,131.96

    509.20 46.56 23,708.356,129.02 4.79 29,358.01

    33,663.7626.00 299.07 7,775.82

    324.82 28.59 9,286.601,640.18 4.79 7,856.462,484.34 3.52 8,744.88

    3,216.703.31 361.87 1,197.79

    22.04 46.61 1,027.28207.02 4.79 991.63

    108.010.04 301.10 12.041.41 46.56 65.656.33 4.79 30.32

    4,126.514.68 323.90 1,515.85

    56.00 28.68 1,606.08208.42 4.82 1,004.58

    34,944.3514,649.76

    1,367.00 5.06 6,917.021,121.04 4.80 5,380.99

    169.44 4.89 828.56200.84 6.57 1,319.52

    31.00 6.57 203.6720,294.59

    442.21 39.93 17,657.4546.29 56.97 2,637.14

    46,919.21298.34 99.60 29,714.66269.15 63.03 16,964.52

    5.20 46.16 240.0341,460.33

    565.61 16.39 9,270.35400.89 21.02 8,426.71270.66 19.93 5,394.25373.37 29.37 10,965.88

    18.89 22.53 425.59418.44 8.39 3,510.71

    1,220.72 2.84 3,466.8426,638.63

    300.55 35.53 10,678.54425.63 35.61 15,156.68268.70 2.99 803.41

    21,558.7113,880.10

    578.82 23.98 13,880.107,678.61

    127.10 42.46 5,396.677.70 253.59 1,952.64

    35.60 9.25 329.306,003.44

    702.12167.57 4.19 702.12

  • 1,722.65302.75 5.69 1,722.65

    3,578.6735.65 20.92 745.80

    4.60 16.70 76.8212.60 38.02 479.0520.00 113.85 2,277.00

    31,826.297,400.99

    29.83 235.00 7,010.0511.00 35.54 390.94

    2,981.377.00 425.91 2,981.37

    21,443.93146.91 140.00 20,567.40

    37.00 23.69 876.53830.28

    11.00 68.07 748.7711.00 7.41 81.51

    13,970.843,383.06

    409.86 4.66 1,909.95256.55 5.24 1,344.32

    29.54 4.36 128.794,504.47

    399.90 5.61 2,243.44301.39 5.87 1,769.16

    1.58 5.87 9.27167.57 2.88 482.60

    5,468.40300.55 7.63 2,293.20425.63 7.46 3,175.20

    614.9112.00 3.21 38.5226.80 2.71 72.6312.00 3.46 41.5293.76 4.93 462.24

    17,648.115,453.19

    93.76 39.90 3,741.0261.10 23.78 1,452.96

    7.00 37.03 259.21565.55

    0.90 341.97 307.777.28 35.41 257.78

    11,629.3722.35 21.31 476.2815.04 276.59 4,159.91

    181.49 28.68 5,205.13167.42 10.68 1,788.05

    26,953.067,238.44

    58.00 64.79 3,757.8251.00 67.88 3,461.88

    2.00 9.37 18.74893.46

    2.00 319.84 639.68

  • 1.00 234.84 234.842.00 9.47 18.94

    1,099.982.00 549.99 1,099.98

    6,621.3258.00 78.54 4,555.3220.00 103.30 2,066.00

    4,774.801.00 2,580.00 2,580.006.00 365.80 2,194.80

    6,325.0621.60 8.74 188.7886.97 57.30 4,983.3826.06 21.31 555.3426.06 22.93 597.56

    1,270.164.00 282.00 1,128.004.00 35.54 142.16

    3,917.283,018.40

    175.364.00 43.84 175.36

    1,562.8851.94 13.55 703.7951.94 8.52 442.5351.94 8.02 416.56

    278.5415.30 4.36 66.71

    4.80 9.50 45.6020.10 4.26 85.6320.10 4.01 80.60

    77.142.00 12.19 24.384.00 13.19 52.76

    42.912.00 12.97 25.941.00 16.97 16.97

    881.576.00 127.91 767.461.00 114.11 114.11

    898.88157.40

    4.00 39.35 157.40238.22

    62.10 3.33 206.7910.80 2.91 31.43

    81.423.00 3.46 10.384.00 3.54 14.16

    16.00 2.74 43.844.00 3.26 13.04

    323.608.00 32.76 262.081.00 61.52 61.52

    98.241.00 98.24 98.24

    10,278.70

  • 16.81 11.17 187.77226.24 34.55 7,816.59

    24.00 21.04 504.963.10 54.64 169.381.00 500.00 500.001.00 900.00 900.001.00 200.00 200.00

    170,574.89545.91

    267.60 0.71 190.00267.60 1.33 355.91

    12,911.8626.76 5.62 150.3998.64 24.36 2,402.8754.60 34.10 1,861.8640.74 52.66 2,145.3753.52 53.68 2,872.95

    174.07 7.54 1,312.49167.14 7.34 1,226.81

    81.45 11.53 939.1212,431.45

    1,169.948.19 142.85 1,169.94

    2,888.899.62 142.85 1,374.229.62 157.45 1,514.67

    3,545.625.20 230.41 1,198.13

    60.80 38.61 2,347.494,827.00

    167.14 28.88 4,827.0045,706.37

    5,385.3013.65 273.76 3,736.82

    344.15 4.79 1,648.489,804.50

    8.45 290.69 2,456.3376.76 38.92 2,987.50

    910.37 4.79 4,360.6719,101.93

    2.34 341.97 800.219.06 393.86 3,568.37

    116.86 39.87 4,659.212,103.16 4.79 10,074.14

    11,414.640.68 298.21 202.788.19 309.06 2,531.20

    76.40 46.56 3,557.181,069.62 4.79 5,123.48

    21,936.369,052.45

    911.33 5.06 4,611.33740.00 4.80 3,552.00117.33 6.57 770.8618.00 6.57 118.26

    12,883.91283.17 39.93 11,306.98

  • 27.68 56.97 1,576.9312,341.13

    75.97 99.60 7,566.6175.75 63.03 4,774.52

    11,667.17164.74 16.39 2,700.09120.40 21.02 2,530.81

    95.11 19.93 1,895.5479.18 29.37 2,325.5210.80 20.61 222.59

    136.68 8.39 1,146.75297.84 2.84 845.87

    9,882.07263.99 35.61 9,400.68161.00 2.99 481.39

    9,140.184,008.02

    167.14 23.98 4,008.025,132.16

    77.48 42.46 3,289.806.49 253.59 1,645.80

    21.25 9.25 196.561,631.96

    885.43103.68 8.54 885.43

    746.53131.20 5.69 746.53

    11,527.342,355.57

    9.57 235.00 2,248.953.00 35.54 106.62

    1,039.099.00 76.01 684.09

    22.80 15.57 355.00

    56.06 140.00 7,848.4012.00 23.69 284.28

    226.443.00 68.07 204.213.00 7.41 22.23

    4,973.291,526.26

    164.74 4.66 767.69129.06 5.24 676.27

    10.80 7.62 82.301,200.79

    107.15 5.61 601.1168.41 5.87 401.5731.10 6.37 198.11

    1,969.37263.99 7.46 1,969.37

    276.8756.16 4.93 276.87

    8,838.303,217.81

    56.16 39.90 2,240.7822.40 23.78 532.67

  • 12.00 37.03 444.36304.62

    0.46 341.97 157.314.16 35.41 147.31

    5,315.8712.24 21.31 260.83

    4.24 276.59 1,172.74101.55 28.68 2,912.45

    90.81 10.68 969.856,375.771,990.15

    18.00 64.79 1,166.2212.00 67.88 814.56

    1.00 9.37 9.37329.31

    1.00 319.84 319.841.00 9.47 9.47

    1,562.2812.00 78.54 942.48

    6.00 103.30 619.802,494.03

    51.25 8.74 447.9346.25 21.31 985.5946.25 22.93 1,060.51

    439.294.84 11.17 54.061.00 200.00 200.001.00 185.23 185.23

    77,252.802,275.62

    86.09 0.71 61.1286.09 1.33 114.50

    42,000.00 0.05 2,100.001,987.50

    36.12 21.31 769.724.53 52.66 238.55

    39.49 7.54 297.7549.96 7.82 390.6925.22 11.53 290.79

    8,106.724,022.33

    7.80 142.85 1,114.2318.47 157.45 2,908.10

    2,173.552.62 230.41 603.67

    40.66 38.61 1,569.881,497.10

    50.02 29.93 1,497.10413.74

    7.93 30.60 242.660.48 294.90 141.550.09 328.10 29.53

    13,062.372,955.59

    1.65 290.69 479.6425.38 38.92 987.79

    310.68 4.79 1,488.16

  • 4,532.642.81 354.58 996.37

    43.27 39.87 1,725.17378.10 4.79 1,811.10

    5,173.363.09 298.21 921.47

    47.79 46.56 2,225.10423.13 4.79 2,026.79

    400.780.32 320.58 102.594.77 30.60 145.96

    31.78 4.79 152.237,065.592,900.93

    48.57 4.89 237.51450.75 4.89 2,204.17

    13.10 4.80 62.8844.10 6.57 289.7416.23 6.57 106.63

    4,164.6691.23 39.93 3,642.81

    9.16 56.97 521.858,128.35

    128.96 63.03 8,128.356,668.81

    93.87 13.24 1,242.8480.36 16.39 1,317.10

    0.77 16.39 12.6266.15 21.02 1,390.4728.38 19.93 565.6136.57 29.37 1,074.0650.52 8.19 413.76

    137.88 2.84 391.5891.82 2.84 260.77

    2,955.3876.41 35.61 2,720.9678.40 2.99 234.42

    4,221.532,693.62

    50.03 53.84 2,693.621,527.91

    25.22 42.46 1,070.841.62 253.59 410.825.00 9.25 46.25

    5,298.645.86 4.19 24.55

    68.01 64.11 4,360.1214.33 63.78 913.97

    702.006.94 64.11 444.924.01 64.11 257.08

    3,021.303,021.30

    4.10 235.00 963.508.96 190.00 1,702.40

    10.00 35.54 355.401,211.16

  • 736.368.02 80.00 641.604.00 23.69 94.76

    474.802.00 68.07 136.148.00 33.07 264.56

    10.00 7.41 74.10297.67

    86.28 3.45 297.671,857.98

    510.2130.35 4.88 148.1183.05 4.36 362.10

    633.0370.16 5.28 370.4430.35 5.87 178.1529.32 2.88 84.44

    570.0276.41 7.46 570.02

    144.7218.26 4.93 90.02

    8.02 6.82 54.701,794.16

    8.00 159.66 1,277.288.00 16.00 128.008.00 35.54 284.328.00 13.07 104.56

    2,243.19679.28

    8.00 57.29 458.322.00 44.72 89.443.00 43.84 131.52

    564.1535.10 9.50 333.4516.58 7.19 119.2125.57 4.36 111.49

    534.582.00 13.19 26.388.00 10.95 87.601.00 12.19 12.19

    10.00 14.89 148.902.00 14.89 29.781.00 14.69 14.698.00 13.19 105.528.00 13.69 109.52

    192.062.00 23.41 46.822.00 29.96 59.921.00 25.69 25.691.00 25.69 25.692.00 16.97 33.94

    273.122.00 136.56 273.12

    1,293.85432.85

    11.00 39.35 432.85140.81

  • 20.00 3.33 66.6025.50 2.91 74.21

    90.302.00 3.46 6.922.00 3.54 7.08

    10.00 2.74 27.4015.00 3.26 48.90

    306.183.00 38.94 116.826.00 31.56 189.36

    323.712.00 98.24 196.484.48 28.40 127.23

    4,029.111,188.55

    18.26 39.90 728.5710.00 23.78 237.80

    6.00 37.03 222.18165.84

    0.26 354.58 92.192.08 35.41 73.65

    2,674.728.45 21.31 180.074.62 276.59 1,277.85

    36.23 28.68 1,039.0816.64 10.68 177.72

    1,031.87398.11

    6.00 64.79 388.741.00 9.37 9.37

    113.0025.00 4.52 113.00

    520.764.00 78.54 314.162.00 103.30 206.60

    7,036.495,406.57

    13.566.65 0.71 4.726.65 1.33 8.84

    571.9814.30 28.42 406.4117.87 7.54 134.74

    4.20 7.34 30.834,061.17

    1.19 320.58 381.4931.55 4.79 151.12

    3.09 320.58 990.5940.86 30.60 1,250.32

    125.11 4.79 599.280.84 309.07 259.625.20 30.49 158.55

    56.41 4.79 270.20632.17

    24.38 25.93 632.1786.97

    4.50 9.50 42.75

  • 2.00 14.89 29.782.00 7.22 14.44

    40.724.00 10.18 40.72

    1,629.928.83

    4.33 0.71 3.074.33 1.33 5.76

    231.616.12 28.42 173.937.65 7.54 57.68

    432.770.54 309.09 166.914.55 34.64 157.61

    22.60 4.79 108.25562.86

    8.93 63.03 562.86315.08

    15.00 9.50 142.502.00 14.89 29.781.00 14.89 14.891.00 127.91 127.91

    78.771.74 45.27 78.77

    181,488.557,463.36

    151.16 0.71 107.32151.16 1.33 201.04

    143,100.00 0.05 7,155.006,543.57

    165.34 24.36 4,027.6828.13 52.66 1,481.33

    137.21 7.54 1,034.5613,265.16

    84.25 157.45 13,265.1693,098.8018,169.22

    10.53 290.69 3,060.97142.94 38.92 5,563.22

    1,992.70 4.79 9,545.0326,727.68

    28.61 294.03 8,412.20389.08 38.63 15,030.16685.87 4.79 3,285.32

    29,216.0812.92 341.97 4,418.25

    205.01 39.87 8,173.753,470.58 4.79 16,624.08

    18,985.8210.53 285.60 3,007.37

    142.94 46.56 6,655.291,946.38 4.79 9,323.16

    42,640.77635.86 67.06 42,640.77

    14,573.64421.25 14.89 6,272.41132.00 19.93 2,630.76

  • 193.07 29.37 5,670.473,903.25

    746.32 5.23 3,903.2516,739.20

    337.959.54 21.31 203.301.39 52.66 73.208.15 7.54 61.45

    1,267.455.94 207.11 1,230.231.47 25.32 37.22

    7,505.54372.56

    1.47 203.75 299.5115.25 4.79 73.05

    1,022.490.59 290.69 171.518.04 38.92 312.92

    112.33 4.79 538.061,010.19

    1.50 294.03 441.0510.03 38.63 387.4637.93 4.79 181.68

    3,116.881.82 341.97 622.39

    26.21 39.87 1,044.99302.61 4.79 1,449.50

    1,983.421.39 285.60 396.98

    17.52 46.56 815.73160.90 4.79 770.71

    2,265.9335.95 63.03 2,265.93

    2,947.3471.90 21.02 1,511.3419.09 14.89 284.2519.87 19.93 396.0119.87 29.37 583.5860.62 2.84 172.16

    1,822.411.00 1,225.00 1,225.001.00 405.00 405.009.00 11.21 100.894.00 5.11 20.442.00 35.54 71.08

    592.58105.63 5.61 592.58

    5,532.52929.81

    5.78 21.31 123.1769.96 11.53 806.64

    4,602.715.78 21.95 126.874.40 286.79 1,261.88

    69.96 43.56 3,047.4618.00 9.25 166.50

    49,733.13

  • 4,193.80720.00 0.71 511.20720.00 1.33 957.60

    54,500.00 0.05 2,725.008,379.00

    72.00 21.31 1,534.32288.00 21.41 6,166.08

    90.00 7.54 678.6028,473.40

    720.00 35.76 25,747.207.28 261.11 1,900.88

    37.60 21.95 825.322,980.32

    76.00 13.44 1,021.44264.00 7.42 1,958.88

    997.39997.39

    164.18 2.18 357.9172.00 2.18 156.96

    221.34 2.18 482.523,986.06

    2.00 1,920.00 3,840.002.00 40.00 80.002.00 33.03 66.06

    723.166.00 57.46 344.761.00 40.00 40.00

    720.00 0.47 338.4037,346.04

    831.94407.81 0.71 289.55407.81 1.33 542.39

    5,320.3768.30 21.31 1,455.4761.17 52.66 3,221.2185.37 7.54 643.69

    25,649.57396.00 42.46 16,814.16

    28.65 253.59 7,265.355.94 264.32 1,570.06

    2,863.874.22 320.58 1,352.85

    19.07 37.06 706.73167.91 4.79 804.29

    1,733.76129.00 13.44 1,733.76

    946.531.70 307.60 522.924.40 28.68 126.191.00 297.42 297.42