PROYECTO : MEJORAMIENTO DE LA INSTITUCIÓN EDUCATIVA Nº 82467 FRANCISCO DELGADO GUERRERO, PROYECTISTA : LDGB NAMO - DISTRITO HUASMÍN - CELENDÍN - CAJAMARCA LOCALIDAD : NAMO DISTRITO : HUASMÍN DPTO : CAJAMARCA PROVINCIA : CELENDÍN FECHA : Octubre 2012 ITEM DESCRIPCION VOLUMEN (m3) AREAS (m2) METRO LINEAL (m) UND ACERO a/Area l ó e h ó% n ó esp Vol. a/Area l n Area l n Lt u (KG) 03.00.00 ARQUITECTURA 03.01.00 MUROS Y TABIQUES DE ALBAÑILERÍA 03.01.01 MURO DE LADRILLO DE ARCILLA K K DE SOGA PABELLÓN PRIMER NIVEL EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23 EJE 3, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23 EJE 5, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23 EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23 EJE A, ENTRE EJE 1 - EJE 7 1.05 3.05 6.00 19.22 EJE B, ENTRE EJE 1 - EJE 7 1.85 2.02 6.00 22.42 SEGUNDO NIVEL EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40 EJE 4, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40 EJE 5, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40 EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40 EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13 EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70 EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95 VOLADO ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65 ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51 ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51 ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51 ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51 ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65 ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05 EJE 1 0.90 1.75 1.00 1.58 EJE 12 0.90 1.75 1.00 1.58 ESCALERA EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67 EJE 11 1.00 1.95 1.00 1.95 EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08 EJE 12 1.00 1.95 1.00 1.95 DESCANSO 1.00 4.55 1.00 4.55 BEBAJO - DESCANSO 1.53 8.20 1.00 12.55

Transcript of Metrado Falso Piso Namo

Page 1: Metrado Falso Piso Namo

PROYECTO : MEJORAMIENTO DE LA INSTITUCIÓN EDUCATIVA Nº 82467 FRANCISCO DELGADO GUERRERO, PROYECTISTA : LDGBNAMO - DISTRITO HUASMÍN - CELENDÍN - CAJAMARCA LOCALIDAD : NAMO

DISTRITO : HUASMÍN DPTO : CAJAMARCA

PROVINCIA : CELENDÍN FECHA : Octubre 2012

ITEM DESCRIPCION VOLUMEN (m3) AREAS (m2) METRO LINEAL (m) UND ACERO

a/Area l ó e h ó% n ó esp Vol. a/Area l n Area l n Lt u (KG)

03.00.00 ARQUITECTURA

03.01.00 MUROS Y TABIQUES DE ALBAÑILERÍA

03.01.01 MURO DE LADRILLO DE ARCILLA K K DE SOGA

PABELLÓN

PRIMER NIVEL

EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE 3, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE 5, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE A, ENTRE EJE 1 - EJE 7 1.05 3.05 6.00 19.22

EJE B, ENTRE EJE 1 - EJE 7 1.85 2.02 6.00 22.42

SEGUNDO NIVEL

EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40

EJE 4, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40

EJE 5, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40

EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40

EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13

EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70

EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95

VOLADO

ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65

ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51

ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51

ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51

ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51

ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65

ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05

EJE 1 0.90 1.75 1.00 1.58

EJE 12 0.90 1.75 1.00 1.58

ESCALERA

EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67

EJE 11 1.00 1.95 1.00 1.95

EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08

EJE 12 1.00 1.95 1.00 1.95

DESCANSO 1.00 4.55 1.00 4.55

BEBAJO - DESCANSO 1.53 8.20 1.00 12.55

Page 2: Metrado Falso Piso Namo

SS.HH. - COCINA

EJE 8, ENTRE EJE C - EJE F 2.40 5.25 1.00 12.60

EJE 8, ENTRE EJE E - EJE F (Ventana) 2.10 0.60 1.00 1.26

EJE 9, ENTRE EJE C - EJE F 2.73 1.50 1.00 4.10

EJE 10, ENTRE EJE C - EJE F 2.30 2.85 1.00 6.56

EJE 10, ENTRE EJE C - EJE F 1.00 1.20 1.00 1.20

EJE 10, ENTRE EJE C - EJE F 1.80 4.35 1.00 7.83

EJE C, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 3.55 1.00 9.33

EJE D, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 1.00 11.42

EJE E, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 1.00 11.42

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 (altura media = (2.70+2.35)/2) 2.63 5.20 1.00 13.65

EJE F, ENTRE EJE 8 - EJE 10 2.63 1.95 1.00 5.12

EJE F, ENTRE EJE 8 - EJE 10 0.80 2.40 1.00 1.92

PARAPETO BAÑO VARONES 1.70 1.05 1.00 1.79

PARAPETO BAÑO DAMAS 1.70 0.85 1.00 1.45

371.89

03.01.02 MURO DE LADRILLO DE ARCILLA K K DE CANTO

SS. HH. CABALLEROS 1.80 4.30 1.00 7.74

SS. HH. DAMAS 1.80 4.00 1.00 7.20

14.94

03.02.00 REVOQUES Y ENLUCIDOS

03.02.01 TARRAJEO EN EXTERIORES CON CEMENTO ARENA 1:4

PABELLÓN

MUROS

PRIMER NIVEL

EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE A, ENTRE EJE 1 - EJE 7 1.05 3.05 6.00 19.22

EJE B, ENTRE EJE 1 - EJE 7 1.85 2.02 6.00 22.42

SEGUNDO NIVEL

EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 3.33 2.00 20.81

EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 3.33 2.00 20.81

EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13

EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70

EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95

Page 3: Metrado Falso Piso Namo

VOLADO

ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65

ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51

ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51

ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51

ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51

ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65

ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05

EJE 1 0.90 1.75 1.00 1.58

EJE 12 0.90 1.75 1.00 1.58

ESCALERA

EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67

EJE 11 1.00 1.95 1.00 1.95

EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08

EJE 12 1.00 1.95 1.00 1.95

DESCANSO 1.00 4.55 1.00 4.55

SS.HH. - COCINA

EJE 8, ENTRE EJE C - EJE F 2.40 5.25 1.00 12.60

EJE 8, ENTRE EJE E - EJE F 2.10 0.60 1.00 1.26

EJE 10, ENTRE EJE C - EJE F 2.30 2.85 1.00 6.56

EJE 10, ENTRE EJE C - EJE F 1.00 1.20 1.00 1.20

EJE 10, ENTRE EJE C - EJE F 1.80 4.35 1.00 7.83

EJE C, ENTRE EJE 8 - EJE 10 (altura media = (2.70+2.35)/2) 2.63 3.56 1.00 9.36

EJE F, ENTRE EJE 8 - EJE 10 2.63 1.95 1.00 5.13

EJE F, ENTRE EJE 8 - EJE 10 0.80 2.40 1.00 1.92

255.11

03.02.02 TARRAJEO EN INTERIORES CON CEMENTO 1:4

PABELLÓN

PRIMER NIVEL

EJE 1, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE 3, ENTRE EJE A - EJE B 2.42 2.94 4.00 28.46

EJE 5, ENTRE EJE A - EJE B 2.42 2.94 4.00 28.46

EJE 7, ENTRE EJE A - EJE B 2.42 2.94 2.00 14.23

EJE A, ENTRE EJE 1 - EJE 7 1.05 2.82 6.00 17.77

EJE B, ENTRE EJE 1 - EJE 7 1.85 1.90 6.00 21.09

Page 4: Metrado Falso Piso Namo

SEGUNDO NIVEL

EJE 1, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40

EJE 4, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 4.00 36.81

EJE 5, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 4.00 36.81

EJE 7, ENTRE EJE A - EJE B (altura media = (3.47+2.79)/2) 3.13 2.94 2.00 18.40

EJE A, ENTRE EJE 1 - EJE 7 1.10 3.05 6.00 20.13

EJE B, ENTRE EJE 1 - EJE 7 1.95 2.02 5.00 19.70

EJE B, ENTRE EJE 2 - EJE 3 1.95 3.05 1.00 5.95

VOLADO

ENTRE EJE 1 - EJE 2 0.90 4.05 1.00 3.65

ENTRE EJE 2 - EJE 3 0.90 3.90 1.00 3.51

ENTRE EJE 3 - EJE 4 0.90 3.90 1.00 3.51

ENTRE EJE 4 - EJE 5 0.90 3.90 1.00 3.51

ENTRE EJE 5 - EJE 6 0.90 3.90 1.00 3.51

ENTRE EJE 6 - EJE 7 0.90 4.05 1.00 3.65

ENTRE EJE 11- EJE 12 0.90 4.50 1.00 4.05

EJE 1 0.90 1.75 1.00 1.58

EJE 12 0.90 1.75 1.00 1.58

ESCALERA

EJE 11 (altura media = (4.35+2.81)/2) 3.58 2.70 1.00 9.67

EJE 11 1.00 1.95 1.00 1.95

EJE 12 (altura media = (2.65+1.10)/2) 1.88 2.70 1.00 5.08

EJE 12 1.00 1.95 1.00 1.95

DESCANSO 1.00 4.55 1.00 4.55

MURO ESCALERA PRIMER TRAMO 2.70 1.05 2.00 5.67

MURO ESCALERA SEGUNDO TRAMO 2.70 1.05 2.00 5.67

SS.HH. - COCINA

EJE 8, ENTRE EJE C - EJE F 2.40 5.25 1.00 12.60

EJE 8, ENTRE EJE E - EJE F 2.10 0.60 1.00 1.26

EJE 9, ENTRE EJE C - EJE F 2.73 1.50 2.00 8.19

EJE 10, ENTRE EJE C - EJE F 2.30 2.70 1.00 6.21

EJE 10, ENTRE EJE C - EJE F 1.00 1.20 1.00 1.20

EJE 10, ENTRE EJE C - EJE F 1.80 4.35 1.00 7.83

EJE C, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 3.31 1.00 8.69

EJE D, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 2.00 22.84

EJE E, ENTRE EJE 8 - EJE 10 (altura media =(2.4+2.85)/2) 2.63 4.35 2.00 22.84

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 (altura media = (2.4+2.85)/2) 2.63 4.35 2.00 22.84

EJE F, ENTRE EJE 8 - EJE 10 2.63 2.05 1.00 5.38

EJE F, ENTRE EJE 8 - EJE 10 0.80 2.40 1.00 1.92

PARAPETO BAÑO VARONES 1.70 1.05 2.00 3.57

PARAPETO BAÑO DAMAS 1.70 0.85 2.00 2.89

SS. HH. CABALLEROS 1.80 4.30 2.00 15.48

SS. HH. DAMAS 1.80 4.00 2.00 14.40

501.67

03.02.03 TARRAJEO DE COLUMNAS y COLUMNETAS C.A. 1:5 E=1.5 cm

COLUMNAS

Page 5: Metrado Falso Piso Namo

EXTERIORES

C-1 0.90 6.75 4.00 24.30

C-2 0.65 6.75 10.00 43.88

C-3 0.30 6.10 1.00 1.83

C-3 0.75 6.10 1.00 4.58

C-3 0.45 5.30 1.00 2.39

C-4 0.40 2.80 2.00 2.24

C-4 0.55 3.25 1.00 1.79

C-5 0.30 2.80 3.00 2.52

C-5 0.45 2.80 3.00 3.78

C-6 0.45 2.80 1.00 1.26

INTERIORES

C-1 0.40 6.70 4.00 10.72

C-2 0.80 6.70 10.00 53.60

C-3 0.30 6.10 2.00 3.66

C-3 0.30 5.30 1.00 1.59

C-3 0.75 5.30 1.00 3.98

C-4 0.40 2.80 1.00 1.12

C-4 0.40 3.25 6.00 7.80

C-5 0.30 2.80 9.00 7.56

C-6 0.60 2.80 1.00 1.68

C-7 0.45 1.80 2.00 1.62

COLUMNETAS

EXTERIORES

PRIMER NIVEL

COLUMNETA Cc 1 0.25 1.20 12.00 3.60

COLUMNETA Cc 1 0.25 2.00 12.00 6.00

COLUMNETA Cc 1 0.25 2.57 6.00 3.86

SEGUNDO NIVEL

COLUMNETA Cc 1 0.25 1.25 12.00 3.75

COLUMNETA Cc 1 0.25 2.10 12.00 6.30

COLUMNETA Cc 1 0.25 3.03 4.00 3.03

COLUMNETA Cc 1 0.25 3.67 2.00 1.84

Page 6: Metrado Falso Piso Namo

VOLADO

COLUMNETA Cc 2 0.15 1.00 18.00 2.70

INTERIORES

PRIMER NIVEL

COLUMNETA Cc 1 0.25 1.20 12.00 3.60

COLUMNETA Cc 1 0.25 2.00 12.00 6.00

COLUMNETA Cc 1 0.25 2.57 18.00 11.57

SEGUNDO NIVEL

COLUMNETA Cc 1 0.25 1.25 12.00 3.75

COLUMNETA Cc 1 0.25 2.10 12.00 6.30

COLUMNETA Cc 1 0.25 3.03 12.00 9.09

COLUMNETA Cc 1 0.25 3.67 6.00 5.51

VOLADO

COLUMNETA Cc 2 0.15 1.00 14.00 2.10

260.90

03.02.04 TARRAJEO DE VIGAS y VIGUETAS C.A. 1:5 E=1.5 cm

VIGAS

PABELLÓN

PRIMER NIVEL

VP-101

EJE 1, ENTRE EJE A - EJE B 1.45 6.70 1.00 9.72

EJE 7, ENTRE EJE A - EJE B 1.45 6.70 1.00 9.72

VP-101 VOLADO

EJE 1, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 7, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

VP-102

EJE 2, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 3, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 4, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 5, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 6, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

VP-102 VOLADO

EJE 2, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 3, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 4, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 5, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 6, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

Page 7: Metrado Falso Piso Namo

VA-101

EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

Vb-101

EJE B', ENTRE EJE 1 - EJE 2 0.70 3.35 1.00 2.35

EJE B', ENTRE EJE 2 - EJE 3 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 3 - EJE 4 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 4 - EJE 5 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 5 - EJE 6 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 6 - EJE 7 0.70 3.35 1.00 2.35

SEGUNDO NIVEL

VP-201

EJE 1, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 2, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 3, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 4, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 5, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 6, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 7, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

VP-201 VOLADO

EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

Page 8: Metrado Falso Piso Namo

VA-201

EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

EJE C, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE C, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

VOLADO (ambos lados) 1.10 1.00 3.00 3.30

VA-202

EJE A', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84

EJE A', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84

EJE C', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84

EJE C', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84

VOLADO (ambos lados) 0.55 1.00 2.00 1.10

ESCALERA

VE-101

EJE H, ENTRE EJE 11 - EJE 12 1.40 4.40 1.00 6.16

VE-102

EJE G, ENTRE EJE 11 - EJE 12 1.20 4.40 1.00 5.28

VE-103

EJE 11, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89

VE-103

EJE 12, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89

Page 9: Metrado Falso Piso Namo

VP-101 VOLADO

EJE 11, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20

EJE 12, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20

VE-201

EJE H, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86

VE-201

EJE G, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86

VE-201

EJE 11, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43

VE-201

EJE 12, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43

VE-201 VOLADO

EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60

EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60

VE-201 VOLADO

EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88

EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88

VE-202

EJE H', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70

EJE G', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70

SS.HH. - COCINA

VA-103

EJE C, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.4*2+0.3)) 0.75 6.22 1.00 4.67

EJE D, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74

EJE E, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74

EJE F, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74

EJE 8, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.15)) 0.75 10.60 1.00 7.95

EJE 9, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. 4*0.15) 0.75 11.05 1.00 8.29

EJE 10, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.45)) 0.75 10.30 1.00 7.73

VA-104

EJE 8', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08

EJE 10', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08

VIGUETAS

EJE A, ENTRE EJE 1 - EJE 7 (1° y 2° nivel) 0.20 3.35 12.00 8.04

EJE B, ENTRE EJE 1 - EJE 8 (1° y 2° nivel) 0.20 2.30 11.00 5.06

EJE B, ENTRE EJE 2 - EJE3 (2° nivel) 0.20 3.35 1.00 0.67

EJE 1, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 3, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 5, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 7, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 1, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

EJE 4, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

EJE 5, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

EJE 7, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

Page 10: Metrado Falso Piso Namo

VOLADO

ENTRE EJE 1 - EJE 2 0.20 4.35 1.00 0.87

ENTRE EJE 2 - EJE 3 0.20 4.20 1.00 0.84

ENTRE EJE 3 - EJE 4 0.20 4.20 1.00 0.84

ENTRE EJE 4 - EJE 5 0.20 4.20 1.00 0.84

ENTRE EJE 5 - EJE 6 0.20 4.20 1.00 0.84

ENTRE EJE 6 - EJE 7 0.20 4.35 1.00 0.87

ENTRE EJE 11- EJE 12 0.20 5.00 1.00 1.00

EJE 1 0.20 2.00 1.00 0.40

EJE 12 0.20 2.00 1.00 0.40

468.00

03.02.05 VESTIDURA DE DERRAMES

PABELLÓN

VENTANA ILUMINACIÓN PABELLÓN 10.67 12.00 128.04 10.40

PUERTA - VENTANA VENTILACIÓN PABELLÓN 11.95 11.00 131.45 10.30

VENTANA VENTILACIÓN PABELLÓN 8.86 1.00 8.86

SS.HH. - COCINA

PUERTA (0.90x2.10) 5.10 4.00 20.40

PUERTA (0.70x2.10) 4.90 1.00 4.90

PUERTA - VENTANA SS.HH. DOCENTES 7.00 1.00 7.00

VENTANA SS.HH. VARONES 4.90 1.00 4.90

VENTANA SS.HH. DAMAS 6.60 1.00 6.60

VENTANA COCINA 5.40 1.00 5.40

VENTANA COCINA 5.20 2.00 10.40

PUERTA BATERÍA DE BAÑOS 1.80 6.00 10.80

338.75

03.02.06 BRUÑAS DE 1 cm

PABELLÓN - ESCALERA

ELEVACIÓN PRINCIPAL

COLUNMAS 2.10 13.00 27.30

VOLADO 10.10 2.00 20.20

VOLADO 9.80 4.00 39.20

VOLADO 11.40 1.00 11.40

ELEVACIÓN POSTERIOR

COLUNMAS 1.40 24.00 33.60

VIGAS 3.35 18.00 60.30

ELEVACIÓN LATERAL IZQUIERDA

COLUNMAS 2.80 2.00 5.60

COLUNMAS 3.10 2.00 6.20

VIGAS 6.60 2.00 13.20

VIGAS 6.66 1.00 6.66

VOLADO 5.50 1.00 5.50

Page 11: Metrado Falso Piso Namo

ELEVACIÓN LATERAL DERECHA

COLUNMAS 2.80 2.00 5.60

COLUNMAS 3.10 2.00 6.20

VIGAS 6.60 2.00 13.20

VIGAS 6.66 1.00 6.66

VOLADO 5.50 1.00 5.50

SS.HH. - COCINA

ELEVACIÓN PRINCIPAL

2.40 3.00 7.20

ELEVACIÓN POSTERIOR

2.40 4.00 9.60

1.80 2.00 3.60

ELEVACIÓN LATERAL IZQUIERDA

5.85 2.00 11.70

ELEVACIÓN LATERAL DERECHA

5.85 2.00 11.70

310.12

03.02.07 TARRAJEO EN FONDO DE ESCALERA C.A. 1:5 E=1.5 cm

PRIMER TRAMO 3.15 2.20 1.00 6.93

DESCANSO 5.00 1.95 1.00 9.75

SEGUNDO TRAMO 3.15 2.20 1.00 6.93

23.61

03.02.08 PREPARACIÓN DE GRADAS DE CONCRETO

PRIMER TRAMO 2.20 10.00 22.00

SEGUNDO TRAMO 2.20 10.00 22.00

44.00

03.02.09 PREPARACIÓN DE DESCANSOS

DESCANSO 5.00 1.95 1.00 9.75

9.75

03.03.00 CIELORRASOS

03.03.01 CIELORRASOS CON CON MEZCLA C:A 1:4 x 1.50 cm

PABELLÓN

PRIMER NIVEL

VOLADO PASADIZO 30.63 2.00 1.00 61.26

AULAS PRIMER NIVEL 182.91 - 1.00 182.91

ESCALERA 21.30 - 1.00 21.30

265.47

03.03.02 CIELORRASOS CON TRIPLAY

(teniendo en cuenta la pendiente de techo)

PABELLÓN - ESCALERA

SALA DE USOS MÚLTIPLES 12.65 7.46 1.00 94.37

DIRECCIÓN 4.10 7.46 1.00 30.59

AULA DE INNOVACIÓN PEDAGÓGICA 8.40 7.46 1.00 62.66

ESCALERA 4.40 5.65 1.00 24.86

Page 12: Metrado Falso Piso Namo

PASADIZO 30.62 2.15 1.00 65.83

SS.HH. - COCINA

INTERIOR DE AMBIENTES 10.35 5.20 1.00 53.82

332.13

Page 13: Metrado Falso Piso Namo

03.04.00 PISOS Y PAVIMENTOS

03.04.01 CONTRAPISO DE CEMENTO E= 2"

(Área calculada con AutoCAD Arquitectural 2013, regiones)

SS.HH. VARONES 13.13 1.00 13.13

SS.HH. MUJERES 14.14 1.00 14.14

DUCHA 1.41 1.00 1.41

SS.HH. DOCENTES 3.68 1.00 3.68

COCINA 12.62 1.00 12.62

44.98

03.04.02 PISO CERAMICO DE ALTO TRANSITO 30X30 cm

(Área calculada con AutoCAD Arquitectural 2013, regiones)

SS.HH. VARONES 13.13 1.00 13.13

SS.HH. MUJERES 14.14 1.00 14.14

DUCHA 1.41 1.00 1.41

SS.HH. DOCENTES 3.68 1.00 3.68

COCINA 12.62 1.00 12.62

44.98

03.04.03 PISO DE CONCRETO E= 2",PULIDO, COLOREADO Y BRUÑADO

(Área calculada con AutoCAD Arquitectural 2013, regiones)

AULAS (1° NIVEL) 182.93 182.93

ESCALERA 22.40 1.00 22.40

ALMACEN 3.68 1.00 3.68

AULAS (2° NIVEL)

AULAS 182.93 182.93

PASADIZO 65.83 - 1.00 65.83

457.77

03.04.05 VEREDAS F'C=140 KG/CM², E=10CM PASTA 1:2

(Área calculada con AutoCAD Arquitectural 2013, regiones)

AULAS - ESCALERA 97.00 - 1.00 97.00

SS. HH., COCINA 31.34 - 1.00 31.34

128.34

03.04.06 ENCOFRADO Y DESENCOFRADO EN VEREDAS

PABELLÓN - ESCALERA

PERÍMETRO 84.65 0.20 1.00 16.93

JUNTAS 2.00 0.10 8.00 1.60

JUNTAS 0.70 0.10 16.00 1.12

SS.HH. - COCINA

PERÍMETRO 38.80 0.20 1.00 7.76

JUNTAS 1.30 0.10 4.00 0.52

JUNTAS 0.70 0.10 10.00 0.70

28.63

Page 14: Metrado Falso Piso Namo

03.04.07 CANTONERAS DE ALUMINIO ESCALERA Y JUNTAS PISOS

PRIMER TRAMO 2.10 10.00 21.00

SEGUNDO TRAMO 2.10 10.00 21.00

42.00

03.04.08 JUNTAS ASFÁLTICAS 1" VEREDAS

PABELLÓN - ESCALERA

JUNTAS 2.00 8.00 16.00

JUNTAS 0.70 16.00 11.20

SS.HH. - COCINA

JUNTAS 1.30 4.00 5.20

JUNTAS 0.70 10.00 7.00

39.40

03.04.09 JUNTAS ASFÁLTICAS 1" CANAL DE EVACUACIÓN PLUVIAL

PABELLÓN - ESCALERA

JUNTAS 1.60 24.00 38.40

SS.HH. - COCINA

JUNTAS 1.60 14.00 22.40

60.80

03.04.10 JUNTAS ASFÁLTICAS 1/2" AULAS

JUNTAS 8.40 3.00 25.20

JUNTAS 6.60 3.00 19.80

45.00

03.05.00 ZOCALOS Y CONTRAZOCALOS

03.05.01 CONTRAZOCALO DE CEMENTO H=0.10 M

AULAS 31.58 3.00 94.74

AULA DE INNOVACIÓN PEDAGÓGICA 31.58 1.00 31.58

DIRECCIÓN 21.76 1.00 21.76

SALA DE USOS MÚLTIPLES 40.22 1.00 40.22

ALMACÉN 11.14 1.00 11.14

199.44

03.05.02 CONTRAZOCALO DE CEMENTO H=0.30 M

PABELLÓN - ESCALERA

PRIMER NIVEL 70.55 1.00 70.55

SEGUNDO NIVEL 56.07 1.00 56.07

SS.HH. - COCINA

PERÍMETRO 23.85 1.00 23.85

150.47

Page 15: Metrado Falso Piso Namo

03.05.03 ZOCALO DE MAYOLICA BLANCA DE 20 X 30 (PRIMERA)

SS.HH. VARONES

URINARIO + BEBEDERO

13.20 1.80 1.00 13.20

INODORO

3.90 1.80 2.00 7.80

SS.HH. DAMAS

URINARIO + BEBEDERO

12.00 1.80 1.00 12.00

INODORO

3.90 1.80 3.00 11.70

SS.HH. DOCENTES

7.15 1.80 1.00 7.15

DUCHA

4.10 1.80 1.00 7.38

COCINA

3.90 2.50 1.00 3.90

1.20 1.00 3.00 3.60

1.65 2.75 1.00 1.65

5.05 2.75 1.00 5.05

73.43

03.06.00 CARPINTERÍA DE MADERA

03.06.01 PUERTA DE MADERA DE CEDRO ENTABLERADA

PUERTAS TIPO P1 (1.05 m x 2.10 m) 1.05 2.10 11.00 24.26

PUERTAS TIPO P2 (1.05 m x 2.10 m) 0.90 2.10 5.00 9.45

PUERTAS TIPO P3 (0.70 m x 2.10 m) 0.70 2.10 1.00 1.47

35.18

03.06.02 PUERTA DE MADERA DE CEDRO CONTRAPLACADA triplay 6mm

PUERTAS TIPO P4 (0.70 m x 1.60 m) 0.70 1.60 5.00 5.60

03.06.03 COLOCACIÓN DE PUERTAS 22.00

Page 16: Metrado Falso Piso Namo

03.06.04 VENTANA DE MADERA DE CEDRO

VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 6.00 17.28

VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 6.00 34.56

VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 6.00 37.37

VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 6.00 19.01

VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 2.00 3.36

VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 1.00 1.80

VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 1.00 1.82

VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 1.00 1.23

VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 1.00 0.60

117.03

03.06.05 COLOCACIÓN DE VENTANAS 30.00

03.06.06 TICERO DE MADERA CEDRO L=5 m BARNIZADO 5.00

03.07.00 CARPINTERÍA METÁLICA

03.07.01 BARRAS DE SEGURIDAD FIERRO LISO Ø 1/2" EN VENTANAS

VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 29.20 6.00 175.20

VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 58.40 6.00 350.40

VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 63.82 6.00 382.92

VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 30.32 6.00 181.92

VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 16.40 2.00 32.80

VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 18.00 1.00 18.00

VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 17.40 1.00 17.40

VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 11.90 1.00 11.90

VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 5.40 1.00 5.40

1,175.94

03.08.00 CERRAJERÍA

03.08.01 BISAGRA Ac. ALUMINIZADA DE 4" X 4"

PUERTAS TIPO P1 (1.05 m x 2.10 m) 44.00

PUERTAS TIPO P2 (1.05 m x 2.10 m) 20.00

PUERTAS TIPO P3 (0.70 m x 2.10 m) 4.00

68.00

Page 17: Metrado Falso Piso Namo

03.08.02 BISAGRA Ac. ALUMINIZADA DE 3" X 3"

PUERTAS TIPO P4 (0.70 m x 1.60 m) 15.00

03.08.03 BISAGRA Ac. ALUMINIZADA DE 2 1/2" X 2 1/2"

VENTANAS TIPO V1 (3.60 m x 0.80 m) 48.00

VENTANAS TIPO V2 (3.60 m x 1.60 m) 48.00

VENTANAS TIPO V3 (3.60 m x 1.73 m) 48.00

VENTANAS TIPO V4 (3.60 m x 0.88 m) 48.00

VENTANAS TIPO V5 (1.20m x 1.40 m) 8.00

VENTANAS TIPO V6 (1.20 m x 1.50 m) 4.00

VENTANAS TIPO V7 (2.60 m x 0.70 m) 8.00

VENTANAS TIPO V8 (1.75 m x 0.70 m) 4.00

VENTANAS TIPO V9 (1.50 m x 0.40 m) 2.00

218.00

03.08.04 CERRADURA PARA PUERTA PESADA

PUERTAS TIPO P1 (1.05 m x 2.10 m) 11.00

PUERTAS TIPO P2 (1.05 m x 2.10 m) 5.00

PUERTAS TIPO P3 (0.70 m x 2.10 m) 1.00

17.00

03.08.05 PESTILLO 4"

PUERTAS TIPO P1 (1.05 m x 2.10 m) 5.00

03.08.06 PESTILLO 3"

VENTANAS TIPO V1 (3.60 m x 0.80 m) 24.00

VENTANAS TIPO V2 (3.60 m x 1.60 m) 24.00

VENTANAS TIPO V3 (3.60 m x 1.73 m) 24.00

VENTANAS TIPO V4 (3.60 m x 0.88 m) 24.00

VENTANAS TIPO V5 (1.20m x 1.40 m) 4.00

VENTANAS TIPO V6 (1.20 m x 1.50 m) 2.00

VENTANAS TIPO V7 (2.60 m x 0.70 m) 4.00

VENTANAS TIPO V8 (1.75 m x 0.70 m) 2.00

VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.00

109.00

03.09.00 VIDRIOS, CRISTALES Y SIMILARES

03.09.01 VIDRIO SEMI DOBLE INCOLORO

VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 6.00 17.28

VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 6.00 34.56

VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 6.00 37.37

VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 6.00 19.01

VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 2.00 3.36

Page 18: Metrado Falso Piso Namo

VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 1.00 1.80

VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 1.00 1.82

VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 1.00 1.23

VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 1.00 0.60

117.03

PIE CUADRADO = 1,258.39

03.10.00 PINTURA

03.10.01 PINTURA LATEX EN DOS MANOS

TARRAJEO DE MUROS y CIELORRAZOS EXTERIORES - - - 255.11

TARRAJEO DE MUROS y CIELORRAZOS INTERIORES - - - 501.67

TARRAJEO DE COLUMNAS y COLUMNETAS - - - 260.90

TARRAJEO DE VIGAS y VIGUETAS - - - 468.00

VESTIDURA DE DERRAMES 0.15 338.75 - 50.81

TARRAJEO EN FONDO DE ESCALERA - - - 23.61

1,560.10

03.10.02 PINTURA BARNIZ EN PUERTAS DE MADERA

PUERTAS TIPO P1 (1.05 m x 2.10 m) 1.05 2.10 11.00 24.26

PUERTAS TIPO P2 (1.05 m x 2.10 m) 0.90 2.10 5.00 9.45

PUERTAS TIPO P3 (0.70 m x 2.10 m) 0.70 2.10 1.00 1.47

PUERTAS TIPO P4 (0.70 m x 1.60 m) 0.70 1.60 5.00 5.60

40.78

03.10.03 PINTURA BARNIZ EN VENTANAS DE MADERA

VENTANAS TIPO V1 (3.60 m x 0.80 m) 3.60 0.80 6.00 17.28

VENTANAS TIPO V2 (3.60 m x 1.60 m) 3.60 1.60 6.00 34.56

VENTANAS TIPO V3 (3.60 m x 1.73 m) 3.60 1.73 6.00 37.37

VENTANAS TIPO V4 (3.60 m x 0.88 m) 3.60 0.88 6.00 19.01

VENTANAS TIPO V5 (1.20m x 1.40 m) 1.20 1.40 2.00 3.36

VENTANAS TIPO V6 (1.20 m x 1.50 m) 1.20 1.50 1.00 1.80

VENTANAS TIPO V7 (2.60 m x 0.70 m) 2.60 0.70 1.00 1.82

VENTANAS TIPO V8 (1.75 m x 0.70 m) 1.75 0.70 1.00 1.23

VENTANAS TIPO V9 (1.50 m x 0.40 m) 1.50 0.40 1.00 0.60

117.03

Page 19: Metrado Falso Piso Namo

03.10.04 PINTURA BARNIZ EN CIELORRAZO TRYPLAY

(teniendo en cuenta la pendiente de techo)

PABELLÓN - ESCALERA

SALA DE USOS MÚLTIPLES 12.65 7.46 1.00 94.37

DIRECCIÓN 4.10 7.46 1.00 30.59

AULA DE INNOVACIÓN PEDAGÓGICA 8.40 7.46 1.00 62.66

ESCALERA 4.40 5.65 1.00 24.86

PASADIZO 30.62 2.15 1.00 65.83

SS.HH. - COCINA

INTERIOR DE AMBIENTES 10.35 5.20 1.00 53.82

332.13

03.10.05 PINTURA DE CONTRAZOCALO CON ESMALTE

CONTRAZOCALO DE CEMENTO H=0.10 M 0.10 199.44 - 19.94

CONTRAZOCALO DE CEMENTO H=0.30 M 0.30 150.47 - 45.14

65.08

03.10.06 PINTURA DE PIZARRA DE CEMENTO 1.10 5.00 5.00 27.50

27.50

03.11.00 VARIOS, LIMPIEZA,JARDINERÍA

03.11.01 LIMPIEZA GENERAL DE OBRA #REF!

03.11.02 SEMBRÍO DE GRASS

( Área calculada con AutoCAD Civil 3D Land Desktop 2013) 136.62

Page 20: Metrado Falso Piso Namo
Page 21: Metrado Falso Piso Namo

PROYECTO : MEJORAMIENTO DE LA INSTITUCIÓN EDUCATIVA Nº 82467 FRANCISCO DELGADO GUERRERO, PROYECTISTA : LDGBNAMO - DISTRITO HUASMÍN - CELENDÍN - CAJAMARCA LOCALIDAD : NAMO

DISTRITO : HUASMÍN DPTO : CAJAMARCA

PROVINCIA : CELENDÍN FECHA : Octubre 2012

ITEM DESCRIPCION VOLUMEN (m3) AREAS (m2) METRO LINEAL (m) UND ACERO

a/Area l ó e h ó% n ó esp Vol. a/Area l n Area l n Lt u (KG)

02.00.00 ESTRUCTURAS

02.01.00 MOVIMIENTO DE TIERRAS

02.01.01 NIVELACION DEL TERRENO

PABELLÓN - ESCALERA (inc/veredas) #REF! - 1.00 #REF!

SS.HH. COCINA (inc/veredas) #REF! - 1.00 #REF!

#REF!

02.01.02 CORTE DE TERRENO A NIVEL DE AFIRMADO PARA PISO Y VEREDAS

(Volumen calculado con AutoCAD Civil 3D Land Desktop 2013)

PABELLÓN - ESCALERA (hasta cota 2,617.11), inc/veredas 330.63

SS.HH. COCINA (hasta cota 2,616.06), inc/veredas 109.07

GRADERÍA (hasta cota 2,616.06) 6.60

446.30

02.01.03 CORTE DE TERRENO PARA CONFORMACIÓN DE TALUD

(Volumen calculado con AutoCAD Civil 3D Land Desktop 2013)

PABELLÓN - ESCALERA, SS.HH. COCINA (hasta cota 2,617.31) 95.83

02.01.04 EXCAVACION DE ZANJAS

ZAPATAS PABELLÓN - ESCALERA

EJE A - EJE 1 (Z-1) 1.70 1.70 2.00 1.00 5.78

EJE A - EJE 2 (Z-2) 2.00 2.00 2.00 1.00 8.00

EJE A - EJE 3 (Z-2) 2.00 2.00 2.00 1.00 8.00

EJE A - EJE 4 (Z-2) 2.00 2.00 2.00 1.00 8.00

EJE A - EJE 5 (Z-2) 2.00 2.00 2.00 1.00 8.00

EJE A - EJE 6 (Z-2) 2.00 2.00 2.00 1.00 8.00

EJE A - EJE 7 (Z-1) 1.70 1.70 2.00 1.00 5.78

EJE B - EJE 1 (Z-3) 1.90 1.90 2.00 1.00 7.22

EJE B - EJE 2 (Z-4) 2.20 2.20 2.00 1.00 9.68

EJE B - EJE 3 (Z-4) 2.20 2.20 2.00 1.00 9.68

EJE B - EJE 4 (Z-4) 2.20 2.20 2.00 1.00 9.68

EJE B - EJE 5 (Z-4) 2.20 2.20 2.00 1.00 9.68

EJE B - EJE 6 (Z-4) 2.20 2.20 2.00 1.00 9.68

EJE B - EJE 7 (Z-3) 1.90 1.90 2.00 1.00 7.22

EJE G - EJE 11 (Z-5) 1.50 1.50 1.70 1.00 3.83

EJE G - EJE 11 (Z-5) 1.50 1.50 1.70 1.00 3.83

EJE H - EJE 11 (Z-5) 1.50 1.50 1.70 1.00 3.83

EJE H - EJE 12 (Z-5) 1.50 1.50 1.70 1.00 3.83

Page 22: Metrado Falso Piso Namo

ZAPATAS SS.HH. COCINA

EJE C - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE C - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE C - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE D - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE D - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE D - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE E - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE E - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE E - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE F - EJE 8 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE F - EJE 9 (Z-6) 1.00 1.00 1.50 1.00 1.50

EJE F - EJE 10 (Z-6) 1.00 1.00 1.50 1.00 1.50

VIGAS DE CIMENTACIÓN, CIMIENTO CORRIDO PABELLÓN - ESCALERA

EJE A, ENTRE EJE 1 - EJE 2 2.40 0.30 1.00 1.00 0.72

EJE A, ENTRE EJE 2 - EJE 3 2.25 0.30 1.00 1.00 0.68

EJE A, ENTRE EJE 3 - EJE 4 2.25 0.30 1.00 1.00 0.68

EJE A, ENTRE EJE 4 - EJE 5 2.25 0.30 1.00 1.00 0.68

EJE A, ENTRE EJE 5 - EJE 6 2.25 0.30 1.00 1.00 0.68

EJE A, ENTRE EJE 6 - EJE 7 2.40 0.30 1.00 1.00 0.72

EJE B, ENTRE EJE 1 - EJE 2 2.18 0.30 1.00 1.00 0.65

EJE B, ENTRE EJE 2 - EJE 3 2.05 0.30 1.00 1.00 0.62

EJE B, ENTRE EJE 3 - EJE 4 2.05 0.30 1.00 1.00 0.62

EJE B, ENTRE EJE 4 - EJE 5 2.05 0.30 1.00 1.00 0.62

EJE B, ENTRE EJE 5 - EJE 6 2.05 0.30 1.00 1.00 0.62

EJE B, ENTRE EJE 6 - EJE 7 2.18 0.30 1.00 1.00 0.65

EJE 1, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 2, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 3, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 4, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 5, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 6, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 7, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.00 1.50

EJE 11, ENTRE EJE G - EJE H 1.50 0.45 0.90 1.00 0.61

EJE 12, ENTRE EJE G - EJE H 1.50 0.45 0.90 1.00 0.61

ESCALERA 1.00 0.50 1.10 1.00 0.55

CIMIENTOS CORRIDOS SS.HH. COCINA

EJE C, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92

EJE D, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92

EJE E, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92

EJE F, ENTRE EJE 8 - EJE 9 1.40 0.60 1.10 1.00 0.92

EJE C, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92

Page 23: Metrado Falso Piso Namo

EJE D, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92

EJE E, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92

EJE F, ENTRE EJE 9 - EJE 10 1.40 0.60 1.10 1.00 0.92

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.00 0.60 1.10 1.00 2.64

EJE 8, ENTRE EJE C - EJE F 11.10 0.60 1.10 1.00 7.33

EJE 9, ENTRE EJE C - EJE F 0.85 0.60 1.10 1.00 0.56

EJE 10, ENTRE EJE C - EJE F 11.10 0.60 1.10 1.00 7.33

ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.60 1.10 1.00 0.79

ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.60 1.10 1.00 0.66

GRADERÍA VEREDA 1.30 0.50 0.60 1.00 0.39

CANAL DE EVACUACIÓN PLUVIAL

(Volumen calculado con AutoCAD Civil 3D Land Desktop 2013)

PABELLÓN - ESCALERA (hasta cota 2,616.61), inc/veredas 26.12

SS.HH. COCINA (hasta cota 2,615.56), inc/veredas 12.35

ZANJA PARA TUBERÍA DE EVACUACIÓN PLUVIAL

PABELLÓN - ESCALERA 2.50 0.40 0.60 1.00 0.60

SS.HH. COCINA 32.60 0.40 0.60 1.00 7.82

241.88

02.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO MANUAL.

ZAPATAS PABELLÓN - ESCALERA

ZAPATA (Z-1) 1.70 1.70 1.00 2.00 5.78

Volúmen de columna y viga de cimentación 0.35 - (0.60) 2.00 (0.42)

Volúmen de columna y sobrecimiento 0.28 - (0.40) 2.00 (0.22)

ZAPATA (Z-2) 2.00 2.00 1.00 5.00 20.00

Volúmen de columna y viga de cimentación 0.66 - (0.60) 5.00 (1.98)

Volúmen de columna y sobrecimiento 0.46 - (0.40) 5.00 (0.92)

ZAPATA (Z-3) 1.90 1.90 1.00 2.00 7.22

Volúmen de columna y viga de cimentación 0.39 - (0.60) 2.00 (0.47)

Volúmen de columna y sobrecimiento 0.30 - (0.40) 2.00 (0.24)

ZAPATA (Z-4) 2.20 2.20 1.00 5.00 24.20

Volúmen de columna y viga de cimentación 0.72 - (0.60) 5.00 (2.16)

Volúmen de columna y sobrecimiento 0.45 - (0.40) 5.00 (0.90)

ZAPATA (Z-5) 1.50 1.50 0.80 3.00 5.40

Volúmen de columna y cimiento corrido 0.41 - (0.80) 3.00 (0.98)

ZAPATA (Z-5) 1.50 1.50 0.80 1.00 1.80

Volúmen de columna, cimentación escalera y cim. corrido 0.97 - (0.80) 1.00 (0.78)

ZAPATAS SS.HH. COCINA

C-4 ZAPATA (Z-6) 1.00 1.00 0.65 1.00 0.65

Volúmen de columna y cimiento corrido 0.84 - (0.35) 1.00 (0.29)

Volúmen de columna y sobrecimiento 0.21 - (0.30) 1.00 (0.06)

Page 24: Metrado Falso Piso Namo

C-4 ZAPATA (Z-6) 1.00 1.00 0.65 4.00 2.60

Volúmen de columna y cimiento corrido 0.60 - (0.35) 4.00 (0.84)

Volúmen de columna y sobrecimiento 0.15 - (0.30) 4.00 (0.18)

C-5 ZAPATA (Z-6) 1.00 1.00 0.65 3.00 1.95

Volúmen de columna y cimiento corrido 0.84 - (0.35) 3.00 (0.88)

Volúmen de columna y sobrecimiento 0.21 - (0.30) 3.00 (0.19)

C-5 ZAPATA (Z-6) 1.00 1.00 0.65 3.00 1.95

Volúmen de columna y cimiento corrido 0.84 - (0.35) 3.00 (0.88)

Volúmen de columna y sobrecimiento 0.24 - (0.30) 3.00 (0.22)

C-6 ZAPATA (Z-6) 1.00 1.00 0.65 1.00 0.65

Volúmen de columna y cimiento corrido 0.84 - (0.35) 1.00 (0.29)

Volúmen de columna y sobrecimiento 0.24 - (0.30) 1.00 (0.07)

VIGAS DE CIMENTACIÓN, CIMIENTO CORRIDO PABELLÓN - ESCALERA

EJE A, ENTRE EJE 1 - EJE 2 2.40 0.15 0.40 1.00 0.14

EJE A, ENTRE EJE 2 - EJE 3 2.25 0.15 0.40 1.00 0.14

EJE A, ENTRE EJE 3 - EJE 4 2.25 0.15 0.40 1.00 0.14

EJE A, ENTRE EJE 4 - EJE 5 2.25 0.15 0.40 1.00 0.14

EJE A, ENTRE EJE 5 - EJE 6 2.25 0.15 0.40 1.00 0.14

EJE A, ENTRE EJE 6 - EJE 7 2.40 0.15 0.40 1.00 0.14

EJE B, ENTRE EJE 1 - EJE 2 2.18 0.15 0.40 1.00 0.13

EJE B, ENTRE EJE 2 - EJE 3 2.05 0.15 0.40 1.00 0.12

EJE B, ENTRE EJE 3 - EJE 4 2.05 0.15 0.40 1.00 0.12

EJE B, ENTRE EJE 4 - EJE 5 2.05 0.15 0.40 1.00 0.12

EJE B, ENTRE EJE 5 - EJE 6 2.05 0.15 0.40 1.00 0.12

EJE B, ENTRE EJE 6 - EJE 7 2.18 0.15 0.40 1.00 0.13

EJE 1, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 2, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 3, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 4, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 5, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 6, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 7, ENTRE EJE A - EJE B 5.00 0.15 0.40 1.00 0.30

EJE 11, ENTRE EJE G - EJE H 1.50 0.30 0.10 2.00 0.09

EJE 12, ENTRE EJE G - EJE H 1.50 0.30 0.10 3.00 0.14

ESCALERA 1.00 0.20 0.10 3.00 0.06

CIMIENTOS CORRIDOS SS.HH. COCINA

EJE C, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19

EJE D, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19

EJE E, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19

EJE F, ENTRE EJE 8 - EJE 9 1.40 0.45 0.30 1.00 0.19

EJE C, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19

EJE D, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19

Page 25: Metrado Falso Piso Namo

EJE E, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19

EJE F, ENTRE EJE 9 - EJE 10 1.40 0.45 0.30 1.00 0.19

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.00 0.45 0.30 1.00 0.54

EJE 8, ENTRE EJE C - EJE F 11.10 0.45 0.30 1.00 1.50

EJE 9, ENTRE EJE C - EJE F 0.85 0.45 0.30 1.00 0.11

EJE 10, ENTRE EJE C - EJE F 11.10 0.45 0.30 1.00 1.50

ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.45 0.30 1.00 0.16

ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.45 0.30 1.00 0.14

ZANJA PARA TUBERÍA DE EVACUACIÓN PLUVIAL

PABELLÓN - ESCALERA 2.50 0.40 0.60 1.00 0.60

SS.HH. COCINA 32.60 0.40 0.60 1.00 7.82

77.09

02.01.06 BASE COMPACTADO CON MATERIAL PRESTAMO (AFIRMADO e=0.30m) BAJO CIMENTACION

ZAPATAS PABELLÓN - ESCALERA

ZAPATA (Z-1) 1.70 1.70 0.30 2.00 1.73

ZAPATA (Z-2) 2.00 2.00 0.30 5.00 6.00

ZAPATA (Z-3) 1.90 1.90 0.30 5.00 5.42

ZAPATA (Z-4) 2.20 2.20 0.30 2.00 2.90

ZAPATA (Z-5) 1.50 1.50 0.30 4.00 2.70

ZAPATA (Z-6) 1.00 1.00 0.30 12.00 3.60

ESCALERA 1.00 0.50 0.20 1.00 0.10

22.45

02.01.07 BASE COMPACTADO CON MATERIAL PRESTAMO (AFIRMADO e=0.10m) PARA FALSO PISOS Y VEREDAS

PISO Y VEREDAS PABELLÓN - ESCALERA

#REF! - 0.10 1.00 #REF!

PISO Y VEREDAS SS.HH. COCINA, GRADERÍA

#REF! - 0.10 1.00 #REF!

3.30 - 0.10 1.00 0.33

#REF!

02.01.08 ELIMINACION DE MATERIAL EXCEDENTE

CORTE DE TERRENO A NIVEL DE AFIRMADO PARA PISO Y VEREDAS 446.30 - - 1.25 557.88

CORTE DE TERRENO PARA CONFORMACIÓN DE TALUD 95.83 - - 1.25 119.79

EXCAVACION DE ZANJAS 241.88 - - 1.25 302.35

RELLENO COMPACTADO CON MATERIAL PROPIO MANUAL. 77.09 - - (1.25) (96.36)

883.66

Page 26: Metrado Falso Piso Namo

02.02.00 CONCRETO SIMPLE

02.02.01 SOLADO C:H 1:12 (e=0.10m)

ZAPATAS PABELLÓN - ESCALERA

EJE A - EJE 1 (Z-1) 1.70 1.70 1.00 2.89

EJE A - EJE 2 (Z-2) 2.00 2.00 1.00 4.00

EJE A - EJE 3 (Z-2) 2.00 2.00 1.00 4.00

EJE A - EJE 4 (Z-2) 2.00 2.00 1.00 4.00

EJE A - EJE 5 (Z-2) 2.00 2.00 1.00 4.00

EJE A - EJE 6 (Z-2) 2.00 2.00 1.00 4.00

EJE A - EJE 7 (Z-1) 1.70 1.70 1.00 2.89

EJE B - EJE 1 (Z-3) 1.90 1.90 1.00 3.61

EJE B - EJE 2 (Z-4) 2.20 2.20 1.00 4.84

EJE B - EJE 3 (Z-4) 2.20 2.20 1.00 4.84

EJE B - EJE 4 (Z-4) 2.20 2.20 1.00 4.84

EJE B - EJE 5 (Z-4) 2.20 2.20 1.00 4.84

EJE B - EJE 6 (Z-4) 2.20 2.20 1.00 4.84

EJE B - EJE 7 (Z-3) 1.90 1.90 1.00 3.61

EJE G - EJE 11 (Z-5) 1.50 1.50 1.00 2.25

EJE G - EJE 11 (Z-5) 1.50 1.50 1.00 2.25

EJE H - EJE 11 (Z-5) 1.50 1.50 1.00 2.25

EJE H - EJE 12 (Z-5) 1.50 1.50 1.00 2.25

ZAPATAS SS.HH. COCINA

EJE C - EJE 8 (Z-6) 1.00 1.00 1.00 1.00

EJE C - EJE 9 (Z-6) 1.00 1.00 1.00 1.00

EJE C - EJE 10 (Z-6) 1.00 1.00 1.00 1.00

EJE D - EJE 8 (Z-6) 1.00 1.00 1.00 1.00

EJE D - EJE 9 (Z-6) 1.00 1.00 1.00 1.00

EJE D - EJE 10 (Z-6) 1.00 1.00 1.00 1.00

EJE E - EJE 8 (Z-6) 1.00 1.00 1.00 1.00

EJE E - EJE 9 (Z-6) 1.00 1.00 1.00 1.00

EJE E - EJE 10 (Z-6) 1.00 1.00 1.00 1.00

EJE F - EJE 8 (Z-6) 1.00 1.00 1.00 1.00

EJE F - EJE 9 (Z-6) 1.00 1.00 1.00 1.00

EJE F - EJE 10 (Z-6) 1.00 1.00 1.00 1.00

VIGAS DE CIMENTACIÓN PABELLÓN - CIMENTACIÓN ESCALERA

EJE A, ENTRE EJE 1 - EJE 2 2.40 0.30 1.00 0.72

EJE A, ENTRE EJE 2 - EJE 3 2.25 0.30 1.00 0.68

EJE A, ENTRE EJE 3 - EJE 4 2.25 0.30 1.00 0.68

EJE A, ENTRE EJE 4 - EJE 5 2.25 0.30 1.00 0.68

EJE A, ENTRE EJE 5 - EJE 6 2.25 0.30 1.00 0.68

EJE A, ENTRE EJE 6 - EJE 7 2.40 0.30 1.00 0.72

EJE B, ENTRE EJE 1 - EJE 2 2.18 0.30 1.00 0.65

EJE B, ENTRE EJE 2 - EJE 3 2.05 0.30 1.00 0.62

EJE B, ENTRE EJE 3 - EJE 4 2.05 0.30 1.00 0.62

Page 27: Metrado Falso Piso Namo

EJE B, ENTRE EJE 4 - EJE 5 2.05 0.30 1.00 0.62

EJE B, ENTRE EJE 5 - EJE 6 2.05 0.30 1.00 0.62

EJE B, ENTRE EJE 6 - EJE 7 2.18 0.30 1.00 0.65

EJE 1, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

EJE 2, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

EJE 3, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

EJE 4, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

EJE 5, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

EJE 6, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

EJE 7, ENTRE EJE A - EJE B 5.00 0.30 1.00 1.50

ESCALERA 1.00 0.50 1.00 0.50

97.14

02.02.02 CIMIENTO CORRIDO 1:10 (C:H) + 30% P.G MÁX. 8"

CIMIENTOS CORRIDOS ESCALERA

EJE 11, ENTRE EJE G - EJE H 2.90 0.45 0.80 1.00 1.04

EJE 12, ENTRE EJE G - EJE H 2.90 0.45 0.80 1.00 1.04

ESCALERA 2.05 0.50 0.75 1.00 0.77

CIMIENTOS CORRIDOS SS.HH. COCINA, GRADERÍA VEREDA

EJE C, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01

EJE D, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01

EJE E, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01

EJE F, ENTRE EJE 8 - EJE 9 2.10 0.60 0.80 1.00 1.01

EJE C, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01

EJE D, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01

EJE E, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01

EJE F, ENTRE EJE 9 - EJE 10 2.10 0.60 0.80 1.00 1.01

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.60 0.60 0.80 1.00 2.21

EJE 8, ENTRE EJE C - EJE F 11.10 0.60 0.80 1.00 5.33

EJE 9, ENTRE EJE C - EJE F 0.85 0.60 0.80 1.00 0.41

EJE 10, ENTRE EJE C - EJE F 11.10 0.60 0.80 1.00 5.33

ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.60 0.80 1.00 0.58

ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.60 0.80 1.00 0.48

25.27

02.02.03 CONCRETO EN SOBRECIMIENTO f'c=175 kg/cm²

PABELLÓN - ESCALERA

EJE A, ENTRE EJE 1 - EJE 2 3.35 0.15 0.80 1.00 0.40

EJE A, ENTRE EJE 2 - EJE 3 3.38 0.15 0.80 1.00 0.41

EJE A, ENTRE EJE 3 - EJE 4 3.38 0.15 0.80 1.00 0.41

EJE A, ENTRE EJE 4 - EJE 5 3.38 0.15 0.80 1.00 0.41

EJE A, ENTRE EJE 5 - EJE 6 3.38 0.15 0.80 1.00 0.41

EJE A, ENTRE EJE 6 - EJE 7 3.35 0.15 0.80 1.00 0.40

Page 28: Metrado Falso Piso Namo

EJE B, ENTRE EJE 1 - EJE 2 3.35 0.15 0.80 1.00 0.40

EJE B, ENTRE EJE 2 - EJE 3 3.38 0.15 0.80 1.00 0.41

EJE B, ENTRE EJE 3 - EJE 4 3.38 0.15 0.80 1.00 0.41

EJE B, ENTRE EJE 4 - EJE 5 3.38 0.15 0.80 1.00 0.41

EJE B, ENTRE EJE 5 - EJE 6 3.38 0.15 0.80 1.00 0.41

EJE B, ENTRE EJE 6 - EJE 7 3.35 0.15 0.80 1.00 0.40

EJE 1, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 2, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 3, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 4, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 5, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 6, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 7, ENTRE EJE A - EJE B 6.60 0.15 0.80 1.00 0.79

EJE 11, ENTRE EJE G - EJE H 2.70 0.15 0.40 1.00 0.16

EJE 12, ENTRE EJE G - EJE H 2.70 0.15 0.40 1.00 0.16

SS.HH. COCINA

EJE C, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22

EJE D, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22

EJE E, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22

EJE C, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22

EJE D, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22

EJE E, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.60 0.15 0.70 1.00 0.48

EJE 8, ENTRE EJE C - EJE F 6.20 0.15 0.70 1.00 0.65

EJE 9, ENTRE EJE C - EJE F 0.85 0.15 0.70 1.00 0.09

EJE 10, ENTRE EJE C - EJE F 11.10 0.15 0.70 1.00 1.17

ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.15 0.70 1.00 0.13

ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.15 0.70 1.00 0.11

14.68

02.02.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

PABELLÓN - ESCALERA

EJE A, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36

EJE A, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36

EJE B, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36

EJE B, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36

EJE 1, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

Page 29: Metrado Falso Piso Namo

EJE 2, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 3, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 4, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 5, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 6, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 7, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 11, ENTRE EJE G - EJE H 2.70 0.40 2.00 2.16

EJE 12, ENTRE EJE G - EJE H 2.70 0.40 2.00 2.16

SS.HH. COCINA

EJE C, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94

EJE D, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94

EJE E, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94

EJE C, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94

EJE D, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94

EJE E, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94

ENTRE EJE E - EJE F, ENTRE EJE 8 - EJE 10 4.60 0.70 2.00 6.44

EJE 8, ENTRE EJE C - EJE F 6.20 0.70 2.00 8.68

EJE 9, ENTRE EJE C - EJE F 0.85 0.70 2.00 1.19

EJE 10, ENTRE EJE C - EJE F 11.10 0.70 2.00 15.54

ENTRE EJE C - EJE D, ENTRE EJE 8 - EJE 9 1.20 0.70 2.00 1.68

ENTRE EJE D - EJE E, ENTRE EJE 8 - EJE 9 1.00 0.70 2.00 1.40

195.53

02.02.05 CONCRETO f'c=140 kg/cm² GRADAS

(Área calculada con AutoCAD Arquitectural 2013, corte lateral grada)

GRADA VEREDA 0.40 1.30 - 1.00 0.52

02.02.06 ENCOFRADO Y DESENCOFRADO DE GRADAS

0.40 - 2.00 0.80

02.02.07 FALSO PISO E=4" 1:8

(Área calculada con AutoCAD Arquitectural 2013, regiones)

SS. HH., COCINA (no incluye almacén) 45.71 - 1.00 45.71

45.71

02.02.08 CONCRETO f'c=175 kg/cm² LOSA CANAL DE EVACUACIÓN PLUVIAL

(Área calculada con AutoCAD Civil 3D Land Desktop 2013)

PABELLÓN - ESCALERA 52.24 - 0.15 1.00 7.84

SS.HH. COCINA 24.70 - 0.15 1.00 3.71

11.55

02.02.09 CONCRETO f'c=175 kg/cm² DADO DE PROTECCIÓN DE MONTANTE PLUVIAL

PABELLÓN - ESCALERA 0.04 - 1.40 8.00 0.42

SS.HH. COCINA 0.04 - 1.40 4.00 0.21

0.63

Page 30: Metrado Falso Piso Namo

02.02.10 ENCOFRADO Y DESENCOFRADO EN DADO DE PROTECCIÓN DE MONTANTE PLUVIAL

PABELLÓN - ESCALERA 0.55 1.40 8.00 6.16

SS.HH. COCINA 0.55 1.40 4.00 3.08

9.24

02.03.00 CONCRETO ARMADO

02.03.01 CONCRETO EN ZAPATAS f'c=210 kg/cm²

ZAPATAS

ZAPATA (Z-1) 1.70 1.70 0.60 2.00 3.47

ZAPATA (Z-2) 2.00 2.00 0.60 5.00 12.00

ZAPATA (Z-3) 1.90 1.90 0.60 2.00 4.33

ZAPATA (Z-4) 2.20 2.20 0.60 5.00 14.52

ZAPATA (Z-5) 1.50 1.50 0.50 4.00 4.50

ZAPATA (Z-6) 1.00 1.20 0.45 12.00 6.48

45.30

02.03.02 ACERO EN ZAPATAS f'y = 4,200 Kg/cm²

VER PLANILLA #REF!

02.03.03 CONCRETO EN VIGAS DE CIMENTACIÓN f'c=210 kg/cm²

VIGAS DE CIMENTACIÓN

EJE A, ENTRE EJE 1 - EJE 2 3.35 0.30 0.80 1.00 0.80

EJE A, ENTRE EJE 2 - EJE 3 3.38 0.30 0.80 1.00 0.81

EJE A, ENTRE EJE 3 - EJE 4 3.38 0.30 0.80 1.00 0.81

EJE A, ENTRE EJE 4 - EJE 5 3.38 0.30 0.80 1.00 0.81

EJE A, ENTRE EJE 5 - EJE 6 3.38 0.30 0.80 1.00 0.81

EJE A, ENTRE EJE 6 - EJE 7 3.35 0.30 0.80 1.00 0.80

EJE B, ENTRE EJE 1 - EJE 2 3.35 0.30 0.80 1.00 0.80

EJE B, ENTRE EJE 2 - EJE 3 3.38 0.30 0.80 1.00 0.81

EJE B, ENTRE EJE 3 - EJE 4 3.38 0.30 0.80 1.00 0.81

EJE B, ENTRE EJE 4 - EJE 5 3.38 0.30 0.80 1.00 0.81

EJE B, ENTRE EJE 5 - EJE 6 3.38 0.30 0.80 1.00 0.81

EJE B, ENTRE EJE 6 - EJE 7 3.35 0.30 0.80 1.00 0.80

EJE 1, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

EJE 2, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

EJE 3, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

EJE 4, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

EJE 5, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

EJE 6, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

EJE 7, ENTRE EJE A - EJE B 6.60 0.30 0.80 1.00 1.58

20.74

Page 31: Metrado Falso Piso Namo

02.03.04 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN

VIGAS RIOSTRAS Y DE CIMENTACIÓN PABELLÓN - ESCALERA

EJE A, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36

EJE A, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41

EJE A, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36

EJE B, ENTRE EJE 1 - EJE 2 3.35 0.80 2.00 5.36

EJE B, ENTRE EJE 2 - EJE 3 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 3 - EJE 4 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 4 - EJE 5 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 5 - EJE 6 3.38 0.80 2.00 5.41

EJE B, ENTRE EJE 6 - EJE 7 3.35 0.80 2.00 5.36

EJE 1, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 2, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 3, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 4, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 5, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 6, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

EJE 7, ENTRE EJE A - EJE B 6.60 0.80 2.00 10.56

138.64

02.03.05 ACERO EN VIGAS DE CIMENTACIÓN f'y = 4,200 Kg/cm²

VER PLANILLA #REF!

02.03.06 CONCRETO EN SOBRECIMIENTO f'c=175 kg/cm²

EJE F, ENTRE EJE 8 - EJE 9 2.10 0.15 0.70 1.00 0.22

EJE F, ENTRE EJE 9 - EJE 10 2.10 0.15 0.70 1.00 0.22

EJE 8, ENTRE EJE E - EJE F 4.00 0.15 0.70 1.00 0.42

0.86

02.03.07 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

EJE F, ENTRE EJE 8 - EJE 9 2.10 0.70 2.00 2.94

EJE F, ENTRE EJE 9 - EJE 10 2.10 0.70 2.00 2.94

EJE 8, ENTRE EJE E - EJE F 4.00 0.70 2.00 5.60

8.54

02.03.08 ACERO EN SOBRECIMIENTO f'y = 4,200 Kg/cm²

VER PLANILLA #REF!

02.03.09 CONCRETO EN COLUMNAS f'c=210 kg/cm²

COLUMNA (C -1) 0.22 - 8.10 4.00 7.13

COLUMNA (C -2) 0.30 - 8.10 10.00 24.30

COLUMNA (C -3) 0.09 - 7.15 2.00 1.29

COLUMNA (C -3) 0.09 - 6.25 2.00 1.13

COLUMNA (C -4) 0.06 - 3.70 1.00 0.22

Page 32: Metrado Falso Piso Namo

COLUMNA (C -4) 0.06 - 4.15 4.00 1.00

COLUMNA (C -5) 0.07 - 3.70 6.00 1.55

COLUMNA (C -6) 0.09 - 3.70 1.00 0.33

COLUMNA (C -7) 0.02 - 2.80 2.00 0.11

COLUMNA (C -7) 1.02 - 3.80 1.00 3.88

40.94

02.03.10 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

COLUMNA (C -1) 2.20 8.10 4.00 71.28

COLUMNA (C -2) 2.80 8.10 10.00 226.80

COLUMNA (C -3) 1.20 7.15 2.00 17.16

COLUMNA (C -3) 1.20 6.25 2.00 15.00

COLUMNA (C -4) 1.10 3.70 1.00 4.07

COLUMNA (C -4) 1.10 4.15 4.00 18.26

COLUMNA (C -5) 1.20 3.70 6.00 26.64

COLUMNA (C -6) 1.50 3.70 1.00 5.55

COLUMNA (C -7) 0.60 2.80 2.00 3.36

COLUMNA (C -7) 0.60 3.80 1.00 2.28

390.40

02.03.11 ACERO EN COLUMNAS f'y = 4,200 Kg/cm²

VER PLANILLA #REF!

02.03.12 CONCRETO EN COLUMNETAS f'c=175 kg/cm²

PRIMER NIVEL

COLUMNETA Cc 1 0.15 0.25 1.20 12.00 0.54

COLUMNETA Cc 1 0.15 0.25 2.00 12.00 0.90

COLUMNETA Cc 1 0.15 0.25 2.60 12.00 1.17

SEGUNDO NIVEL

COLUMNETA Cc 1 0.15 0.25 1.25 12.00 0.56

COLUMNETA Cc 1 0.15 0.25 2.10 12.00 0.95

COLUMNETA Cc 1 0.15 0.25 3.03 8.00 0.91

COLUMNETA Cc 1 0.15 0.25 3.67 4.00 0.55

VOLADO

COLUMNETA Cc 2 0.15 0.15 1.00 16.00 0.36

5.94

02.03.13 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS

PRIMER NIVEL

COLUMNETA Cc 1 0.80 1.20 12.00 11.52

COLUMNETA Cc 1 0.80 2.00 12.00 19.20

COLUMNETA Cc 1 0.80 2.60 12.00 24.96

SEGUNDO NIVEL

COLUMNETA Cc 1 0.80 1.25 12.00 12.00

COLUMNETA Cc 1 0.80 2.10 12.00 20.16

COLUMNETA Cc 1 0.80 3.03 8.00 19.39

COLUMNETA Cc 1 0.80 3.67 4.00 11.74

VOLADO

COLUMNETA Cc 2 0.60 1.00 18.00 10.80

129.77

Page 33: Metrado Falso Piso Namo

02.03.14 ACERO EN COLUMNETAS f'y = 4,200 kg/cm²

VER PLANILLA #REF!

02.03.15 CONCRETO EN VIGAS f'c=210 kg/cm²

PABELLÓN

PRIMER NIVEL

VP-101

EJE 1, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

EJE 7, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

VP-101 VOLADO

EJE 1, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

EJE 7, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

VP-102

EJE 2, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

EJE 3, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

EJE 4, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

EJE 5, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

EJE 6, ENTRE EJE A - EJE B 6.60 0.25 0.60 1.00 0.99

VP-102 VOLADO

EJE 2, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

EJE 3, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

EJE 4, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

EJE 5, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

EJE 6, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 2.00 0.25 0.40 1.00 0.20

VA-101

EJE A, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40

EJE A, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40

EJE B, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40

EJE B, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40

Vb-101

EJE B', ENTRE EJE 1 - EJE 2 3.35 0.20 0.25 1.00 0.17

EJE B', ENTRE EJE 2 - EJE 3 3.38 0.20 0.25 1.00 0.17

EJE B', ENTRE EJE 3 - EJE 4 3.38 0.20 0.25 1.00 0.17

EJE B', ENTRE EJE 4 - EJE 5 3.38 0.20 0.25 1.00 0.17

EJE B', ENTRE EJE 5 - EJE 6 3.38 0.20 0.25 1.00 0.17

EJE B', ENTRE EJE 6 - EJE 7 3.35 0.20 0.25 1.00 0.17

SEGUNDO NIVEL

VP-201

EJE 1, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

EJE 2, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

EJE 3, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

Page 34: Metrado Falso Piso Namo

EJE 4, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

EJE 5, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

EJE 6, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

EJE 7, ENTRE EJE A - EJE C 7.20 0.25 0.45 1.00 0.81

VP-201 VOLADO

EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 2.10 0.25 0.33 1.00 0.17

EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.70 0.25 0.33 1.00 0.06

VA-201

EJE A, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40

EJE A, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41

EJE A, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40

EJE B, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40

EJE B, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41

EJE B, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40

EJE C, ENTRE EJE 1 - EJE 2 3.35 0.30 0.40 1.00 0.40

EJE C, ENTRE EJE 2 - EJE 3 3.38 0.30 0.40 1.00 0.41

EJE C, ENTRE EJE 3 - EJE 4 3.38 0.30 0.40 1.00 0.41

EJE C, ENTRE EJE 4 - EJE 5 3.38 0.30 0.40 1.00 0.41

EJE C, ENTRE EJE 5 - EJE 6 3.38 0.30 0.40 1.00 0.41

EJE C, ENTRE EJE 6 - EJE 7 3.35 0.30 0.40 1.00 0.40

VOLADO (ambos lados) 1.00 0.30 0.40 3.00 0.36

VA-202

EJE A', ENTRE EJE 1 - EJE 2 3.35 0.15 0.20 1.00 0.10

EJE A', ENTRE EJE 2 - EJE 3 3.38 0.15 0.20 1.00 0.10

EJE A', ENTRE EJE 3 - EJE 4 3.38 0.15 0.20 1.00 0.10

EJE A', ENTRE EJE 4 - EJE 5 3.38 0.15 0.20 1.00 0.10

EJE A', ENTRE EJE 5 - EJE 6 3.38 0.15 0.20 1.00 0.10

EJE A', ENTRE EJE 6 - EJE 7 3.35 0.15 0.20 1.00 0.10

EJE C', ENTRE EJE 1 - EJE 2 3.35 0.15 0.20 1.00 0.10

EJE C', ENTRE EJE 2 - EJE 3 3.38 0.15 0.20 1.00 0.10

EJE C', ENTRE EJE 3 - EJE 4 3.38 0.15 0.20 1.00 0.10

EJE C', ENTRE EJE 4 - EJE 5 3.38 0.15 0.20 1.00 0.10

Page 35: Metrado Falso Piso Namo

EJE C', ENTRE EJE 5 - EJE 6 3.38 0.15 0.20 1.00 0.10

EJE C', ENTRE EJE 6 - EJE 7 3.35 0.15 0.20 1.00 0.10

VOLADO (ambos lados) 1.00 0.15 0.20 2.00 0.06

ESCALERA

VE-101

EJE H, ENTRE EJE 11 - EJE 12 4.40 0.30 0.55 1.00 0.73

VE-102

EJE G, ENTRE EJE 11 - EJE 12 4.40 0.30 0.45 1.00 0.59

VE-103

EJE 11, ENTRE EJE H - EJE G 2.70 0.30 0.20 1.00 0.16

VE-103

EJE 12, ENTRE EJE H - EJE G 2.70 0.30 0.20 1.00 0.16

VP-101 VOLADO (verificar descripción)

EJE 11, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 2.00 0.30 0.40 1.00 0.24

EJE 12, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 2.00 0.30 0.40 1.00 0.24

VE-201

EJE H, ENTRE EJE 11 - EJE 12 4.90 0.30 0.55 1.00 0.81

VE-201

EJE G, ENTRE EJE 11 - EJE 12 4.90 0.30 0.55 1.00 0.81

VE-201

EJE 11, ENTRE EJE H - EJE G 2.70 0.30 0.30 1.00 0.24

VE-201

EJE 12, ENTRE EJE H - EJE G 2.70 0.30 0.30 1.00 0.24

VE-201 VOLADO

EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.00 0.30 0.25 1.00 0.15

EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.00 0.30 0.25 1.00 0.15

VE-201 VOLADO

EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.35 0.30 0.25 1.00 0.18

EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 2.35 0.30 0.25 1.00 0.18

VE-202

EJE H', ENTRE EJE 11 - EJE 12 4.90 0.15 0.20 1.00 0.15

EJE G', ENTRE EJE 11 - EJE 12 4.90 0.15 0.20 1.00 0.15

SS.HH. - COCINA

VA-103

EJE C, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.4*2+0.3)) 6.22 0.15 0.30 1.00 0.28

EJE D, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 6.32 0.15 0.30 1.00 0.28

EJE E, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 6.32 0.15 0.30 1.00 0.28

EJE F, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 6.32 0.15 0.30 1.00 0.28

EJE 8, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.15)) 10.60 0.15 0.30 1.00 0.48

EJE 9, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. 4*0.15) 11.05 0.15 0.30 1.00 0.50

EJE 10, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.45)) 10.30 0.15 0.30 1.00 0.46

VA-104

EJE 8', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 11.05 0.15 0.20 1.00 0.33

EJE 10', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 11.05 0.15 0.20 1.00 0.33

38.85

02.03.16 ENCOFRADO Y DESENCOFRADO EN VIGAS

PABELLÓN

PRIMER NIVEL

VP-101

Page 36: Metrado Falso Piso Namo

EJE 1, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 7, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

Page 37: Metrado Falso Piso Namo

VP-101 VOLADO

EJE 1, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 7, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

VP-102

EJE 2, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 3, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 4, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 5, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

EJE 6, ENTRE EJE A - EJE B 1.45 6.60 1.00 9.57

VP-102 VOLADO

EJE 2, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 3, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 4, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 5, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

EJE 6, ENTRE EJE A - EJE B (altura media = (0.25+0.55)/2)) 1.05 2.00 1.00 2.10

VA-101

EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

Vb-101

EJE B', ENTRE EJE 1 - EJE 2 0.70 3.35 1.00 2.35

EJE B', ENTRE EJE 2 - EJE 3 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 3 - EJE 4 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 4 - EJE 5 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 5 - EJE 6 0.70 3.38 1.00 2.37

EJE B', ENTRE EJE 6 - EJE 7 0.70 3.35 1.00 2.35

SEGUNDO NIVEL

VP-201

EJE 1, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 2, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 3, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 4, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 5, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 6, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

EJE 7, ENTRE EJE A - EJE C 1.15 7.20 1.00 8.28

VP-201 VOLADO

EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

Page 38: Metrado Falso Piso Namo

EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

Page 39: Metrado Falso Piso Namo

EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 2.10 1.00 1.89

EJE 1, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 2, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 3, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 4, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 5, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 6, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

EJE 7, ENTRE EJE A - EJE B (altura media = (0.20+0.45)/2)) 0.90 0.70 1.00 0.63

VA-201

EJE A, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE A, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE A, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE B, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE B, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

EJE C, ENTRE EJE 1 - EJE 2 1.10 3.35 1.00 3.69

EJE C, ENTRE EJE 2 - EJE 3 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 3 - EJE 4 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 4 - EJE 5 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 5 - EJE 6 1.10 3.38 1.00 3.72

EJE C, ENTRE EJE 6 - EJE 7 1.10 3.35 1.00 3.69

VOLADO (ambos lados) 1.10 1.00 3.00 3.30

VA-202

EJE A', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84

EJE A', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86

EJE A', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84

EJE C', ENTRE EJE 1 - EJE 2 0.55 3.35 1.00 1.84

EJE C', ENTRE EJE 2 - EJE 3 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 3 - EJE 4 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 4 - EJE 5 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 5 - EJE 6 0.55 3.38 1.00 1.86

EJE C', ENTRE EJE 6 - EJE 7 0.55 3.35 1.00 1.84

VOLADO (ambos lados) 0.55 1.00 2.00 1.10

ESCALERA

VE-101

EJE H, ENTRE EJE 11 - EJE 12 1.40 4.40 1.00 6.16

VE-102

EJE G, ENTRE EJE 11 - EJE 12 1.20 4.40 1.00 5.28

VE-103

EJE 11, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89

Page 40: Metrado Falso Piso Namo

VE-103

EJE 12, ENTRE EJE H - EJE G 0.70 2.70 1.00 1.89

VP-101 VOLADO

EJE 11, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20

EJE 12, ENTRE EJE H - EJE G (altura media = (0.25+0.55)/2)) 1.10 2.00 1.00 2.20

VE-201

EJE H, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86

VE-201

EJE G, ENTRE EJE 11 - EJE 12 1.40 4.90 1.00 6.86

VE-201

EJE 11, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43

VE-201

EJE 12, ENTRE EJE H - EJE G 0.90 2.70 1.00 2.43

VE-201 VOLADO

EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60

EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.00 1.00 1.60

VE-201 VOLADO

EJE H, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88

EJE G, ENTRE EJE 11 - EJE 12 (altura media = (0.30+0.20)/2)) 0.80 2.35 1.00 1.88

VE-202

EJE H', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70

EJE G', ENTRE EJE 11 - EJE 12 0.55 4.90 1.00 2.70

SS.HH. - COCINA

VA-103

EJE C, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.4*2+0.3)) 0.75 6.22 1.00 4.67

EJE D, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74

EJE E, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74

EJE F, ENTRE EJE 8 - EJE 10 (long. de eje 7.32-long. de col. (0.3*2+0.4)) 0.75 6.32 1.00 4.74

EJE 8, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.15)) 0.75 10.60 1.00 7.95

EJE 9, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. 4*0.15) 0.75 11.05 1.00 8.29

EJE 10, ENTRE EJE C - EJE F (long. de eje 11.65-long. de col. (0.3*3+0.45)) 0.75 10.30 1.00 7.73

VA-104

EJE 8', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08

EJE 10', ENTRE EJE C - EJE F (long. de eje 11.65-long. de base vigas 4*0.15) 0.55 11.05 1.00 6.08

414.99

02.03.17 ACERO EN VIGAS f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.03.18 CONCRETO EN VIGUETAS f'c=175 kg/cm²

EJE A, ENTRE EJE 1 - EJE 7 (1° y 2° nivel) 3.35 0.15 0.10 12.00 0.60

EJE B, ENTRE EJE 1 - EJE 8 (1° y 2° nivel) 2.30 0.15 0.10 11.00 0.38

EJE B, ENTRE EJE 2 - EJE3 (2° nivel) 3.35 0.15 0.10 1.00 0.05

EJE 1, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30

EJE 3, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30

EJE 5, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30

EJE 7, ENTRE EJE A - EJE B (1° nivel) 6.60 0.15 0.15 2.00 0.30

EJE 1, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30

EJE 4, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30

EJE 5, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30

Page 41: Metrado Falso Piso Namo

EJE 7, ENTRE EJE A - EJE B (2° nivel) 6.75 0.15 0.15 2.00 0.30

Page 42: Metrado Falso Piso Namo

VOLADO

ENTRE EJE 1 - EJE 2 4.35 0.15 0.10 1.00 0.07

ENTRE EJE 2 - EJE 3 4.20 0.15 0.10 1.00 0.06

ENTRE EJE 3 - EJE 4 4.20 0.15 0.10 1.00 0.06

ENTRE EJE 4 - EJE 5 4.20 0.15 0.10 1.00 0.06

ENTRE EJE 5 - EJE 6 4.20 0.15 0.10 1.00 0.06

ENTRE EJE 6 - EJE 7 4.35 0.15 0.10 1.00 0.07

ENTRE EJE 11- EJE 12 5.00 0.15 0.10 1.00 0.08

EJE 1 2.00 0.15 0.10 1.00 0.03

EJE 12 2.00 0.15 0.10 1.00 0.03

3.95

02.03.19 ENCOFRADO Y DESENCOFRADO EN VIGUETAS

EJE A, ENTRE EJE 1 - EJE 7 (1° y 2° nivel) 0.20 3.35 12.00 8.04

EJE B, ENTRE EJE 1 - EJE 8 (1° y 2° nivel) 0.20 2.30 11.00 5.06

EJE B, ENTRE EJE 2 - EJE3 (2° nivel) 0.20 3.35 1.00 0.67

EJE 1, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 3, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 5, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 7, ENTRE EJE A - EJE B (1° nivel) 0.30 6.60 2.00 3.96

EJE 1, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

EJE 4, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

EJE 5, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

EJE 7, ENTRE EJE A - EJE B (2° nivel) 0.30 6.75 2.00 4.05

VOLADO

ENTRE EJE 1 - EJE 2 0.20 4.35 1.00 0.87

ENTRE EJE 2 - EJE 3 0.20 4.20 1.00 0.84

ENTRE EJE 3 - EJE 4 0.20 4.20 1.00 0.84

ENTRE EJE 4 - EJE 5 0.20 4.20 1.00 0.84

ENTRE EJE 5 - EJE 6 0.20 4.20 1.00 0.84

ENTRE EJE 6 - EJE 7 0.20 4.35 1.00 0.87

ENTRE EJE 11- EJE 12 0.20 5.00 1.00 1.00

EJE 1 0.20 2.00 1.00 0.40

EJE 12 0.20 2.00 1.00 0.40

52.71

02.03.20 ACERO EN VIGUETAS f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.03.21 CONCRETO EN DINTEL f'c=175 kg/cm²

EJE 8, ENTRE EJE C - EJE F 10.60 0.15 0.20 1.00 0.32

EJE 10, ENTRE EJE E - EJE F 1.65 0.15 0.20 1.00 0.05

0.37

02.03.22 ENCOFRADO Y DESENCOFRADO EN DINTEL

EJE 8, ENTRE EJE C - EJE F 0.55 10.60 1.00 5.83

EJE 10, ENTRE EJE E - EJE F 0.55 1.65 1.00 0.91

6.74

Page 43: Metrado Falso Piso Namo

02.03.23 ACERO EN DINTEL f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.03.24 CONCRETO EN ESCALERA f'c=210 kg/cm²

PRIMER TRAMO (área lateral*ancho) 1.15 2.20 1.00 2.53

SEGUNDO TRAMO (área lateral*ancho) 1.30 2.20 1.00 2.86

5.39

02.03.25 ENCOFRADO Y DESENCOFRADO EN ESCALERA

PRIMER TRAMO 4.85 2.20 1.00 10.67

SEGUNDO TRAMO 4.85 2.20 1.00 10.67

LATERAL PRIMER TRAMO 1.15 1.00 1.15

LATERAL SEGUNDO TRAMO 1.30 1.00 1.30

CONTRAPASOS PRIMER TRAMO 2.20 0.17 10.00 3.74

CONTRAPASOS SEGUNDO TRAMO 2.20 0.17 10.00 3.74

31.27

02.03.26 ACERO EN ESCALERA f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.03.27 CONCRETO EN LOSA ALIGERADA f'c=210 kg/cm²

VIGUETAS PRIMER NIVEL

ENTRE EJE A - EJE B y ENTRE EJE 1 - EJE 2 3.93 0.10 0.20 21.00 1.65

ENTRE EJE A - EJE B y ENTRE EJE 2 - EJE 3 3.95 0.10 0.20 21.00 1.66

ENTRE EJE A - EJE B y ENTRE EJE 3 - EJE 4 3.95 0.10 0.20 21.00 1.66

ENTRE EJE A - EJE B y ENTRE EJE 4 - EJE 5 3.95 0.10 0.20 21.00 1.66

ENTRE EJE A - EJE B y ENTRE EJE 5 - EJE 6 3.95 0.10 0.20 21.00 1.66

ENTRE EJE A - EJE B y ENTRE EJE 6 - EJE 7 3.93 0.10 0.20 21.00 1.65

ENTRE EJE G - EJE H y ENTRE EJE 11 - EJE 9 4.40 0.10 0.20 4.00 0.35

LOSA PRIMER NIVEL

ENTRE EJE A - EJE B y ENTRE EJE 1 - EJE 2 3.93 9.00 0.05 1.00 1.77

ENTRE EJE A - EJE B y ENTRE EJE 2 - EJE 3 3.95 9.00 0.05 1.00 1.78

ENTRE EJE A - EJE B y ENTRE EJE 3 - EJE 4 3.95 9.00 0.05 1.00 1.78

ENTRE EJE A - EJE B y ENTRE EJE 4 - EJE 5 3.95 9.00 0.05 1.00 1.78

ENTRE EJE A - EJE B y ENTRE EJE 5 - EJE 6 3.95 9.00 0.05 1.00 1.78

ENTRE EJE A - EJE B y ENTRE EJE 6 - EJE 7 3.93 9.00 0.05 1.00 1.77

ENTRE EJE G - EJE H y ENTRE EJE 11 - EJE 9 4.40 2.00 0.05 1.00 0.44

21.39

02.03.28 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA

LOSA PRIMER NIVEL

PABELLÓN 23.66 9.00 1.00 212.94

ESCALERA 4.40 2.00 1.00 8.80

221.74

Page 44: Metrado Falso Piso Namo

02.03.29 LADRILLO HUECO DE COCRETO H=20 cm PARA LOSA ALIGERADA

LOSA PRIMER NIVEL 2,217.00

02.03.30 ACERO EN LOSA ALIGERADA f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.03.31 CONCRETO EN MURO ESCALERA f'c=210 kg/cm²

PRIMER TRAMO 2.70 0.10 1.05 1.00 0.28

SEGUNDO TRAMO 2.70 0.10 1.05 1.00 0.28

0.56

02.03.32 ENCOFRADO Y DESENCOFRADO EN MURO ESCALERA

PRIMER TRAMO 2.70 1.05 2.00 5.67

SEGUNDO TRAMO 2.70 1.05 2.00 5.67

11.34

02.03.33 ACERO EN MURO ESCALERA f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.03.34 CONCRETO f'c=175 kg/cm² MUROS CANAL DE EVACUACIÓN PLUVIAL

(Perímetro medio calculado con AutoCAD Civil 3D Land Desktop 2013)

PABELLÓN - ESCALERA 87.05 0.35 0.10 2.00 6.09

SS.HH. COCINA 41.17 0.35 0.10 2.00 2.88

8.97

02.03.35 ENCOFRADO Y DESENCOFRADO EN MUROS CANAL DE EVACUACIÓN PLUVIAL

PABELLÓN - ESCALERA 87.05 0.35 2.00 60.94

SS.HH. COCINA 41.17 0.35 2.00 28.82

89.76

02.03.36 ACERO EN MUROS CANAL DE EVACUACIÓN PLUVIAL f'y = 4,200 kg/cm²

VER PLANILLAS #REF!

02.04.00 ESTRUCTURA DE MADERA

02.04.01 MADERA TORNILLO PARA LA ARMADURA DE LA COBERTURA (considerar vigas de 4"x8" y correas de 3"x2")

PABELLÓN (S = 19.5%) 27.15 6.00 1.00 162.90

PABELLÓN (S = 23%) 27.15 4.75 1.00 128.96

ESCALERA (S = 19.5%) 5.70 6.00 1.00 34.20

ESCALERA (S = 27%) 5.70 2.15 1.00 12.26

338.32

02.04.02 MADERA TORNILLO PARA LA ARMADURA DE LA COBERTURA (considerar vigas de 4"X8"y correas de 2"x1.5")

SS.HH.-COCINA (S = 19.0%) 12.05 3.45 1.00 41.57

SS.HH.-COCINA (S = 17.0%) 12.05 4.00 1.00 48.20

89.77

Page 45: Metrado Falso Piso Namo

02.04.03 COBERTURA CON ETERNIT- TEJA ANDINA

PABELLÓN -ESCALERA 338.32

SS.HH.-COCINA 89.77

428.09

02.04.04 CUMBRERA ARTICULADA

PABELLÓN -ESCALERA 32.85 1.00 32.85

SS.HH.-COCINA 12.05 1.00 12.05

44.90

02.05.00 VARIOS

02.05.01 CURADO DE CONCRETO

(considerando las áreas de las caras encofradas de las estructuras)

ENCOFRADO Y DESENCOFRADO EN COLUMNAS 390.40

ENCOFRADO Y DESENCOFRADO EN COLUMNETAS 129.77

ENCOFRADO Y DESENCOFRADO EN VIGAS 414.99

ENCOFRADO Y DESENCOFRADO EN VIGUETAS 52.71

ENCOFRADO Y DESENCOFRADO EN DINTEL 6.74

ENCOFRADO Y DESENCOFRADO EN ESCALERA 31.27

ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA 221.74

ENCOFRADO Y DESENCOFRADO EN MURO ESCALERA 11.34

1,258.96

02.05.02 JUNTAS SÍSMICAS e=1"

PRIMER NIVEL

COLUMNETA Cc 1 1.30 0.15 12.00 2.34

COLUMNETA Cc 1 2.10 0.15 10.00 3.15

SEGUNDO NIVEL

COLUMNETA Cc 1 1.25 0.15 12.00 2.25

COLUMNETA Cc 1 2.10 0.15 7.00 2.21

COLUMNETA Cc 1 3.03 0.15 8.00 3.64

13.59