CRONOGRAMA VALORIZADO - HUANCAYA
-
Upload
gorrion0180 -
Category
Documents
-
view
9 -
download
7
description
Transcript of CRONOGRAMA VALORIZADO - HUANCAYA
CRONOGRAMA VALORIZADO
Presupuesto 0704001
EJECUCION 90 DIAS CALENDARIOS
Cliente MUNICIPALIDAD DISTRITAL DE HUANCAYA
Lugar LIMA - YAUYOS - HUANCAYA
Item Descripción Und. Metrado Precio S/. Parcial S/.01 TRABAJOS PRELIMINARES 599.1201.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 M und 1.00 599.12 599.1202 TRANSPORTE Y MOVILIZACION 6,500.0002.01 FLETE TERRESTRE A OBRA GLB 1.00 4,500.00 4,500.0002.02 FLETE RURAL (TRASLADO DE MATERIALES) GLB 1.00 2,000.00 2,000.0003 LINEA DE CONDUCCION 279,664.6303.01 OBRAS PRELIMINARES 12,695.6103.01.01 DEFORESTACION Y LIMPIEZA DE TERRENO m2 1,522.26 1.12 1,704.9303.01.02 TRAZO Y REPLANTEO PRELIMINAR m 3,044.51 3.61 10,990.6803.02 MOVIMIENTO DE TIERRAS 46,745.5003.02.01 EXCAVACION DE ZANJA EN MATERIAL SUELTO m3 715.53 11.66 8,343.0803.02.02 REFINE Y NIVELACION EN FONDOS DE ZANJA m2 715.53 7.49 5,359.3203.02.03 m 1,431.05 7.74 11,076.3303.02.04 RELLENO Y APISONADO C/MATERIAL PROPIO m3 715.53 30.70 21,966.7703.03 170,681.3303.03.01 SUMINISTRO E INST. TUBO Ø 4" PVC UF C-10 m 1,431.05 119.27 170,681.3303.04 49,542.1903.04.01 SUMINSTRO E INST. TUBO Ø 4" HDPE C-10 m 1,613.46 28.84 46,532.1903.04.02 ANCLAJE PARA TUBERIA HDPE und 76.00 15.00 1,140.0003.04.03 ENLACE PARA TUBERIA HDPE GLB 17.00 110.00 1,870.0004 CAMARA ROMPE PRESION TIPO 6 (06 UND) 6,853.7804.01 OBRAS PRELIMINARES 11.0404.01.01 TRAZO DE NIVELES Y REPLANTEO PRELIMINAR m2 6.00 1.84 11.0404.02 MOVIMIENTO DE TIERRAS 304.7904.02.01 EXCAVACION DE TERRENO EN MATERIAL SUELTO m3 6.60 41.10 271.2604.02.02 NIVELACION Y COMPACTACION MANUALMENTE m2 6.60 5.08 33.5304.03 OBRAS DE CONCRETO SIMPLE 2.6504.03.01 SOLADO MEZCLA 1:10 C:H (e=0.10) m2 0.07 37.85 2.6504.04 OBRAS DE CONCRETO ARMADO 3,745.5504.04.01 CONCRETO F'C=210 KG/CM2 m3 2.87 420.38 1,206.4904.04.02 ENCOFRADO Y DESENCOFRADO m2 47.76 43.01 2,054.1604.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 107.28 4.52 484.9104.05 REVOQUES ENLUCIDOS Y MOLDURAS 1,435.4404.05.01 m2 27.60 26.66 735.8204.05.02 m2 21.60 32.39 699.6204.06 CARPINTERIA METALICA 793.2004.06.01 und 6.00 132.20 793.2004.07 PINTURA 561.1104.07.01 PINTADO DE MURO EXTERIOR C/LATEX VINILICO m2 27.60 20.33 561.1105 CAJA DE VALVULAS DE PURGA Y DE AIRE 2 1/2" (03 UND) 2,109.7305.01 OBRAS PRELIMINARES 0.6305.01.01 TRAZO Y REPLANTEO m2 0.75 0.84 0.6305.02 MOVIMIENTO DE TIERRAS 22.2805.02.01 EXCAVACION MANUAL m3 0.75 29.71 22.28
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE EN EL DISTRITO DE HUANCAYA - PROVINCIA DE YAUYOS - DEPARTAMENTO DE LIMA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO E= 0.20 CM
INSTALACION DE TUBERIAS PVC EN LA LINEA DE CONDUCCION
INSTALACION DE TUBERIAS HDPE EN LA LINEA DE CONDUCCION
TARRAJEO MURO INTERIOR CON IMPERMEABILIZANTE 1:3 C:A E=CMTARRAJEO MURO EXTERIOR FROTACHADO C/MORT 1:5X1.5 CM.
MARCO Y TAPA PLANCHA LAC 1/8" 0.60X0.60 M C/MECAN. DE SEGUR. S/DISEÑO
05.03 OBRAS DE CONCRETO SIMPLE 58.4505.03.01 SOLADO DE CONCRETO 1:10 e=2" m2 1.08 25.45 27.4905.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.72 43.01 30.9705.04 OBRAS DE CONCRETO ARMADO 638.5105.04.01 ENCOFRADO Y DESENCOFRADO EN LOSAS DE TAPA m2 0.05 43.01 2.1505.04.02 CONCRETO FC=175/KCM2 - MUROS m3 0.54 346.70 187.2205.04.03 CONCRETO FC=175/KCM2 - LOSA DE FONDO m3 0.11 346.70 38.1405.04.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 90.93 4.52 411.0005.05 REVOQUES ENLUCIDOS Y MOLDURAS 145.6405.05.01 TARRAJEO EXTERIOR CON CEMENTO ARENA m2 5.40 26.97 145.6405.06 VALVULAS Y ACCESORIOS 1,196.4305.06.01 VALVULA DE AIRE DE FIERRO FUNDIDO DE 4" und 1.00 456.88 456.8805.06.02 VALVULA DE PURGA DE 4" und 1.00 490.17 490.1705.06.03 VALVULA DE PURGA DE 2" und 1.00 249.38 249.3805.07 PINTURA 47.7905.07.01 PINTURA LATEX INTERIOR Y EXTERIORES m2 5.40 8.85 47.7906 PASE AEREO (L=39. 00 M) 10,604.9406.01 OBRAS PRELIMINARES 43.9806.01.01 DEFORESTACION Y LIMPIEZA DE TERRENO m2 18.00 0.45 8.1006.01.02 TRAZO DE NIVELES Y REPLANTEO PRELIMINAR m2 19.50 1.84 35.8806.02 MOVIMIENTO DE TIERRAS 62.2706.02.01 EXCAVACION DE TERRENO EN MATERIAL SUELTO m3 0.98 39.14 38.3606.02.02 NIVELACION Y COMPACTACION MANUALMENTE m2 0.50 5.08 2.5406.02.03 ELIMINACION DE MAT. EXCEDENTE DIST. PROM.= 30 M m3 0.98 21.81 21.3706.03 OBRAS DE CONCRETO SIMPLE 31.0406.03.01 SOLADO MEZCLA 1:10 C:H (e=0.10) m2 0.82 37.85 31.0406.04 OBRAS DE CONCRETO ARMADO 664.8906.04.01 CONCRETO FC=210/KCM2 m3 1.20 423.05 507.6606.04.02 ENCOFRADO Y DESENCOFRADO m2 2.88 43.01 123.8706.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 7.38 4.52 33.3606.05 TUBERIAS ACCESORIOS DE SOPORTE Y SUJECCION 9,802.7706.05.01 CABLE DE ACERO TIPO BOA DE 5/8" m 45.00 122.03 5,491.3506.05.02 ACCESORIOS DE PENDOLAS PARA EL PASE AEREO GLB 1.00 841.84 841.8406.05.03 ACCESORIOS DE ANCLAJE PARA EL PASE AEREO GLB 1.00 3,469.58 3,469.5807 VALVULA DE CONTROL DE 2" Y 1 1/2" (04 UND) 2,007.1007.01 OBRAS PRELIMINARES 7.3607.01.01 TRAZO DE NIVELES Y REPLANTEO PRELIMINAR m2 4.00 1.84 7.3607.02 MOVIMIENTO DE TIERRAS 164.4007.02.01 EXCAVACION DE TERRENO EN MATERIAL SUELTO m3 4.00 41.10 164.4007.03 OBRAS DE CONCRETO SIMPLE 486.1207.03.01 SOLADO DE CONCRETO F'c=175 Kg/cm2 e=2" m3 1.00 382.90 382.9007.03.02 ENCOFRADO Y DESENCOFRADO m2 2.40 43.01 103.2207.04 OBRAS DE CONCRETO ARMADO 538.9407.04.01 ENCOFRADO Y DESENCOFRADO EN LOSAS DE TAPA m2 1.00 43.01 43.0107.04.02 CONCRETO FC=175/KCM2 - MUROS m3 0.58 346.70 201.0907.04.03 CONCRETO FC=175/KCM2 - LOSA DE FONDO m3 0.10 346.70 34.6707.04.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 57.56 4.52 260.1707.05 REVOQUES ENLUCIDOS Y MOLDURAS 194.1807.05.01 TARRAJEO EXTERIOR CON CEMENTO ARENA m2 7.20 26.97 194.1807.06 VALVULAS Y ACCESORIOS 616.0907.06.01 VALVULA DE COMPUERTA DE BRONCE DE 1 1/2" und 1.00 152.95 152.9507.06.02 VALVULA DE COMPUERTA DE BRONCE DE 2" und 3.00 154.38 463.1408 LINEA DE ADUCCION Y RED DE DISTRIBUCION 220,126.3308.01 OBRAS PRELIMINARES 7,757.6208.01.01 TRAZO Y REPLANTEO PRELIMINAR m 3,232.34 2.40 7,757.6208.02 MOVIMIENTO DE TIERRAS 186,150.4608.02.01 m3 1,642.34 11.66 19,149.6808.02.02 m3 1,590.00 11.66 18,539.4008.02.03 REFINE Y NIVELACION EN FONDOS DE ZANJA m2 3,232.34 7.49 24,210.2308.02.04 PREPARACION DE CAMA DE APOYO m 3,232.34 7.74 25,018.3108.02.05 RELLENO Y COMPACTACION P/TUB. Ø 1", 1 1/2" 2" m3 3,232.34 30.70 99,232.8408.03 SUMINISTRO E INST. DE TUBERIAS PVC 25,429.9308.03.01 SUMINISTRO E INST. TUB. Ø 2" PVC C-5 m 62.81 11.05 694.05
EXCAVACION DE ZANJA CON MAQUINARIA 1.00 PROF T.CONG TUB. Ø 1", 1 1/2", Y 2"EXCAVACION DE ZANJA CON MAQUINARIA 1.00 PROF T.CONG TUB. 1/2"
08.03.02 SUMINISTRO E INST. TUB. Ø 2 1/2" PVC C-5 m 733.01 21.55 15,796.3708.03.03 SUMINISTRO E INST. TUB. Ø 1 1/2" PVC C-5 m 661.24 12.03 7,954.7208.03.04 SUMINISTRO E INST. TUB. Ø 1" PVC C-5 m 94.77 2.56 242.6108.03.05 SUMINISTRO E INST. TUB. Ø 3/4" PVC C-5 m 90.51 8.20 742.1808.04 PRUEBA HIDRAULICA 788.3208.04.01 PRUEBA HIDRAULICA EN RED DE DISTRIBUCION m 1,642.34 0.48 788.3209 CONEXION DOMICILIARIA (55 UND) 68,433.3809.01 CONEXION AGUA POTABLE X 5 MTS. und 127.00 286.69 36,409.6309.02 CONEXION AGUA POTABLE X 10 MTS. und 85.00 376.75 32,023.7510 1,652.80
10.01 SUMINISTRO E INSTALACION DE ACCESORIOS und 1.00 1,652.80 1,652.8011 OTROS 1,111.7811.01 VICIOS OCULTOS GLB 1.00 700.00 700.0011.02 PLACA RECORDATORIA und 1.00 411.78 411.7812 MITIGACION DE IMPACTO AMBIENTAL 2,875.2312.01 MEDIDAS DE PREVENCION 1,453.0012.01.01 EQUIPOS E IMPLEMENTOS DE SEGURIDAD GLB 1.00 1,453.00 1,453.0012.02 MEDIDAS DE MITIGACION 1,422.2312.02.01 LIMPIEZA GENERAL DEL AREA AFECTADA m2 1,292.94 1.10 1,422.23
Costo DirectoGASTOS GENERALES (5% CD)
INSPECTOR DE OBRA (3%CD)
TOTAL
SUMINISTROS E INST. DE ACCESORIOS EN LA LINEA DE CONDUCCION, ADUCCION Y DISTRIBUCION
CRONOGRAMA VALORIZADO
Parcial S/. PRIMER MES % SEGUNDO MES %599.12599.12 599.12 100% 0%
6,500.004,500.00 2250 50% 2250 50%2,000.00 0% 1200 60%
279,664.6312,695.61
1,704.93 1022.95872 60% 681.97248 40%10,990.68 10990.6811 100% 0%46,745.50
8,343.08 4171.5399 50% 4171.5399 50%5,359.32 0 0% 5359.3197 100%
11,076.33 0% 11076.327 100%21,966.77 0% 21966.771 100%
170,681.33170,681.33 0% 0%
49,542.1946,532.19 0% 23266.0932 50%
1,140.00 0% 600 53%1,870.00 0% 1100 59%6,853.78
11.0411.04 0% 11.04 100%
304.79271.26 0% 205.5 76%
33.53 0% 25.4 76%2.652.65 0% 2.6495 100%
3,745.551,206.49 0% 0%2,054.16 0% 0%
484.91 0% 0%1,435.44
735.82 0% 0%699.62 0% 0%793.20793.20 0% 0%561.11561.11 0% 0%
2,109.730.630.63 0% 0.63 100%
22.2822.28 0% 22.2825 100%
MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE EN EL DISTRITO DE HUANCAYA - PROVINCIA DE YAUYOS - DEPARTAMENTO DE LIMA
58.4527.49 0% 27.486 100%30.97 0% 30.9672 100%
638.512.15 0% 2.1505 100%
187.22 0% 187.218 100%38.14 0% 38.137 100%
411.00 0% 411.0036 100%145.64145.64 0% 145.638 100%
1,196.43456.88 0% 456.88 100%490.17 0% 490.17 100%249.38 0% 249.38 100%
47.7947.79 0% 47.79 100%
10,604.9443.98
8.10 0% 0%35.88 0% 0%62.2738.36 0% 0%
2.54 0% 0%21.37 0% 0%31.0431.04 0% 0%
664.89507.66 0% 0%123.87 0% 0%
33.36 0% 0%9,802.775,491.35 0% 0%
841.84 0% 0%3,469.58 0% 0%2,007.10
7.367.36 0% 0%
164.40164.40 0% 0%486.12382.90 0% 0%103.22 0% 0%538.94
43.01 0% 0%201.09 0% 0%
34.67 0% 0%260.17 0% 0%194.18194.18 0% 0%616.09152.95 0% 0%463.14 0% 0%
220,126.337,757.627,757.62 0 0% 0%
186,150.4619,149.68 0 0% 0%18,539.40 0 0% 0%24,210.23 0 0% 0%25,018.31 0 0% 0%99,232.84 0 0% 0%25,429.93
694.05 0 0% 0%
15,796.37 0 0% 0%7,954.72 0 0% 0%
242.61 0 0% 0%742.18 0 0% 0%788.32788.32 0 0% 0%
68,433.3836,409.63 0 0% 0%32,023.75 0 0% 0%
1,652.80
1,652.80 0% 0%1,111.78
700.00 0% 0%411.78 0% 0%
2,875.231,453.001,453.00 726.5 50% 726.5 50%1,422.231,422.23 0% 0%
602,538.84 19,760.82 3% 74,752.85 12%
30126.9421 988.040986 3737.64227918,076.17 592.82 2,242.59650,741.95 21,341.69 80,733.07
CRONOGRAMA VALORIZADO
TERCER MES %
0%###0%
800 40%
0%0%###0%0%0%0%###
170681.3335 100%###
23266.0932 50%540 47%770 41%
0%
65.76 24%8.128 24%
0%###
1206.4906 100%2054.1576 100%
484.9056 100%###
735.816 100%699.624 100%
###793.2 100%
###561.108 100%
0%###0%
###0%0%###0%0%0%0%###0%###0%0%0%###0%######
8.1 100%35.88 100%
###38.3572 100%
2.54 100%21.3738 100%
###31.037 100%
###507.66 100%
123.8688 100%33.3576 100%
###5491.35 100%
841.84 100%3469.58 100%
######
7.36 100%###
164.4 100%###
382.9 100%103.224 100%
###43.01 100%
201.086 100%34.67 100%
260.1712 100%###
194.184 100%###
152.95 100%463.14 100%
######
7757.616 100%###
19149.6844 100%18539.4 100%
24210.2266 100%25018.3116 100%
99232.838 100%###
694.0505 100%
15796.3655 100%7954.7172 100%
242.6112 100%742.182 100%
###788.3232 100%
###36409.63 100%32023.75 100%
######
1652.8 100%###
700 100%411.78 100%
######0%###
1422.234 100%
508,025.18 84%
25401.25881515,240.76
548,667.19