Libro1
2
OPERACIÓN: PLANCHADO DE CAMISETA TALLA 14 NIÑO DEPARTAMENTO: INGENIERIA INDUSTRIAL AREA : PLANCHADO DIAS: 5 FECHA TIEMPO UTILIZADO (MIN) 4/15/2015 3.4 3.4 4/16/2015 3.2 3.2 4/17/2015 2.4 2.4 4/18/2015 2.5 2.5 4/20/2015 2.6 2.6 TIEMPO PROMEDIO 2.8 21.2 169.6 21.2 21.2 21.2 21.2 21.2 21.2 21.2 21.2 169.6 CATIDAD DE CAMISAS POR HORA TIEMPO PROMEDIO EN JONADA DE 8 HORAS
-
Upload
carol-reyes -
Category
Documents
-
view
221 -
download
0
description
medicion del trabajo
Transcript of Libro1
Hoja1OPERACIN: PLANCHADO DE CAMISETA TALLA 14 NIODEPARTAMENTO: INGENIERIA INDUSTRIALAREA : PLANCHADODIAS: 5FECHA TIEMPO UTILIZADO (MIN)4/15/153.43.42044/16/153.23.21924/17/152.42.41444/18/152.52.51504/20/152.62.6156TIEMPO PROMEDIO2.8169.2CATIDAD DE CAMISAS POR HORA21.2TIEMPO PROMEDIO EN JONADA DE 8 HORAS169.621.221.221.221.221.221.221.221.2169.6
Hoja2