DISEÑO DE ESTRUCTURAS DE CONCRETO ARMADOPREDIMENSIONAMIENTO Y METRADO DE CARGAS
Se realizara el diseño de un edificio de 5 pisos cuya estructuración se presenta
^ Y
¦¦
¦¦
¦¦
¦¦
¦¦
¦¦
¦¦
==================> X
Tabiqueria (Piso Tìpico) 180
Tabiqueria (Azotea) 0
Acabados 100
S/C Piso Tipico 350
S/C Techo 100
Peso Concreto 2400
CONSIDERACIONES INICIALES: En este parrafo se anotan valores obtenidos de Reglamentos
Altura Entrepisos (1°) 4 (2°,3°,4°,5°)= 3
PROPIEDADES DE LOS ELEMENTOS
f'c = 210
Ec= 2.2E+05 (15000*Raiz(f'c))
fy = 4200
E s= 2000000
1) ESPESOR DE LOSA ALIGERADA: (L/20 - L/25) se elige en el sentido de la losa
L1 (eje X)= 5 L2 (eje Y)= 6
h = 0.225 Err:508
Peso Losa = 350
2) PREDIMENSIONAMIENTO DE VIGAS
ACI (h)
Simp. Apoy. L/16 Altura
Cont. 1 Ext. L/18.5 Ancho Int
Cont. 2 Ext. L/21 Ancho Per.
Voladizo L/8
Eje Viga Luz Libre (m) Usar, h(m.) Ancho Trib.
A
V-T04-5 6.00 0.50 2.50
V-T04-4 6.00 0.50 2.50
V-T04-3 6.00 0.50 2.50
V-T04-2 6.00 0.50 2.50
V-T04-1 6.00 0.50 2.50
B
V-T05-5 6.00 0.50 5.00
V-T05-4 6.00 0.50 5.00
V-T05-3 6.00 0.50 5.00
V-T05-2 6.00 0.50 5.00
V-T05-1 6.00 0.50 5.00
C
V-T06-5 6.00 0.50 2.50
V-T06-4 6.00 0.50 2.50
V-T06-3 6.00 0.50 2.50
V-T06-2 6.00 0.50 2.50
V-T06-1 6.00 0.50 2.50
1
V-T01-5 5.00 0.45 1.00
V-T01-4 5.00 0.45 1.00
V-T01-3 5.00 0.45 1.00
V-T01-2 5.00 0.45 1.00
V-T01-1 5.00 0.45 1.00
2
V-T02-5 5.00 0.45 1.00
V-T02-4 5.00 0.45 1.00
V-T02-3 5.00 0.45 1.00
b1=
bb=
0.75*bb=
0.50*bb=
RECOMEND. PRACTICA
2
V-T02-2 5.00 0.45 1.00
V-T02-1 5.00 0.45 1.00
3
V-T03-5 5.00 0.45 1.00
V-T03-4 5.00 0.45 1.00
V-T03-3 5.00 0.45 1.00
V-T03-2 5.00 0.45 1.00
V-T03-1 5.00 0.45 1.00
CALCULOS DE PESOS DE APORTANTES (SIN CONSIDERAR PESOS DE VIGAS NI COLUMNAS)
Aportante TIPO DE CARGA
Losa D 350 350 1.00
Tabiqueria D 180 0 1.00
Acabados D 100 100 1.00
S/C L 350 100 1.00
630 450
WL 350 100
(Piso tipico)
kg/m2
(Azotea)
kg/m2
(Ancho Trib.)
01,02,03
WD
CARGAS PARA VIGAS (NO INCLUYEN SU PESO PROPIO)
AportanteTIPO DE CARGA
Carga Muerta 630 450 1670
Carga Viva 350 100 928
3) PREDIMENSIONAMIENTO DE COLUMNAS
ESQUINA: b x d = 1.5 x PG PG = A x W
0.2 x f´c A = Area Tributaria
W = Carga de Servicio en todos
LATERAL: b x d = 1.25 x PG los niveles sobre la columna
0.25x f´c
CENTRAL: b x d = 1.1 x PG
0.3 x f´c
AREAS TRIBUTARIAS
(Piso tipico)
01,02,03 (kg/m)
(Azotea)
01,02,03 (kg/m)
(Piso tipico)
A, C (kg/m)
WD
WL
ESTIMACION DE PESOS Y DIMENSIONES:
COLUMNA ESQUINA (C1) - NIVEL 5
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 1
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 2.65 3.15 --- 1
TABIQUERIA 2.65 3.15 --- 1
SOBREC. 2.65 3.15 --- 1
b x d = 199.0767857143 USAR
0.2 x f´c
COLUMNA ESQUINA - NIVEL 4
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 1
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 2.65 3.15 --- 1
TABIQUERIA 2.65 3.15 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 2.65 3.15 --- 1
b x d = 561.45 USAR
0.2 x f´c
COLUMNA ESQUINA - NIVEL 3
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 1
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 2.65 3.15 --- 1
TABIQUERIA 2.65 3.15 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 2.65 3.15 --- 1
b x d = 923.8232142857 USAR
0.2 x f´c
COLUMNA ESQUINA - NIVEL 2
1.5 x PG =
1.5 x PG =
1.5 x PG =
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 1
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 2.65 3.15 --- 1
TABIQUERIA 2.65 3.15 --- 1
COLUMNA 0.30 0.45 3.00 1
SOBREC. 2.65 3.15 --- 1
b x d = 1297.7678571429 USAR
0.2 x f´c
COLUMNA ESQUINA - NIVEL 1
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 1
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 2.65 3.15 --- 1
TABIQUERIA 2.65 3.15 --- 1
COLUMNA 0.30 0.45 4.00 1
SOBREC. 2.65 3.15 --- 1
b x d = 1683.2839285714 USAR
0.2 x f´c
USAR! 1°al 5° Nivel 30.00 60.00N° Colum.= 4
1.5 x PG =
1.5 x PG =
COLUMNA LATERAL (C2) - NIVEL 5
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 5.00 3.15 --- 1
TABIQUERIA 5.00 3.15 --- 1
SOBREC. 5.00 3.15 --- 1
b x d = 249.8821428571 USAR
0.25 x f´c
COLUMNA LATERAL (C2) - NIVEL 4
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 5.00 3.15 --- 1
TABIQUERIA 5.00 3.15 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 5.00 3.15 --- 1
b x d = 676.4428571429 USAR
0.25 x f´c
COLUMNA LATERAL (C2) - NIVEL 3
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 5.00 3.15 --- 1
TABIQUERIA 5.00 3.15 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 5.00 3.15 --- 1
b x d = 1103.0035714286 USAR
0.25 x f´c
COLUMNA LATERAL (C2) - NIVEL 2
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
1.25 x PG =
1.25 x PG =
1.25 x PG =
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 5.00 3.15 --- 1
TABIQUERIA 5.00 3.15 --- 1
COLUMNA 0.30 0.40 3.00 1
SOBREC. 5.00 3.15 --- 1
b x d = 1534.7071428572 USAR
0.25 x f´c
COLUMNA LATERAL (C2) - NIVEL 1
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 3.15 0.30 0.50 1
ACABADOS 5.00 3.15 --- 1
TABIQUERIA 5.00 3.15 --- 1
COLUMNA 0.30 0.55 4.00 1
SOBREC. 5.00 3.15 --- 1
b x d = 1983.5535714286 USAR
0.25 x f´c
USAR! 1°al 5° Nivel 35 60N° Colum.= 2
1.25 x PG =
1.25 x PG =
COLUMNA LATERAL (C3) - NIVEL 5
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 2.65 6.00 --- 1
TABIQUERIA 2.65 6.00 --- 1
SOBREC. 2.65 6.00 --- 1
b x d = 256.8964285714 USAR
0.25 x f´c
COLUMNA LATERAL (C3) - NIVEL 4
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 2.65 6.00 --- 1
TABIQUERIA 2.65 6.00 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 2.65 6.00 --- 1
b x d = 692.0071428571 USAR
0.25 x f´c
COLUMNA LATERAL (C3) - NIVEL 3
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 2.65 6.00 --- 1
TABIQUERIA 2.65 6.00 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 2.65 6.00 --- 1
b x d = 1127.1178571429 USAR
0.25 x f´c
COLUMNA LATERAL (C3) - NIVEL 2
APORTANTE L (m) B (m) H (m) N° VECES
1.25 x PG =
1.25 x PG =
1.25 x PG =
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 2.65 6.00 --- 1
TABIQUERIA 2.65 6.00 --- 1
COLUMNA 0.30 0.40 3.00 1
SOBREC. 2.65 6.00 --- 1
b x d = 1567.3714285714 USAR
0.25 x f´c
COLUMNA LATERAL (C3) - NIVEL 1
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 2
VIGAS - X 2.35 0.30 0.45 1
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 2.65 6.00 --- 1
TABIQUERIA 2.65 6.00 --- 1
COLUMNA 0.30 0.55 4.00 1
SOBREC. 2.65 6.00 --- 1
b x d = 2024.7678571429 USAR
0.25 x f´c
USAR! 1° al 5° Nivel 35.00 60N° Colum.= 2
1.25 x PG =
1.25 x PG =
COLUMNA CENTRAL (C4) - NIVEL 5
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 4
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 5.00 6.00 --- 1
TABIQUERIA 5.00 6.00 --- 1
SOBREC. 5.00 6.00 --- 1
b x d = 427.0671428571 USAR
0.3 x f´c
COLUMNA CENTRAL (C4) - NIVEL 4
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 4
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 5.00 6.00 --- 1
TABIQUERIA 5.00 6.00 --- 1
COLUMNA 0.30 0.30 3.00 1
SOBREC. 5.00 6.00 --- 1
b x d = 996.400952381 USAR
0.3 x f´c
COLUMNA CENTRAL (C4) - NIVEL 3
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 4
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 5.00 6.00 --- 1
TABIQUERIA 5.00 6.00 --- 1
COLUMNA 0.30 0.40 3.00 1
SOBREC. 5.00 6.00 --- 1
b x d = 1569.5061904762 USAR
0.3 x f´c
COLUMNA CENTRAL (C4) - NIVEL 2
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 4
1.1 x PG =
1.1 x PG =
1.1 x PG =
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 5.00 6.00 --- 1
TABIQUERIA 5.00 6.00 --- 1
COLUMNA 0.30 0.55 3.00 1
SOBREC. 5.00 6.00 --- 1
b x d = 2148.2685714286 USAR
0.3 x f´c
COLUMNA CENTRAL (C4) - NIVEL 1
APORTANTE L (m) B (m) H (m) N° VECES
LOSA 2.35 2.85 --- 4
VIGAS - X 2.35 0.30 0.45 2
VIGAS - Y 6.00 0.30 0.50 1
ACABADOS 5.00 6.00 --- 1
TABIQUERIA 5.00 6.00 --- 1
COLUMNA 0.40 0.55 4.00 1
SOBREC. 5.00 6.00 --- 1
b x d = 2743.1642857143 USAR
0.3 x f´c
USAR! 1° al 5° Nivel 45.00 65.00N° Colum.= 1
1.1 x PG =
1.1 x PG =
Peso de la Edificacion (P)
QUINTO NIVEL Peso Area LongitudPeso de Losa 5to Nivel = 300 26.79 ----------Peso de Viga V-X = 2400 kg/cm3 0.14 4.7Peso de Viga V-Y = 2400 kg/cm3 0.15 6Peso de Columnas = 2400 kg/cm3 1.85 3.0Peso de Acabados = 100 31.67 ----------Peso de Tabiqueria = 0 31.67 ----------25% Sobrecarga = 87.5 31.67 ----------
CUARTO NIVEL Peso Area LongitudPeso de Losa 4to Nivel = 300 26.79 ----------Peso de Viga V-X = 2400 kg/cm3 0.14 4.7Peso de Viga V-Y = 2400 kg/cm3 0.15 6Peso de Columnas = 2400 kg/cm3 1.85 3.0Peso de Acabados = 100 31.67 ----------Peso de Tabiqueria = 180 31.67 ----------50% Sobrecarga = 175 31.67 ----------
TERCER NIVEL Peso Area LongitudPeso de Losa 3er Nivel = 300 26.79 ----------Peso de Viga V-X = 2400 kg/cm3 0.14 4.7Peso de Viga V-Y = 2400 kg/cm3 0.15 6Peso de Columnas = 2400 kg/cm3 1.85 3.0Peso de Acabados = 100 31.67 ----------Peso de Tabiqueria = 180 31.67 ----------50% Sobrecarga = 175 31.67 ----------
SEGUNDO NIVEL Peso Area LongitudPeso de Losa 2do Nivel = 300 26.79Peso de Viga V-X = 2400 kg/cm3 0.14 4.7Peso de Viga V-Y = 2400 kg/cm3 0.15 6Peso de Columnas = 2400 kg/cm3 1.85 3.0Peso de Acabados = 100 31.67 -----Peso de Tabiqueria = 180 31.67 -----50% Sobrecarga = 175 31.67 -----
PRIMER NIVEL Peso Area LongitudPeso de Losa 1er Nivel = 300 26.79Peso de Viga V-X = 2400 kg/cm3 0.14 4.7Peso de Viga V-Y = 2400 kg/cm3 0.15 6Peso de Columnas = 2400 kg/cm3 1.85 4.0
Peso de Acabados = 100 31.67 -----Peso de Tabiqueria = 180 31.67 -----50% Sobrecarga = 175 31.67 -----
PESO TOTAL =
FUERZAS LATERALES POR CARGAS ESTATICAS EQUIVALENTES
Determinación de Cargas Laterales (Sismicas en X)Cargas Estaticas Equivalentes - NTE E.030
Cortante en la base :
Donde :Z =Factor de zonaU = Factor de uso e importanciaS = Factor de SueloC =Coeficiente de Amplificación sísmicaR =Coeficiente de reducción de solicitación sísmicaP = Peso total de la Edificacion
Datos :
Z = 0.4 : Zona 3U = 1.3 : Edificaciones importantes (B)S = 1.4 : Suelo Flexible (S3)R = 8 : Porticos de Concreto Armado
hn = 15.00 : Altura Total del Edificio CT = 35 : Porticos de Concreto ArmadoTs = 0.9 : Suelo Flexible (S3)
T = hn = 0.43
C = 5.230 C <=2.5
V =
Cortante en la base : V = 113.24 toneladas
Nivel Pi (Ton) Altura Piso (m) Hi (m) Pi*Hi5 73.57 3.0 16.0 1177.184 93.65 3.0 13.0 1217.393 117.76 3.0 10.0 1177.572 117.76 3.0 7.0 824.301 121.87 4.0 4.0 487.49
4883.93
CT
b(Pi*Hi) =
DISEÑO DE ESTRUCTURAS DE CONCRETO ARMADOPREDIMENSIONAMIENTO Y METRADO DE CARGAS
0.85
0.02125
0.01594
0.01063
se elige en el sentido de la losa
L/12
B/20
(B/20)*1.2
b (m.) Usar, b(m)
0.15 0.30
0.15 0.30
0.15 0.30
0.15 0.30
0.15 0.30
0.25 0.30
0.25 0.30
0.25 0.30
0.25 0.30
0.25 0.30
0.15 0.30
0.15 0.30
0.15 0.30
0.15 0.30
0.15 0.30
0.06 0.30
0.06 0.30
0.06 0.30
0.06 0.30
0.06 0.30
0.05 0.30
0.05 0.30
0.05 0.30
0.05 0.30
0.05 0.30
0.06 0.30
0.06 0.30
0.06 0.30
0.06 0.30
0.06 0.30
CALCULOS DE PESOS DE APORTANTES (SIN CONSIDERAR PESOS DE VIGAS NI COLUMNAS)
2.65 5.00
2.65 5.00
2.65 5.00
2.65 5.00
(Ancho Trib.) A,
C
(Ancho Trib.)
B
1193 3150 2250
265 1750 500
Carga de Servicio en todos
los niveles sobre la columna
(Azotea) A,
C (kg/m)
(Piso tipico)
B (kg/m)
(Azotea) B
(kg/m)
Peso PESO (Kgs)
350 2344
2400 761
2400 1134
100 835
0 0
100 835
TOTAL= 5574
30 30 ok
W (Kgs) PESO (Kgs)
350 2344
2400 761
2400 1134
100 835
180 1503
2400 648
350 2922
TOTAL= 10146
30 30 ok
W (Kgs) PESO (Kgs)
350 2344
2400 761
2400 1134
100 835
180 1503
2400 648
350 2922
TOTAL= 10146
30 45 ok
W (Kgs) PESO (Kgs)
350 2344
2400 761
2400 1134
100 835
180 1503
2400 972
350 2922
TOTAL= 10470
30 45 ok
W (Kgs) PESO (Kgs)
350 2344
2400 761
2400 1134
100 835
180 1503
2400 1296
350 2922
TOTAL= 10794
30 60 ok
(Columnas C-1)
W (Kgs) PESO (Kgs)
350 4688
2400 1523
2400 1134
100 1575
0 0
100 1575
TOTAL= 10495
30 30 ok
W (Kgs) PESO (Kgs)
350 4688
2400 1523
2400 1134
100 1575
180 2835
2400 648
350 5513
TOTAL= 17916
30 30 ok
W (Kgs) PESO (Kgs)
350 4688
2400 1523
2400 1134
100 1575
180 2835
2400 648
350 5513
TOTAL= 17916
30 40 ok
W (Kgs) PESO (Kgs)
350 4688
2400 1523
2400 1134
100 1575
180 2835
2400 864
350 5513
TOTAL= 18132
30 55 ok
W (Kgs) PESO (Kgs)
350 4688
2400 1523
2400 1134
100 1575
180 2835
2400 1584
350 5513
TOTAL= 18852
35 60 ok
(Columnas C-2)
W (Kgs) PESO (Kgs)
350 4688
2400 761
2400 2160
100 1590
0 0
100 1590
TOTAL= 10790
30 30 ok
W (Kgs) PESO (Kgs)
350 4688
2400 761
2400 2160
100 1590
180 2862
2400 648
350 5565
TOTAL= 18275
30 30 ok
W (Kgs) PESO (Kgs)
350 4688
2400 761
2400 2160
100 1590
180 2862
2400 648
350 5565
TOTAL= 18275
30 40 ok
W (Kgs) PESO (Kgs)
350 4688
2400 761
2400 2160
100 1590
180 2862
2400 864
350 5565
TOTAL= 18491
30 55 ok
W (Kgs) PESO (Kgs)
350 4688
2400 761
2400 2160
100 1590
180 2862
2400 1584
350 5565
TOTAL= 19211
35 60 ok
(Columnas C-3)
W (Kgs) PESO (Kgs)
350 9377
2400 1523
2400 2160
100 3000
180 5400
100 3000
TOTAL= 24459
30 30 ok
W (Kgs) PESO (Kgs)
350 9377
2400 1523
2400 2160
100 3000
180 5400
2400 648
350 10500
TOTAL= 32607
30 40 ok
W (Kgs) PESO (Kgs)
350 9377
2400 1523
2400 2160
100 3000
180 5400
2400 864
350 10500
TOTAL= 32823
30 55 ok
W (Kgs) PESO (Kgs)
350 9377
2400 1523
2400 2160
100 3000
180 5400
2400 1188
350 10500
TOTAL= 33147
40 55 ok
W (Kgs) PESO (Kgs)
350 9377
2400 1523
2400 2160
100 3000
180 5400
2400 2112
350 10500
TOTAL= 34071
45 65 ok
(Columnas C-4)
Peso de la Edificacion (P)
N° Veces Peso (Kgs)4 321486 91373 64801 133384 126694 04 11085
Total= 84857.175
N° Veces4 321486 91373 64801 133384 126694 228044 5543
Total= 102118.6875
N° Veces4 321486 91373 64801 133384 126694 228044 5543
Total= 102118.6875
N° Veces4 321486 91373 64801 133384 126694 228044 5543
Total= 102118.6875
N° Veces4 321486 91373 64801 17784
4 126694 228044 5543
Total= 106564.6875
497,778 Kgs
498 Ton
FUERZAS LATERALES POR CARGAS ESTATICAS EQUIVALENTES
C= 2.5
Vi (Ton)0.241 28.770.249 29.750.241 28.780.169 20.140.100 11.91
119.35
Pi*Hi/bPi*Hi