Informe Valorizado

14
RESUMEN DE VALORIZACIONES SEGÚN SUB PRESUPUESTOS: DEL 01 AL 10 DE ABRIL DEL 2015 MODALIDAD PROCESO DE ADJUDICACION DIRECTA PUBLICA Nº 063 – 2014-GRJ-CE-O PROPIETARIO MINISTERIO DE EDUCACION Valorización : 8 ENTIDAD LICITANTE GOBIERNO REGIONAL DE JUNIN Fecha : 10-Apr-15 CONTRATISTA Consorcio EDUCAPERU Valor Contratado : ### RESIDENTE Daniel Mauricio Muñoz Saenz 1.159900306 SUB PROYECTO PRESUPUESTO REFERENCIAL AVANCE ACUM. ANTERIOR AVANCE ACTUAL AVANCE ACUM. A LA FECHA SALDO POR SUB-PRESUPUESTOS MONTO Valorizado % Valorizado % Valorizado % Valorizado 01 914,960.54 888,194.69 97.07% 467.64 0.05% 888,662.33 97.13% 26,298.21 COSTO DIRECTO 914,960.54 888,194.69 97.07% 467.64 0.05% 888,662.33 97.13% 26,298.21 GASTOS GENERALES 8.00 % 73,196.84 71,055.58 37.41 71,092.99 2,103.86 UTILIDAD 7.00 % 64,047.24 62,173.63 32.73 62,206.36 1,840.87 SUB TOTAL 1,052,204.62 1,021,423.90 537.78 1,021,961.68 30,242.94 0.90000 FACTOR RELACIÓN 0.9000 946,984.16 919,281.51 484.00 919,765.51 27,218.65 IGV (18.00%) 170,457.15 165,470.67 87.12 165,557.79 4,899.36 TOTAL VALORIZACIÓN (INC. IGV) 1,117,441.31 1,084,752.19 571.13 1,085,323.31 32,118.00 TOTAL DEL COMPROMISO A FACTURAR QUE INCLUYE EL IGV 571.13 "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E. 31697 DEL CENTRO POBLADO BUENOS AIRES DEL DISTRITO DE PERENE, CHANCHAMAYO – JUNIN"

description

valorizacion mensual

Transcript of Informe Valorizado

ResumRESUMEN DE VALORIZACIONESSEGN SUB PRESUPUESTOS: DEL 01 AL 10 DE ABRIL DEL 2015MODALIDADPROCESO DE ADJUDICACION DIRECTA PUBLICA N 063 2014-GRJ-CE-OPROPIETARIO MINISTERIO DE EDUCACION Valorizacin N :8ENTIDAD LICITANTEGOBIERNO REGIONAL DE JUNIN Fecha :10-Apr-15CONTRATISTA Consorcio EDUCAPERU Valor Contratado:1117441.30744(Inc. IGV)RESIDENTEDaniel Mauricio Muoz Saenz

1.159900306SUB PROYECTOPRESUPUESTO REFERENCIALAVANCE ACUM. ANTERIORAVANCE ACTUALAVANCE ACUM. A LA FECHASALDO POR EJECUTARSUB-PRESUPUESTOSMONTOValorizado%Valorizado%Valorizado%Valorizado%01"MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E. 31697 DEL CENTRO POBLADO BUENOS AIRES DEL DISTRITO DE PERENE, CHANCHAMAYO JUNIN"914,960.54888,194.6997.07%467.640.05%888,662.3397.13%26,298.212.87%

COSTO DIRECTO 914,960.54888,194.6997.07%467.640.05%888,662.3397.13%26,298.212.87%100.00%GASTOS GE+NERALES 800.00 %73,196.8471,055.5837.4171,092.992,103.86UTILIDAD 700.00 %64,047.2462,173.6332.7362,206.361,840.87SUB TOTAL1,052,204.621,021,423.90537.781,021,961.6830,242.940.90000FACTOR RE+LACIN 0.9000946,984.16919,281.51484.00919,765.5127,218.65946,984.16IGV (18.00%)170,457.15165,470.6787.12165,557.794,899.36TOTAL VALORIZACIN (INC. IGV)1,117,441.311,084,752.19571.131,085,323.3132,118.001,117,441.31TOTAL DEL COMPROMISO A FACTURAR QUE INCLUYE EL IGV571.13

CONTROL DE VALORIZACIONES

DESCRIPCIONVALORIZ. N 01VALORIZ. N 02VALORIZ. N 03VALORIZ. N 04VALORIZ. N 05VALORIZ. N 06VALORIZ. N 07SUBTOTALESTOTAL VALORIZACIN (INC. IGV)180,928.95336,701.00397,350.6385,192.5117,273.242,137.2865,168.58571.131,085,323.31TOTAL VALORIZACION0.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.000.000.00TOTAL VALORIZACION0.000.000.000.000.000.000.00SUB TOTAL170,366.24317,044.25374,153.1380,218.9316,264.822,012.5061,364.01537.781,021,961.66487,410.49FACTOR RE+LACIN 0.90153,329.62285,339.83336,737.8272,197.0414,638.341,811.2555,227.61484.00919,765.49ERROR:#REF!PORCENTAJE16.19%30.13%35.56%7.62%1.55%0.19%5.83%0.05%306.77%PORCENTAJE ACUMULADO EJECUTADO16.19%46.32%81.88%89.51%91.05%91.24%97.07%97.13%PORCENTAJE PROGRAMADO 3.55%11.55%18.85%28.14%19.27%7.64%5.00%5.00%0.0924PORCENTAJE ACUMULADO PROGRAMADO 3.55%15.10%33.95%62.09%81.36%89.00%94.00%99.00%0.1208

CURVAS DEL CRONOGRAMA VALORIZADO

PORCENTAJE ACUMULADO EJECUTADO16.19%46.32%81.88%89.51%91.05%91.24%97.07%97.13%PORCENTAJE ACUMULADO PROGRAMADO3.55%15.10%33.95%62.09%81.36%89.00%94.00%100.00%

BUENOS AIRES INFRAESTRUCTURVALORIZACIN DE OBRA N 08(DEL 01 AL 10 DE ABRIL DEL 2015)

MODALIDADPROCESO DE ADJUDICACION DIRECTA PUBLICA N 063 2014-GRJ-CE-OOBRA"MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E. 31697 DEL CENTRO POBLADO BUENOS AIRES DEL DISTRITO DE PERENE, CHANCHAMAYO JUNIN"

ENTIDADGOBIERNO REGIONAL DE JUNIN

EMPRESAConsorcio EDUCAPERU

RESIDENTEDaniel Mauricio Muoz Saenz

ITEMDESCRIPCINUNDMETRADOPRECIOPARCIALVALORIZACIN VALORIZACIN VALORIZACIN SALDO PORANTERIORACTUALACUMULADAVALORIZARMETRADOPARCIAL%METRADOPARCIAL%METRADOPARCIAL%METRADOPARCIAL%

1SUB PROYECTO N 01: OBRAS DE INFRAESTRUCTURA EDUCATIVA914,960.5401OBRAS PROVISIONALES01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 M x 3.60 M.und1.00350.00350.001.00350.00100%0.000.000%1.00350.00100%0.000.000%01.02 ALMACEN DE OBRAMES6.00250.001,500.006.001,500.00100%0.000.000%6.001,500.00100%0.000.000%01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOGLB1.001,500.001,500.001.001,500.00100%0.000.000%1.001,500.00100%0.000.000%02TRABAJOS PRELIMINARES02.01 TRABAJOS PRELIMINARES02.01.01 LIMPIEZA DE TERRENO MANUALm2289.330.41118.63289.33118.63100%0.000.000%289.33118.63100%0.000.000%02.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINARm2289.330.81234.36289.33234.36100%0.000.000%289.33234.36100%0.000.000%02.02 SEGURIDAD Y SALUD02.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJOGLB1.00400.00400.001.00400.00100%0.000.000%1.00400.00100%0.000.000%02.02.02 CAPACITACION DE SEGURIDAD Y SALUDDIA6.00200.001,200.006.001,200.00100%0.000.000%6.001,200.00100%0.000.000%02.02.03 EQUIPOS DE PROTECCION INDIVIDUALund25.0083.912,097.7525.002,097.75100%0.000.000%25.002,097.75100%0.000.000%02.02.04 EQUIPOS DE PROTECCION COLECTIVAGLB1.00343.00343.001.00343.00100%0.000.000%1.00343.00100%0.000.000%02.02.05 SEALIZACION TEMPORAL DE SEGURIDADGLB1.00200.00200.001.00200.00100%0.000.000%1.00200.00100%0.000.000%02.02.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJOGLB1.00540.00540.001.00540.00100%0.000.000%1.00540.00100%0.000.000%02.03 MEDIDAS DE MITIGACION AMBIENTAL02.03.01 RECUPERACION DE AREAS AFECTADASm278.0014.881,160.6478.001,160.64100%0.000.000%78.001,160.64100%0.000.000%02.03.02 RIEGO PERMANENTE EN ZONA DE TRABAJOmes6.00206.331,237.986.001,237.98100%0.000.000%6.001,237.98100%0.000.000%02.03.03 ACONDICIONAMIENTO DE BOTADEROGLB1.002,000.002,000.001.002,000.00100%0.000.000%1.002,000.00100%0.000.000%02.03.04 LETRINA PROVISIONALGLB1.00850.00850.001.00850.00100%0.000.000%1.00850.00100%0.000.000%03MOVIMIENTO DE TIERRAS03.01 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOSm333.8829.48998.7833.88998.78100%0.000.000%33.88998.78100%0.000.000%03.02 EXCAVACION PARA ZAPATAS DE H=2.00m3343.6234.3911,817.09343.6211,817.09100%0.000.000%343.6211,817.09100%0.000.000%03.03 NIVELACION Y COMPACTACION DE TERRENO CON COMPACTADORAm2255.002.16550.80255.00550.80100%0.000.000%255.00550.80100%0.000.000%03.04 RELLENO CON MATERIAL DE PRESTAMOm385.91112.309,647.6985.919,647.69100%0.000.000%85.919,647.69100%0.000.000%03.05 RELLENO CON MATERIAL DE PRESTAMO E=0.15m, inc. compactacion.m2255.0021.695,530.95255.005,530.95100%0.000.000%255.005,530.95100%0.000.000%03.06 COLOCADO DE PEDRAPLEN E=0.15m piedra min. 4"m2255.0033.838,626.65255.008,626.65100%0.000.000%255.008,626.65100%0.000.000%03.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPOm3490.759.284,554.16490.754,554.16100%0.000.000%490.754,554.16100%0.000.000%04OBRAS DE CONCRETO SIMPLE04.01 CIMIENTO04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm353.09294.8515,653.5953.0915,653.59100%0.000.000%53.0915,653.59100%0.000.000%04.02 SOBRECIMIENTO04.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOSm35.57329.411,834.815.571,834.81100%0.000.000%5.571,834.81100%0.000.000%04.02.02 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MTm274.2329.982,225.4274.232,225.42100%0.000.000%74.232,225.42100%0.000.000%04.03 CONCRETO SIMPLE04.03.01 SOLADO EN ZAPATAS E=4"m2286.3531.969,151.75286.359,151.75100%0.000.000%286.359,151.75100%0.000.000%04.03.02 FALSO PISO, E 4"(MEZCLA 1:8 CEMENTO HORMIGON)m2255.0035.579,070.35255.009,070.35100%0.000.000%255.009,070.35100%0.000.000%05OBRAS DE CONCRETO ARMADO05.01 ZAPATA05.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2m3143.18373.0553,413.30143.1853,413.30100%0.000.000%143.1853,413.30100%0.000.000%05.01.02 ACERO CORRUGADO FY=4200 Kg/cm2kg7,287.903.6726,746.597,287.9026,746.59100%0.000.000%7,287.9026,746.59100%0.000.000%05.02 COLUMNAS05.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2m322.48429.679,658.9822.489,658.98100%0.000.000%22.489,658.98100%0.000.000%05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2264.7038.3610,153.89264.7010,153.89100%0.000.000%264.7010,153.89100%0.000.000%05.02.03 ACERO CORRUGADO FY=4200 Kg/cm2kg3,745.623.6713,746.433,745.6213,746.43100%0.000.000%3,745.6213,746.43100%0.000.000%05.03 VIGAS05.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2m325.71429.6711,046.8225.7111,046.82100%0.000.000%25.7111,046.82100%0.000.000%05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm2171.8435.366,076.26171.846,076.26100%0.000.000%171.846,076.26100%0.000.000%05.03.03 ACERO CORRUGADO FY=4200 Kg/cm2kg3,544.463.6713,008.173,544.4613,008.17100%0.000.000%3,544.4613,008.17100%0.000.000%05.04 LOSA ARMADA05.04.01 CONCRETO EN LOSA ARMNADA FC= 210 KG/CM2m30.88429.67378.110.88378.11100%0.000.000%0.88378.11100%0.000.000%05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ARMADAm212.5438.36481.0312.54481.03100%0.000.000%12.54481.03100%0.000.000%05.04.03 ACERO CORRUGADO FY=4200 Kg/cm2kg92.103.67338.0192.10338.01100%0.000.000%92.10338.01100%0.000.000%05.05 LOSAS ALIGERADAS05.05.01 CONCRETO EN LOSAS ALIGERADAS FC=210 KG/CM2m330.39436.4713,264.3230.3813,259.96100%0.000.000%30.3813,259.96100%0.000.000%05.05.02 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADASm2350.9827.199,543.15350.989,543.15100%0.000.000%350.989,543.15100%0.000.000%05.05.03 ACERO CORRUGADO FY=4200 Kg/cm2kg1,438.613.675,279.701,438.615,279.69100%0.000.000%1,438.615,279.69100%0.000.000%05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOund2,948.232.748,078.152,948.238,078.16100%0.000.000%2,948.238,078.16100%0.000.000%05.06 COLUMNETAS05.06.01 COLUMNETA - CONCRETO FC=175KG/CM2m39.28372.083,452.909.283,452.90100%0.000.000%9.283,452.90100%0.000.000%05.06.02 COLUMNETA - ENCOFRADO Y DESENCOFRADOm2123.7236.664,535.58123.724,535.58100%0.000.000%123.724,535.58100%0.000.000%05.06.03 ACERO CORRUGADO FY=4200 Kg/cm2kg1,179.763.674,329.721,179.764,329.72100%0.000.000%1,179.764,329.72100%0.000.000%05.07 VIGUETAS05.07.01 VIGUETAS - CONCRETO FC=175KG/CMm31.93372.08718.111.93718.11100%0.000.000%1.93718.11100%0.000.000%05.07.02 VIGUETA - ENCOFRADO Y DESENCOFRADOm225.7136.66942.5325.72942.90100%0.000.000%25.72942.90100%0.000.000%05.07.03 ACERO CORRUGADO FY=4200 Kg/cm2kg348.403.671,278.63348.401,278.63100%0.000.000%348.401,278.63100%0.000.000%06MUROS Y TABIQUES06.01 MURO DE SOGA LADRILLO KK 18 HUECOS CON CEMENTO - ARENAm2237.4165.8715,638.20237.4115,638.20100%0.000.000%237.4115,638.20100%0.000.000%07ESTRUCTURAS DE MADERA Y COBERTURA07.01 CORREA DE MADERA DE 2"X3"ML816.007.926,462.72816.006,462.72100%0.000.000%816.006,462.72100%0.000.000%07.02 COBERTURA PLANCHA DE ONDULINEm2448.7440.6818,254.74448.7418,254.74100%0.000.000%448.7418,254.74100%0.000.000%07.03 CUMBRERA PARA PLANCHA DE ONDULINEm47.1021.291,002.7647.101,002.76100%0.000.000%47.101,002.76100%0.000.000%08REVOQUES ENLUCIDOS Y MOLDURAS08.01 TARRAJEO EN EXTERIORES E INTERIORESm2487.3718.889,201.55487.379,201.55100%0.000.000%487.379,201.55100%0.000.000%08.02 TARRAJEO DE SUPERFICIE DE COLUMNASm2299.5421.686,494.03299.546,494.03100%0.000.000%299.546,494.03100%0.000.000%08.03 TARRAJEO DE SUPERFICIE DE VIGASm2197.5525.855,106.67197.555,106.67100%0.000.000%197.555,106.67100%0.000.000%08.04 VESTIDURA DE DERRAMESML417.148.033,349.63417.143,349.63100%0.000.000%417.143,349.63100%0.000.000%09PISOS Y PAVIMENTOS09.01 CONTRAPISO DE 25 MM.m2255.0020.685,273.40255.005,273.40100%0.000.000%255.005,273.40100%0.000.000%09.02 PISO DE CERAMICO DE 0.30m x 0.30mm2255.0043.4311,074.65255.0011,074.65100%0.000.000%255.0011,074.65100%0.000.000%10CIELO RASOS10.01 CIELO RASO CON MEZCLA DE CEMENTO ARENAm2350.9834.4712,098.28350.9812,098.28100%0.000.000%350.9812,098.28100%0.000.000%11ZOCALOS11.01 ZOCALO DE CERAMICO 20x30cmm268.3343.432,967.5768.332,967.57100%0.000.000%68.332,967.57100%0.000.000%12CONTRAZOCALOS12.01 CONTRAZOCALO DE CEMENTO FROTACHADO H=0.30mm126.6515.932,017.53126.652,017.53100%0.000.000%126.652,017.53100%0.000.000%12.02 CONTRAZOCALO DE CERAMICO 30x30 H=0.10mm172.808.241,423.87172.801,423.87100%0.000.000%172.801,423.87100%0.000.000%13REVESTIMIENTOS13.01 REVESTIMIENTO DE TERRAZO PULIDOm212.5474.07928.8412.54928.84100%0.000.000%12.54928.84100%0.000.000%14CARPINTERIA DE MADERA14.01 PUERTAS14.01.01 PUERTA DE MADERA CEDRO APANELADAm232.76300.009,828.0032.769,828.00100%0.000.000%32.769,828.00100%0.000.000%14.01.02 MARCO DE MADERA CEDRO 2"x4"m91.2023.002,097.6091.202,097.60100%0.000.000%91.202,097.60100%0.000.000%14.02 DIVISIONES DE MELAMINE14.02.01 PUERTA DE MELAMINEm23.84141.53543.483.84543.48100%0.000.000%3.84543.48100%0.000.000%14.02.02 DIVISIONES DE MELAMINEm27.87141.531,113.847.871,113.84100%0.000.000%7.871,113.84100%0.000.000%15CERRAJERIA15.01 CERRADURAS15.01.01 CERRADURA TIPO "B"und9.0025.42228.789.00228.78100%0.000.000%9.00228.78100%0.000.000%15.01.02 CERRADURA TIPO "I"und9.0050.85457.659.00457.65100%0.000.000%9.00457.65100%0.000.000%15.01.03 COLOCACION DE CERRADURASund18.0016.79302.2218.00302.22100%0.000.000%18.00302.22100%0.000.000%15.02 BISAGRAS15.02.01 BISAGRA CAPUCHINA DE 3"und18.0011.71210.7818.00210.78100%0.000.000%18.00210.78100%0.000.000%15.03 CIERRA PUERTAS15.03.01 CERROJO SIMPLEund4.006.9827.924.0027.92100%0.000.000%4.0027.92100%0.000.000%16PINTURA16.01 PINTURA LATEX EN MUROS EXTERIORES E INTERIORESm2487.376.533,182.53487.373,182.53100%0.000.000%487.373,182.53100%0.000.000%16.02 PINTURA LATEX EN COLUMNASm2299.546.531,956.00299.541,956.00100%0.000.000%299.541,956.00100%0.000.000%16.03 PINTURA LATEX EN VIGASm2197.556.531,290.00197.551,290.00100%0.000.000%197.551,290.00100%0.000.000%16.04 PINTURA LATEX EN CIELORRASOm2350.985.691,997.08350.981,997.08100%0.000.000%350.981,997.08100%0.000.000%17VIDRIOS, CRISTALES Y SIMILARES17.01 CRISTAL TEMPLADO DE 6mm con acc. y colocacionm2159.30237.2937,800.30159.3037,800.30100%0.000.000%159.3037,800.30100%0.000.000%17.02 ESPEJOS MIREX 4mm con acc. y colocacionm20.9047.0342.330.9042.33100%0.000.000%0.9042.33100%0.000.000%18VARIOS18.01 PLACA RECORDATORIAund1.00400.00400.000.000.000%1.00400.00100%1.00400.00100%0.000.000%19APARATOS SANITARIOS Y ACCESORIOS19.01 INODORO TOP PIECE O SIMILARund2.00173.94347.882.00347.88100%0.000.000%2.00347.88100%0.000.000%19.02 INODORO TAZA BABY O SIMILARund4.00258.641,034.564.001,034.56100%0.000.000%4.001,034.56100%0.000.000%19.03 LAVATORIO OVALIN SONNET O SIMILARund4.00172.24688.964.00688.96100%0.000.000%4.00688.96100%0.000.000%19.04 LAVATORIO MANCORA O SIMILARund2.00151.04302.082.00302.08100%0.000.000%2.00302.08100%0.000.000%19.05 URINARIO CADET O SIMILARund3.00167.14501.423.00501.42100%0.000.000%3.00501.42100%0.000.000%19.06 LAVADERO DE ACERO INOXIDABLE DE 1 POZA C/ESCURRIDOR O SIMILARund3.00206.14618.423.00618.42100%0.000.000%3.00618.42100%0.000.000%19.07 PAPELERA DE SOBREPONERund6.0012.7076.206.0076.20100%0.000.000%6.0076.20100%0.000.000%19.08 DISPENSADOR DE JABON LIQUIDO, TIPO BOLAund4.0030.00120.004.00120.00100%0.000.000%4.00120.00100%0.000.000%20SISTEMA DE DESAGUE Y VENTILACION20.01 SALIDAS DE DESAGUE Y VENTILACION20.01.01 SALIDA DE PVC SAL PARA DESAGUE DE 2"pto12.0021.70260.4012.00260.40100%0.000.000%12.00260.40100%0.000.000%20.01.02 SALIDA DE PVC SAL PARA DESAGUE DE 4"pto6.0027.71166.266.00166.26100%0.000.000%6.00166.26100%0.000.000%20.01.03 SALIDA DE VENTILACION PVC DE 2"pto4.0023.3393.324.0093.32100%0.000.000%4.0093.32100%0.000.000%20.02 REDES DE DISTRIBUCION20.02.01 TUBERIA PVC-SAL 2"m36.0012.41446.7636.00446.76100%0.000.000%36.00446.76100%0.000.000%20.02.02 TUBERIA PVC-SAL 3"m24.0014.35344.4024.00344.40100%0.000.000%24.00344.40100%0.000.000%20.02.03 TUBERIA PVC-SAL 4"m12.0016.13193.5612.00193.56100%0.000.000%12.00193.56100%0.000.000%20.02.04 MONTANTE DE PVC-SAL 2"m16.0012.99207.8416.00207.84100%0.000.000%16.00207.84100%0.000.000%20.03 REDES COLECTORAS20.03.01 TUBERIA PVC-SAL 4"m34.0016.13548.4234.00548.42100%0.000.000%34.00548.42100%0.000.000%20.04 CAMARAS DE INSPECCION20.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24"und5.00198.18990.905.00990.90100%0.000.000%5.00990.90100%0.000.000%20.05 ADITAMENTOS VARIOS20.05.01 REGISTRO DE BRONCE DE 2"und7.0022.47157.297.00157.29100%0.000.000%7.00157.29100%0.000.000%20.05.02 REGISTRO DE BRONCE DE 4"und1.0026.3126.311.0026.31100%0.000.000%1.0026.31100%0.000.000%21SISTEMA DE AGUA FRIA21.01 SALIDAS DE AGUA FRIA21.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto24.0019.58469.9224.00469.92100%0.000.000%24.00469.92100%0.000.000%21.02 REDES DE DISTRIBUCION21.02.01 TUBERIA PVC-SAP 1/2" C-10m179.203.79679.17179.20679.17100%0.000.000%179.20679.17100%0.000.000%21.02.02 TUBERIA PVC-SAP 3/4" C-10m28.304.15117.4528.30117.45100%0.000.000%28.30117.45100%0.000.000%21.02.03 TUBERIA PVC-SAP 1" C-10m2.504.5111.282.5011.28100%0.000.000%2.5011.28100%0.000.000%21.03 LLAVES Y VALVULAS21.03.01 VALVULA COMPUERTA DE BRONCE DE 1/2"und7.0059.99419.937.00419.93100%0.000.000%7.00419.93100%0.000.000%21.04 ALMACENAMIENTO DE AGUA Y OTRAS INSTALACIONES21.04.01 TANQUE CISTERNA PREFABRICADOund1.001,724.921,724.921.001,724.92100%0.000.000%1.001,724.92100%0.000.000%21.04.02 TANQUE ELEVADO PREFABRICADOund1.00610.92610.921.00610.92100%0.000.000%1.00610.92100%0.000.000%21.04.03 ELECTROBOMBA 0.5 HPund1.00719.22719.221.00719.22100%0.000.000%1.00719.22100%0.000.000%22SISTEMA DE DESAGUE PLUVIAL22.01 CANALETA GALVANIZADA DE 6"m94.2049.494,661.9694.204,661.96100%0.000.000%94.204,661.96100%0.000.000%22.02 BAJADA DE TUBERIA PLUVIAL PVC-SAP DE 3"und12.0035.43425.1612.00425.16100%0.000.000%12.00425.16100%0.000.000%23INSTALACIONES ELECTRICAS23.01 SALIDAS PARA ALUMBRADO23.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 15mmpto49.0031.601,548.4049.001,548.40100%0.000.000%49.001,548.40100%0.000.000%23.02 SALIDAS PARA INTERRUPTORES23.02.01 INTERRUPTOR UNIPOLAR SIMPLE DE PVC SAP 15mmpto11.0039.76437.3611.00437.36100%0.000.000%11.00437.36100%0.000.000%23.02.02 INTERRUPTOR UNIPOLAR DOBLE DE PVC SAP 15mmpto4.0044.96179.844.00179.84100%0.000.000%4.00179.84100%0.000.000%23.02.03 INTERRUPTOR UNIPOLAR TRIPLE DE PVC SAP 15mmpto2.0052.55105.102.00105.10100%0.000.000%2.00105.10100%0.000.000%23.03 SALIDAS PARA TOMACORRIENTES23.03.01 TOMACORRIENTE BIPOLAR DOBLE C/LINEA A TIERRA PVC SAP 15mm EN PAREDpto37.0042.611,576.5737.001,576.57100%0.000.000%37.001,576.57100%0.000.000%23.04 SALIDAS PARA FUERZA0.000.0023.04.01 SALIDA DE FUERZA, 1/2HP HASTA 5HP PVC SAP 15mmpto1.0075.2575.251.0075.25100%0.000.000%1.0075.25100%0.000.000%24CANALIZACIONES Y TUBERIAS24.01 TUBERIA PVC SAP (ELECTRICAS) D=20mmm277.003.821,058.14277.001,058.14100%0.000.000%277.001,058.14100%0.000.000%24.02 TUBERIA PVC SAP (ELECTRICAS) D=25mmm50.805.29268.7350.80268.73100%0.000.000%50.80268.73100%0.000.000%24.03 TUBERIA PVC SAP (ELECTRICAS) D=35mmm7.306.4847.307.3047.30100%0.000.000%7.3047.30100%0.000.000%25CONDUCTORES Y/O CABLES25.01 CABLE ELECTRICO LSOH 2.5 mm2m317.801.49473.52317.80473.52100%0.000.000%317.80473.52100%0.000.000%25.02 CABLE ELECTRICO LSOH 4 mm2m236.202.03479.49236.20479.49100%0.000.000%236.20479.49100%0.000.000%25.03 CABLE ELECTRICO LSOH 10 mm2m101.604.38445.01101.60445.01100%0.000.000%101.60445.01100%0.000.000%25.04 CABLE ELECTRICO LSOH 16 mm2m14.607.06103.0814.60103.08100%0.000.000%14.60103.08100%0.000.000%26TABLEROS Y CUCHILLAS26.01 TABLERO GENERAL TG-01 (PARA ADOSAR)und1.00144.59144.591.00144.59100%0.000.000%1.00144.59100%0.000.000%26.02 TABLERO DISTRIBUCION TD-01 (PARA ADOSAR)und1.00144.59144.591.00144.59100%0.000.000%1.00144.59100%0.000.000%26.03 TABLERO DISTRIBUCION TD-02 (PARA ADOSAR)und1.00174.25174.251.00174.25100%0.000.000%1.00174.25100%0.000.000%26.04 TABLERO DISTRIBUCION TD-03 (PARA ADOSAR)und1.00144.59144.591.00144.59100%0.000.000%1.00144.59100%0.000.000%26.05 MEDIDOR DE LUZund1.00700.00700.001.00700.00100%0.000.000%1.00700.00100%0.000.000%27ARTEFACTOS27.01 ARTEFACTO ADOSADO A TECHO C/2 LAMPARAS FLUORESCENTE 36Wund31.0076.302,365.3031.002,365.30100%0.000.000%31.002,365.30100%0.000.000%27.02 ARTEFACTO ADOSADO A TECHO C/1 LAMPARA FLUORESCENTE CIRCULAR 32Wund7.0038.20267.407.00267.40100%0.000.000%7.00267.40100%0.000.000%27.03 ARTEFACTO ADOSADO A TECHO C/1 LAMPARA DE 20Wund11.0025.50280.5011.00280.50100%0.000.000%11.00280.50100%0.000.000%27.04 COLOCACION DE ARTEFACTOS DE ALUMBRADOund49.0018.84923.1649.00923.16100%0.000.000%49.00923.16100%0.000.000%28VARIOS28.01 POZO A TIERRAund1.00924.70924.701.00924.70100%0.000.000%1.00924.70100%0.000.000%28.02 FLETE TERRESTREGLB1.0022,964.9722,964.971.0022,964.97100%0.000.000%1.0022,964.97100%0.000.000%1SUB PROYECTO N 02: OBRAS EXTERIORES01TRABAJOS PRELIMINARES01.01 LIMPIEZA DE TERRENO MANUALm2766.700.41314.35766.70314.35100%0.000.000%766.70314.35100%0.000.000%01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINARm2766.700.81621.03766.70621.03100%0.000.000%766.70621.03100%0.000.000%01.03 CORTE DE TERRENO INCL. ELIMINACIONm3788.5023.9818,908.23788.5018,908.23100%0.000.000%788.5018,908.23100%0.000.000%02MOVIMIENTO DE TIERRAS02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOSm3339.2829.4810,001.97324.289,559.7396%0.000.000%324.289,559.7396%15.00442.244%02.02 EXCAVACION PARA ZAPATAS DE H=2.00m335.6034.391,224.2835.601,224.28100%0.000.000%35.601,224.28100%0.000.000%02.03 NIVELACION Y COMPACTACION DE TERRENO CON COMPACTADORAm2623.722.161,347.24623.721,347.24100%0.000.000%623.721,347.24100%0.000.000%02.04 RELLENO CON MATERIAL DE PRESTAMOm3386.08112.3043,356.78386.0843,356.78100%0.000.000%386.0843,356.78100%0.000.000%02.05 RELLENO CON MATERIAL DE PRESTAMO E=0.15m, inc. compactacion.m2383.7721.698,323.97383.778,323.97100%0.000.000%383.778,323.97100%0.000.000%02.06 COLOCADO DE PEDRAPLEN E=0.15m piedra min. 4"m2237.2833.838,027.18237.288,027.18100%0.000.000%237.288,027.18100%0.000.000%02.07 COLOCADO DE PEDRAPLEN E=0.30m piedra min. 4"m2146.4960.188,815.77146.498,815.77100%0.000.000%146.498,815.77100%0.000.000%02.08 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPOm3487.349.284,522.52467.844,341.5796%0.000.000%467.844,341.5796%19.50180.944%03OBRAS DE CONCRETO SIMPLE03.01 CIMIENTO03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm332.97294.859,721.2020.976,183.0064%0.000.000%20.976,183.0064%12.003,538.2036%03.02 SARDINEL03.02.01 SARDINEL - CONCRETO FC=175KG/CMm314.06372.085,231.4414.065,231.44100%0.000.000%14.065,231.44100%0.000.000%03.02.02 SARDINEL - ENCOFRADO Y DESENCOFRADOm2201.0424.915,007.91201.045,007.91100%0.000.000%201.045,007.91100%0.000.000%03.03 CANAL0.0003.03.01 CANAL - CONCRETO FC=175KG/CMm33.84372.081,428.793.841,428.79100%0.000.000%3.841,428.79100%0.000.000%03.03.02 CANAL - ENCOFRADO Y DESENCOFRADOm248.0024.911,195.6848.001,195.68100%0.000.000%48.001,195.68100%0.000.000%03.04 CONCRETO SIMPLE03.04.01 SOLADO EN ZAPATAS E=4"m29.0431.96288.929.04288.92100%0.000.000%9.04288.92100%0.000.000%04OBRAS DE CONCRETO ARMADO04.01 ZAPATA04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2m35.00373.051,865.255.001,865.25100%0.000.000%5.001,865.25100%0.000.000%04.01.02 ACERO CORRUGADO FY=4200 Kg/cm2kg97.313.67357.1397.31357.13100%0.000.000%97.31357.13100%0.000.000%04.02 COLUMNAS04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2m310.65429.674,575.998.773,768.2182%0.000.000%8.773,768.2182%1.88807.7818%04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2164.9138.366,325.95134.915,175.1582%0.000.000%134.915,175.1582%30.001,150.8018%04.02.03 ACERO CORRUGADO FY=4200 Kg/cm2kg1,574.963.675,780.101,358.344,985.1286%0.000.000%1,358.344,985.1286%216.62794.9814%04.03 VIGAS04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2m31.26429.67541.381.26541.38100%0.000.000%1.26541.38100%0.000.000%04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm215.8035.36558.6915.80558.69100%0.000.000%15.80558.69100%0.000.000%04.03.03 ACERO CORRUGADO FY=4200 Kg/cm2kg185.783.67681.81185.78681.81100%0.000.000%185.78681.81100%0.000.000%04.04 VIGAS DE CIMENTACION04.04.01 CONCRETO EN VIGAS DE CIMENTACION FC=210KG/CM2m30.61429.67262.100.61262.10100%0.000.000%0.61262.10100%0.000.000%04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACIONm24.8635.36171.854.86171.85100%0.000.000%4.86171.85100%0.000.000%04.04.03 ACERO CORRUGADO FY=4200 Kg/cm2kg38.363.67140.7838.36140.78100%0.000.000%38.36140.78100%0.000.000%04.05 LOSA ARMADA04.05.01 CONCRETO EN LOSA ARMADA FC= 210 KG/CM2m32.53429.671,087.072.531,087.07100%0.000.000%2.531,087.07100%0.000.000%04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ARMADAm230.4038.361,166.1430.401,166.14100%0.000.000%30.401,166.14100%0.000.000%04.05.03 ACERO CORRUGADO FY=4200 Kg/cm2kg209.253.67767.95209.25767.95100%0.000.000%209.25767.95100%0.000.000%04.06 MURO ARMADO04.06.01 CONCRETO EN MURO ARMADO FC=210 KG/CM2m398.80429.6742,451.4098.8042,451.40100%0.000.000%98.8042,451.40100%0.000.000%04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO ARMADOm2280.0038.3610,740.80280.0010,740.80100%0.000.000%280.0010,740.80100%0.000.000%04.06.03 ACERO CORRUGADO FY=4200 Kg/cm2kg4,878.293.6717,903.324,878.2917,903.32100%0.000.000%4,878.2917,903.32100%0.000.000%04.07 TANQUE DE CONCRETO04.07.01 CONCRETO EN TANQUE DE CONCRETO FC= 210 KG/CM2m35.88429.672,526.465.882,526.46100%0.000.000%5.882,526.46100%0.000.000%04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE DE CONCRETOm231.3638.361,202.9731.361,202.97100%0.000.000%31.361,202.97100%0.000.000%04.07.03 ACERO CORRUGADO FY=4200 Kg/cm2kg336.223.671,233.93336.221,233.93100%0.000.000%336.221,233.93100%0.000.000%04.08 SOBRECIMIENTO REFORZADO04.08.01 SOBRECIMIENTO REFORZADO - CONCRETO FC=175 KG/CM2m311.26372.084,189.627.892,935.7170%0.000.000%7.892,935.7170%3.371,253.9130%04.08.02 SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADOm2150.1424.913,739.99105.142,619.0470%0.000.000%105.142,619.0470%45.001,120.9530%04.08.03 ACERO CORRUGADO FY=4200 Kg/cm2kg920.323.673,377.57681.002,499.2774%0.000.000%681.002,499.2774%239.32878.3026%04.09 GRADERIA04.09.01 GRADERIA - CONCRETO FC=175KG/CMm32.66372.08989.732.66989.73100%0.000.000%2.66989.73100%0.000.000%04.09.02 GRADERIA - ENCOFRADO Y DESENCOFRADOm24.5624.91113.594.56113.59100%0.000.000%4.56113.59100%0.000.000%04.09.03 ACERO CORRUGADO FY=4200 Kg/cm2kg63.343.67232.4663.34232.46100%0.000.000%63.34232.46100%0.000.000%04.10 RAMPA04.10.01 RAMPA - CONCRETO FC=175KG/CM2m32.72372.081,012.062.721,012.06100%0.000.000%2.721,012.06100%0.000.000%04.10.02 RAMPA - ENCOFRADO Y DESENCOFRADOm24.9724.91123.804.97123.80100%0.000.000%4.97123.80100%0.000.000%04.10.03 ACERO CORRUGADO FY=4200 Kg/cm2kg106.173.67389.64106.17389.64100%0.000.000%106.17389.64100%0.000.000%04.11 JARDINERA0.0004.11.01 JARDINERA - CONCRETO FC=175KG/CMm311.04372.084,107.7611.044,107.76100%0.000.000%11.044,107.76100%0.000.000%04.11.02 JARDINERA - ENCOFRADO Y DESENCOFRADOm279.2024.911,972.8779.201,972.87100%0.000.000%79.201,972.87100%0.000.000%04.11.03 ACERO CORRUGADO FY=4200 Kg/cm2kg411.243.671,509.25411.241,509.25100%0.000.000%411.241,509.25100%0.000.000%05REVOQUES ENLUCIDOS Y MOLDURAS05.01 TARRAJEO EN EXTERIORES E INTERIORESm2358.4218.886,766.97307.805,811.2686%0.000.000%307.805,811.2686%50.62955.7114%05.02 TARRAJEO DE SUPERFICIE DE COLUMNASm2150.6421.683,265.88120.642,615.4880%0.000.000%120.642,615.4880%30.00650.4020%05.03 TARRAJEO DE SUPERFICIE DE VIGASm216.5925.85428.8516.59428.85100%0.000.000%16.59428.85100%0.000.000%06PISOS Y PAVIMENTOS06.01 PISO ADOQUINADO06.01.01 PISO ADOQUINADOm291.3845.534,160.5391.384,160.53100%0.000.000%91.384,160.53100%0.000.000%06.02 VEREDA06.02.01 VEREDA DE CONCRETO F'C= 175 KG/CM2 e=10cmm2118.6851.266,083.54118.686,083.54100%0.000.000%118.686,083.54100%0.000.000%06.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDASm243.1122.32962.2243.11962.22100%0.000.000%43.11962.22100%0.000.000%06.02.03 JUNTAS ASFALTICAS EN VEREDAML29.204.10119.7229.20119.72100%0.000.000%29.20119.72100%0.000.000%06.03 LOSA DE CONCRETO0.0006.03.01 LOSA DE CONCRETO F'C= 175 KG/CM2m314.65325.424,767.4014.654,767.40100%0.000.000%14.654,767.40100%0.000.000%06.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETOm211.9823.13277.1011.98277.10100%0.000.000%11.98277.10100%0.000.000%06.03.03 JUNTAS ASFALTICAS EN LOSAML69.804.10286.1869.80286.18100%0.000.000%69.80286.18100%0.000.000%07REVESTIMIENTOS07.01 REVESTIMIENTO DE GRANITO LAVADOm270.4055.183,884.6770.403,884.67100%0.000.000%70.403,884.67100%0.000.000%08CARPINTERIA METALICA08.01 PUERTA METALICA08.01.01 PUERTA METALICA SEGUN DISEO (2.50x2.50)und1.001,300.001,300.001.001,300.00100%0.000.000%1.001,300.00100%0.000.000%08.02 CERCO METALICO08.02.01 CERCO METALICO DE TUBO DE 2" - TIPO 01m107.16373.1639,987.8369.6625,994.3365%0.000.000%69.6625,994.3365%37.5013,993.5035%08.02.02 CERCO METALICO DE TUBO DE 2" - TIPO 02m35.92292.6610,512.3535.9210,512.35100%0.000.000%35.9210,512.35100%0.000.000%08.03 REJILLA METALICA08.03.01 REJILLA METALICA SEGUN DISEOm48.0050.002,400.0048.002,400.00100%0.000.000%48.002,400.00100%0.000.000%09CERRAJERIA09.01 CERRADURAS09.01.01 CERRADURA TIPO "I"und1.0050.8550.850.000.000%1.0050.85100%1.0050.85100%0.000.000%09.01.02 COLOCACION DE CERRADURASund1.0016.7916.790.000.000%1.0016.79100%1.0016.79100%0.000.000%10PINTURA10.01 PINTURA LATEX EN MUROS EXTERIORES E INTERIORESm2299.586.531,956.26248.961,625.7183%0.000.000%248.961,625.7183%50.62330.5517%10.02 PINTURA LATEX EN COLUMNASm2139.086.53908.19109.08712.2978%0.000.000%109.08712.2978%30.00195.9022%10.03 PINTURA LATEX EN VIGASm216.596.53108.3316.59108.33100%0.000.000%16.59108.33100%0.000.000%11JARDINERIA11.01 PREPARACION DE TIERRA AGRICOLA INC. FERTILIZANTESm2677.213.992,702.07677.212,702.07100%0.000.000%677.212,702.07100%0.000.000%11.02 EXTENDIDO Y NIVELADO DE TIERRA AGRICOLAm2677.212.581,747.20677.211,747.20100%0.000.000%677.211,747.20100%0.000.000%11.03 SEMBRADO DE GRASSm2677.215.283,575.67677.213,575.67100%0.000.000%677.213,575.67100%0.000.000%11.04 RIEGO DE GRASSm26,772.100.271,828.476,772.101,828.47100%0.000.000%6,772.101,828.47100%0.000.000%11.05 SIEMBRA DE PLANTASund50.004.06203.0050.00203.00100%0.000.000%50.00203.00100%0.000.000%1SUB PROYECTO N 03: BIODIGESTOR01SISTEMA DE DESAGUE01.01 TRABAJOS PRELIMINARES01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR (TUBERIA)m10.001.1911.9010.0011.90100%0.000.000%10.0011.90100%0.000.000%01.02 RED COLECTORA01.02.01 EXCAVACION DE ZANJAS PARA TUBOm10.0010.32103.2010.00103.20100%0.000.000%10.00103.20100%0.000.000%01.02.02 REFINE DE FONDO DE ZANJA DE 4" A 8"m10.002.5325.3010.0025.30100%0.000.000%10.0025.30100%0.000.000%01.02.03 CAMA DE APOYO PARA TUBERIAm10.0012.49124.9010.00124.90100%0.000.000%10.00124.90100%0.000.000%01.02.04 RELLENO Y COMPACTADO C/MATERIAL PROPIO EN ZANJASm10.0013.72137.2010.00137.20100%0.000.000%10.00137.20100%0.000.000%01.02.05 SUMINISTRO E INSTALACION DE TUBERIA PVC-U DE 4"m10.0014.10141.0010.00141.00100%0.000.000%10.00141.00100%0.000.000%01.02.06 PRUEBA HIDRAULICA + ESCORRENTIA DE TUBERIA A ZANJA TAPADAm10.001.6216.2010.0016.20100%0.000.000%10.0016.20100%0.000.000%02INSTALACION DE BIODIGESTOR02.01 BIODIGESTOR02.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINARm24.490.813.644.493.64100%0.000.000%4.493.64100%0.000.000%02.01.02 EXCAVACION DE ZANJASm38.7229.48257.078.72257.07100%0.000.000%8.72257.07100%0.000.000%02.01.03 SUMINISTRO E INSTALACION DE BIODIGESTOR INC. ACCESORIOSund1.005,622.045,622.041.005,622.04100%0.000.000%1.005,622.04100%0.000.000%02.02 CAJA DE RECEPCION DE LODOS02.02.01 CONCRETO FC=175KG/CM2m30.07374.1826.190.0726.19100%0.000.000%0.0726.19100%0.000.000%02.02.02 ENCOFRADO Y DESENCOFRADOm20.4233.0913.900.4213.90100%0.000.000%0.4213.90100%0.000.000%02.02.03 MURO DE SOGA LADRILLO KK 18 HUECOS CON CEMENTO - ARENAm21.2072.3286.781.2086.78100%0.000.000%1.2086.78100%0.000.000%02.02.04 TARRAJEO Y ACABADO CON CEMENTO - ARENAm21.2521.1626.451.2526.45100%0.000.000%1.2526.45100%0.000.000%03ZANJAS DE INFILTRACION03.01 TRABAJOS PRELIMINARES03.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINARm219.500.8115.8019.5015.80100%0.000.000%19.5015.80100%0.000.000%03.02 MOVIMIENTO DE TIERRAS03.02.01 EXCAVACION DE ZANJASm313.0829.48385.6013.08385.60100%0.000.000%13.08385.60100%0.000.000%03.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADOm35.8512.9075.475.8575.47100%0.000.000%5.8575.47100%0.000.000%03.02.03 FILTRO DE GRAVAm37.23169.891,228.307.231,228.30100%0.000.000%7.231,228.30100%0.000.000%03.03 INSTALACION DE TUBERIAS03.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-U DE 2"m36.357.61276.6236.35276.62100%0.000.000%36.35276.62100%0.000.000%1SUB PROYECTO N 04: EQUIPAMIENTO01EQUIPAMIENTO01.01 EQUIPAMIENTOund1.0052,211.7652,211.761.0052,211.76100%0.000.000%1.0052,211.76100%0.000.000%-0.05-0.054.05

COSTO DIRECTO914,960.54888,194.69467.64888,662.3326,298.21914,960.54GASTOS GE+NERALES 800.00 %73,196.8471,055.5837.4171,092.992,103.86UTILIDAD 700.00 %64,047.2462,173.6332.7362,206.361,840.87=============================================SUB TOTAL1,052,204.621,021,423.90537.781,021,961.6830,242.94FACTOR RE+LACIN 0.9000946,984.16919,281.51484.00919,765.5127,218.6518170,457.15165,470.6787.12165,557.794,899.36=============================================TOTAL1,117,441.311,084,752.18571.121,085,323.3132,118.0032,118.00PORCENTAJE ACTUAL97.07%0.05%97.13%2.87%1,117,441.30PORCENTAJE ACUMULADO97.07%0.05%97.13%

1085323.30

MET VALVALORIZACIN DE OBRA N 08(DEL 01 AL 10 DE ABRIL DEL 2015)

MODALIDADPROCESO DE ADJUDICACION DIRECTA PUBLICA N 063 2014-GRJ-CE-OOBRA"MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E. 31697 DEL CENTRO POBLADO BUENOS AIRES DEL DISTRITO DE PERENE, CHANCHAMAYO JUNIN"

ENTIDADGOBIERNO REGIONAL DE JUNIN

EMPRESAConsorcio EDUCAPERU

RESIDENTEDaniel Mauricio Muoz Saenz

ITEMDESCRIPCINPROGRAMADOPRECIOPARCIALVALORIZACIN VALORIZACIN VALORIZACIN SALDO PORANTERIORACTUALACUMULADAVALORIZARUNDMETRADOMETRADOPARCIAL%METRADOPARCIAL%METRADOPARCIAL%METRADOPARCIAL%

1SUB PROYECTO N 01: OBRAS DE INFRAESTRUCTURA EDUCATIVA18VARIOS18.01 PLACA RECORDATORIAund1.00400.00400.000.000.000%1.00400.00100%1.00400.00100%1SUB PROYECTO N 02: OBRAS EXTERIORES09CERRAJERIA09.01 CERRADURASNUMEROPARTIDAUNIDADMETRADO PROGR.METRADO EJECUT.%09.01.01 CERRADURA TIPO "I"und1.0050.8550.850.000.000%1.0050.85100%1SUB PROYECTO N 02: OBRAS EXTERIORES09.01.02 COLOCACION DE CERRADURASund1.0016.7916.790.000.000%1.0016.79100%09CERRAJERIA09.01 CERRADURAS09.01.01 CERRADURA TIPO "I"und11.00100%09.01.02 COLOCACION DE CERRADURASund11.00100%