OBRA : PUENTE CARROZABLE CAHUISH (SUPERESTRUCTURA) FECHA : AGOSTO 2005 HECHO : JB PART. Descripción Cantidad ACERO LONGITUD TOTAL Diametro SUB. TOT (Kg) Varillas Longitud TOTAL (Kg) VIGAS PRINCIPAL 04.01.03 ACERO f'y = 4200 Kg/cm2 p/viga 598.63 ACERO(+) 3 D=1" 2 1" 3 8.00 48 192.00 3 D=1" 2 1" 3 6.00 36 144.00 2 D=1/2" 2 1/2" 2 4.00 16 16.32 ACERO TORSION 2 D=1/2" 2 1/2" 2 8.00 32 32.64 ACERO(-) 2 D=1/2" 2 1/2" 4 8.00 64 65.28 ESTRIBOS D=3/8" 2 3/8" 55 1.90 209.00 148.39 VIGA DIAGRAGMA 04.02.03 ACERO f'y = 4200 Kg/cm2 237.67 ACERO(+) 2 D=1/2" 4 1/2" 2 2.60 20.8 21.22 TORCION 2 D=1/2" 4 1/2" 2 2.60 20.8 21.22 ACERO(-) 2 D=1/2" 4 1/2" 2 2.60 20.8 21.22 ESTRIBOS D=3/8" 2 3/8" 57 2.15 245.10 174.02 LOSAS DE CONCRETO 04.03.03 ACERO f'y = 4200 Kg/cm2 1325.22 CAPA SUPERIOR TRASNV. D=3/8"@0.25 1 3/8" 61 3.00 183.00 129.93 LONG. D=1/2"@0.20 4 1/2" 15 8.00 488 497.76 CAPA INFERIOR TRASNV. D=3/8"@0.25 1 3/8" 61 3.00 183.00 129.93 LONG. D=1/2"@0.20 4 1/2" 15 8.00 488 497.76 BORDES 2 3/8" 4 8.00 64.00 45.44 2 1/4" 61 0.80 98 24.40 UBICACIÓN : DIST: JANGAS PROV: HUARAZ f 1/4 " f 3/8 " f 1/2 " f 5/8 " f 3/4 " f 1"

description

BUENO

Transcript of Metrado Puente Jalinca

Page 1: Metrado Puente Jalinca

OBRA : PUENTE CARROZABLE CAHUISH (SUPERESTRUCTURA) FECHA : AGOSTO 2005

HECHO : JB

PART. Descripción Cantidad

ACERO LONGITUD TOTAL

DiametroN° SUB. TOT (Kg)

Varillas Longitud TOTAL (Kg)

VIGAS PRINCIPAL04.01.03 ACERO f'y = 4200 Kg/cm2 p/viga 598.63

ACERO(+)3 D=1" 2 1" 3 8.00 48 192.003 D=1" 2 1" 3 6.00 36 144.00

2 D=1/2" 2 1/2" 2 4.00 16 16.32

ACERO TORSION2 D=1/2" 2 1/2" 2 8.00 32 32.64

ACERO(-)2 D=1/2" 2 1/2" 4 8.00 64 65.28

ESTRIBOSD=3/8" 2 3/8" 55 1.90 209.00 148.39

VIGA DIAGRAGMA04.02.03 ACERO f'y = 4200 Kg/cm2 237.67

ACERO(+)2 D=1/2" 4 1/2" 2 2.60 20.8 21.22

TORCION2 D=1/2" 4 1/2" 2 2.60 20.8 21.22

ACERO(-)2 D=1/2" 4 1/2" 2 2.60 20.8 21.22

ESTRIBOSD=3/8" 2 3/8" 57 2.15 245.10 174.02

LOSAS DE CONCRETO04.03.03 ACERO f'y = 4200 Kg/cm2 1325.22

CAPA SUPERIORTRASNV. D=3/8"@0.25 1 3/8" 61 3.00 183.00 129.93LONG. D=1/2"@0.20 4 1/2" 15 8.00 488 497.76

CAPA INFERIORTRASNV. D=3/8"@0.25 1 3/8" 61 3.00 183.00 129.93LONG. D=1/2"@0.20 4 1/2" 15 8.00 488 497.76

BORDES2 3/8" 4 8.00 64.00 45.442 1/4" 61 0.80 98 24.40

UBICACIÓN : DIST: JANGAS PROV: HUARAZ

f 1/4 " f 3/8 " f 1/2 " f 5/8 " f 3/4 " f 1"

Page 2: Metrado Puente Jalinca

PLANILLA DE METRADOSOBRA PUENTE PEATONAL JAULINCA FECHA : ABRIL 2007

YAUYA - CARLOS F. FITZCARRALD - ANCASH HECHO : JB

PART. DESCRIPCION UND CANT. AREADIMENSIONES CANTIDAD

LARGO ANCH0 ALTO PARCIAL TOTAL

01.00 OBRAS PRELIMINARES

01.00 LIMPIEZA DE ZONA DE TRABAJO 1 20.00 6.00 120.00 120.00

01.02 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO M2 120.00PUENTE 1 10.00 6.00 60.00FALSO PUENTE 1 10.00 6.00 60.00

01.03 CASETA-ALMACEN M2 1 6.00 7.00 42.00 42.00

01.04 CARTEL DE IDENTIFICACION DE OBRA UND 1 1.00 1.00 1.00

01.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1 1.00 1.00 252.03

02.00 MOVIMIENTO DE TIERRAS

02.01 EXCAVACION ROCA SUELTA A MANO M3 23.568(ESTRIBO LADO IZQUIERDO)

Area de la base del estribo 1 19.64 1.2 23.568

02.01 EXCAVACION EN ROCA DURA m3 1.08(ESTRIBO LADO DERECHO - CONSTRUCCION CAJUELA) 1 3.00 0.60 0.60 1.08

02.02 RELLENO CON MATERIAL DE PRESTAMO m3 48.62(ESTRIBO LADO IZQUIERDO)

area de perfil longitudinal del rellenoç 1 8.84 5.50 48.62 48.62

03.00 CONCRETO SIMPLE

03.01. ESTRIBOS

03.01.01 ENCOFRADO Y DESENCOFRADO ESTRIBOS M2 37.06 ESTRIBO IZQUIERDO

CARA LATERAL 2 6.53 13.06CARA TRASNVERSAL 2 4.00 3.00 24.00

03.01.02 CONCRETO CICLOPEO F'C=175 KG/CM2+30% P.G M3 19.59 19.59 ESTRIBO IZQUIERDO

Area secccion estribo=6.53 1 6.53 3.00 19.59

03.02 ALETAS

03.02.01 ENCOFRADO Y DESENCOFRADO DE ALETAS M2 72.54 72.54ALETAS (LADO IZQUIERDO)

SECCION TRASVERS. PROMEDIO ALETA Ap=4.83m2 2 4.83 9.66SECCION LONG. ALETA A=14.24m2 4 14.24 56.96

COSTADOS A=2.96m2 2 2.96 5.92

03.01.02 CONCRETO CICLOPEO F'C=175 KG/CM2+30% P.G M3 28.98 28.98ALETAS (LADO IZQUIERDO)

SECCION TRASVERS. PROMEDIO ALETA Ap=4.83m2 2 4.83 3.00 28.98

UBICACIÓN :

Page 3: Metrado Puente Jalinca

PLANILLA DE METRADOSOBRA PUENTE PEATONAL JAULINCA FECHA : ABRIL 2007

YAUYA - CARLOS F. FITZCARRALD - ANCASH HECHO : JB

PART. DESCRIPCION UND CANT. AREADIMENSIONES CANTIDAD

LARGO ANCH0 ALTO PARCIAL TOTAL

UBICACIÓN :

04.00 CONCRETO ARAMADO - SUPER ESTRUCTURA DE C°A°

04.01 VIGA PRINCIPAL

04.01.01 CONCRETO f'c = 280 Kg/cm2 M3 2.16VIGAS PRINCIPALES 2 8.00 0.30 0.45 2.16

04.01.02 ENCOFRADO Y DESENCOFRADO M2 20.04LONGITUD 4 8.00 0.45 14.40BASE 2 8.00 0.30 4.80COSTADOS 4 0.30 0.70 0.84

04.01.03 ACERO f'y = 4200 Kg/cm2 KG 598.63

04.02 VIGA DIAGRAGMA

04.02.01 CONCRETO f'c = 280 Kg/cm2 M3 0.56VIGA DIAFRAGMA 4 1.75 0.20 0.40 0.56

04.02.02 ENCOFRADO Y DESENCOFRADO M2 7.00LADOS 8 1.75 0.40 5.60BASE 4 1.75 0.20 1.40

04.02.03 ACERO f'y = 4200 Kg/cm2 KG 237.67

04.03. LOSA DE CONCRETO ARMADO

04.03.01 CONCRETO f'c = 280 Kg/cm2 M3 3.78LOSA 1 8.00 2.85 0.15 3.42BORDES 2 8.00 0.15 0.15 0.36

04.03.02 ENCOFRADO Y DESENCOFRADO M2 28.46BASE 1 8.00 2.85 22.80COSTADOS 2 2.85 0.15 0.86BORDES 4 8.00 0.15 4.80

04.03.03 ACERO f'y = 4200 Kg/cm2 KG 1325.22

05.0 OBRA FALSA

05.01 EXCAVACION EN ROCA DURA P/DADOS m3 4.59ESTRIBO DERECHO 1 0.64 3.00 1.92

ESTRIBO IZQUIERDO 1 0.89 3.00 2.67

05.02 FALSO PUENTE M 7.001 7.00 7.00

Page 4: Metrado Puente Jalinca

PLANILLA DE METRADOSOBRA PUENTE PEATONAL JAULINCA FECHA : ABRIL 2007

YAUYA - CARLOS F. FITZCARRALD - ANCASH HECHO : JB

PART. DESCRIPCION UND CANT. AREADIMENSIONES CANTIDAD

LARGO ANCH0 ALTO PARCIAL TOTAL

UBICACIÓN :

06.0 VARIOS

06.01 BARANDAS DE TUBERIA F°G°, MONTAJE, COLOCACION ML 16.002 C/U DE 11.40 ML 2 8.00 16.00

06.02 APOYO DE NEOPRENO UND 2.002 2.00

06.03 APOYOS FIJOS Y ANCLAJE TIPO DOWEL KG D=5/8" 10.958 1.55 1.40 10.95

06.04 TUBO DE DRENAJE M 4.008 0.50 4.00

06.05 JUNTA DE DILATACION M 6.002 3.00 6.00

06.06 PRUEBAS DE CONCRETO UND 4.00VIGAS PRINCIPALES 2 2.00LOSA 1 1.00VIGA DIAFRAGMA 1 1.00

07.0 FLETE