Junio

148
Equipo Tiempo Tiempo Grupo Turno Duracio Estado Estado/ Ubicaci Region PE7 Mon Jun Tue Jun Grupo 3 A 93634.0 Reserva Reserva 90 No Requerido PE1 Mon Jun Wed Jun Grupo 3 A 202130.0Reserva Reserva F03B189 ESPERA PE11 Mon Jun Wed Jun Grupo 3 A 219469.0Reserva Reserva 90 No Requerido PE2 Mon Jun Thu Jun Grupo 3 A 248046.0Demora Demora 5 F04B210 ESPERA PE10 Mon Jun Mon Jun Grupo 3 A 3046.0 Demora Demora 1 F04B210 ESPERA PE6 Mon Jun Mon Jun Grupo 3 A 1558.0 Demora Demora 1 F05B229 ESPERA PE9 Mon Jun Wed Jun Grupo 3 A 167928.0Reserva Reserva 90 No Requerido PE8 Mon Jun Mon Jun Grupo 3 A 1877.0 Demora Demora 1 F05B229 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 2195.0 Demora Demora 1 F04B210 ESPERA PE12 Mon Jun Wed Jun Grupo 3 A 186600.0Reserva Reserva F03B194 ESPERA PE13 Mon Jun Fri Jun Grupo 3 A 353503.0Reserva Reserva F03B191 ESPERA PE5 Mon Jun Mon Jun Grupo 3 A 2242.0 Demora Demora 1 F04B210 ESPERA PE4 Mon Jun Fri Jun Grupo 3 A 358221.0Demora Demora 4 F05B229 ESPERA PE6 Mon Jun Mon Jun Grupo 3 A 16309.0 Operativo Operativo F05B229 ESPERA PE8 Mon Jun Mon Jun Grupo 3 A 1412.0 Operativo Operativo F05B229 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 6966.0 Operativo Operativo F04B210 ESPERA PE5 Mon Jun Mon Jun Grupo 3 A 24920.0 Operativo Operativo F04B210 ESPERA PE10 Mon Jun Mon Jun Grupo 3 A 468.0 Demora Demora 4 F04B210 ESPERA PE8 Mon Jun Mon Jun Grupo 3 A 7331.0 Mantenci Mantenci F05B229 ESPERA PE10 Mon Jun Mon Jun Grupo 3 A 6943.0 Operativo Operativo F04B210 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 1168.0 Demora Demora 4 F04B210 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 6140.0 Operativo Operativo F04B210 ESPERA PE10 Mon Jun Mon Jun Grupo 3 A 810.0 Demora Demora 2 F04B210 ESPERA PE8 Mon Jun Mon Jun Grupo 3 A 809.0 Demora Demora 3 F05B229 ESPERA PE10 Mon Jun Mon Jun Grupo 3 A 5379.0 Operativo Operativo F04B210 ESPERA PE8 Mon Jun Mon Jun Grupo 3 A 21841.0 Demora Demora 4 F05B229 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 9004.0 Demora Demora 1 F04B210 ESPERA PE10 Mon Jun Mon Jun Grupo 3 A 14194.0 Demora Demora 2 F04B210 ESPERA PE6 Mon Jun Mon Jun Grupo 3 A 7632.0 Demora Demora 1 F05B229 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 7255.0 Demora Demora 3 F04B210 ESPERA PE6 Mon Jun Mon Jun Grupo 3 A 1068.0 Demora Demora 3 F05B229 ESPERA PE6 Mon Jun Mon Jun Grupo 3 A 29335.0 Operativo Operativo F05B229 ESPERA PE5 Mon Jun Mon Jun Grupo 3 A 2804.0 Demora Demora 4 F04B210 ESPERA PE5 Mon Jun Tue Jun Grupo 3 A 55253.0 Operativo Operativo F04B210 ESPERA PE10 Mon Jun Tue Jun Grupo 3 A 32060.0 Demora Demora 4 F04B210 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 5088.0 Demora Demora 4 F04B210 ESPERA PE8 Mon Jun Mon Jun Grupo 3 A 18924.0 Operativo Operativo F04B210 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 1686.0 Demora Demora 4 F04B210 ESPERA PE3 Mon Jun Mon Jun Grupo 3 A 676.0 Operativo Operativo F04B210 ESPERA PE3 Mon Jun Tue Jun Grupo 3 A 24960.0 Mantenci Mantenci F04B210 ESPERA PE8 Mon Jun Mon Jun Grupo 1 B 281.0 Demora Demora 3 F04B210 ESPERA PE8 Mon Jun Tue Jun Grupo 1 B 10489.0 Operativo Operativo F04B210 ESPERA PE6 Mon Jun Mon Jun Grupo 1 B 163.0 Demora Demora 2 F05B229 ESPERA PE6 Mon Jun Tue Jun Grupo 1 B 15317.0 Operativo Operativo F05B229 ESPERA PE10 Tue Jun Tue Jun Grupo 1 B 28958.0 Operativo Operativo F04B210 ESPERA PE8 Tue Jun Tue Jun Grupo 1 B 304.0 Demora Demora 2 F04B210 ESPERA PE8 Tue Jun Tue Jun Grupo 1 B 1936.0 Operativo Operativo F04B210 ESPERA PE3 Tue Jun Tue Jun Grupo 1 B 24.0 Demora Demora 3 F04B210 ESPERA PE3 Tue Jun Tue Jun Grupo 1 B 5840.0 Demora Demora 4 F04B210 ESPERA PE8 Tue Jun Tue Jun Grupo 1 B 1111.0 Mantenci Mantenci F04B210 ESPERA PE8 Tue Jun Tue Jun Grupo 1 B 18804.0 Operativo Operativo F04B210 ESPERA PE3 Tue Jun Tue Jun Grupo 1 B 1684.0 Demora Demora 4 F04B210 ESPERA

description

junio

Transcript of Junio

Equipo TiempoTiempo Grupo Turno DuracioEstado Estado/UbicaciRegionPE7 Mon Jun Tue Jun Grupo 3 A 93634.0 Reserva Reserva 90 No RequeridoPE1 Mon Jun Wed Jun Grupo 3 A 202130.0Reserva Reserva F03B1896ESPERANZAPE11 Mon Jun Wed Jun Grupo 3 A 219469.0Reserva Reserva 90 No RequeridoPE2 Mon Jun Thu Jun Grupo 3 A 248046.0Demora Demora 55F04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 3 A 3046.0 Demora Demora 1F04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 A 1558.0 Demora Demora 1F05B2296ESPERANZAPE9 Mon Jun Wed Jun Grupo 3 A 167928.0Reserva Reserva 90 No RequeridoPE8 Mon Jun Mon Jun Grupo 3 A 1877.0 Demora Demora 1F05B2296ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 2195.0 Demora Demora 1F04B2104ESPERANZAPE12 Mon Jun Wed Jun Grupo 3 A 186600.0Reserva Reserva F03B1944ESPERANZAPE13 Mon Jun Fri Jun Grupo 3 A 353503.0Reserva Reserva F03B1912ESPERANZAPE5 Mon Jun Mon Jun Grupo 3 A 2242.0 Demora Demora 1F04B2104ESPERANZAPE4 Mon Jun Fri Jun Grupo 3 A 358221.0Demora Demora 4F05B2296ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 A 16309.0 OperativoOperativoF05B2296ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 A 1412.0 OperativoOperativoF05B2296ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 6966.0 OperativoOperativoF04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 3 A 24920.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 3 A 468.0 Demora Demora 4F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 A 7331.0 Mantenci MantencioF05B2296ESPERAPE10 Mon Jun Mon Jun Grupo 3 A 6943.0 OperativoOperativoF04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 1168.0 Demora Demora 4F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 6140.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 3 A 810.0 Demora Demora 2F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 A 809.0 Demora Demora 3F05B2296ESPERANZAPE10 Mon Jun Mon Jun Grupo 3 A 5379.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 A 21841.0 Demora Demora 4F05B2296ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 9004.0 Demora Demora 1F04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 3 A 14194.0 Demora Demora 2F04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 A 7632.0 Demora Demora 1F05B2296ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 7255.0 Demora Demora 3F04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 A 1068.0 Demora Demora 3F05B2296ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 A 29335.0 OperativoOperativoF05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 3 A 2804.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Tue Jun Grupo 3 A 55253.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Tue Jun Grupo 3 A 32060.0 Demora Demora 4F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 5088.0 Demora Demora 4F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 A 18924.0 OperativoOperativoF04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 1686.0 Demora Demora 4F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 3 A 676.0 OperativoOperativoF04B2104ESPERANZAPE3 Mon Jun Tue Jun Grupo 3 A 24960.0 Mantenci MantencioF04B2104ESPERAPE8 Mon Jun Mon Jun Grupo 1 B 281.0 Demora Demora 3F04B2104ESPERANZAPE8 Mon Jun Tue Jun Grupo 1 B 10489.0 OperativoOperativoF04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 1 B 163.0 Demora Demora 2F05B2296ESPERANZAPE6 Mon Jun Tue Jun Grupo 1 B 15317.0 OperativoOperativoF05B2296ESPERANZAPE10 Tue Jun Tue Jun Grupo 1 B 28958.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 1 B 304.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 1 B 1936.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 1 B 24.0 Demora Demora 3F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 1 B 5840.0 Demora Demora 4F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 1 B 1111.0 Mantenci MantencioF04B2104ESPERAPE8 Tue Jun Tue Jun Grupo 1 B 18804.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 1 B 1684.0 Demora Demora 4F04B2104ESPERANZA

PE6 Tue Jun Tue Jun Grupo 1 B 1343.0 Demora Demora 55F05B2296ESPERANZAPE3 Tue Jun Tue Jun Grupo 1 B 14908.0 OperativoOperativoF04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 1 B 940.0 OperativoOperativoF05B2296ESPERANZAPE6 Tue Jun Tue Jun Grupo 1 B 376.0 Demora Demora 2F05B2296ESPERANZAPE6 Tue Jun Tue Jun Grupo 1 B 13559.0 OperativoOperativoF05B2296ESPERANZAPE8 Tue Jun Tue Jun Grupo 1 B 4035.0 Demora Demora 1F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 1 B 3981.0 Demora Demora 1F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 3 A 1077.0 Demora Demora 1F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 3 A 265.0 Demora Demora 1F05B2296ESPERANZAPE6 Tue Jun Tue Jun Grupo 3 A 35810.0 OperativoOperativoF05B2296ESPERANZAPE3 Tue Jun Tue Jun Grupo 3 A 3340.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 3 A 13969.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 3 A 16393.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 A 4892.0 Demora Demora 4F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 3 A 2722.0 Demora Demora 4F04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 3 A 13999.0 Mantenci Mantencion 316 Sistema PerPE3 Tue Jun Tue Jun Grupo 3 A 1451.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 3 A 165.0 Demora Demora 4F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 3 A 378.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 3 A 4321.0 Demora Demora 4F04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 A 1411.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 A 9489.0 Mantenci Mantenci F04B2104ESPERAPE3 Tue Jun Tue Jun Grupo 3 A 28802.0 Demora Demora 3F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 3 A 16720.0 Demora Demora 3F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 3 A 6797.0 Demora Demora 3F04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 3 A 22829.0 Demora Demora 32 Entregado por MantencioPE10 Tue Jun Tue Jun Grupo 3 A 16571.0 Demora Demora 3F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 3 A 24521.0 Mantenci Mantenci F04B2104ESPERAPE8 Tue Jun Tue Jun Grupo 3 A 2697.0 Demora Demora 4F04B2104ESPERANZAPE8 Tue Jun Wed Jun Grupo 3 A 31202.0 OperativoOperativoF04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 3 A 6643.0 Demora Demora 2F05B2296ESPERANZAPE10 Tue Jun Wed Jun Grupo 3 A 22501.0 Mantenci MantencioF04B2104ESPERAPE3 Tue Jun Tue Jun Grupo 1 B 6691.0 Demora Demora 4F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 1 B 7835.0 Demora Demora 55F05B2296ESPERANZAPE7 Tue Jun Tue Jun Grupo 1 B 5977.0 Demora Demora 42 Movimiento de CablesPE7 Tue Jun Wed Jun Grupo 1 B 35244.0 OperativoOperativo 1 ProduccionPE3 Tue Jun Wed Jun Grupo 1 B 35139.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 1 B 854.0 Demora Demora 3F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 1 B 5289.0 Demora Demora 4F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 1 B 264.0 OperativoOperativoF05B2296ESPERANZAPE6 Tue Jun Wed Jun Grupo 1 B 6141.0 Demora Demora 55F05B2296ESPERANZAPE5 Tue Jun Wed Jun Grupo 1 B 28620.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 B 2824.0 OperativoOperativoF05B2296ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 B 14009.0 Demora Demora 3F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 B 295.0 Demora Demora 49F05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 B 10773.0 OperativoOperativoF05B2296ESPERANZAPE8 Wed Jun Wed Jun Grupo 1 B 341.0 Demora Demora 2F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 1 B 12443.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 B 1808.0 Demora Demora 4F05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 B 11419.0 OperativoOperativoF05B2296ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 B 7202.0 OperativoOperativoF04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 1 B 655.0 Demora Demora 2F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 1 B 672.0 Demora Demora 2F04B2104ESPERANZA

PE8 Wed Jun Wed Jun Grupo 1 B 59.0 Demora Demora 4F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 1 B 7448.0 Demora Demora 55F04B2104ESPERANZAPE9 Wed Jun Wed Jun Grupo 1 B 18.0 Demora Demora 55 Preparacion Patio PerforaPE10 Wed Jun Wed Jun Grupo 1 B 7013.0 Demora Demora 54F04B2104ESPERANZAPE9 Wed Jun Wed Jun Grupo 1 B 53101.0 Demora Demora 55 Preparacion Patio PerforaPE5 Wed Jun Wed Jun Grupo 1 B 3818.0 Demora Demora 1F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 B 2678.0 Demora Demora 1F05B2296ESPERANZAPE3 Wed Jun Wed Jun Grupo 1 B 3681.0 Demora Demora 1F04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 1 B 4717.0 Demora Demora 45 Traslado de RegionPE6 Wed Jun Wed Jun Grupo 4 A 1460.0 Demora Demora 4F05B2296ESPERANZAPE10 Wed Jun Wed Jun Grupo 4 A 13053.0 Demora Demora 4F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 A 23725.0 Demora Demora 4F04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 4 A 7339.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 5295.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 A 13406.0 OperativoOperativoF05B2296ESPERANZAPE7 Wed Jun Thu Jun Grupo 4 A 79163.0 Mantenci Mantencion 1001 MantencionPE5 Wed Jun Wed Jun Grupo 4 A 168.0 Demora Demora 3F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 3600.0 OperativoOperativoF04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 4 A 2862.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 5703.0 Demora Demora 4F04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 4 A 4574.0 OperativoOperativoF04B2104ESPERANZAPE12 Wed Jun Wed Jun Grupo 4 A 1952.0 Mantenci Mantenci F03B1944ESPERAPE10 Wed Jun Wed Jun Grupo 4 A 34124.0 OperativoOperativoF04B2104ESPERANZAPE12 Wed Jun Wed Jun Grupo 4 A 29978.0 Demora Demora 3F03B1944ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 A 2205.0 Demora Demora 4F05B2296ESPERANZAPE3 Wed Jun Wed Jun Grupo 4 A 3940.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 15408.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 A 1421.0 OperativoOperativoF05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 A 4942.0 Reserva Reserva 9F05B2296ESPERANZAPE3 Wed Jun Wed Jun Grupo 4 A 4234.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 A 5027.0 OperativoOperativoF05B2296ESPERANZAPE3 Wed Jun Thu Jun Grupo 4 A 32681.0 Demora Demora 3F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 A 6897.0 Demora Demora 4F04B2104ESPERANZAPE1 Wed Jun Wed Jun Grupo 4 A 3059.0 OperativoOperativoF03B1896ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 A 3453.0 Demora Demora 4F05B2296ESPERANZAPE1 Wed Jun Wed Jun Grupo 4 A 5731.0 Demora Demora 3F03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 4459.0 Demora Demora 3F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 A 4937.0 Demora Demora 3F04B2104ESPERANZAPE6 Wed Jun Thu Jun Grupo 4 A 108363.0Demora Demora 3F05B2296ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 20.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 2002.0 Demora Demora 4F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 A 2086.0 Demora Demora 2F04B2104ESPERANZAPE1 Wed Jun Thu Jun Grupo 4 A 19577.0 OperativoOperativoF03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 73.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 1181.0 Demora Demora 55F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 A 1141.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 7.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 A 4835.0 Demora Demora 2F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 A 3619.0 Demora Demora 2F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 2 B 1044.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 B 2539.0 Demora Demora 55F04B2104ESPERANZAPE12 Wed Jun Wed Jun Grupo 2 B 3616.0 Demora Demora 4F03B1944ESPERANZAPE8 Wed Jun Thu Jun Grupo 2 B 65591.0 Mantenci Mantenci F04B2104ESPERA

PE11 Wed Jun Wed Jun Grupo 2 B 4606.0 Demora Demora 36 Punto de Trabajo ObstruiPE5 Wed Jun Wed Jun Grupo 2 B 204.0 Demora Demora 2F04B2104ESPERANZAPE5 Wed Jun Thu Jun Grupo 2 B 13560.0 OperativoOperativoF04B2104ESPERANZAPE9 Wed Jun Thu Jun Grupo 2 B 77235.0 Mantenci Mantencion 1003 ImprevistoPE10 Wed Jun Wed Jun Grupo 2 B 2234.0 Mantenci MantencioF04B2104ESPERAPE12 Wed Jun Thu Jun Grupo 2 B 15614.0 OperativoOperativoF03B1944ESPERANZAPE11 Wed Jun Thu Jun Grupo 2 B 18947.0 Demora Demora 47 Cambio Aceros PerforaciPE10 Wed Jun Wed Jun Grupo 2 B 98.0 Demora Demora 4F04B2104ESPERANZAPE10 Wed Jun Thu Jun Grupo 2 B 6893.0 Reserva Reserva F04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 B 24614.0 Mantenci Mantenci F03B1896ESPERAPE3 Thu Jun Thu Jun Grupo 2 B 18269.0 OperativoOperativoF04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 20380.0 Mantenci MantencioF04B2104ESPERAPE5 Thu Jun Thu Jun Grupo 2 B 499.0 Demora Demora 2F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 9874.0 OperativoOperativoF04B2104ESPERANZAPE12 Thu Jun Thu Jun Grupo 2 B 22340.0 Reserva Reserva 9F03B1944ESPERANZAPE11 Thu Jun Thu Jun Grupo 2 B 24231.0 OperativoOperativo 1 ProduccionPE5 Thu Jun Thu Jun Grupo 2 B 439.0 Demora Demora 2F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 1688.0 OperativoOperativoF04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 707.0 Demora Demora 3F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 2074.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 B 10573.0 Demora Demora 4F04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 B 5661.0 Demora Demora 49F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 4396.0 Demora Demora 49F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 342.0 Demora Demora 4F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 2881.0 Demora Demora 5F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 3157.0 OperativoOperativoF04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 B 12084.0 OperativoOperativoF04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 16.0 OperativoOperativoF04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 124.0 Demora Demora 4F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 8.0 OperativoOperativoF04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 1974.0 Mantenci Mantenci F04B2104ESPERAPE1 Thu Jun Thu Jun Grupo 2 B 1483.0 Reserva Reserva 9F03B1896ESPERANZAPE7 Thu Jun Thu Jun Grupo 2 B 51758.0 Demora Demora 45 Traslado de RegionPE1 Thu Jun Thu Jun Grupo 2 B 272.0 OperativoOperativoF03B1896ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 B 5622.0 Demora Demora 2F03B1896ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 12.0 OperativoOperativoF04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 1039.0 Demora Demora 4F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 3724.0 Demora Demora 2F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 19606.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 B 1181.0 Demora Demora 1F04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 A 2595.0 Demora Demora 4F04B2104ESPERANZAPE12 Thu Jun Thu Jun Grupo 4 A 45855.0 OperativoOperativoF03B1944ESPERANZAPE5 Thu Jun Thu Jun Grupo 4 A 26055.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 A 14562.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 A 6540.0 OperativoOperativoF03B1896ESPERANZAPE3 Thu Jun Thu Jun Grupo 4 A 718.0 Demora Demora 2F04B2104ESPERANZAPE11 Thu Jun Thu Jun Grupo 4 A 2412.0 Demora Demora 47 Cambio Aceros PerforaciPE3 Thu Jun Thu Jun Grupo 4 A 3406.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 A 1178.0 Reserva Reserva F03B1896ESPERANZAPE11 Thu Jun Thu Jun Grupo 4 A 7671.0 OperativoOperativo 1 ProduccionPE1 Thu Jun Thu Jun Grupo 4 A 6408.0 OperativoOperativoF03B1896ESPERANZAPE3 Thu Jun Thu Jun Grupo 4 A 1279.0 Mantenci Mantenci F04B2104ESPERAPE3 Thu Jun Thu Jun Grupo 4 A 2964.0 OperativoOperativoF04B2104ESPERANZA

PE3 Thu Jun Thu Jun Grupo 4 A 23466.0 Mantenci Mantenci F04B2104ESPERAPE1 Thu Jun Thu Jun Grupo 4 A 7644.0 Demora Demora 3F03B1896ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 A 6758.0 Demora Demora 3F04B2104ESPERANZAPE11 Thu Jun Thu Jun Grupo 4 A 7345.0 Demora Demora 34 Evacuacion por TronadurPE10 Thu Jun Thu Jun Grupo 4 A 5881.0 Demora Demora 3F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 4 A 4854.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 A 15250.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 A 231.0 OperativoOperativoF03B1896ESPERANZAPE8 Thu Jun Sat Jun Grupo 4 A 118800.0Mantenci Mantenci F04B2104ESPERAPE1 Thu Jun Thu Jun Grupo 4 A 524.0 Demora Demora 3F03B1896ESPERANZAPE11 Thu Jun Thu Jun Grupo 4 A 3844.0 OperativoOperativo 1 ProduccionPE1 Thu Jun Thu Jun Grupo 4 A 1861.0 OperativoOperativoF03B1896ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 A 8444.0 Mantenci Mantenci F03B1896ESPERAPE5 Thu Jun Thu Jun Grupo 4 A 3852.0 Demora Demora 4F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 4 A 1493.0 Demora Demora 4F04B2104ESPERANZAPE11 Thu Jun Thu Jun Grupo 4 A 1019.0 Mantenci Mantencion 109 InspeccionPE11 Thu Jun Fri Jun Grupo 4 A 28783.0 OperativoOperativo 1 ProduccionPE10 Thu Jun Thu Jun Grupo 4 A 20025.0 OperativoOperativoF04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 4 A 2308.0 OperativoOperativoF04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 4 A 5059.0 Mantenci Mantenci F04B2104ESPERAPE1 Thu Jun Fri Jun Grupo 4 A 40849.0 OperativoOperativoF03B1896ESPERANZAPE9 Thu Jun Thu Jun Grupo 4 A 14033.0 OperativoOperativo 1 ProduccionPE5 Thu Jun Thu Jun Grupo 4 A 1687.0 OperativoOperativoF04B2104ESPERANZAPE3 Thu Jun Fri Jun Grupo 4 A 34652.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 A 967.0 Demora Demora 2F04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 A 3244.0 Demora Demora 3F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 4 A 5963.0 Demora Demora 2F04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 B 6141.0 OperativoOperativoF04B2104ESPERANZAPE12 Thu Jun Thu Jun Grupo 2 B 1360.0 Demora Demora 4F03B1944ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 B 2161.0 OperativoOperativoF04B2104ESPERANZAPE12 Thu Jun Fri Jun Grupo 2 B 10066.0 OperativoOperativoF03B1944ESPERANZAPE7 Thu Jun Fri Jun Grupo 2 B 15847.0 OperativoOperativo 1 ProduccionPE5 Thu Jun Thu Jun Grupo 2 B 165.0 Demora Demora 2F04B2104ESPERANZAPE5 Thu Jun Fri Jun Grupo 2 B 12452.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 B 803.0 Demora Demora 2F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 2 B 1554.0 Demora Demora 4F04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 B 4278.0 OperativoOperativoF04B2104ESPERANZAPE10 Thu Jun Fri Jun Grupo 2 B 36273.0 OperativoOperativoF04B2104ESPERANZAPE9 Thu Jun Thu Jun Grupo 2 B 3408.0 Demora Demora 47 Cambio Aceros PerforaciPE2 Thu Jun Thu Jun Grupo 2 B 1677.0 Demora Demora 4F04B2104ESPERANZAPE6 Thu Jun Fri Jun Grupo 2 B 15211.0 Demora Demora 4F05B2296ESPERANZAPE9 Thu Jun Fri Jun Grupo 2 B 2598.0 OperativoOperativo 1 ProduccionPE2 Thu Jun Fri Jun Grupo 2 B 4767.0 OperativoOperativoF04B2104ESPERANZAPE12 Fri Jun Fri Jun Grupo 2 B 35419.0 Reserva Reserva 9F03B1944ESPERANZAPE9 Fri Jun Fri Jun Grupo 2 B 14094.0 Demora Demora 10 ColacionPE11 Fri Jun Fri Jun Grupo 2 B 12805.0 Demora Demora 10 ColacionPE5 Fri Jun Fri Jun Grupo 2 B 445.0 Demora Demora 2F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 2 B 19483.0 Mantenci Mantenci F04B2104ESPERAPE5 Fri Jun Fri Jun Grupo 2 B 3891.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun Fri Jun Grupo 2 B 5234.0 Demora Demora 10 ColacionPE5 Fri Jun Fri Jun Grupo 2 B 461.0 Demora Demora 3F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 2 B 1995.0 OperativoOperativoF04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 2 B 548.0 Demora Demora 4F04B2104ESPERANZA

PE5 Fri Jun Fri Jun Grupo 2 B 4721.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun Fri Jun Grupo 2 B 21655.0 OperativoOperativo 1 ProduccionPE6 Fri Jun Fri Jun Grupo 2 B 4575.0 Demora Demora 55F05B2296ESPERANZAPE11 Fri Jun Fri Jun Grupo 2 B 15248.0 OperativoOperativo 1 ProduccionPE9 Fri Jun Fri Jun Grupo 2 B 13785.0 OperativoOperativo 1 ProduccionPE5 Fri Jun Fri Jun Grupo 2 B 577.0 Demora Demora 2F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 2 B 59.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 2 B 878.0 Demora Demora 2F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 2 B 16587.0 Mantenci Mantenci F04B2104ESPERAPE3 Fri Jun Fri Jun Grupo 2 B 13324.0 OperativoOperativoF04B2104ESPERANZAPE6 Fri Jun Fri Jun Grupo 2 B 19036.0 OperativoOperativoF05B2296ESPERANZAPE1 Fri Jun Fri Jun Grupo 2 B 562.0 Demora Demora 2F03B1896ESPERANZAPE1 Fri Jun Fri Jun Grupo 2 B 6378.0 OperativoOperativoF03B1896ESPERANZAPE2 Fri Jun Fri Jun Grupo 2 B 5.0 OperativoOperativoF04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 2 B 43.0 Reserva Reserva 9F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 2 B 14243.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun Fri Jun Grupo 2 B 4362.0 Demora Demora 2F03B1896ESPERANZAPE9 Fri Jun Fri Jun Grupo 4 A 6710.0 Demora Demora 47 Cambio Aceros PerforaciPE11 Fri Jun Fri Jun Grupo 4 A 3663.0 Demora Demora 45 Traslado de RegionPE1 Fri Jun Fri Jun Grupo 4 A 6551.0 OperativoOperativoF03B1896ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 4841.0 Demora Demora 4F04B2104ESPERANZAPE10 Fri Jun Fri Jun Grupo 4 A 2074.0 Demora Demora 4F04B2104ESPERANZAPE10 Fri Jun Fri Jun Grupo 4 A 52720.0 OperativoOperativoF04B2104ESPERANZAPE11 Fri Jun Fri Jun Grupo 4 A 17492.0 OperativoOperativo 1 ProduccionPE7 Fri Jun Fri Jun Grupo 4 A 1900.0 Mantenci Mantencion 309 Sistema EstPE5 Fri Jun Fri Jun Grupo 4 A 8660.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun Fri Jun Grupo 4 A 6403.0 OperativoOperativo 1 ProduccionPE3 Fri Jun Fri Jun Grupo 4 A 5738.0 OperativoOperativoF04B2104ESPERANZAPE12 Fri Jun Fri Jun Grupo 4 A 44700.0 Demora Demora 55F03B1944ESPERANZAPE9 Fri Jun Fri Jun Grupo 4 A 41491.0 OperativoOperativo 1 ProduccionPE6 Fri Jun Fri Jun Grupo 4 A 35346.0 Demora Demora 4F05B2296ESPERANZAPE13 Fri Jun Sat Jun Grupo 4 A 117059.0Reserva Reserva 9F03B1912ESPERANZAPE1 Fri Jun Fri Jun Grupo 4 A 15620.0 Demora Demora 4F03B1896ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 1870.0 Demora Demora 4F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 223.0 Demora Demora 3F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 277.0 OperativoOperativoF04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 1999.0 Demora Demora 4F04B2104ESPERANZAPE4 Fri Jun Fri Jun Grupo 4 A 9.0 OperativoOperativoF05B2296ESPERANZAPE4 Fri Jun Fri Jun Grupo 4 A 2119.0 Demora Demora 4F05B2296ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 5.0 Demora Demora 24F04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 4.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 8263.0 Mantenci MantencioF04B2104ESPERAPE7 Fri Jun Fri Jun Grupo 4 A 14944.0 Mantenci Mantencion 316 Sistema PerPE5 Fri Jun Fri Jun Grupo 4 A 695.0 Demora Demora 2F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 10819.0 Demora Demora 3F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 4 A 6307.0 OperativoOperativoF04B2104ESPERANZAPE4 Fri Jun Fri Jun Grupo 4 A 28451.0 Mantenci Mantenci F05B2296ESPERAPE5 Fri Jun Fri Jun Grupo 4 A 12381.0 Mantenci MantencioF04B2104ESPERAPE3 Fri Jun Fri Jun Grupo 4 A 7272.0 OperativoOperativoF04B2104ESPERANZAPE11 Fri Jun Fri Jun Grupo 4 A 5065.0 Demora Demora 34 Evacuacion por TronadurPE1 Fri Jun Fri Jun Grupo 4 A 5799.0 Demora Demora 55F03B1896ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 3421.0 Demora Demora 4F04B2104ESPERANZAPE11 Fri Jun Fri Jun Grupo 4 A 23649.0 OperativoOperativo 1 Produccion

PE2 Fri Jun Fri Jun Grupo 4 A 5749.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun Fri Jun Grupo 4 A 16239.0 Demora Demora 45 Traslado de RegionPE3 Fri Jun Fri Jun Grupo 4 A 854.0 Demora Demora 4F04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 3989.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun Fri Jun Grupo 4 A 8730.0 OperativoOperativoF03B1896ESPERANZAPE5 Fri Jun Fri Jun Grupo 4 A 1432.0 Demora Demora 4F04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 1064.0 Demora Demora 4F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 2770.0 Mantenci MantencioF04B2104ESPERAPE5 Fri Jun Fri Jun Grupo 4 A 6186.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 5763.0 OperativoOperativoF04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 4402.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun Fri Jun Grupo 4 A 1857.0 Demora Demora 4F03B1896ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 1192.0 Demora Demora 2F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 4 A 445.0 Demora Demora 2F04B2104ESPERANZAPE1 Fri Jun Fri Jun Grupo 4 A 25.0 OperativoOperativoF03B1896ESPERANZAPE1 Fri Jun Fri Jun Grupo 4 A 4891.0 Demora Demora 55F03B1896ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 900.0 Demora Demora 2F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 4 A 874.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 18.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 4 A 4610.0 Demora Demora 4F04B2104ESPERANZAPE2 Fri Jun Fri Jun Grupo 4 A 1991.0 Demora Demora 3F04B2104ESPERANZAPE5 Fri Jun Fri Jun Grupo 4 A 3993.0 Demora Demora 2F04B2104ESPERANZAPE6 Fri Jun Sat Jun Grupo 2 B 88445.0 Reserva Reserva 9F05B2296ESPERANZAPE4 Fri Jun Sat Jun Grupo 2 B 59681.0 OperativoOperativoF05B2296ESPERANZAPE2 Fri Jun Fri Jun Grupo 2 B 5544.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun Fri Jun Grupo 2 B 1914.0 OperativoOperativo 1 ProduccionPE1 Fri Jun Fri Jun Grupo 2 B 8668.0 OperativoOperativoF03B1896ESPERANZAPE5 Fri Jun Sat Jun Grupo 2 B 17277.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun Fri Jun Grupo 2 B 9110.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun Fri Jun Grupo 2 B 1648.0 Demora Demora 55 Preparacion Patio PerforaPE7 Fri Jun Sat Jun Grupo 2 B 11693.0 OperativoOperativo 1 ProduccionPE9 Fri Jun Fri Jun Grupo 2 B 1119.0 Mantenci Mantencion 314 Sistema LubPE2 Fri Jun Sat Jun Grupo 2 B 24904.0 Demora Demora 4F04B2104ESPERANZAPE9 Fri Jun Sat Jun Grupo 2 B 14280.0 OperativoOperativo 1 ProduccionPE11 Fri Jun Sat Jun Grupo 2 B 8069.0 Demora Demora 47 Cambio Aceros PerforaciPE12 Fri Jun Fri Jun Grupo 2 B 1931.0 Demora Demora 4F03B1944ESPERANZAPE12 Fri Jun Fri Jun Grupo 2 B 2285.0 OperativoOperativoF03B1944ESPERANZAPE1 Fri Jun Fri Jun Grupo 2 B 1350.0 Demora Demora 4F03B1896ESPERANZAPE3 Fri Jun Fri Jun Grupo 2 B 600.0 Demora Demora 2F04B2104ESPERANZAPE1 Fri Jun Fri Jun Grupo 2 B 955.0 Demora Demora 55F03B1896ESPERANZAPE3 Fri Jun Sat Jun Grupo 2 B 12712.0 OperativoOperativoF04B2104ESPERANZAPE12 Fri Jun Sat Jun Grupo 2 B 11464.0 Mantenci Mantenci F03B1944ESPERAPE1 Fri Jun Sat Jun Grupo 2 B 28375.0 OperativoOperativoF03B1896ESPERANZAPE10 Fri Jun Sat Jun Grupo 2 B 663.0 Demora Demora 2F04B2104ESPERANZAPE8 Sat Jun Mon Jun Grupo 2 B 190440.0Mantenci Mantenci F04B2104ESPERAPE10 Sat Jun Sat Jun Grupo 2 B 17019.0 OperativoOperativoF04B2104ESPERANZAPE11 Sat Jun Sat Jun Grupo 2 B 11886.0 Demora Demora 10 ColacionPE7 Sat Jun Sat Jun Grupo 2 B 1832.0 Mantenci Mantencion 300 AccesoriosPE7 Sat Jun Sat Jun Grupo 2 B 5107.0 OperativoOperativo 1 ProduccionPE5 Sat Jun Sat Jun Grupo 2 B 652.0 Demora Demora 3F04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 2 B 15116.0 OperativoOperativoF04B2104ESPERANZAPE9 Sat Jun Sat Jun Grupo 2 B 6240.0 Demora Demora 10 ColacionPE7 Sat Jun Sat Jun Grupo 2 B 6894.0 Demora Demora 10 Colacion

PE12 Sat Jun Sat Jun Grupo 2 B 4287.0 Demora Demora 3F03B1944ESPERANZAPE3 Sat Jun Sat Jun Grupo 2 B 685.0 Demora Demora 2F04B2104ESPERANZAPE3 Sat Jun Sat Jun Grupo 2 B 8674.0 OperativoOperativoF04B2104ESPERANZAPE9 Sat Jun Sat Jun Grupo 2 B 1432.0 Demora Demora 45 Traslado de RegionPE11 Sat Jun Sat Jun Grupo 2 B 2491.0 OperativoOperativo 1 ProduccionPE12 Sat Jun Sat Jun Grupo 2 B 680.0 OperativoOperativoF03B1944ESPERANZAPE9 Sat Jun Sat Jun Grupo 2 B 3296.0 Demora Demora 47 Cambio Aceros PerforaciPE12 Sat Jun Sat Jun Grupo 2 B 18133.0 Reserva Reserva 9F03B1944ESPERANZAPE7 Sat Jun Sat Jun Grupo 2 B 5154.0 OperativoOperativo 1 ProduccionPE11 Sat Jun Sat Jun Grupo 2 B 1678.0 Demora Demora 45 Traslado de RegionPE2 Sat Jun Sat Jun Grupo 2 B 10453.0 OperativoOperativoF04B2104ESPERANZAPE10 Sat Jun Sat Jun Grupo 2 B 1218.0 Demora Demora 3F04B2104ESPERANZAPE11 Sat Jun Sat Jun Grupo 2 B 13978.0 OperativoOperativo 1 ProduccionPE9 Sat Jun Sat Jun Grupo 2 B 23832.0 OperativoOperativo 1 ProduccionPE10 Sat Jun Sat Jun Grupo 2 B 9268.0 OperativoOperativoF04B2104ESPERANZAPE3 Sat Jun Sat Jun Grupo 2 B 1702.0 Demora Demora 4F04B2104ESPERANZAPE7 Sat Jun Sat Jun Grupo 2 B 48423.0 Mantenci Mantencion 316 Sistema PerPE5 Sat Jun Sat Jun Grupo 2 B 788.0 Demora Demora 2F04B2104ESPERANZAPE3 Sat Jun Sat Jun Grupo 2 B 434.0 Demora Demora 2F04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 2 B 5369.0 OperativoOperativoF04B2104ESPERANZAPE3 Sat Jun Sat Jun Grupo 2 B 3494.0 OperativoOperativoF04B2104ESPERANZAPE3 Sat Jun Sat Jun Grupo 2 B 15971.0 Demora Demora 3F04B2104ESPERANZAPE2 Sat Jun Sat Jun Grupo 2 B 4028.0 Demora Demora 2F04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 2 B 4459.0 Demora Demora 2F04B2104ESPERANZAPE1 Sat Jun Sat Jun Grupo 2 B 3906.0 Demora Demora 2F03B1896ESPERANZAPE10 Sat Jun Sat Jun Grupo 2 B 668.0 Demora Demora 2F04B2104ESPERANZAPE10 Sat Jun Sat Jun Grupo 2 B 1958.0 Demora Demora 1F04B2104ESPERANZAPE10 Sat Jun Sun Jun Grupo 4 A 74456.0 OperativoOperativoF04B2104ESPERANZAPE2 Sat Jun Sat Jun Grupo 4 A 15049.0 OperativoOperativoF04B2104ESPERANZAPE1 Sat Jun Sat Jun Grupo 4 A 15835.0 OperativoOperativoF03B1896ESPERANZAPE11 Sat Jun Sat Jun Grupo 4 A 2761.0 Demora Demora 45 Traslado de RegionPE5 Sat Jun Sat Jun Grupo 4 A 1569.0 OperativoOperativoF04B2104ESPERANZAPE12 Sat Jun Sun Jun Grupo 4 A 56040.0 OperativoOperativoF03B1944ESPERANZAPE5 Sat Jun Sat Jun Grupo 4 A 1872.0 Demora Demora 2F04B2104ESPERANZAPE11 Sat Jun Sat Jun Grupo 4 A 11802.0 OperativoOperativo 1 ProduccionPE5 Sat Jun Sat Jun Grupo 4 A 6419.0 OperativoOperativoF04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 4 A 837.0 Demora Demora 3F04B2104ESPERANZAPE9 Sat Jun Sun Jun Grupo 4 A 53940.0 Mantenci Mantencion 316 Sistema PerPE3 Sat Jun Sat Jun Grupo 4 A 24.0 OperativoOperativoF04B2104ESPERANZAPE3 Sat Jun Sat Jun Grupo 4 A 24011.0 Demora Demora 3F04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 4 A 2766.0 OperativoOperativoF04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 4 A 10836.0 Demora Demora 3F04B2104ESPERANZAPE4 Sat Jun Sat Jun Grupo 4 A 5119.0 Demora Demora 3F05B2296ESPERANZAPE11 Sat Jun Sat Jun Grupo 4 A 3186.0 Mantenci Mantencion 300 AccesoriosPE2 Sat Jun Sat Jun Grupo 4 A 2634.0 Demora Demora 4F04B2104ESPERANZAPE1 Sat Jun Sat Jun Grupo 4 A 8184.0 Demora Demora 3F03B1896ESPERANZAPE2 Sat Jun Sat Jun Grupo 4 A 2559.0 Demora Demora 3F04B2104ESPERANZAPE11 Sat Jun Wed Jul Grupo 4 A 2139899.Mantenci Mantencion 1003 ImprevistoPE4 Sat Jun Sat Jun Grupo 4 A 16906.0 Mantenci Mantenci F05B2296ESPERAPE2 Sat Jun Sat Jun Grupo 4 A 3939.0 OperativoOperativoF04B2104ESPERANZAPE2 Sat Jun Sat Jun Grupo 4 A 6301.0 Reserva Reserva 9F04B2104ESPERANZAPE1 Sat Jun Sat Jun Grupo 4 A 14174.0 OperativoOperativoF03B1896ESPERANZAPE5 Sat Jun Sat Jun Grupo 4 A 3122.0 Demora Demora 4F04B2104ESPERANZA

PE5 Sat Jun Sat Jun Grupo 4 A 11310.0 OperativoOperativoF04B2104ESPERANZAPE2 Sat Jun Sat Jun Grupo 4 A 7758.0 OperativoOperativoF04B2104ESPERANZAPE3 Sat Jun Sun Jun Grupo 4 A 23916.0 OperativoOperativoF04B2104ESPERANZAPE4 Sat Jun Sat Jun Grupo 4 A 863.0 OperativoOperativoF05B2296ESPERANZAPE13 Sat Jun Sat Jun Grupo 4 A 79.0 OperativoOperativoF03B1912ESPERANZAPE13 Sat Jun Sat Jun Grupo 4 A 770.0 Reserva Reserva 9F03B1912ESPERANZAPE4 Sat Jun Sat Jun Grupo 4 A 7181.0 Demora Demora 4F05B2296ESPERANZAPE13 Sat Jun Sat Jun Grupo 4 A 2148.0 OperativoOperativoF03B1912ESPERANZAPE2 Sat Jun Sat Jun Grupo 4 A 682.0 Demora Demora 2F04B2104ESPERANZAPE7 Sat Jun Sat Jun Grupo 4 A 6805.0 Demora Demora 32 Entregado por MantencioPE1 Sat Jun Sat Jun Grupo 4 A 4055.0 Demora Demora 2F03B1896ESPERANZAPE2 Sat Jun Sat Jun Grupo 4 A 3640.0 Demora Demora 3F04B2104ESPERANZAPE5 Sat Jun Sat Jun Grupo 4 A 3959.0 Demora Demora 2F04B2104ESPERANZAPE13 Sat Jun Sat Jun Grupo 4 A 11755.0 OperativoOperativoF03B1912ESPERANZAPE1 Sat Jun Sun Jun Grupo 2 B 14829.0 OperativoOperativoF03B1896ESPERANZAPE2 Sat Jun Sat Jun Grupo 2 B 6260.0 Mantenci Mantenci F04B2104ESPERAPE6 Sat Jun Sun Jun Grupo 2 B 13111.0 OperativoOperativoF05B2296ESPERANZAPE5 Sat Jun Sat Jun Grupo 2 B 3872.0 OperativoOperativoF04B2104ESPERANZAPE4 Sat Jun Sat Jun Grupo 2 B 87.0 OperativoOperativoF05B2296ESPERANZAPE4 Sat Jun Sat Jun Grupo 2 B 917.0 Demora Demora 4F05B2296ESPERANZAPE7 Sat Jun Sun Jun Grupo 2 B 26493.0 Mantenci Mantencion 316 Sistema PerPE4 Sat Jun Sat Jun Grupo 2 B 3015.0 OperativoOperativoF05B2296ESPERANZAPE5 Sat Jun Sat Jun Grupo 2 B 4603.0 Demora Demora 4F04B2104ESPERANZAPE4 Sat Jun Sun Jun Grupo 2 B 11266.0 Mantenci MantencioF05B2296ESPERAPE2 Sat Jun Sat Jun Grupo 2 B 3787.0 OperativoOperativoF04B2104ESPERANZAPE13 Sat Jun Sat Jun Grupo 2 B 872.0 Mantenci Mantenci F04B2104ESPERAPE5 Sat Jun Sat Jun Grupo 2 B 3161.0 Demora Demora 55F04B2104ESPERANZAPE13 Sat Jun Sun Jun Grupo 2 B 6178.0 OperativoOperativoF04B2104ESPERANZAPE2 Sat Jun Sat Jun Grupo 2 B 526.0 Demora Demora 4F04B2104ESPERANZAPE2 Sat Jun Sun Jun Grupo 2 B 16182.0 Demora Demora 4F04B2104ESPERANZAPE5 Sat Jun Sun Jun Grupo 2 B 13793.0 OperativoOperativoF04B2104ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 B 4567.0 Demora Demora 1F05B2296ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 B 542.0 Demora Demora 3F03B1896ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 B 5245.0 OperativoOperativoF03B1896ESPERANZAPE12 Sun Jun Sun Jun Grupo 2 B 6954.0 Demora Demora 1F03B1944ESPERANZAPE13 Sun Jun Sun Jun Grupo 2 B 6877.0 Reserva Reserva 9F04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 2 B 3173.0 Demora Demora 1F04B2104ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 B 1314.0 Reserva Reserva 9F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 B 11600.0 OperativoOperativoF05B2296ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 B 9957.0 OperativoOperativoF05B2296ESPERANZAPE3 Sun Jun Sun Jun Grupo 2 B 499.0 OperativoOperativoF04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 2 B 14013.0 Mantenci Mantenci F04B2104ESPERAPE1 Sun Jun Sun Jun Grupo 2 B 375.0 Demora Demora 2F03B1896ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 B 19000.0 OperativoOperativoF03B1896ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 B 6972.0 Demora Demora 47 Cambio Aceros PerforaciPE13 Sun Jun Sun Jun Grupo 2 B 16971.0 OperativoOperativoF04B2104ESPERANZAPE12 Sun Jun Sun Jun Grupo 2 B 25943.0 OperativoOperativoF03B1944ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 726.0 Demora Demora 3F04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 2 B 9657.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 8900.0 OperativoOperativoF04B2104ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 B 322.0 Demora Demora 2F05B2296ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 B 266.0 OperativoOperativoF05B2296ESPERANZAPE7 Sun Jun Sun Jun Grupo 2 B 3049.0 Reserva Reserva 91 Sin Operador Disponible

PE9 Sun Jun Sun Jun Grupo 2 B 1417.0 Demora Demora 45 Traslado de RegionPE4 Sun Jun Sun Jun Grupo 2 B 4764.0 Mantenci MantencioF05B2296ESPERAPE6 Sun Jun Sun Jun Grupo 2 B 315.0 Demora Demora 2F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 B 10686.0 OperativoOperativoF05B2296ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 B 8018.0 OperativoOperativo 1 ProduccionPE10 Sun Jun Sun Jun Grupo 2 B 599.0 Demora Demora 2F04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 2 B 7407.0 OperativoOperativoF04B2104ESPERANZAPE7 Sun Jun Sun Jun Grupo 2 B 22007.0 Mantenci Mantencion 316 Sistema PerPE3 Sun Jun Sun Jun Grupo 2 B 382.0 Reserva Reserva 9F04B2104ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 B 6645.0 OperativoOperativoF05B2296ESPERANZAPE3 Sun Jun Sun Jun Grupo 2 B 10251.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 302.0 Demora Demora 2F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 4223.0 OperativoOperativoF04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 2 B 708.0 Demora Demora 2F04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 2 B 6725.0 OperativoOperativoF04B2104ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 B 8403.0 Demora Demora 47 Cambio Aceros PerforaciPE10 Sun Jun Sun Jun Grupo 2 B 1015.0 Demora Demora 4F04B2104ESPERANZAPE13 Sun Jun Mon Jun Grupo 2 B 131788.0Demora Demora 2F04B2104ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 B 3802.0 Demora Demora 2F03B1896ESPERANZAPE10 Sun Jun Sun Jun Grupo 2 B 21305.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 3313.0 Demora Demora 2F04B2104ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 B 4860.0 Reserva Reserva F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 B 4975.0 Demora Demora 1F05B2296ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 A 7370.0 OperativoOperativoF03B1896ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 1990.0 OperativoOperativoF04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 4046.0 Demora Demora 4F04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 4 A 407.0 Demora Demora 4F04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 4 A 5787.0 OperativoOperativoF04B2104ESPERANZAPE4 Sun Jun Sun Jun Grupo 4 A 41830.0 OperativoOperativoF05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 552.0 Demora Demora 2F04B2104ESPERANZAPE6 Sun Jun Sun Jun Grupo 4 A 8658.0 Mantenci MantencioF05B2296ESPERAPE5 Sun Jun Sun Jun Grupo 4 A 9811.0 OperativoOperativoF04B2104ESPERANZAPE9 Sun Jun Sun Jun Grupo 4 A 40445.0 OperativoOperativo 1 ProduccionPE2 Sun Jun Sun Jun Grupo 4 A 11694.0 OperativoOperativoF04B2104ESPERANZAPE12 Sun Jun Sun Jun Grupo 4 A 3083.0 Mantenci Mantenci F03B1944ESPERAPE3 Sun Jun Sun Jun Grupo 4 A 410.0 Demora Demora 2F04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 4 A 12621.0 OperativoOperativoF04B2104ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 A 1041.0 Demora Demora 2F03B1896ESPERANZAPE12 Sun Jun Sun Jun Grupo 4 A 36415.0 OperativoOperativoF03B1944ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 A 2147.0 OperativoOperativoF03B1896ESPERANZAPE7 Sun Jun Sun Jun Grupo 4 A 10029.0 Reserva Reserva 91 Sin Operador DisponiblePE1 Sun Jun Sun Jun Grupo 4 A 9205.0 Demora Demora 3F03B1896ESPERANZAPE6 Sun Jun Sun Jun Grupo 4 A 14696.0 Demora Demora 3F05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 443.0 Demora Demora 3F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 6956.0 OperativoOperativoF04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 744.0 Demora Demora 2F04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 1270.0 OperativoOperativoF04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 9780.0 Demora Demora 4F04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 4 A 7333.0 Demora Demora 1F04B2104ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 A 14400.0 Demora Demora 4F03B1896ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 5489.0 Demora Demora 1F04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 4 A 5669.0 Reserva Reserva 9F04B2104ESPERANZAPE7 Sun Jun Sun Jun Grupo 4 A 24010.0 OperativoOperativo 1 Produccion

PE10 Sun Jun Sun Jun Grupo 4 A 5366.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 2181.0 OperativoOperativoF04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 4 A 4891.0 OperativoOperativoF04B2104ESPERANZAPE6 Sun Jun Sun Jun Grupo 4 A 17372.0 Reserva Reserva 9F05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 1013.0 Demora Demora 4F04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 5322.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 2597.0 Demora Demora 3F04B2104ESPERANZAPE3 Sun Jun Sun Jun Grupo 4 A 4263.0 Demora Demora 3F04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 4 A 1201.0 Demora Demora 4F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 2214.0 OperativoOperativoF04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 4 A 15523.0 Demora Demora 3F04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 2792.0 Demora Demora 4F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 1113.0 Demora Demora 4F04B2104ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 A 7200.0 OperativoOperativoF03B1896ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 640.0 OperativoOperativoF04B2104ESPERANZAPE3 Sun Jun Mon Jun Grupo 4 A 51256.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 A 7906.0 Demora Demora 3F04B2104ESPERANZAPE2 Sun Jun Sun Jun Grupo 4 A 5613.0 Demora Demora 3F04B2104ESPERANZAPE1 Sun Jun Tue Jun Grupo 2 B 167346.0Mantenci Mantenci F03B1896ESPERAPE2 Sun Jun Sun Jun Grupo 2 B 1831.0 Demora Demora 4F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 8790.0 OperativoOperativoF04B2104ESPERANZAPE6 Sun Jun Mon Jun Grupo 2 B 14072.0 OperativoOperativoF05B2296ESPERANZAPE2 Sun Jun Mon Jun Grupo 2 B 15822.0 Mantenci MantencioF04B2104ESPERAPE4 Sun Jun Sun Jun Grupo 2 B 811.0 Demora Demora 3F05B2296ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 B 8243.0 Demora Demora 36 Punto de Trabajo ObstruiPE7 Sun Jun Sun Jun Grupo 2 B 1694.0 Demora Demora 45 Traslado de RegionPE4 Sun Jun Mon Jun Grupo 2 B 25608.0 OperativoOperativoF05B2296ESPERANZAPE12 Sun Jun Sun Jun Grupo 2 B 2009.0 Demora Demora 4F03B1944ESPERANZAPE7 Sun Jun Mon Jun Grupo 2 B 13054.0 OperativoOperativo 1 ProduccionPE12 Sun Jun Mon Jun Grupo 2 B 12622.0 OperativoOperativoF03B1944ESPERANZAPE10 Sun Jun Sun Jun Grupo 2 B 10.0 OperativoOperativoF04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 2 B 870.0 Demora Demora 4F04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 2 B 1185.0 OperativoOperativoF04B2104ESPERANZAPE10 Sun Jun Sun Jun Grupo 2 B 2751.0 Demora Demora 55F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 B 3258.0 Demora Demora 4F04B2104ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 B 2906.0 OperativoOperativo 1 ProduccionPE10 Sun Jun Mon Jun Grupo 2 B 8519.0 OperativoOperativoF04B2104ESPERANZAPE9 Sun Jun Mon Jun Grupo 2 B 1077.0 Demora Demora 47 Cambio Aceros PerforaciPE5 Sun Jun Mon Jun Grupo 2 B 8841.0 OperativoOperativoF04B2104ESPERANZAPE9 Mon Jun Mon Jun Grupo 2 B 4407.0 OperativoOperativo 1 ProduccionPE6 Mon Jun Mon Jun Grupo 2 B 10127.0 Demora Demora 1F05B2296ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 B 7153.0 Reserva Reserva 9F04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 B 25454.0 Demora Demora 4F03B1944ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 B 12175.0 Demora Demora 10 ColacionPE9 Mon Jun Mon Jun Grupo 2 B 7894.0 Demora Demora 10 ColacionPE10 Mon Jun Mon Jun Grupo 2 B 21540.0 Mantenci MantencioF04B2104ESPERAPE5 Mon Jun Mon Jun Grupo 2 B 533.0 Demora Demora 2F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 B 5461.0 OperativoOperativoF04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 B 2580.0 OperativoOperativoF04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 2 B 32436.0 OperativoOperativoF05B2296ESPERANZAPE9 Mon Jun Mon Jun Grupo 2 B 61902.0 OperativoOperativo 1 ProduccionPE2 Mon Jun Mon Jun Grupo 2 B 1560.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 B 801.0 Demora Demora 3F04B2104ESPERANZA

PE4 Mon Jun Mon Jun Grupo 2 B 675.0 Demora Demora 2F05B2296ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 B 3120.0 Mantenci Mantenci F04B2104ESPERAPE4 Mon Jun Mon Jun Grupo 2 B 12003.0 OperativoOperativoF05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 B 10009.0 OperativoOperativoF04B2104ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 B 8152.0 OperativoOperativo 1 ProduccionPE8 Mon Jun Mon Jun Grupo 2 B 6876.0 Mantenci MantencioF04B2104ESPERAPE2 Mon Jun Mon Jun Grupo 2 B 13595.0 OperativoOperativoF04B2104ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 B 34536.0 Demora Demora 48 Sin Marcas para PerforacPE8 Mon Jun Mon Jun Grupo 2 B 2148.0 OperativoOperativoF04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 B 1640.0 Demora Demora 3F04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 B 11518.0 OperativoOperativoF04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 B 1050.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 B 5107.0 Demora Demora 2F04B2104ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 B 5124.0 Demora Demora 2F05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 B 3967.0 Demora Demora 2F04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 4 A 29398.0 Demora Demora 4F03B1944ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 A 445.0 Demora Demora 3F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 A 16913.0 OperativoOperativoF04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 4 A 8455.0 Mantenci MantencioF04B2104ESPERAPE5 Mon Jun Mon Jun Grupo 4 A 10050.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 3844.0 OperativoOperativoF04B2104ESPERANZAPE4 Mon Jun Mon Jun Grupo 4 A 27189.0 OperativoOperativoF05B2296ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 456.0 Demora Demora 2F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 1219.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 648.0 Demora Demora 2F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 8203.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 A 2091.0 Mantenci MantencioF04B2104ESPERAPE2 Mon Jun Mon Jun Grupo 4 A 7198.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 A 820.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 A 1395.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 A 15929.0 Demora Demora 4F04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 A 3255.0 OperativoOperativoF04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 4 A 18237.0 Reserva Reserva 9F05B2296ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 A 15614.0 Demora Demora 3F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 1377.0 Demora Demora 2F04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 4 A 8456.0 Demora Demora 3F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 13525.0 Demora Demora 3F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 A 8825.0 Reserva Reserva 9F04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 4 A 1086.0 OperativoOperativoF04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 A 11116.0 OperativoOperativoF04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 4 A 617.0 Demora Demora 4F04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 4 A 13023.0 OperativoOperativoF04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 A 2358.0 OperativoOperativoF04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 4 A 15864.0 Demora Demora 55F03B1944ESPERANZAPE7 Mon Jun Mon Jun Grupo 4 A 19144.0 Demora Demora 55 Preparacion Patio PerforaPE4 Mon Jun Mon Jun Grupo 4 A 2277.0 Mantenci MantencioF05B2296ESPERAPE5 Mon Jun Tue Jun Grupo 4 A 34067.0 Mantenci Mantenci F04B2104ESPERAPE8 Mon Jun Mon Jun Grupo 4 A 249.0 Demora Demora 4F04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 A 16635.0 Demora Demora 4F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 3653.0 OperativoOperativoF04B2104ESPERANZAPE4 Mon Jun Mon Jun Grupo 4 A 15934.0 OperativoOperativoF05B2296ESPERANZAPE6 Mon Jun Mon Jun Grupo 4 A 19114.0 OperativoOperativoF05B2296ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 1142.0 Mantenci MantencioF04B2104ESPERA

PE8 Mon Jun Mon Jun Grupo 4 A 4216.0 OperativoOperativoF04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 A 1277.0 Demora Demora 4F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 A 12032.0 OperativoOperativoF04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 4 A 3181.0 Demora Demora 3F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 A 3152.0 Demora Demora 2F04B2104ESPERANZAPE13 Mon Jun Wed Jun Grupo 2 B 167353.0Reserva Reserva 9F04B2104ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 B 5237.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 B 3830.0 OperativoOperativoF04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 B 117.0 OperativoOperativoF03B1944ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 B 6782.0 Mantenci MantencioF03B1944ESPERAPE9 Mon Jun Mon Jun Grupo 2 B 1671.0 Demora Demora 36 Punto de Trabajo ObstruiPE9 Mon Jun Mon Jun Grupo 2 B 884.0 Demora Demora 45 Traslado de RegionPE9 Mon Jun Mon Jun Grupo 2 B 7378.0 OperativoOperativo 1 ProduccionPE8 Mon Jun Mon Jun Grupo 2 B 276.0 Demora Demora 2F04B2104ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 B 2285.0 Demora Demora 45 Traslado de RegionPE4 Mon Jun Mon Jun Grupo 2 B 6565.0 Mantenci MantencioF05B2296ESPERAPE8 Mon Jun Tue Jun Grupo 2 B 19336.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 B 9.0 OperativoOperativoF04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 B 149.0 Demora Demora 4F04B2104ESPERANZAPE10 Mon Jun Tue Jun Grupo 2 B 10306.0 Mantenci MantencioF04B2104ESPERAPE2 Mon Jun Mon Jun Grupo 2 B 937.0 Demora Demora 2F04B2104ESPERANZAPE2 Mon Jun Tue Jun Grupo 2 B 10047.0 OperativoOperativoF04B2104ESPERANZAPE7 Mon Jun Tue Jun Grupo 2 B 13887.0 OperativoOperativo 1 ProduccionPE3 Mon Jun Mon Jun Grupo 2 B 349.0 Demora Demora 2F04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 B 4088.0 Demora Demora 4F03B1944ESPERANZAPE6 Mon Jun Mon Jun Grupo 2 B 3214.0 Demora Demora 4F05B2296ESPERANZAPE3 Mon Jun Tue Jun Grupo 2 B 12145.0 OperativoOperativoF04B2104ESPERANZAPE4 Mon Jun Tue Jun Grupo 2 B 6130.0 OperativoOperativoF05B2296ESPERANZAPE9 Mon Jun Mon Jun Grupo 2 B 1751.0 Demora Demora 47 Cambio Aceros PerforaciPE6 Mon Jun Tue Jun Grupo 2 B 29668.0 OperativoOperativoF05B2296ESPERANZAPE12 Mon Jun Tue Jun Grupo 2 B 9222.0 OperativoOperativoF03B1944ESPERANZAPE9 Mon Jun Tue Jun Grupo 2 B 24025.0 OperativoOperativo 1 ProduccionPE10 Tue Jun Tue Jun Grupo 2 B 66.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 2 B 13.0 Demora Demora 3F04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 2 B 3063.0 Demora Demora 4F04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 661.0 Demora Demora 2F04B2104ESPERANZAPE4 Tue Jun Tue Jun Grupo 2 B 5566.0 Demora Demora 1F05B2296ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 19992.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 2 B 2284.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 2 B 6023.0 Demora Demora 1F04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 B 6057.0 Demora Demora 10 ColacionPE10 Tue Jun Tue Jun Grupo 2 B 81.0 Demora Demora 1F04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 2 B 5626.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 2 B 20.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 2 B 11990.0 OperativoOperativoF04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 2 B 5465.0 Demora Demora 1F03B1944ESPERANZAPE4 Tue Jun Tue Jun Grupo 2 B 4544.0 OperativoOperativoF05B2296ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 B 240.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 B 12803.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 2 B 27210.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 2 B 9829.0 OperativoOperativoF04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 B 1646.0 OperativoOperativo 1 ProduccionPE12 Tue Jun Tue Jun Grupo 2 B 21441.0 OperativoOperativoF03B1944ESPERANZA

PE4 Tue Jun Tue Jun Grupo 2 B 1776.0 Demora Demora 2F05B2296ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 B 6798.0 Demora Demora 30 Carga CombustiblePE4 Tue Jun Tue Jun Grupo 2 B 11124.0 OperativoOperativoF05B2296ESPERANZAPE5 Tue Jun Tue Jun Grupo 2 B 1234.0 Demora Demora 2F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 2 B 36.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 2 B 6442.0 Demora Demora 4F04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 B 12160.0 Reserva Reserva 91 Sin Operador DisponiblePE10 Tue Jun Tue Jun Grupo 2 B 708.0 Demora Demora 2F04B2104ESPERANZAPE9 Tue Jun Tue Jun Grupo 2 B 741.0 Demora Demora 45 Traslado de RegionPE8 Tue Jun Tue Jun Grupo 2 B 237.0 Demora Demora 2F04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 2 B 27644.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 B 3776.0 OperativoOperativoF04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 456.0 Demora Demora 2F04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 2972.0 OperativoOperativoF04B2104ESPERANZAPE9 Tue Jun Tue Jun Grupo 2 B 1523.0 OperativoOperativo 1 ProduccionPE9 Tue Jun Tue Jun Grupo 2 B 54656.0 Demora Demora 47 Cambio Aceros PerforaciPE4 Tue Jun Tue Jun Grupo 2 B 3772.0 Demora Demora 2F05B2296ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 531.0 Demora Demora 2F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 2 B 4159.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 B 3357.0 Demora Demora 2F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 2 B 4942.0 Demora Demora 1F05B2296ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 132.0 OperativoOperativoF04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 2497.0 Demora Demora 1F04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 4 A 14944.0 OperativoOperativoF04B2104ESPERANZAPE4 Tue Jun Tue Jun Grupo 4 A 19480.0 OperativoOperativoF05B2296ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 2860.0 Demora Demora 4F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 A 4549.0 OperativoOperativoF04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 1619.0 OperativoOperativoF05B2296ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 6780.0 OperativoOperativoF04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 4 A 1922.0 Mantenci Mantencion 312 Sistema HidPE6 Tue Jun Tue Jun Grupo 4 A 4877.0 Demora Demora 4F05B2296ESPERANZAPE12 Tue Jun Wed Jun Grupo 4 A 126542.0Reserva Reserva 9F03B1944ESPERANZAPE7 Tue Jun Tue Jun Grupo 4 A 16.0 Demora Demora 32 Entregado por MantencioPE7 Tue Jun Tue Jun Grupo 4 A 45647.0 OperativoOperativo 1 ProduccionPE5 Tue Jun Tue Jun Grupo 4 A 30788.0 Demora Demora 4F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 3893.0 OperativoOperativoF05B2296ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 A 950.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 665.0 Demora Demora 3F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 A 6377.0 Demora Demora 4F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 5375.0 OperativoOperativoF04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 1499.0 Demora Demora 2F05B2296ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 2015.0 OperativoOperativoF05B2296ESPERANZAPE2 Tue Jun Tue Jun Grupo 4 A 5073.0 Demora Demora 4F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 21009.0 Demora Demora 3F05B2296ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 703.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 2212.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 A 2382.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 989.0 Demora Demora 2F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 A 1714.0 Mantenci Mantenci F04B2104ESPERANZAPE4 Tue Jun Tue Jun Grupo 4 A 6254.0 Demora Demora 1F05B2296ESPERANZAPE2 Tue Jun Tue Jun Grupo 4 A 12885.0 Demora Demora 3F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 277.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 6725.0 Demora Demora 3F04B2104ESPERANZA

PE10 Tue Jun Tue Jun Grupo 4 A 5801.0 Demora Demora 3F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 A 6133.0 Demora Demora 3F04B2104ESPERANZAPE4 Tue Jun Tue Jun Grupo 4 A 20723.0 OperativoOperativoF05B2296ESPERANZAPE10 Tue Jun Tue Jun Grupo 4 A 28736.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 1062.0 OperativoOperativoF04B2104ESPERANZAPE3 Tue Jun Wed Jun Grupo 4 A 40555.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 677.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 3681.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 419.0 Demora Demora 2F04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 4 A 2730.0 Demora Demora 4F04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 1727.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 1820.0 Demora Demora 4F04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 4 A 6791.0 Demora Demora 55F04B2104ESPERANZAPE1 Tue Jun Tue Jun Grupo 4 A 15907.0 Reserva Reserva 9F03B1896ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 A 552.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 A 490.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 A 4814.0 Demora Demora 2F04B2104ESPERANZAPE8 Tue Jun Wed Jun Grupo 4 A 20362.0 Demora Demora 4F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 75.0 Reserva Reserva 9F05B2296ESPERANZAPE6 Tue Jun Tue Jun Grupo 4 A 4389.0 Reserva Reserva 9F05B2296ESPERANZAPE6 Tue Jun Tue Jun Grupo 2 B 2494.0 Demora Demora 4F05B2296ESPERANZAPE5 Tue Jun Wed Jun Grupo 2 B 16269.0 OperativoOperativoF04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 12027.0 Mantenci Mantenci F04B2104ESPERAPE6 Tue Jun Wed Jun Grupo 2 B 16917.0 OperativoOperativoF05B2296ESPERANZAPE4 Tue Jun Tue Jun Grupo 2 B 444.0 Demora Demora 4F05B2296ESPERANZAPE4 Tue Jun Wed Jun Grupo 2 B 15436.0 OperativoOperativoF05B2296ESPERANZAPE9 Tue Jun Wed Jun Grupo 2 B 10207.0 OperativoOperativo 1 ProduccionPE7 Tue Jun Tue Jun Grupo 2 B 449.0 Demora Demora 45 Traslado de RegionPE7 Tue Jun Wed Jun Grupo 2 B 7525.0 OperativoOperativo 1 ProduccionPE1 Tue Jun Wed Jun Grupo 2 B 6206.0 Mantenci MantencioF03B1896ESPERAPE2 Tue Jun Tue Jun Grupo 2 B 96.0 OperativoOperativoF04B2104ESPERANZAPE2 Tue Jun Tue Jun Grupo 2 B 976.0 Demora Demora 2F04B2104ESPERANZAPE10 Tue Jun Wed Jun Grupo 2 B 14637.0 Demora Demora 4F04B2104ESPERANZAPE2 Tue Jun Wed Jun Grupo 2 B 5256.0 OperativoOperativoF04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 2 B 108.0 OperativoOperativoF03B1896ESPERANZAPE8 Wed Jun Wed Jun Grupo 2 B 32396.0 Demora Demora 4F03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 B 338.0 Demora Demora 2F04B2104ESPERANZAPE1 Wed Jun Wed Jun Grupo 2 B 9587.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 B 59.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 B 7199.0 Demora Demora 1F04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 B 6181.0 Reserva Reserva 91 Sin Operador DisponiblePE9 Wed Jun Wed Jun Grupo 2 B 7583.0 Reserva Reserva 91 Sin Operador DisponiblePE2 Wed Jun Wed Jun Grupo 2 B 2511.0 Demora Demora 2F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 B 5136.0 Demora Demora 1F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 2 B 6452.0 Demora Demora 1F05B2296ESPERANZAPE2 Wed Jun Wed Jun Grupo 2 B 2478.0 OperativoOperativoF04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 B 2733.0 OperativoOperativo 1 ProduccionPE5 Wed Jun Wed Jun Grupo 2 B 10234.0 OperativoOperativoF04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 2 B 815.0 Demora Demora 4F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 B 15012.0 OperativoOperativoF05B2296ESPERANZAPE2 Wed Jun Wed Jun Grupo 2 B 6130.0 Reserva Reserva 9F04B2104ESPERANZAPE9 Wed Jun Wed Jun Grupo 2 B 6510.0 OperativoOperativo 1 ProduccionPE1 Wed Jun Wed Jun Grupo 2 B 2283.0 OperativoOperativoF04B2104ESPERANZA

PE7 Wed Jun Wed Jun Grupo 2 B 487.0 Demora Demora 30 Carga CombustiblePE3 Wed Jun Wed Jun Grupo 2 B 1187.0 Demora Demora 4F04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 B 9272.0 OperativoOperativo 1 ProduccionPE4 Wed Jun Wed Jun Grupo 2 B 12655.0 OperativoOperativoF05B2296ESPERANZAPE3 Wed Jun Thu Jun Grupo 2 B 126047.0OperativoOperativoF04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 2 B 18854.0 OperativoOperativoF04B2104ESPERANZAPE1 Wed Jun Wed Jun Grupo 2 B 45631.0 Mantenci Mantenci F04B2104ESPERAPE2 Wed Jun Wed Jun Grupo 2 B 6521.0 Mantenci Mantenci F04B2104ESPERAPE9 Wed Jun Wed Jun Grupo 2 B 3330.0 Demora Demora 47 Cambio Aceros PerforaciPE5 Wed Jun Wed Jun Grupo 2 B 562.0 Demora Demora 2F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 B 3078.0 OperativoOperativoF04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 B 237.0 Demora Demora 26 Relleno/Espera de aguaPE9 Wed Jun Wed Jun Grupo 2 B 23185.0 OperativoOperativo 1 ProduccionPE7 Wed Jun Wed Jun Grupo 2 B 2973.0 OperativoOperativo 1 ProduccionPE2 Wed Jun Wed Jun Grupo 2 B 535.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 B 10724.0 Demora Demora 4F04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 2 B 965.0 Demora Demora 4F04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 2 B 7069.0 OperativoOperativoF04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 B 21366.0 Demora Demora 20 Actividades de SeguridadPE6 Wed Jun Wed Jun Grupo 2 B 6313.0 Demora Demora 2F03B1896ESPERANZAPE4 Wed Jun Wed Jun Grupo 2 B 5244.0 Demora Demora 2F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 1 A 35236.0 Mantenci MantencioF05B2296ESPERAPE6 Wed Jun Wed Jun Grupo 1 A 1463.0 Demora Demora 4F03B1896ESPERANZAPE2 Wed Jun Wed Jun Grupo 1 A 1276.0 Demora Demora 4F04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 A 21270.0 Demora Demora 4F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 1646.0 OperativoOperativoF03B1896ESPERANZAPE2 Wed Jun Wed Jun Grupo 1 A 13367.0 OperativoOperativoF04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 1 A 44002.0 Demora Demora 55F03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 1 A 4443.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 9000.0 Demora Demora 4F03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 1 A 2972.0 Demora Demora 4F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 1 A 5479.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 3218.0 OperativoOperativoF05B2296ESPERANZAPE9 Wed Jun Wed Jun Grupo 1 A 31479.0 Demora Demora 34 Evacuacion por TronadurPE7 Wed Jun Wed Jun Grupo 1 A 6991.0 Demora Demora 34 Evacuacion por TronadurPE2 Wed Jun Wed Jun Grupo 1 A 3600.0 Demora Demora 1F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 5983.0 Demora Demora 3F05B2296ESPERANZAPE5 Wed Jun Wed Jun Grupo 1 A 6289.0 Demora Demora 3F04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 1 A 3237.0 Demora Demora 4F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 6664.0 OperativoOperativoF05B2296ESPERANZAPE7 Wed Jun Wed Jun Grupo 1 A 23528.0 OperativoOperativo 1 ProduccionPE2 Wed Jun Wed Jun Grupo 1 A 7917.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 1 A 15557.0 OperativoOperativoF04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 A 3066.0 OperativoOperativoF04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 A 286.0 Demora Demora 2F04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 A 8508.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 10925.0 Mantenci MantencioF05B2296ESPERAPE1 Wed Jun Wed Jun Grupo 1 A 15101.0 Demora Demora 3F04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 1 A 15338.0 Reserva Reserva F04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 1 A 1476.0 Demora Demora 3F04B2104ESPERANZAPE4 Wed Jun Wed Jun Grupo 1 A 5985.0 Demora Demora 3F05B2296ESPERANZAPE13 Wed Jun Wed Jun Grupo 1 A 10202.0 Demora Demora 4F04B2104ESPERANZAPE10 Wed Jun Thu Jun Grupo 1 A 39037.0 OperativoOperativoF04B2104ESPERANZA

PE5 Wed Jun Wed Jun Grupo 1 A 6974.0 Demora Demora 3F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 1 A 7812.0 Demora Demora 3F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 3 B 8674.0 Mantenci MantencioF05B2296ESPERAPE1 Wed Jun Wed Jun Grupo 3 B 568.0 Demora Demora 4F04B2104ESPERANZAPE12 Wed Jun Fri Jun 1 Grupo 3 B 171861.0Demora Demora 4F03B1944ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 B 1596.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Thu Jun Grupo 3 B 10473.0 OperativoOperativoF04B2104ESPERANZAPE9 Wed Jun Thu Jun Grupo 3 B 69558.0 OperativoOperativo 1 ProduccionPE2 Wed Jun Thu Jun Grupo 3 B 10154.0 OperativoOperativoF04B2104ESPERANZAPE7 Wed Jun Thu Jun Grupo 3 B 25721.0 Reserva Reserva 90 No RequeridoPE13 Wed Jun Thu Jun Grupo 3 B 47555.0 OperativoOperativoF04B2104ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 B 1001.0 Demora Demora 2F04B2104ESPERANZAPE8 Wed Jun Thu Jun Grupo 3 B 28889.0 OperativoOperativoF03B1896ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 B 4838.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 384.0 Demora Demora 4F05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 1527.0 OperativoOperativoF05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 5170.0 Demora Demora 3F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 3 B 334.0 Demora Demora 3F05B2296ESPERANZAPE4 Wed Jun Thu Jun Grupo 3 B 5695.0 OperativoOperativoF05B2296ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 B 1013.0 Mantenci MantencioF04B2104ESPERAPE1 Wed Jun Wed Jun Grupo 3 B 480.0 OperativoOperativoF04B2104ESPERANZAPE1 Wed Jun Thu Jun Grupo 3 B 16921.0 Demora Demora 4F04B2104ESPERANZAPE6 Wed Jun Thu Jun Grupo 3 B 2917.0 OperativoOperativoF05B2296ESPERANZAPE5 Thu Jun Thu Jun Grupo 3 B 24855.0 Demora Demora 3F04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 3 B 5937.0 Reserva Reserva F04B2104ESPERANZAPE4 Thu Jun Thu Jun Grupo 3 B 5277.0 Demora Demora 1F05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 3 B 4745.0 Demora Demora 1F05B2296ESPERANZAPE4 Thu Jun Thu Jun Grupo 3 B 21944.0 OperativoOperativoF05B2296ESPERANZAPE2 Thu Jun Thu Jun Grupo 3 B 4655.0 OperativoOperativoF04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 3 B 7843.0 OperativoOperativoF05B2296ESPERANZAPE2 Thu Jun Fri Jun 1 Grupo 3 B 115245.0Reserva Reserva F04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 3 B 10682.0 Demora Demora 3F05B2296ESPERANZAPE1 Thu Jun Thu Jun Grupo 3 B 18509.0 Reserva Reserva F04B2104ESPERANZAPE7 Thu Jun Thu Jun Grupo 3 B 43347.0 OperativoOperativo 1 ProduccionPE10 Thu Jun Thu Jun Grupo 3 B 5519.0 Reserva Reserva F04B2104ESPERANZAPE8 Thu Jun Thu Jun Grupo 3 B 15798.0 Demora Demora 3F03B1896ESPERANZAPE5 Thu Jun Thu Jun Grupo 3 B 18345.0 Demora Demora 4F04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 3 B 6112.0 OperativoOperativoF05B2296ESPERANZAPE10 Thu Jun Thu Jun Grupo 3 B 8549.0 OperativoOperativoF04B2104ESPERANZAPE4 Thu Jun Thu Jun Grupo 3 B 4094.0 Demora Demora 1F05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 754.0 Demora Demora 4F05B2312ESPERANZAPE4 Thu Jun Thu Jun Grupo 1 A 6989.0 OperativoOperativoF05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 1240.0 OperativoOperativoF05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 10434.0 Demora Demora 4F05B2296ESPERANZAPE1 Thu Jun Thu Jun Grupo 1 A 730.0 Demora Demora 4F04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 1 A 34480.0 Mantenci Mantenci F04B2104ESPERAPE10 Thu Jun Thu Jun Grupo 1 A 9332.0 OperativoOperativoF04B2104ESPERANZAPE8 Thu Jun Thu Jun Grupo 1 A 3279.0 OperativoOperativoF03B1896ESPERANZAPE13 Thu Jun Thu Jun Grupo 1 A 6160.0 Demora Demora 4F04B2104ESPERANZAPE4 Thu Jun Thu Jun 1Grupo 1 A 2443.0 Mantenci Mantenci F05B2296ESPERAPE8 Thu Jun Thu Jun Grupo 1 A 6197.0 Demora Demora 3F03B1896ESPERANZAPE4 Thu Jun 1Fri Jun 1 Grupo 1 A 46924.0 OperativoOperativoF05B2296ESPERANZAPE5 Thu Jun Fri Jun 1 Grupo 1 A 112207.0Mantenci Mantenci F04B2104ESPERA

PE10 Thu Jun Thu Jun Grupo 1 A 2313.0 Demora Demora 4F04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 355.0 OperativoOperativoF05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 1806.0 Demora Demora 4F05B2296ESPERANZAPE13 Thu Jun Thu Jun Grupo 1 A 4380.0 Mantenci Mantenci F04B2104ESPERAPE8 Thu Jun Thu Jun Grupo 1 A 56.0 OperativoOperativoF03B1896ESPERANZAPE8 Thu Jun Thu Jun Grupo 1 A 4801.0 Demora Demora 3F03B1896ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 17588.0 Mantenci MantencioF05B2296ESPERAPE10 Thu Jun Thu Jun Grupo 1 A 6912.0 Demora Demora 3F04B2104ESPERANZAPE13 Thu Jun Thu Jun Grupo 1 A 2070.0 Demora Demora 3F04B2104ESPERANZAPE8 Thu Jun Thu Jun Grupo 1 A 11713.0 Demora Demora 55F03B1896ESPERANZAPE13 Thu Jun Thu Jun Grupo 1 A 10113.0 Demora Demora 55F04B2104ESPERANZAPE10 Thu Jun Thu Jun Grupo 1 A 21583.0 Demora Demora 4F04B2104ESPERANZAPE3 Thu Jun Sat Jun 1Grupo 1 A 189617.0Demora Demora 4F04B2104ESPERANZAPE7 Thu Jun Thu Jun Grupo 1 A 7359.0 Mantenci Mantencion 316 Sistema PerPE9 Thu Jun Thu Jun Grupo 1 A 17305.0 Demora Demora 55 Preparacion Patio PerforaPE13 Thu Jun Thu Jun Grupo 1 A 6121.0 OperativoOperativoF04B2104ESPERANZAPE8 Thu Jun Thu Jun Grupo 1 A 14636.0 OperativoOperativoF03B1896ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 2378.0 Demora Demora 3F05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 1 A 9717.0 OperativoOperativoF05B2296ESPERANZAPE7 Thu Jun Thu Jun Grupo 1 A 16887.0 Demora Demora 55 Preparacion Patio PerforaPE13 Thu Jun Fri Jun 1 Grupo 1 A 45352.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 1 A 10215.0 Demora Demora 3F04B2104ESPERANZAPE10 Thu Jun Fri Jun 1 Grupo 3 B 51469.0 OperativoOperativoF04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 3 B 719.0 Demora Demora 4F05B2296ESPERANZAPE6 Thu Jun Fri Jun 1 Grupo 3 B 11590.0 OperativoOperativoF05B2296ESPERANZAPE8 Thu Jun Thu Jun Grupo 3 B 729.0 Demora Demora 2F03B1896ESPERANZAPE9 Thu Jun Fri Jun 1 Grupo 3 B 19069.0 OperativoOperativo 1 ProduccionPE8 Thu Jun Thu Jun Grupo 3 B 1358.0 OperativoOperativoF03B1896ESPERANZAPE1 Thu Jun Thu Jun Grupo 3 B 2.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 3 B 3120.0 Demora Demora 4F04B2104ESPERANZAPE8 Thu Jun Thu Jun Grupo 3 B 410.0 Demora Demora 3F03B1896ESPERANZAPE8 Thu Jun Thu Jun Grupo 3 B 6889.0 OperativoOperativoF03B1896ESPERANZAPE1 Thu Jun Thu Jun Grupo 3 B 1132.0 Demora Demora 4F04B2120ESPERANZAPE1 Thu Jun Thu Jun Grupo 3 B 2982.0 OperativoOperativoF04B2104ESPERANZAPE7 Thu Jun Sun Jun Grupo 3 B 239876.0OperativoOperativo 1 ProduccionPE1 Thu Jun Fri Jun 1 Grupo 3 B 49905.0 Mantenci Mantenci F04B2104ESPERAPE8 Thu Jun Fri Jun 1 Grupo 3 B 1244.0 Demora Demora 49F03B1896ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 18.0 OperativoOperativoF03B1896ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 527.0 Demora Demora 2F03B1896ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 3 B 12.0 Demora Demora 4F05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 3 B 1553.0 Demora Demora 1F05B2296ESPERANZAPE4 Fri Jun 1 Fri Jun 1 Grupo 3 B 3849.0 Demora Demora 1F05B2296ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 19107.0 OperativoOperativoF03B1896ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 3 B 4357.0 OperativoOperativoF05B2296ESPERANZAPE4 Fri Jun 1 Fri Jun 1 Grupo 3 B 21208.0 OperativoOperativoF05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 3 B 15798.0 Demora Demora 3F05B2296ESPERANZAPE9 Fri Jun 1 Fri Jun 1 Grupo 3 B 11194.0 Demora Demora 47 Cambio Aceros PerforaciPE9 Fri Jun 1 Fri Jun 1 Grupo 3 B 13177.0 OperativoOperativo 1 ProduccionPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 370.0 Demora Demora 2F03B1896ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 11192.0 OperativoOperativoF03B1896ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 3 B 20441.0 OperativoOperativoF05B2296ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 3 B 5865.0 Reserva Reserva F04B2104ESPERANZAPE4 Fri Jun 1 Fri Jun 1 Grupo 3 B 3892.0 Demora Demora 2F05B2296ESPERANZA

PE4 Fri Jun 1 Fri Jun 1 Grupo 1 A 594.0 Demora Demora 3F05B2296ESPERANZAPE4 Fri Jun 1 Fri Jun 1 Grupo 1 A 5679.0 OperativoOperativoF05B2296ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 1 A 47927.0 Demora Demora 4F04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 3803.0 Demora Demora 4F03B1896ESPERANZAPE9 Fri Jun 1 Fri Jun 1 Grupo 1 A 10813.0 Mantenci Mantencion 303 Motor diesePE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 19720.0 Demora Demora 4F03B1896ESPERANZAPE4 Fri Jun 1 Fri Jun 1 Grupo 1 A 90.0 Reserva Reserva 9F05B2296ESPERANZAPE4 Fri Jun 1 Fri Jun 1 Grupo 1 A 36692.0 Reserva Reserva 9F05B2296ESPERANZAPE10 Fri Jun 1 Fri Jun 1 Grupo 1 A 247.0 Demora Demora 4F04B2104ESPERANZAPE10 Fri Jun 1 Fri Jun 1 Grupo 1 A 1846.0 OperativoOperativoF04B2104ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 3834.0 OperativoOperativoF04B2088ESPERANZAPE10 Fri Jun 1 Fri Jun 1 Grupo 1 A 15805.0 Demora Demora 4F04B2104ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 1 A 13974.0 Demora Demora 3F05B2296ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 300.0 Demora Demora 49F04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 2066.0 Demora Demora 4F04B2088ESPERANZAPE9 Fri Jun 1 Fri Jun 1 Grupo 1 A 4006.0 OperativoOperativo 1 ProduccionPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 2151.0 OperativoOperativoF04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 489.0 Demora Demora 3F04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 1021.0 OperativoOperativoF04B2088ESPERANZAPE9 Fri Jun 1 Fri Jun 1 Grupo 1 A 8807.0 Demora Demora 34 Evacuacion por TronadurPE1 Fri Jun 1 Fri Jun 1 Grupo 1 A 9707.0 Demora Demora 3F04B2104ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 6049.0 Demora Demora 3F04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 13639.0 OperativoOperativoF04B2088ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 1659.0 Mantenci MantencioF03B1896ESPERAPE10 Fri Jun 1 Fri Jun 1 Grupo 1 A 18815.0 OperativoOperativoF04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 4.0 OperativoOperativoF03B1896ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 44.0 OperativoOperativoF03B1896ESPERANZAPE9 Fri Jun 1 Fri Jun 1 Grupo 1 A 18020.0 Demora Demora 55 Preparacion Patio PerforaPE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 7839.0 Demora Demora 55F03B1896ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 1 A 4857.0 Demora Demora 4F05B2296ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 1 A 9.0 Demora Demora 5F04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 1 A 3413.0 Demora Demora 4F04B2104ESPERANZAPE6 Fri Jun 1 Sat Jun 1Grupo 1 A 63992.0 OperativoOperativoF05B2296ESPERANZAPE1 Fri Jun 1 Sat Jun 1Grupo 1 A 30334.0 OperativoOperativoF04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 1 A 12073.0 OperativoOperativoF03B1896ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 1 A 5745.0 Demora Demora 3F04B2104ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 1 A 5166.0 Demora Demora 2F04B2088ESPERANZAPE4 Fri Jun 1 Sat Jun 1Grupo 3 B 13798.0 OperativoOperativoF05B2296ESPERANZAPE12 Fri Jun 1 Sat Jun 1Grupo 3 B 39082.0 Mantenci Mantenci F03B1944ESPERAPE2 Fri Jun 1 Sat Jun 1Grupo 3 B 39557.0 OperativoOperativoF04B2088ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 3 B 4785.0 Demora Demora 4F04B2104ESPERANZAPE9 Fri Jun 1 Sat Jun 1Grupo 3 B 12732.0 OperativoOperativo 1 ProduccionPE10 Fri Jun 1 Fri Jun 1 Grupo 3 B 304.0 Demora Demora 55F04B2104ESPERANZAPE10 Fri Jun 1 Mon Jun Grupo 3 B 214965.0Reserva Reserva F04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 222.0 Demora Demora 3F03B1896ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 5567.0 OperativoOperativoF03B1896ESPERANZAPE13 Fri Jun 1 Sat Jun 1Grupo 3 B 8725.0 OperativoOperativoF04B2104ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 3 B 131.0 OperativoOperativoF04B2104ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 3 B 3734.0 Demora Demora 4F04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 3 B 644.0 Demora Demora 2F03B1896ESPERANZAPE5 Fri Jun 1 Sat Jun 1Grupo 3 B 69762.0 Mantenci Mantenci F04B2104ESPERAPE8 Fri Jun 1 Sat Jun 1Grupo 3 B 4391.0 OperativoOperativoF03B1896ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 3 B 4879.0 Demora Demora 1F05B2296ESPERANZA

PE8 Sat Jun 1Sat Jun 1Grupo 3 B 4184.0 Demora Demora 1F03B1896ESPERANZAPE13 Sat Jun 1Sat Jun 1Grupo 3 B 4194.0 Demora Demora 1F04B2104ESPERANZAPE9 Sat Jun 1Sat Jun 1Grupo 3 B 4163.0 Demora Demora 10 ColacionPE4 Sat Jun 1Sat Jun 1Grupo 3 B 15604.0 OperativoOperativoF05B2296ESPERANZAPE9 Sat Jun 1Sat Jun 1Grupo 3 B 54918.0 Reserva Reserva 90 No RequeridoPE8 Sat Jun 1Sat Jun 1Grupo 3 B 55040.0 Reserva Reserva F03B1896ESPERANZAPE13 Sat Jun 1Sat Jun 1Grupo 3 B 56680.0 Reserva Reserva F04B2104ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 3 B 6466.0 Demora Demora 4F04B2088ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 3 B 13281.0 OperativoOperativoF04B2104ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 3 B 1969.0 Demora Demora 4F05B2296ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 3 B 2593.0 OperativoOperativoF05B2296ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 3 B 7343.0 Demora Demora 4F05B2296ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 3 B 11444.0 Demora Demora 4F04B2104ESPERANZAPE12 Sat Jun 1Mon Jun Grupo 3 B 178284.0Reserva Reserva F03B1944ESPERANZAPE2 Sat Jun 1Sat Jun 1Grupo 3 B 3290.0 Reserva Reserva F04B2088ESPERANZAPE2 Sat Jun 1Sat Jun 1Grupo 1 A 15049.0 OperativoOperativoF04B2088ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 1 A 18295.0 OperativoOperativoF05B2296ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 2264.0 OperativoOperativoF03B1896ESPERANZAPE6 Sat Jun 1Sat Jun 1Grupo 1 A 380.0 Demora Demora 2F05B2296ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 489.0 Demora Demora 3F04B2088ESPERANZAPE6 Sat Jun 1Sat Jun 1Grupo 1 A 11284.0 OperativoOperativoF05B2296ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 3312.0 OperativoOperativoF04B2088ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 5907.0 Mantenci MantencioF04B2088ESPERAPE2 Sat Jun 1Sat Jun 1Grupo 1 A 7655.0 Demora Demora 1F04B2088ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 4093.0 Demora Demora 3F04B2088ESPERANZAPE6 Sat Jun 1Sat Jun 1Grupo 1 A 6534.0 Demora Demora 3F05B2296ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 1 A 6681.0 Demora Demora 3F05B2296ESPERANZAPE2 Sat Jun 1Sat Jun 1Grupo 1 A 7018.0 OperativoOperativoF04B2088ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 16606.0 OperativoOperativoF04B2088ESPERANZAPE6 Sat Jun 1Sun Jun Grupo 1 A 68462.0 OperativoOperativoF05B2296ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 1 A 9572.0 OperativoOperativoF05B2296ESPERANZAPE2 Sat Jun 1Sat Jun 1Grupo 1 A 141.0 Demora Demora 4F04B2088ESPERANZAPE2 Sat Jun 1Sun Jun Grupo 1 A 41145.0 OperativoOperativoF04B2088ESPERANZAPE9 Sat Jun 1Sun Jun Grupo 1 A 64176.0 OperativoOperativo 1 ProduccionPE8 Sat Jun 1Sat Jun 1Grupo 1 A 8615.0 OperativoOperativoF03B1896ESPERANZAPE13 Sat Jun 1Sun Jun Grupo 1 A 47524.0 OperativoOperativoF03B1896ESPERANZAPE5 Sat Jun 1Sat Jun 1Grupo 1 A 6385.0 Demora Demora 3F04B2104ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 1 A 1604.0 Demora Demora 4F05B2296ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 1 A 6235.0 Demora Demora 4F05B2296ESPERANZAPE3 Sat Jun 1Sun Jun Grupo 1 A 70843.0 Demora Demora 4F04B2104ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 1 A 8.0 Demora Demora 4F03B1896ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 1 A 717.0 Demora Demora 55F03B1896ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 1 A 3679.0 Demora Demora 1F03B1896ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 1 A 3155.0 Demora Demora 1F04B2088ESPERANZAPE5 Sat Jun 1Sat Jun 1Grupo 3 B 7426.0 Reserva Reserva F04B2104ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 3 B 5113.0 OperativoOperativoF04B2088ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 3 B 6319.0 OperativoOperativoF03B1896ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 3 B 274.0 Demora Demora 4F05B2296ESPERANZAPE4 Sat Jun 1Sat Jun 1Grupo 3 B 10155.0 OperativoOperativoF05B2296ESPERANZAPE1 Sat Jun 1Sat Jun 1Grupo 3 B 1769.0 Demora Demora 4F04B2088ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 3 B 450.0 Demora Demora 2F03B1896ESPERANZAPE1 Sat Jun 1Sun Jun Grupo 3 B 39902.0 OperativoOperativoF04B2088ESPERANZAPE5 Sat Jun 1Sun Jun Grupo 3 B 46592.0 OperativoOperativoF04B2088ESPERANZA

PE8 Sat Jun 1Sat Jun 1Grupo 3 B 1294.0 OperativoOperativoF03B1896ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 3 B 307.0 Demora Demora 3F03B1896ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 3 B 2781.0 OperativoOperativoF03B1896ESPERANZAPE8 Sat Jun 1Sat Jun 1Grupo 3 B 654.0 Demora Demora 49F03B1896ESPERANZAPE8 Sat Jun 1Sun Jun Grupo 3 B 16778.0 OperativoOperativoF03B1896ESPERANZAPE4 Sat Jun 1Sun Jun Grupo 3 B 1547.0 Demora Demora 55F05B2296ESPERANZAPE4 Sun Jun Sun Jun Grupo 3 B 18057.0 OperativoOperativoF05B2296ESPERANZAPE2 Sun Jun Sun Jun Grupo 3 B 544.0 Demora Demora 2F04B2088ESPERANZAPE2 Sun Jun Sun Jun Grupo 3 B 14555.0 OperativoOperativoF04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 3 B 4863.0 Demora Demora 2F03B1896ESPERANZAPE4 Sun Jun Sun Jun Grupo 3 B 20086.0 Reserva Reserva F05B2296ESPERANZAPE8 Sun Jun Sun Jun Grupo 3 B 25723.0 OperativoOperativoF03B1896ESPERANZAPE13 Sun Jun Sun Jun Grupo 3 B 7395.0 Demora Demora 4F03B1896ESPERANZAPE2 Sun Jun Sun Jun Grupo 1 A 33705.0 Demora Demora 4F04B2088ESPERANZAPE13 Sun Jun Sun Jun Grupo 1 A 7463.0 OperativoOperativoF03B1896ESPERANZAPE1 Sun Jun Sun Jun Grupo 1 A 349.0 Demora Demora 3F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 1 A 1440.0 OperativoOperativoF04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 1 A 9335.0 Demora Demora 2F04B2088ESPERANZAPE13 Sun Jun Sun Jun Grupo 1 A 2326.0 Mantenci Mantenci F03B1896ESPERAPE9 Sun Jun Sun Jun Grupo 1 A 37376.0 Demora Demora 47 Cambio Aceros PerforaciPE4 Sun Jun Sun Jun Grupo 1 A 10972.0 OperativoOperativoF05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 1 A 208.0 Demora Demora 2F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 1 A 10119.0 OperativoOperativoF05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 1 A 510.0 Demora Demora 2F04B2088ESPERANZAPE13 Sun Jun Sun Jun Grupo 1 A 6651.0 OperativoOperativoF03B1896ESPERANZAPE5 Sun Jun Sun Jun Grupo 1 A 20189.0 Demora Demora 3F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 1 A 19149.0 Demora Demora 3F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 1 A 9134.0 Demora Demora 3F03B1896ESPERANZAPE13 Sun Jun Sun Jun Grupo 1 A 10469.0 Demora Demora 3F03B1896ESPERANZAPE4 Sun Jun Sun Jun Grupo 1 A 6911.0 Demora Demora 3F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 1 A 7320.0 Mantenci MantencioF05B2296ESPERAPE3 Sun Jun Mon Jun Grupo 1 A 57600.0 Mantenci Mantenci F04B2104ESPERAPE8 Sun Jun Sun Jun Grupo 1 A 495.0 Demora Demora 3F03B1896ESPERANZAPE8 Sun Jun Sun Jun Grupo 1 A 8332.0 OperativoOperativoF03B1896ESPERANZAPE4 Sun Jun Sun Jun Grupo 1 A 20434.0 OperativoOperativoF05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 1 A 6453.0 OperativoOperativoF05B2296ESPERANZAPE13 Sun Jun Sun Jun Grupo 1 A 6169.0 OperativoOperativoF03B1896ESPERANZAPE5 Sun Jun Mon Jun Grupo 1 A 25328.0 Demora Demora 4F04B2088ESPERANZAPE2 Sun Jun Tue Jun Grupo 1 A 121699.0Demora Demora 55F04B2088ESPERANZAPE1 Sun Jun Mon Jun Grupo 1 A 76530.0 Demora Demora 55F04B2088ESPERANZAPE13 Sun Jun Sun Jun Grupo 1 A 384.0 OperativoOperativoF03B1896ESPERANZAPE6 Sun Jun Sun Jun Grupo 1 A 10451.0 OperativoOperativoF05B2296ESPERANZAPE7 Sun Jun Sun Jun Grupo 1 A 13542.0 Demora Demora 55 Preparacion Patio PerforaPE13 Sun Jun Sun Jun Grupo 1 A 2552.0 Demora Demora 4F03B1896ESPERANZAPE8 Sun Jun Sun Jun Grupo 1 A 14742.0 Demora Demora 55F03B1896ESPERANZAPE13 Sun Jun Mon Jun Grupo 1 A 51323.0 OperativoOperativoF03B1896ESPERANZAPE6 Sun Jun Sun Jun Grupo 3 B 1044.0 Demora Demora 4F05B2296ESPERANZAPE6 Sun Jun Mon Jun Grupo 3 B 32408.0 OperativoOperativoF05B2296ESPERANZAPE9 Sun Jun Sun Jun Grupo 3 B 4758.0 OperativoOperativo 1 ProduccionPE4 Sun Jun Sun Jun Grupo 3 B 1866.0 Demora Demora 4F05B2296ESPERANZAPE7 Sun Jun Mon Jun Grupo 3 B 62912.0 OperativoOperativo 1 ProduccionPE8 Sun Jun Mon Jun Grupo 3 B 24510.0 OperativoOperativoF03B1896ESPERANZAPE4 Sun Jun Sun Jun Grupo 3 B 6380.0 OperativoOperativoF05B2296ESPERANZA

PE9 Sun Jun Mon Jun Grupo 3 B 22608.0 Demora Demora 47 Cambio Aceros PerforaciPE4 Sun Jun Mon Jun Grupo 3 B 4795.0 Mantenci MantencioF05B2296ESPERAPE5 Mon Jun Mon Jun Grupo 3 B 36057.0 OperativoOperativoF04B2088ESPERANZAPE4 Mon Jun Mon Jun Grupo 3 B 1497.0 OperativoOperativoF05B2296ESPERANZAPE4 Mon Jun Mon Jun Grupo 3 B 2209.0 Demora Demora 1F05B2296ESPERANZAPE4 Mon Jun Mon Jun Grupo 3 B 3158.0 OperativoOperativoF05B2296ESPERANZAPE4 Mon Jun Mon Jun Grupo 3 B 20768.0 Reserva Reserva F05B2296ESPERANZAPE9 Mon Jun Tue Jun Grupo 3 B 73206.0 Mantenci Mantencion 312 Sistema HidPE8 Mon Jun Mon Jun Grupo 3 B 327.0 Demora Demora 2F03B1896ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 B 7347.0 OperativoOperativoF03B1896ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 B 729.0 Demora Demora 2F05B2296ESPERANZAPE6 Mon Jun Mon Jun Grupo 3 B 9560.0 OperativoOperativoF05B2296ESPERANZAPE3 Mon Jun Wed Jun Grupo 3 B 165833.0Demora Demora 55F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 B 13942.0 Demora Demora 3F03B1896ESPERANZAPE4 Mon Jun Wed Jun Grupo 1 A 151497.0Demora Demora 3F05B2296ESPERANZAPE6 Mon Jun Mon Jun Grupo 1 A 2061.0 Demora Demora 55F05B2296ESPERANZAPE10 Mon Jun Mon Jun Grupo 1 A 52209.0 Demora Demora 5F04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 1 A 43233.0 Demora Demora 55F03B1944ESPERANZAPE13 Mon Jun Mon Jun Grupo 1 A 14607.0 OperativoOperativoF03B1896ESPERANZAPE6 Mon Jun Mon Jun Grupo 1 A 2569.0 OperativoOperativoF05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 1 A 1768.0 Demora Demora 4F04B2088ESPERANZAPE6 Mon Jun Tue Jun Grupo 1 A 55733.0 Mantenci Mantenci F05B2296ESPERAPE5 Mon Jun Mon Jun Grupo 1 A 1664.0 OperativoOperativoF04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 1 A 6645.0 OperativoOperativoF03B1896ESPERANZAPE5 Mon Jun Mon Jun Grupo 1 A 7872.0 Mantenci Mantenci F04B2088ESPERAPE8 Mon Jun Mon Jun Grupo 1 A 20374.0 Demora Demora 3F03B1896ESPERANZAPE13 Mon Jun Mon Jun Grupo 1 A 21113.0 Demora Demora 3F03B1896ESPERANZAPE5 Mon Jun Mon Jun Grupo 1 A 4248.0 Demora Demora 3F04B2088ESPERANZAPE5 Mon Jun Mon Jun Grupo 1 A 15022.0 OperativoOperativoF04B2088ESPERANZAPE7 Mon Jun Mon Jun Grupo 1 A 20465.0 Demora Demora 20 Actividades de SeguridadPE1 Mon Jun Mon Jun Grupo 1 A 2698.0 Demora Demora 4F04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 1 A 11080.0 Mantenci Mantenci F04B2088ESPERAPE8 Mon Jun Mon Jun Grupo 1 A 8687.0 Demora Demora 4F03B1896ESPERANZAPE5 Mon Jun Tue Jun Grupo 1 A 25244.0 Demora Demora 4F04B2088ESPERANZAPE13 Mon Jun Tue Jun Grupo 1 A 48819.0 OperativoOperativoF03B1896ESPERANZAPE1 Mon Jun Mon Jun Grupo 1 A 5518.0 Demora Demora 3F04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 3 B 2627.0 Mantenci Mantenci F04B2088ESPERAPE7 Mon Jun Mon Jun Grupo 3 B 235.0 Demora Demora 45 Traslado de RegionPE8 Mon Jun Mon Jun Grupo 3 B 7647.0 OperativoOperativoF03B1896ESPERANZAPE7 Mon Jun Wed Jun Grupo 3 B 111446.0 OperativoOperativo 1 ProduccionPE12 Mon Jun Mon Jun Grupo 3 B 5195.0 OperativoOperativoF03B1944ESPERANZAPE1 Mon Jun Mon Jun Grupo 3 B 43.0 OperativoOperativoF04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 3 B 4093.0 Demora Demora 4F04B2088ESPERANZAPE1 Mon Jun Tue Jun Grupo 3 B 6782.0 OperativoOperativoF04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 3 B 2024.0 Mantenci Mantenci F03B1944ESPERAPE12 Mon Jun Tue Jun Grupo 3 B 5808.0 OperativoOperativoF03B1944ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 B 857.0 Demora Demora 3F03B1896ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 B 1450.0 OperativoOperativoF03B1896ESPERANZAPE10 Mon Jun Mon Jun Grupo 3 B 1997.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 3 B 1326.0 Demora Demora 49F03B1896ESPERANZAPE8 Mon Jun Tue Jun Grupo 3 B 11877.0 OperativoOperativoF03B1896ESPERANZAPE10 Mon Jun Tue Jun Grupo 3 B 7093.0 Mantenci MantencioF04B2104ESPERAPE1 Tue Jun Tue Jun Grupo 3 B 457.0 Demora Demora 3F04B2104ESPERANZA

PE1 Tue Jun Tue Jun Grupo 3 B 20260.0 OperativoOperativoF04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 3 B 364.0 Demora Demora 4F03B1944ESPERANZAPE12 Tue Jun Tue Jun Grupo 3 B 2604.0 OperativoOperativoF03B1944ESPERANZAPE9 Tue Jun Tue Jun Grupo 3 B 4191.0 Reserva Reserva 90 No RequeridoPE12 Tue Jun Tue Jun Grupo 3 B 17230.0 Mantenci Mantenci F03B1944ESPERAPE5 Tue Jun Tue Jun Grupo 3 B 5919.0 Reserva Reserva F04B2104ESPERANZAPE6 Tue Jun Tue Jun Grupo 3 B 58601.0 Reserva Reserva F05B2296ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 B 37.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 B 4068.0 Mantenci MantencioF04B2104ESPERAPE9 Tue Jun Tue Jun Grupo 3 B 5042.0 Demora Demora 45 Traslado de RegionPE10 Tue Jun Tue Jun Grupo 3 B 16517.0 Demora Demora 4F04B2104ESPERANZAPE8 Tue Jun Wed Jun Grupo 3 B 118197.0Demora Demora 4F03B1896ESPERANZAPE5 Tue Jun Tue Jun Grupo 3 B 35134.0 OperativoOperativoF04B2104ESPERANZAPE9 Tue Jun Tue Jun Grupo 3 B 1528.0 Demora Demora 47 Cambio Aceros PerforaciPE2 Tue Jun Tue Jun Grupo 3 B 30256.0 Mantenci MantencioF04B2088ESPERAPE9 Tue Jun Tue Jun Grupo 3 B 59101.0 OperativoOperativo 1 ProduccionPE1 Tue Jun Tue Jun Grupo 3 B 1071.0 Demora Demora 2F04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 3 B 628.0 Demora Demora 3F03B1944ESPERANZAPE1 Tue Jun Tue Jun Grupo 3 B 4013.0 OperativoOperativoF04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 3 B 16021.0 OperativoOperativoF03B1944ESPERANZAPE1 Tue Jun Tue Jun Grupo 3 B 11973.0 Demora Demora 49F04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 B 2707.0 Reserva Reserva F04B2104ESPERANZAPE13 Tue Jun Tue Jun Grupo 1 A 8825.0 OperativoOperativoF03B1896ESPERANZAPE10 Tue Jun Tue Jun Grupo 1 A 15193.0 OperativoOperativoF04B2104ESPERANZAPE1 Tue Jun Tue Jun Grupo 1 A 5373.0 OperativoOperativoF04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 1 A 3127.0 Mantenci MantencioF03B1944ESPERAPE13 Tue Jun Tue Jun Grupo 1 A 8396.0 Demora Demora 4F03B1896ESPERANZAPE12 Tue Jun Tue Jun Grupo 1 A 33029.0 Demora Demora 3F03B1944ESPERANZAPE2 Tue Jun Wed Jun Grupo 1 A 119795.0Demora Demora 3F04B2088ESPERANZAPE1 Tue Jun Wed Jun Grupo 1 A 71192.0 Demora Demora 4F04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 1 A 28275.0 Demora Demora 2F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 1 A 12685.0 Demora Demora 1F04B2104ESPERANZAPE13 Tue Jun Tue Jun Grupo 1 A 9467.0 Demora Demora 3F03B1896ESPERANZAPE13 Tue Jun Tue Jun Grupo 1 A 7965.0 Demora Demora 4F03B1896ESPERANZAPE5 Tue Jun Tue Jun Grupo 1 A 16419.0 Demora Demora 2F04B2104ESPERANZAPE6 Tue Jun Wed Jun Grupo 1 A 25249.0 Mantenci MantencioF05B2296ESPERAPE13 Tue Jun Tue Jun Grupo 1 A 8631.0 OperativoOperativoF03B1896ESPERANZAPE13 Tue Jun Wed Jun Grupo 3 B 12884.0 OperativoOperativoF03B1896ESPERANZAPE9 Tue Jun Tue Jun Grupo 3 B 10917.0 Demora Demora 47 Cambio Aceros PerforaciPE10 Tue Jun Tue Jun Grupo 3 B 16.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 B 2448.0 Demora Demora 55F04B2104ESPERANZAPE12 Tue Jun Wed Jun Grupo 3 B 25098.0 OperativoOperativoF03B1944ESPERANZAPE5 Tue Jun Tue Jun Grupo 3 B 7283.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 3 B 7596.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Wed Jun Grupo 3 B 12037.0 Mantenci Mantenci F04B2104ESPERAPE10 Tue Jun Tue Jun Grupo 3 B 674.0 Demora Demora 2F04B2104ESPERANZAPE10 Tue Jun Wed Jun Grupo 3 B 20204.0 OperativoOperativoF04B2104ESPERANZAPE9 Tue Jun Wed Jun Grupo 3 B 35222.0 OperativoOperativo 1 ProduccionPE13 Wed Jun Wed Jun Grupo 3 B 7323.0 Demora Demora 4F03B1896ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 22.0 OperativoOperativoF05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 46.0 Demora Demora 3F05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 4249.0 Demora Demora 4F05B2296ESPERANZAPE13 Wed Jun Wed Jun Grupo 3 B 16429.0 OperativoOperativoF03B1896ESPERANZA

PE6 Wed Jun Wed Jun Grupo 3 B 40.0 OperativoOperativoF05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 7816.0 Demora Demora 4F05B2296ESPERANZAPE5 Wed Jun Wed Jun Grupo 3 B 2.0 OperativoOperativoF04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 3 B 179.0 Demora Demora 3F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 3 B 25315.0 OperativoOperativoF04B2104ESPERANZAPE4 Wed Jun Wed Jun Grupo 3 B 13049.0 OperativoOperativoF05B2296ESPERANZAPE7 Wed Jun Wed Jun Grupo 3 B 16562.0 Reserva Reserva 90 No RequeridoPE12 Wed Jun Wed Jun Grupo 3 B 16653.0 Reserva Reserva F03B1944ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 5927.0 OperativoOperativoF05B2296ESPERANZAPE3 Wed Jun Wed Jun Grupo 3 B 1389.0 OperativoOperativoF04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 3 B 908.0 Demora Demora 2F04B2104ESPERANZAPE10 Wed Jun Wed Jun Grupo 3 B 3987.0 OperativoOperativoF04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 3 B 27170.0 Mantenci Mantenci F04B2104ESPERAPE6 Wed Jun Wed Jun Grupo 3 B 2195.0 Demora Demora 2F05B2296ESPERANZAPE10 Wed Jun Wed Jun Grupo 3 B 7759.0 Reserva Reserva F04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 3 B 6857.0 Demora Demora 1F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 3 B 7209.0 Demora Demora 1F05B2296ESPERANZAPE13 Wed Jun Wed Jun Grupo 3 B 6479.0 Demora Demora 1F03B1896ESPERANZAPE1 Wed Jun Wed Jun Grupo 2 A 39620.0 Demora Demora 4F04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 A 6408.0 Demora Demora 45 Traslado de RegionPE13 Wed Jun Wed Jun Grupo 2 A 15240.0 OperativoOperativoF03B1896ESPERANZAPE12 Wed Jun Wed Jun Grupo 2 A 7051.0 Demora Demora 4F03B1944ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 A 2802.0 OperativoOperativoF05B2296ESPERANZAPE10 Wed Jun Wed Jun Grupo 2 A 15086.0 OperativoOperativoF04B2104ESPERANZAPE4 Wed Jun Wed Jun Grupo 2 A 10103.0 OperativoOperativoF05B2296ESPERANZAPE9 Wed Jun Wed Jun Grupo 2 A 1019.0 Demora Demora 47 Cambio Aceros PerforaciPE6 Wed Jun Wed Jun Grupo 2 A 3989.0 Mantenci Mantenci F05B2296ESPERAPE5 Wed Jun Wed Jun Grupo 2 A 1121.0 Demora Demora 4F04B2104ESPERANZAPE9 Wed Jun Wed Jun Grupo 2 A 2627.0 Mantenci Mantencion 314 Sistema LubPE5 Wed Jun Wed Jun Grupo 2 A 3442.0 OperativoOperativoF04B2104ESPERANZAPE7 Wed Jun Wed Jun Grupo 2 A 1010.0 OperativoOperativo 1 ProduccionPE9 Wed Jun Wed Jun Grupo 2 A 979.0 OperativoOperativo 1 ProduccionPE12 Wed Jun Wed Jun Grupo 2 A 4166.0 OperativoOperativoF03B1944ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 A 223.0 Demora Demora 3F05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 A 7915.0 OperativoOperativoF05B2296ESPERANZAPE7 Wed Jun Thu Jun Grupo 2 A 73811.0 Mantenci Mantencion 316 Sistema PerPE9 Wed Jun Wed Jun Grupo 2 A 6389.0 Demora Demora 45 Traslado de RegionPE5 Wed Jun Wed Jun Grupo 2 A 510.0 Demora Demora 2F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 A 6142.0 OperativoOperativoF04B2104ESPERANZAPE4 Wed Jun Wed Jun Grupo 2 A 4506.0 Demora Demora 4F05B2296ESPERANZAPE12 Wed Jun Wed Jun Grupo 2 A 1415.0 Mantenci Mantenci F03B1944ESPERAPE12 Wed Jun Wed Jun Grupo 2 A 3089.0 OperativoOperativoF03B1944ESPERANZAPE8 Wed Jun Wed Jun Grupo 2 A 1797.0 Demora Demora 4F03B1896ESPERANZAPE9 Wed Jun Wed Jun Grupo 2 A 11545.0 Demora Demora 34 Evacuacion por TronadurPE8 Wed Jun Wed Jun Grupo 2 A 6883.0 Demora Demora 3F03B1896ESPERANZAPE13 Wed Jun Wed Jun Grupo 2 A 9031.0 Demora Demora 3F05B2296ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 A 7487.0 Demora Demora 3F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 2 A 13288.0 Demora Demora 3F05B2296ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 A 3543.0 Demora Demora 1F04B2104ESPERANZAPE12 Wed Jun Wed Jun Grupo 2 A 6758.0 Demora Demora 1F03B1944ESPERANZAPE10 Wed Jun Wed Jun Grupo 2 A 6966.0 Reserva Reserva 9F04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 2 A 31558.0 Demora Demora 3F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 A 4140.0 Demora Demora 3F04B2104ESPERANZA

PE8 Wed Jun Wed Jun Grupo 2 A 15175.0 Demora Demora 4F03B1896ESPERANZAPE12 Wed Jun Wed Jun Grupo 2 A 5596.0 OperativoOperativoF03B1944ESPERANZAPE10 Wed Jun Wed Jun Grupo 2 A 5946.0 OperativoOperativoF04B2104ESPERANZAPE6 Wed Jun Wed Jun Grupo 2 A 25304.0 Demora Demora 3F05B2296ESPERANZAPE5 Wed Jun Wed Jun Grupo 2 A 16758.0 OperativoOperativoF04B2104ESPERANZAPE13 Wed Jun Wed Jun Grupo 2 A 1114.0 OperativoOperativoF05B2296ESPERANZAPE13 Wed Jun Wed Jun Grupo 2 A 2064.0 Mantenci Mantenci F05B2296ESPERAPE9 Wed Jun Wed Jun Grupo 2 A 12651.0 OperativoOperativo 1 ProduccionPE13 Wed Jun Wed Jun Grupo 2 A 4.0 OperativoOperativoF05B2296ESPERANZAPE13 Wed Jun Wed Jun Grupo 2 A 8554.0 OperativoOperativoF05B2296ESPERANZAPE12 Wed Jun Wed Jun Grupo 2 A 13565.0 Demora Demora 4F03B1944ESPERANZAPE4 Wed Jun Thu Jun Grupo 2 A 97489.0 Demora Demora 4F05B2296ESPERANZAPE10 Wed Jun Sat Jun 2Grupo 2 A 250253.0Demora Demora 55F04B2104ESPERANZAPE13 Wed Jun Wed Jun Grupo 2 A 341.0 Demora Demora 2F05B2296ESPERANZAPE13 Wed Jun Wed Jun Grupo 2 A 11491.0 OperativoOperativoF05B2296ESPERANZAPE8 Wed Jun Wed Jun Grupo 2 A 8452.0 Demora Demora 4F03B1896ESPERANZAPE1 Wed Jun Wed Jun Grupo 2 A 17772.0 Demora Demora 4F04B2104ESPERANZAPE9 Wed Jun Wed Jun Grupo 2 A 1697.0 Demora Demora 28 Traslado entre pozosPE5 Wed Jun Wed Jun Grupo 2 A 4763.0 Demora Demora 2F04B2104ESPERANZAPE9 Wed Jun Thu Jun Grupo 2 A 54836.0 OperativoOperativo 1 ProduccionPE12 Wed Jun Wed Jun Grupo 4 B 5100.0 Demora Demora 4F03B1944ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 B 1349.0 Demora Demora 4F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 3493.0 OperativoOperativoF03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 B 5409.0 OperativoOperativoF04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 4 B 2654.0 Mantenci MantencioF04B2088ESPERAPE12 Wed Jun Thu Jun Grupo 4 B 11737.0 OperativoOperativoF03B1944ESPERANZAPE13 Wed Jun Thu Jun Grupo 4 B 9554.0 OperativoOperativoF05B2296ESPERANZAPE3 Wed Jun Thu Jun Grupo 4 B 26720.0 Demora Demora 4F04B2104ESPERANZAPE6 Wed Jun Thu Jun Grupo 4 B 10613.0 Demora Demora 4F05B2296ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 860.0 Demora Demora 49F03B1896ESPERANZAPE2 Wed Jun Wed Jun Grupo 4 B 27.0 OperativoOperativoF04B2088ESPERANZAPE2 Wed Jun Wed Jun Grupo 4 B 6769.0 Demora Demora 4F04B2088ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 136.0 OperativoOperativoF03B1896ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 6.0 Demora Demora 5F03B1896ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 8.0 OperativoOperativoF03B1896ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 773.0 Demora Demora 49F03B1896ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 3586.0 OperativoOperativoF03B1896ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 B 343.0 Demora Demora 2F04B2104ESPERANZAPE5 Wed Jun Thu Jun Grupo 4 B 21117.0 OperativoOperativoF04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 1091.0 Demora Demora 49F03B1896ESPERANZAPE8 Wed Jun Thu Jun Grupo 4 B 36767.0 OperativoOperativoF03B1896ESPERANZAPE1 Wed Jun Thu Jun Grupo 4 B 5806.0 OperativoOperativoF04B2104ESPERANZAPE2 Wed Jun Thu Jun Grupo 4 B 3818.0 Demora Demora 55F04B2088ESPERANZAPE13 Thu Jun Thu Jun Grupo 4 B 1274.0 Mantenci Mantenci F05B2296ESPERAPE12 Thu Jun Thu Jun Grupo 4 B 3838.0 Mantenci Mantenci F03B1944ESPERAPE13 Thu Jun Thu Jun Grupo 4 B 4302.0 OperativoOperativoF05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 4 B 3679.0 OperativoOperativoF05B2296ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 B 1398.0 OperativoOperativoF04B2088ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 B 5738.0 Reserva Reserva 9F04B2088ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 B 5733.0 Demora Demora 1F04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 4 B 5837.0 Reserva Reserva 9F05B2296ESPERANZAPE12 Thu Jun Thu Jun Grupo 4 B 4875.0 Demora Demora 3F03B1944ESPERANZAPE13 Thu Jun Thu Jun Grupo 4 B 4995.0 Reserva Reserva 9F05B2296ESPERANZA

PE2 Thu Jun Thu Jun Grupo 4 B 13757.0 OperativoOperativoF04B2088ESPERANZAPE12 Thu Jun Thu Jun Grupo 4 B 36447.0 OperativoOperativoF03B1944ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 B 3969.0 OperativoOperativoF04B2104ESPERANZAPE13 Thu Jun Thu Jun Grupo 4 B 22734.0 OperativoOperativoF05B2296ESPERANZAPE6 Thu Jun Thu Jun Grupo 4 B 14125.0 OperativoOperativoF05B2296ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 B 2956.0 Demora Demora 3F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 4 B 627.0 Demora Demora 4F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 4 B 13179.0 Reserva Reserva 9F04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 B 29484.0 OperativoOperativoF04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 4 B 22239.0 OperativoOperativoF04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 4 B 8893.0 Demora Demora 4F04B2088ESPERANZAPE7 Thu Jun Thu Jun Grupo 4 B 5102.0 OperativoOperativo 1 ProduccionPE6 Thu Jun Thu Jun Grupo 4 B 4258.0 Reserva Reserva 9F05B2296ESPERANZAPE7 Thu Jun Thu Jun Grupo 2 A 9838.0 Mantenci Mantencion 316 Sistema PerPE5 Thu Jun Thu Jun Grupo 2 A 16566.0 OperativoOperativoF04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 2 A 4288.0 Demora Demora 4F05B2296ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 A 14.0 OperativoOperativoF04B2088ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 A 21589.0 Reserva Reserva 9F04B2088ESPERANZAPE13 Thu Jun Thu Jun Grupo 2 A 3577.0 Mantenci Mantenci F05B2296ESPERAPE6 Thu Jun Thu Jun Grupo 2 A 12389.0 OperativoOperativoF05B2296ESPERANZAPE8 Thu Jun Thu Jun Grupo 2 A 2628.0 Demora Demora 4F03B1896ESPERANZAPE13 Thu Jun Thu Jun Grupo 2 A 8129.0 OperativoOperativoF05B2296ESPERANZAPE8 Thu Jun Thu Jun Grupo 2 A 8088.0 Demora Demora 4F03B1896ESPERANZAPE9 Thu Jun Thu Jun Grupo 2 A 6849.0 Demora Demora 45 Traslado de RegionPE7 Thu Jun Thu Jun Grupo 2 A 628.0 Demora Demora 45 Traslado de RegionPE7 Thu Jun Thu Jun Grupo 2 A 6937.0 OperativoOperativo 1 ProduccionPE3 Thu Jun Thu Jun Grupo 2 A 677.0 Demora Demora 4F04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 431.0 OperativoOperativoF04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 2159.0 Mantenci MantencioF04B2104ESPERAPE3 Thu Jun Thu Jun Grupo 2 A 37.0 OperativoOperativoF04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 8614.0 Demora Demora 3F04B2104ESPERANZAPE9 Thu Jun Sun Jun Grupo 2 A 234955.0Mantenci Mantencion 105 MP paso 5PE13 Thu Jun Thu Jun Grupo 2 A 6767.0 Demora Demora 3F05B2296ESPERANZAPE8 Thu Jun Thu Jun Grupo 2 A 10094.0 Demora Demora 3F03B1896ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 A 2749.0 Demora Demora 3F04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 2 A 5326.0 Demora Demora 3F05B2296ESPERANZAPE12 Thu Jun Thu Jun Grupo 2 A 5882.0 Demora Demora 1F03B1944ESPERANZAPE7 Thu Jun Thu Jun Grupo 2 A 5828.0 Demora Demora 10 ColacionPE1 Thu Jun Thu Jun Grupo 2 A 1700.0 Demora Demora 3F04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 4620.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 A 3960.0 Demora Demora 1F04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 2 A 2131.0 OperativoOperativoF05B2296ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 1250.0 Demora Demora 4F04B2104ESPERANZAPE13 Thu Jun Thu Jun Grupo 2 A 1323.0 Demora Demora 4F05B2296ESPERANZAPE7 Thu Jun Thu Jun Grupo 2 A 18570.0 OperativoOperativo 1 ProduccionPE12 Thu Jun Fri Jun 1 Grupo 2 A 67668.0 OperativoOperativoF03B1944ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 A 16513.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 10500.0 OperativoOperativoF04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 419.0 OperativoOperativoF04B2104ESPERANZAPE13 Thu Jun Fri Jun 1 Grupo 2 A 35365.0 OperativoOperativoF05B2296ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 2246.0 Mantenci MantencioF04B2104ESPERAPE6 Thu Jun Thu Jun Grupo 2 A 1354.0 Demora Demora 4F05B2296ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 A 7721.0 OperativoOperativoF04B2088ESPERANZA

PE6 Thu Jun Thu Jun Grupo 2 A 11882.0 OperativoOperativoF05B2296ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 7124.0 OperativoOperativoF04B2104ESPERANZAPE8 Thu Jun Thu Jun Grupo 2 A 6890.0 Demora Demora 4F03B1896ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 A 543.0 Demora Demora 2F04B2088ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 A 2529.0 OperativoOperativoF04B2088ESPERANZAPE8 Thu Jun Fri Jun 1 Grupo 2 A 49073.0 OperativoOperativoF04B2088ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 8.0 Demora Demora 24F04B2104ESPERANZAPE3 Thu Jun Thu Jun Grupo 2 A 20673.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 2475.0 Demora Demora 55F04B2104ESPERANZAPE2 Thu Jun Thu Jun Grupo 2 A 544.0 Demora Demora 2F04B2088ESPERANZAPE2 Thu Jun Fri Jun 1 Grupo 2 A 26050.0 OperativoOperativoF04B2088ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 3048.0 OperativoOperativoF04B2104ESPERANZAPE6 Thu Jun Thu Jun Grupo 2 A 372.0 Demora Demora 2F05B2296ESPERANZAPE6 Thu Jun Fri Jun 1 Grupo 2 A 20998.0 OperativoOperativoF05B2296ESPERANZAPE4 Thu Jun Fri Jun 1 Grupo 2 A 101141.0Demora Demora 4F05B2296ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 4.0 Demora Demora 1F04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 8.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 2 A 10723.0 Demora Demora 2F04B2104ESPERANZAPE5 Thu Jun Thu Jun Grupo 2 A 5465.0 Demora Demora 2F04B2104ESPERANZAPE7 Thu Jun Thu Jun Grupo 4 B 8827.0 Demora Demora 45 Traslado de RegionPE5 Thu Jun Thu Jun Grupo 4 B 3948.0 Demora Demora 4F04B2104ESPERANZAPE5 Thu Jun Fri Jun 1 Grupo 4 B 10562.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Thu Jun Grupo 4 B 4547.0 Reserva Reserva 9F04B2104ESPERANZAPE7 Thu Jun Fri Jun 1 Grupo 4 B 39998.0 OperativoOperativo 1 ProduccionPE3 Thu Jun Thu Jun Grupo 4 B 526.0 Demora Demora 2F04B2104ESPERANZAPE3 Thu Jun Fri Jun 1 Grupo 4 B 4907.0 OperativoOperativoF04B2104ESPERANZAPE1 Thu Jun Fri Jun 1 Grupo 4 B 1943.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 4 B 10223.0 Demora Demora 4F04B2104ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 8322.0 Demora Demora 49F05B2296ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 4 B 1865.0 OperativoOperativoF05B2296ESPERANZAPE3 Fri Jun 1 Fri Jun 1 Grupo 4 B 7317.0 Demora Demora 4F04B2104ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 4 B 7045.0 Reserva Reserva 9F04B2104ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 4 B 4787.0 Reserva Reserva 9F05B2296ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 4 B 5186.0 Reserva Reserva 9F04B2088ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 4 B 4.0 OperativoOperativoF05B2296ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 4 B 35676.0 OperativoOperativoF05B2296ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 4 B 8911.0 OperativoOperativoF04B2104ESPERANZAPE3 Fri Jun 1 Fri Jun 1 Grupo 4 B 19387.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 4 B 7106.0 OperativoOperativoF04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 3325.0 OperativoOperativoF05B2296ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 4 B 14545.0 OperativoOperativoF04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 3315.0 Demora Demora 49F05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 162.0 OperativoOperativoF05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 1577.0 Demora Demora 49F05B2296ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 4 B 543.0 Demora Demora 4F04B2088ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 4 B 891.0 OperativoOperativoF04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 1273.0 OperativoOperativoF05B2296ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 4 B 1010.0 Demora Demora 4F04B2088ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 4 B 715.0 Demora Demora 2F04B2104ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 4 B 12183.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 4 B 16885.0 OperativoOperativoF04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 1316.0 Demora Demora 49F05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 4438.0 OperativoOperativoF05B2296ESPERANZA

PE2 Fri Jun 1 Fri Jun 1 Grupo 4 B 625.0 Demora Demora 2F04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 4 B 4951.0 Demora Demora 3F04B2088ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 4 B 4587.0 Demora Demora 2F04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 4 B 5062.0 Demora Demora 49F05B2296ESPERANZAPE3 Fri Jun 1 Fri Jun 1 Grupo 2 A 4316.0 Demora Demora 3F04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 7487.0 OperativoOperativoF04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 3454.0 OperativoOperativoF04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 14642.0 Demora Demora 4F05B2296ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 268.0 Demora Demora 4F04B2104ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 10733.0 Demora Demora 3F04B2104ESPERANZAPE7 Fri Jun 1 Fri Jun 1 Grupo 2 A 785.0 Demora Demora 45 Traslado de RegionPE3 Fri Jun 1 Fri Jun 1 Grupo 2 A 2607.0 OperativoOperativoF04B2104ESPERANZAPE12 Fri Jun 1 Fri Jun 1 Grupo 2 A 451.0 Demora Demora 4F03B1944ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 1409.0 Demora Demora 3F04B2088ESPERANZAPE12 Fri Jun 1 Fri Jun 1 Grupo 2 A 8551.0 Demora Demora 4F03B1944ESPERANZAPE7 Fri Jun 1 Fri Jun 1 Grupo 2 A 8533.0 Demora Demora 42 Movimiento de CablesPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 6551.0 OperativoOperativoF04B2088ESPERANZAPE3 Fri Jun 1 Fri Jun 1 Grupo 2 A 6671.0 Demora Demora 55F04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 2 A 1600.0 Demora Demora 4F04B2088ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 2846.0 Reserva Reserva 9F04B2088ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 2 A 14004.0 OperativoOperativoF04B2088ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 3440.0 OperativoOperativoF04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 366.0 Demora Demora 2F04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 3040.0 OperativoOperativoF04B2088ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 8894.0 OperativoOperativoF04B2104ESPERANZAPE7 Fri Jun 1 Fri Jun 1 Grupo 2 A 37557.0 OperativoOperativo 1 ProduccionPE12 Fri Jun 1 Sat Jun 2Grupo 2 A 64721.0 OperativoOperativoF03B1944ESPERANZAPE3 Fri Jun 1 Fri Jun 1 Grupo 2 A 7367.0 OperativoOperativoF04B2104ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 1203.0 Demora Demora 2F04B2088ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 529.0 Demora Demora 3F05B2296ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 1618.0 OperativoOperativoF04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 7017.0 Demora Demora 4F04B2088ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 26.0 OperativoOperativoF05B2296ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 1104.0 Demora Demora 4F05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 6013.0 OperativoOperativoF05B2312ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 4403.0 OperativoOperativoF05B2296ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 848.0 Demora Demora 4F04B2088ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 3199.0 OperativoOperativoF04B2088ESPERANZAPE3 Fri Jun 1 Fri Jun 1 Grupo 2 A 14515.0 Demora Demora 3F04B2104ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 13446.0 Demora Demora 3F05B2296ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 516.0 Demora Demora 4F04B2088ESPERANZAPE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 13963.0 Demora Demora 3F04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 13166.0 Demora Demora 3F05B2312ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 783.0 Demora Demora 4F04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 2 A 688.0 Demora Demora 4F04B2088ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 13688.0 Demora Demora 3F04B2088ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 12539.0 Demora Demora 3F04B2104ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 2 A 12466.0 Demora Demora 3F04B2088ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 15.0 OperativoOperativoF05B2296ESPERANZAPE13 Fri Jun 1 Fri Jun 1 Grupo 2 A 1577.0 Demora Demora 4F05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 1379.0 Demora Demora 4F05B2312ESPERANZAPE3 Fri Jun 1 Sat Jun 2Grupo 2 A 31654.0 Demora Demora 4F04B2104ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 1443.0 Demora Demora 4F04B2104ESPERANZA

PE8 Fri Jun 1 Fri Jun 1 Grupo 2 A 497.0 Demora Demora 4F04B2088ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 2 A 601.0 Demora Demora 4F04B2088ESPERANZAPE8 Fri Jun 1 Sat Jun 2Grupo 2 A 28425.0 OperativoOperativoF04B2088ESPERANZAPE13 Fri Jun 1 Sat Jun 2Grupo 2 A 21943.0 OperativoOperativoF05B2296ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 266.0 Demora Demora 2F05B2312ESPERANZAPE2 Fri Jun 1 Fri Jun 1 Grupo 2 A 7781.0 Demora Demora 4F04B2088ESPERANZAPE1 Fri Jun 1 Fri Jun 1 Grupo 2 A 1431.0 OperativoOperativoF04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 2528.0 OperativoOperativoF05B2312ESPERANZAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 2880.0 OperativoOperativoF04B2104ESPERANZAPE1 Fri Jun 1 Sat Jun 2Grupo 2 A 27998.0 Demora Demora 4F04B2088ESPERANZAPE6 Fri Jun 1 Fri Jun 1 Grupo 2 A 9618.0 Mantenci MantencioF05B2312ESPERAPE5 Fri Jun 1 Fri Jun 1 Grupo 2 A 5113.0 Demora Demora 2F04B2104ESPERANZAPE2 Fri Jun 1 Sat Jun 2Grupo 4 B 12954.0 OperativoOperativoF04B2088ESPERANZAPE5 Fri Jun 1 Sat Jun 2Grupo 4 B 12173.0 OperativoOperativoF04B2104ESPERANZAPE6 Fri Jun 1 Sat Jun 2Grupo 4 B 9641.0 OperativoOperativoF05B2312ESPERANZAPE7 Fri Jun 1 Fri Jun 1 Grupo 4 B 2100.0 Mantenci Mantencion 314 Sistema LubPE7 Fri Jun 1 Sat Jun 2Grupo 4 B 33406.0 OperativoOperativo 1 ProduccionPE4 Fri Jun 1 Sat Jun 2Grupo 4 B 48895.0 Mantenci MantencioF05B2296ESPERAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 526.0 Demora Demora 3F04B2104ESPERANZAPE2 Sat Jun 2Sat Jun 2Grupo 4 B 6877.0 Demora Demora 55F04B2088ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 165.0 OperativoOperativoF04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 7101.0 Reserva Reserva 9F04B2104ESPERANZAPE13 Sat Jun 2Sat Jun 2Grupo 4 B 1275.0 Mantenci Mantenci F05B2296ESPERAPE6 Sat Jun 2Sat Jun 2Grupo 4 B 4986.0 Reserva Reserva 9F05B2312ESPERANZAPE13 Sat Jun 2Sat Jun 2Grupo 4 B 43400.0 OperativoOperativoF05B2296ESPERANZAPE6 Sat Jun 2Sat Jun 2Grupo 4 B 36841.0 OperativoOperativoF05B2312ESPERANZAPE2 Sat Jun 2Sat Jun 2Grupo 4 B 893.0 Demora Demora 4F04B2088ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 4 B 1156.0 Demora Demora 4F04B2088ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 6876.0 OperativoOperativoF04B2104ESPERANZAPE2 Sat Jun 2Sat Jun 2Grupo 4 B 16992.0 OperativoOperativoF04B2088ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 4 B 32426.0 OperativoOperativoF04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 15519.0 OperativoOperativoF04B2088ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 4 B 1486.0 Demora Demora 4F04B2104ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 4 B 2500.0 OperativoOperativoF04B2104ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 4 B 1852.0 Demora Demora 4F04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 7.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 1466.0 Demora Demora 4F04B2104ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 4 B 24828.0 OperativoOperativoF04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 3059.0 OperativoOperativoF04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 579.0 Demora Demora 2F04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 4 B 20424.0 OperativoOperativoF04B2104ESPERANZAPE12 Sat Jun 2Sat Jun 2Grupo 4 B 7193.0 Demora Demora 4F03B1944ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 1057.0 Demora Demora 2F04B2088ESPERANZAPE2 Sat Jun 2Sat Jun 2Grupo 4 B 788.0 Demora Demora 2F04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 125.0 Reserva Reserva F04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 4505.0 Reserva Reserva F04B2088ESPERANZAPE2 Sat Jun 2Sat Jun 2Grupo 4 B 3956.0 Demora Demora 3F04B2088ESPERANZAPE12 Sat Jun 2Sat Jun 2Grupo 2 A 20770.0 Mantenci Mantenci F03B1944ESPERAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 1788.0 Demora Demora 45 Traslado de RegionPE2 Sat Jun 2Sat Jun 2Grupo 2 A 4343.0 OperativoOperativoF04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 15200.0 OperativoOperativoF04B2088ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 4076.0 OperativoOperativo 1 ProduccionPE2 Sat Jun 2Sat Jun 2Grupo 2 A 907.0 Demora Demora 4F04B2088ESPERANZA

PE2 Sat Jun 2Sat Jun 2Grupo 2 A 551.0 OperativoOperativoF04B2088ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 1893.0 Demora Demora 45 Traslado de RegionPE2 Sat Jun 2Sun Jun Grupo 2 A 86331.0 Demora Demora 4F04B2088ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 4205.0 OperativoOperativo 1 ProduccionPE5 Sat Jun 2Sat Jun 2Grupo 2 A 423.0 Demora Demora 3F04B2104ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 2 A 1437.0 Demora Demora 4F04B2104ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 2 A 2986.0 Demora Demora 4F04B2104ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 686.0 Demora Demora 2F04B2088ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 581.0 Demora Demora 30 Carga CombustiblePE7 Sat Jun 2Sat Jun 2Grupo 2 A 3749.0 OperativoOperativo 1 ProduccionPE8 Sat Jun 2Sat Jun 2Grupo 2 A 3511.0 OperativoOperativoF04B2088ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 2 A 7283.0 Demora Demora 3F04B2104ESPERAPE6 Sat Jun 2Sat Jun 2Grupo 2 A 518.0 Demora Demora 2F05B2312ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 2 A 1991.0 OperativoOperativoF04B2104ESPERANZAPE6 Sat Jun 2Sat Jun 2Grupo 2 A 3133.0 OperativoOperativoF05B2312ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 440.0 Demora Demora 4F04B2088ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 1455.0 Demora Demora 4F04B2088ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 3340.0 Demora Demora 34 Evacuacion por TronadurPE5 Sat Jun 2Sat Jun 2Grupo 2 A 3292.0 Demora Demora 3F04B2104ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 3230.0 Demora Demora 3F04B2088ESPERANZAPE13 Sat Jun 2Sat Jun 2Grupo 2 A 3045.0 Demora Demora 3F05B2296ESPERANZAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 150.0 Demora Demora 3F05B2296ESPERANZAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 2669.0 Demora Demora 4F05B2296ESPERANZAPE6 Sat Jun 2Sat Jun 2Grupo 2 A 2077.0 Demora Demora 3F05B2312ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 2066.0 Demora Demora 3F04B2088ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 2 A 4243.0 Demora Demora 1F04B2104ESPERANZAPE6 Sat Jun 2Sat Jun 2Grupo 2 A 2649.0 Demora Demora 1F05B2312ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 4587.0 Demora Demora 1F04B2088ESPERANZAPE12 Sat Jun 2Sat Jun 2Grupo 2 A 5065.0 Demora Demora 1F03B1944ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 4091.0 Demora Demora 10 ColacionPE13 Sat Jun 2Sat Jun 2Grupo 2 A 2724.0 Demora Demora 1F05B2296ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 4553.0 Demora Demora 1F04B2088ESPERANZAPE10 Sat Jun 2Sat Jun 2Grupo 2 A 14744.0 Demora Demora 1F04B2104ESPERANZAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 2726.0 Demora Demora 1F05B2296ESPERANZAPE3 Sat Jun 2Sat Jun 2Grupo 2 A 33606.0 Mantenci Mantenci F04B2104ESPERAPE6 Sat Jun 2Sat Jun 2Grupo 2 A 8381.0 OperativoOperativoF05B2312ESPERANZAPE13 Sat Jun 2Sat Jun 2Grupo 2 A 25889.0 Mantenci MantencioF05B2296ESPERAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 8.0 OperativoOperativoF05B2296ESPERANZAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 3753.0 Demora Demora 4F05B2296ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 5607.0 OperativoOperativo 1 ProduccionPE5 Sat Jun 2Sat Jun 2Grupo 2 A 1486.0 Demora Demora 4F04B2104ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 8.0 OperativoOperativoF04B2088ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 680.0 Demora Demora 4F04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 1050.0 Demora Demora 4F04B2088ESPERANZAPE12 Sat Jun 2Sat Jun 2Grupo 2 A 22302.0 Demora Demora 4F03B1944ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 8682.0 OperativoOperativoF04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 14680.0 OperativoOperativoF04B2088ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 2 A 1551.0 OperativoOperativoF04B2104ESPERANZAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 1211.0 Demora Demora 4F05B2312ESPERANZAPE5 Sat Jun 2Sat Jun 2Grupo 2 A 27177.0 Mantenci Mantenci F04B2104ESPERAPE4 Sat Jun 2Sat Jun 2Grupo 2 A 2825.0 OperativoOperativoF05B2312ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 3771.0 Mantenci Mantencion 209 BL-Sistema PE4 Sat Jun 2Sun Jun Grupo 2 A 56186.0 Demora Demora 3F05B2312ESPERANZA

PE6 Sat Jun 2Sat Jun 2Grupo 2 A 1520.0 Demora Demora 4F05B2312ESPERANZAPE6 Sat Jun 2Sat Jun 2Grupo 2 A 1280.0 OperativoOperativoF05B2312ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 2 A 14165.0 Demora Demora 45 Traslado de RegionPE6 Sat Jun 2Sat Jun 2Grupo 2 A 19423.0 Demora Demora 3F05B2312ESPERANZAPE8 Sat Jun 2Sat Jun 2Grupo 2 A 604.0 Demora Demora 2F04B2088ESPERANZAPE8 Sat Jun 2Sun Jun Grupo 2 A 46511.0 OperativoOperativoF04B2088ESPERANZAPE10 Sat Jun 2Sun Jun Grupo 2 A 53086.0 Demora Demora 4F04B2104ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 2 A 3909.0 Demora Demora 2F04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 4035.0 OperativoOperativoF04B2088ESPERANZAPE12 Sat Jun 2Sun Jun Grupo 4 B 50553.0 OperativoOperativoF03B1944ESPERANZAPE7 Sat Jun 2Sat Jun 2Grupo 4 B 9.0 Demora Demora 45 Traslado de RegionPE7 Sat Jun 2Sun Jun Grupo 4 B 17049.0 OperativoOperativo 1 ProduccionPE1 Sat Jun 2Sat Jun 2Grupo 4 B 924.0 Mantenci MantencioF04B2088ESPERAPE13 Sat Jun 2Sat Jun 2Grupo 4 B 3305.0 Demora Demora 4F05B2296ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 858.0 Demora Demora 3F04B2088ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 4901.0 OperativoOperativoF04B2088ESPERANZAPE13 Sat Jun 2Sun Jun Grupo 4 B 9820.0 OperativoOperativoF05B2296ESPERANZAPE6 Sat Jun 2Sat Jun 2Grupo 4 B 1831.0 Demora Demora 4F05B2296ESPERANZAPE3 Sat Jun 2Sun Jun Grupo 4 B 22674.0 Demora Demora 3F04B2104ESPERANZAPE5 Sat Jun 2Sun Jun Grupo 4 B 3661.0 OperativoOperativoF04B2104ESPERANZAPE1 Sat Jun 2Sat Jun 2Grupo 4 B 268.0 Demora Demora 2F04B2088ESPERANZAPE6 Sat Jun 2Sun Jun Grupo 4 B 2614.0 OperativoOperativoF05B2296ESPERANZAPE1 Sat Jun 2Sun Jun Grupo 4 B 1596.0 OperativoOperativoF04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 B 33.0 Reserva Reserva 9F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 B 6764.0 Reserva Reserva 9F04B2088ESPERANZAPE6 Sun Jun Sun Jun Grupo 4 B 5044.0 Reserva Reserva 9F05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 3103.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 8910.0 OperativoOperativoF04B2104ESPERANZAPE13 Sun Jun Sun Jun Grupo 4 B 13870.0 Mantenci MantencioF05B2296ESPERAPE6 Sun Jun Sun Jun Grupo 4 B 870.0 OperativoOperativoF05B2296ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 B 18054.0 OperativoOperativoF04B2088ESPERANZAPE6 Sun Jun Sun Jun Grupo 4 B 1934.0 Reserva Reserva 9F05B2296ESPERANZAPE7 Sun Jun Sun Jun Grupo 4 B 11707.0 Demora Demora 47 Cambio Aceros PerforaciPE6 Sun Jun Sun Jun Grupo 4 B 27171.0 OperativoOperativoF05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 1953.0 Demora Demora 4F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 2089.0 Mantenci Mantenci F04B2104ESPERAPE5 Sun Jun Sun Jun Grupo 4 B 15148.0 OperativoOperativoF04B2104ESPERANZAPE13 Sun Jun Sun Jun Grupo 4 B 4919.0 OperativoOperativoF05B2296ESPERANZAPE7 Sun Jun Sun Jun Grupo 4 B 19257.0 OperativoOperativo 1 ProduccionPE3 Sun Jun Sun Jun Grupo 4 B 37320.0 Mantenci Mantenci F04B2104ESPERAPE9 Sun Jun Sun Jun Grupo 4 B 9972.0 Demora Demora 32 Entregado por MantencioPE13 Sun Jun Sun Jun Grupo 4 B 19470.0 Mantenci MantencioF05B2296ESPERAPE8 Sun Jun Sun Jun Grupo 4 B 546.0 Demora Demora 3F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 4 B 11.0 OperativoOperativoF04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 4 B 832.0 Demora Demora 2F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 B 6763.0 Demora Demora 2F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 4 B 10.0 OperativoOperativoF04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 4 B 5211.0 Demora Demora 2F04B2088ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 A 374.0 OperativoOperativoF05B2312ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 A 2368.0 Demora Demora 4F05B2312ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 3491.0 OperativoOperativoF04B2088ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 A 36141.0 Demora Demora 47 Cambio Aceros PerforaciPE10 Sun Jun Sun Jun Grupo 2 A 8674.0 Demora Demora 4F04B2104ESPERANZA

PE1 Sun Jun Sun Jun Grupo 2 A 2307.0 OperativoOperativoF04B2088ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 A 1868.0 Demora Demora 4F04B2104ESPERANZAPE4 Sun Jun Sun Jun Grupo 2 A 19533.0 OperativoOperativoF05B2312ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 602.0 Demora Demora 4F04B2088ESPERAPE8 Sun Jun Sun Jun Grupo 2 A 7312.0 Demora Demora 4F04B2088ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 A 2546.0 Mantenci Mantenci F04B2104ESPERAPE1 Sun Jun Sun Jun Grupo 2 A 7152.0 Demora Demora 4F04B2088ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 748.0 Demora Demora 2F05B2296ESPERANZAPE2 Sun Jun Mon Jun Grupo 2 A 80623.0 Demora Demora 4F04B2088ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 3284.0 OperativoOperativoF05B2296ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 A 157.0 Demora Demora 3F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 2 A 40921.0 Demora Demora 4F04B2104ESPERANZAPE7 Sun Jun Sun Jun Grupo 2 A 2095.0 Demora Demora 45 Traslado de RegionPE10 Sun Jun Sun Jun Grupo 2 A 26501.0 Demora Demora 3F04B2104ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 689.0 Demora Demora 4F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 64.0 OperativoOperativoF05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 3200.0 Demora Demora 4F05B2296ESPERANZAPE7 Sun Jun Sun Jun Grupo 2 A 11009.0 OperativoOperativo 1 ProduccionPE12 Sun Jun Sun Jun Grupo 2 A 10685.0 OperativoOperativoF03B1944ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 8634.0 OperativoOperativoF04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 1500.0 OperativoOperativoF04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 3582.0 Mantenci MantencioF04B2088ESPERAPE13 Sun Jun Sun Jun Grupo 2 A 1147.0 Demora Demora 3F05B2296ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 7699.0 OperativoOperativoF05B2296ESPERANZAPE13 Sun Jun Sun Jun Grupo 2 A 3.0 OperativoOperativoF05B2296ESPERANZAPE13 Sun Jun Sun Jun Grupo 2 A 3038.0 OperativoOperativoF05B2296ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 281.0 Demora Demora 3F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 5372.0 OperativoOperativoF04B2088ESPERANZAPE13 Sun Jun Sun Jun Grupo 2 A 22155.0 Demora Demora 3F05B2296ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 525.0 Demora Demora 3F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 1815.0 OperativoOperativoF04B2088ESPERANZAPE6 Sun Jun Sun Jun Grupo 2 A 17539.0 Demora Demora 3F05B2296ESPERANZAPE12 Sun Jun Sun Jun Grupo 2 A 9809.0 Demora Demora 4F03B1944ESPERANZAPE7 Sun Jun Mon Jun Grupo 2 A 64509.0 Demora Demora 45 Traslado de RegionPE4 Sun Jun Sun Jun Grupo 2 A 20868.0 Demora Demora 3F05B2312ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 5869.0 Demora Demora 3F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 1362.0 Demora Demora 4F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 4287.0 Demora Demora 3F04B2088ESPERANZAPE3 Sun Jun Mon Jun Grupo 2 A 54907.0 Demora Demora 4F04B2104ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 8310.0 Demora Demora 1F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 8664.0 Demora Demora 1F04B2088ESPERANZAPE12 Sun Jun Sun Jun Grupo 2 A 9953.0 OperativoOperativoF03B1944ESPERANZAPE10 Sun Jun Mon Jun Grupo 2 A 37413.0 Demora Demora 4F04B2104ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 457.0 Demora Demora 4F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 533.0 Demora Demora 4F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 3105.0 OperativoOperativoF04B2088ESPERANZAPE9 Sun Jun Sun Jun Grupo 2 A 4506.0 OperativoOperativo 1 ProduccionPE8 Sun Jun Sun Jun Grupo 2 A 2335.0 OperativoOperativoF04B2088ESPERANZAPE6 Sun Jun Mon Jun Grupo 2 A 37271.0 OperativoOperativoF05B2296ESPERANZAPE13 Sun Jun Sun Jun Grupo 2 A 6091.0 Demora Demora 4F05B2296ESPERANZAPE8 Sun Jun Sun Jun Grupo 2 A 3725.0 Demora Demora 2F04B2088ESPERANZAPE1 Sun Jun Sun Jun Grupo 2 A 3181.0 Demora Demora 2F04B2088ESPERANZAPE12 Sun Jun Sun Jun Grupo 4 B 3347.0 Demora Demora 4F03B1944ESPERANZA

PE9 Sun Jun Mon Jun Grupo 4 B 68340.0 Reserva Reserva 91 Sin Operador DisponiblePE4 Sun Jun Mon Jun Grupo 4 B 18958.0 Demora Demora 4F05B2312ESPERANZAPE1 Sun Jun Sun Jun Grupo 4 B 3953.0 Demora Demora 4F04B2088ESPERANZAPE8 Sun Jun Sun Jun Grupo 4 B 3948.0 OperativoOperativoF04B2088ESPERANZAPE12 Sun Jun Mon Jun Grupo 4 B 26107.0 OperativoOperativoF03B1944ESPERANZAPE13 Sun Jun Sun Jun Grupo 4 B 28.0 OperativoOperativoF05B2296ESPERANZAPE13 Sun Jun Mon Jun Grupo 4 B 20378.0 OperativoOperativoF05B2296ESPERANZAPE1 Sun Jun Mon Jun Grupo 4 B 14310.0 OperativoOperativoF04B2088ESPERANZAPE8 Sun Jun Mon Jun Grupo 4 B 8842.0 Mantenci Mantenci F04B2088ESPERAPE5 Sun Jun Sun Jun Grupo 4 B 93.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 5.0 Demora Demora 3F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 136.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 4.0 Demora Demora 3F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 31.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 4.0 Demora Demora 3F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 35.0 OperativoOperativoF04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 17.0 Demora Demora 3F04B2104ESPERANZAPE5 Sun Jun Sun Jun Grupo 4 B 3110.0 Demora Demora 55F04B2104ESPERANZAPE5 Sun Jun Mon Jun Grupo 4 B 9616.0 OperativoOperativoF04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 B 8161.0 OperativoOperativoF04B2088ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 83.0 Reserva Reserva F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 157.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 6270.0 Reserva Reserva 9F04B2104ESPERANZAPE1 Mon Jun Mon Jun Grupo 4 B 5557.0 Reserva Reserva 9F04B2088ESPERANZAPE4 Mon Jun Mon Jun Grupo 4 B 6246.0 Demora Demora 4F05B2296ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 B 881.0 Demora Demora 2F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 B 16259.0 OperativoOperativoF04B2088ESPERANZAPE13 Mon Jun Mon Jun Grupo 4 B 4598.0 Demora Demora 4F05B2296ESPERANZAPE1 Mon Jun Mon Jun Grupo 4 B 14816.0 OperativoOperativoF04B2088ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 1321.0 OperativoOperativoF04B2104ESPERANZAPE4 Mon Jun Mon Jun Grupo 4 B 2222.0 OperativoOperativoF05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 1520.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 7516.0 Mantenci Mantenci F04B2104ESPERAPE4 Mon Jun Mon Jun Grupo 4 B 7633.0 Demora Demora 4F05B2296ESPERANZAPE13 Mon Jun Mon Jun Grupo 4 B 43674.0 Mantenci Mantenci F05B2296ESPERAPE12 Mon Jun Mon Jun Grupo 4 B 1922.0 Mantenci MantencioF03B1944ESPERAPE12 Mon Jun Mon Jun Grupo 4 B 14468.0 OperativoOperativoF03B1944ESPERANZAPE10 Mon Jun Mon Jun Grupo 4 B 43300.0 Demora Demora 4F04B2088ESPERANZAPE6 Mon Jun Mon Jun Grupo 4 B 4978.0 Demora Demora 4F05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 916.0 Demora Demora 4F04B2104ESPERANZAPE4 Mon Jun Mon Jun Grupo 4 B 25546.0 OperativoOperativoF05B2312ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 21.0 OperativoOperativoF04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 1052.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 11320.0 OperativoOperativoF04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 4 B 207.0 OperativoOperativoF05B2296ESPERANZAPE6 Mon Jun Mon Jun Grupo 4 B 15354.0 OperativoOperativoF05B2296ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 B 387.0 Demora Demora 2F04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 4 B 609.0 Demora Demora 2F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 B 354.0 OperativoOperativoF04B2088ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 B 14073.0 Reserva Reserva 9F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 4 B 4879.0 Demora Demora 2F04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 4 B 4060.0 Demora Demora 3F04B2088ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 A 4141.0 OperativoOperativo 1 Produccion

PE1 Mon Jun Mon Jun Grupo 2 A 11195.0 OperativoOperativoF04B2088ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 9.0 OperativoOperativoF04B2088ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 914.0 Demora Demora 4F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 1364.0 Demora Demora 4F04B2088ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 A 2854.0 Mantenci MantencioF03B1944ESPERAPE2 Mon Jun Mon Jun Grupo 2 A 9419.0 OperativoOperativoF04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 5761.0 OperativoOperativoF04B2088ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 A 22466.0 OperativoOperativoF03B1944ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 A 303.0 Demora Demora 30 Carga CombustiblePE7 Mon Jun Mon Jun Grupo 2 A 1211.0 Mantenci Mantencion 315 Sistema NePE5 Mon Jun Mon Jun Grupo 2 A 10304.0 OperativoOperativoF04B2104ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 A 20587.0 OperativoOperativo 1 ProduccionPE8 Mon Jun Mon Jun Grupo 2 A 1099.0 Demora Demora 2F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 7046.0 OperativoOperativoF04B2088ESPERANZAPE3 Mon Jun Mon Jun Grupo 2 A 310.0 Demora Demora 4F04B2104ESPERANZAPE3 Mon Jun Mon Jun Grupo 2 A 6578.0 OperativoOperativoF04B2104ESPERANZAPE6 Mon Jun Mon Jun Grupo 2 A 763.0 Demora Demora 2F05B2296ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 970.0 Demora Demora 4F04B2088ESPERANZAPE6 Mon Jun Mon Jun Grupo 2 A 5269.0 OperativoOperativoF05B2296ESPERANZAPE1 Mon Jun Mon Jun Grupo 2 A 4459.0 Demora Demora 4F04B2088ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 14898.0 Demora Demora 3F04B2088ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 A 33.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 A 20640.0 Demora Demora 2F04B2104ESPERANZAPE1 Mon Jun Mon Jun Grupo 2 A 2251.0 OperativoOperativoF04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 615.0 Demora Demora 3F04B2088ESPERANZAPE6 Mon Jun Mon Jun Grupo 2 A 17965.0 Demora Demora 3F05B2296ESPERANZAPE3 Mon Jun Mon Jun Grupo 2 A 1198.0 Demora Demora 4F04B2104ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 1630.0 OperativoOperativoF04B2088ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 644.0 Demora Demora 4F05B2312ESPERANZAPE3 Mon Jun Mon Jun Grupo 2 A 8475.0 Demora Demora 3F04B2104ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 1705.0 OperativoOperativoF05B2312ESPERANZAPE1 Mon Jun Mon Jun Grupo 2 A 9163.0 Demora Demora 3F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 861.0 Demora Demora 4F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 7088.0 Demora Demora 3F04B2088ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 792.0 Demora Demora 3F05B2312ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 8581.0 OperativoOperativoF05B2312ESPERANZAPE9 Mon Jun Mon Jun Grupo 2 A 32013.0 Mantenci Mantencion 316 Sistema PerPE3 Mon Jun Mon Jun Grupo 2 A 9385.0 Demora Demora 3F04B2104ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 A 10720.0 Demora Demora 36 Punto de Trabajo ObstruiPE8 Mon Jun Mon Jun Grupo 2 A 1006.0 Demora Demora 3F04B2088ESPERANZAPE12 Mon Jun Mon Jun Grupo 2 A 20361.0 Demora Demora 3F03B1944ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 837.0 Demora Demora 4F04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 2 A 554.0 Demora Demora 4F04B2088ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 1663.0 Demora Demora 4F04B2088ESPERANZAPE8 Mon Jun Mon Jun Grupo 2 A 4408.0 OperativoOperativoF04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 2 A 3829.0 OperativoOperativoF04B2088ESPERANZAPE13 Mon Jun Mon Jun Grupo 2 A 2879.0 Demora Demora 3F05B2296ESPERANZAPE2 Mon Jun Mon Jun Grupo 2 A 11.0 OperativoOperativoF04B2088ESPERANZAPE2 Mon Jun Tue Jun Grupo 2 A 100126.0Reserva Reserva 9F04B2088ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 4722.0 Demora Demora 4F05B2312ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 A 2935.0 OperativoOperativoF04B2088ESPERANZAPE13 Mon Jun Mon Jun Grupo 2 A 13.0 OperativoOperativoF05B2296ESPERANZAPE13 Mon Jun Mon Jun Grupo 2 A 2756.0 Demora Demora 4F05B2296ESPERANZA

PE1 Mon Jun Mon Jun Grupo 2 A 23141.0 Mantenci MantencioF04B2088ESPERAPE8 Mon Jun Mon Jun Grupo 2 A 713.0 Demora Demora 2F04B2088ESPERANZAPE8 Mon Jun Tue Jun Grupo 2 A 48486.0 OperativoOperativoF04B2088ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 A 2605.0 Demora Demora 4F04B2088ESPERANZAPE13 Mon Jun Mon Jun Grupo 2 A 1209.0 OperativoOperativoF05B2296ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 1272.0 OperativoOperativoF05B2312ESPERANZAPE6 Mon Jun Tue Jun Grupo 2 A 70627.0 Mantenci MantencioF05B2296ESPERAPE13 Mon Jun Mon Jun Grupo 2 A 1039.0 Reserva Reserva 9F05B2296ESPERANZAPE4 Mon Jun Mon Jun Grupo 2 A 9099.0 Reserva Reserva 9F05B2312ESPERANZAPE3 Mon Jun Mon Jun Grupo 2 A 1116.0 Demora Demora 4F04B2104ESPERANZAPE5 Mon Jun Mon Jun Grupo 2 A 16355.0 Mantenci Mantenci F04B2104ESPERAPE13 Mon Jun Tue Jun Grupo 2 A 64694.0 OperativoOperativoF05B2296ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 A 3305.0 OperativoOperativoF04B2088ESPERANZAPE3 Mon Jun Mon Jun Grupo 2 A 2569.0 OperativoOperativoF04B2104ESPERANZAPE7 Mon Jun Mon Jun Grupo 2 A 4531.0 OperativoOperativo 1 ProduccionPE3 Mon Jun Mon Jun Grupo 2 A 6125.0 Demora Demora 4F04B2104ESPERANZAPE10 Mon Jun Mon Jun Grupo 2 A 5314.0 Demora Demora 4F04B2088ESPERANZAPE7 Mon Jun Tue Jun Grupo 4 B 44486.0 Demora Demora 45 Traslado de RegionPE4 Mon Jun Mon Jun Grupo 4 B 2997.0 Demora Demora 4F05B2312ESPERANZAPE10 Mon Jun Tue Jun Grupo 4 B 16525.0 OperativoOperativoF04B2088ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 B 4794.0 OperativoOperativoF04B2104ESPERANZAPE12 Mon Jun Mon Jun Grupo 4 B 298.0 OperativoOperativoF03B1944ESPERANZAPE12 Mon Jun Mon Jun Grupo 4 B 2977.0 Mantenci Mantenci F03B1944ESPERAPE4 Mon Jun Mon Jun Grupo 4 B 4303.0 Demora Demora 4F05B2312ESPERANZAPE12 Mon Jun Tue Jun Grupo 4 B 38395.0 OperativoOperativoF03B1944ESPERANZAPE3 Mon Jun Mon Jun Grupo 4 B 305.0 Demora Demora 2F04B2104ESPERANZAPE3 Mon Jun Tue Jun Grupo 4 B 9185.0 OperativoOperativoF04B2104ESPERANZAPE4 Mon Jun Tue Jun Grupo 4 B 21568.0 OperativoOperativoF05B2296ESPERANZAPE5 Mon Jun Mon Jun Grupo 4 B 9.0 OperativoOperativoF04B2088ESPERANZAPE5 Mon Jun Tue Jun Grupo 4 B 8699.0 Demora Demora 4F04B2088ESPERANZAPE1 Mon Jun Mon Jun Grupo 4 B 774.0 Demora Demora 3F04B2088ESPERANZAPE9 Mon Jun Tue Jun Grupo 4 B 30880.0 Demora Demora 32 Entregado por MantencioPE1 Mon Jun Tue Jun Grupo 4 B 5549.0 OperativoOperativoF04B2088ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 B 579.0 Demora Demora 2F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 B 564.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 B 9364.0 Reserva Reserva 9F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 B 5961.0 Reserva Reserva 9F04B2104ESPERANZAPE1 Tue Jun Tue Jun Grupo 4 B 7263.0 Reserva Reserva 9F04B2088ESPERANZAPE10 Tue Jun Tue Jun Grupo 4 B 7016.0 Reserva Reserva 9F04B2088ESPERANZAPE3 Tue Jun Tue Jun Grupo 4 B 20412.0 OperativoOperativoF04B2104ESPERANZAPE10 Tue Jun Tue Jun Grupo 4 B 54900.0 Demora Demora 4F04B2088ESPERANZAPE1 Tue Jun Tue Jun Grupo 4 B 37222.0 OperativoOperativoF04B2088ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 B 860.0 OperativoOperativoF04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 B 4643.0 Mantenci MantencioF04B2104ESPERAPE4 Tue Jun Tue Jun Grupo 4 B 27.0 Demora Demora 4F05B2296ESPERANZAPE4 Tue Jun Tue Jun Grupo 4 B 1184.0 Demora Demora 4F05B2296ESPERANZAPE4 Tue Jun Tue Jun Grupo 4 B 37541.0 Reserva Reserva 9F05B2296ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 B 1767.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 B 3738.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 B 6353.0 Demora Demora 4F04B2088ESPERANZAPE5 Tue Jun Tue Jun Grupo 4 B 4925.0 Demora Demora 2F04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 A 4205.0 OperativoOperativo 1 ProduccionPE5 Tue Jun Tue Jun Grupo 2 A 4430.0 OperativoOperativoF04B2104ESPERANZA

PE9 Tue Jun Tue Jun Grupo 2 A 754.0 OperativoOperativo 1 ProduccionPE9 Tue Jun Tue Jun Grupo 2 A 13741.0 Demora Demora 45 Traslado de RegionPE8 Tue Jun Tue Jun Grupo 2 A 1816.0 OperativoOperativoF04B2088ESPERANZAPE3 Tue Jun Tue Jun Grupo 2 A 37.0 Demora Demora 3F04B2104ESPERANZAPE3 Tue Jun Tue Jun Grupo 2 A 13771.0 OperativoOperativoF04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 2 A 2507.0 Demora Demora 4F03B1944ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 1905.0 Demora Demora 4F04B2088ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 A 2295.0 Demora Demora 45 Traslado de RegionPE5 Tue Jun Tue Jun Grupo 2 A 2311.0 Demora Demora 4F04B2104ESPERANZAPE12 Tue Jun Tue Jun Grupo 2 A 30174.0 Mantenci Mantenci F03B1944ESPERAPE8 Tue Jun Tue Jun Grupo 2 A 1717.0 Demora Demora 55F04B2088ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 A 1799.0 Demora Demora 30 Carga CombustiblePE8 Tue Jun Tue Jun Grupo 2 A 5993.0 OperativoOperativoF04B2088ESPERANZAPE5 Tue Jun Wed Jun Grupo 2 A 60237.0 Mantenci Mantenci F04B2104ESPERAPE7 Tue Jun Tue Jun Grupo 2 A 7031.0 OperativoOperativo 1 ProduccionPE8 Tue Jun Tue Jun Grupo 2 A 547.0 Demora Demora 2F04B2088ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 4316.0 OperativoOperativoF04B2088ESPERANZAPE13 Tue Jun Tue Jun Grupo 2 A 11518.0 Demora Demora 3F05B2296ESPERANZAPE9 Tue Jun Tue Jun Grupo 2 A 6.0 OperativoOperativo 1 ProduccionPE9 Tue Jun Tue Jun Grupo 2 A 1071.0 Demora Demora 45 Traslado de RegionPE3 Tue Jun Tue Jun Grupo 2 A 17649.0 Demora Demora 3F04B2104ESPERANZAPE7 Tue Jun Tue Jun Grupo 2 A 16765.0 Demora Demora 45 Traslado de RegionPE9 Tue Jun Tue Jun Grupo 2 A 15557.0 Demora Demora 34 Evacuacion por TronadurPE8 Tue Jun Tue Jun Grupo 2 A 8107.0 Demora Demora 3F04B2088ESPERANZAPE6 Tue Jun Wed Jun Grupo 2 A 47120.0 Demora Demora 3F05B2296ESPERANZAPE1 Tue Jun Tue Jun Grupo 2 A 5783.0 Demora Demora 3F04B2088ESPERANZAPE1 Tue Jun Tue Jun Grupo 2 A 955.0 Demora Demora 1F04B2088ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 2983.0 OperativoOperativoF04B2088ESPERANZAPE4 Tue Jun Tue Jun Grupo 2 A 1317.0 Demora Demora 4F05B2296ESPERANZAPE13 Tue Jun Tue Jun Grupo 2 A 15.0 OperativoOperativoF05B2296ESPERANZAPE13 Tue Jun Tue Jun Grupo 2 A 2329.0 Demora Demora 4F05B2296ESPERANZAPE1 Tue Jun Tue Jun Grupo 2 A 7079.0 OperativoOperativoF04B2088ESPERANZAPE4 Tue Jun Tue Jun Grupo 2 A 9348.0 Demora Demora 4F05B2296ESPERANZAPE13 Tue Jun Wed Jun Grupo 2 A 34449.0 OperativoOperativoF05B2296ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 726.0 Demora Demora 3F04B2088ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 3438.0 OperativoOperativoF04B2088ESPERANZAPE9 Tue Jun Tue Jun Grupo 2 A 793.0 Demora Demora 45 Traslado de RegionPE7 Tue Jun Tue Jun Grupo 2 A 1227.0 Mantenci Mantencion 300 AccesoriosPE9 Tue Jun Tue Jun Grupo 2 A 21345.0 OperativoOperativo 1 ProduccionPE3 Tue Jun Wed Jun Grupo 2 A 33537.0 OperativoOperativoF04B2104ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 581.0 Demora Demora 2F04B2088ESPERANZAPE7 Tue Jun Wed Jun Grupo 2 A 23592.0 OperativoOperativo 1 ProduccionPE8 Tue Jun Tue Jun Grupo 2 A 4140.0 Demora Demora 4F04B2088ESPERANZAPE1 Tue Jun Tue Jun Grupo 2 A 414.0 Demora Demora 2F04B2088ESPERANZAPE1 Tue Jun Tue Jun Grupo 2 A 4704.0 OperativoOperativoF04B2088ESPERANZAPE12 Tue Jun Wed Jun Grupo 2 A 50124.0 OperativoOperativoF03B1944ESPERANZAPE4 Tue Jun Tue Jun Grupo 2 A 2523.0 OperativoOperativoF05B2296ESPERANZAPE10 Tue Jun Wed Jun Grupo 2 A 19289.0 Demora Demora 4F04B2088ESPERANZAPE8 Tue Jun Tue Jun Grupo 2 A 9277.0 OperativoOperativoF04B2088ESPERANZAPE1 Tue Jun Tue Jun Grupo 2 A 3431.0 Demora Demora 2F04B2088ESPERANZAPE4 Tue Jun Wed Jun Grupo 2 A 27386.0 Demora Demora 2F05B2296ESPERANZAPE1 Tue Jun Tue Jun Grupo 4 B 2532.0 OperativoOperativoF04B2088ESPERANZAPE2 Tue Jun Wed Jun Grupo 4 B 19175.0 Demora Demora 4F04B2088ESPERANZA

PE1 Tue Jun Tue Jun Grupo 4 B 3106.0 Demora Demora 4F04B2088ESPERANZAPE8 Tue Jun Tue Jun Grupo 4 B 3719.0 Demora Demora 4F04B2088ESPERANZAPE1 Tue Jun Wed Jun Grupo 4 B 17979.0 OperativoOperativoF04B2088ESPERANZAPE8 Tue Jun Wed Jun Grupo 4 B 29909.0 OperativoOperativoF04B2104ESPERANZAPE9 Tue Jun Wed Jun Grupo 4 B 2700.0 Mantenci Mantencion 312 Sistema HidPE9 Wed Jun Wed Jun Grupo 4 B 84516.0 OperativoOperativo 1 ProduccionPE10 Wed Jun Wed Jun Grupo 4 B 49219.0 Demora Demora 4F04B2088ESPERANZAPE7 Wed Jun Wed Jun Grupo 4 B 2218.0 Mantenci Mantencion 312 Sistema HidPE7 Wed Jun Wed Jun Grupo 4 B 28318.0 Demora Demora 32 Entregado por MantencioPE2 Wed Jun Wed Jun Grupo 4 B 18756.0 OperativoOperativoF04B2088ESPERANZAPE13 Wed Jun Wed Jun Grupo 4 B 6098.0 Demora Demora 4F05B2296ESPERANZAPE1 Wed Jun Wed Jun Grupo 4 B 4067.0 Reserva Reserva 9F04B2088ESPERANZAPE6 Wed Jun Wed Jun Grupo 4 B 32646.0 Reserva Reserva 9F05B2296ESPERANZAPE4 Wed Jun Wed Jun Grupo 4 B 20615.0 Reserva Reserva 9F05B2296ESPERANZAPE3 Wed Jun Wed Jun Grupo 4 B 22220.0 Reserva Reserva 9F04B2104ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 B 8207.0 Reserva Reserva 9F04B2104ESPERANZAPE13 Wed Jun Wed Jun Grupo 4 B 29881.0 OperativoOperativoF05B2296ESPERANZAPE1 Wed Jun Wed Jun Grupo 4 B 16109.0 OperativoOperativoF04B2088ESPERANZAPE5 Wed Jun Wed Jun Grupo 4 B 12053.0 Demora Demora 4F04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 801.0 Demora Demora 2F04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 4 B 1025.0 Demora Demora 2F04B2088ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 334.0 OperativoOperativoF04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 4 B 5940.0 Demora Demora 2F04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 4 B 5553.0 Demora Demora 3F04B2088ESPERANZAPE12 Wed Jun Wed Jun Grupo 3 A 13200.0 Mantenci Mantenci F03B1944ESPERAPE1 Wed Jun Wed Jun Grupo 3 A 2406.0 Demora Demora 1F04B2088ESPERANZAPE4 Wed Jun Wed Jun Grupo 3 A 12723.0 OperativoOperativoF05B2296ESPERANZAPE5 Wed Jun Wed Jun Grupo 3 A 523.0 OperativoOperativoF04B2088ESPERANZAPE7 Wed Jun Wed Jun Grupo 3 A 54201.0 OperativoOperativo 1 ProduccionPE8 Wed Jun Wed Jun Grupo 3 A 3773.0 OperativoOperativoF04B2104ESPERANZAPE2 Wed Jun Wed Jun Grupo 3 A 6345.0 OperativoOperativoF04B2088ESPERANZAPE5 Wed Jun Wed Jun Grupo 3 A 5641.0 Reserva Reserva F04B2088ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 A 36.0 OperativoOperativoF04B2088ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 A 2461.0 Demora Demora 55F04B2088ESPERANZAPE3 Wed Jun Wed Jun Grupo 3 A 1299.0 OperativoOperativoF04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 3 A 1954.0 Demora Demora 4F04B2104ESPERANZAPE1 Wed Jun Wed Jun Grupo 3 A 14891.0 OperativoOperativoF04B2088ESPERANZAPE8 Wed Jun Wed Jun Grupo 3 A 669.0 Demora Demora 3F04B2104ESPERANZAPE3 Wed Jun Wed Jun Grupo 3 A 7128.0 OperativoOperativoF04B2104ESPERANZAPE8 Wed Jun Wed Jun Grupo 3 A 4080.0 OperativoOperativoF04B2104ESPERANZA

Comentario.Por despachador?true

ESPERANZA truetrue

ESPERANZA trueESPERANZA trueESPERANZA true

trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Se cambiatrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZA trueESPERANZA

Mantencion programa de backlog ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA true

se corta manguera de llave piso, se cambia.ESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Sistema atrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Fuga hidraulica en rueda tensora lado no cabina + relleno aceite hidraulico ESPERANZAESPERANZAESPERANZA

Demora 32 Entregado por Mantencio trueESPERANZA true

Mantencion programada paso #05+ backlog´s ESPERANZAESPERANZAESPERANZA

Perdida ctrueESPERANZAESPERANZA

Demora 42 Movimiento de Cables truetrue

ESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

ESPERANZA trueESPERANZA true

Demora 55 Preparacion Patio PerforatrueESPERANZA true

Demora 55 Preparacion Patio PerforatrueESPERANZA trueESPERANZA trueESPERANZA true

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

MantenciótrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

InspecciótrueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA true

Estrella superior carrusel con desgaste, barra se desmonta.

Demora 36 Punto de Trabajo Obstrui trueESPERANZAESPERANZA

Sin lubri trueFalla de comunicación entre modulos.

ESPERANZA trueDemora 47 Cambio Aceros Perforaci true

ESPERANZAESPERANZA

Fuga excetrueESPERANZA

Falla de alimentacion modulo D501.ESPERANZAESPERANZAESPERANZA true

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Perdida de alumbrado de propulsión.ESPERANZA

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZA

trueESPERANZA

Perdida intermitente de Pull Down, se realizan pruebas de perforación con carga sin presentarse falla, se libera equipo, quedando en observación.ESPERANZA

Perdida intermitente de Pull Down, en evaluación, sin falla aparente.ESPERANZAESPERANZA

Demora 34 Evacuacion por Tronadur trueESPERANZA trueESPERANZAESPERANZAESPERANZA

MP PASO 4trueESPERANZA

trueESPERANZA

Movimiento involuntario en Rod Support, más evaluación en fuga cilindro de avance.ESPERANZAESPERANZA

Inspecciótruetrue

ESPERANZAESPERANZA

cambio l trueESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA true

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZA

trueESPERANZAESPERANZA true

truetrue

ESPERANZASin control de umbral Pull-Down muy alto.

ESPERANZAtrue

ESPERANZAESPERANZAESPERANZA

ESPERANZAtrue

ESPERANZAtruetrue

ESPERANZAESPERANZAESPERANZA

Perdida de Pull-down.ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueDemora 45 Traslado de Region true

ESPERANZAESPERANZAESPERANZAESPERANZA

truedesacoplatrue

ESPERANZAtrue

ESPERANZAESPERANZA true

trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Pantalla UI sobre cargada, sin touch.desacoplatrue

ESPERANZAESPERANZAESPERANZA

calibracion de rod supportabrasadera de soporte condensador cortada, repuso abrasadera soporte motor y condensador

ESPERANZA trueDemora 34 Evacuacion por Tronadur true

ESPERANZAESPERANZA

true

ESPERANZADemora 45 Traslado de Region true

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Bajo nivel de aceite hidraulico, se normaliza relleno.ESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZA

Demora 55 Preparacion Patio Perforatruetrue

Bajo niveltrueESPERANZA

trueDemora 47 Cambio Aceros Perforaci true

ESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

Falla inte trueESPERANZAESPERANZA

Sistema dtrueESPERANZA

trueSello y cotrue

trueESPERANZAESPERANZA

truetrue

ESPERANZA trueESPERANZAESPERANZA

Demora 45 Traslado de Region truetrue

ESPERANZA trueDemora 47 Cambio Aceros Perforaci true

ESPERANZA truetrue

Demora 45 Traslado de Region trueESPERANZAESPERANZA

truetrue

ESPERANZAESPERANZA

Perdida dtrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 45 Traslado de Region trueESPERANZAESPERANZA trueESPERANZA

trueESPERANZAESPERANZA

Fuga excetrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Se solici trueESPERANZAESPERANZAESPERANZA

Equipo sitrueFalla en true

ESPERANZAESPERANZA trueESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 32 Entregado por Mantencio trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

Fuga de aceite por tapa filtro separador compresor. Se encuentran pernos tapa sueltos, se retorquean.ESPERANZAESPERANZAESPERANZAESPERANZA

Falla col trueESPERANZAESPERANZA

Equipo sitrueESPERANZA

Fuga hidráulica acumulador unidad de rotación.ESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

Perdida de pull-down. movimiento erratico de cilindro pull-down lado no canbina, pero no afecta la penetración.ESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Reserva 91 Sin Operador Disponible true

Demora 45 Traslado de Region trueMulti-Linktrue

ESPERANZAESPERANZA

trueESPERANZAESPERANZA

Colector trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Relleno de aceite pto, aceite compresor, cambio sello polvo, normalizas focos lado no cabinaESPERANZA

trueESPERANZA

InpecciontrueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

Reserva 91 Sin Operador Disponible trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

true

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

MP PASO trueESPERANZAESPERANZAESPERANZA

Fuga por cañeria de propulsión lado no cabina.ESPERANZA

Demora 36 Punto de Trabajo Obstrui trueDemora 45 Traslado de Region true

ESPERANZAESPERANZA true

trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZA

trueESPERANZAESPERANZA trueESPERANZA true

truetrue

Alarma de temperatura de rodamiento de motor lado PTO. Se encuentra fitting sima-lube cortado, se drena grasa degradada y se normaliza sistema de lubricación.ESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZA

ESPERANZAAlarma bajo nivel de aceite.

ESPERANZAESPERANZA

truetraslado

ESPERANZA trueDemora 48 Sin Marcas para Perforac true

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

Se normaliza cable para dar condicion sistema de comunicaion (pantalla)ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

parada de emergencia activada, se cierra puerta de gabinete que acciona parada de emergenciaESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA true

Demora 55 Preparacion Patio Perforatruealarma acttrueLlave de piso desgastada y orejas dobladas en llave y cilindro lado no cabina. Austing trabaja en recuperación de condición y madidas de llave de piso.

ESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

regulacion del sistema de engrase

ESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA true

Se rompr trueDemora 36 Punto de Trabajo Obstrui trueDemora 45 Traslado de Region true

trueESPERANZA

Demora 45 Traslado de Region truePantalla true

ESPERANZAESPERANZAESPERANZA

Alarma de perdida de señal de freno y alta velocidad de cable reel. Se encuentra dañado sello de pilotaje pulsar.ESPERANZAESPERANZA

trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZA true

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA true

ESPERANZADemora 30 Carga Combustible true

ESPERANZAESPERANZAESPERANZAESPERANZA

Reserva 91 Sin Operador Disponible trueESPERANZA

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueDemora 47 Cambio Aceros Perforaci true

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Relleno detrueESPERANZAESPERANZA true

Demora 32 Entregado por Mantencio truetrue

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

Fuga por tapa filtro separador. Se reemplaza filtro y se normaliza nivel de aceite + relleno de hidraulico.ESPERANZAESPERANZAESPERANZA

trueDemora 45 Traslado de Region true

trueTRASLADO

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

Reserva 91 Sin Operador Disponible trueReserva 91 Sin Operador Disponible true

ESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA

Demora 30 Carga Combustible trueESPERANZA

trueESPERANZAESPERANZAESPERANZA

Carrusel trueGato delantero lado no cabina con fuga hidráulica. fuga por tapon, se reemplaza Oring quedando OK.

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZA

Demora 26 Relleno/Espera de agua truetruetrue

ESPERANZAESPERANZAESPERANZAESPERANZA

Demora 20 Actividades de Seguridad trueESPERANZAESPERANZA true

En inspeccion se detecta eslabon lado no cabina fisurado. se mantiene condicion por falta de soldadores.ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 34 Evacuacion por Tronadur trueDemora 34 Evacuacion por Tronadur true

ESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Baja rpm en motor de aire acondicionado. se trabaja en regulación.ESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

ESPERANZAESPERANZA

Se chequea niveles de lubricantes y se rellena aceite de caja PTO ESPERANZAESPERANZA trueESPERANZAESPERANZA

trueESPERANZA

trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Se realiza cambio filtros de aire de motor segun programa ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Perdida dtrueESPERANZA trueESPERANZAESPERANZA

Cambio setrueESPERANZAESPERANZA true

Cambio detrue

ESPERANZAESPERANZAESPERANZA

Se realiz trueESPERANZAESPERANZA

Sin referencia en control de winche, se detecta corto circuito en linea de alimentación a valvulas de control, se elimina cortocircuito y se cambian pulsar de control.ESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA true

Se encuentrueDemora 55 Preparacion Patio Perforatrue

ESPERANZAESPERANZAESPERANZAESPERANZA

Demora 55 Preparacion Patio PerforatrueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

trueRegulacion de recorrido de cilindros de carrusel, más chequeo de niveles .

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci truetrue

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

ESPERANZA trueESPERANZAESPERANZAESPERANZA

Alarma detrueESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

trueESPERANZAESPERANZAESPERANZA

Demora 34 Evacuacion por Tronadur trueESPERANZA trueESPERANZAESPERANZA

Sin parti trueESPERANZAESPERANZA trueESPERANZA true

Demora 55 Preparacion Patio PerforatrueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

Mantenci trueESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

Alta temperatura en mando final lado cabina .ESPERANZAESPERANZA

ESPERANZA trueESPERANZA true

trueESPERANZA

trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Se atiendtrueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Se realiz trueDemora 47 Cambio Aceros Perforaci true

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Sin contatrueCambio detrue

ESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA true

Demora 55 Preparacion Patio PerforatrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA

trueESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueSe normaliza condicion de enrolla cable se regula presión a 700 psi.

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Baja prestrueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZA

MP Paso 6 + Backlogs.-ESPERANZAESPERANZA

Fisura entrueESPERANZAESPERANZAESPERANZA trueESPERANZA

Demora 20 Actividades de Seguridad trueESPERANZA

Se solicita evaluación por desgaste en permnos de sproket, se da prioridad a trabajos perfo 9.ESPERANZAESPERANZAESPERANZAESPERANZA

Evaluacion de sistema de rodado rueda propulsion lado cabina Demora 45 Traslado de Region true

ESPERANZAtrue

ESPERANZA trueESPERANZAESPERANZAESPERANZA

ProblemastrueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

DetenciontrueESPERANZA

ESPERANZAESPERANZA trueESPERANZA true

trueProblemastrue

ESPERANZAESPERANZA trueESPERANZA

Relleno sistema de estanque aceite hidraulico Demora 45 Traslado de Region true

ESPERANZA trueESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueMantenciotrue

trueESPERANZAESPERANZA trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

MantenciotrueESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Equipo sitrueESPERANZAESPERANZA true

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

relleno con soldadura de pestaña guia de llave de piso ESPERANZAESPERANZA

trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA true

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

problema trueESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA true

Demora 45 Traslado de Region trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueCable Reel enrrolla muy rapido. Se realiza ajuste de parametros por pantalla.

ESPERANZABajo niveltrue

ESPERANZAtruetrue

ESPERANZA trueESPERANZAESPERANZA

Sin percutrueDemora 45 Traslado de Region true

ESPERANZAESPERANZAESPERANZA

InspecciótrueESPERANZA trueESPERANZA

Demora 34 Evacuacion por Tronadur trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

ESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZA

Inspección diaria.true

ESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

Demora 28 Traslado entre pozos trueESPERANZA

trueESPERANZA trueESPERANZAESPERANZAESPERANZA

Equipo sin condición de partida. sin falla, 369 en OFF.ESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Inspección Diaria, más relleno de niveles y reemplazo de sello de polvo.Relleno dtrue

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZA

ESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

trueESPERANZA

Equipo sitrueESPERANZAESPERANZAESPERANZAESPERANZA

Inspección diaria + cambio de compresor A/C.ESPERANZAESPERANZAESPERANZAESPERANZA

Demora 45 Traslado de Region trueDemora 45 Traslado de Region true

trueESPERANZAESPERANZA

Trigger de joystick pull-down enclabado en pantalla. Se realiza mantención general componente.ESPERANZAESPERANZA

MP PASO trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZA

Perdida de control pull-down.ESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 45 Traslado de Region trueESPERANZAESPERANZA trueESPERANZAESPERANZA true

Demora 42 Movimiento de Cables trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Equipo se detiene por bajo nivel de aceite hidraulico. Se realiza relleno hidráulico y compresor, normalizando condición.ESPERANZAESPERANZAESPERANZAESPERANZA true

Relleno dtruetrue

Pauta Programada, Carpeta de Backlogs.ESPERANZAESPERANZAESPERANZAESPERANZA true

Inspección Diaria.ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

cambio detrueDemora 45 Traslado de Region true

ESPERANZAESPERANZA

trueESPERANZA

ESPERANZADemora 45 Traslado de Region true

ESPERANZAtrue

ESPERANZAESPERANZAESPERANZAESPERANZA

Demora 30 Carga Combustible truetrue

ESPERANZAFuga hidrálica linea de bastidor, sistema de propulsión.

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 34 Evacuacion por Tronadur trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA true

trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA true

Fuga hidrtrueESPERANZA

Equipo sin arranque. se da condición de partida, sin novedad.ESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

Sin inyección de agua. se normaliza condición reemplazando bomba de agua.ESPERANZA

Sellado ctrueESPERANZA

ESPERANZAESPERANZA

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Demora 45 Traslado de Region truetrue

Evaluación de fuga en cilindros de avance, más relleno de aceite hidráulico.ESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZAESPERANZA

Perdida de inyección de agua, se normaliza descebado, reemplazando válvula check de succión.ESPERANZAESPERANZA

truePerdida de control presión de Pull Down en empate. en espera de energia a partir de las 16:50

Demora 32 Entregado por Mantencio trueSe detientrue

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 47 Cambio Aceros Perforaci trueESPERANZA true

ESPERANZAESPERANZAESPERANZA

Fuga excesiva de aceite hidráulico por lineas alternas de cilindro pull-down.ESPERANZA

cambio llave de piso + sellado de cabina.ESPERANZA trueESPERANZAESPERANZA trueESPERANZAESPERANZA trueESPERANZA true

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZA trueESPERANZAESPERANZA

Fuga linea cilindro pull-down por nipple + bajo nivel de hidráulico.ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Demora 45 Traslado de Region trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Reserva 91 Sin Operador Disponible trueESPERANZA trueESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA trueESPERANZA

Fuga de agua por fisura en ducto rigido de barrido, sobre cabezal de rotación, se normaliza foco de alumbrado defectuoso sobre cabina, mas reparación con aporte de soldadura en fisura detectada.ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Perdida de inyección de agua, se evalua sistema, mas operación intermitente por falta de operador, sin falla aparente.ESPERANZA

Mantención Paso 04, más Backlogs.Detencióntrue

ESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

true

ESPERANZAESPERANZAESPERANZAESPERANZA

Motor se trueESPERANZAESPERANZAESPERANZA true

Demora 30 Carga Combustible trueFiltro de true

ESPERANZAtrue

ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Fuga airetrueESPERANZA true

Demora 36 Punto de Trabajo Obstrui trueESPERANZA trueESPERANZA trueESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Fuga hidráulica por prensado manguera de propulsión desde valvula diversora. se reemplaza más relleno de aceite.ESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Corta cadena de guia cable reel. Se repara eslabón maestro cortado, se arma. espera de energización para regulación guia cable.ESPERANZAESPERANZA trueESPERANZA

Fuga de atrueESPERANZAESPERANZAESPERANZA

trueESPERANZAESPERANZA

Demora 45 Traslado de Region trueESPERANZA trueESPERANZAESPERANZAESPERANZA true

Evaluaci trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA true

Demora 32 Entregado por Mantencio trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZA

Sobre temperatura de refrigerante motor por bajo nivel. se realiza relleno, más reemplazo de filtros de admisión aire motor, cabe mencionar que equipo no ha sido entregado a mantencion por parte de operaciones.ESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZA

trueESPERANZA

trueDemora 45 Traslado de Region true

ESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA

Demora 45 Traslado de Region trueESPERANZA

Falla lim trueESPERANZA

Demora 30 Carga Combustible trueESPERANZA

MP PASO 6 + Back-Logs.true

ESPERANZAESPERANZAESPERANZA

trueDemora 45 Traslado de Region true

ESPERANZADemora 45 Traslado de Region trueDemora 34 Evacuacion por Tronadur true

ESPERANZAESPERANZA trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Demora 45 Traslado de Region trueSello de true

trueESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

ESPERANZAESPERANZAESPERANZAESPERANZA

Relleno atruetrue

ESPERANZA trueRelleno dtrue

Demora 32 Entregado por Mantencio trueESPERANZAESPERANZAESPERANZAESPERANZA trueESPERANZA trueESPERANZAESPERANZA trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

RegulaciotrueESPERANZA trueESPERANZAESPERANZA

trueESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZAESPERANZA

Perdida intermitente de Pull Down, se realizan pruebas de perforación con carga sin presentarse falla, se libera equipo, quedando en observación.

abrasadera de soporte condensador cortada, repuso abrasadera soporte motor y condensador

Fuga de aceite por tapa filtro separador compresor. Se encuentran pernos tapa sueltos, se retorquean.

Perdida de pull-down. movimiento erratico de cilindro pull-down lado no canbina, pero no afecta la penetración.

Alarma de temperatura de rodamiento de motor lado PTO. Se encuentra fitting sima-lube cortado, se drena grasa degradada y se normaliza sistema de lubricación.

parada de emergencia activada, se cierra puerta de gabinete que acciona parada de emergencia

Llave de piso desgastada y orejas dobladas en llave y cilindro lado no cabina. Austing trabaja en recuperación de condición y madidas de llave de piso.

Alarma de perdida de señal de freno y alta velocidad de cable reel. Se encuentra dañado sello de pilotaje pulsar.

Fuga por tapa filtro separador. Se reemplaza filtro y se normaliza nivel de aceite + relleno de hidraulico.

Gato delantero lado no cabina con fuga hidráulica. fuga por tapon, se reemplaza Oring quedando OK.

En inspeccion se detecta eslabon lado no cabina fisurado. se mantiene condicion por falta de soldadores.

Sin referencia en control de winche, se detecta corto circuito en linea de alimentación a valvulas de control, se elimina cortocircuito y se cambian pulsar de control.

Se solicita evaluación por desgaste en permnos de sproket, se da prioridad a trabajos perfo 9.

Trigger de joystick pull-down enclabado en pantalla. Se realiza mantención general componente.

Equipo se detiene por bajo nivel de aceite hidraulico. Se realiza relleno hidráulico y compresor, normalizando condición.

Perdida de inyección de agua, se normaliza descebado, reemplazando válvula check de succión.

Perdida de control presión de Pull Down en empate. en espera de energia a partir de las 16:50

Fuga de agua por fisura en ducto rigido de barrido, sobre cabezal de rotación, se normaliza foco de alumbrado defectuoso sobre cabina, mas reparación con aporte de soldadura en fisura detectada.

Perdida de inyección de agua, se evalua sistema, mas operación intermitente por falta de operador, sin falla aparente.

Fuga hidráulica por prensado manguera de propulsión desde valvula diversora. se reemplaza más relleno de aceite.

Corta cadena de guia cable reel. Se repara eslabón maestro cortado, se arma. espera de energización para regulación guia cable.

Sobre temperatura de refrigerante motor por bajo nivel. se realiza relleno, más reemplazo de filtros de admisión aire motor, cabe mencionar que equipo no ha sido entregado a mantencion por parte de operaciones.

Fuga de agua por fisura en ducto rigido de barrido, sobre cabezal de rotación, se normaliza foco de alumbrado defectuoso sobre cabina, mas reparación con aporte de soldadura en fisura detectada.

Sobre temperatura de refrigerante motor por bajo nivel. se realiza relleno, más reemplazo de filtros de admisión aire motor, cabe mencionar que equipo no ha sido entregado a mantencion por parte de operaciones.