RESUMEN DE METRADOS DEL NUEVO EXPEDIENTE
Item Descripcion Unidad TOTAL
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION MASIVA C/ MAQUINARIA m3 78,867.13
02.01.02 EXACAVACION DE ZANJAS Y ZAPATAS m3 1,693.59
02.01.03 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 12,649.70
02.01.04 NIVELACION INTERIOR Y APISONADO C/MATERIAL DE PRESTAMO (AFIRMADO) m2 8,189.79
02.01.05 ELIMININACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 79,189.52
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SUB CIMIENTOS Y SOLADOS
02.02.01.01 SUBCIMIENTO / SUBZAPATA, MEZCLA 1:12+30%PG m3 79.18
02.02.01.02 SOLADO DE CONCRETO E= 4" MEZCLA C:H 1:1O f¨c=100 kg/cm2 m2 3,399.41
02.02.02 CIMIENTOS
02.02.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G m3 433.89
02.02.03 SOBRECIMIENTOS
02.02.03.01 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M m3 65.58
02.02.03.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 852.52
02.02.04 FALSO PISO
02.02.04.01 FALSO PISO C:H 1:8 E = 10 cm m2 2,507.86
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS F`C = 280 KG/CM2 m3 313.82
02.03.01.02 ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 15,264.89
02.03.02 VIGAS DE CIMENTACION
02.03.02.01 VIGAS DE CIMENTACION CONCRETO F`C = 280 KG/CM2 m3 153.90
02.03.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 879.46
02.03.02.03 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 kg 15,544.90
02.03.03 COLUMNAS
02.03.03.01 COLUMNAS CONCRETO F`C = 280 KG/CM2 m3 423.56
02.03.03.03 COLUMNAS ENCOFRADO Y DESENCOFRADO m2 4,029.11
02.03.03.05 COLUMNAS - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 108,805.88
02.03.04 PLACAS
02.03.04.01 PLACAS CONCRETO F`C = 280 KG/CM2 m3 2,075.65
02.03.04.02 PLACAS ENCOFRADO Y DESENCOFRADO m2 18,347.91
02.03.04.03 PLACAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 290,567.87
02.03.05 MUROS DE CONTENCION
02.03.05.01 MUROS DE CONTENCION CONCRETO F`C = 280 KG/CM2 m3 3,371.29
02.03.05.02 MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO m2 8,009.61
02.03.05.03 MUROS DE CONTENCION ACERO DE REFUERZO Fy=4200 kg/cm2 kg 268,973.86
02.03.06 VIGAS
02.03.06.01 VIGAS CONCRETO F`C = 280 KG/CM2 m3 1,297.99
02.03.06.03 VIGAS ENCOFRADO Y DESENCOFRADO m2 7,633.68
02.03.06.05 VIGAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 206,609.14
02.03.07 LOSAS MACIZAS
02.03.07.01 LOSAS MACIZAS CONCRETO F`C = 280 KG/CM2 m3 762.95
02.03.07.02 LOSAS MACIZAS ENCOFRADO Y DESENCOFRADO m2 4,850.46
02.03.07.03 LOSAS MACIZAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 63,118.06
Página 2
RESUMEN DE METRADOS DEL NUEVO EXPEDIENTE
Item Descripcion Unidad TOTAL
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.03.08 LOSAS ALIGERADAS EN UN SENTIDO
02.03.08.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 m3 147.67
Página 3
RESUMEN DE METRADOS DEL NUEVO EXPEDIENTE
Item Descripcion Unidad TOTAL
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.03.08.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO m2 1,330.81
02.03.08.03 LOSA ALIGERADA ACERO DE REFUERZO Fy=4200 kg/cm2 kg 9,305.65
02.03.08.04 LOSA ALIGERADA LADRILLO HUECO 15 x 30 x 30 cm. und 11,311.87
02.03.09 LOSAS ALIGERADAS EN DOS SENTIDOS
02.03.09.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 m3 2,076.26
02.03.09.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO m2 14,076.59
02.03.09.03 LOSA ALIGERADA ACERO DE REFUERZO Fy=4200 kg/cm2 kg 270,003.44
02.03.09.04 LOSA ALIGERADA LADRILLO HUECO 20 x 30 x 30 cm. und 91,497.83
02.03.12 POZOS SUMIDEROS
02.03.12.01 POZOS SUMIDEROS CONCRETO F`C = 210 KG/CM2 m3 147.04
02.03.12.02 POZOS SUMIDEROS ENCOFRADO Y DESENCOFRADO m2 880.46
02.03.12.03 POZOS SUMIDEROS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 10,737.73
02.03.13 DUCTO DE COCINA
02.03.13.01 DUCTO DE COCINA CONCRETO F`C = 210 KG/CM2 m3 49.74
02.03.13.02 DUCTO DE COCINA ENCOFRADO Y DESENCOFRADO m2 195.34
02.03.13.03 DUCTO DE COCINA ACERO DE REFUERZO Fy=4200 kg/cm2 kg 2,673.69
PARTIDAS ADICIONALES
MOVIMIENTO DE TIERRA
NIVELACION Y COMPACTACION DE PLATEA m2 4,528.12OBRAS DE CONCRETO SIMPLE
SOLADO DE PLATEA
SOLADO DE CONCRETO E= 4" F'C=100KG/CM2 m2 4,528.12
PLATEA
CONCRETO PLATEA DE CIMENTACIÓN F´C= 280 KG/CM2 m3 2,263.80
ENCOFRADO Y DESENCOFRADO DE PLATEA DE CIMENTACIÓN. m2 302.83
ACERO CORRUGADO PARA PLATEA DE CIMENTACIÓN FY=4200 Kg/cm2 kg 201,593.04
PEDESTALES
CONCRETO PEDESTALES F´C= 280 KG/CM2 m3 111.94
ENCOFRADO Y DESENCOFRADO DE PEDESTALES m2 210.36
ACERO CORRUGADO PEDESTALES FY=4200 Kg/cm2. kg 8,756.44
POLIESTIRENO EXPANDIDO EN PLATEA
RELLENO CON POLIESTIRENO EXPANDIDO m3 #REF!
PISO CON MALLA ELECTROSOLDADA
CONCRETO PARA PISO REFORZADO FC=210 Kg/cm2 m3 623.59
ENCOFRADO Y DESENCOFRADO PARA PISO REFORZADO m2 306.19
MALLA ELECTROSOLDADA m2 4,864.03
CALZADURAS
MOVIMIENTO DE TIERRAS
EXCAVACION NICHO DE CALZADURAS H=0.60, B=0.50 MT m3 22.50
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA INCLUYE ACARREO MANUAL m3 29.25
OBRAS DE CONCRETO SIMPLE
CONCRETO MEZCLA 1:8 CEMENTO -HORMIGON+30%PM m3 22.50
ENCOFRADO Y DESENCOFRADO CALZADURAS m2 45.00
PICADO DE CACHIMBAS DE CONCRETO ml 45.00
APUNTALAMIENTO DE MURO DE ADOBE
APUNTALAMIENTO MURO DE ADOBE ml 45.00
Página 4
RESUMEN DE METRADOS DEL NUEVO EXPEDIENTE
Item Descripcion Unidad TOTAL
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
COBERTURA METALICA
TIJERAL V-01 (BRIDAS TC 75x75x4.5mm) H = 0.45 ml ml 902.41
TIJERAL V-02 (BRIDAS TC 75x75x4.5mm) H = 0.45 ml ml 244.85
TIJERAL VA (TC 75x75xx3mm) H = 0.45 ml ml 572.71
TIJERAL V-03 (BRIDAS TC 100x100x4.5mm) H = 0.45 ml ml 14.61
TIJERAL V-04 (BRIDAS TC 100x100x4.5mm) H = 0.45 ml ml 430.80
ARRIOSTRE DE VIGUETAS TC 50x50x3mm ml 1,748.87
TENSOR Ø5/8" ml 877.81
COBERTURA CON LAMINA CALAMINON TL m2 7,222.29
COLUMNAS METALICAS CM DE 6"x6"x4.5mm ml 615.52
CORREA C10"x3"x4.5 ml 6,139.76
CORREA C6."x3"x4.5 ml 563.26
SEGMENTOS DE APOYO C4"x2"x3mm und 1,377.00
VIGUETA TIPICA TC 75x75x4.5mm ml 53.58
UNION COLUMNA VIGA TIPO I und 12.00
UNION COLUMNA VIGA TIPO II und 79.00
UNION COLUMNA VIGA TIPO III und 4.00
UNION COLUMNA VIGA TIPO IV und 17.00
TAPA PL 4.5 und 369.00
ANCLAJE COLUMNAS METALICAS DE 5/8"Øx10" und 369.00
ANCLAJE COLUMNAS CM -TIJERAL PL 6"x6"x8mm und 386.00
ANCLAJE COLUMNAS CM -TIJERAL PL 125x100x8mm und 302.00
Página 5
RESUMEN DE METRADOS DEL NUEVO EXPEDIENTE
Item Descripcion Unidad MODIFICADO ADICIONAL DEDUCTIVO
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
CONTRAACTUAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION MASIVA C/ MAQUINARIA m3 78,867.13 61089.61 17,777.5202.01.02 EXACAVACION DE ZANJAS Y ZAPATAS m3 1,693.59 2457.21 763.6202.01.03 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 12,649.70 1382.86 11,266.8402.01.04 NIVELACION INTERIOR Y APISONADO C/MATERIAL DE PRESTAMO (AFIRMADO) m2 8,189.79 5543.00 2,646.7902.01.05 ELIMININACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 79,189.52 68518.64 10,670.88
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SUB CIMIENTOS Y SOLADOS
02.02.01.01 SUBCIMIENTO / SUBZAPATA, MEZCLA 1:12+30%PG m3 79.18 65.00 14.1802.02.01.02 SOLADO DE CONCRETO E= 4" MEZCLA C:H 1:1O f¨c=100 kg/cm2 m2 3,399.41 4505.81 1,106.40
02.02.02 CIMIENTOS
02.02.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G m3 433.89 858.88 437.8502.02.03 SOBRECIMIENTOS
02.02.03.01 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M m3 65.58 63.96 0.9302.02.03.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 852.52 835.73 12.44
02.02.04 FALSO PISO
02.02.04.01 FALSO PISO C:H 1:8 E = 10 cm m2 2,507.86 5543.00 3,035.1402.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS F`C = 280 KG/CM2 m3 313.82 967.28 653.4602.03.01.02 ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 15,264.89 46892.14 31,627.25
02.03.02 VIGAS DE CIMENTACION
02.03.02.01 VIGAS DE CIMENTACION CONCRETO F`C = 280 KG/CM2 m3 153.90 331.06 177.1602.03.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO m2 879.46 1891.78 1,012.3202.03.02.03 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2 kg 15,544.90 33249.54 17,704.64
02.03.03 COLUMNAS
02.03.03.01 COLUMNAS CONCRETO F`C = 280 KG/CM2 m3 423.56 284.50 139.0602.03.03.03 COLUMNAS ENCOFRADO Y DESENCOFRADO m2 4,029.11 3001.45 1,027.6602.03.03.05 COLUMNAS - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 108,805.88 60235.76 48,570.12
02.03.04 PLACAS
02.03.04.01 PLACAS CONCRETO F`C = 280 KG/CM2 m3 2,075.65 1920.33 155.3202.03.04.02 PLACAS ENCOFRADO Y DESENCOFRADO m2 18,347.91 17526.41 821.5002.03.04.03 PLACAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 290,567.87 263622.64 26,945.23
02.03.05 MUROS DE CONTENCION
02.03.05.01 MUROS DE CONTENCION CONCRETO F`C = 280 KG/CM2 m3 3,371.29 2451.52 919.7602.03.05.02 MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO m2 8,009.61 6993.91 1,015.7002.03.05.03 MUROS DE CONTENCION ACERO DE REFUERZO Fy=4200 kg/cm2 kg 268,973.86 196121.84 72,852.02
02.03.06 VIGAS
02.03.06.01 VIGAS CONCRETO F`C = 280 KG/CM2 m3 1,297.99 1243.85 54.1302.03.06.03 VIGAS ENCOFRADO Y DESENCOFRADO m2 7,633.68 7332.60 301.0802.03.06.05 VIGAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 206,609.14 149137.09 57,472.05
02.03.07 LOSAS MACIZAS
02.03.07.01 LOSAS MACIZAS CONCRETO F`C = 280 KG/CM2 m3 762.95 497.34 0.0002.03.07.02 LOSAS MACIZAS ENCOFRADO Y DESENCOFRADO m2 4,850.46 2161.31 0.0002.03.07.03 LOSAS MACIZAS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 63,118.06 39978.22 23,139.84
02.03.08 LOSAS ALIGERADAS EN UN SENTIDO
02.03.08.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 m3 147.67 133.60 0.0002.03.08.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO m2 1,330.81 1260.43 0.0002.03.08.03 LOSA ALIGERADA ACERO DE REFUERZO Fy=4200 kg/cm2 kg 9,305.65 8540.61 765.0302.03.08.04 LOSA ALIGERADA LADRILLO HUECO 15 x 30 x 30 cm. und 11,311.87 10713.64 0.00
02.03.09 LOSAS ALIGERADAS EN DOS SENTIDOS
02.03.09.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 m3 2,076.26 1638.96 0.0002.03.09.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO m2 14,076.59 11611.66 0.0002.03.09.03 LOSA ALIGERADA ACERO DE REFUERZO Fy=4200 kg/cm2 kg 270,003.44 219117.20 50,886.24
02.03.09.04 LOSA ALIGERADA LADRILLO HUECO 20 x 30 x 30 cm. und 91,497.83 75475.82 0.0002.03.12 POZOS SUMIDEROS
02.03.12.01 POZOS SUMIDEROS CONCRETO F`C = 210 KG/CM2 m3 147.04 144.69 2.3502.03.12.02 POZOS SUMIDEROS ENCOFRADO Y DESENCOFRADO m2 880.46 858.37 22.0802.03.12.03 POZOS SUMIDEROS ACERO DE REFUERZO Fy=4200 kg/cm2 kg 10,737.73 10643.66 94.07
02.03.13 DUCTO DE COCINA
02.03.13.01 DUCTO DE COCINA CONCRETO F`C = 210 KG/CM2 m3 49.74 29.61 20.1302.03.13.02 DUCTO DE COCINA ENCOFRADO Y DESENCOFRADO m2 195.34 176.46 18.8802.03.13.03 DUCTO DE COCINA ACERO DE REFUERZO Fy=4200 kg/cm2 kg 2,673.69 2330.97 342.73
PARTIDAS ADICIONALES
MOVIMIENTO DE TIERRA
NIVELACION Y COMPACTACION DE PLATEA m2 4,528.12OBRAS DE CONCRETO SIMPLE
SOLADO DE PLATEA
SOLADO DE CONCRETO E= 4" F'C=100KG/CM2 m2 4,528.12
PLATEA
CONCRETO PLATEA DE CIMENTACIÓN F´C= 280 KG/CM2 m3 2,263.80
ENCOFRADO Y DESENCOFRADO DE PLATEA DE CIMENTACIÓN. m2 302.83
ACERO CORRUGADO PARA PLATEA DE CIMENTACIÓN FY=4200 Kg/cm2 kg 201,593.04
PEDESTALES
CONCRETO PEDESTALES F´C= 280 KG/CM2 m3 111.94
ENCOFRADO Y DESENCOFRADO DE PEDESTALES m2 210.36
ACERO CORRUGADO PEDESTALES FY=4200 Kg/cm2. kg 8,756.44
PISO CON MALLA ELECTROSOLDADA
CONCRETO PARA PISO REFORZADO FC=210 Kg/cm2 m3 623.59
Página 6
RESUMEN DE METRADOS DEL NUEVO EXPEDIENTE
Item Descripcion Unidad MODIFICADO ADICIONAL DEDUCTIVO
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
CONTRAACTUAL
ENCOFRADO Y DESENCOFRADO PARA PISO REFORZADO m2 306.19
MALLA ELECTROSOLDADA m2 4,864.03
CALZADURAS
MOVIMIENTO DE TIERRAS
EXCAVACION NICHO DE CALZADURAS H=0.60, B=0.50 MT m3 22.50
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA INCLUYE ACARREO MANUAL m3 29.25
OBRAS DE CONCRETO SIMPLE
CONCRETO MEZCLA 1:8 CEMENTO -HORMIGON+30%PM m3 22.50
ENCOFRADO Y DESENCOFRADO CALZADURAS m2 45.00
PICADO DE CACHIMBAS DE CONCRETO ml 45.00
APUNTALAMIENTO DE MURO DE ADOBE
APUNTALAMIENTO MURO DE ADOBE ml 45.00
7 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
02.01.01 EXCAVACION MASIVA C/ MAQUINARIAPARA PLATAFORMASCORTE HASTA NIVEL -0.30 m3 1 4,366.54CORTE HASTA NIVEL +0.80 m3 1 13,136.11CORTE HASTA NIVEL +1.00 m3 1 5,931.20HASTA EL NIVEL - 3.30 EN SOTANO m3 1 7,750.00 4.30 33,325.00 56,758.84
PARA PLATEA DE CIMENTACIONCORTE PARA PLATEA HASTA NIVEL -4.50 m3 1 4,664.40 1.20 5,597.28CORTE PARA ENCOFRADO PLATEA DE 1m m3 1 423.60 1.20 508.32CORTE PARA ASCENSORES Y MONT. HASTA NIVEL -5.00 m3 1 56.32 0.50 28.16CORTE PARA DUCTO COCINA HASTA NIVEL -6.05 m3 1 33.08 1.55 51.27 6,185.03
PARA SUBCIMIENTOSUB CIMIENTO COLINDANTE A CISTERNA m3 area= 50.80 0.70 35.56 35.56
PARA BASE MUROS DE CONTENCIONM1 ENTRE EJE 30-31 Longitud Ancho AlturaBASE m3 1 32.35 5.00 8.70 1407.23
m3 1 32.35 3.50 1.35 152.85TALON m3 1 32.35 0.70 1.20 27.17M2 ENTRE EJE 30-31 L A HBASE m3 1 18.62 5.00 8.70 809.97
m3 1 18.62 3.50 1.35 87.98TALON m3 1 18.62 0.70 1.20 15.64M3" ENTRE EJE 30-31 L A HBASE m3 1 8.30 4.70 8.00 312.08
m3 1 8.30 2.80 1.35 31.37TALON m3 1 8.30 0.70 1.00 5.81M3 ENTRE EJE G-H L A HBASE m3 1 12.55 4.70 8.00 471.88
m3 1 12.55 2.80 1.35 47.44TALON m3 1 12.55 0.70 1.00 8.79M4 ENTRE EJE G-H L A HBASE m3 1 5.30 4.70 8.00 199.28
m3 1 5.30 2.80 1.35 20.03TALON m3 1 5.30 0.70 1.00 3.71M5 EJE 27 ENTRE EJE G-H L A HBASE m3 1 7.70 0.70 7.75 41.77M6 EJE 27ENTRE EJE G-H L A HBASE m3 1 5.75 0.60 7.65 26.39M-7' EN EJE 24 ENTRE I & JBASE m3 1 6.00 3.60 7.90 170.64M-12 EN EJE B ENTRE EJES 7-8BASE m3 1 6.70 5.30 5.60 198.86TALON m3 1 6.7 1 0.7 4.69M-13 EN EJE 7 ENTRE EJES A-B BASE m3 1 6.15 3.60 5.10 112.91TALON m3 1 6.15 1 0.7 4.31M-14A ENTRE EJES A-B y 3-4BASE m3 1 12.05 3.80 5.20 238.11M-14A EN EJE 4 ENTRE EJES A-B BASE m3 1 2.60 3.80 5.20 51.38M-14 EN EJE A ENTRE EJES 4-7 BASE m3 1 21.80 3.30 4.60 330.92TALON m3 1 21.8 1 0.7 15.26
8 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
M-15 EN INGRESOBASE EN SOTANO m3 1 21.90 2.35 3.15 162.11TALON m3 1 21.9 1 0.3 6.57
9 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
M-16 EN EJE A - ENTRADA
BASE m3 1 30.17 7.20 2.55 553.92
TALON m3 1 30.17 0.50 0.80 12.07
M-17 EN EJE A en 3-5
BASE m3 1 19.32 6.75 4.45 580.32
TALON m3 1 19.32 0.60 1.00 11.59
M 18 EN EJE A en 6 y 8
BASE m3 1 18.95 9.53 4.65 839.32
TALON m3 1 18.95 0.80 1.40 21.22
M-19 EN EJE A en 8 y 12
BASE m3 1 28.43 5.40 1.35 207.25
TALON m3 1 28.43 1.00 1.60 45.49
M-20 EN EJE A en 13 y 17
BASE m3 1 28.43 5.90 1.35 226.44
TALON m3 1 28.43 1.20 2.00 68.23
M-21 EN EJE A en 17 y 23
BASE m3 1 37.90 6.80 1.35 347.92
TALON m3 1 37.90 1.20 2.20 100.06
M-22 EN EJE A en 24 y 29
BASE m3 1 34.25 7.80 1.35 360.65
TALON m3 1 34.25 1.40 2.60 124.67
M-24 EN EJE J-N
BASE m3 1 70.13 2.35 3.15 519.14
TALON m3 1 70.13 0.40 0.40 11.22 8,994.68
PARA TALUD DE CORTE EN MUROS DE CONTENCIONM1 ENTRE EJE 30-31 LTALUD DE CORTE m3 area= 14.82 32.35 479.51M2 ENTRE EJE 30-31 LTALUD DE CORTE m3 area= 14.82 18.62 275.99M3" ENTRE EJE 30-31 LTALUD DE CORTE m3 area= 12.25 8.30 101.68M3 ENTRE EJE 30-31 LTALUD DE CORTE m3 area= 12.25 12.55 153.74M4 ENTRE EJE G-H LTALUD DE CORTE m3 area= 12.25 5.30 64.93M5 EJE 27 ENTRE EJE G-H LTALUD DE CORTE m3 area= 19.48 7.70 149.96M6 EJE 27 ENTRE EJE G-H LTALUD DE CORTE m3 area= 19.48 5.75 111.98M-7 EN EJE I ENTRE 25-27TALUD DE CORTE m3 area= 19.25 13.05 251.21M-10 EN EJE F ENTRE EJES 8-12TALUD DE CORTE m3 area= 15.00 29.10 436.50M-10 EN EJE 12 ENTRE EJES F-GTALUD DE CORTE m3 area= 15.00 7.20 108.00M-10 EN EJE G ENTRE EJES 13-14TALUD DE CORTE m3 area= 15.00 3.60 54.00M-10 ENTRE EJES F-G y 13-14TALUD DE CORTE m3 area= 15.00 7.20 108.00M-10 EN EJE H ENTRE 13-15TALUD DE CORTE m3 area= 15.00 10.70 160.50
10 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
M-10 EN EJE H ENTRE 17-18TALUD DE CORTE m3 area= 15.00 7.10 106.50M-10 EN EJE 18 ENTRE H-GTALUD DE CORTE m3 area= 15.00 4.65 69.75M-10 ENTRE EJES H-G y 18-22TALUD DE CORTE m3 area= 15.00 16.25 243.75M-10 EN EJE 22 ENTRE H-GTALUD DE CORTE m3 area= 15.00 4.65 69.75M-10 EN EJE H ENTRE 22-23TALUD DE CORTE m3 area= 15.00 7.45 111.75M-12 EN EJE B ENTRE EJES 7-8BASE m3 area= 7.84 6.70 52.53M-13 EN EJE 7 ENTRE EJES A-B TALUD DE CORTE m3 area= 4.95 6.15 30.45M-14A ENTRE EJES A-B y 3-4TALUD DE CORTE m3 area= 3.90 12.05 47.00M-14A EN EJE 4 ENTRE EJES A-B TALUD DE CORTE m3 area= 3.90 2.60 10.14M-14 EN EJE A ENTRE EJES 4-7 TALUD DE CORTE m3 area= 3.90 21.80 85.03M-15 EN INGRESOTALUD DE CORTE m3 area= 1.50 21.90 32.86
M-16 EN EJE A - ENTRADA
TALUD DE CORTE m3 area= 3.73 30.17 112.55
M-17 EN EJE A en 3-5
TALUD DE CORTE m3 area= 6.84 19.32 132.15
M 18 EN EJE A en 6 y 8
TALUD DE CORTE m3 area= 9.89 18.95 187.42
M-19 EN EJE A en 8 y 12
TALUD DE CORTE m3 area= 11.96 28.43 340.02
M-20 EN EJE A en 13 y 17
TALUD DE CORTE m3 area= 14.21 28.43 403.99
M-21 EN EJE A en 17 y 23
TALUD DE CORTE m3 area= 16.64 37.90 630.66
M-22 EN EJE A en 24 y 29
TALUD DE CORTE m3 area= 19.25 34.25 659.31
M-24 EN EJE J-N
TALUD DE CORTE m3 area= 1.50 70.13 105.24 5,886.85
PARA CISTERNASCISTERNAS SECTOR DCIMENTACION largo anchoEJE L m3 1 15.70 4.70 1.00 73.79
m3 1 23.00 5.50 1.00 126.50CISTERNA TRASCIEGO
Aream3 1 45.90 1.00 45.90
CISTERNA AGUA DE LLUVIAArea
m3 1 26.40 4.65 122.76 368.95PARA POZOS SUMIDEROSPOZO DE AGUAS GRISES 1
m3 AreaBASE m3 1 6.17 3.15 19.45
11 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
CASETABASE m3 1 1.55 1.70 0.70 1.84POZO DE AGUAS GRISES 2
AreaBASE m3 1 6.17 2.03 12.53CASETABASE m3 1 1.55 1.70 0.70 1.84POZO DE AGUAS NEGRAS 1
AreaBASE m3 1 6.17 3.15 19.45CASETABASE m3 1 1.55 1.70 0.70 1.84POZO DE AGUAS NEGRAS 2
AreaBASE m3 1 11.37 3.03 34.46CASETABASE m3 1 1.55 1.70 0.70 1.84POZO DE AGUA DE LLUVIAS 1
AreaBASE m3 1 36.41 3.60 131.09CASETABASE m3 1 1.55 1.70 0.70 1.84POZO DE AGUA DE LLUVIAS 2-3-4
AreaBASE m3 3 18.14 3.01 163.84CASETABASE m3 3 1.55 1.70 0.70 5.53 395.57PLACAS ESCALERA 7ZAPATA m3 1 8.60 7.15 1.65 101.46 101.46PARA PLANTA DE TRATAMIENTO Area
m3 1 65.20 2.15 140.18 140.18
TOTALES M3 78,867.13
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Longitud Ancho Altura Parcial Total
02.01.02 EXCAVACION DE ZANJAS Y ZAPATASPARA CIMIENTOS CORRIDOS
SECTOR A
ENTRE EJES A-B / 3-4 m3 1 2.42 0.50 1.30 1.57
ENTRE EJES A-B / 4-5 m3 1 7.47 0.50 1.30 4.86
ENTRE EJES A-B / 5-6 m3 3 1.07 0.50 1.30 2.09m3 1 2.90 0.50 1.30 1.89
ENTRE EJES A-B / 6-7 m3 1 2.40 0.50 1.30 1.56
ENTRE EJES B-C / 4-5 m3 1 13.80 0.50 1.30 8.97
ENTRE EJES B-C / 5-6 m3 1 5.47 0.50 1.30 3.56
ENTRE EJES B-C / 6-7 m3 1 9.87 0.50 1.30 6.42
ENTRE EJES C-D / 3-4 m3 1 13.50 0.50 1.30 8.78
ENTRE EJES D-E /3-4 m3 1 7.03 0.50 1.30 4.57
ENTRE EJES D-E /4-5 m3 1 14.73 0.50 1.30 9.57
ENTRE EJES E-F /4-5 m3 1 14.20 0.50 1.30 9.23
ENTRE EJES F-G /4-5 m3 1 12.12 0.50 1.30 7.88
12 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
ENTRE EJES G-H /4-5 m3 1 5.65 0.50 1.30 3.67
ENTRE EJES H - I -J /1 - 2 m3 1 6.55 0.50 1.30 4.26
ENTRE EJES H - I -J /2 - 3 m3 1 17.44 0.50 1.30 11.34
ENTRE EJES C-D /5-6 m3 1 7.95 0.50 1.30 5.17
ENTRE EJES C-D /6-7 m3 2 4.65 0.50 1.30 6.05m3 2 2.65 0.50 1.30 3.45m3 3 1.90 0.50 1.30 3.70m3 1 6.32 0.50 1.30 4.11
ENTRE EJES D-E/5-6 m3 1 17.06 0.50 1.30 11.09
ENTRE EJES D-E/6-7 m3 1 22.79 0.50 1.30 14.81
ENTRE EJES E-F/5-6 m3 1 16.15 0.50 1.30 10.50
ENTRE EJES E-F/6-7 m3 1 13.36 0.50 1.30 8.68
ENTRE EJES F-G/5-6 m3 1 13.20 0.50 1.30 8.58
ENTRE EJES F-G/6-7 m3 1 9.65 0.50 1.30 6.27
ENTRE EJES G-H/5-6 m3 1 4.17 0.50 1.30 2.71 175.31
SECTOR B (1 Y 4)
ENTRE EJES F-G/8-9 m3 1 14.62 0.50 1.30 9.50
ENTRE EJES F-G/9-10 m3 1 10.05 0.50 1.30 6.53
ENTRE EJES F-G/10-11 m3 1 10.84 0.50 1.30 7.05
ENTRE EJES F-G/11-12 m3 1 13.89 0.50 1.30 9.03
ENTRE EJES G-H/9-10 m3 1 9.89 0.50 1.30 6.43
ENTRE EJES G-H/10-11 m3 1 6.47 0.50 1.30 4.21
ENTRE EJES G-H/11-12 m3 1 6.83 0.50 1.30 4.44
ENTRE EJES H-I / 10-11 m3 1 15.03 0.50 1.30 9.77
ENTRE EJES H-I / 11-12 m3 1 12.62 0.50 1.30 8.20
ENTRE EJES H-I / 13-14 m3 1 5.53 0.50 1.30 3.59
ENTRE EJES H-I / 18-19 m3 1 12.23 0.50 1.30 7.95
ENTRE EJES H-I / 20-21 m3 1 6.66 0.50 1.30 4.33
ENTRE EJES H-I / 21-22 m3 1 14.03 0.50 1.30 9.12m3 1 0.88 0.27 1.30 0.31 90.46
SECTOR C
ENTRE EJES G-H/25-25´ m3 1 14.20 0.50 1.30 9.23
ENTRE EJES G-H/25´-26´ m3 1 20.28 0.50 1.30 13.18 22.41
SECTOR D
ENTRE EJES I - J / 25´-28 m3 1 53.04 0.80 1.50 63.65 63.65
SECTOR E
ENTRE EJES D´´ - E´´ /28´´ - 30 m3 15 2.60 0.50 1.30 25.35m3 1 23.22 0.50 1.30 15.09
ENTRE EJES E´´-F´´ /28´´ - 30 m3 13 2.60 0.50 1.30 21.97m3 1 17.99 0.50 1.30 11.69 74.11
SECTOR F
ENTRE EJES A´´-A / 28´´-29´ m3 1 26.03 0.50 1.30 16.92
ENTRE EJES A´´-A / 29´-30 m3 1 11.48 0.50 1.30 7.46
13 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
ENTRE EJES A-A´ / 28´´-29´ m3 1 14.24 0.50 1.30 9.26
ENTRE EJES A´-B´ / 28´´-30 m3 1 14.78 0.50 1.30 9.61
ENTRE EJES 30 /A´B´- C´ m3 1 7.75 0.50 1.30 5.04
ENTRE EJES C´ m3 1 5.70 0.50 1.30 3.70 51.99
CASETAS DE CONTROL
CASETA 1 m3 1 19.97 0.50 1.30 12.98
CASETA 2 m3 1 18.14 0.50 1.30 11.79
CASETA 3 m3 1 17.91 0.50 1.30 11.64
CASETA 4 m3 1 17.91 0.50 1.30 11.64
CASETA CONTRO PLANTA TRATAMIENTO m3 2 2.85 0.50 1.30 3.71m3 2 4.85 0.50 1.30 6.31m3 1 17.91 0.50 1.30 11.64 69.71
PARA ZAPATASSECTOR A
LA-5 m3 1 11.70 3.10 1.30 47.15m3 1 4.35 1.80 1.30 10.18
Z-A7 m3 1 2.95 7.55 1.30 28.95
ZA-14 m3 1 3.50 5.30 1.30 24.12
Z-1 m3 16 1.20 1.20 1.30 29.95
Z-2 m3 6 1.40 1.40 1.30 15.29
Z-3 m3 3 1.60 1.60 1.30 9.98
Z-4 m3 2 1.20 1.85 1.30 5.77
Z-5 m3 1 1.40 1.70 1.30 3.09
Z-6 m3 2 1.70 1.70 1.30 7.51
Z-7 m3 4 1.85 1.85 1.30 17.80
Z-8 m3 3 1.00 1.00 1.30 3.90
Z-9 m3 1 2.00 2.00 1.30 5.20
Z-10 m3 3 1.50 3.00 1.30 17.55
Z-11 m3 1 1.50 3.25 1.30 6.34
Z-12 m3 1 1.50 3.40 1.30 6.63
Z-13 m3 2 1.20 3.00 1.30 9.36
Z-14 m3 1 1.30 3.00 1.30 5.07
Z-15 m3 1 1.60 3.50 1.30 7.28
Z-17 m3 1 1.80 2.10 1.30 4.91
Z-18 m3 1 1.10 3.30 1.30 4.72m3 1 1.10 2.85 1.30 4.08
ZAPATA ASCENSOR SECTOR AZAPATA m3 1 4.00 3.90 1.30 20.28 295.12SECTOR B 1 y B4
I-10 (ZB7) m3 1 4.70 3.30 1.30 20.16
I-22 (ZB14) m3 1 4.70 3.00 1.30 18.33
Z-19 m3 1 1.50 3.00 1.30 5.85
Z-20 m3 3 2.50 2.50 1.30 24.38
Z-20" m3 2 2.90 2.50 1.30 18.85
Z-22 m3 4 2.30 2.30 1.30 27.51
Z-27 m3 2 2.52 3.30 1.30 21.62
Z-28 m3 12 2.20 2.20 1.30 75.50
Z-33 m3 1 1.50 4.00 1.30 7.80
Z-33" m3 1 1.60 4.15 1.30 8.63
ZAPATA ESCALERA 7ZAPATA m3 1 8.60 7.15 1.30 79.94 309
14 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
SECTOR C
Z-01 m3 5 1.00 1.00 1.50 7.50 7.50SECTOR D
Eje 25'-26' en I-J m3 4 0.64 1.00 1.50 3.84 3.84SECTOR EZ-1E m3 24 1.00 1.00 1.30 31.20 31.20SECTOR FZ-1F m3 1 1.15 1.30 1.30 1.94
Z-2F m3 1 1.55 1.25 1.30 2.52
Z-3F m3 2 1.20 1.40 1.30 4.37
Z-4F m3 1 1.15 1.40 1.30 2.09
Z-5F m3 1 1.55 1.20 1.30 2.42
Z-6F m3 1 1.65 1.10 1.30 2.36
Z-7F m3 1 1.20 1.50 1.30 2.34
Z-8F m3 2 1.60 1.15 1.30 4.78
Z-9F m3 1 1.25 2.75 1.30 4.47
Z-10F m3 1 1.55 2.35 1.30 4.74 32.03
PARA VIGAS DE CIMENTACIONSECTOR AVC-101 PRIMER PISOEJES HORIZONTALESEJE B m3 1 4.00 3.90 0.70 10.92
m3 1 6.60 0.35 0.70 1.62
EJE C m3 3 6.85 0.35 0.70 5.03m3 1 6.60 0.35 0.70 1.62
EJE D m3 3 6.85 0.35 0.70 5.03m3 1 4.70 0.35 0.70 1.15
ENTRE EJES D y E m3 1 6.85 0.35 0.70 1.68
EJE E m3 2 2.85 0.35 0.70 1.40m3 2 6.90 0.35 0.70 3.38m3 2 2.85 0.35 0.70 1.40
EJE F m3 3 6.85 0.35 0.70 5.03
EJE G m3 1 5.20 0.35 0.70 1.27m3 1 6.85 0.35 0.70 1.68m3 1 4.40 0.35 0.70 1.08
EJE H m3 2 6.60 0.35 0.70 3.23m3 1 6.30 0.35 0.70 1.54
ENTRE EJES H y I m3 2 7.30 0.35 0.70 3.58
EJES VERTICALESEJE 3 m3 1 3.00 0.35 0.70 0.73
m3 1 6.90 0.35 0.70 1.69m3 1 4.20 0.35 0.70 1.03m3 1 3.30 0.35 0.70 0.81
EJE 4 m3 1 1.30 0.35 0.70 0.32m3 1 6.90 0.35 0.70 1.69m3 1 4.65 0.35 0.70 1.14m3 1 3.30 0.35 0.70 0.81m3 1 2.95 0.35 0.70 0.72m3m3 1 5.40 0.35 0.70 1.32m3 1 6.20 0.35 0.70 1.52m3 1 6.35 0.35 0.70 1.56m3 1 6.60 0.35 0.70 1.62
EJE 5 m3 1 5.40 0.35 0.70 1.32m3 1 6.60 0.35 0.70 1.62
15 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
m3 1 6.90 0.35 0.70 1.69m3 1 5.30 0.35 0.70 1.30m3m3 1 6.60 0.35 0.70 1.62m3 1 6.90 0.35 0.70 1.69m3 1 6.90 0.35 0.70 1.69m3 1 4.20 0.35 0.70 1.03
EJE 6 m3 1 5.40 0.35 0.70 1.32m3 1 6.60 0.35 0.70 1.62m3 1 4.05 0.35 0.70 0.99m3 1 6.25 0.35 0.70 1.53
m3 1 6.60 0.35 0.70 1.62m3 1 6.55 0.35 0.70 1.60m3 1 6.90 0.35 0.70 1.69m3 1 1.88 0.35 0.70 0.46
EJE 6 m3 1 6.60 0.35 0.70 1.62m3 1 5.25 0.35 0.70 1.29m3 1 3.60 0.35 0.70 0.88m3m3 1 4.95 0.35 0.70 1.21m3 1 6.55 0.35 0.70 1.60m3 1 4.50 0.35 0.70 1.10
AUDITORIUMVC-101 PRIMER PISOEJES HORIZONTALESEJE F m3 2 2.85 0.35 0.70 1.40
m3 1 6.90 0.35 0.70 1.69
EJE H m3 2 2.90 0.35 0.70 1.42m3 1 6.90 0.35 0.70 1.69m3 1 3.10 0.35 0.70 0.76
ENTRE EJES I y J m3 1 6.85 0.35 0.70 1.68m3 1 6.55 0.35 0.70 1.60m3 1 3.75 0.35 0.70 0.92
m3 1 3.75 0.35 0.70 0.92
EJES VERTICALESEJE 1 m3 2 6.90 0.35 0.70 3.38
m3m3 1 6.00 0.35 0.70 1.47m3 1 3.50 0.35 0.70 0.86
EJE 2 m3 1 6.00 0.35 0.70 1.47m3 1 2.60 0.35 0.70 0.64
EJE 3 m3 1 6.90 0.35 0.70 1.69
ENTRE EJES 3 y 4 m3 2 6.90 0.35 0.70 3.38
EJE 4 m3 1 6.60 0.35 0.70 1.62 122.68SECTOR B1 y B4VC-101 PRIMER PISOEJES HORIZONTALESEJE G m3 2 6.90 0.35 0.70 3.38
m3m3 1 6.55 0.35 0.70 1.60m3 1 6.90 0.35 0.70 1.69
EJE H m3 1 0.80 0.35 0.70 0.20m3 1 3.85 0.35 0.70 0.94m3 1 6.60 0.35 0.70 1.62
16 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
m3 1 5.15 0.35 0.70 1.26m3 1 5.20 0.35 0.70 1.27m3 0.70 0.00m3 1 2.85 0.35 0.70 0.70
m3 1 6.10 0.35 0.70 1.49
m3 2 5.20 0.35 0.70 2.55
EJE I m3 2 6.90 0.35 0.70 3.38m3 1 4.35 0.35 0.70 1.07m3 1 6.30 0.35 0.70 1.54m3 1 6.60 0.35 0.70 1.62
m3 2 6.90 0.35 0.70 3.38m3 1 4.35 0.35 0.70 1.07m3 1 6.30 0.35 0.70 1.54m3 1 6.60 0.35 0.70 1.62
EJES VERTICALESEJE 8 m3 1 6.20 0.35 0.70 1.52
m3 1 4.70 0.35 0.70 1.15
EJE 9 m3 2 6.60 0.35 0.70 3.23
EJE 10 m3 1 6.90 0.35 0.70 1.69m3 1 6.60 0.35 0.70 1.62m3 1 5.05 0.35 0.70 1.24
EJE 10' m3 1 6.90 0.35 0.70 1.69m3 1 6.60 0.35 0.70 1.62
EJE 11 m3 1 2.25 0.35 0.70 0.55m3 1 6.60 0.35 0.70 1.62m3 1 5.05 0.35 0.70 1.24
EJE 12 m3 1 6.60 0.35 0.70 1.62m3 1 5.35 0.35 0.70 1.31
EJE 13 m3 1 6.00 0.35 0.70 1.47
EJE 14 m3 1 5.05 0.35 0.70 1.24
EJE 18 m3 1 6.00 0.35 0.70 1.47
EJE 20 m3 1 5.35 0.35 0.70 1.31m3 1 5.05 0.35 0.70 1.24
EJE 21 m3 1 5.35 0.35 0.70 1.31m3 1 5.05 0.35 0.70 1.24
EJE 22 m3 1 6.00 0.35 0.70 1.47 62.76
TOTALES M3 1,693.59
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
02.01.03 RELLENO COMPACTADO C/EQUIPO MAT/PROPIOPARA PLATAFORMA BLOQUE A NIVEL +0.70BLOQ. A m3 1 1,689.90 0.2 337.98 337.98RELLENO PLATEAAREA DE PLATEA MENOS ASC .Y RADIOTERAPIA(H=0.60m) m3 1 4,419.66 0.5 2,209.83
AREA DE ,DUCTOS Y SUMIDEROS Area Negativa (H=0.60m.)
Sumidero 1 m3 1 57.38 -0.5 -28.69
Sumidero 2 m3 1 21.16 -0.5 -10.58
Sumidero 3 m3 1 54.75 -0.5 -27.38
Ducto de cocina m3 1 33.08 -0.5 -16.54
PEDESTALES -111.94
17 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
2,014.70
RELLENO A 1 M DE LA PLATEABLOQ. B2,B3,B5 m3 1 423.60 1.20 508.32 508.32
PARA CIMIENTOS CORRIDOS
SECTOR A
ENTRE EJES A-B / 3-4 m3 1 2.42 0.35 0.20 0.17
ENTRE EJES A-B / 4-5 m3 1 7.47 0.35 0.20 0.52
ENTRE EJES A-B / 5-6 m3 3 1.07 0.35 0.20 0.22m3 1 2.90 0.35 0.20 0.20
ENTRE EJES A-B / 6-7 m3 1 2.40 0.35 0.20 0.17
ENTRE EJES B-C / 4-5 m3 1 13.80 0.35 0.20 0.97
ENTRE EJES B-C / 5-6 m3 1 5.47 0.35 0.20 0.38
ENTRE EJES B-C / 6-7 m3 1 9.87 0.35 0.20 0.69
ENTRE EJES C-D / 3-4 m3 1 13.50 0.35 0.20 0.95
ENTRE EJES D-E /3-4 m3 1 7.03 0.35 0.20 0.49
ENTRE EJES D-E /4-5 m3 1 14.73 0.35 0.20 1.03
ENTRE EJES E-F /4-5 m3 1 14.20 0.35 0.20 0.99
ENTRE EJES F-G /4-5 m3 1 12.12 0.35 0.20 0.85
ENTRE EJES G-H /4-5 m3 1 5.65 0.35 0.20 0.40
ENTRE EJES H - I -J /1 - 2 m3 1 6.55 0.35 0.20 0.46
ENTRE EJES H - I -J /2 - 3 m3 1 17.44 0.35 0.20 1.22
ENTRE EJES C-D /5-6 m3 1 7.95 0.35 0.20 0.56
ENTRE EJES C-D /6-7 m3 2 4.65 0.35 0.20 0.65m3 2 2.65 0.35 0.20 0.37m3 3 1.90 0.35 0.20 0.40m3 1 6.32 0.35 0.20 0.44
ENTRE EJES D-E/5-6 m3 1 17.06 0.35 0.20 1.19
ENTRE EJES D-E/6-7 m3 1 22.79 0.35 0.20 1.60
ENTRE EJES E-F/5-6 m3 1 16.15 0.35 0.20 1.13
ENTRE EJES E-F/6-7 m3 1 13.36 0.35 0.20 0.94
ENTRE EJES F-G/5-6 m3 1 13.20 0.35 0.20 0.92
ENTRE EJES F-G/6-7 m3 1 9.65 0.35 0.20 0.68
ENTRE EJES G-H/5-6 m3 1 4.17 0.35 0.20 0.29 18.88
SECTOR B (B1 Y B4)
ENTRE EJES F-G/8-9 m3 1 14.62 0.35 0.20 1.02
ENTRE EJES F-G/9-10 m3 1 10.05 0.35 0.20 0.70
ENTRE EJES F-G/10-11 m3 1 10.84 0.35 0.20 0.76
ENTRE EJES F-G/11-12 m3 1 13.89 0.35 0.20 0.97
ENTRE EJES G-H/9-10 m3 1 9.89 0.35 0.20 0.69
ENTRE EJES G-H/10-11 m3 1 6.47 0.35 0.20 0.45
ENTRE EJES G-H/11-12 m3 1 6.83 0.35 0.20 0.48
ENTRE EJES H-I / 10-11 m3 1 15.03 0.35 0.20 1.05
ENTRE EJES H-I / 11-12 m3 1 12.62 0.35 0.20 0.88
ENTRE EJES H-I / 13-14 m3 1 5.53 0.35 0.20 0.39
ENTRE EJES H-I / 18-19 m3 1 12.23 0.35 0.20 0.86
ENTRE EJES H-I / 20-21 m3 1 6.66 0.35 0.20 0.47
18 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
ENTRE EJES H-I / 21-22 m3 1 14.03 0.35 0.20 0.98m3 1 0.88 0.35 0.20 0.06 9.77
SECTOR C
ENTRE EJES G-H/25-25´ m3 1 14.20 0.35 0.20 0.99
ENTRE EJES G-H/25´-26´ m3 1 20.28 0.35 0.20 1.42 2.41
SECTOR D
ENTRE EJES I - J / 25´-28 m3 1 35.20 0.80 0.90 25.34 25.34
SECTOR E
ENTRE EJES D´´ - E´´ /28´´ - 30 m3 15 2.60 0.35 0.20 2.73m3 1 23.22 0.35 0.20 1.63
ENTRE EJES E´´-F´´ /28´´ - 30 m3 13 2.60 0.35 0.20 2.37m3 1 17.99 0.35 0.20 1.26 7.98
SECTOR FZ-1F m3 1 1.15 1.30 0.90 1.35Z-2F m3 1 1.55 1.25 0.90 1.74Z-3F m3 2 1.20 1.40 0.90 3.02Z-4F m3 1 1.15 1.40 0.90 1.45Z-5F m3 1 1.55 1.20 0.90 1.67Z-6F m3 1 1.65 1.10 0.90 1.63Z-7F m3 1 1.20 1.50 0.90 1.62Z-8F m3 2 1.60 1.15 0.90 3.31Z-9F m3 1 1.25 2.75 0.90 3.09Z-10F m3 1 S 2.35 0.90 2.12 21.01CASETAS DE CONTROLCASETA 1 m3 1 19.97 0.35 0.20 1.40CASETA 2 m3 1 18.14 0.35 0.20 1.27CASETA 3 m3 1 17.91 0.35 0.20 1.25
CASETA 4 m3 1 17.91 0.35 0.20 1.25
CASETA CONTRO PLANTA TRATAMIENTO m3 2 2.85 0.50 0.20 0.57m3 2 4.85 0.50 0.20 0.97 6.72
PARA MURO DE CONTENCIONL A H
M1TALUD DE RELLENO m3 1 32.35 6.23 7.70 1550.62M2TALUD DE RELLENO m3 1 18.62 6.23 7.70 892.50M3"TALUD DE RELLENO m3 1 8.30 5.75 7.00 334.08M3"TALUD DE RELLENO m3 1 12.55 5.75 7.00 505.14M4TALUD DE RELLENO m3 1 5.30 5.75 7.00 213.33M5TALUD DE RELLENO m3 1 7.70 2.76 7.05 149.96M6TALUD DE RELLENO m3 1 5.75 2.76 7.05 111.98
M-7 EN EJE I ENTRE 25-27TALUD DE RELLENO m3 area= 19.25 13.05 251.21M-10 EN EJE F ENTRE EJES 8-12TALUD DE RELLENO m3 area= 15.00 29.10 436.50M-10 EN EJE 12 ENTRE EJES F-GTALUD DE RELLENO m3 area= 15.00 7.20 108.00M-10 EN EJE G ENTRE EJES 13-14TALUD DE RELLENO m3 area= 15.00 3.60 54.00
19 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
M-10 ENTRE EJES F-G y 13-14TALUD DE RELLENO m3 area= 15.00 7.20 108.00M-10 EN EJE H ENTRE 13-15TALUD DE RELLENO m3 area= 15.00 10.70 160.50M-10 EN EJE H ENTRE 17-18TALUD DE RELLENO m3 area= 15.00 7.10 106.50M-10 EN EJE 18 ENTRE H-GTALUD DE RELLENO m3 area= 15.00 4.65 69.75M-10 ENTRE EJES H-G y 18-22TALUD DE RELLENO m3 area= 15.00 16.25 243.75M-10 EN EJE 22 ENTRE H-GTALUD DE RELLENO m3 area= 15.00 4.65 69.75M-10 EN EJE H ENTRE 22-23TALUD DE RELLENO m3 area= 15.00 7.45 111.75M-12 EN EJE B ENTRE EJES 7-8TALUD DE RELLENO m3 area= 22.96 10.84 248.89M-13 EN EJE 7 ENTRE EJES A-B TALUD DE RELLENO m3 area= 12.07 6.15 74.23M-14A ENTRE EJES A-B y 3-4TALUD DE RELLENO m3 area= 18.72 12.05 225.58M-14A EN EJE 4 ENTRE EJES A-B TALUD DE RELLENO m3 area= 18.72 2.60 48.67M-14 EN EJE A ENTRE EJES 4-7 TALUD DE RELLENO m3 area= 18.72 21.80 408.11M-15 EN INGRESOTALUD DE RELLENO m3 area= 4.69 21.90 102.62
M-16 EN EJE A - ENTRADA
TALUD DE RELLENO m3 area= 3.73 30.17 112.55
M-17 EN EJE A en 3-5
TALUD DE RELLENO m3 area= 6.84 19.32 132.15
M 18 EN EJE A en 6 y 8
TALUD DE RELLENO m3 area= 9.89 18.95 187.42
M-19 EN EJE A en 8 y 12
TALUD DE RELLENO m3 area= 11.96 28.43 340.02
M-20 EN EJE A en 13 y 17
TALUD DE RELLENO m3 area= 14.21 28.43 403.99
M-21 EN EJE A en 17 y 23
TALUD DE RELLENO m3 area= 16.64 37.90 630.66
M-22 EN EJE A en 24 y 29
TALUD DE RELLENO m3 area= 19.25 34.25 659.31M-24 EJE J-NTALUD DE RELLENO m3 area= 4.69 70.13 328.60 9380.12
ZAPATASSECTOR A Long./ AreaLA-5 m3 1 11.70 3.10 0.50 18.13
m3 1 4.35 1.80 0.50 3.91
Z-A7 m3 1 2.95 7.55 0.50 11.14
ZA-14 m3 1 3.50 5.30 0.50 9.28
Z-1 m3 16 1.20 1.20 0.50 11.52
Z-2 m3 6 1.40 1.40 0.50 5.88
Z-3 m3 3 1.60 1.60 0.50 3.84
Z-4 m3 2 1.20 1.85 0.50 2.22
Z-5 m3 1 1.40 1.70 0.50 1.19
Z-6 m3 2 1.70 1.70 0.50 2.89
20 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
Z-7 m3 4 1.85 1.85 0.50 6.85
Z-8 m3 3 1.00 1.00 0.50 1.50
Z-9 m3 1 2.00 2.00 0.50 2.00
Z-10 m3 3 1.50 3.00 0.50 6.75
Z-11 m3 1 1.50 3.25 0.50 2.44
Z-12 m3 1 1.50 3.40 0.50 2.55
Z-13 m3 2 1.20 3.00 0.50 3.60
Z-14 m3 1 1.30 3.00 0.50 1.95
Z-15 m3 1 1.60 3.50 0.50 2.80
Z-17 m3 1 1.80 2.10 0.50 1.89
Z-18 m3 1 1.10 3.30 0.50 1.82m3 1 1.10 2.85 0.50 1.57
ZAPATA ASCENSOR SECTOR AZAPATA m3 1 4.00 3.90 0.50 15.60 121.31SECTOR B 1 y B4
I-10 (ZB7) m3 1 4.70 3.30 0.50 7.76
I-22 (ZB14) m3 1 4.70 3.00 0.50 7.05Z-19 m3 1 1.50 3.00 0.50 2.25
Z-20 m3 3 2.50 2.50 0.50 9.38
Z-20" m3 2 2.90 2.50 0.50 7.25
Z-22 m3 4 2.30 2.30 0.50 10.58
Z-27 m3 2 2.52 3.30 0.50 8.32
Z-28 m3 12 2.20 2.20 0.50 29.04
Z-33 m3 1 1.50 4.00 0.50 3.00
Z-33" m3 1 1.60 4.15 0.50 3.32
ZAPATA ESCALERA 7ZAPATA m3 1 8.60 7.15 0.50 30.75 119SECTOR C m3
Z-01 m3 5 1.00 1.00 0.80 4.00 4.00SECTOR D m3
Eje 25'-26' en I-J m3 4 0.64 1.00 0.80 2.05 2.05SECTOR E m3
Z-1E m3 24 1.00 1.00 0.50 12.00 12.00SECTOR F m3
Z-1F m3 10 1.05 1.40 0.50 7.35
Z-2F m3 2 1.05 1.80 0.50 1.89 9.24PLACAS ESCALERA 7ZAPATA m3 1 8.60 7.15 0.80 49.19 49.19
TOTALES M3 12,649.70
DescripciónVOLUMEN
N° DimensionesPart. Coeficiente Nro Vec. Volumen Altura Parcial Total
02.01.04 NIVELACION INTERIOR Y APISONADO C/MATERIAL DE PRESTAMO (AFIRMADO)IDEM FALSO PISOS
BLOQ. C, D,E y F M2 1 730.46 730.46PARA BLOQUES A Y BBLOQ. A M2 1 1,689.90 1689.9BLOQ. B2, B3, B5 M2 1 4,236.60 4,236.60 BLOQ. B1 y B4 M2 1 1,532.83 1532.83
TOTALES M2 8,189.79
21 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
DescripciónVOLUMEN
N° DimensionesPart. Und. Nro Vec. Area Ancho Altura Parcial Total
DescripciónVOLUMEN
N° DimensionesPart. Coef. Esp. Nro Vec. Volumen Altura Parcial Total
02.01.05 ELIM INACION DE MATERIAL EXCEDENTE C/MAQUINARIA
VOLUMEN EXCAVACION MANUAL M3 1 1,693.59 1.1 1,930.69VOLUMEN EXCAVACION MAQUINA M3 1 78,867.13 1.1 89,908.53MENOS VOLUMEN DE RELLENO M3 1 12,649.70 12,649.70
Sub Total 79,189.52
TOTALES M3 79,189.52
DescripciónVOLUMEN
N° DimensionesPart. Coeficiente Nro Vec. Volumen Altura Parcial Total
NIVELACION Y COMPACTACION DE PLATEA
AREA PLATEA M2 1 4664.40 4,664.40 menos TRAGALUZ B2 M3 -1 57.38 -57.38 menos TRAGALUZ B3 M4 -1 21.16 -21.16 menos TRAGALUZ B5 M5 -1 57.75 -57.75
TOTALES M2 4,528.12
MOVIMIENTO DE TIERRAS A NIVEL -0.30
PROGRESIVA DISTANCIA AREA CORTE
0+ 0.00 0.00 0.00 0.00 0.00 5.980+ 8.00 8.00 0.00 1.49 5.80 8.540+ 16.00 8.00 1.45 0.64 31.38 2.560+ 24.00 8.00 6.40 0.00 103.44 0.000+ 32.00 8.00 19.47 0.00 207.25 0.000+ 40.00 8.00 32.35 0.00 310.86 0.000+ 48.00 8.00 45.37 0.00 403.54 0.000+ 56.00 8.00 55.52 0.00 492.52 0.000+ 64.00 8.00 67.61 0.00 559.95 0.000+ 72.00 8.00 72.38 0.00 654.60 0.000+ 80.00 8.00 91.27 0.00 762.18 0.000+ 88.00 8.00 99.27 0.00 835.04 0.000+ 96.00 8.00 109.49 0.00
PARCIAL 1 4366.54 17.07
MOVIMIENTO DE TIERRAS A NIVEL +0.80
PROGRESIVA DISTANCIA AREA CORTE
0+ 96.00 0.00 15.05 0.81 149.07 3.220+ 104.00 8.00 22.22 0.00 214.71 0.000+ 112.00 8.00 31.46 0.00 286.46 0.000+ 120.00 8.00 40.16 0.00 361.85 0.000+ 128.00 8.00 50.31 0.00 437.64 0.000+ 136.00 8.00 59.10 0.00 529.64 0.000+ 144.00 8.00 73.31 0.00 629.84 0.000+ 152.00 8.00 84.15 0.00 802.30 0.000+ 160.00 8.00 116.42 0.00 984.14 0.000+ 168.00 8.00 129.61 0.00 1089.25 0.000+ 176.00 8.00 142.70 0.00 1159.14 0.000+ 184.00 8.00 147.09 0.00 1116.04 0.000+ 192.00 8.00 131.93 0.00 1088.68 0.000+ 200.00 8.00 140.25 0.00 1158.90 0.000+ 208.00 8.00 149.48 0.00 1141.82 0.000+ 216.00 8.00 135.98 0.00 1120.94 0.000+ 224.00 8.00 144.26 0.00 865.67 0.000+ 229.70 5.70 159.49
PARCIAL 2 13136.11 3.22
AREA RELLENO
VOLUMEN CORTE
VOLUMEN RELLENO
AREA RELLENO
VOLUMEN CORTE
VOLUMEN RELLENO
MOVIMIENTO DE TIERRAS A NIVEL +1.00
PROGRESIVA DISTANCIA AREA CORTE
0+ 88.00 0.00 0.00 0.00 0.00 3.240+ 96.00 8.00 0.00 0.81 13.24 3.240+ 104.00 8.00 3.31 0.00 39.83 0.000+ 112.00 8.00 6.65 0.00 67.31 0.000+ 120.00 8.00 10.18 0.00 106.07 0.000+ 128.00 8.00 16.34 0.00 162.40 0.000+ 136.00 8.00 24.26 0.00 170.43 0.000+ 144.00 8.00 18.35 0.00 150.64 0.000+ 152.00 8.00 19.31 0.00 85.62 0.000+ 160.00 8.00 2.09 0.00 17.69 0.000+ 168.00 8.00 2.33 0.00 20.49 0.000+ 176.00 8.00 2.79 0.00 52.76 0.000+ 184.00 8.00 10.40 0.00 170.28 0.000+ 192.00 8.00 32.17 0.00 388.67 0.000+ 200.00 8.00 64.99 0.00 533.76 0.000+ 208.00 8.00 68.45 0.00 626.29 0.000+ 216.00 8.00 88.13 0.00 727.89 0.000+ 224.00 8.00 93.85 0.00 523.47 0.000+ 229.70 5.70 89.83 0.00
PARCIAL 3 3856.82 6.48
PROGRESIVA DISTANCIA AREA CORTE
0+ 229.70 0.00 232.02 0.00 541.17 0.930+ 232.00 2.30 238.56 0.81 1533.21 2.550+ 238.30 6.30 248.17 0.00
PARCIAL 4 2074.38 3.48
RESUMENPARCIAL 1 4,366.54 17.07
PARCIAL 2 13,136.11 3.22
PARCIAL 3 3,856.82 6.48
PARCIAL 4 2,074.38 3.48
TOTAL 23,433.84 30.26
AREA RELLENO
VOLUMEN CORTE
VOLUMEN RELLENO
AREA RELLENO
VOLUMEN CORTE
VOLUMEN RELLENO
24 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
SOLADO DE CONCRETO PARA PLATEA DE CIMENTACIÓN F´C=140 Kg/cm2
SECTOR B
SUBSECTOR B2,B3,B5
PLATEA H= 0.50 m 1 area= 4664.40 4664.40
Area totatl x altura
menos TRAGALUZ B2 1 area= 57.38 -57.38
menos TRAGALUZ B3 1 area= 21.16 -21.16
menos TRAGALUZ B5 1 area= 57.75 -57.75
M2 4528.12
02.02.01.02 SOLADO DE CONCRETO E= 4" MEZCLA C:H 1:1O
PARA ZAPATAS
SECTOR ALA-5 1 11.70 3.10 36.27
1 4.35 1.80 7.83ZA-7 1 2.95 7.55 22.27ZA-14 1 3.50 5.30 18.55
Z-1 16 1.20 1.20 23.04
Z-2 6 1.40 1.40 11.76
Z-3 3 1.60 1.60 7.68
Z-4 2 1.20 1.85 4.44
Z-5 1 1.40 1.70 2.38
Z-6 2 1.70 1.70 5.78
Z-7 4 1.85 1.85 13.69
Z-8 3 1.00 1.00 3.00
Z-9 1 2.00 2.00 4.00
Z-10 3 1.50 3.00 13.50
Z-11 1 1.50 3.25 4.88
Z-12 1 1.50 3.40 5.10
Z-13 2 1.20 3.00 7.20
Z-14 1 1.30 3.00 3.90
Z-15 1 1.60 3.50 5.60
Z-17 1 1.80 2.10 3.78
Z-18 1 1.10 3.30 3.63
1 1.10 2.85 3.14PLACAS ASCENSOR SECTOR A
ZAPATA 1 4.00 3.90 15.60
ZAPATAS BSECTOR B 1 y B4
I-10 (ZB7) 1 4.70 3.30 15.51
I-22 (ZB14) 1 4.70 3.00 14.10
H,I-8,9 (ZB6) 1 9.50 7.30 69.35Z-19 1 1.50 3.00 4.50Z-20 3 2.50 2.50 18.75Z-20" 2 2.90 2.50 14.50Z-22 4 2.30 2.30 21.16Z-27 2 2.52 3.30 16.63Z-28 12 2.20 2.20 58.08Z-33 1 1.50 4.00 6.00Z-33" 1 1.60 4.15 6.64
SECTOR C
Z-01 5 1.00 1.00 5.00
SECTOR D
Eje 25'-26' en I-J 4 0.64 1.00 2.56
SECTOR E
Z-1E 24 1.00 1.00 24.00
SECTOR F
Eje A-28" Z1F 1 1.15 1.30 1.49
Eje A-29' Z2F 1 1.55 1.25 1.94
25 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
Eje A, A'-30 Z3F 2 1.20 1.40 3.36
Eje A'-28" Z4F 1 1.15 1.40 1.61
Eje A'-29' Z5F 1 1.55 1.20 1.86
Eje B'-28" Z6F 1 1.65 1.10 1.82
Eje B'-29" Z7F 1 1.20 1.50 1.80
Eje B'-30 & C'-29' Z8F 2 1.60 1.15 3.68
Eje C'-28" Z9F 1 1.25 2.75 3.44
Eje C'-30 ZF10 1 1.55 2.35 3.64
PLACAS ESCALERA 7
ZAPATA 1 8.60 7.15 61.49
PARA VIGAS DE CIMENTACION
SECTOR A
VC-101 PRIMER PISO
EJES HORIZONTALES
EJE B 3 6.85 0.35 7.19
1 6.60 0.35 2.31
EJE C 3 6.85 0.35 7.19
1 6.60 0.35 2.31
EJE D 3 6.85 0.35 7.19
1 4.70 0.35 1.65
ENTRE EJES D y E 1 6.85 0.35 2.40
EJE E 2 2.85 0.35 1.99
2 6.90 0.35 4.83
2 2.85 0.35 1.99
EJE F 3 6.85 0.35 7.19
EJE G 1 5.20 0.35 1.82
1 6.85 0.35 2.40
1 4.40 0.35 1.54
EJE H 2 6.60 0.35 4.62
1 6.30 0.35 2.20
ENTRE EJES H y I 2 7.30 0.35 5.11
EJES VERTICALES
EJE 3 1 3.00 0.35 1.05
1 6.90 0.35 2.42
1 4.20 0.35 1.47
1 3.30 0.35 1.15
EJE 4 1 1.30 0.35 0.45
1 6.90 0.35 2.42
1 4.65 0.35 1.63
1 3.30 0.35 1.15
1 2.95 0.35 1.03
1 5.40 0.35 1.89
1 6.20 0.35 2.17
1 6.35 0.35 2.22
1 6.60 0.35 2.31
EJE 5 1 5.40 0.35 1.89
1 6.60 0.35 2.31
1 6.90 0.35 2.42
1 5.30 0.35 1.85
1 6.60 0.35 2.31
1 6.90 0.35 2.42
1 6.90 0.35 2.42
1 4.20 0.35 1.47
EJE 6 1 5.40 0.35 1.89
1 6.60 0.35 2.31
26 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
1 4.05 0.35 1.42
1 6.25 0.35 2.19
0.00
1 6.60 0.35 2.31
1 6.55 0.35 2.29
1 6.90 0.35 2.42
1 1.88 0.35 0.66
0.00
EJE 6 1 6.60 0.35 2.31
1 5.25 0.35 1.84
1 3.60 0.35 1.26
1 4.95 0.35 1.73
1 6.55 0.35 2.29
1 4.50 0.35 1.58
AUDITORIUM
VC-101 PRIMER PISO
EJES HORIZONTALES
EJE F 2 2.85 0.35 1.99
1 6.90 0.35 2.42
EJE H 2 2.90 0.35 2.03
1 6.90 0.35 2.42
1 3.10 0.35 1.09
ENTRE EJES I y J 1 6.85 0.35 2.40
1 6.55 0.35 2.29
1 3.75 0.35 1.31
0.00
1 3.75 0.35 1.31
EJES VERTICALES
EJE 1 2 6.90 0.35 4.83
0.00
1 6.00 0.35 2.10
1 3.50 0.35 1.22
EJE 2 1 6.00 0.35 2.10
1 2.60 0.35 0.91
EJE 3 1 6.90 0.35 2.42
ENTRE EJES 3 y 4 2 6.90 0.35 4.83
EJE 4 1 6.60 0.35 2.31
SECTOR BSECTOR B1 y B4VC-101 PRIMER PISOEJES HORIZONTALESEJE G 2 6.90 0.35 4.83
1 6.55 0.35 2.29
1 6.90 0.35 2.42
EJE H 1 0.80 0.35 0.28
1 3.85 0.35 1.35
1 6.60 0.35 2.31
1 5.15 0.35 1.80
1 5.20 0.35 1.82
1 2.85 0.35 1.00
1 6.10 0.35 2.14
2 5.20 0.35 3.64
EJE I 2 6.90 0.35 4.83
1 4.35 0.35 1.52
1 6.30 0.35 2.20
1 6.60 0.35 2.31
2 6.90 0.35 4.83
27 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial1 4.35 0.35 1.52
1 6.30 0.35 2.20
1 6.60 0.35 2.31
EJES VERTICALESEJE 8 1 6.20 0.35 2.17
1 4.70 0.35 1.65
EJE 9 2 6.60 0.35 4.62
EJE 10 1 6.90 0.35 2.42
1 6.60 0.35 2.31
1 5.05 0.35 1.77
EJE 10' 1 6.90 0.35 2.42
1 6.60 0.35 2.31
EJE 11 1 2.25 0.35 0.79
1 6.60 0.35 2.31
1 5.05 0.35 1.77
EJE 12 1 6.60 0.35 2.31
1 5.35 0.35 1.87
EJE 13 1 6.00 0.35 2.10
EJE 14 1 5.05 0.35 1.77
EJE 18 1 6.00 0.35 2.10
EJE 20 1 5.35 0.35 1.87
1 5.05 0.35 1.77
EJE 21 1 5.35 0.35 1.87
1 5.05 0.35 1.77
EJE 22 1 6.00 0.35 2.10
PARA CISTERNAS
CISTERNAS SECTOR D
CIMENTACION largo ancho
EJE L 1 15.70 4.70 73.79
1 23.00 5.50 126.50
CISTERNA TRASCIEGO
Area
1 45.90 45.90
CISTERNA AGUA DE LLUVIA
Area
1 26.40 26.40
PARA POZOS SUMIDEROS
POZO DE AGUAS GRISES 1
Area
BASE 1 6.17 6.17
CASETA
BASE 1 1.55 1.70 2.64
POZO DE AGUAS GRISES 2
Area
BASE 1 6.17 6.17
CASETA
BASE 1 1.55 1.70 2.64
POZO DE AGUAS NEGRAS 1
Area
BASE 1 6.17 6.17
CASETA
BASE 1 1.55 1.70 2.64
POZO DE AGUAS NEGRAS 2
Area
BASE 1 11.37 11.37
CASETA
BASE 1 1.55 1.70 2.64
POZO DE AGUA DE LLUVIAS 1
Area
BASE 1 36.41 36.41
CASETA
BASE 1 1.55 1.70 2.64
POZO DE AGUA DE LLUVIAS 2-3-4
Area
28 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
BASE 3 18.14 54.43
CASETA
BASE 3 1.55 1.70 7.91
PARA DUCTO DE COCINA
BASE 1 8.15 1.80 14.67
1 4.90 2.60 12.74
PARA PLANTA DE TRATAMIENTO Area
BASE 1 65.20 65.20
PARA MUROS DE CONTENCION largo ancho
M1 1 32.35 7.80 252.33
M2 1 18.62 7.80 145.24
M3" 1 8.30 6.80 56.44
M3" 1 12.55 6.80 85.34
M4 1 5.30 6.80 36.04
M-7' EN EJE 24 ENTRE I & J
BASE 1 6.00 3.60 21.60
M-12 EN EJE B ENTRE EJES 7-8
BASE 1 8.28 5.30 43.88
TALON 1 6.70 0.60 4.02
M-13 EN EJE 7 ENTRE EJES A-B
BASE 1 5.55 3.60 19.98
TALON 1 5.55 0.40 2.22
M-14A ENTRE EJES A-B y 3-4
BASE 1 12.05 3.80 45.79
M-14A EN EJE 4 ENTRE EJES A-B
BASE 1 0.75 1.65 1.24
M-14 EN EJE A ENTRE EJES 4-7
BASE 1 19.95 3.30 65.84
TALON 1 19.95 0.40 7.98
M-15 EN INGRESO
BASE 1 21.90 2.35 51.46
TALON 1 21.90 0.40 8.76
M-16 EN EJE A - ENTRADA
BASE 1 30.17 2.00 60.34
M-17 EN EJE A en 3-5
BASE 1 19.32 3.20 61.82
M 18 EN EJE A en 6 y 8
BASE 1 18.95 3.90 73.91
M-19 EN EJE A en 8 y 12
BASE 1 28.43 4.40 125.09
M-20 EN EJE A en 13 y 17
BASE 1 28.43 4.70 133.62
M-21 EN EJE A en 17 y 23
BASE 1 37.90 5.60 212.24
M-22 EN EJE A en 24 y 29
BASE 1 34.25 6.40 219.20
M-24 ENTRE EJE J-N
BASE 1 70.13 2.35 164.81
RELLENO DE TUBERIAS SANITARIAS f´c=100 kg/cm2
RELLENO TUB. AL POZO SUMIDERO 1
ramal 1 29.07 0.15 3 13.08
ramal 2 48.20 0.15 3 21.69
ramal 3 85.13 0.15 3 38.31
RELLENO TUB. AL POZO SUMIDERO 3
ramal 5 128.10 0.15 3 57.64
ramal 6 13.48 0.15 3 6.07
ramal 7 22.19 0.15 3 9.99
29 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
M2 3399.41
02.02.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G
SECTOR A
ENTRE EJES A-B / 3-4 1 2.42 0.50 1.10 1.33
1 0.85 0.50 0.40 0.17
ENTRE EJES A-B / 4-5 1 7.47 0.50 1.10 4.11
1 0.85 0.50 0.40 0.17
ENTRE EJES A-B / 5-6 3 1.07 0.50 1.10 1.77
3 0.85 0.50 0.40 0.51
1 2.90 0.50 1.10 1.60
ENTRE EJES A-B / 6-7 1 2.40 0.50 1.10 1.32
ENTRE EJES B-C / 4-5 1 13.80 0.50 1.10 7.59
ENTRE EJES B-C / 5-6 1 5.47 0.50 1.10 3.01
ENTRE EJES B-C / 6-7 1 9.87 0.50 1.10 5.43
ENTRE EJES C-D / 3-4 1 13.50 0.50 1.10 7.43
1 0.60 0.50 0.40 0.12
ENTRE EJES C-D / 4-5 1 17.05 0.50 0.40 3.41
ENTRE EJES D-E /3-4 1 7.03 0.50 1.10 3.87
ENTRE EJES D-E /4-5 1 14.73 0.50 1.10 8.10
1 0.52 0.50 0.40 0.10
ENTRE EJES E-F /4-5 1 14.20 0.50 1.10 7.81
1 0.45 0.50 0.40 0.09
ENTRE EJES F-G /4-5 1 12.12 0.50 1.10 6.67
1 0.60 0.50 0.40 0.12
ENTRE EJES G-H /4-5 1 5.65 0.50 1.10 3.11
ENTRE EJES H - I -J /1 - 2 1 6.55 0.50 1.10 3.60
2 0.45 0.50 0.40 0.18
ENTRE EJES H - I -J /2 - 3 1 17.44 0.50 1.10 9.59
ENTRE EJES C-D /5-6 1 7.95 0.50 1.10 4.37
ENTRE EJES C-D /6-7 2 4.65 0.50 1.10 5.12
2 2.65 0.50 1.10 2.92
3 1.90 0.50 1.10 3.14
1 6.32 0.50 1.10 3.48
ENTRE EJES D-E/5-6 1 17.06 0.50 1.10 9.38
ENTRE EJES D-E/6-7 1 22.79 0.50 1.10 12.53
ENTRE EJES E-F/5-6 1 16.15 0.50 1.10 8.88
ENTRE EJES E-F/6-7 1 13.36 0.50 1.10 7.35
ENTRE EJES F-G/5-6 1 13.20 0.50 1.10 7.26
ENTRE EJES F-G/6-7 1 9.65 0.50 1.10 5.31
ENTRE EJES G-H/5-6 1 4.17 0.50 1.10 2.29
SECTOR B1 Y B4
ENTRE EJES F-G/8-9 1 14.62 0.50 1.10 8.04
ENTRE EJES F-G/9-10 1 10.05 0.50 1.10 5.53
ENTRE EJES F-G/10-11 1 10.84 0.50 1.10 5.96
ENTRE EJES F-G/11-12 1 13.89 0.50 1.10 7.64
ENTRE EJES G-H/9-10 1 9.89 0.50 1.10 5.44
ENTRE EJES G-H/10-11 1 6.47 0.50 1.10 3.56
ENTRE EJES G-H/11-12 1 6.83 0.50 1.10 3.76
ENTRE EJES H-I / 10-11 1 15.03 0.50 1.10 8.27
ENTRE EJES H-I / 11-12 1 12.62 0.50 1.10 6.94
1 1.78 0.50 0.40 0.36
ENTRE EJES H-I / 13-14 1 5.53 0.50 1.10 3.04
1 0.57 0.50 0.40 0.11
ENTRE EJES H-I / 18-19 1 12.23 0.50 1.10 6.73
ENTRE EJES H-I / 20-21 1 6.66 0.50 1.10 3.66
ENTRE EJES H-I / 21-22 1 14.03 0.50 1.10 7.72
1 0.88 0.27 1.10 0.26
SECTOR C
ENTRE EJES G-H/25-25´ 1 14.20 0.50 1.10 7.81
30 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
ENTRE EJES G-H/25´-26´ 1 20.28 0.50 1.10 11.15
SECTOR D
ENTRE EJES I - J / 25´-28 (CC9)
A1 1 1.99 0.60 0.70 0.84
A2 1 10.69 0.60 1.10 7.06
ENTRE EJES I - J / 25´-28 (CC10)
A1 1 3.60 0.60 0.70 1.51
A2 1 3.60 0.60 0.70 1.51
ENTRE EJES I - J / 25´-28 (CC11)
A1 1 0.30 0.55 0.70 0.12
A2 1 7.95 0.55 1.10 4.81
ENTRE EJES I - J / 25´-28 (CC12)
A1 1 2.48 0.45 0.40 0.45
A2 1 2.48 0.45 0.70 0.78
ENTRE EJES I - J / 25´-28 (CC13)
A1 1 0.29 0.75 0.70 0.15
A2 1 4.56 0.75 1.10 3.76
CIMIENTO CON SOBRECIMIENTO ARMADO
A1 1 0.30 0.40 0.70 0.08
A2 1 17.75 0.40 1.10 7.81
SECTOR E
ENTRE EJES D´´ - E´´ /28´´ - 30 15 2.60 0.50 1.10 21.45
1 23.22 0.50 1.10 12.77
ENTRE EJES E´´-F´´ /28´´ - 30 13 2.60 0.50 1.10 18.59
1 17.99 0.50 1.10 9.89
SECTOR F
ENTRE EJES A´´-A / 28´´-29´ 1 26.03 0.50 1.10 14.32
ENTRE EJES A´´-A / 29´-30 1 11.48 0.50 1.10 6.31
ENTRE EJES A-A´ / 28´´-29´ 1 14.24 0.50 1.10 7.83
ENTRE EJES A´-B´ / 28´´-30 1 14.78 0.50 1.10 8.13
ENTRE EJES 30 /A´B´- C´ 1 7.75 0.50 1.10 4.26
ENTRE EJES C´ 1 5.70 0.50 1.10 3.14
CASETAS DE CONTROL
CASETA 1 1 19.97 0.50 1.10 10.98
CASETA 2 1 18.14 0.50 1.10 9.98
CASETA 3 1 17.91 0.50 1.10 9.85
CASETA 4 1 17.91 0.50 1.10 9.85
CASETA CONTROL PLANTA DE TRATAMIENTO
2 2.85 0.50 1.10 3.14
2 4.85 0.50 1.10 5.34
M3 433.89
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
02.02.01.01 SUBCIMIENTO / SUBZAPATA, MEZCLA 1:12+30%PG
SUB CIMIENTO COLINDANTE A CISTERNA 1 12.07 1.60 0.70 13.52
1 3.25 1.68 0.70 3.82
SECTOR A
Z1 1 4.57 1.20 3.00 16.45
Z1' 1 1.05 1.35 3.00 4.25
Z10 1 3.00 1.50 3.00 13.50
SECTOR B
SUB CIMIENTO ESCALONADO DUCTO DE COCINA 1 0.75 3.60 1.50 4.05
1 0.75 3.60 0.75 2.03
31 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
1 0.75 1.95 1.50 2.19
1 0.75 1.95 0.75 1.10
1 0.75 2.50 1.50 2.81
1 0.75 2.50 0.75 1.41
SECTOR MURO DE CONTENCION ENTRADA
1 1.50 1.60 3.80 9.12
1 1.60 2.20 1.40 4.93
M3 79.18
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
02.02.03.01 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M
02.02.03.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
SECTOR A Caras
EJE A 1 16.15 0.15 0.25 0.61 1 16.15 2 0.25 8.08
ENTRE EJES A-B / 3-4 1 3.27 0.15 0.45 0.22 1 3.27 2 0.45 2.94
ENTRE EJES A-B / 4-5 1 6.00 0.15 0.45 0.40 1 6.00 2 0.45 5.40
2 1.00 0.15 0.45 0.14 2 1.00 2 0.45 1.80
ENTRE EJES A-B / 5-6 3 2.40 0.15 0.45 0.49 3 2.40 2 0.45 6.48
2 0.25 0.15 0.45 0.03 2 0.25 2 0.45 0.45
ENTRE EJES A-B / 6-7 1 2.40 0.15 0.45 0.16 1 2.40 2 0.45 2.16
EJE B 1 20.18 0.15 0.25 0.76 1 20.18 2 0.25 10.09
ENTRE EJES B-C / 4-5 1 14.28 0.15 0.45 0.96 1 14.28 2 0.45 12.85
ENTRE EJES B-C / 5-6 1 5.10 0.15 0.45 0.34 1 5.10 2 0.45 4.59
ENTRE EJES B-C / 6-7 1 9.03 0.15 0.45 0.61 1 9.03 2 0.45 8.13
EJE C 1 9.45 0.15 0.25 0.35 1 9.45 2 0.25 4.73
ENTRE EJES C-D / 3-4 1 13.80 0.15 0.45 0.93 1 13.80 2 0.45 12.42
ENTRE EJES C-D / 4-5 1 22.60 0.15 0.45 1.53 1 22.60 2 0.45 20.34
1 0.97 0.15 0.25 0.04 1 0.97 2 0.25 0.49
EJE D : 4-5 1 6.90 0.15 0.25 0.26 1 6.90 2 0.25 3.45
EJE D : 3-4 1 5.85 0.15 0.25 0.22 1 5.85 2 0.25 2.93
ENTRE EJES D-E /3-4 1 6.87 0.15 0.25 0.26 1 6.87 2 0.25 3.44
1 8.75 0.15 0.45 0.59 1 8.75 2 0.45 7.88
ENTRE EJES D-E /4-5 1 10.98 0.15 0.45 0.74 1 10.98 2 0.45 9.88
1 11.55 0.15 0.25 0.43 1 11.55 2 0.25 5.78
ENTRE EJES E-F /4-5 1 13.29 0.15 0.45 0.90 1 13.29 2 0.45 11.96
1 3.60 0.15 0.25 0.14 1 3.60 2 0.25 1.80
ENTRE EJES F-G-H /1-2-3 2 12.60 0.15 0.25 0.95 2 12.60 2 0.25 12.60
2 13.80 0.15 0.25 1.04 2 13.80 2 0.25 13.80
ENTRE EJES F-G /4-5 1 12.75 0.15 0.45 0.86 1 12.75 2 0.45 11.48
1 11.40 0.15 0.25 0.43 1 11.40 2 0.25 5.70
ENTRE EJES G-H /4-5 1 5.20 0.15 0.45 0.35 1 5.20 2 0.45 4.68
1 6.35 0.15 0.25 0.24 1 6.35 2 0.25 3.18
ENTRE EJES H - I -J /1 - 2 1 6.00 0.15 0.45 0.40 1 6.00 2 0.45 5.40
1 19.85 0.15 0.25 0.74 1 19.85 2 0.25 9.93
ENTRE EJES H - I -J /2 - 3 1 17.53 0.15 0.45 1.18 1 17.53 2 0.45 15.78
ENTRE EJES H - I /3 - 4 1 4.15 0.15 0.25 0.16 1 4.15 2 0.25 2.08
ENTRE EJES H - I /4 - 5 1 12.06 0.15 0.25 0.45 1 12.06 2 0.25 6.03
ENTRE EJES C-D /5-6 1 6.65 0.15 0.45 0.45 1 6.65 2 0.45 5.99
1 13.59 0.15 0.25 0.51 1 13.59 2 0.25 6.80
ENTRE EJES C-D /6-7 1 21.95 0.15 0.45 1.48 1 21.95 2 0.45 19.76
1 10.35 0.15 0.25 0.39 1 10.35 2 0.25 5.18
ENTRE EJES D-E/5-6 1 16.48 0.15 0.45 1.11 1 16.48 2 0.45 14.83
1 8.02 0.15 0.25 0.30 1 8.02 2 0.25 4.01
ENTRE EJES D-E/6-7 1 22.44 0.15 0.45 1.51 1 22.44 2 0.45 20.20
1 10.05 0.15 0.25 0.38 1 10.05 2 0.25 5.03
32 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
ENTRE EJES E-F/5-6 1 15.06 0.15 0.45 1.02 1 15.06 2 0.45 13.55
1 9.02 0.15 0.25 0.34 1 9.02 2 0.25 4.51
ENTRE EJES E-F/6-7 1 12.22 0.15 0.25 0.46 1 12.22 2 0.25 6.11
1 0.55 0.15 0.25 0.02 1 0.55 2 0.25 0.28
ENTRE EJES F-G/5-6 1 13.56 0.15 0.45 0.92 1 13.56 2 0.45 12.20
1 13.13 0.15 0.25 0.49 1 13.13 2 0.25 6.57
ENTRE EJES F-G/6-7 1 8.20 0.15 0.25 0.31 1 8.20 2 0.25 4.10
1 10.95 0.15 0.25 0.41 1 10.95 2 0.25 5.48
ENTRE EJES G-H/5-6 1 5.46 0.15 0.45 0.37 1 5.46 2 0.45 4.91
1 5.13 0.15 0.25 0.19 1 5.13 2 0.25 2.57
ENTRE EJES G-H/6-7 1 11.55 0.15 0.25 0.43 1 11.55 2 0.25 5.78
ENTRE EJES H-I/5-6 1 7.77 0.15 0.25 0.29 1 7.77 2 0.25 3.89
SECTOR B
ENTRE EJES F-G/8-9 1 13.26 0.15 0.45 0.90 1 13.26 2 0.45 11.93
ENTRE EJES F-G/9-10 1 9.23 0.15 0.45 0.62 1 9.23 2 0.45 8.31
ENTRE EJES F-G/10-11 1 9.04 0.15 0.45 0.61 1 9.04 2 0.45 8.14
1 3.52 0.15 0.25 0.13 1 3.52 2 0.25 1.76
ENTRE EJES F-G/11-12 1 16.65 0.15 0.45 1.12 1 16.65 2 0.45 14.99
ENTRE EJES G-H/9-10 1 8.28 0.15 0.45 0.56 1 8.28 2 0.45 7.45
1 0.35 0.15 0.25 0.01 1 0.35 2 0.25 0.18
ENTRE EJES G-H/10-11 1 6.47 0.15 0.45 0.44 1 6.47 2 0.45 5.82
1 0.35 0.15 0.25 0.01 1 0.35 2 0.25 0.18
ENTRE EJES G-H/11-12 1 6.87 0.15 0.45 0.46 1 6.87 2 0.45 6.18
1 0.70 0.15 0.25 0.03 1 0.70 2 0.25 0.35
ENTRE EJES H-I / 10-11 1 13.52 0.15 0.45 0.91 1 13.52 2 0.45 12.17
1 11.50 0.15 0.25 0.43 1 11.50 2 0.25 5.75
ENTRE EJES H-I / 11-12 1 17.66 0.15 0.45 1.19 1 17.66 2 0.45 15.89
1 10.35 0.15 0.25 0.39 1 10.35 2 0.25 5.18
ENTRE EJES H-I / 13-14 1 5.22 0.15 0.45 0.35 1 5.22 2 0.45 4.70
ENTRE EJES H-I / 18-19 1 10.80 0.15 0.45 0.73 1 10.80 2 0.45 9.72
1 8.25 0.15 0.25 0.31 1 8.25 2 0.25 4.13
ENTRE EJES H-I / 20-21 1 7.93 0.15 0.45 0.54 1 7.93 2 0.45 7.14
1 0.70 0.15 0.25 0.03 1 0.70 2 0.25 0.35
ENTRE EJES H-I / 21-22 1 13.28 0.15 0.45 0.90 1 13.28 2 0.45 11.951 11.95 0.15 0.25 0.45 1 11.95 2.00 0.25 5.98
SECTOR C
ENTRE EJES G-H/25-25´ 1 14.20 0.20 0.40 1.14 2 14.20 0.40 11.36
ENTRE EJES G-H/25´-26´ 1 20.28 0.20 0.40 1.62 2 20.28 0.40 16.224
SECTOR D
SOBRE SOBRECIMIENTOS EN X (25 cm) 1 7.80 0.25 0.45 0.88 2 7.80 0.45 7.02
SOBRE SOBRECIMIENTOS EN X (15 cm) 1 3.50 0.15 0.45 0.24 2 3.50 0.45 3.15
SOBRE SOBRECIMINETOS EN Y (25 cm) 1 2.00 0.25 0.45 0.23 2 2.00 0.45 1.8
SOBRE SOBRECIMINETOS EN Y (15 cm) 1 12.56 0.15 0.45 0.85 2 12.56 0.45 11.304
SECTOR E
ENTRE EJES D´´ - E´´ /28´´ - 30 13 2.60 0.15 0.45 2.28 13 2.60 2 0.45 30.42
1 17.42 0.15 0.45 1.18 1 17.42 2 0.45 15.68
34 0.35 0.15 0.25 0.45 34 0.35 2 0.25 5.95
ENTRE EJES E´´-F´´ /28´´ - 30 11 2.60 0.15 0.45 1.93 11 2.60 2 0.45 25.74
1 20.43 0.15 0.45 1.38 1 20.43 2 0.45 18.39
25 0.35 0.15 0.25 0.33 25 0.35 2 0.25 4.38
SECTOR F
ENTRE EJES A´´-A / 28´´-29´ 1 20.24 0.15 0.45 1.37 1 20.24 2 0.45 18.22
1 1.20 0.15 0.25 0.05 1 1.20 2 0.25 0.60
ENTRE EJES A´´-A / 29´-30 1 11.50 0.15 0.45 0.78 1 11.50 2 0.45 10.35
ENTRE EJES A-A´ / 28´´-29´ 1 14.75 0.15 0.45 1.00 1 14.75 2 0.45 13.28
1 1.65 0.15 0.25 0.06 1 1.65 2 0.25 0.83
ENTRE EJES A-A´ / 29´-30 1 3.75 0.15 0.45 0.25 1 3.75 2 0.45 3.38
1 2.10 0.15 0.25 0.08 1 2.10 2 0.25 1.05
ENTRE EJES A´-B´ / 28´´-30 1 16.53 0.15 0.45 1.12 1 16.53 2 0.45 14.88
33 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
1 2.90 0.15 0.25 0.11 1 2.90 2 0.25 1.45
ENTRE EJES 30 /A´B´- C´ 1 7.75 0.15 0.45 0.52 1 7.75 2 0.45 6.98
1 1.95 0.15 0.25 0.07 1 1.95 2 0.25 0.98
ENTRE EJES C´ 1 2.80 0.15 0.45 0.19 1 2.80 2 0.45 2.52
1 3.80 0.15 0.25 0.14 1 3.80 2 0.25 1.90
CASETAS DE CONTROL
CASETA 1 1 17.90 0.15 0.45 1.21 1 17.90 2 0.45 16.11
CASETA 2 1 16.35 0.15 0.45 1.10 1 16.35 2 0.45 14.72
CASETA 3 1 16.84 0.15 0.45 1.14 1 16.84 2 0.45 15.16
CASETA 4 1 16.84 0.15 0.45 1.14 1 16.84 2 0.45 15.16
CASETA CONTROL PLANTA DE TRATAMIENTO
1 1.95 0.15 0.45 0.13 1 1.95 2 0.45 1.76
3 1.80 0.15 0.45 0.36 3 1.80 2 0.45 4.86
1 3.05 0.15 0.45 0.21 1 3.05 2 0.45 2.75
1 1.10 0.15 0.45 0.07 1 1.10 2 0.45 0.99
SECTOR D
SOBRECIMIENTO ARMADO EN X 1 11.40 0.25 0.45 1.28 2 11.40 0.45 10.26
SOBRECIMIENTO ARMADO EN Y 1 4.86 0.15 0.45 0.33 2 4.86 0.45 4.37
TOTALES M3 65.58 M2 852.52
DescripciónCONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
02.02.04.01 FALSO PISO C:H 1:8 E = 10 cm
VER CUADRO GENERAL DE ARQUITECTURA 1 2507.86
SECTOR A, B1 Y B4,C,D E, F Y CASETAS
M2 2507.86
34 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
Descripción
CONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
02.02.02.01 CIMIENTO CORRIDOS 1:10 + 30% P.G
SECTOR B
ENTRE EJES B-C/8-9 1 6.87 0.50 1.10 3.78
ENTRE EJES A-B/9-10 1 5.06 0.50 1.10 2.78
ENTRE EJES B-C/9-10 1 16.20 0.50 1.10 8.91
ENTRE EJES B-C/10-11 1 8.17 0.50 1.10 4.49
ENTRE EJES B-C/11-12 1 6.82 0.50 1.10 3.75
ENTRE EJES B-C/13-14 1 8.26 0.50 1.10 4.54
1 0.63 0.50 0.40 0.13
ENTRE EJES B-C/14-15 1 1.23 0.50 1.10 0.68
1 1.17 0.17 1.10 0.22
ENTRE EJES B-C/15-16 1 12.20 0.50 1.10 6.71
ENTRE EJES B-C/16-17 1 9.95 0.50 1.10 5.47
1 0.70 0.50 0.40 0.14
ENTRE EJES B-C/17-18 1 13.20 0.50 1.10 7.26
1 0.35 0.50 0.40 0.07
ENTRE EJES B-C/18-19 1 10.07 0.50 1.10 5.54
1 0.70 0.50 0.40 0.14
ENTRE EJES B-C/20-21 1 20.84 0.50 1.10 11.46
ENTRE EJES B-C/21-22 1 14.85 0.5 1.1 8.17
1 0.35 0.50 0.40 0.07
ENTRE EJES B-C/22-23 1 17.29 0.50 1.10 9.51
1 0.70 0.50 0.40 0.14
ENTRE EJES B-C/23-24 1 16.43 0.50 1.10 9.04
1 0.55 0.50 0.40 0.11
ENTRE EJES C-D/8-9 1 6.83 0.50 1.10 3.76
1 0.37 0.50 0.40 0.07
ENTRE EJES C-D/9-10 1 5.63 0.50 1.10 3.10
1 0.70 0.50 0.40 0.14
ENTRE EJES C-D/10-11 1 8.85 0.50 1.10 4.87
1 1.50 0.50 0.40 0.30
ENTRE EJES C-D/11-12 1 10.90 0.50 1.10 6.00
1 0.84 0.50 0.40 0.17
ENTRE EJES C-D/13-14 1 8.77 0.50 1.10 4.82
1 0.70 0.50 0.40 0.14
ENTRE EJES C-D/14-15 1 28.88 0.50 1.10 15.88
ENTRE EJES C-D/15-16 1 13.60 0.50 1.10 7.48
ENTRE EJES C-D/16-17 1 5.63 0.50 1.10 3.10
ENTRE EJES C-D/17-18 1 4.00 0.50 1.10 2.20
ENTRE EJES C-D/18-19 1 21.15 0.50 1.10 11.63
1 1.22 0.27 1.10 0.36
1 0.70 0.50 0.40 0.14
ENTRE EJES C-D/20-21 1 25.20 0.50 1.10 13.86
ENTRE EJES C-D/21-22 1 27.64 0.50 1.10 15.20
ENTRE EJES C-D/22-23 1 21.79 0.50 1.10 11.98
ENTRE EJES C-D/23-24 1 8.87 0.50 1.10 4.88
1 0.35 0.50 0.40 0.07
ENTRE EJES D-E/8-9 1 6.85 0.50 1.10 3.77
ENTRE EJES D-E/9-10 1 6.82 0.50 1.10 3.75
ENTRE EJES D-E/13-14 1 11.88 0.50 1.10 6.53
ENTRE EJES D-E/14-15 1 31.31 0.50 1.10 17.22
ENTRE EJES D-E/15-16 1 4.35 0.50 1.10 2.39
35 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02.02 ESTRUCTURAS
02.02.01 OBRAS DE CONCRETO SIMPLE
ENTRE EJES D-E/17-18 1 10.40 0.50 1.10 5.72
ENTRE EJES D-E/18-19 1 17.80 0.50 1.10 9.79
1 0.95 0.20 1.10 0.21
1 1.98 0.27 1.10 0.59
ENTRE EJES D-E/22-23 1 15.42 0.50 1.10 8.48
1 0.90 0.50 0.40 0.18
ENTRE EJES D-E/23-24 1 14.34 0.50 1.10 7.89
ENTRE EJES E-F/9-10 1 6.85 0.50 1.10 3.77
ENTRE EJES E-F/13-14 1 25.48 0.50 1.10 14.01
1 0.67 0.50 0.40 0.13
ENTRE EJES E-F/14-15 1 18.85 0.50 1.10 10.37
1 0.35 0.50 0.40 0.07
ENTRE EJES E-F/18-19 1 21.52 0.50 1.10 11.84
ENTRE EJES E-F/22-23 1 22.77 0.50 1.10 12.52
ENTRE EJES E-F/23-24 1 16.15 0.50 1.10 8.88
ENTRE EJES F-G/13-14 1 22.46 0.50 1.10 12.35
ENTRE EJES F-G/14-15 1 25.65 0.50 1.10 14.11
ENTRE EJES F-G/15-16 1 10.95 0.50 1.10 6.02
ENTRE EJES F-G/17-18 1 11.15 0.50 1.10 6.13
ENTRE EJES F-G/18-19 1 6.85 0.50 1.10 3.77
ENTRE EJES F-G/20-21 1 16.40 0.50 1.10 9.02
1 0.15 0.25 1.10 0.04
ENTRE EJES F-G/21-22 1 14.02 0.50 1.10 7.71
ENTRE EJES F-G/22-23 1 24.61 0.50 1.10 13.54
ENTRE EJES F-G/23-24 1 11.97 0.50 1.10 6.58
ENTRE EJES G-H/13-14 1 6.89 0.50 1.10 3.79
ENTRE EJES G-H/14-15 1 18.17 0.50 1.10 9.99
ENTRE EJES G-H/15-16 1 12.72 0.50 1.10 7.00
ENTRE EJES G-H/22-23 1 10.57 0.50 1.10 5.81
1 1.00 0.32 1.10 0.35
1 0.88 0.27 1.10 0.26
M3 437.85 M2
Descripción
CONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
02.02.03.01 SOBRECIMIENTO CONCRETO C:H 1:8 +25% P.M
02.02.03.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
SECTOR B
ENTRE EJES F-G/13-14 1 6.85 0.15 0.45 0.46 1 6.85 2 0.45 6.17
ENTRE EJES G-H/13-14 1 3.15 0.15 0.25 0.12 1 3.15 2 0.25 1.58
ENTRE EJES H-I / 13-14 1 5.22 0.15 0.45 0.35 1 5.22 2 0.45 4.70
M3 0.93 M2 12.44
Descripción
CONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
02.02.04.01 FALSO PISO C:H 1:8 E = 10 cm
VER CUADRO GENERAL DE ARQUITECTURA 1 3035.14
M2 3035.14
36 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
ESTRUCTURAS
CALZADURAS
DescripciónVOLUMEN
N° Dimensiones
Part. Und. Nro Vec. Largo Ancho Altura Parcial Total
01 CALZADURAS
01.01 MOVIMIENTO DE TIERRAS factor
01.01.01 EXCAVACION NICHO DE CALZADURAS H=0.60, B=0.50 MT m3 45.00 0.50 1.00 22.50 22.50
01.01.02 m3 1.30 45.00 0.50 1.00 29.25 29.25
01.02 OBRAS DE CONCRETO SIMPLE
01.02.01 CONCRETO MEZCLA 1:8 CEMENTO -HORMIGON+30%PM m3 45.00 0.50 1.00 22.50 22.50
01.02.02 ENCOFRADO Y DESENCOFRADO CALZADURAS m2 45.00 1.00 45.00 45.00
01.02.03 PICADO DE CACHIMBAS DE CONCRETO ml 45.00 1.00 45.00 45.00
01.03 APUNTALAMIENTO DE MURO DE ADOBE
01.03.01 APUNTALAMIENTO MURO DE ADOBE ml 45.00 1.00 45.00 45.00
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA INCLUYE ACARREO MANUAL
37 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
02.03.02.01 VIGAS DE CIMENTACION CONCRETO F`C = 280 KG/CM2
02.03.02.02 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO
02.03.02.03 VIGAS DE CIMENTACION ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
VC-101 PRIMER PISO
EJES HORIZONTALES Caras
EJE B 3 6.85 0.35 0.60 4.32 3 6.85 2 0.60 24.66 Principal 5/8" 5 32.75 1 163.75
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 32.75 1 65.50
Estribos 3/8" 41 2.10 3 258.30
Estribos 3/8" 40 2.10 1 84.00
EJE C 3 6.85 0.35 0.60 4.32 3 6.85 2 0.60 24.66 Principal 5/8" 5 32.75 1 163.75
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 32.75 1 65.50
Estribos 3/8" 41 2.10 3 258.30
Estribos 3/8" 40 2.10 1 84.00
EJE D 3 6.85 0.35 0.60 4.32 3 6.85 2 0.60 24.66 Principal 5/8" 5 32.75 1 163.75
1 4.70 0.35 0.60 0.99 1 4.70 2 0.60 5.64 Principal 1/2" 2 32.75 1 65.50
Estribos 3/8" 41 2.10 3 258.30
Estribos 3/8" 33 2.10 1 69.30
ENTRE EJES D y E 1 6.85 0.35 0.60 1.44 1 6.85 2 0.60 8.22 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 41 2.10 1 86.10
EJE E 2 2.85 0.35 0.60 1.20 2 2.85 2 0.60 6.84 Principal 5/8" 5 25.50 2 255.00
2 6.90 0.35 0.60 2.90 2 6.90 2 0.60 16.56 Principal 1/2" 2 25.50 2 102.00
2 2.85 0.35 0.60 1.20 2 2.85 2 0.60 6.84 Estribos 3/8" 25 2.10 2 105.00
Estribos 3/8" 42 2.10 2 176.40
Estribos 3/8" 25 2.10 2 105.00
EJE F 3 6.85 0.35 0.60 4.32 3 6.85 2 0.60 24.66 Principal 5/8" 5 25.50 1 127.50
Principal 1/2" 2 25.50 1 51.00
Estribos 3/8" 41 2.10 3 258.30
EJE G 1 5.20 0.35 0.60 1.09 1 5.20 2 0.60 6.24 Principal 5/8" 5 25.50 2 255.00
1 6.85 0.35 0.60 1.44 1 6.85 2 0.60 8.22 Principal 1/2" 2 25.50 2 102.00
1 4.40 0.35 0.60 0.92 1 4.40 2 0.60 5.28 Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 41 2.10 1 86.10
Estribos 3/8" 32 2.10 1 67.20
38 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
EJE H 2 6.60 0.35 0.60 2.77 2 6.60 2 0.60 15.84 Principal 5/8" 5 25.50 1 127.50
1 6.30 0.35 0.60 1.32 1 6.30 2 0.60 7.56 Principal 1/2" 2 25.50 1 51.00
Estribos 3/8" 40 2.10 2 168.00
Estribos 3/8" 39 2.10 1 81.90
ENTRE EJES H y I 2 7.30 0.35 0.60 3.07 2 7.30 2 0.60 17.52 Principal 5/8" 5 18.10 1 90.50
Principal 1/2" 2 18.10 1 36.20
Estribos 3/8" 43 2.10 2 180.60
EJES VERTICALES Caras
EJE 3 1 3.00 0.35 0.60 0.63 1 3.00 2 0.60 3.60 Principal 5/8" 5 25.50 1 127.50
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 1/2" 2 25.50 1 51.00
1 4.20 0.35 0.60 0.88 1 4.20 2 0.60 5.04 Estribos 3/8" 26 2.10 1 54.60
1 3.30 0.35 0.60 0.69 1 3.30 2 0.60 3.96 Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 31 2.10 1 65.10
Estribos 3/8" 27 2.10 1 56.70
EJE 4 1 1.30 0.35 0.60 0.27 1 1.30 2 0.60 1.56 Principal 5/8" 5 28.75 1 143.75
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 1/2" 2 28.75 1 57.50
1 4.65 0.35 0.60 0.98 1 4.65 2 0.60 5.58 Estribos 3/8" 19 2.10 1 39.90
1 3.30 0.35 0.60 0.69 1 3.30 2 0.60 3.96 Estribos 3/8" 42 2.10 1 88.20
1 2.95 0.35 0.60 0.62 1 2.95 2 0.60 3.54 Estribos 3/8" 33 2.10 1 69.30
Estribos 3/8" 27 2.10 1 56.70
Estribos 3/8" 26 2.10 1 54.60
1 5.40 0.35 0.60 1.13 1 5.40 2 0.60 6.48 Principal 5/8" 5 32.70 1 163.50
1 6.20 0.35 0.60 1.30 1 6.20 2 0.60 7.44 Principal 1/2" 2 32.70 1 65.40
1 6.35 0.35 0.60 1.33 1 6.35 2 0.60 7.62 Estribos 3/8" 36 2.10 1 75.60
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Estribos 3/8" 39 2.10 1 81.90
Estribos 3/8" 39 2.10 1 81.90
Estribos 3/8" 40 2.10 1 84.00
EJE 5 1 5.40 0.35 0.60 1.13 1 5.40 2 0.60 6.48 Principal 5/8" 5 28.75 1 143.75
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 28.75 1 57.50
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Estribos 3/8" 36 2.10 1 75.60
1 5.30 0.35 0.60 1.11 1 5.30 2 0.60 6.36 Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 35 2.10 1 73.50
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 5/8" 5 30.20 1 151.00
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 1/2" 2 30.20 1 60.40
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Estribos 3/8" 40 2.10 1 84.00
1 4.20 0.35 0.60 0.88 1 4.20 2 0.60 5.04 Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 42 2.10 1 88.20
39 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
Estribos 3/8" 31 2.10 1 65.10
EJE 6 1 5.40 0.35 0.60 1.13 1 5.40 2 0.60 6.48 Principal 5/8" 5 31.10 1 155.50
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 31.10 1 62.20
1 4.05 0.35 0.60 0.85 1 4.05 2 0.60 4.86 Estribos 3/8" 36 2.10 1 75.60
1 6.25 0.35 0.60 1.31 1 6.25 2 0.60 7.50 Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 39 2.10 1 81.90
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 5/8" 5 27.90 1 139.50
1 6.55 0.35 0.60 1.38 1 6.55 2 0.60 7.86 Principal 1/2" 2 27.90 1 55.80
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Estribos 3/8" 40 2.10 1 84.00
1 1.88 0.35 0.60 0.39 1 1.88 2 0.60 2.26 Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 22 2.10 1 46.20
EJE 6 1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 5/8" 5 25.15 1 125.75
1 5.25 0.35 0.60 1.10 1 5.25 2 0.60 6.30 Principal 1/2" 2 25.15 1 50.30
1 3.60 0.35 0.60 0.76 1 3.60 2 0.60 4.32 Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 28 2.10 1 58.80
1 4.95 0.35 0.60 1.04 1 4.95 2 0.60 5.94 Principal 5/8" 5 25.50 1 127.50
1 6.55 0.35 0.60 1.38 1 6.55 2 0.60 7.86 Principal 1/2" 2 25.50 1 51.00
1 4.50 0.35 0.60 0.95 1 4.50 2 0.60 5.40 Estribos 3/8" 34 2.10 1 71.40
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 32 2.10 1 67.20
AUDITORIUM
VC-101 PRIMER PISO
EJES HORIZONTALES Caras
EJE F 2 2.85 0.35 0.60 1.20 2 2.85 2 0.60 6.84 Principal 5/8" 5 17.00 1 85.00
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 1/2" 2 17.00 1 34.00
Estribos 3/8" 25 2.10 2 105.00
Estribos 3/8" 42 2.10 1 88.20
EJE H 2 2.90 0.35 0.60 1.22 2 2.90 2 0.60 6.96 Principal 5/8" 5 21.00 1 105.00
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 1/2" 2 21.00 1 42.00
1 3.10 0.35 0.60 0.65 1 3.10 2 0.60 3.72 Estribos 3/8" 26 2.10 2 109.20
Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 26 2.10 1 54.60
ENTRE EJES I y J 1 6.85 0.35 0.60 1.44 1 6.85 2 0.60 8.22 Principal 5/8" 5 17.00 1 85.00
1 6.55 0.35 0.60 1.38 1 6.55 2 0.60 7.86 Principal 1/2" 2 17.00 1 34.00
1 3.75 0.35 0.60 0.79 1 3.75 2 0.60 4.50 Estribos 3/8" 41 2.10 1 86.10
40 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 29 2.10 1 60.90
1 3.75 0.35 0.60 0.79 1 3.75 2 0.60 4.50 Principal 5/8" 5 17.00 1 85.00
Principal 1/2" 2 17.00 1 34.00
Estribos 3/8" 29 2.10 1 60.90
EJES VERTICALES
EJE 1 2 6.90 0.35 0.60 2.90 2 6.90 2 0.60 16.56 Principal 5/8" 5 17.30 1 86.50
Principal 1/2" 2 17.30 1 34.60
Estribos 3/8" 42 2.10 2 176.40
1 6.00 0.35 0.60 1.26 1 6.00 2 0.60 7.20 Principal 5/8" 5 12.00 1 60.00
1 3.50 0.35 0.60 0.73 1 3.50 2 0.60 4.20 Principal 1/2" 2 12.00 1 24.00
Estribos 3/8" 38 2.10 1 79.80
Estribos 3/8" 28 2.10 1 58.80
EJE 2 1 6.00 0.35 0.60 1.26 1 6.00 2 0.60 7.20 Principal 5/8" 5 12.00 1 60.00
1 2.60 0.35 0.60 0.55 1 2.60 2 0.60 3.12 Principal 1/2" 2 12.00 1 24.00
Estribos 3/8" 38 2.10 1 79.80
Estribos 3/8" 24 2.10 1 50.40
EJE 3 1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 42 2.10 1 88.20
ENTRE EJES 3 y 4 2 6.90 0.35 0.60 2.90 2 6.90 2 0.60 16.56 Principal 5/8" 5 17.30 1 86.50
Principal 1/2" 2 17.30 1 34.60
Estribos 3/8" 42 2.10 2 176.40
EJE 4 1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 40 2.10 1 84.00
SECTOR B1 Y B4
VC-101 PRIMER PISO
EJES HORIZONTALES Caras
EJE G 2 6.90 0.35 0.60 2.90 2 6.90 2 0.60 16.56 Principal 5/8" 5 16.30 1 81.50
Principal 1/2" 2 16.30 1 32.60
Estribos 3/8" 42 2.10 2 176.40
1 6.55 0.35 0.60 1.38 1 6.55 2 0.60 7.86 Principal 5/8" 5 15.95 1 79.75
1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 1/2" 2 15.95 1 31.90
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 42 2.10 1 88.20
EJE H 1 0.80 0.35 0.60 0.17 1 0.80 2 0.60 0.96 Principal 5/8" 5 16.30 1 81.50
1 3.85 0.35 0.60 0.81 1 3.85 2 0.60 4.62 Principal 1/2" 2 16.30 1 32.60
41 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Estribos 3/8" 17 2.10 1 35.70
Estribos 3/8" 29 2.10 1 60.90
Estribos 3/8" 40 2.10 1 84.00
1 5.15 0.35 0.60 1.08 1 5.15 2 0.60 6.18 Principal 5/8" 5 15.95 1 79.75
1 5.20 0.35 0.60 1.09 1 5.20 2 0.60 6.24 Principal 1/2" 2 15.95 1 31.90
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 35 2.10 1 73.50
1 2.85 0.35 0.60 0.60 1 2.85 2 0.60 3.42 Principal 5/8" 5 5.10 1 25.50
Principal 1/2" 2 5.10 1 10.20
Estribos 3/8" 25 2.10 1 52.50
1 6.10 0.35 0.60 1.28 1 6.10 2 0.60 7.32 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 38 2.10 1 79.80
2 5.20 0.35 0.60 2.18 2 5.20 2 0.60 12.48 Principal 5/8" 5 15.95 1 79.75
Principal 1/2" 2 15.95 1 31.90
Estribos 3/8" 35 2.10 2 147.00
EJE I 2 6.90 0.35 0.60 2.90 2 6.90 2 0.60 16.56 Principal 5/8" 5 40.90 1 204.50
1 4.35 0.35 0.60 0.91 1 4.35 2 0.60 5.22 Principal 1/2" 2 40.90 1 81.80
1 6.30 0.35 0.60 1.32 1 6.30 2 0.60 7.56 Estribos 3/8" 42 2.10 2 176.40
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Estribos 3/8" 31 2.10 1 65.10
Estribos 3/8" 39 2.10 1 81.90
Estribos 3/8" 40 2.10 1 84.00
2 6.90 0.35 0.60 2.90 2 6.90 2 0.60 16.56 Principal 5/8" 5 40.90 1 204.50
1 4.35 0.35 0.60 0.91 1 4.35 2 0.60 5.22 Principal 1/2" 2 40.90 1 81.80
1 6.30 0.35 0.60 1.32 1 6.30 2 0.60 7.56 Estribos 3/8" 42 2.10 2 176.40
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Estribos 3/8" 31 2.10 1 65.10
Estribos 3/8" 39 2.10 1 81.90
Estribos 3/8" 40 2.10 1 84.00
EJES VERTICALES Caras
EJE 8 1 6.20 0.35 0.60 1.30 1 6.20 2 0.60 7.44 Principal 5/8" 5 16.30 1 81.50
1 4.70 0.35 0.60 0.99 1 4.70 2 0.60 5.64 Principal 1/2" 2 16.30 1 32.60
Estribos 3/8" 39 2.10 1 81.90
Estribos 3/8" 33 2.10 1 69.30
EJE 9 2 6.60 0.35 0.60 2.77 2 6.60 2 0.60 15.84 Principal 5/8" 5 16.30 1 81.50
Principal 1/2" 2 16.30 1 32.60
Estribos 3/8" 40 2.10 2 168.00
EJE 10 1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 5/8" 5 23.30 1 116.50
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 23.30 1 46.60
42 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
1 5.05 0.35 0.60 1.06 1 5.05 2 0.60 6.06 Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 34 2.10 1 71.40
EJE 10' 1 6.90 0.35 0.60 1.45 1 6.90 2 0.60 8.28 Principal 5/8" 5 17.30 1 86.50
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 17.30 1 34.60
Estribos 3/8" 42 2.10 1 88.20
Estribos 3/8" 40 2.10 1 84.00
EJE 11 1 2.25 0.35 0.60 0.47 1 2.25 2 0.60 2.70 Principal 5/8" 5 23.30 1 116.50
1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 1/2" 2 23.30 1 46.60
1 5.05 0.35 0.60 1.06 1 5.05 2 0.60 6.06 Estribos 3/8" 23 2.10 1 48.30
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 34 2.10 1 71.40
EJE 12 1 6.60 0.35 0.60 1.39 1 6.60 2 0.60 7.92 Principal 5/8" 5 15.10 1 75.50
1 5.35 0.35 0.60 1.12 1 5.35 2 0.60 6.42 Principal 1/2" 2 15.10 1 30.20
Estribos 3/8" 40 2.10 1 84.00
Estribos 3/8" 35 2.10 1 73.50
EJE 13 1 6.00 0.35 0.60 1.26 1 6.00 2 0.60 7.20 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 38 2.10 1 79.80
EJE 14 1 5.05 0.35 0.60 1.06 1 5.05 2 0.60 6.06 Principal 5/8" 5 6.55 1 32.75
Principal 1/2" 2 6.55 1 13.10
Estribos 3/8" 34 2.10 1 71.40
EJE 18 1 6.00 0.35 0.60 1.26 1 6.00 2 0.60 7.20 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 38 2.10 1 79.80
EJE 20 1 5.35 0.35 0.60 1.12 1 5.35 2 0.60 6.42 Principal 5/8" 5 12.55 1 62.75
1 5.05 0.35 0.60 1.06 1 5.05 2 0.60 6.06 Principal 1/2" 2 12.55 1 25.10
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 34 2.10 1 71.40
EJE 21 1 5.35 0.35 0.60 1.12 1 5.35 2 0.60 6.42 Principal 5/8" 5 12.55 1 62.75
1 5.05 0.35 0.60 1.06 1 5.05 2 0.60 6.06 Principal 1/2" 2 12.55 1 25.10
Estribos 3/8" 35 2.10 1 73.50
Estribos 3/8" 34 2.10 1 71.40
EJE 22 1 6.00 0.35 0.60 1.26 1 6.00 2 0.60 7.20 Principal 5/8" 5 8.10 1 40.50
Principal 1/2" 2 8.10 1 16.20
Estribos 3/8" 38 2.10 1 79.80
TOTALES M3 153.90 M2 879.46 ML - 9,987.60 2,045.60 5,114.00 - -
43 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"perimet Elemento
KG 5,593.06 2,025.14 7,926.70 -
% DE DESPERDICIOS 0% 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
153.90 879.46 5,593.06 2,025.14 7,926.70 - -
44 de 336
ACEROTOTAL
45 de 336
ACEROTOTAL
46 de 336
ACEROTOTAL
47 de 336
ACEROTOTAL
48 de 336
ACEROTOTAL
49 de 336
ACEROTOTAL
50 de 336
ACEROTOTAL
15,544.90
15,544.90
51 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet ElementoPLATEA
CONCRETO PLATEA DE CIMENTACIÓN F´C= 280 KG/CM2
SECTOR B2,B3,B5
PLATEA H= 0.50 m 1 area= 4664.40 0.50 2332.20
Area totatl x altura
menos TRAGALUZ B2 1 area= 57.38 0.50 -28.69
menos TRAGALUZ B3 1 area= 21.16 0.50 -10.58
menos TRAGALUZ B5 1 area= 57.75 0.50 -28.88
menos MONTACARGA 1 Y 2, ASCENSOR 4 Y 5 1 area= 36.68 0.50 -18.34
menos ASCENSOR 2 Y 3 1 area= 19.64 0.50 -9.82
PLATEA H= 0.40 m
MONTACARGA 1 Y 2, ASCENSOR 4 Y 5 1 area= 38.94 0.40 15.58
ASCENSOR 2 Y 3 1 area= 20.94 0.40 8.37
PLATEA H= 1.00 m
borde de platea 1 area= 0.13 31.60 3.95
ENCOFRADO Y DESENCOFRADO DE PLATEA DE CIMENTACIÓN.
SECTOR B2,B3,B5
PLATEA H= 0.50 m, no colindante con muro de contencion
Eje A 1 47.10 0.50 23.55
Eje B 1 57.30 0.50 28.65
Eje 8,9,14,18 y 23 5 6.00 0.50 15.00
Eje 25 1 23.90 0.50 11.95
Eje 27 1 3.50 0.50 1.75
PLATEA H= 0.50 m, colindante con muro de contencion 1 217.562 0.50 108.78
EN TRAGALUZ B2 1 30.500 0.50 15.25
EN TRAGALUZ B3 1 18.400 0.50 9.20
EN TRAGALUZ B5 1 41.450 0.50 20.73
PLATEA H=0.40 m
Ascensor n°2 y n°3 1 9.15 0.40 3.66
Ascensor n°4 y n°5 1 15.25 0.40 6.10
Montacarga n°1 y n°2 1 7.50 0.40 3.00
PLATEA H= 1.00 m, radioterapia
Eje 27 1 18.30 1.00 18.30
Entre Eje D y E 1 13.25 1.00 13.25
Eje 25 1 18.30 0.75 13.73
Eje G 1 13.25 0.75 9.94
ACERO CORRUGADO PARA PLATEA DE CIMENTACIÓN FY=4200 Kg/cm2
ACERO EN ASCENSORES, SALA DE ACELERADORES
base platea acero en Ascensores AB
Horizontal
Eje 15-16 X 5/8" 13 8.70 2 226.20
Eje 16 X 5/8" 14 4.30 2 120.40
Vertical
Eje A-B (1) Y 5/8" 18 3.60 2 129.60
Eje A-B (2) Y 5/8" 16 7.00 2 224.00
52 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
base platea acero en Ascensores HJ
Horizontal
Eje 16-17 X 5/8" 21 4.45 2 186.90
Vertical
Eje H-J Y 5/8" 16 5.70 2 182.40
Sala de Aceleradores
Direccion X Superior
Eje 16-17 X 3/4" 92 2.15 1 197.80
Direccion X Inferior
Eje 16-17 X 3/4" 92 14.70 1 1,352.40
1 Empalme 3/4" 92 1.00 1 92.00
Direccion Y
Eje H-J Y 3/4" 67 19.35 2 2,592.90
1 Empalme 3/4" 67 1.00 2 134.00
Direccion Z
Eje H-J Y 3/4" 2 18.25 2 73.00
1 Empalme 3/4" 2 1.00 2 4.00
ACERO GENERAL
HORIZONTAL
v Eje A a B, de 8 a 9, 23 a 24 X 3/4" 21 8.30 4 697.20
v Eje A a B, de 14 a 18 X 3/4" 1 27.50 2 55.00
3 Empalmes 3/4" 1 3.00 2 6.00
v Eje A a B, de 14 a 15 X 3/4" 10 8.05 2 161.00
v Eje A a B, de 14 a 16 X 3/4" 11 12.45 2 273.90
1 Empalme 3/4" 11 1.00 2 22.00
v Eje A a B, de 16 a 18 X 3/4" 21 12.45 2 522.90
1 Empalme 3/4" 21 1.00 2 42.00
v Eje B a D, de 8 a 24 X 3/4" 40 100.20 2 8,016.00
12 Empalmes 3/4" 40 12.00 2 960.00
v Eje D a E,de 8 a 18 X 3/4" 21 59.70 2 2,507.40
7 Empalmes 3/4" 21 7.00 2 294.00
v Eje D a E,de 8 a 17 X 3/4" 4 54.15 2 433.20
6 Empalmes 3/4" 4 6.00 2 48.00
v Eje D a E,de 11 a 17 X 3/4" 4 27.80 2 222.40
4 Empalmes 3/4" 4 4.00 2 32.00
V Eje E , de 8 a 10 X 3/4" 24 18.45 2 885.60
2 Empalmes 3/4" 24 2.00 2 96.00
v Eje E a F, de 8 a 19 X 3/4" 4 74.90 2 599.20
9 Empalmes 3/4" 4 9.00 2 72.00
v Eje D a E, de 13 a 16 X 3/4" 16 21.75 2 696.00
2 Empalmes 3/4" 16 2.00 2 64.00
v Eje E' a F de 8 a 24 X 3/4" 11 100.15 2 2,203.30
12 Empalmes 3/4" 11 12.00 2 264.00
v Eje E ,de 17 a 20 X 3/4" 13 22.80 2 592.80
2 Empalmes 3/4" 13 2.00 2 52.00
v Eje E a F ,de 13 a 20 X 3/4" 5 48.55 2 485.50
6 Empalmes 3/4" 5 6.00 2 60.00
53 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
v Eje D-E, de 17 a 20 X 3/4" 4 21.12 1 84.48
2 Empalmes 3/4" 4 2.00 1 8.00
v Eje D-E, de 18 a 20 X 3/4" 13 11.48 1 149.17
1 Empalme 3/4" 13 1.00 1 13.00
v Eje D-E. de 18 a 24 X 3/4" 16 38.30 2 1,225.60
4 Empalmes 3/4" 16 4.00 2 128.00
v Eje E-F, de 21 a 24 X 3/4" 11 24.02 2 528.44
3 Empalmes 3/4" 11 3.00 2 66.00
v Eje E-F, de 22 a 24 X 3/4" 26 18.15 2 943.80
1 Empalme 3/4" 26 1.00 2 52.00
v Eje F-G, de 13 a 24 X 3/4" 24 71.00 2 3,408.00
8 Empalmes 3/4" 24 8.00 2 384.00
v Eje F-G, de 13 a 27 X 3/4" 11 80.70 2 1,775.40
9 Empalmes 3/4" 11 9.00 2 198.00
v Eje G-H, de 13 a 18 X 3/4" 17 32.10 1 545.70
4 Empalmes 3/4" 17 4.00 1 68.00
v Eje H-I, de 15 a 17 X 3/4" 11 14.95 1 164.45
1 Empalme 3/4" 11 1.00 1 11.00
v Eje I-J, de 15 a 17 X 3/4" 17 10.15 2 345.10
1 Empalme 3/4" 17 1.00 2 34.00
v Eje H-I, de 22 a 27 X 3/4" 17 28.75 2 977.50
3 Empalmes 3/4" 17 3.00 2 102.00
v Eje I-J, de 23 a 27 X 3/4" 21 21.55 2 905.10
2 Empalmes 3/4" 21 2.00 2 84.00
VERTICAL
v EJE 8- 9 Y 3/4" 27 35.50 2 1,917.00
4 Empalmes 3/4" 27 4.00 2 216.00
v EJE 9-10,10' Y 3/4" 35 29.80 2 2,086.00
3 Empalmes 3/4" 35 3.00 2 210.00
v EJE 10,10'-12,13 (1) Y 3/4" 29 19.10 2 1,107.80
2 Empalmes 3/4" 29 2.00 2 116.00
v EJE 10,10'-12,13 (2) Y 3/4" 29 4.45 2 258.10
v EJE 10,10'-12,13 (3) Y 3/4" 10 29.80 2 596.00
3 Empalmes 3/4" 10 3.00 2 60.00
v EJE 12,13-14 (1) Y 3/4" 13 37.00 2 962.00
4 Empalmes 3/4" 13 4.00 2 104.00
v EJE 12,13-14 (2) Y 3/4" 13 44.20 2 1,149.20
5 Empalmes 3/4" 13 5.00 2 130.00
v EJE 14-15 (1) Y 3/4" 24 50.20 2 2,409.60
6 Empalmes 3/4" 24 6.00 2 288.00
v EJE 14-15 (2) Y 3/4" 3 58.00 2 348.00
7 Empalmes 3/4" 3 7.00 2 42.00
v EJE 15- 16 (1) Y 3/4" 14 55.20 2 1,545.60
6 Empalmes 3/4" 14 6.00 2 168.00
v EJE 15- 16 (2) Y 3/4" 17 20.20 2 686.80
2 Empalmes 3/4" 17 2.00 2 68.00
v EJE 15-16 (3) Y 3/4" 16 27.85 2 891.20
3 Empalmes 3/4" 16 3.00 2 96.00
v EJE 16-17 (1) Y 3/4" 3 26.05 2 156.30
54 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
3 Empalmes 3/4" 3 3.00 2 18.00
v EJE 16-17 (2) Y 3/4" 3 58.00 2 348.00
7 Empalmes 3/4" 3 7.00 2 42.00
v EJE 16-17 (3) Y 3/4" 4 53.10 2 424.80
6 Empalmes 3/4" 4 6.00 2 48.00
v EJE 16-17 (4) Y 3/4" 11 27.40 2 602.80
3 Empalmes 3/4" 11 3.00 2 66.00
v EJE 16-17 (5) Y 3/4" 20 24.20 2 968.00
3 Empalmes 3/4" 20 3.00 2 120.00
v EJE 17-18 (1) Y 3/4" 10 18.20 2 364.00
1 Empalme 3/4" 10 1.00 2 20.00
v EJE 17-18 (2) Y 3/4" 19 24.50 2 931.00
3 Empalmes 3/4" 19 3.00 2 114.00
v EJE 17-18 (3) Y 3/4" 6 50.20 2 602.40
6 Empalmes 3/4" 6 6.00 2 72.00
v EJE 18-19 Y 3/4" 29 39.55 2 2,293.90
4 Empalmes 3/4" 29 4.00 2 232.00
v EJE 20-21 (1) Y 3/4" 16 16.50 2 528.00
2 Empalmes 3/4" 16 2.00 2 64.00
v EJE 20-21 (2) Y 3/4" 10 19.05 2 381.00
2 Empalmes 3/4" 10 2.00 2 40.00
v EJE 20-22 (1) Y 3/4" 21 19.35 2 812.70
2 Empalmes 3/4" 21 2.00 2 84.00
v EJE 20-22 (2) Y 3/4" 27 13.20 2 712.80
1 Empalme 3/4" 27 1.00 2 54.00
v EJE 21-22 Y 3/4" 10 39.55 2 791.00
4 Empalmes 3/4" 10 4.00 2 80.00
v EJE 22-23 Y 3/4" 25 44.20 2 2,210.00
5 Empalmes 3/4" 25 5.00 2 250.00
v EJE 23-24 Y 3/4" 27 56.20 2 3,034.80
7 Empalmes 3/4" 27 7.00 2 378.00
v EJE 25-27 Superior Y 3/4" 45 15.05 1 677.25
1 Empalme 3/4" 45 1.00 1 45.00
v EJE 25-27 Inferior Y 3/4" 45 15.25 1 686.25
1 Empalme 3/4" 45 1.00 1 45.00
ACERO INFERIOR ADICIONAL (MORADO)
EJE B
X 3/4" 5 100.00 1 500.00
Adicional por 11 empalmes 3/4" 5 11.00 1 55.00
v C-9
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v C-10-10'
X 3/4" 13 4.00 1 52.00
Y 3/4" 13 4.00 1 52.00
v C - D 11
X 3/4" 55 3.00 1 165.00
Y1 3/4" 10 5.00 1 50.00
Y2 3/4" 10 5.00 1 50.00
55 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
v C12-13
X 3/4" 13 4.00 1 52.00
Y 3/4" 13 4.00 1 52.00
v C-14
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v C-15
X 3/4" 13 6.00 1 78.00
Y 3/4" 19 3.50 1 66.50
v C-16
X 3/4" 13 3.50 1 45.50
Y 3/4" 15 3.50 1 52.50
v C-17 1
X 3/4" 13 3.50 1 45.50
Y 3/4" 12 3.50 1 42.00
v C-18
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v C,D,E,E',F,G-19,20
X1 3/4" 29 4.00 1 116.00
X2 3/4" 6 5.00 1 30.00
X3 3/4" 7 2.25 1 15.75
X4 3/4" 8 3.15 1 25.20
X5 3/4" 25 4.00 1 100.00
X6 3/4" 7 5.00 1 35.00
X7 3/4" 28 4.00 1 112.00
Y 3/4" 9 34.02 1 306.18
Adicional por 4 empalmes Y 3/4" 9 4.00 1 36.00
v C-21
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v C-22,22'
X 3/4" 13 4.50 1 58.50
Y 3/4" 13 4.50 1 58.50
v C-23
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v C-24,25
X 3/4" 12 2.25 1 27.00
Y 3/4" 6 4.00 1 24.00
v D-9
X1 3/4" 9 2.50 1 22.50
X2 3/4" 9 2.50 1 22.50
Y 3/4" 25 3.50 1 87.50
v D-10,10'
X1 3/4" 9 4.50 1 40.50
X2 3/4" 4 2.50 1 10.00
Y1 3/4" 7 4.50 1 31.50
Y2 3/4" 6 3.50 1 21.00
56 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
v D,E,E',F-12,13
X1 3/4" 3 3.00 1 9.00
X2 3/4" 9 6.00 1 54.00
X3 3/4" 44 3.00 1 132.00
Y1 3/4" 7 3.00 1 21.00
Y2 3/4" 9 15.50 1 139.50
Adicional por 1 empalme Y 3/4" 9 1.00 1 9.00
v D-14
X 3/4" 17 4.50 1 76.50
Y 3/4" 13 4.50 1 58.50
v D,E,E',F-15,16,17
X1 3/4" 11 16.70 1 183.70
X2 3/4" 3 16.70 1 50.10
X3 3/4" 8 3.00 1 24.00
X4 3/4" 5 3.00 2 30.00
X5 3/4" 8 3.00 2 48.00
X6 3/4" 3 16.70 1 50.10
X7 3/4" 11 16.70 1 183.70
Y1 3/4" 9 19.10 1 171.90
Y2 3/4" 31 3.00 2 186.00
Y3 3/4" 9 5.70 1 51.30
Y4 3/4" 9 12.00 1 108.00
Adicional por 2 empalme X 3/4" 28 2.00 1 56.00
Adicional por 2 empalmes Y1 3/4" 9 2.00 1 18.00
Adicional por 1 empalme Y4 3/4" 9 1.00 1 9.00
v D-18
X 3/4" 17 3.70 1 62.90
Y 3/4" 13 4.50 1 58.50
v D-21
X 3/4" 11 3.50 1 38.50
Y 3/4" 11 3.50 1 38.50
v D-22,22'
X1 3/4" 8 4.00 2 64.00
X2 3/4" 8 5.00 1 40.00
Y 3/4" 19 6.00 1 114.00
v D-23
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v D-24,25
X 3/4" 19 2.25 1 42.75
Y 3/4" 6 6.00 1 36.00
v E,E'- 9
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v E,E'- 10
X 3/4" 7 3.00 1 21.00
Y 3/4" 7 3.00 1 21.00
v E,E'- 14
X 3/4" 17 4.50 1 76.50
57 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
Y 3/4" 13 4.50 1 58.50
v E- 18
X 3/4" 17 4.50 1 76.50
Y 3/4" 13 4.50 1 58.50
v E- 22,22'
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v E- 23
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v E- 24,25
X 3/4" 9 3.00 1 27.00
Y 3/4" 5 6.00 1 30.00
v F- 10,10'
X 3/4" 8 3.00 1 24.00
v F-14
X 3/4" 17 4.50 1 76.50
Y 3/4" 13 4.50 1 58.50
v F-18
X 3/4" 17 4.50 1 76.50
Y 3/4" 13 4.50 1 58.50
v F-21
X 3/4" 16 3.50 1 56.00
Y 3/4" 13 5.00 1 65.00
v F-22,22',23
X1 3/4" 5 2.25 1 11.25
X2 3/4" 9 12.00 1 108.00
Y1 3/4" 6 3.00 1 18.00
Y2 3/4" 7 4.50 1 31.50
Y3 3/4" 26 3.00 1 78.00
Adicional por 1 empalme X 3/4" 9 1.00 1 9.00
v F-24,25
X 3/4" 9 3.00 1 27.00
Y 3/4" 5 3.00 1 15.00
v G-14
X 3/4" 13 6.00 1 78.00
Y 3/4" 20 3.50 1 70.00
v G-15
X 3/4" 13 4.00 1 52.00
Y 3/4" 13 4.00 1 52.00
v G-16
X 3/4" 13 4.00 1 52.00
Y 3/4" 13 4.00 1 52.00
v G-17
X 3/4" 13 4.00 1 52.00
Y 3/4" 13 4.00 1 52.00
v G-18
X1 3/4" 17 4.50 1 76.50
X2 3/4" 3 2.25 1 6.75
58 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
Y1 3/4" 7 6.00 1 42.00
Y2 3/4" 6 5.00 1 30.00
v G-21
X 3/4" 13 4.00 1 52.00
Y 3/4" 13 4.00 1 52.00
v G-22,22'
X1 3/4" 30 4.50 1 135.00
X2 3/4" 4 3.00 1 12.00
Y1 1" 4 4.50 1 18.00
Y2 1" 6 6.00 1 36.00
v G-23
X 3/4" 15 4.50 1 67.50
Y 3/4" 15 4.50 1 67.50
v G-24,25
X 3/4" 19 2.25 1 42.75
Y 3/4" 9 6.00 1 54.00
v H-16
X 3/4" 11 3.50 1 38.50
Y 3/4" 11 3.50 1 38.50
V ZB4 (F,G-11)
X 5/8" 41 2.30 2 188.60
Y 5/8" 13 8.80 2 228.80
ACERO SUPERIOR ADICIONAL(MORADO)
V Eje 8, B-F
X 3/4" 47 5.50 1 258.50
v Eje B, 9 a 14
Y 3/4" 57 5.50 1 313.50
v Eje B, 18 a 23
Y 3/4" 55 5.50 1 302.50
v Eje B, 8 a 24
X 3/4" 5 100.00 1 500.00
11 Empalmes X 3/4" 5 11.00 1 55.00
v Eje 14 a 15, de C a G
X 3/4" 7 4.50 4 126.00
Y 3/4" 7 4.50 5 157.50
v Eje 17 a 18, de C a G
X 3/4" 7 4.50 3 94.50
Y 3/4" 31 4.50 1 139.50
Y 3/4" 2 3.50 1 7.00
v Eje 24, de B a D
X 3/4" 27 5.50 1 148.50
v Eje F, de 8 a 10
Y 3/4" 22 5.50 1 121.00
v Eje F a G, de 13 a 14
X 3/4" 9 5.50 1 49.50
X 3/4" 8 7.00 1 56.00
X 3/4" 7 3.50 1 24.50
v Eje G a H, de 13 a 23
Y 3/4" 52 5.50 1 286.00
59 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
ACERO INFERIOR ADICIONAL 2 (VERDE)
9-C X 3/4" 8 2.25 1 18.00
Y 3/4" 8 2.25 1 18.00
10 10´-C X 3/4" 8 2.25 1 18.00
Y 3/4" 8 2.25 1 18.00
11-C X 3/4" 8 3.00 1 24.00
Y 1" 7 3.00 1 21.00
12 13-C X 3/4" 8 2.25 1 18.00
Y 3/4" 8 2.25 1 18.00
14-C X 1" 10 3.00 1 30.00
Y 1" 8 3.00 1 24.00
15-C X 1" 4 6.00 1 24.00
Y 1" 5 3.00 2 30.00
16-C
17-C X 1" 10 3.00 1 30.00
Y 1" 12 3.00 1 36.00
18-C X 1" 8 4.50 1 36.00
Y 1" 12 3.00 1 36.00
19 20-C X 3/4" 8 4.00 1 32.00
21-C X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
22 22´-C
23-C X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
24 25-C
9-D X 3/4" 4 2.50 2 20.00
Y 3/4" 6 2.25 2 27.00
10 10´-D X 3/4" 7 2.25 1 15.75
Y 3/4" 7 2.25 1 15.75
11-D X 3/4" 6 3.00 1 18.00
Y 3/4" 6 2.25 1 13.50
12 13-D X 1" 8 3.00 1 24.00
Y 1" 8 3.00 1 24.00
14-D X 1" 12 3.00 1 36.00
Y 1" 8 4.50 1 36.00
15-D
18-D X 1" 12 3.00 1 36.00
Y 1" 7 4.50 1 31.50
23-D X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
24 25-D
9-E X 3/4" 8 2.25 1 18.00
60 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
Y 3/4" 8 2.25 1 18.00
14-E X 1" 12 3.00 1 36.00
Y 1" 8 4.50 1 36.00
15-E
18-E X 1" 12 3.00 1 36.00
Y 1" 8 4.50 1 36.00
19 20-E
22 22´-E X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
23-E X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
14-F X 1" 12 3.00 1 36.00
Y 1" 8 4.50 1 36.00
18-F X 1" 12 3.00 1 36.00
Y 1" 8 4.50 1 36.00
21-F
Y 3/4" 6 5.00 1 30.00
23-F X 3/4" 6 2.25 1 13.50
14-G X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
15-G X 1" 8 3.00 1 24.00
Y 1" 8 3.00 1 24.00
17-G X 1" 8 3.00 1 24.00
Y 1" 8 3.00 1 24.00
18-G X 3/4" 8 4.50 1 36.00
Y 3/4" 5 6.00 1 30.00
18-G G1 X 3/4" 3 4.50 1 13.50
X1 3/4" 3 2.25 1 6.75
Y 3/4" 3 4.50 1 13.50
Y 1" 9 3.00 1 27.00
23-G X 3/4" 10 3.00 1 30.00
Y 3/4" 10 3.00 1 30.00
ACERO DE SOPORTE (CABALLETE) x m2 area
parael acero en platea en bloque B2,B3,B5 X + Y 1/2" 2 1.5 4397.53 13,192.59
para el acero en platea en sala bindadas X + Y 1/2" 2 2.5 240.24 1,201.20
TOTALES M3 2263.80 M2 302.83 ML - - 14,393.79 1,486.90 82,449.12 919.50
KG 14,249.86 2,304.69 181,388.07 3,650.42 201,593.04
% DE DESPERDICIOS 0% 0% % DE DESPERDICIOS 0% 0% 0% 0%
2,263.80 302.83 14,249.86 2,304.69 181,388.07 3,650.42 201,593.04
61 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
0 PEDESTALES
0 CONCRETO PEDESTALES F´C= 280 KG/CM2
0 ENCOFRADO Y DESENCOFRADO DE PEDESTALES
0 ACERO CORRUGADO PEDESTALES FY=4200 Kg/cm2.
SECTOR B area
10,10' - B 1 4.31 1.00 0.4 1.72 1.00 10.6 0.4 4.24
X 5/8" 5 6.05 1 30.25
Y 5/8" 21 2.80 1 58.80
12,13 - B 1 4.59 1.00 0.4 1.84 1.00 10.85 0.4 4.34
X 5/8" 5 6.33 1 31.63
Y 5/8" 22 2.80 1 61.60
19,20 - B 1 4.00 1.00 0.40 1.60 1.00 10.15 0.4 4.06
X 5/8" 5 6.05 1 30.25
Y 5/8" 21 2.78 1 58.28
21- B 1 2.78 1.00 0.40 1.11 1.00 7.65 0.4 3.06
X 5/8" 4 4.80 1 19.20
Y 5/8" 15 2.78 1 41.63
22,22'- B 1 4.00 1.00 0.40 1.60 1.00 10.15 0.4 4.06
X 5/8" 5 6.05 1 30.25
Y 5/8" 21 2.78 1 58.28
9-C 1 1.81 1.00 0.40 0.72 1.00 5.40 0.40 2.16
X 5/8" 8 3.20 1 25.60
Y 5/8" 7 3.40 1 23.80
10 10´-C 1 2.70 1.00 0.40 1.08 1.00 6.60 0.40 2.64
X 5/8" 8 3.75 1 30.00
Y 5/8" 10 3.45 1 34.50
11-C 1 7.11 1.00 0.40 2.84 1.00 14.50 0.40 5.80
X 5/8" 22 3.10 1 68.20
Y 5/8" 6 7.75 1 46.50
X1 5/8" 8 3.40 1 27.20
Y2 5/8" 2 3.40 1 6.80
12 13-C 1 2.70 1.00 0.40 1.08 1.00 6.60 0.40 2.64
X 5/8" 8 3.75 1 30.00
Y 5/8" 10 3.45 1 34.50
14-C 1 2.24 1.00 0.40 0.90 1.00 6.00 0.40 2.40
X 5/8" 8 3.55 1 28.40
Y 5/8" 9 3.35 1 30.15
15-C 1 3.05 1.00 0.40 1.22 1.00 7.60 0.40 3.04
X 5/8" 6 4.60 1 27.60
Y 5/8" 14 3.10 1 43.40
16-C 1 1.81 1.00 0.40 0.72 1.00 5.40 0.40 2.16
X 5/8" 7 3.40 1 23.80
Y 5/8" 8 3.20 1 25.60
17-C 1 1.81 1.00 0.40 0.72 1.00 5.40 0.40 2.16
X 5/8" 7 3.40 1 23.80
Y 5/8" 8 3.20 1 25.60
18-C 1 2.59 1.00 0.40 1.04 1.00 6.80 0.40 2.72
X 5/8" 6 4.20 1 25.20
Y 5/8" 12 3.10 1 37.20
19 20-C 1 3.30 1.00 0.40 1.32 1.00 7.40 0.40 2.96
X 5/8" 12 3.45 1 41.40
Y 5/8" 8 4.15 1 33.20
21-C 1 2.36 1.00 0.40 0.94 1.00 6.40 0.40 2.56
X 5/8" 6 4.00 1 24.00
Y 5/8" 11 3.10 1 34.10
23-C 1 2.36 1.00 0.40 0.94 1.00 6.40 0.40 2.56
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.00 1 24.00
24 25-C 1 2.76 1.00 0.40 1.10 1.00 7.15 0.40 2.86
X 5/8" 13 3.08 1 39.97
Y 5/8" 6 4.40 1 26.40
9-D 1 5.30 1.00 0.40 2.12 1.00 11.50 0.40 4.60
X 5/8" 6 6.55 1 39.30
Y 5/8" 24 3.10 1 74.40
11-D 1 6.78 1.00 0.40 2.71 1.00 14.10 0.40 5.64
X 5/8" 21 3.10 1 65.10
Y 5/8" 6 7.25 1 43.50
X1 5/8" 6 3.70 1 22.20
Y2 5/8" 2 3.10 1 6.20
Y3 5/8" 2 3.10 1 6.20
12 13-D 1 7.91 1.00 0.40 3.16 1.00 11.71 0.40 4.68
X 5/8" 4 5.15 1 20.60
Y 5/8" 4 5.30 1 21.20
X VARIABLE 5/8" 1 48.22 1 48.22
Y VARIABLE 5/8" 1 44.47 1 44.47
14-D 1 2.88 1.00 0.40 1.15 1.00 7.30 0.40 2.92
X 5/8" 13 3.10 1 40.30
Y 5/8" 6 4.45 1 26.70
15-D 1 16.72 1.00 0.40 6.69 1.00 16.25 0.40 6.50
X 5/8" 11 6.35 1 69.85
Y 5/8" 22 3.90 1 85.89
X VARIABLE 5/8" 1 51.70 1 51.70
Y VARIABLE 5/8" 1 63.06 1 63.06
16-D 1 3.85 1.00 0.40 1.54 1.00 8.40 0.40 3.36
X 5/8" 7 4.80 1 33.60
Y 5/8" 15 3.30 1 49.50
62 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
17-D 1 16.72 1.00 0.40 6.69 1.00 16.25 0.40 6.50
X 5/8" 11 6.35 1 69.85
Y 5/8" 22 3.90 1 85.89
X VARIABLE 5/8" 1 51.70 1 51.70
Y VARIABLE 5/8" 1 63.06 1 63.06
18-D 1 2.87 1.00 0.40 1.15 1.00 7.30 0.40 2.92
X 5/8" 13 3.10 1 40.30
Y 5/8" 6 4.45 1 26.70
19 20-D 1 14.31 1.00 0.40 5.72 1.00 14.94 0.40 5.98
X VARIABLE 5/8" 1 114.36 1 114.36
Y 5/8" 4 7.55 1 30.20
Y VARIABLE 5/8" 1 56.38 1 56.38
21-D 1 1.67 1.00 0.40 0.67 1.00 5.20 0.40 2.08
X 5/8" 6 3.40 1 20.40
Y 5/8" 8 3.10 1 24.80
22 22´-D 1 9.41 1.00 0.40 3.76 1.00 12.54 0.40 5.02
X VARIABLE 5/8" 1 85.86 1 85.86
Y 5/8" 4 6.45 1 25.80
Y VARIABLE 5/8" 1 43.26 1 43.26
23-D 1 2.36 1.00 0.40 0.94 1.00 6.40 0.40 2.56
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.00 1 24.00
24 25-D 1 4.75 1.00 0.40 1.90 1.00 6.30 0.40 2.52
X 5/8" 20 3.00 1 60.00
Y 5/8" 6 5.75 1 34.50
9-E 1 1.81 1.00 0.40 0.72 1.00 5.40 0.40 2.16
X 5/8" 8 3.20 1 25.60
Y 5/8" 7 3.40 1 23.80
12-13-E 1 3.68 1.00 0.40 1.47 1.00 8.70 0.40 3.48
X 5/8" 17 3.10 1 52.70
Y 5/8" 6 5.15 1 30.90
14-E 1 2.41 1.00 0.40 0.96 1.00 6.50 0.40 2.60
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.05 1 24.30
15-E 1 5.00 1.00 0.40 2.00 1.00 11.00 0.40 4.40
X 5/8" 22 3.10 1 68.20
Y 5/8" 6 6.30 1 37.80
17-E 1 6.47 1.00 0.4 2.59 1.00 10.98 0.40 4.39
X VARIABLE 5/8" 1 72.66 1 72.66
Y 5/8" 4 6.25 1 25.00
Y VARIABLE 5/8" 1 20.68 1 20.68
18-E 1 2.41 1.00 0.40 0.96 1.00 6.50 0.40 2.60
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.05 1 24.30
19 20-E 1 3.68 1.00 0.4 1.47 1.00 8.70 0.40 3.48
X 5/8" 17 3.10 1 52.70
Y 5/8" 6 5.15 1 30.90
22 22´-E 1 1.66 1.00 0.40 0.66 1.00 5.20 0.40 2.08
X 5/8" 8 3.10 1 24.80
Y 5/8" 6 3.40 1 20.40
23-E 1 2.36 1.00 0.40 0.94 1.00 6.40 0.40 2.56
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.00 1 24.00
24 25-E 1 1.12 1.00 0.40 0.45 1.00 4.45 0.40 1.78
X 5/8" 8 2.73 1 21.80
Y 5/8" 4 3.40 1 13.60
14-F 1 2.47 1.00 0.40 0.99 1.00 6.60 0.40 2.64
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.10 1 24.60
15-F 1 16.72 1.00 0.40 6.69 1.00 16.25 0.40 6.50
X 5/8" 11 6.35 1 69.85
Y 5/8" 22 3.90 1 85.89
X VARIABLE 5/8" 1 51.70 1 51.70
Y VARIABLE 5/8" 1 63.06 1 63.06
16-F 1 3.85 1.00 0.40 1.54 1.00 8.40 0.40 3.36
X 5/8" 7 4.80 1 33.60
Y 5/8" 15 3.30 1 49.50
17-F 1 16.72 1.00 0.40 6.69 1.00 16.25 0.40 6.50
X 5/8" 11 6.35 1 69.85
Y 5/8" 22 3.90 1 85.89
X VARIABLE 5/8" 1 51.70 1 51.70
Y VARIABLE 5/8" 1 63.06 1 63.06
18-F 1 2.47 1.00 0.40 0.99 1.00 6.60 0.40 2.64
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.10 1 24.60
19 20-F 1 12.86 1.00 0.40 5.14 1.00 15.34 0.40 6.14
X VARIABLE 5/8" 1 112.19 1 112.19
Y 5/8" 4 7.85 1 31.40
Y VARIABLE 5/8" 1 62.90 1 62.90
21-F 1 4.25 1.00 0.40 1.70 1.00 9.70 0.40 3.88
X 5/8" 19 3.20 1 60.80
Y 5/8" 7 5.65 1 39.55
22 22´-F 1 6.22 1.00 0.40 2.49 1.00 10.25 0.40 4.10
X 5/8" 4 4.80 1 19.20
Y 5/8" 4 4.80 1 19.20
X VARIABLE 5/8" 1 38.10 1 38.10
63 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial SENTIDO D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
perimet Elemento
Y VARIABLE 5/8" 1 38.10 1 38.10
23-F 1 6.67 1.00 0.40 2.67 1.00 13.90 0.40 5.56
X 5/8" 6 7.75 1 46.50
Y 5/8" 30 3.10 1 93.00
24 25-F 1 2.06 1.00 0.40 0.82 1.00 6.00 0.40 2.40
X 5/8" 9 3.10 1 27.90
Y 5/8" 4 3.80 1 15.20
X1 5/8" 1 2.73 1 2.73
Y2 5/8" 2 3.61 1 7.22
14-G 1 1.81 1.00 0.40 0.72 1.00 5.40 0.40 2.16
X 5/8" 8 3.20 1 25.60
Y 5/8" 7 3.40 1 23.80
15-G 1 2.13 1.00 0.40 0.85 1.00 6.00 0.40 2.40
X 5/8" 6 3.80 1 22.80
Y 5/8" 10 3.10 1 31.00
16-G 1 2.13 1.00 0.40 0.85 1.00 6.00 0.40 2.40
X 5/8" 6 3.80 1 22.80
Y 5/8" 10 3.10 1 31.00
17-G 1 2.87 1.00 0.40 1.15 1.00 7.30 0.40 2.92
X 5/8" 6 4.45 1 26.70
Y 5/8" 13 3.10 1 40.30
18-G 1 1.81 1.00 0.40 0.72 1.00 5.40 0.40 2.16
X 5/8" 8 3.20 1 25.60
Y 5/8" 7 3.40 1 23.80
21-G 1 1.66 1.00 0.40 0.66 1.00 5.20 0.40 2.08
X 5/8" 8 3.40 1 27.20
Y 5/8" 8 3.40 1 27.20
22-G 1 2.41 1.00 0.40 0.96 1.00 6.50 0.40 2.60
X 5/8" 8 4.05 1 32.40
Y 5/8" 11 3.40 1 37.40
23-G 1 2.36 1.00 0.40 0.94 1.00 6.40 0.40 2.56
X 5/8" 11 3.10 1 34.10
Y 5/8" 6 4.00 1 24.00
24 25-G 1 4.32 1.00 0.40 1.73 1.00 10.15 0.40 4.06
X 5/8" 3 2.73 1 8.18
Y 5/8" 4 5.88 1 23.50
X1 5/8" 18 3.10 1 55.80
Y2 5/8" 2 5.35 1 10.70
16-H 1 1.66 1.00 0.40 0.66 1.00 5.20 0.40 2.08
X 5/8" 6 3.40 1 20.40
Y 5/8" 8 3.10 1 24.80
TOTALES M3 111.94 M2 210.36 ML - - - 5,649.32 - -
KG - 8,756.44 - - 8,756.44
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
111.94 210.36 - - 8,756.44 - - 8,756.44
64 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
EJE perimet Elemento
02.03.01.01 CONCRETO EN ZAPATAS F`C = 280 KG/CM2
02.03.01.02 ZAPATAS ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
LA-5 1 11.71 3.10 0.60 21.78 X 5/8" 78 3.50 2 546.00
Y 5/8" 21 12.11 2 508.62
1 4.35 1.80 0.60 4.70 5/8" 29 5.40 2 313.20
5/8" 12 4.75 2 114.00
refuerzo adicional 3/4" 32 5.92 2 378.88
empalme 1m 5/8" 21 1.00 2 42.00
Eje C8 ZA-7 1 3.50 5.30 0.60 11.13 X 5/8" 24 5.20 1 124.80
Y 5/8" 36 3.40 1 122.40
EJE F-7 ZA-14 1 2.95 7.55 0.60 13.36 X 5/8" 50 3.45 1 172.50
Y 5/8" 20 7.45 1 149.00
Z-1 16 1.20 1.20 0.60 13.82 5/8" 7 1.20 16 134.40
5/8" 7 1.20 16 134.40
Z-2 6 1.40 1.40 0.60 7.06 5/8" 8 1.40 6 67.20
5/8" 8 1.40 6 67.20
Z-3 3 1.60 1.60 0.60 4.61 5/8" 9 1.60 3 43.20
5/8" 9 1.60 3 43.20
Z-4 2 1.20 1.85 0.60 2.66 5/8" 7 1.85 2 25.90
5/8" 11 1.20 2 26.40
Z-5 1 1.40 1.70 0.60 1.43 5/8" 8 1.70 1 13.60
5/8" 10 1.40 1 14.00
Z-6 2 1.70 1.70 0.60 3.47 5/8" 10 1.70 2 34.00
5/8" 10 1.70 2 34.00
Z-7 4 1.85 1.85 0.60 8.21 5/8" 11 1.85 4 81.40
5/8" 11 1.85 4 81.40
Z-8 3 1.00 1.00 0.60 1.80 5/8" 6 1.00 3 18.00
5/8" 6 1.00 3 18.00
Z-9 1 2.00 2.00 0.60 2.40 5/8" 11 2.00 1 22.00
5/8" 11 2.00 1 22.00
Z-10 3 1.50 3.00 0.60 8.10 5/8" 9 3.00 3 81.00
5/8" 16 1.50 3 72.00
Z-11 1 1.50 3.25 0.60 2.93 5/8" 9 3.25 1 29.25
5/8" 18 1.50 1 27.00
Z-12 1 1.50 3.40 0.60 3.06 5/8" 9 3.40 1 30.60
5/8" 18 1.50 1 27.00
Z-13 2 1.20 3.00 0.60 4.32 5/8" 7 3.00 2 42.00
5/8" 16 1.20 2 38.40
Z-14 1 1.30 3.00 0.60 2.34 5/8" 8 3.00 1 24.00
65 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
EJE perimet Elemento
5/8" 16 1.30 1 20.80
Z-15 1 1.60 3.50 0.60 3.36 5/8" 9 3.50 1 31.50
5/8" 19 1.60 1 30.40
Z-17 1 1.80 2.10 0.60 2.27 5/8" 10 2.10 1 21.00
5/8" 12 1.80 1 21.60
Z-18 1 1.10 3.30 0.60 2.18 5/8" 7 3.30 1 23.10
1 1.10 2.85 0.60 1.88 5/8" 18 1.10 1 19.80
5/8" 7 2.85 1 19.95
5/8" 16 1.10 1 17.60 PLACAS ASCENSOR SECTOR A ZAPATA 1 4.00 3.90 0.8 12.48 Longitud. Sup e inf. 5/8" 54 6.10 1 329.40
Transvers. Sup. e inf. 5/8" 52 6.20 1 322.40
SECTOR B
I-10 ZB-7 1 4.70 3.30 0.60 9.31 X 5/8" 33 4.60 1 151.80
-1 2.96 1.00 0.3 -0.89 Y 5/8" 22 3.20 1 70.40
-1 19.20 1.00 0.30 -5.76 Y 5/8" 16 3.00 12 576.00
I-22 ZB-14 1 4.70 3.00 0.6 8.46 X 5/8" 31 4.60 1 142.60
-1 2.92 1.00 0.30 -0.88 Y 5/8" 16 2.90 1 46.40
SECTOR B
SECTOR B1 Y B4
Z-19 1 1.50 3.00 0.60 2.70 5/8" 9 3.00 1 27.00
5/8" 16 1.50 1 24.00
Z-20 3 2.50 2.50 0.60 11.25 5/8" 14 2.50 3 105.00
5/8" 14 2.50 3 105.00
Z-20' 2 2.90 2.50 0.60 8.70 5/8" 16 2.50 2 80.00
5/8" 14 2.90 2 81.20
Z-22 4 2.30 2.30 0.60 12.70 5/8" 13 2.50 4 130.00
5/8" 13 2.30 4 119.60
Z-27 2 2.52 3.30 0.60 9.98 5/8" 14 3.30 2 92.40
5/8" 18 2.52 2 90.72
Z-28 12 2.20 2.20 0.60 34.85 5/8" 12 2.20 12 316.80
5/8" 12 2.20 12 316.80
Z-33 1 1.50 4.00 0.60 3.60 5/8" 9 4.00 1 36.00
5/8" 21 1.50 1 31.50
Z-33" 1 1.60 4.15 0.60 3.98 5/8" 9 4.15 1 37.35
5/8" 22 1.60 1 35.20 PLACAS ESCALERA 7 ZAPATA 1 8.60 7.15 0.8 49.19 Longitud. Sup e inf. 5/8" 116 9.35 1 1,084.60
Transvers. Sup. e inf. 5/8" 96 10.80 1 1,036.80
SECTOR C
Z-01 5 1.00 1.00 0.40 2.00 1/2" 5 1.00 5 25.00
1/2" 5 1.00 5 25.00
66 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
EJE perimet Elemento
SECTOR D
Eje 25' a 26' Zt-1 4 0.80 0.80 0.40 1.02 1/2" 5 1.07 4 21.40
1/2" 5 1.07 4 21.40
SECTOR E
Z-1E 24 1.00 1.00 0.60 14.40 1/2" 5 1.00 24 120.00
1/2" 5 1.00 24 120.00
SECTOR F
Eje A-28" Z-1F 1 1.15 1.30 0.40 0.60 Y 1/2" 6 1.30 1 7.80
X 1/2" 6 1.15 1 6.90
Eje A-29' Z-2F 1 1.55 1.25 0.40 0.78 Y 1/2" 6 1.25 1 7.50
X 1/2" 7 1.55 1 10.85
Eje A, A'-30 Z-3F 2 1.20 1.40 0.40 1.34 Y 1/2" 7 1.40 2 19.60
X 1/2" 6 1.20 2 14.40
Eje A'-28" Z-4F 1 1.15 1.40 0.40 0.64 Y 1/2" 7 1.40 1 9.80
X 1/2" 6 1.15 1 6.90
Eje A'-29' Z-5F 1 1.55 1.20 0.40 0.74 Y 1/2" 6 1.20 1 7.20
X 1/2" 7 1.55 1 10.85
Eje B'-28" Z-6F 1 1.65 1.10 0.40 0.73 Y 1/2" 5 1.10 1 5.50
X 1/2" 8 1.65 1 13.20
Eje B'-29" Z-7F 1 1.20 1.50 0.40 0.72 Y 1/2" 7 1.50 1 10.50
X 1/2" 6 1.20 1 7.20
Eje B'-30 & C'-29' Z-8F 2 1.60 1.15 0.40 1.47 Y 1/2" 6 1.15 2 13.80
X 1/2" 7 1.60 2 22.40
Eje C'-28" Z-9F 1 1.25 2.75 0.40 1.38 Y 1/2" 12 2.75 1 33.00
X 1/2" 6 1.25 1 7.50
Eje C'-30 Z-10F 1 1.55 2.35 0.40 1.46 Y 1/2" 10 2.35 1 23.50
X 1/2" 7 1.55 1 10.85
TOTALES M3 313.82 ML - - 582.05 8,938.79 378.88 -
KG 576.23 13,855.12 833.54 15,264.89
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
313.82 - 576.23 13,855.12 833.54 - 15,264.89
67 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento 02.03.03 COLUMNAS
02.03.03.01 COLUMNAS CONCRETO F`C = 280 KG/CM2
02.03.03.03 COLUMNAS ENCOFRADO Y DESENCOFRADO
02.03.03.05 COLUMNAS - ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
SUBSECTOR A-3
CA-1
EJE A-7 SOTANO, PRIMER Y SEGUNDO PISO 1 1.25 0.30 12.25 4.59 0.38 1 3.70 12.25 45.33 Verticales 5/8" 24 13.33 1 319.80 1 0.30 0.30 12.25 1.10
Horizontales sotano +1er P (h=7.35) 3/8" 42 4.98 1 208.16 Horizontales 1er. P tipo "C" 3/8" 41 0.98 1 39.98 Horizontales 2do. P (h=3.4) 3/8" 25 4.98 1 124.50 Horizontales 2do. P tipo "C" 3/8" 25 0.98 1 24.50 empalme 1 5/8" 24 1.00 1 24.00
CA-2 Eje entre A & BSOTANO, PRIMER, Y SEGUNDO PISO 2 0.30 0.30 12.25 2.21 2 1.20 12.25 29.40 Verticales 5/8" 6 13.33 2 159.90
Horizontales sotano +1er P (h=7.35) 3/8" 42 1.12 2 93.63 Horizontales 2do. P (h=3.4) 3/8" 25 1.12 2 56.00
Eje 3 y 4, entrePRIMER Y SEGUNDO PISO 3 0.30 0.30 8.85 2.39 3 1.20 8.85 31.86 Verticales 5/8" 6 10.23 3 184.05 Horizontales 1er P (h=3.4) 3/8" 32 1.12 3 107.52 Horizontales 2do. P (h=3.4) 3/8" 25 1.12 3 84.00 empalme 1 5/8" 6 1.00 1 6.00
CA-2 VIENE DE PLATEA
Eje 8 - B/C SOTANO Y PRIMER PISO 2 0.30 0.30 9.55 1.72 2 1.20 9.55 22.92 Verticales 5/8" 6 10.93 2 131.10
Horizontales sotano +1er P (h=7.35) 3/8" 48 1.12 2 107.07 CA-3
Eje B, D - 3 PRIMER Y SEGUNDO PISO 2 0.60 0.30 8.85 3.19 2 1.80 8.85 31.86 Vertical 5/8" 12 10.23 2 245.40 Horizontales 1er. P (h=3.4) 3/8" 32 1.72 2 110.08 Horizontal 1er P tipo "C" 3/8" 31 0.46 2 28.52 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 2 86.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 2 23.00 empalme 1 5/8" 12 1.00 2 24.00
CA-4 Eje B-7 SOTANO,PRIMER Y SEGUNDO PISO 1 0.60 0.30 12.25 2.21 1 1.80 12.25 22.05 Vertical 5/8" 12 13.33 1 159.90
Horizontales sotano +1er P (h=7.35) 3/8" 42 1.72 1 71.90 Horizontal 1er P tipo "C" 3/8" 41 0.46 1 18.77 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 1 43.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 1 11.50 empalme 1 5/8" 12 1.00 1 12.00
PRIMER Y SEGUNDO PISO 5 0.60 0.30 8.85 7.96 5 1.80 8.85 79.65 Verticales 5/8" 10
10.23 5 511.25 Horizontales 1er. P (h=3.4) 3/8" 32 1.72 5 275.20 Horizontal 1er P tipo "C" 3/8" 31 0.46 5 71.30 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 5 215.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 5 57.50 empalme 1 5/8" 10 1.00 5 50.00
CA-5 Eje C-7 PRIMER Y SEGUNDO PISO 1 0.60 0.30 8.85 1.59 1 1.80 8.85 15.93 Vertical 5/8" 16 10.23 1 163.60
Horizontales 1er. P (h=3.4) 3/8" 32 1.72 1 55.04 Horizontal 1er P tipo "C" 3/8" 31 0.46 1 14.26
Eje B-5,6 & Eje C-4,5,6
68 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 2do. P (h=3.4) 3/8" 25 1.72 1 43.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 1 11.50 empalme 1 5/8" 16 1.00 1 16.00
69 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento CA-6
Eje E' -6 PRIMER , SEGUNDO Y TERCER PISO 1 0.60 0.30 14.5 2.61 1 1.80 14.50 26.10 Verticales 5/8" 14 15.88 1 222.25 1 0.30 0.30 14.5 1.31 1 1.20 14.50 17.40
Horizontales 1er. P (h=3.4) 3/8" 32 3.44 1 110.08 Horizontales 2do. P (h=3.4) 3/8" 25 3.44 1 86.00 Horizontales 3er. P (2.75) 3/8" 21 3.44 1 72.24 Horizontales atico (h=1.45) 3/8" 15 3.44 1 51.60 empalme 1 5/8" 14 1.00 1 14.00
CA-7
Eje E'-7 PRIMER , SEGUNDO Y TERCER PISO 1 1.60 0.30 12.35 5.93 1 3.80 12.35 46.93 Verticales 3/4" 16 13.73 1 219.60 Verticales 1/2" 8 13.73 1 109.80 Horizontales 1er. P (h=3.4) 3/8" 21 3.34 1 70.14 Horizontales 1er. P (h=3.4) 3/8" 30 1.25 1 37.50 Horizontal 1er P tipo "C" 3/8" 29 0.46 1 13.34 Horizontales 2do. P (h=3.4) 3/8" 14 3.34 1 46.76 Horizontales 2do. P (h=3.4) 3/8" 23 1.25 1 28.75 Horizontal 2do P tipo "C" 3/8" 23 0.46 1 10.58 Horizontales 3er. P (h=2.75) 3/8" 11 3.34 1 36.74 Horizontales 3er. P (h=2.75) 3/8" 19 1.25 1 23.75 Horizontal 2do P tipo "C" 3/8" 19 0.46 1 8.74 empalme 1 3/4" 16 1.00 0 0.00 empalme 2 1/2" 8 1.00 1 8.00
COLUMNAS ESCALERA N°11 CA-2
Eje 7 entre B VIENE DESDE LOSA LA-1 2 0.30 0.30 8.00 1.44 2 1.20 8.00 19.20 Verticales 5/8" 6 9.23 2 110.70 Horizontales sotano +1er P (h=3.95) 3/8" 44 1.12 2 98.11
CE2 VIENE DESDE LOSA LA1 2 0.23 0.30 8.00 1.10 2 1.06 8.00 16.96 Verticales 3/4" 6 9.23 2 110.70
Horizontales sotano +1er P (h=3.95) 3/8" 44 1.10 2 96.36 CE1 HASTA DESCANSO NPT +4.85 1 0.40 0.40 4.90 0.78 1 1.60 4.90 7.84 Verticales 3/4" 12 6.13 1 73.50
Horizontales 1er P (h=3.95) 3/8" 28 1.64 1 45.92 HASTA DESCANSO NPT +2.8 1 0.40 0.40 2.90 0.46 1 1.60 2.90 4.64 Verticales 3/4" 12 4.13 1 49.50
Horizontales 1er P (h=1.95) 3/8" 17 1.64 1 27.88 COLUMNAS ESCALERA N°16 CE1 HASTA DESCANSO NPT +6.21 1 0.40 0.40 6.26 1.00 1 1.60 6.26 10.02 Verticales 3/4" 12 7.49 1 89.82
Horizontales 1er P (h=6.26) 3/8" 39 1.64 1 63.96 CE1 HASTA DESCANSO NPT +3.48 1 0.40 0.40 3.43 0.55 1 1.60 3.43 5.49 Verticales 3/4" 12 4.81 1 57.66
Horizontales 1er. P 3/8" 28 1.52 1 42.56 Horizontales 1er. P tipo "C" 3/8" 27 2.24 1 60.48
SUBSECTOR A-2 CA-4
Eje E-7 PRIMER, SEGUNDO Y TERCER PISO 1 0.60 0.30 12 2.16 1 1.80 12.00 21.60 Verticales 5/8" 10 13.47 1 134.65 empalme 1 5/8" 10 1.00 1 10.00 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2do. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 21 1.72 1 36.12 Horizontales 3er. P tipo"C" 3/8" 21 0.46 1 9.66
Eje F-5 PRIMER Y SEGUNDO PISO 1 0.60 0.30 8.55 1.54 1 1.80 8.55 15.39 Verticales 5/8" 10 10.23 1 102.25 empalme 1 5/8" 10 1.00 1 10.00
70 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 25 1.72 1 43.00 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50
Eje H-7 PRIMER, SEGUNDO Y TERCER PISO + 4 1 0.60 0.30 16.95 3.05 1 1.80 16.95 30.51 Vertical 5/8" 10 18.63 1 186.25 empalme 1 5/8" 10 2.00 1 20.00 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo "C" 3/8" 21 0.46 1 9.66 Horizontales 4to. P 3/8" 29 1.72 1 49.88 Horizontales 4to. P tipo "C" 3/8" 29 0.46 1 13.34
CA-5 Eje F-6 PRIMER, SEGUNDO Y TERCER PISO,AT 1 0.60 0.30 14.15 2.55 1 1.80 14.15 25.47 Vertical 5/8" 16 15.88 1 254.00
empalme 1 5/8" 16 1.00 1 16.00 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo "C" 3/8" 21 0.46 1 9.66 Horizontales atico 3/8" 15 1.72 1 25.80 Horizontales atico tipo "C" 3/8" 15 0.46 1 6.90
Eje H-4,5 PRIMER Y SEGUNDO PISO 2 0.60 0.30 8.55 3.08 2 1.80 8.55 30.78 Vertical 5/8" 16 10.23 2 327.20 empalme 1 5/8" 16 1.00 2 32.00 Horizontales 1er. P 3/8" 32 1.72 2 110.08 Horizontales 1er. P tipo "C" 3/8" 31 0.46 2 28.52 Horizontales 2do. P 3/8" 25 1.72 2 86.00 Horizontales 2er. P tipo "C" 3/8" 25 0.46 2 23.00
CA-8 Eje E-4 PRIMER Y SEGUNDO PISO 1 0.30 0.30 8.55 0.77 1 1.20 8.55 10.26 Vertical 3/4" 6 10.23 1 61.35
empalme 1 3/4" 6 1.00 1 6.00 Horizontales 1er. P 3/8" 32 1.12 1 35.84 Horizontales 2do. P 3/8" 25 1.12 1 28.00
CA-9 Eje E-6 PRIMER, SEGUNDO Y TERCER PISO, AT 1 0.60 0.30 14.15 2.55 1 1.80 14.15 25.47 Vertical 3/4" 14 15.88 1 222.25
empalme 1 3/4" 14 1.00 1 14.00 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2do. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo"C" 3/8" 21 0.46 1 9.66 Horizontales atico 3/8" 15 1.72 1 25.80 Horizontales atico tipo "C" 3/8" 15 0.46 1 6.90
CA-10 Eje H-6 PRIMER, SEGUNDO Y TERCER PISO + 4 1 0.60 0.30 14.75 2.66 1 1.80 14.75 26.55 Vertical 5/8" 16 16.83 1 269.20
empalme 1 5/8" 16 1.00 1 16.00 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo "C" 3/8" 21 0.46 1 9.66
71 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 4to. P 3/8" 18 1.72 1 30.96 Horizontales 4to. P tipo "C" 3/8" 18 0.46 1 8.28
CA-11 Entre H e I - 4,PRIMER Y SEGUNDO PISO 3 0.55 0.30 8.55 4.23 3 1.71 8.55 43.86 Verticales 5/8" 13 10.23 3 398.78
empalme 1 5/8" 13 1.00 3 39.00 Horizontales 1er. P 3/8" 32 164.00 3 15,744.00 Horizontales 1er. P tipo "C" 3/8" 31 0.46 3 42.78 Horizontales 2do. P 3/8" 25 164.00 3 12,300.00 Horizontales 2er. P tipo "C" 3/8" 25 0.46 3 34.50
SUBSECTOR A-1 CA-2
EJE H-2 AUDITORIO 1 0.30 0.30 6.41 0.58 1 1.20 5.71 6.85 Verticales 1er 5/8" 6 6.27 1 37.65 Horizontales 1er. P 3/8" 31 1.12 1 34.72
EJE I-1, IJ-1, I PRIMER PISO DEPOSITO 3 0.30 0.30 3.45 0.93 3 1.20 2.75 9.90 Verticales 1er 5/8" 6 5.07 3 91.35 3 Columnas Horizontales 1er. P 3/8" 25 1.12 3 84.00
CA-2 EJE H-3,4 & I- AUDITORIO 1 0.30 0.30 8.09 0.73 1 1.20 7.39 8.87 Verticales 1er 5/8" 6 6.27 1 37.65 3 Columnas Horizontales 1er. P 3/8" 31 1.12 1 34.72
CA-2
EJE H-3,4 & I- HALL 2 0.30 0.30 4.7 0.85 2 1.20 4.00 9.60 Verticales 1er 5/8" 6 6.27 2 75.30 3 Columnas Horizontales 1er. P 3/8" 31 1.12 2 69.44
CA-4
EJE H,entre 3 PRIMER PISO AUDITORIO 1 0.60 0.30 8.9 1.60 1 1.80 8.20 14.76 Verticales 5/8" 10 11.20 1 112.00 empalme 1 5/8" 10 1.00 1 10.00 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 33 0.46 1 15.18 Horizontales 2do. P 3/8" 25 1.72 1 43.00 Horizontales 2do. P tipo "C" 3/8" 25 0.46 1 11.50
CA-4 EJE I-4 PRIMER PISO HALL 1 0.60 0.30 4.7 0.85 70.25 1 1.80 4.00 7.20 Verticales 5/8" 10 6.27 1 62.75
Horizontales 1er. P 3/8" 31 1.72 1 53.32 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26
AUDITORIO C - 14 PRIMER PISO 2 0.60 0.30 8.9 3.20 2 1.80 8.9 32.04 Verticales 1 5/8" 10 11.00 2 220.00
empalme 1 5/8" 10 1.00 2 20.00 2 0.60 0.30 5.9 2.12 2 1.80 5.9 21.24 Verticales 2 5/8" 10 8.00 2 160.00
T1 Horizontales 1er. P 3/8" 22 1.58 4 139.04 T1 Horizontales 2do. P 3/8" 25 1.58 2 79.00 T1 Horizontales 2er. P 3/8" 16 1.58 2 50.56 T2 Horizontales 1er. P 3/8" 22 0.98 4 86.24 T2 Horizontales 2do. P 3/8" 25 0.98 2 49.00 T2 Horizontales 2er. P 3/8" 16 0.98 2 31.36
C - 13 PRIMER PISO 1 0.30 0.30 8.35 0.75 1 1.20 8.35 10.02 Verticales 1 5/8" 6 10.45 2 125.40
empalme 1 5/8" 6 1.00 2 12.00 1 0.30 0.30 6.86 0.62 1 1.20 6.86 8.23 Verticales 2 5/8" 6 8.96 2 107.52
Horizontales 1er. P 3/8" 22 0.98 2 43.12 Horizontales 2do. P 3/8" 18 0.98 1 17.64 Horizontales 2er. P 3/8" 25 0.98 1 24.50
SECTORB SUBSECTOR B1
72 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento CB69
EJE H-10,11,1PRIMER Y SEGUNDO PISO 3 0.30 0.60 9.35 5.05 3 1.80 9.35 50.49 Verticales 5/8" 10 10.73 3 321.75 empalme 1 5/8" 10 1.00 3 30.00 Horizontales 1er. P 3/8" 34 1.40 3 142.80 Horizontales 1er. P 3/8" 34 1.40 3 142.80 Horizontales 2do. P 3/8" 25 1.40 3 105.00 Horizontales 2do. P 3/8" 25 1.40 3 105.00
EJE H-14 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 1 1.80 14.05 25.29 Verticales 5/8" 10 15.03 1 150.25 empalme 1 5/8" 10 1.00 1 10.00 Horizontales zotano 3/8" 35 1.40 1 49.00 Horizontales zotano 3/8" 35 1.40 1 49.00 Horizontales 1er. P 3/8" 27 1.40 1 37.80 Horizontales 1er. P 3/8" 27 1.40 1 37.80 Horizontales 2do. P 3/8" 25 1.40 1 35.00 Horizontales 2do. P 3/8" 25 1.40 1 35.00
CB70 EJE I-11,12 PRIMER Y SEGUNDO PISO 2 0.30 0.60 9.35 3.37 10.94 2 1.80 9.35 33.66 Verticales 3/4" 12 10.73 2 257.40
empalme 1 3/4" 12 1.00 2 24.00 Horizontales 1er. P 3/8" 34 1.40 2 95.20 Horizontales 1er. P 3/8" 34 1.40 2 95.20 Horizontales 2do. P 3/8" 25 1.40 2 70.00 Horizontales 2do. P 3/8" 25 1.40 2 70.00
SUBSECTOR B2.1 EJE B-8 CB1
ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.90 14.05 3.79 0.27 1 2.40 14.05 33.72 Verticales 1" 4 15.03 1 60.10empalme 1 1" 4 1.00 1 4.00Verticales 3/4" 10 15.03 1 150.25 empalme 2 3/4" 10 1.00 1 10.00 Horizontales zotano 3/8" 37 1.70 1 62.90 Horizontales zotano 3/8" 37 1.70 1 62.90 Horizontales 1er. P 3/8" 29 1.70 1 49.30 Horizontales 1er. P 3/8" 29 1.70 1 49.30 Horizontales 2do. P 3/8" 27 1.70 1 45.90 Horizontales 2do. P 3/8" 27 1.70 1 45.90
ENTRE EJE B-CB2 ZOTANO 2 0.30 0.75 5.35 2.41 0.22 2 2.10 5.35 22.47 Verticales 1" 6 6.07 2 72.90
Verticales 3/4" 8 6.07 2 97.20 Horizontales zotano 3/8" 37 1.52 2 112.48 Horizontales zotano 3/8" 37 1.52 2 112.48
ENTRE EJE B-CB3 ZOTANO 1 0.30 1.20 5.35 1.93 0.36 1 3.00 5.35 16.05 Verticales 1" 6 6.07 1 36.45
Verticales 3/4" 6 6.07 1 36.45 Horizontales zotano 3/8" 37 2.92 1 108.04 Horizontales zotano tipo "C" 3/8" 36 1.38 1 49.68
EJE C,F-8 CB-4 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.30 1.00 14.05 8.43 0.30 2 2.60 14.05 73.06 Verticales 1" 16 15.03 2 480.80
empalme 1 1" 16 1.00 2 32.00Horizontales zotano 3/8" 25 1.94 2 97.00 Horizontales zotano 3/8" 25 1.94 2 97.00 Horizontales 1er. P 3/8" 29 1.94 2 112.52 Horizontales 1er. P 3/8" 29 1.94 2 112.52 Horizontales 2do. P 3/8" 27 1.94 2 104.76 Horizontales 2do. P 3/8" 27 1.94 2 104.76
EJE C,E-9 CB-5 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.40 0.60 14.05 6.74 0.24 2 2.00 14.05 56.20 Verticales 3/4" 12 15.03 2 360.60
empalme 1 3/4" 12 1.00 2 24.00
73 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales zotano 3/8" 35 1.52 2 106.40 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 1er. P 3/8" 27 1.52 2 82.08 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.52 2 76.00
EJE C-10/F-9 CB-6 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.30 0.60 14.05 5.06 0.18 2 1.80 14.05 50.58 Verticales 1" 10 15.03 2 300.50
empalme 1 1" 10 1.00 2 20.00Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00
EJE D-9 CB-7 SEGUNDO PISO 1 0.30 0.60 4.1 0.74 1 1.80 4.10 7.38 Verticales 3/4" 10 4.35 1 43.50 (columna reducida en 2do piso) Horizontales 2do. P 3/8" 25 1.60 1 40.00
Horizontales 2do. P 3/8" 25 1.60 1 40.00 EJE E-8 CB-8
ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 0.18 1 1.80 14.05 25.29 Verticales 1" 12 15.03 1 180.30empalme 1 1" 12 1.00 1 12.00Horizontales zotano 3/8" 25 1.60 1 40.00 Horizontales zotano 3/8" 25 1.60 1 40.00 Horizontales 1er. P 3/8" 29 1.60 1 46.40 Horizontales 1er. P 3/8" 29 1.60 1 46.40 Horizontales 2do. P 3/8" 27 1.60 1 43.20 Horizontales 2do. P 3/8" 27 1.60 1 43.20
EJE C-10 CB-9 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 0.18 1 1.80 14.05 25.29 Verticales 1" 10 15.03 1 150.25
empalme 1 1" 10 1.00 1 10.00Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 2do. P 3/8" 25 1.60 1 40.00 Horizontales 2do. P 3/8" 25 1.60 1 40.00
CB-10 EJE G-9/H-10 PRIMER Y SEGUNDO PISO 2 0.30 0.60 9.35 3.37 2 1.80 9.35 33.66 Verticales 1" 10 10.73 2 214.50
empalme 1 1" 10 1.00 2 20.00Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00
CB-11 EJE G-10/H-9 PRIMER Y SEGUNDO PISO 2 0.30 0.60 9.35 3.37 2 1.80 9.35 33.66 Verticales 1" 12 10.73 2 257.40
empalme 1 1" 12 1.00 2 24.00Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00
CB-12 EJE H-8 PRIMER Y SEGUNDO PISO 1 0.30 0.90 9.35 2.52 1 2.40 9.35 22.44 Verticales 1" 26 10.73 1 278.85
74 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento empalme 1 1" 26 1.00 1 26.00Horizontales 1er. P 5/8" 47 1.34 1 62.98 Horizontales 1er. P 5/8" 47 1.34 1 62.98 Horizontales 1er. P 5/8" 47 1.48 1 69.56 Horizontales 2do. P 5/8" 35 1.34 1 46.90 Horizontales 2do. P 5/8" 35 1.34 1 46.90 Horizontales 2do. P 5/8" 35 1.48 1 51.80
CB-13 EJE H-8 PRIMER Y SEGUNDO PISO 1 0.30 1.35 9.35 3.79 1 3.30 9.35 30.86 Verticales 1" 28 10.73 1 300.30
empalme 1 1" 28 1.00 1 28.00Horizontales 1er. P 5/8" 47 1.59 1 74.73 Horizontales 1er. P 5/8" 47 1.59 1 74.73 Horizontales 1er. P 5/8" 47 2.00 1 94.00 Horizontales 2do. P 5/8" 35 1.59 1 55.65 Horizontales 2do. P 5/8" 35 1.59 1 55.65 Horizontales 2do. P 5/8" 35 2.00 1 70.00
SUBSECTOR B2.2 CB-18
EJE G-10,11/HPRIMER Y SEGUNDO PISO 3 0.30 0.60 9.35 5.05 3 1.80 9.35 50.49 Verticales 3/4" 10 10.73 3 321.75 empalme 1 3/4" 10 1.00 3 30.00 Horizontales 1er. P 3/8" 34 1.60 3 163.20 Horizontales 1er. P 3/8" 34 1.60 3 163.20 Horizontales 2do. P 3/8" 25 1.60 3 120.00 Horizontales 2do. P 3/8" 25 1.60 3 120.00
CB-19 EJE G-12 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 0.18 1 1.80 14.05 25.29 Verticales 3/4" 12 15.03 1 180.30
empalme 1 3/4" 12 1.00 1 12.00 Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 2do. P 3/8" 25 1.60 1 40.00 Horizontales 2do. P 3/8" 25 1.60 1 40.00
SUBSECTOR B2.3 CB-14
EJE B-11 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.90 14.05 3.79 0.27 1 2.40 14.05 33.72 Verticales 1" 12 15.03 1 180.30empalme 1 1" 12 1.00 1 12.00Horizontales zotano 3/8" 37 1.60 1 59.20 Horizontales zotano tipo "C" 3/8" 36 1.38 1 49.68 Horizontales 1er. P 3/8" 29 1.60 1 46.40 Horizontales zotano tipo "C" 3/8" 29 1.38 1 40.02 Horizontales 2do. P 3/8" 27 1.60 1 43.20 Horizontales zotano tipo "C" 3/8" 27 1.38 1 37.26
CB-15 EJE C-10,12 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.60 0.60 14.05 10.12 0.36 2 2.40 14.05 67.44 Verticales 1" 12 15.03 2 360.60
empalme 1 1" 12 1.00 2 24.00Horizontales zotano 3/8" 35 2.32 2 162.40 Horizontales zotano 3/8" 35 1.69 2 118.30 Horizontales zotano 3/8" 35 1.69 2 118.30 Horizontales 1er. P 3/8" 27 2.32 2 125.28 Horizontales 1er. P 3/8" 27 1.69 2 91.26 Horizontales 1er. P 3/8" 27 1.69 2 91.26 Horizontales 2do. P 3/8" 25 2.32 2 116.00 Horizontales 2do. P 3/8" 25 1.69 2 84.50 Horizontales 2do. P 3/8" 25 1.69 2 84.50
EJE C-11 CB-16
75 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento SEGUNDO PISO 1 0.60 0.60 4.1 1.48 1 2.40 4.10 9.84 Verticales 1" 12 4.35 1 52.20(columna reducida en 2do piso) Horizontales 2do. P 3/8" 25 2.32 1 58.00
Horizontales 2do. P 3/8" 25 1.69 1 42.25 Horizontales 2do. P 3/8" 25 1.69 1 42.25
EJE D-11 CB-17 SEGUNDO PISO 1 0.60 0.90 4.1 2.21 1 3.00 4.10 12.30 Verticales 1" 8 4.35 1 34.80(columna reducida en 2do piso) Horizontales 2do. P 3/8" 27 1.81 1 48.76
Horizontales 2do. P 3/8" 27 1.81 1 48.76
SUBSECTOR B3
Eje B -14 CB20 SOTANO,PRIMER Y SEGUNDO PISO 1 0.30 1.30 4.95 1.93 0.39 1 3.20 4.95 15.84 Verticales sotano 1" 6 6.32 1 37.95
Verticales sotano 3/4" 10 6.32 1 63.25
Horizontal Sotano+1P 1/2" 56 3.24 1 181.44
Horizontal 2P 3/8" 26 3.24 1 84.24 Horiz. Cimiento 1/2" 8 3.24 1 25.92 Horizontal tipo "C" 3/8" 56 2.45 1 137.20
TERCER PISO 1 0.30 0.65 3.4 0.66 1 1.90 3.40 6.46 Verticales 3P 1" 6 4.15 1 24.90Verticales 3P 3/4" 6 4.15 1 24.90 Horizontal 3P 3/8" 26 1.94 1 50.44 Horizontal tipo "C" 3/8" 26 0.49 1 12.74
Eje B 14/15 CB21 SOTANO 1 0.30 1.05 4.95 1.56 0.32 1 2.70 4.95 13.36 Verticales sotano 3/4" 6 6.32 1 37.95
Verticales sotano 5/8" 6 6.32 1 37.95
Horizontal Sotano 3/8" 28 2.74 1 76.72 Horiz. Cimiento 3/8" 8 2.74 1 21.92 Horizontal tipo "C" 3/8" 28 1.47 1 41.16
Eje B 14/15 CB22 SOTANO 1 0.30 0.95 4.95 1.41 0.29 1 2.50 4.95 12.37 Verticales sotano 3/4" 12 6.32 1 75.90
Horizontal Sotano 3/8" 28 2.54 1 71.12 Horiz. Cimiento 3/8" 8 2.54 1 20.32 Horizontal tipo "C" 3/8" 28 1.47 1 41.16
Eje B -15 CB23
SOTANO 1 0.30 1.40 4.95 2.08 0.42 1 3.40 4.95 16.83 Verticales sotano 1" 4 6.32 1 25.30Verticales sotano 3/4" 16 6.32 1 101.20 Horizontal Sotano 1/2" 28 3.44 1 96.32 Horiz. Cimiento 1/2" 8 3.44 1 27.52 Horizontal tipo "C" 3/8" 28 1.96 1 54.88
PRIMER,SEGUNDO Y TERCER PISO 1 0.30 1.00 12.8 3.84 1 2.60 12.80 33.28 Verticales 1P a 3P 1" 6 13.55 1 81.30empalme 1 1" 6 1.00 1 6.00Verticales 1P a 3P 3/4" 10 13.55 1 135.50 empalme 1 3/4" 10 1.00 1 10.00 Horizontal +1P 1/2" 28 2.64 1 73.92 Horizontal al 2P+3P 3/8" 52 2.64 1 137.28 Horizontal tipo "C" 3/8" 80 0.98 1 78.40
Eje B -17 CB24
SOTANO 1 0.30 1.80 4.95 2.67 0.54 1 4.20 4.95 20.79 Verticales sotano 1" 20 6.32 1 126.50Horizontal Sotano 1/2" 28 4.24 1 118.72 Horiz. Cimiento 1/2" 8 4.24 1 33.92 Horizontal tipo "C" 3/8" 28 2.94 1 82.32
PRIMER,SEGUNDO Y TERCER PISO 1 0.30 1.00 12.8 3.84 1 2.60 12.80 33.28 Verticales 1P a 3P 1" 14 13.55 1 189.70empalme 1 1" 14 1.00 1 14.00Horizontal +1P 3/8" 28 2.64 1 73.92
76 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontal al 2P+3P 3/8" 52 2.64 1 137.28 Horizontal tipo "C" 3/8" 80 0.98 1 78.40
Eje B -17/18 CB25 SOTANO 1 0.30 1.65 4.95 2.45 0.49 1 3.90 4.95 19.30 Verticales sotano 3/4" 4 6.32 1 25.30
Verticales sotano 1/2" 12 6.32 1 75.90
Horizontal Sotano 3/8" 28 3.94 1 110.32 Horiz. Cimiento 3/8" 8 3.94 1 31.52 Horizontal tipo "C" 3/8" 28 2.94 1 82.32
Eje B -18 CB26
SOTANO, PRIMER,SEGUNDO Y TERCER 1 0.30 1.30 17.75 6.92 0.39 1 3.20 17.75 56.80 Verticales hasta 3er nivel 3/4" 4 19.13 1 76.50 empalme 1 3/4" 4 1.00 1 4.00 Verticales hasta 3er nivel 1/2" 12 19.13 1 229.50 Horizontal Sótano +1P 1/2" 56 6.48 1 362.88 Horizontal al 2P+3P 3/8" 48 6.48 1 311.04 Horiz. Cimiento 3/8" 8 6.48 1 51.84 Horizontal tipo "C" 3/8" 104 1.96 1 203.84
Eje C-13 CB27
SOTANO, PRIMER,SEGUNDO Y TERCER 1 0.60 0.30 17.75 3.20 0.18 1 1.80 17.75 31.95 Verticales hasta 3er nivel 1" 12 19.13 1 229.50empalme 1 1" 12 1.00 1 12.00Horizontal Sótano +1P 3/8" 52 3.16 1 164.32 Horizontal al 2P+3P 3/8" 48 3.16 1 151.68 Horiz. Cimiento 3/8" 8 3.16 1 25.28
Eje C-14 CB28
SOTANO 1 0.60 0.40 4.95 1.19 0.24 1 2.00 4.95 9.90 Verticales hasta sotano 1" 16 6.32 1 101.20Horizontal Sotano 3/8" 26 4.88 1 126.88 Horiz. Cimiento 3/8" 8 4.88 1 39.04
PRIMER,SEGUNDO Y TERCER PISO 1 0.30 0.60 12.8 2.30 1 1.80 12.80 23.04 Verticales hasta 3er nivel 3/4" 12 13.55 1 162.60 empalme 1 3/4" 12 1.00 1 12.00 Horizontal +1P 3/8" 26 3.16 1 82.16 Horizontal al 2P+3P 3/8" 48 3.16 1 151.68
Eje C-16 CB29
SOTANO 2 0.60 0.40 4.95 2.38 0.24 2 2.00 4.95 19.80 Verticales hasta sotano 1" 14 6.32 2 177.10Horizontal Sotano 3/8" 26 5.07 2 263.64 Horiz. Cimiento 3/8" 8 5.07 2 81.12
PRIMER,SEGUNDO Y TERCER PISO 2 0.30 0.60 12.8 4.61 2 1.80 12.80 46.08 Verticales hasta 3er nivel 1" 12 13.55 2 325.20empalme 1 1" 12 1.00 2 24.00Horizontal +1P 3/8" 26 3.16 2 164.32 Horizontal al 2P+3P 3/8" 48 3.16 2 303.36
Eje C-18 CB30
SOTANO 1 0.30 1.40 4.95 2.08 0.42 1 3.40 4.95 16.83 Verticales hasta sotano 3/4" 18 6.32 1 113.85 Horizontal Sotano 3/8" 28 3.44 1 96.32 Horiz. Cimiento 3/8" 8 3.44 1 27.52 Horizontal tipo "C" 3/8" 28 1.96 1 54.88
PRIMER Y SEGUNDO 1 0.30 1.00 8.7 2.61 1 2.60 8.70 22.62 Verticales hasta 1P + 2P 3/4" 12 9.70 1 116.40 empalme 1 3/4" 12 1.00 1 12.00 Horizontal +1P 3/8" 28 2.64 1 73.92 Horizontal al +2P 3/8" 26 2.64 1 68.64 Horizontal tipo "C" 3/8" 28 1.96 1 54.88
TERCER PISO 1 0.30 0.30 4.1 0.37 1 1.20 4.10 4.92 Verticales hasta +3P 3/4" 6 4.85 1 29.10 Horizontal +3P 3/8" 24 1.24 1 29.76
Eje C-19 CB31
77 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SOTANO Y PRIMER PISO 1 0.30 1.35 9.55 3.87 0.41 1 3.30 9.55 31.52 Verticales hasta +1P 1" 12 10.93 1 131.10empalme 1 1" 12 1.00 1 12.00Horizontal Sotano+1P 3/8" 56 3.34 1 187.04 Horiz. Cimiento 3/8" 8 3.34 1 26.72 Horizontal tipo "C" 3/8" 56 1.47 1 82.32
SEGUNDO Y TERCER PISO 1 0.30 0.60 8.2 1.48 1 1.80 8.20 14.76 Verticales 2P+3P 1" 12 8.95 1 107.40Horizontal 2P+3P 3/8" 48 3.16 1 151.68
Eje D-14 & 18 CB32
SOTANO Y PRIMER PISO 2 0.30 1.65 9.55 9.45 0.49 2 3.90 9.55 74.49 Verticales hasta +1P 3/4" 18 10.93 2 393.30 empalme 1 3/4" 18 1.00 2 36.00 Horizontal Sotano+1P 3/8" 56 3.94 2 441.28 Horiz. Cimiento 3/8" 8 3.94 2 63.04 Horizontal tipo "C" 3/8" 56 2.94 2 329.28
SEGUNDO Y TERCER PISO 2 0.30 0.60 8.2 2.95 2 1.80 8.20 29.52 Verticales 2P+3P 1" 12 8.95 2 214.80Horizontal 2P+3P 3/8" 48 3.16 2 303.36
Eje E-14 CB33
SOTANO 1 0.30 1.25 17.75 6.66 1 3.10 17.75 55.03 Verticales hasta sotano 1" 14 19.13 1 267.75empalme 1 1" 14 1.00 1 14.00Horizontal Sotano +1P 3/8" 56 3.14 1 175.84 Horizontal al 2P+3P 3/8" 52 3.14 1 163.28 Horizontal tipo "C" 3/8" 108 1.96 1 211.68 Horiz. Cimiento 3/8" 8 3.14 1 25.12
Eje E-18 CB34
SOTANO Y PRIMER PISO 1 0.30 1.25 9.55 3.58 0.38 1 3.10 9.55 29.60 Verticales hasta sotano 1" 14 10.93 1 152.95empalme 1 1" 14 1.00 1 14.00Horizontal Sotano +1P 3/8" 56 3.14 1 175.84 Horiz. Cimiento 3/8" 8 3.14 1 25.12 Horizontal tipo "C" 3/8" 56 1.96 1 109.76
SEGUNDO PISO 1 0.30 1.20 4.1 1.48 1 3.00 4.10 12.30 Verticales 1P + 2P 1" 14 5.10 1 71.40Horizontal +1P 3/8" 28 3.04 1 85.12 Horizontal al +2P 3/8" 26 3.04 1 79.04 Horizontal tipo "C" 3/8" 54 1.96 1 105.84
TERCER PISO 1 0.30 0.60 4.1 0.74 1 1.80 4.10 7.38 Verticales 3P 1" 10 4.85 1 48.50Horizontal 3P 3/8" 24 3.08 1 73.92
Eje F-14 & 18 CB35
SOTANO Y PRIMER PISO 2 0.30 1.30 9.55 7.45 0.39 2 3.20 9.55 61.12 Verticales Sotano + 1P 1" 16 10.93 2 349.60empalme 1 1" 16 1.00 1 16.00Horizontal Sotano+1P 3/8" 56 3.24 2 362.88 Horiz. Cimiento 3/8" 8 3.24 2 51.84 Horizontal tipo "C" 3/8" 56 2.45 2 274.40
SEGUNDO Y TERCER PISO 2 0.30 0.60 8.2 2.95 2 1.80 8.20 29.52 Verticales 2P+3P 1" 10 8.95 2 179.00Horizontal 2P+3P 3/8" 48 3.08 2 295.68
Eje G-13 CB36
SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 0.60 17.75 3.20 0.18 1 1.80 17.75 31.95 Verticales hasta +3P 1" 14 19.13 1 267.75empalme 1 1" 14 2.00 1 28.00Horizontal Sotano 3/8" 16 2.88 1 46.08 Horizontal 1P 3/8" 28 2.88 1 80.64 Horizontal 2P+3P 3/8" 48 2.88 1 138.24 Horiz. Cimiento 3/8" 8 2.88 1 23.04
Eje G-14 & 18 CB37
78 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SOTANO Y PRIMER PISO 2 0.40 0.60 9.55 4.58 0.24 2 2.00 9.55 38.20 Verticales Sotano + 1P 3/4" 16 10.93 2 349.60 empalme 1 3/4" 16 1.00 2 32.00 Horizontal Sotano+1P 3/8" 52 4.88 2 507.52 Horiz. Cimiento 3/8" 8 4.88 2 78.08
SEGUNDO Y TERCER PISO 2 0.30 0.60 8.2 2.95 2 1.80 8.20 29.52 Verticales 2P+3P 3/4" 12 8.95 2 214.80 Horizontal 2P+3P 3/8" 48 2.88 2 276.48
Eje G-15 CB38
SOTANO Y PRIMER PISO 1 0.30 1.00 9.55 2.86 0.30 1 2.60 9.55 24.83 Verticales Sotano + 1P 1" 14 10.93 1 152.95empalme 1 1" 14 1.00 1 14.00Horizontal Sotano+1P 3/8" 56 2.64 1 147.84 Horiz. Cimiento 3/8" 8 2.64 1 21.12 Horizontal tipo "C" 3/8" 56 0.98 1 54.88
SEGUNDO PISO 1 0.30 1.00 3.4 1.02 1 2.60 3.40 8.84 Verticales 2P 1" 14 4.15 1 58.10Horizontal 2P 3/8" 26 2.64 1 68.64 Horizontal tipo "C" 3/8" 26 0.98 1 25.48
TERCER PISO 1 0.30 0.60 3.4 0.61 1 1.80 3.40 6.12 Verticales 3P 1" 12 4.15 1 49.80Horizontal 3P 3/8" 24 2.64 1 63.36 Horizontal tipo "C" 3/8" 24 0.98 1 23.52
Eje G-16 CB39 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 1.00 17.75 5.33 0.30 1 2.60 17.75 46.15 Verticales hasta +3P 1" 14 19.13 1 267.75
empalme 1 1" 14 2.00 1 28.00Horizontal Sotano+1P 3/8" 56 2.64 1 147.84 Horizontal 2P+3P 3/8" 52 2.64 1 137.28 Horiz. Cimiento 3/8" 8 2.64 1 21.12 Horizontal tipo "C" 3/8" 108 0.98 1 105.84
Eje G-17 CB40 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 1.65 17.75 8.79 0.49 1 3.90 17.75 69.23 Verticales hasta +3P 1" 16 19.13 1 306.00
empalme 1 1" 16 2.00 1 32.00Horizontal Sotano+1P 3/8" 56 3.94 1 220.64 Horizontal 2P+3P 3/8" 52 3.94 1 204.88 Horiz. Cimiento 3/8" 8 3.94 1 31.52 Horizontal tipo "C" 3/8" 108 2.45 1 264.60
Eje G-19 CB41 PRIMER, SEGUNDO Y TERCER PISO 1 0.30 0.60 12.8 2.30 1 1.80 12.80 23.04 Verticales hasta +3P 1" 10 13.55 1 135.50
empalme 1 1" 10 1.00 1 10.00Horizontal Sotano+1P 3/8" 26 3.00 1 78.00
0.75 Horizontal 2P+3P 3/8" 48 3.00 1 144.00 Horiz. Cimiento 3/8" 8 3.00 1 24.00
Eje H 13 & 19 CB-42 PRIMER Y SEGUNDO PISO 2 0.30 0.75 9.2 4.14 2 2.10 9.20 38.64 Verticales 3/4" 10 10.58 2 211.50
empalme 1 3/4" 10 1.00 2 20.00 Horizontales 1 P 3/8" 27 2.04 2 110.16 Horizontales 2P 3/8" 25 2.04 2 102.00 Horiz. Cimiento 3/8" 8 2.04 2 32.64 Horizontal tipo "C" 3/8" 52 0.49 2 50.96
Eje H-14 CB43 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 0.60 17.75 3.20 0.18 1 1.80 17.75 31.95 Verticales hasta +3P 1" 10 19.13 1 191.25
empalme 1 1" 10 2.00 1 20.00Horizontal Sotano 3/8" 16 3.00 1 48.00 Horizontal 1P 3/8" 26 3.00 1 78.00 Horizontal 2P+3P 3/8" 48 3.00 1 144.00 Horiz. Cimiento 3/8" 8 3.00 1 24.00
Eje H-15 CB44 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 1.00 17.75 5.33 0.30 1 2.60 17.75 46.15 Verticales hasta +3P 1" 12 19.13 1 229.50
79 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento empalme 1 1" 12 2.00 1 24.00Horizontal Sotano 3/8" 16 2.64 1 42.24 Horizontal 1P 3/8" 28 2.64 1 73.92 Horizontal 2P+3P 3/8" 52 2.64 1 137.28 Horiz. Cimiento 3/8" 8 2.64 1 21.12 Horizontal tipo "C" 3/8" 80 1.47 1 117.60
Eje H-16 CB45 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 0.60 17.75 3.20 0.18 1 1.80 17.75 31.95 Verticales hasta +3P 1" 10 19.13 1 191.25
empalme 1 1" 10 2.00 1 20.00Horizontal Sotano +1P 3/8" 52 3.00 1 156.00 Horizontal 2P+3P 3/8" 48 3.00 1 144.00 Horiz. Cimiento 3/8" 8 3.00 1 24.00 Horizontal tipo "C" 3/8" 100 1.47 1 147.00
Eje H-17 CB46 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 0.95 17.75 5.06 0.29 1 2.50 17.75 44.38 Verticales hasta +3P 1" 12 19.13 1 229.50
empalme 1 1" 12 2.00 1 24.00Horizontal Sotano 3/8" 16 2.54 1 40.64 Horizontal 1P 3/8" 28 2.54 1 71.12 Horizontal 2P+3P 3/8" 52 2.54 1 132.08 Horiz. Cimiento 3/8" 8 2.54 1 20.32 Horizontal tipo "C" 3/8" 68 1.47 1 99.96
Eje H-18 CB47 SOTANO ,PRIMER, SEGUNDO Y TERCER 1 0.30 0.65 17.75 3.46 0.20 1 1.90 17.75 33.73 Verticales hasta +3P 3/4" 10 19.13 1 191.25
empalme 1 3/4" 10 2.00 1 20.00 Horizontal Sotano 3/8" 16 1.94 1 31.04 Horizontal 1P 3/8" 26 1.94 1 50.44 Horizontal 2P+3P 3/8" 48 1.94 1 93.12 Horiz. Cimiento 3/8" 8 1.94 1 15.52 Horizontal tipo "C" 3/8" 90 0.49 1 44.10
SUBSECTOR B4 CB69
EJE H-18,22' PRIMER Y SEGUNDO PISO 2 0.60 0.30 9.4 3.38 2 1.80 9.40 33.84 Verticales 1er y 2do piso 5/8" 10 10.53 2 210.50 empalme 1 5/8" 10 1.00 2 20.00 Horiz. Cimiento 3/8" 7 1.41 2 19.74 Horiz. 1er. P 3/8" 28 1.41 2 78.96 Horiz. 2do. P 3/8" 26 1.41 2 73.32 Horiz. Cimiento (2) 3/8" 7 1.35 2 18.90 Horiz. 1er. P (2) 3/8" 28 1.35 2 75.60 Horiz. 2do. P (2) 3/8" 26 1.35 2 70.20
EJE H-18,22' PRIMER Y SEGUNDO PISO 2 0.60 0.30 14.05 5.06 2 1.80 14.05 50.58 Verticales 1er y 2do piso 5/8" 10 15.18 2 303.50 empalme 1 5/8" 10 1.00 2 20.00 Horiz. Cimiento 3/8" 7 1.41 2 19.74 Horiz. 1er. P 3/8" 28 1.41 2 78.96 Horiz. 2do. P 3/8" 26 1.41 2 73.32 Horiz. Cimiento (2) 3/8" 7 1.35 2 18.90 Horiz. 1er. P (2) 3/8" 28 1.35 2 75.60 Horiz. 2do. P (2) 3/8" 26 1.35 2 70.20
CB70 EJE H-18,22' PRIMER Y SEGUNDO PISO 2 0.60 0.30 9.4 3.38 2 1.80 9.40 33.84 Verticales 1er y 2do piso 3/4" 12 10.53 2 252.60
empalme 1 3/4" 12 1.00 2 24.00 Horiz. Cimiento 3/8" 7 1.49 2 20.86 Horiz. 1er. P 3/8" 28 1.49 2 83.44 Horiz. 2do. P 3/8" 26 1.49 2 77.48 Horiz. Cimiento (2) 3/8" 7 1.42 2 19.88 Horiz. 1er. P (2) 3/8" 28 1.42 2 79.52
80 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horiz. 2do. P (2) 3/8" 26 1.42 2 73.84
SUBSECTOR B5
EJE CB54 1 1.20 0.30 14.1 5.08 0.36 1 3.00 14.10 42.30 Verticales 1" 18 15.08 1 271.35
empalme 1 1" 18 1.00 1 18.00B-23,24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 2.87 1 22.96
Horiz. Sotano. P 3/8" 31 2.87 1 88.97 Horiz. 1er. P 3/8" 31 2.87 1 88.97 Horiz. 2do. P 3/8" 29 2.87 1 83.23 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horiz. Sotano. P (2) 3/8" 31 1.76 1 54.56 Horiz. 1er. P (2) 3/8" 31 1.76 1 54.56 Horiz. 2do. P (2) 3/8" 29 1.76 1 51.04
EJE CB55 1 0.85 0.30 5.4 1.38 0.26 1 2.30 5.40 12.42 Verticales 1" 10 6.37 1 63.75B-23,24 SOTANO Horiz. Cimiento 3/8" 8 2.17 1 17.36
Horiz. Sotano. P 3/8" 28 2.17 1 60.76 Horiz. Cimiento (2) 3/8" 8 0.88 1 7.04 Horiz. Sotano. P (2) 3/8" 28 0.88 1 24.64
EJE CB56 1 0.65 0.30 5.4 1.05 0.20 1 1.90 5.40 10.26 Verticales 1" 10 6.37 1 63.75B-23,24 SOTANO Horiz. Cimiento 3/8" 8 1.77 1 14.16
Horiz. Sotano. P 3/8" 28 1.77 1 49.56 Horiz. Cimiento (2) 3/8" 8 0.88 1 7.04 Horiz. Sotano. P (2) 3/8" 28 0.88 1 24.64
EJE CB57 1 0.90 0.30 14.1 3.81 0.27 1 2.40 14.10 33.84 Verticales 3/4" 14 15.08 1 211.05
empalme 1 3/4" 14 1.00 1 14.00 B-23,24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 2.27 1 18.16
Horiz. Sotano. P 1/2" 31 2.27 1 70.37 Horiz. 1er. P 1/2" 31 2.27 1 70.37 Horiz. 2do. P 3/8" 29 2.27 1 65.83 Horiz. Cimiento (2) 1/2" 8 0.88 1 7.04 Horiz. Sotano. P (2) 1/2" 31 0.88 1 27.28 Horiz. 1er. P (2) 1/2" 31 0.88 1 27.28 Horiz. 2do. P (2) 3/8" 29 0.88 1 25.52
EJE CB48 (1) 1 1.35 0.30 10 4.05 0.41 1 3.30 10.00 33.00 Verticales 3/4" 16 10.98 1 175.60
empalme 1 3/4" 16 1.00 1 16.00 C-20 SOTANO, 1er Horiz. Cimiento 1/2" 8 3.17 1 25.36
Horiz. Sotano. P 1/2" 31 3.17 1 98.27 Horiz. 1er. P 1/2" 31 3.17 1 98.27 Horiz. Cimiento (2) 1/2" 8 2.20 1 17.60 Horiz. Sotano. P (2) 1/2" 31 2.20 1 68.20 Horiz. 1er. P (2) 1/2" 31 2.20 1 68.20
EJE CB48 (2) 1 0.60 0.30 4.35 0.78 1 1.80 4.35 7.83 Verticales 3/4" 10 5.32 1 53.25 C-20 2do PISO Horiz. 2do. P 3/8" 26 1.35 1 35.10
Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB50 (1) 1 1.20 0.30 5.4 1.94 0.36 1 3.00 5.40 16.20 Verticales 3/4" 16 6.37 1 102.00 C-21 SOTANO Horiz. Cimiento 3/8" 8 2.87 1 22.96
Horiz. Sotano. P 3/8" 28 2.87 1 80.36 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horiz. Sotano. P (2) 3/8" 28 1.76 1 49.28
81 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
EJE CB50 (2) 1 0.60 0.30 8.7 1.57 1 1.80 8.70 15.66 Verticales 3/4" 10 9.68 1 96.75 empalme 1 3/4" 10 1.00 1 10.00
C-21 Horiz. 1er. P 1/2" 28 1.35 1 37.80 Horiz. 2do. P 3/8" 26 1.35 1 35.10 Horiz. 1er. P (2) 1/2" 28 1.41 1 39.48 Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB49 1 1.35 0.30 14.1 5.71 0.41 1 3.30 14.10 46.53 Verticales 3/4" 16 15.08 1 241.20
empalme 1 3/4" 16 1.00 1 16.00 C-22 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 3.17 1 25.36
Horiz. Sotano. P 1/2" 31 3.17 1 98.27 Horiz. 1er. P 1/2" 31 3.17 1 98.27 Horiz. 2do. P 3/8" 29 3.17 1 91.93 Horiz. Cimiento (2) 1/2" 8 2.20 1 17.60 Horiz. Sotano. P (2) 1/2" 31 2.20 1 68.20 Horiz. 1er. P (2) 1/2" 31 2.20 1 68.20 Horiz. 2do. P (2) 3/8" 29 2.20 1 63.80
EJE CB58 1 0.60 0.30 14.1 2.54 0.18 1 1.80 14.10 25.38 Verticales 3/4" 14 15.08 1 211.05
empalme 1 3/4" 14 1.00 1 14.00 C-22 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.29 1 10.32
Horiz. Sotano. P 3/8" 28 1.29 1 36.12 Horiz. 1er. P 3/8" 28 1.29 1 36.12 Horiz. 2do. P 3/8" 26 1.29 1 33.54 Horiz. Cimiento (2) 3/8" 8 1.35 1 10.80 Horiz. Sotano. P (2) 3/8" 28 1.35 1 37.80 Horiz. 1er. P (2) 3/8" 28 1.35 1 37.80 Horiz. 2do. P (2) 3/8" 26 1.35 1 35.10
EJE CB50 4 1.20 0.30 5.4 7.78 0.36 4 3.00 5.40 64.80 Verticales 3/4" 14 6.37 4 357.00 C-23 SOTANO Horiz. Cimiento 3/8" 8 2.87 4 91.84 D-23 Horiz. Sotano. P 3/8" 31 2.87 4 355.88 E-23 4 Columnas Horiz. Cimiento (2) 3/8" 8 1.76 4 56.32 G-23 Horiz. Sotano. P (2) 3/8" 31 1.76 4 218.24
EJE CB59 SOTANO 4 1.20 0.30 4.9 7.06 4 3.00 4.90 58.80 Verticales 3/4" 14 5.88 4 329.00 C-23 Horiz. 1er. P 3/8" 32 2.86 4 366.08 D-23 Horiz. 2do. P 3/8" 32 2.86 4 366.08 E-23 4 Columnas Horiz. 1er. P (2) 3/8" 32 1.76 4 225.28 G-23 Horiz. 2do. P (2) 3/8" 32 1.76 4 225.28
EJE CB59 4 0.60 0.30 8.7 6.26 4 1.80 8.70 62.64 Verticales 3/4" 10 9.68 4 387.00
empalme 1 3/4" 10 1.00 4 40.00 C-23 Horiz. 1er. P 1/2" 28 1.35 4 151.20 D-23 Horiz. 2do. P 3/8" 26 1.35 4 140.40 E-23 4 Columnas Horiz. 1er. P (2) 1/2" 28 1.41 4 157.92 G-23 Horiz. 2do. P (2) 3/8" 26 1.41 4 146.64
EJE CB60 1 1.40 0.30 14.1 5.92 0.42 1 3.40 14.10 47.94 Verticales 3/4" 14 15.08 1 211.05
empalme 1 3/4" 14 1.00 1 14.00 c-24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 3.27 1 26.16
Horiz. Sotano. P 1/2" 31 3.27 1 101.37 Horiz. 1er. P 1/2" 31 3.27 1 101.37 Horiz. 2do. P 3/8" 29 3.27 1 94.83 Horiz. Cimiento (2) 1/2" 8 1.76 1 14.08
82 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horiz. Sotano. P (2) 1/2" 31 1.76 1 54.56 Horiz. 1er. P (2) 1/2" 31 1.76 1 54.56 Horiz. 2do. P (2) 3/8" 29 1.76 1 51.04
EJE CB61 3 0.60 0.30 14.1 7.61 0.18 3 1.80 14.10 76.14 Verticales 1" 10 15.08 3 452.25
empalme 1 1" 10 1.00 3 30.00E-22 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.41 3 33.84 E-24 Horiz. Sotano. P 3/8" 28 1.41 3 118.44 G-22 Horiz. 1er. P 3/8" 28 1.41 3 118.44
2 Columnas Horiz. 2do. P 3/8" 26 1.41 3 109.98 Horiz. Cimiento (2) 3/8" 8 1.35 3 32.40 Horiz. Sotano. P (2) 3/8" 28 1.35 3 113.40 Horiz. 1er. P (2) 3/8" 28 1.35 3 113.40 Horiz. 2do. P (2) 3/8" 26 1.35 3 105.30
EJE CB-62 1 0.60 0.30 4.35 0.78 1 1.80 4.35 7.83 Verticales 3/4" 10 5.32 1 53.25 F-23 2do PISO Horiz. 2do. P 3/8" 26 1.35 1 35.10
Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB63 1 1.00 0.30 14.1 4.23 0.30 1 2.60 14.10 36.66 Verticales 1" 10 15.08 1 150.75empalme 1 1" 10 1.00 1 10.00
F-24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.88 1 15.04 Horiz. Sotano. P 3/8" 31 1.88 1 58.28 Horiz. 1er. P 3/8" 31 1.88 1 58.28 Horiz. 2do. P 3/8" 29 1.88 1 54.52 Horiz. Cimiento (2) 3/8" 8 1.94 1 15.52 Horiz. Sotano. P (2) 3/8" 31 1.94 1 60.14 Horiz. 1er. P (2) 3/8" 31 1.94 1 60.14 Horiz. 2do. P (2) 3/8" 29 1.94 1 56.26
EJE CB51 1 0.60 0.30 14.1 2.54 0.18 1 1.80 14.10 25.38 Verticales 1" 10 15.08 1 150.75
empalme 1 1" 10 1.00 1 10.00D-21 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.35 1 10.80
Horiz. Sotano. P 3/8" 28 1.35 1 37.80 Horiz. 1er. P 3/8" 28 1.35 1 37.80 Horiz. 2do. P 3/8" 26 1.35 1 35.10 Horiz. Cimiento (2) 3/8" 8 1.41 1 11.28 Horiz. Sotano. P (2) 3/8" 28 1.41 1 39.48 Horiz. 1er. P (2) 3/8" 28 1.41 1 39.48 Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB 52 3 0.60 0.60 10 10.80 0.36 3 2.40 10.00 72.00 Verticales 1" 12 10.98 3 395.10
empalme 1 1" 12 1.00 3 36.00C-20,22 SOTANO, 1er Horiz. Cimiento 3/8" 8 3.96 3 95.04
Horiz. Sotano. P 3/8" 28 3.96 3 332.64 Horiz. 1er. P 3/8" 28 3.96 3 332.64
3 Columnas Horiz. Cimiento (2) 3/8" 8 1.70 3 40.80 Horiz. Sotano. P (2) 3/8" 28 1.70 3 142.80 Horiz. 1er. P (2) 3/8" 28 1.70 3 142.80
EJE CB52 3 0.60 0.30 4.35 2.35 3 1.80 4.35 23.49 Verticales 1" 10 5.32 3 159.75C-20,22 2do PISO Horiz. 2do. P 3/8" 26 1.35 3 105.30
3 Columnas Horiz. 2do. P (2) 3/8" 26 1.41 3 109.98
EJE H-18,22' CB53 H-21 PRIMER Y SEGUNDO PISO 1 0.60 0.30 9.4 1.69 1 1.80 9.40 16.92 Verticales 1er y 2do piso 1" 12 10.53 1 126.30
83 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento empalme 1 1" 12 1.00 1 12.00Horiz. Cimiento 3/8" 7 1.43 1 10.01 Horiz. 1er. P 3/8" 28 1.43 1 40.04 Horiz. 2do. P 3/8" 26 1.43 1 37.18 Horiz. Cimiento (2) 3/8" 7 1.49 1 10.43 Horiz. 1er. P (2) 3/8" 28 1.49 1 41.72 Horiz. 2do. P (2) 3/8" 26 1.49 1 38.74
EJE CB64 1 0.90 0.30 5.4 1.46 0.27 1 2.40 5.40 12.96 Verticales 3/4" 12 6.37 1 76.50 H-22 SOTANO Horiz. Cimiento 3/8" 8 1.87 1 14.96
Horiz. Sotano. P 3/8" 19 1.87 1 35.53 Horiz. Cimiento (2) 3/8" 8 1.94 1 15.52 Horiz. Sotano. P (2) 3/8" 19 1.94 1 36.86
EJE CB64 1 0.90 0.30 8.7 2.35 1 2.40 8.70 20.88 Verticales 3/4" 12 9.68 1 116.10
empalme 1 3/4" 12 1.00 1 12.00 H-22 PRIMER Y SEGUNDO PISO Horiz. 1er. P 3/8" 31 1.87 1 57.97
Horiz. 2do. P 3/8" 29 1.87 1 54.23 Horiz. 1er. P (2) 3/8" 31 1.94 1 60.14 Horiz. 2do. P (2) 3/8" 29 1.94 1 56.26
EJE CB65 1 0.60 0.30 5.4 0.97 0.18 1 1.80 5.40 9.72 Verticales 1" 10 6.37 1 63.75H-23 SOTANO Horiz. Cimiento 3/8" 8 1.35 1 10.80
Horiz. Sotano. P 3/8" 19 1.35 1 25.65 Horiz. Cimiento (2) 3/8" 8 1.41 1 11.28 Horiz. Sotano. P (2) 3/8" 19 1.41 1 26.79
EJE CB65 1 0.60 0.30 8.7 1.57 1 1.80 8.70 15.66 Verticales 1" 10 9.68 1 96.75
empalme 1 1" 10 1.00 1 10.00H-23 PRIMER Y SEGUNDO PISO Horiz. 1er. P 3/8" 31 1.35 1 41.85
Horiz. 2do. P 3/8" 29 1.35 1 39.15 Horiz. 1er. P (2) 3/8" 31 1.41 1 43.71 Horiz. 2do. P (2) 3/8" 29 1.41 1 40.89
EJE CB66 1 0.90 0.30 14.1 3.81 0.27 1 2.40 14.10 33.84 Verticales 1" 20 15.08 1 301.50
empalme 1 1" 20 1.00 1 20.00H-23,24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 2.27 1 18.16
Horiz. Sotano. P 3/8" 28 2.27 1 63.56 Horiz. 1er. P 3/8" 28 2.27 1 63.56 Horiz. 2do. P 3/8" 26 2.27 1 59.02 Horiz. Cimiento (2) 3/8" 8 1.32 1 10.56 Horiz. Sotano. P (2) 3/8" 28 1.32 1 36.96 Horiz. 1er. P (2) 3/8" 28 1.32 1 36.96 Horiz. 2do. P (2) 3/8" 26 1.32 1 34.32
EJE CB67 1 1.30 0.30 5.4 2.11 0.39 1 3.20 5.40 17.28 Verticales 3/4" 16 6.37 1 102.00 H-23,24 SOTANO Horiz. Cimiento 3/8" 8 3.07 1 24.56
Horiz. Sotano. P 3/8" 31 3.07 1 95.17 Horiz. Cimiento (2) 3/8" 8 2.20 1 17.60 Horiz. Sotano. P (2) 3/8" 31 2.20 1 68.20
EJE CB68 1 0.90 0.30 14.1 3.81 0.27 1 2.40 14.10 33.84 Verticales 3/4" 14 15.08 1 211.05
empalme 1 3/4" 14 1.00 1 14.00 H-24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 2.27 1 18.16
Horiz. Sotano. P 1/2" 31 2.27 1 70.37 Horiz. 1er. P 1/2" 31 2.27 1 70.37
84 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horiz. 2do. P 3/8" 29 2.27 1 65.83 Horiz. Cimiento (2) 1/2" 8 0.88 1 7.04 Horiz. Sotano. P (2) 1/2" 31 0.88 1 27.28 Horiz. 1er. P (2) 1/2" 31 0.88 1 27.28 Horiz. 2do. P (2) 3/8" 29 0.88 1 25.52
EJE B-3 (eje G) SOTANO 3 0.25 0.40 5.35 1.61 0.10 3 1.30 5.35 20.87 Verticales sotano 5/8" 6 6.32 1 37.95
SECTOR PREPARACION PACIENTES Y COMANDO
85 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horiz. sotano 3/8" 36 1.22 1 43.92 Horiz. sotano tipo C 3/8" 35 0.41 1 14.35
SECTOR C C - 1 3 0.40 0.25 7.25 2.18 3 1.30 7.25 28.28 Verticales 5/8" 6 9.45 3 170.10
Estribos 3/8" 43 1.40 3 180.60 Ganchos 3/8" 43 0.45 3 58.05
C - 2 2 0.25 0.25 7.25 0.91 2 1.00 7.25 14.50 Verticales 5/8" 4 9.45 2 75.60 Estribos 3/8" 43 1.10 2 94.60
P - 1 2 1.08 0.25 7.25 3.90 2 2.65 7.25 38.43 Verticales 5/8" 18 9.45 2 340.20 Estribos 3/8" 48 2.75 2 264.00 Estribos 3/8" 48 1.05 2 100.80
C - 1 3 0.40 0.25 4.5 1.35 3 1.30 4.50 17.55 Verticales 5/8" 6 6.70 3 120.60 Estribos 3/8" 29 1.40 3 121.80 Ganchos 3/8" 29 0.45 3 39.15
C - 2 5 0.25 0.25 4.5 1.41 5 1.00 4.50 22.50 Verticales 5/8" 4 6.70 5 134.00 Estribos 3/8" 29 1.10 5 159.50
C - 3 2 0.55 0.25 4.5 1.24 2 1.60 4.50 14.40 Verticales 5/8" 8 6.70 2 107.20 Estribos 3/8" 29 1.70 2 98.60
C - 3 6 0.55 0.25 4.95 4.08 15.06 6 1.60 4.95 47.52 Verticales 5/8" 8 7.15 6 343.20 Estribos 3/8" 32 1.70 6 326.40
SECTOR D C - 1 8 0.60 0.30 5.25 7.56 7.56 8 1.80 5.25 75.60 Verticales 3/4" 6 6.35 8 304.80
Verticales 5/8" 4 6.35 8 203.20 Estribos 3/8" 29 1.30 8 301.60
SECTOR E C -03 24 0.25 0.25 3.35 5.03 24 1.00 3.35 80.40 Verticales 5/8" 4 5.45 24 523.20
Area Perimetro Estribos 3/8" 25 1.00 24 600.00 C -06 1 0.03 3.35 0.09 5.12 1 0.69 3.35 2.31 Verticales 5/8" 5 5.45 1 27.25
Estribos 3/8" 25 0.69 1 17.25 SECTOR F C -02 10 0.60 0.25 4.3 6.45 10 1.70 4.30 73.10 Verticales 1/2" 6 6.40 10 384.00
Estribos 3/8" 29 1.70 10 493.00 Ganchos 3/8" 29 0.45 10 130.50
P -01 2 0.60 0.25 4.3 1.29 2 1.70 4.30 14.62 Verticales 3/4" 12 6.40 2 153.60 2 0.75 0.25 4.3 1.61 2 2.00 4.30 17.20 Verticales 1/2" 4 6.40 2 51.20
Estribos 3/8" 29 1.80 2 104.40 Estribos 3/8" 29 1.10 2 63.80 Horizontales 3/8" 44 1.50 2 132.00
P -02 2 1.00 0.25 4.3 2.15 11.50 2 2.50 4.30 21.50 Verticales 5/8" 10 6.40 2 128.00 Estribos 3/8" 29 2.50 2 145.00 Ganchos 3/8" 29 0.45 6 78.30
CASETAS INGRESO SERVICIOS GENERALES C -04 6 0.55 0.15 3.65 1.81 6 1.40 3.65 30.66 Verticales 1/2" 8 5.75 6 276.00
Estribos 3/8" 28 1.40 6 235.20 Estribos 3/8" 28 0.90 6 151.20
INGRESO EMERGENCIA C -01 2 0.60 0.15 3.65 0.66 2 1.50 3.65 10.95 Verticales 1/2" 8 5.75 2 92.00
Estribos 3/8" 26 1.50 2 78.00 Estribos 3/8" 26 0.90 2 46.80
C -04 4 0.55 0.15 3.65 1.20 4 1.40 3.65 20.44 Verticales 1/2" 8 5.75 4 184.00 Estribos 3/8" 28 1.40 4 156.80 Estribos 3/8" 28 0.90 4 100.80
INGRESO PRINCIPAL C -01 4 0.60 0.15 3.65 1.31 4 1.50 3.65 21.90 Verticales 1/2" 8 5.75 4 184.00
86 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Estribos 3/8" 26 1.50 4 156.00 Estribos 3/8" 26 0.90 4 93.60
C -04 6 0.55 0.15 3.65 1.81 6 1.40 3.65 30.66 Verticales 1/2" 8 5.75 6 276.00 Estribos 3/8" 28 1.40 6 235.20 Estribos 3/8" 28 0.90 6 151.20
INGRESO SERVICIOS GENERALES C -04 6 0.55 0.15 3.65 1.81 6 1.40 3.65 30.66 Verticales 1/2" 8 5.75 6 276.00
Estribos 3/8" 28 1.40 6 235.20 Estribos 3/8" 28 0.90 6 151.20
CASETA DE CONTROL PLANTA DE TRATAMIENTO CA 7 0.30 0.15 3.65 1.15 9.75 7 0.90 3.65 22.99 Verticales 1/2" 4 5.75 7 161.00
Estribos 3/8" 28 0.90 7 176.40
M3 466.40 M2 4,440.20 ML - 68,262.64 5,159.34 9,321.23 8,739.58 10,846.50
KG - 38,227.08 5,107.75 14,447.90 19,227.08 43,060.61
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
466.40 4,440.20 38,227.08 5,107.75 14,447.90 19,227.08 43,060.61
87 de 336
HOJA DE METRADOS
ACERO
TOTAL
88 de 336
HOJA DE METRADOS
ACERO
TOTAL
89 de 336
HOJA DE METRADOS
ACERO
TOTAL
90 de 336
HOJA DE METRADOS
ACERO
TOTAL
91 de 336
HOJA DE METRADOS
ACERO
TOTAL
92 de 336
HOJA DE METRADOS
ACERO
TOTAL
93 de 336
HOJA DE METRADOS
ACERO
TOTAL
94 de 336
HOJA DE METRADOS
ACERO
TOTAL
95 de 336
HOJA DE METRADOS
ACERO
TOTAL
96 de 336
HOJA DE METRADOS
ACERO
TOTAL
97 de 336
HOJA DE METRADOS
ACERO
TOTAL
98 de 336
HOJA DE METRADOS
ACERO
TOTAL
99 de 336
HOJA DE METRADOS
ACERO
TOTAL
100 de 336
HOJA DE METRADOS
ACERO
TOTAL
101 de 336
HOJA DE METRADOS
ACERO
TOTAL
102 de 336
HOJA DE METRADOS
ACERO
TOTAL
103 de 336
HOJA DE METRADOS
ACERO
TOTAL
104 de 336
HOJA DE METRADOS
ACERO
TOTAL
105 de 336
HOJA DE METRADOS
ACERO
TOTAL
106 de 336
HOJA DE METRADOS
ACERO
TOTAL
120,070.41
120,070.41
107 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento 02.03.03 COLUMNAS
02.03.03.01 COLUMNAS CONCRETO F'C = 280 KG/CM2
02.03.03.03 COLUMNAS ENCOFRADO Y DESENCOFRADO
02.03.03.05 COLUMNAS - ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
SUBSECTOR A-3
CA-2 Eje entre A & B-3,4 SOTANO, PRIMER, Y SEGUNDO PISO 2 0.30 0.30 12.25 2.21 2 1.20 12.25 29.40 Verticales 5/8" 6 13.33 2 159.90
Horizontales sotano +1er P (h=7.35) 3/8" 42 1.12 2 93.63 Horizontales 2do. P (h=3.4) 3/8" 25 1.12 2 56.00
Eje 3 y 4, entre D y E' PRIMER Y SEGUNDO PISO 3 0.30 0.30 8.85 2.39 3 1.20 8.85 31.86 Verticales 5/8" 6 10.23 3 184.05 Horizontales 1er P (h=3.4) 3/8" 32 1.12 3 107.52 Horizontales 2do. P (h=3.4) 3/8" 25 1.12 3 84.00 empalme 1 5/8" 6 1.00 1 6.00
CA-2 VIENE DE PLATEA
Eje 8 - B/C SOTANO Y PRIMER PISO 2 0.30 0.30 9.55 1.72 2 1.20 9.55 22.92 Verticales 5/8" 6 10.93 2 131.10
Horizontales sotano +1er P (h=7.35) 3/8" 48 1.12 2 107.07 CA-3
Eje B, D - 3 PRIMER Y SEGUNDO PISO 2 0.60 0.30 8.85 3.19 2 1.80 8.85 31.86 Vertical 5/8" 12 10.23 2 245.40 Horizontales 1er. P (h=3.4) 3/8" 32 1.72 2 110.08 Horizontal 1er P tipo "C" 3/8" 31 0.46 2 28.52 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 2 86.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 2 23.00 empalme 1 5/8" 12 1.00 2 24.00
CA-4 Eje B-7 SOTANO,PRIMER Y SEGUNDO PISO 1 0.60 0.30 12.25 2.21 1 1.80 12.25 22.05 Vertical 5/8" 12 13.33 1 159.90
Horizontales sotano +1er P (h=7.35) 3/8" 42 1.72 1 71.90 Horizontal 1er P tipo "C" 3/8" 41 0.46 1 18.77 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 1 43.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 1 11.50 empalme 1 5/8" 12 1.00 1 12.00
Eje B-5,6 & Eje C-4,5,6 PRIMER Y SEGUNDO PISO 5 0.60 0.30 8.85 7.96 5 1.80 8.85 79.65 Verticales 5/8" 10
10.23 5 511.25 Horizontales 1er. P (h=3.4) 3/8" 32 1.72 5 275.20 Horizontal 1er P tipo "C" 3/8" 31 0.46 5 71.30 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 5 215.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 5 57.50 empalme 1 5/8" 10 1.00 5 50.00
CA-5 Eje C-7 PRIMER Y SEGUNDO PISO 1 0.60 0.30 8.85 1.59 1 1.80 8.85 15.93 Vertical 5/8" 16 10.23 1 163.60
Horizontales 1er. P (h=3.4) 3/8" 32 1.72 1 55.04 Horizontal 1er P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P (h=3.4) 3/8" 25 1.72 1 43.00 Horizontal 2do P tipo "C" 3/8" 25 0.46 1 11.50 empalme 1 5/8" 16 1.00 1 16.00
SUB GERENCIA DE ESTUDIOSG.R.I.
108 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
CA-6 Eje E' -6 PRIMER , SEGUNDO Y TERCER PISO 1 0.60 0.30 14.5 2.61 1 1.80 14.50 26.10 Verticales 5/8" 14 15.88 1 222.25
1 0.30 0.30 14.5 1.31 1 1.20 14.50 17.40 Horizontales 1er. P (h=3.4) 3/8" 32 3.44 1 110.08 Horizontales 2do. P (h=3.4) 3/8" 25 3.44 1 86.00 Horizontales 3er. P (2.75) 3/8" 21 3.44 1 72.24 Horizontales atico (h=1.45) 3/8" 15 3.44 1 51.60 empalme 1 5/8" 14 1.00 1 14.00
CA-7
Eje E'-7 PRIMER , SEGUNDO Y TERCER PISO 1 1.60 0.30 12.35 5.93 1 3.80 12.35 46.93 Verticales 3/4" 16 13.73 1 219.60 Verticales 1/2" 8 13.73 1 109.80 Horizontales 1er. P (h=3.4) 3/8" 21 3.34 1 70.14 Horizontales 1er. P (h=3.4) 3/8" 30 1.25 1 37.50 Horizontal 1er P tipo "C" 3/8" 29 0.46 1 13.34 Horizontales 2do. P (h=3.4) 3/8" 14 3.34 1 46.76 Horizontales 2do. P (h=3.4) 3/8" 23 1.25 1 28.75 Horizontal 2do P tipo "C" 3/8" 23 0.46 1 10.58 Horizontales 3er. P (h=2.75) 3/8" 11 3.34 1 36.74 Horizontales 3er. P (h=2.75) 3/8" 19 1.25 1 23.75 Horizontal 2do P tipo "C" 3/8" 19 0.46 1 8.74 empalme 1 3/4" 16 1.00 0 0.00 empalme 2 1/2" 8 1.00 1 8.00
COLUMNAS ESCALERA N°11 CA-2
Eje 7 entre B & C VIENE DESDE LOSA LA-1 2 0.30 0.30 8.00 1.44 2 1.20 8.00 19.20 Verticales 5/8" 6 9.23 2 110.70 Horizontales sotano +1er P (h=3.95) 3/8" 44 1.12 2 98.11
CE2 VIENE DESDE LOSA LA1 2 0.23 0.30 8.00 1.10 2 1.06 8.00 16.96 Verticales 3/4" 6 9.23 2 110.70
Horizontales sotano +1er P (h=3.95) 3/8" 44 1.10 2 96.36 CE1 HASTA DESCANSO NPT +4.85 1 0.40 0.40 4.90 0.78 1 1.60 4.90 7.84 Verticales 3/4" 12 6.13 1 73.50
Horizontales 1er P (h=3.95) 3/8" 28 1.64 1 45.92 HASTA DESCANSO NPT +2.8 1 0.40 0.40 2.90 0.46 1 1.60 2.90 4.64 Verticales 3/4" 12 4.13 1 49.50
Horizontales 1er P (h=1.95) 3/8" 17 1.64 1 27.88 COLUMNAS ESCALERA N°16 CE1 HASTA DESCANSO NPT +6.21 1 0.40 0.40 6.26 1.00 1 1.60 6.26 10.02 Verticales 3/4" 12 7.49 1 89.82
Horizontales 1er P (h=6.26) 3/8" 39 1.64 1 63.96 CE1 HASTA DESCANSO NPT +3.48 1 0.40 0.40 3.43 0.55 1 1.60 3.43 5.49 Verticales 3/4" 12 4.81 1 57.66
Horizontales 1er. P 3/8" 28 1.52 1 42.56 Horizontales 1er. P tipo "C" 3/8" 27 2.24 1 60.48
SUBSECTOR A-2 CA-4
Eje E-7 PRIMER, SEGUNDO Y TERCER PISO 1 0.60 0.30 12 2.16 1 1.80 12.00 21.60 Verticales 5/8" 10 13.47 1 134.65 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2do. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 21 1.72 1 36.12 Horizontales 3er. P tipo"C" 3/8" 21 0.46 1 9.66
Eje F-5 PRIMER Y SEGUNDO PISO 1 0.60 0.30 8.55 1.54 1 1.80 8.55 15.39 Verticales 5/8" 10 10.23 1 102.25 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 25 1.72 1 43.00 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50
109 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Eje H-7 PRIMER, SEGUNDO Y TERCER PISO + 4TO 1 0.60 0.30 16.95 3.05 1 1.80 16.95 30.51 Vertical 5/8" 10 18.63 1 186.25 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo "C" 3/8" 21 0.46 1 9.66 Horizontales 4to. P 3/8" 29 1.72 1 49.88 Horizontales 4to. P tipo "C" 3/8" 29 0.46 1 13.34
CA-5 Eje F-6 PRIMER, SEGUNDO Y TERCER PISO,ATICO 1 0.60 0.30 14.15 2.55 1 1.80 14.15 25.47 Vertical 5/8" 16 15.88 1 254.00
Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo "C" 3/8" 21 0.46 1 9.66 Horizontales atico 3/8" 15 1.72 1 25.80 Horizontales atico tipo "C" 3/8" 15 0.46 1 6.90
Eje H-4,5 PRIMER Y SEGUNDO PISO 2 0.60 0.30 8.55 3.08 2 1.80 8.55 30.78 Vertical 5/8" 16 10.23 2 327.20 Horizontales 1er. P 3/8" 32 1.72 2 110.08 Horizontales 1er. P tipo "C" 3/8" 31 0.46 2 28.52 Horizontales 2do. P 3/8" 25 1.72 2 86.00 Horizontales 2er. P tipo "C" 3/8" 25 0.46 2 23.00
CA-8 Eje E-4 PRIMER Y SEGUNDO PISO 1 0.30 0.30 8.55 0.77 1 1.20 8.55 10.26 Vertical 3/4" 6 10.23 1 61.35
Horizontales 1er. P 3/8" 32 1.12 1 35.84 Horizontales 2do. P 3/8" 25 1.12 1 28.00
CA-9 Eje E-6 PRIMER, SEGUNDO Y TERCER PISO, ATIC 1 0.60 0.30 14.15 2.55 1 1.80 14.15 25.47 Vertical 3/4" 14 15.88 1 222.25
Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2do. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo"C" 3/8" 21 0.46 1 9.66 Horizontales atico 3/8" 15 1.72 1 25.80 Horizontales atico tipo "C" 3/8" 15 0.46 1 6.90
CA-10 Eje H-6 PRIMER, SEGUNDO Y TERCER PISO + 4TO 1 0.60 0.30 14.75 2.66 1 1.80 14.75 26.55 Vertical 5/8" 16 16.83 1 269.20
Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26 Horizontales 2do. P 3/8" 27 1.72 1 46.44 Horizontales 2er. P tipo "C" 3/8" 25 0.46 1 11.50 Horizontales 3er. P 3/8" 23 1.72 1 39.56 Horizontales 3er. P tipo "C" 3/8" 21 0.46 1 9.66 Horizontales 4to. P 3/8" 18 1.72 1 30.96 Horizontales 4to. P tipo "C" 3/8" 18 0.46 1 8.28
CA-11 Entre H e I - 4,5,6 PRIMER Y SEGUNDO PISO 3 0.55 0.30 8.55 4.23 3 1.71 8.55 43.86 Verticales 5/8" 13 10.23 3 398.78
Horizontales 1er. P 3/8" 32 164.00 3 15,744.00 Horizontales 1er. P tipo "C" 3/8" 31 0.46 3 42.78 Horizontales 2do. P 3/8" 25 164.00 3 12,300.00 Horizontales 2er. P tipo "C" 3/8" 25 0.46 3 34.50
SUBSECTOR A-1 CA-2
EJE H-2 AUDITORIO 1 0.30 0.30 4.7 0.42 1 1.20 4.00 4.80 Verticales 1er 5/8" 6 6.27 1 37.65 Horizontales 1er. P 3/8" 31 1.12 1 34.72
110 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
EJE I-1, IJ-1, IJ-2 PRIMER PISO DEPOSITO 3 0.30 0.30 3.45 0.93 3 1.20 2.75 9.90 Verticales 1er 5/8" 6 5.07 3 91.35 3 Columnas Horizontales 1er. P 3/8" 25 1.12 3 84.00
CA-2 EJE H-3,4 & I-3 AUDITORIO Y HALL 3 0.30 0.30 4.7 1.27 3 1.20 4.00 14.40 Verticales 1er 5/8" 6 6.27 3 112.95 3 Columnas Horizontales 1er. P 3/8" 31 1.12 3 104.16
CA-4
EJE H,entre 3 y 4 PRIMER PISO AUDITORIO 1 0.60 0.30 8 1.44 1 1.80 7.30 13.14 Verticales 5/8" 10 6.27 1 62.75 Horizontales 1er. P 3/8" 32 1.72 1 55.04 Horizontales 1er. P tipo "C" 3/8" 33 0.46 1 15.18 Horizontales 2do. P 3/8" 25 1.72 1 43.00 Horizontales 2do. P tipo "C" 3/8" 25 0.46 1 11.50
CA-4 EJE I-4 PRIMER PISO HALL 1 0.60 0.30 4.7 0.85 1 1.80 4.00 7.20 Verticales 5/8" 10 6.27 1 62.75
Horizontales 1er. P 3/8" 31 1.72 1 53.32 Horizontales 1er. P tipo "C" 3/8" 31 0.46 1 14.26
SECTORB SUBSECTOR B1 CB69
EJE H-10,11,12 PRIMER Y SEGUNDO PISO 3 0.30 0.60 9.35 3 1.80 9.35 Verticales 5/8" 10 10.73 3 321.75 Horizontales 1er. P 3/8" 34 1.40 3 142.80 Horizontales 1er. P 3/8" 34 1.40 3 142.80 Horizontales 2do. P 3/8" 25 1.40 3 105.00 Horizontales 2do. P 3/8" 25 1.40 3 105.00
EJE H-14 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 1 1.80 14.05 Verticales 5/8" 10 15.03 1 150.25 Horizontales zotano 3/8" 35 1.40 1 49.00 Horizontales zotano 3/8" 35 1.40 1 49.00 Horizontales 1er. P 3/8" 27 1.40 1 37.80 Horizontales 1er. P 3/8" 27 1.40 1 37.80 Horizontales 2do. P 3/8" 25 1.40 1 35.00 Horizontales 2do. P 3/8" 25 1.40 1 35.00
CB70 EJE I-11,12 PRIMER Y SEGUNDO PISO 2 0.30 0.60 9.35 2 1.80 9.35 Verticales 3/4" 12 10.73 2 257.40
Horizontales 1er. P 3/8" 34 1.40 2 95.20 Horizontales 1er. P 3/8" 34 1.40 2 95.20 Horizontales 2do. P 3/8" 25 1.40 2 70.00 Horizontales 2do. P 3/8" 25 1.40 2 70.00
C14 EJE H-10,11,12 PRIMER Y SEGUNDO PISO 7 0.30 0.60 9.35 3 1.80 9.35 Verticales 5/8" -10 10.73 7 -750.75
Horizontales 1er. P 3/8" -34 1.40 7 -333.20 Horizontales 1er. P 3/8" -34 1.40 7 -333.20 Horizontales 2do. P 3/8" -25 1.40 7 -245.00 Horizontales 2do. P 3/8" -25 1.40 7 -245.00
SUBSECTOR B2.1 EJE B-8 CB1
ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.90 14.05 3.79 1 2.40 14.05 33.72 Verticales 1" 4 15.03 1 60.10Verticales 3/4" 10 15.03 1 150.25 Horizontales zotano 3/8" 37 1.70 1 62.90 Horizontales zotano 3/8" 37 1.70 1 62.90 Horizontales 1er. P 3/8" 29 1.70 1 49.30 Horizontales 1er. P 3/8" 29 1.70 1 49.30 Horizontales 2do. P 3/8" 27 1.70 1 45.90 Horizontales 2do. P 3/8" 27 1.70 1 45.90
ENTRE EJE B-8,9 CB2 ZOTANO 2 0.30 0.75 5.35 2.41 2 2.10 5.35 22.47 Verticales 1" 6 6.07 2 72.90
Verticales 3/4" 8 6.07 2 97.20 Horizontales zotano 3/8" 37 1.52 2 112.48
111 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Horizontales zotano 3/8" 37 1.52 2 112.48 ENTRE EJE B-8,9 CB3
ZOTANO 1 0.30 1.20 5.35 1.93 1 3.00 5.35 16.05 Verticales 1" 6 6.07 1 36.45Verticales 3/4" 6 6.07 1 36.45 Horizontales zotano 3/8" 37 2.92 1 108.04 Horizontales zotano tipo "C" 3/8" 36 1.38 1 49.68
EJE C,F-8 CB-4 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.30 1.00 14.05 8.43 2 2.60 14.05 73.06 Verticales 1" 16 15.03 2 480.80
Horizontales zotano 3/8" 25 1.94 2 97.00 Horizontales zotano 3/8" 25 1.94 2 97.00 Horizontales 1er. P 3/8" 29 1.94 2 112.52 Horizontales 1er. P 3/8" 29 1.94 2 112.52 Horizontales 2do. P 3/8" 27 1.94 2 104.76 Horizontales 2do. P 3/8" 27 1.94 2 104.76
EJE C,E-9 CB-5 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.40 0.60 14.05 6.74 2 2.00 14.05 56.20 Verticales 3/4" 12 15.03 2 360.60
Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales zotano 3/8" 35 1.52 2 106.40 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 1er. P 3/8" 27 1.52 2 82.08 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.52 2 76.00
EJE C-10/F-9 CB-6 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.30 0.60 14.05 5.06 2 1.80 14.05 50.58 Verticales 1" 10 15.03 2 300.50
Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales zotano 3/8" 35 1.60 2 112.00 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 1er. P 3/8" 27 1.60 2 86.40 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00
EJE D-9 CB-7 SEGUNDO PISO 1 0.30 0.60 4.1 0.74 1 1.80 4.10 7.38 Verticales 3/4" 10 4.35 1 43.50 (columna reducida en 2do piso) Horizontales 2do. P 3/8" 25 1.60 1 40.00
Horizontales 2do. P 3/8" 25 1.60 1 40.00 EJE E-8 CB-8
ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 1 1.80 14.05 25.29 Verticales 1" 12 15.03 1 180.30Horizontales zotano 3/8" 25 1.60 1 40.00 Horizontales zotano 3/8" 25 1.60 1 40.00 Horizontales 1er. P 3/8" 29 1.60 1 46.40 Horizontales 1er. P 3/8" 29 1.60 1 46.40 Horizontales 2do. P 3/8" 27 1.60 1 43.20 Horizontales 2do. P 3/8" 27 1.60 1 43.20
EJE C-10 CB-9 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 1 1.80 14.05 25.29 Verticales 1" 10 15.03 1 150.25
Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 2do. P 3/8" 25 1.60 1 40.00 Horizontales 2do. P 3/8" 25 1.60 1 40.00
CB-10 EJE G-9/H-10 PRIMER Y SEGUNDO PISO 2 0.30 0.60 9.35 3.37 2 1.80 9.35 33.66 Verticales 1" 10 10.73 2 214.50
Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 2do. P 3/8" 25 1.60 2 80.00
112 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Horizontales 2do. P 3/8" 25 1.60 2 80.00 CB-11
EJE G-10/H-9 PRIMER Y SEGUNDO PISO 2 0.30 0.60 9.35 3.37 2 1.80 9.35 33.66 Verticales 1" 12 10.73 2 257.40Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 1er. P 3/8" 34 1.60 2 108.80 Horizontales 2do. P 3/8" 25 1.60 2 80.00 Horizontales 2do. P 3/8" 25 1.60 2 80.00
CB-12 EJE H-8 PRIMER Y SEGUNDO PISO 1 0.30 0.90 9.35 2.52 1 2.40 9.35 22.44 Verticales 1" 26 10.73 1 278.85
Horizontales 1er. P 5/8" 47 1.34 1 62.98 Horizontales 1er. P 5/8" 47 1.34 1 62.98 Horizontales 1er. P 5/8" 47 1.48 1 69.56 Horizontales 2do. P 5/8" 35 1.34 1 46.90 Horizontales 2do. P 5/8" 35 1.34 1 46.90 Horizontales 2do. P 5/8" 35 1.48 1 51.80
CB-13 EJE H-8 PRIMER Y SEGUNDO PISO 1 0.30 1.35 9.35 3.79 1 3.30 9.35 30.86 Verticales 1" 28 10.73 1 300.30
Horizontales 1er. P 5/8" 47 1.59 1 74.73 Horizontales 1er. P 5/8" 47 1.59 1 74.73 Horizontales 1er. P 5/8" 47 2.00 1 94.00 Horizontales 2do. P 5/8" 35 1.59 1 55.65 Horizontales 2do. P 5/8" 35 1.59 1 55.65 Horizontales 2do. P 5/8" 35 2.00 1 70.00
SUBSECTOR B2.2 CB-18
EJE G-10,11/H-12 PRIMER Y SEGUNDO PISO 3 0.30 0.60 9.35 5.05 3 1.80 9.35 50.49 Verticales 3/4" 10 10.73 3 321.75 Horizontales 1er. P 3/8" 34 1.60 3 163.20 Horizontales 1er. P 3/8" 34 1.60 3 163.20 Horizontales 2do. P 3/8" 25 1.60 3 120.00 Horizontales 2do. P 3/8" 25 1.60 3 120.00
CB-19 EJE G-12 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.60 14.05 2.53 1 1.80 14.05 25.29 Verticales 3/4" 12 15.03 1 180.30
Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales zotano 3/8" 35 1.60 1 56.00 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 1er. P 3/8" 27 1.60 1 43.20 Horizontales 2do. P 3/8" 25 1.60 1 40.00 Horizontales 2do. P 3/8" 25 1.60 1 40.00
SUBSECTOR B2.3 CB-14
EJE B-11 ZOTANO , PRIMER Y SEGUNDO PISO 1 0.30 0.90 14.05 3.79 1 2.40 14.05 33.72 Verticales 1" 12 15.03 1 180.30Horizontales zotano 3/8" 37 1.60 1 59.20 Horizontales zotano tipo "C" 3/8" 36 1.38 1 49.68 Horizontales 1er. P 3/8" 29 1.60 1 46.40 Horizontales zotano tipo "C" 3/8" 29 1.38 1 40.02 Horizontales 2do. P 3/8" 27 1.60 1 43.20 Horizontales zotano tipo "C" 3/8" 27 1.38 1 37.26
CB-15 EJE C-10,12 ZOTANO , PRIMER Y SEGUNDO PISO 2 0.60 0.60 14.05 10.12 2 2.40 14.05 67.44 Verticales 1" 12 15.03 2 360.60
Horizontales zotano 3/8" 35 2.32 2 162.40 Horizontales zotano 3/8" 35 1.69 2 118.30 Horizontales zotano 3/8" 35 1.69 2 118.30 Horizontales 1er. P 3/8" 27 2.32 2 125.28 Horizontales 1er. P 3/8" 27 1.69 2 91.26 Horizontales 1er. P 3/8" 27 1.69 2 91.26 Horizontales 2do. P 3/8" 25 2.32 2 116.00 Horizontales 2do. P 3/8" 25 1.69 2 84.50 Horizontales 2do. P 3/8" 25 1.69 2 84.50
113 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
EJE C-11 CB-16 SEGUNDO PISO 1 0.60 0.60 4.1 1.48 1 2.40 4.10 9.84 Verticales 1" 12 4.35 1 52.20(columna reducida en 2do piso) Horizontales 2do. P 3/8" 25 2.32 1 58.00
Horizontales 2do. P 3/8" 25 1.69 1 42.25 Horizontales 2do. P 3/8" 25 1.69 1 42.25
EJE D-11 CB-17 SEGUNDO PISO 1 0.60 0.90 4.1 2.21 1 3.00 4.10 12.30 Verticales 1" 8 4.35 1 34.80(columna reducida en 2do piso) Horizontales 2do. P 3/8" 27 1.81 1 48.76
Horizontales 2do. P 3/8" 27 1.81 1 48.76
SUBSECTOR B3
Eje B -14 CB20 SOTANO,PRIMER Y SEGUNDO PISO 1 0.30 1.30 4.95 1.93 1 3.20 4.95 15.84 Verticales sotano 1" 6 6.32 1 37.95
Verticales sotano 3/4" 10 6.32 1 63.25
Horizontal Sotano+1P 1/2" 56 3.24 1 181.44
Horizontal 2P 3/8" 26 3.24 1 84.24 Horiz. Cimiento 1/2" 8 3.24 1 25.92 Horizontal tipo "C" 3/8" 56 2.45 1 137.20
TERCER PISO 1 0.30 0.65 3.4 0.66 1 1.90 3.40 6.46 Verticales 3P 1" 6 4.15 1 24.90Verticales 3P 3/4" 6 4.15 1 24.90 Horizontal 3P 3/8" 26 1.94 1 50.44 Horizontal tipo "C" 3/8" 26 0.49 1 12.74
Eje B 14/15 CB21 SOTANO 1 0.30 1.05 4.95 1.56 1 2.70 4.95 13.36 Verticales sotano 3/4" 6 6.32 1 37.95
Verticales sotano 5/8" 6 6.32 1 37.95
Horizontal Sotano 3/8" 28 2.74 1 76.72 Horiz. Cimiento 3/8" 8 2.74 1 21.92 Horizontal tipo "C" 3/8" 28 1.47 1 41.16
Eje B 14/15 CB22 SOTANO 1 0.30 0.95 4.95 1.41 1 2.50 4.95 12.37 Verticales sotano 3/4" 12 6.32 1 75.90
Horizontal Sotano 3/8" 28 2.54 1 71.12 Horiz. Cimiento 3/8" 8 2.54 1 20.32 Horizontal tipo "C" 3/8" 28 1.47 1 41.16
Eje B -15 CB23
SOTANO 1 0.30 1.40 4.95 2.08 1 3.40 4.95 16.83 Verticales sotano 1" 4 6.32 1 25.30Verticales sotano 3/4" 16 6.32 1 101.20 Horizontal Sotano 1/2" 28 3.44 1 96.32 Horiz. Cimiento 1/2" 8 3.44 1 27.52 Horizontal tipo "C" 3/8" 28 1.96 1 54.88
PRIMER,SEGUNDO Y TERCER PISO 1 0.30 1.00 12.8 3.84 1 2.60 12.80 33.28 Verticales 1P a 3P 1" 6 13.55 1 81.30Verticales 1P a 3P 3/4" 10 13.55 1 135.50 Horizontal +1P 1/2" 28 2.64 1 73.92 Horizontal al 2P+3P 3/8" 52 2.64 1 137.28 Horizontal tipo "C" 3/8" 80 0.98 1 78.40
Eje B -17 CB24
SOTANO 1 0.30 1.80 4.95 2.67 1 4.20 4.95 20.79 Verticales sotano 1" 20 6.32 1 126.50Horizontal Sotano 1/2" 28 4.24 1 118.72 Horiz. Cimiento 1/2" 8 4.24 1 33.92 Horizontal tipo "C" 3/8" 28 2.94 1 82.32
PRIMER,SEGUNDO Y TERCER PISO 1 0.30 1.00 12.8 3.84 1 2.60 12.80 33.28 Verticales 1P a 3P 1" 14 13.55 1 189.70Horizontal +1P 3/8" 28 2.64 1 73.92 Horizontal al 2P+3P 3/8" 52 2.64 1 137.28 Horizontal tipo "C" 3/8" 80 0.98 1 78.40
Eje B -17/18 CB25 SOTANO 1 0.30 1.65 4.95 2.45 1 3.90 4.95 19.30 Verticales sotano 3/4" 4 6.32 1 25.30
114 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Verticales sotano 1/2" 12 6.32 1 75.90
Horizontal Sotano 3/8" 28 3.94 1 110.32 Horiz. Cimiento 3/8" 8 3.94 1 31.52 Horizontal tipo "C" 3/8" 28 2.94 1 82.32
Eje B -18 CB26
SOTANO, PRIMER,SEGUNDO Y TERCER PI 1 0.30 1.30 17.75 6.92 1 3.20 17.75 56.80 Verticales hasta 3er nivel 3/4" 4 19.13 1 76.50 Verticales hasta 3er nivel 1/2" 12 19.13 1 229.50 Horizontal Sótano +1P 1/2" 56 6.48 1 362.88 Horizontal al 2P+3P 3/8" 48 6.48 1 311.04 Horiz. Cimiento 3/8" 8 6.48 1 51.84 Horizontal tipo "C" 3/8" 104 1.96 1 203.84
Eje C-13 CB27
SOTANO, PRIMER,SEGUNDO Y TERCER PI 1 0.60 0.30 17.75 3.20 1 1.80 17.75 31.95 Verticales hasta 3er nivel 1" 12 19.13 1 229.50Horizontal Sótano +1P 3/8" 52 3.16 1 164.32 Horizontal al 2P+3P 3/8" 48 3.16 1 151.68 Horiz. Cimiento 3/8" 8 3.16 1 25.28
Eje C-14 CB28
SOTANO 1 0.60 0.40 4.95 1.19 1 2.00 4.95 9.90 Verticales hasta sotano 1" 16 6.32 1 101.20Horizontal Sotano 3/8" 26 4.88 1 126.88 Horiz. Cimiento 3/8" 8 4.88 1 39.04
PRIMER,SEGUNDO Y TERCER PISO 1 0.30 0.60 12.8 2.30 1 1.80 12.80 23.04 Verticales hasta 3er nivel 3/4" 12 13.55 1 162.60 Horizontal +1P 3/8" 26 3.16 1 82.16 Horizontal al 2P+3P 3/8" 48 3.16 1 151.68
Eje C-16 CB29
SOTANO 2 0.60 0.40 4.95 2.38 2 2.00 4.95 19.80 Verticales hasta sotano 1" 14 6.32 2 177.10Horizontal Sotano 3/8" 26 5.07 2 263.64 Horiz. Cimiento 3/8" 8 5.07 2 81.12
PRIMER,SEGUNDO Y TERCER PISO 2 0.30 0.60 12.8 4.61 2 1.80 12.80 46.08 Verticales hasta 3er nivel 1" 12 13.55 2 325.20Horizontal +1P 3/8" 26 3.16 2 164.32 Horizontal al 2P+3P 3/8" 48 3.16 2 303.36
Eje C-18 CB30
SOTANO 1 0.30 1.40 4.95 2.08 1 3.40 4.95 16.83 Verticales hasta sotano 3/4" 18 6.32 1 113.85 Horizontal Sotano 3/8" 28 3.44 1 96.32 Horiz. Cimiento 3/8" 8 3.44 1 27.52 Horizontal tipo "C" 3/8" 28 1.96 1 54.88
PRIMER Y SEGUNDO 1 0.30 1.00 8.7 2.61 1 2.60 8.70 22.62 Verticales hasta 1P + 2P 3/4" 12 9.70 1 116.40 Horizontal +1P 3/8" 28 2.64 1 73.92 Horizontal al +2P 3/8" 26 2.64 1 68.64 Horizontal tipo "C" 3/8" 28 1.96 1 54.88
TERCER PISO 1 0.30 0.30 4.1 0.37 1 1.20 4.10 4.92 Verticales hasta +3P 3/4" 6 4.85 1 29.10 Horizontal +3P 3/8" 24 1.24 1 29.76
Eje C-19 CB31
SOTANO Y PRIMER PISO 1 0.30 1.35 9.55 3.87 1 3.30 9.55 31.52 Verticales hasta +1P 1" 12 10.93 1 131.10Horizontal Sotano+1P 3/8" 56 3.34 1 187.04 Horiz. Cimiento 3/8" 8 3.34 1 26.72 Horizontal tipo "C" 3/8" 56 1.47 1 82.32
SEGUNDO Y TERCER PISO 1 0.30 0.60 8.2 1.48 1 1.80 8.20 14.76 Verticales 2P+3P 1" 12 8.95 1 107.40Horizontal 2P+3P 3/8" 48 3.16 1 151.68
Eje D-14 & 18 CB32
SOTANO Y PRIMER PISO 2 0.30 1.65 9.55 9.45 2 3.90 9.55 74.49 Verticales hasta +1P 3/4" 18 10.93 2 393.30 Horizontal Sotano+1P 3/8" 56 3.94 2 441.28
115 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Horiz. Cimiento 3/8" 8 3.94 2 63.04 Horizontal tipo "C" 3/8" 56 2.94 2 329.28
SEGUNDO Y TERCER PISO 2 0.30 0.60 8.2 2.95 2 1.80 8.20 29.52 Verticales 2P+3P 1" 12 8.95 2 214.80Horizontal 2P+3P 3/8" 48 3.16 2 303.36
Eje E-14 CB33
SOTANO 1 0.30 1.25 17.75 6.66 1 3.10 17.75 55.03 Verticales hasta sotano 1" 14 19.13 1 267.75Horizontal Sotano +1P 3/8" 56 3.14 1 175.84 Horizontal al 2P+3P 3/8" 52 3.14 1 163.28 Horizontal tipo "C" 3/8" 108 1.96 1 211.68 Horiz. Cimiento 3/8" 8 3.14 1 25.12
Eje E-18 CB34
SOTANO Y PRIMER PISO 1 0.30 1.25 9.55 3.58 1 3.10 9.55 29.60 Verticales hasta sotano 1" 14 10.93 1 152.95Horizontal Sotano +1P 3/8" 56 3.14 1 175.84 Horiz. Cimiento 3/8" 8 3.14 1 25.12 Horizontal tipo "C" 3/8" 56 1.96 1 109.76
SEGUNDO PISO 1 0.30 1.20 4.1 1.48 1 3.00 4.10 12.30 Verticales 1P + 2P 1" 14 5.10 1 71.40Horizontal +1P 3/8" 28 3.04 1 85.12 Horizontal al +2P 3/8" 26 3.04 1 79.04 Horizontal tipo "C" 3/8" 54 1.96 1 105.84
TERCER PISO 1 0.30 0.60 4.1 0.74 1 1.80 4.10 7.38 Verticales 3P 1" 10 4.85 1 48.50Horizontal 3P 3/8" 24 3.08 1 73.92
Eje F-14 & 18 CB35
SOTANO Y PRIMER PISO 2 0.30 1.30 9.55 7.45 2 3.20 9.55 61.12 Verticales Sotano + 1P 1" 16 10.93 2 349.60Horizontal Sotano+1P 3/8" 56 3.24 2 362.88 Horiz. Cimiento 3/8" 8 3.24 2 51.84 Horizontal tipo "C" 3/8" 56 2.45 2 274.40
SEGUNDO Y TERCER PISO 2 0.30 0.60 8.2 2.95 2 1.80 8.20 29.52 Verticales 2P+3P 1" 10 8.95 2 179.00Horizontal 2P+3P 3/8" 48 3.08 2 295.68
Eje G-13 CB36
SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 0.60 17.75 3.20 1 1.80 17.75 31.95 Verticales hasta +3P 1" 14 19.13 1 267.75Horizontal Sotano 3/8" 16 2.88 1 46.08 Horizontal 1P 3/8" 28 2.88 1 80.64 Horizontal 2P+3P 3/8" 48 2.88 1 138.24 Horiz. Cimiento 3/8" 8 2.88 1 23.04
Eje G-14 & 18 CB37
SOTANO Y PRIMER PISO 2 0.40 0.60 9.55 4.58 2 2.00 9.55 38.20 Verticales Sotano + 1P 3/4" 16 10.93 2 349.60 Horizontal Sotano+1P 3/8" 52 4.88 2 507.52 Horiz. Cimiento 3/8" 8 4.88 2 78.08
SEGUNDO Y TERCER PISO 2 0.30 0.60 8.2 2.95 2 1.80 8.20 29.52 Verticales 2P+3P 3/4" 12 8.95 2 214.80 Horizontal 2P+3P 3/8" 48 2.88 2 276.48
Eje G-15 CB38
SOTANO Y PRIMER PISO 1 0.30 1.00 9.55 2.86 1 2.60 9.55 24.83 Verticales Sotano + 1P 1" 14 10.93 1 152.95Horizontal Sotano+1P 3/8" 56 2.64 1 147.84 Horiz. Cimiento 3/8" 8 2.64 1 21.12 Horizontal tipo "C" 3/8" 56 0.98 1 54.88
SEGUNDO PISO 1 0.30 1.00 3.4 1.02 1 2.60 3.40 8.84 Verticales 2P 1" 14 4.15 1 58.10Horizontal 2P 3/8" 26 2.64 1 68.64 Horizontal tipo "C" 3/8" 26 0.98 1 25.48
TERCER PISO 1 0.30 0.60 3.4 0.61 1 1.80 3.40 6.12 Verticales 3P 1" 12 4.15 1 49.80Horizontal 3P 3/8" 24 2.64 1 63.36 Horizontal tipo "C" 3/8" 24 0.98 1 23.52
Eje G-16 CB39
116 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 1.00 17.75 5.33 1 2.60 17.75 46.15 Verticales hasta +3P 1" 14 19.13 1 267.75Horizontal Sotano+1P 3/8" 56 2.64 1 147.84 Horizontal 2P+3P 3/8" 52 2.64 1 137.28 Horiz. Cimiento 3/8" 8 2.64 1 21.12 Horizontal tipo "C" 3/8" 108 0.98 1 105.84
Eje G-17 CB40 SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 1.65 17.75 8.79 1 3.90 17.75 69.23 Verticales hasta +3P 1" 16 19.13 1 306.00
Horizontal Sotano+1P 3/8" 56 3.94 1 220.64 Horizontal 2P+3P 3/8" 52 3.94 1 204.88 Horiz. Cimiento 3/8" 8 3.94 1 31.52 Horizontal tipo "C" 3/8" 108 2.45 1 264.60
Eje G-19 CB41 PRIMER, SEGUNDO Y TERCER PISO 1 0.30 0.60 12.8 2.30 1 1.80 12.80 23.04 Verticales hasta +3P 1" 10 13.55 1 135.50
Horizontal Sotano+1P 3/8" 26 3.00 1 78.00 0.75 Horizontal 2P+3P 3/8" 48 3.00 1 144.00
Horiz. Cimiento 3/8" 8 3.00 1 24.00 Eje H 13 & 19 CB-42
PRIMER Y SEGUNDO PISO 2 0.30 0.75 9.2 4.14 2 2.10 9.20 38.64 Verticales 3/4" 10 10.58 2 211.50 Horizontales 1 P 3/8" 27 2.04 2 110.16 Horizontales 2P 3/8" 25 2.04 2 102.00 Horiz. Cimiento 3/8" 8 2.04 2 32.64 Horizontal tipo "C" 3/8" 52 0.49 2 50.96
Eje H-14 CB43 SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 0.60 17.75 3.20 1 1.80 17.75 31.95 Verticales hasta +3P 1" 10 19.13 1 191.25
Horizontal Sotano 3/8" 16 3.00 1 48.00 Horizontal 1P 3/8" 26 3.00 1 78.00 Horizontal 2P+3P 3/8" 48 3.00 1 144.00 Horiz. Cimiento 3/8" 8 3.00 1 24.00
Eje H-15 CB44 SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 1.00 17.75 5.33 1 2.60 17.75 46.15 Verticales hasta +3P 1" 12 19.13 1 229.50
Horizontal Sotano 3/8" 16 2.64 1 42.24 Horizontal 1P 3/8" 28 2.64 1 73.92 Horizontal 2P+3P 3/8" 52 2.64 1 137.28 Horiz. Cimiento 3/8" 8 2.64 1 21.12 Horizontal tipo "C" 3/8" 80 1.47 1 117.60
Eje H-16 CB45 SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 0.60 17.75 3.20 1 1.80 17.75 31.95 Verticales hasta +3P 1" 10 19.13 1 191.25
Horizontal Sotano +1P 3/8" 52 3.00 1 156.00 Horizontal 2P+3P 3/8" 48 3.00 1 144.00 Horiz. Cimiento 3/8" 8 3.00 1 24.00 Horizontal tipo "C" 3/8" 100 1.47 1 147.00
Eje H-17 CB46 SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 0.95 17.75 5.06 1 2.50 17.75 44.38 Verticales hasta +3P 1" 12 19.13 1 229.50
Horizontal Sotano 3/8" 16 2.54 1 40.64 Horizontal 1P 3/8" 28 2.54 1 71.12 Horizontal 2P+3P 3/8" 52 2.54 1 132.08 Horiz. Cimiento 3/8" 8 2.54 1 20.32 Horizontal tipo "C" 3/8" 68 1.47 1 99.96
Eje H-18 CB47 SOTANO ,PRIMER, SEGUNDO Y TERCER P 1 0.30 0.65 17.75 3.46 1 1.90 17.75 33.73 Verticales hasta +3P 3/4" 10 19.13 1 191.25
Horizontal Sotano 3/8" 16 1.94 1 31.04 Horizontal 1P 3/8" 26 1.94 1 50.44 Horizontal 2P+3P 3/8" 48 1.94 1 93.12 Horiz. Cimiento 3/8" 8 1.94 1 15.52 Horizontal tipo "C" 3/8" 90 0.49 1 44.10
SUBSECTOR B4 CB69
117 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
EJE H-18,22' PRIMER Y SEGUNDO PISO 4 0.60 0.30 9.4 4 1.80 9.40 Verticales 1er y 2do piso 5/8" 10 10.53 4 421.00 Horiz. Cimiento 3/8" 7 1.41 4 39.48 Horiz. 1er. P 3/8" 28 1.41 4 157.92 Horiz. 2do. P 3/8" 26 1.41 4 146.64 Horiz. Cimiento (2) 3/8" 7 1.35 4 37.80 Horiz. 1er. P (2) 3/8" 28 1.35 4 151.20 Horiz. 2do. P (2) 3/8" 26 1.35 4 140.40
CB70 EJE H-18,22' PRIMER Y SEGUNDO PISO 2 0.60 0.30 9.4 2 1.80 9.40 Verticales 1er y 2do piso 3/4" 12 10.53 2 252.60
Horiz. Cimiento 3/8" 7 1.49 2 20.86 Horiz. 1er. P 3/8" 28 1.49 2 83.44 Horiz. 2do. P 3/8" 26 1.49 2 77.48 Horiz. Cimiento (2) 3/8" 7 1.42 2 19.88 Horiz. 1er. P (2) 3/8" 28 1.42 2 79.52 Horiz. 2do. P (2) 3/8" 26 1.42 2 73.84
C14
EJE H-18,22' PRIMER Y SEGUNDO PISO 7 0.30 0.60 9.35 3 1.80 9.35 Verticales 5/8" -10 10.73 7 -750.75 Horizontales 1er. P 3/8" -34 1.40 7 -333.20 Horizontales 1er. P 3/8" -34 1.40 7 -333.20 Horizontales 2do. P 3/8" -25 1.40 7 -245.00 Horizontales 2do. P 3/8" -25 1.40 7 -245.00
SUBSECTOR B5
EJE CB54 1 1.20 0.30 14.1 5.08 1 3.00 14.10 42.30 Verticales 1" 18 15.08 1 271.35B-23,24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 2.87 1 22.96
Horiz. Sotano. P 3/8" 31 2.87 1 88.97 Horiz. 1er. P 3/8" 31 2.87 1 88.97 Horiz. 2do. P 3/8" 29 2.87 1 83.23 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horiz. Sotano. P (2) 3/8" 31 1.76 1 54.56 Horiz. 1er. P (2) 3/8" 31 1.76 1 54.56 Horiz. 2do. P (2) 3/8" 29 1.76 1 51.04
EJE CB55 1 0.85 0.30 5.4 1.38 1 2.30 5.40 12.42 Verticales 1" 10 6.37 1 63.75B-23,24 SOTANO Horiz. Cimiento 3/8" 8 2.17 1 17.36
Horiz. Sotano. P 3/8" 28 2.17 1 60.76 Horiz. Cimiento (2) 3/8" 8 0.88 1 7.04 Horiz. Sotano. P (2) 3/8" 28 0.88 1 24.64
EJE CB56 1 0.65 0.30 5.4 1.05 1 1.90 5.40 10.26 Verticales 1" 10 6.37 1 63.75B-23,24 SOTANO Horiz. Cimiento 3/8" 8 1.77 1 14.16
Horiz. Sotano. P 3/8" 28 1.77 1 49.56 Horiz. Cimiento (2) 3/8" 8 0.88 1 7.04 Horiz. Sotano. P (2) 3/8" 28 0.88 1 24.64
EJE CB57 1 0.90 0.30 14.1 3.81 1 2.40 14.10 33.84 Verticales 3/4" 14 15.08 1 211.05 B-23,24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 2.27 1 18.16
Horiz. Sotano. P 1/2" 31 2.27 1 70.37 Horiz. 1er. P 1/2" 31 2.27 1 70.37 Horiz. 2do. P 3/8" 29 2.27 1 65.83 Horiz. Cimiento (2) 1/2" 8 0.88 1 7.04 Horiz. Sotano. P (2) 1/2" 31 0.88 1 27.28 Horiz. 1er. P (2) 1/2" 31 0.88 1 27.28 Horiz. 2do. P (2) 3/8" 29 0.88 1 25.52
EJE CB48 (1) 1 1.35 0.30 10 4.05 1 3.30 10.00 33.00 Verticales 3/4" 16 10.98 1 175.60 C-20 SOTANO, 1er Horiz. Cimiento 1/2" 8 3.17 1 25.36
118 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Horiz. Sotano. P 1/2" 31 3.17 1 98.27 Horiz. 1er. P 1/2" 31 3.17 1 98.27 Horiz. Cimiento (2) 1/2" 8 2.20 1 17.60 Horiz. Sotano. P (2) 1/2" 31 2.20 1 68.20 Horiz. 1er. P (2) 1/2" 31 2.20 1 68.20
EJE CB48 (2) 1 0.60 0.30 4.35 0.78 1 1.80 4.35 7.83 Verticales 3/4" 10 5.32 1 53.25 C-20 2do PISO Horiz. 2do. P 3/8" 26 1.35 1 35.10
Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB50 (1) 1 1.20 0.30 5.4 1.94 1 3.00 5.40 16.20 Verticales 3/4" 16 6.37 1 102.00 C-21 SOTANO Horiz. Cimiento 3/8" 8 2.87 1 22.96
Horiz. Sotano. P 3/8" 28 2.87 1 80.36 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horiz. Sotano. P (2) 3/8" 28 1.76 1 49.28
EJE CB50 (2) 1 0.60 0.30 8.7 1.57 1 1.80 8.70 15.66 Verticales 3/4" 10 9.68 1 96.75 C-21 Horiz. 1er. P 1/2" 28 1.35 1 37.80
Horiz. 2do. P 3/8" 26 1.35 1 35.10 Horiz. 1er. P (2) 1/2" 28 1.41 1 39.48 Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB49 1 1.35 0.30 14.1 5.71 1 3.30 14.10 46.53 Verticales 3/4" 16 15.08 1 241.20 C-22 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 3.17 1 25.36
Horiz. Sotano. P 1/2" 31 3.17 1 98.27 Horiz. 1er. P 1/2" 31 3.17 1 98.27 Horiz. 2do. P 3/8" 29 3.17 1 91.93 Horiz. Cimiento (2) 1/2" 8 2.20 1 17.60 Horiz. Sotano. P (2) 1/2" 31 2.20 1 68.20 Horiz. 1er. P (2) 1/2" 31 2.20 1 68.20 Horiz. 2do. P (2) 3/8" 29 2.20 1 63.80
EJE CB58 1 0.60 0.30 14.1 2.54 1 1.80 14.10 25.38 Verticales 3/4" 14 15.08 1 211.05 C-22 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.29 1 10.32
Horiz. Sotano. P 3/8" 28 1.29 1 36.12 Horiz. 1er. P 3/8" 28 1.29 1 36.12 Horiz. 2do. P 3/8" 26 1.29 1 33.54 Horiz. Cimiento (2) 3/8" 8 1.35 1 10.80 Horiz. Sotano. P (2) 3/8" 28 1.35 1 37.80 Horiz. 1er. P (2) 3/8" 28 1.35 1 37.80 Horiz. 2do. P (2) 3/8" 26 1.35 1 35.10
EJE CB50 4 1.20 0.30 5.4 7.78 4 3.00 5.40 64.80 Verticales 3/4" 14 6.37 4 357.00 C-23 SOTANO Horiz. Cimiento 3/8" 8 2.87 4 91.84 D-23 Horiz. Sotano. P 3/8" 31 2.87 4 355.88 E-23 4 Columnas Horiz. Cimiento (2) 3/8" 8 1.76 4 56.32 G-23 Horiz. Sotano. P (2) 3/8" 31 1.76 4 218.24
EJE CB59 4 0.60 0.30 8.7 6.26 4 1.80 8.70 62.64 Verticales 3/4" 10 9.68 4 387.00 C-23 Horiz. 1er. P 1/2" 28 1.35 4 151.20 D-23 Horiz. 2do. P 3/8" 26 1.35 4 140.40 E-23 4 Columnas Horiz. 1er. P (2) 1/2" 28 1.41 4 157.92 G-23 Horiz. 2do. P (2) 3/8" 26 1.41 4 146.64
EJE CB60 1 1.40 0.30 14.1 5.92 1 3.40 14.10 47.94 Verticales 3/4" 14 15.08 1 211.05 c-24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 3.27 1 26.16
Horiz. Sotano. P 1/2" 31 3.27 1 101.37 Horiz. 1er. P 1/2" 31 3.27 1 101.37
119 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Horiz. 2do. P 3/8" 29 3.27 1 94.83 Horiz. Cimiento (2) 1/2" 8 1.76 1 14.08 Horiz. Sotano. P (2) 1/2" 31 1.76 1 54.56 Horiz. 1er. P (2) 1/2" 31 1.76 1 54.56 Horiz. 2do. P (2) 3/8" 29 1.76 1 51.04
EJE CB61 3 0.60 0.30 14.1 7.61 3 1.80 14.10 76.14 Verticales 1" 10 15.08 3 452.25E-22 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.41 3 33.84 E-24 Horiz. Sotano. P 3/8" 28 1.41 3 118.44 G-22 Horiz. 1er. P 3/8" 28 1.41 3 118.44
2 Columnas Horiz. 2do. P 3/8" 26 1.41 3 109.98 Horiz. Cimiento (2) 3/8" 8 1.35 3 32.40 Horiz. Sotano. P (2) 3/8" 28 1.35 3 113.40 Horiz. 1er. P (2) 3/8" 28 1.35 3 113.40 Horiz. 2do. P (2) 3/8" 26 1.35 3 105.30
EJE CB-62 1 0.60 0.30 4.35 0.78 1 1.80 4.35 7.83 Verticales 3/4" 10 5.32 1 53.25 F-23 2do PISO Horiz. 2do. P 3/8" 26 1.35 1 35.10
Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB63 1 1.00 0.30 14.1 4.23 1 2.60 14.10 36.66 Verticales 1" 10 15.08 1 150.75F-24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.88 1 15.04
Horiz. Sotano. P 3/8" 31 1.88 1 58.28 Horiz. 1er. P 3/8" 31 1.88 1 58.28 Horiz. 2do. P 3/8" 29 1.88 1 54.52 Horiz. Cimiento (2) 3/8" 8 1.94 1 15.52 Horiz. Sotano. P (2) 3/8" 31 1.94 1 60.14 Horiz. 1er. P (2) 3/8" 31 1.94 1 60.14 Horiz. 2do. P (2) 3/8" 29 1.94 1 56.26
EJE CB51 1 0.60 0.30 14.1 2.54 1 1.80 14.10 25.38 Verticales 1" 10 15.08 1 150.75D-21 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 1.35 1 10.80
Horiz. Sotano. P 3/8" 28 1.35 1 37.80 Horiz. 1er. P 3/8" 28 1.35 1 37.80 Horiz. 2do. P 3/8" 26 1.35 1 35.10 Horiz. Cimiento (2) 3/8" 8 1.41 1 11.28 Horiz. Sotano. P (2) 3/8" 28 1.41 1 39.48 Horiz. 1er. P (2) 3/8" 28 1.41 1 39.48 Horiz. 2do. P (2) 3/8" 26 1.41 1 36.66
EJE CB 52 3 0.60 0.60 10 10.80 3 2.40 10.00 72.00 Verticales 1" 12 10.98 3 395.10C-20,22 SOTANO, 1er Horiz. Cimiento 3/8" 8 3.96 3 95.04
Horiz. Sotano. P 3/8" 28 3.96 3 332.64 Horiz. 1er. P 3/8" 28 3.96 3 332.64
3 Columnas Horiz. Cimiento (2) 3/8" 8 1.70 3 40.80 Horiz. Sotano. P (2) 3/8" 28 1.70 3 142.80 Horiz. 1er. P (2) 3/8" 28 1.70 3 142.80
EJE CB52 3 0.60 0.30 4.35 2.35 3 1.80 4.35 23.49 Verticales 1" 10 5.32 3 159.75C-20,22 2do PISO Horiz. 2do. P 3/8" 26 1.35 3 105.30
3 Columnas Horiz. 2do. P (2) 3/8" 26 1.41 3 109.98
EJE H-18,22' CB53 H-21 PRIMER Y SEGUNDO PISO 1 0.60 0.30 9.4 1.69 1 1.80 9.40 16.92 Verticales 1er y 2do piso 1" 12 10.53 1 126.30
Horiz. Cimiento 3/8" 7 1.43 1 10.01 Horiz. 1er. P 3/8" 28 1.43 1 40.04 Horiz. 2do. P 3/8" 26 1.43 1 37.18 Horiz. Cimiento (2) 3/8" 7 1.49 1 10.43
120 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
Horiz. 1er. P (2) 3/8" 28 1.49 1 41.72 Horiz. 2do. P (2) 3/8" 26 1.49 1 38.74
EJE CB64 1 0.90 0.30 5.4 1.46 1 2.40 5.40 12.96 Verticales 3/4" 12 6.37 1 76.50 H-22 SOTANO Horiz. Cimiento 3/8" 8 1.87 1 14.96
Horiz. Sotano. P 3/8" 19 1.87 1 35.53 Horiz. Cimiento (2) 3/8" 8 1.94 1 15.52 Horiz. Sotano. P (2) 3/8" 19 1.94 1 36.86
EJE CB64 1 0.90 0.30 8.7 2.35 1 2.40 8.70 20.88 Verticales 3/4" 12 9.68 1 116.10 H-22 PRIMER Y SEGUNDO PISO Horiz. 1er. P 3/8" 31 1.87 1 57.97
Horiz. 2do. P 3/8" 29 1.87 1 54.23 Horiz. 1er. P (2) 3/8" 31 1.94 1 60.14 Horiz. 2do. P (2) 3/8" 29 1.94 1 56.26
EJE CB65 1 0.60 0.30 5.4 0.97 1 1.80 5.40 9.72 Verticales 1" 10 6.37 1 63.75H-23 SOTANO Horiz. Cimiento 3/8" 8 1.35 1 10.80
Horiz. Sotano. P 3/8" 19 1.35 1 25.65 Horiz. Cimiento (2) 3/8" 8 1.41 1 11.28 Horiz. Sotano. P (2) 3/8" 19 1.41 1 26.79
EJE CB65 1 0.60 0.30 8.7 1.57 1 1.80 8.70 15.66 Verticales 1" 10 9.68 1 96.75H-23 PRIMER Y SEGUNDO PISO Horiz. 1er. P 3/8" 31 1.35 1 41.85
Horiz. 2do. P 3/8" 29 1.35 1 39.15 Horiz. 1er. P (2) 3/8" 31 1.41 1 43.71 Horiz. 2do. P (2) 3/8" 29 1.41 1 40.89
EJE CB66 1 0.90 0.30 14.1 3.81 1 2.40 14.10 33.84 Verticales 1" 20 15.08 1 301.50H-23,24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 3/8" 8 2.27 1 18.16
Horiz. Sotano. P 3/8" 28 2.27 1 63.56 Horiz. 1er. P 3/8" 28 2.27 1 63.56 Horiz. 2do. P 3/8" 26 2.27 1 59.02 Horiz. Cimiento (2) 3/8" 8 1.32 1 10.56 Horiz. Sotano. P (2) 3/8" 28 1.32 1 36.96 Horiz. 1er. P (2) 3/8" 28 1.32 1 36.96 Horiz. 2do. P (2) 3/8" 26 1.32 1 34.32
EJE CB67 1 1.30 0.30 5.4 2.11 1 3.20 5.40 17.28 Verticales 3/4" 16 6.37 1 102.00 H-23,24 SOTANO Horiz. Cimiento 3/8" 8 3.07 1 24.56
Horiz. Sotano. P 3/8" 31 3.07 1 95.17 Horiz. Cimiento (2) 3/8" 8 2.20 1 17.60 Horiz. Sotano. P (2) 3/8" 31 2.20 1 68.20
EJE CB68 1 0.90 0.30 14.1 3.81 1 2.40 14.10 33.84 Verticales 3/4" 14 15.08 1 211.05
121 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
H-24 SOTANO, 1er Y 2do PISO Horiz. Cimiento 1/2" 8 2.27 1 18.16 Horiz. Sotano. P 1/2" 31 2.27 1 70.37 Horiz. 1er. P 1/2" 31 2.27 1 70.37 Horiz. 2do. P 3/8" 29 2.27 1 65.83 Horiz. Cimiento (2) 1/2" 8 0.88 1 7.04 Horiz. Sotano. P (2) 1/2" 31 0.88 1 27.28 Horiz. 1er. P (2) 1/2" 31 0.88 1 27.28 Horiz. 2do. P (2) 3/8" 29 0.88 1 25.52
EJE B-3 (eje G) SOTANO 3 0.25 0.40 5.35 1.61 3 1.30 5.35 20.87 Verticales sotano 5/8" 6 6.32 1 37.95
Horiz. sotano 3/8" 36 1.22 1 43.92 Horiz. sotano tipo C 3/8" 35 0.41 1 14.35
SECTOR C C - 1 3 0.40 0.25 7.25 2.18 3 1.30 7.25 28.28 Verticales 5/8" 6 9.45 3 170.10
Estribos 3/8" 43 1.40 3 180.60 Ganchos 3/8" 43 0.45 3 58.05
C - 2 2 0.25 0.25 7.25 0.91 2 1.00 7.25 14.50 Verticales 5/8" 4 9.45 2 75.60 Estribos 3/8" 43 1.10 2 94.60
P - 1 2 1.08 0.25 7.25 3.90 2 2.65 7.25 38.43 Verticales 5/8" 18 9.45 2 340.20 Estribos 3/8" 48 2.75 2 264.00 Estribos 3/8" 48 1.05 2 100.80
C - 1 3 0.40 0.25 4.5 1.35 3 1.30 4.50 17.55 Verticales 5/8" 6 6.70 3 120.60 Estribos 3/8" 29 1.40 3 121.80 Ganchos 3/8" 29 0.45 3 39.15
C - 2 5 0.25 0.25 4.5 1.41 5 1.00 4.50 22.50 Verticales 5/8" 4 6.70 5 134.00 Estribos 3/8" 29 1.10 5 159.50
C - 3 2 0.55 0.25 4.5 1.24 2 1.60 4.50 14.40 Verticales 5/8" 8 6.70 2 107.20 Estribos 3/8" 29 1.70 2 98.60
C - 3 6 0.55 0.25 4.95 4.08 6 1.60 4.95 47.52 Verticales 5/8" 8 7.15 6 343.20 Estribos 3/8" 32 1.70 6 326.40
SECTOR D C - 1 8 0.60 0.30 5.25 7.56 8 1.80 5.25 75.60 Verticales 3/4" 6 6.35 8 304.80
Verticales 5/8" 4 6.35 8 203.20 Estribos 3/8" 29 1.30 8 301.60
SECTOR E C -03 24 0.25 0.25 3.35 5.03 24 1.00 3.35 80.40 Verticales 5/8" 4 5.45 24 523.20
Area Perimetro Estribos 3/8" 25 1.00 24 600.00 C -06 1 0.03 3.35 0.09 1 0.69 3.35 2.31 Verticales 5/8" 5 5.45 1 27.25
Estribos 3/8" 25 0.69 1 17.25 SECTOR F C -02 10 0.60 0.25 4.3 6.45 10 1.70 4.30 73.10 Verticales 1/2" 6 6.40 10 384.00
Estribos 3/8" 29 1.70 10 493.00 Ganchos 3/8" 29 0.45 10 130.50
P -01 2 0.60 0.25 4.3 1.29 2 1.70 4.30 14.62 Verticales 3/4" 12 6.40 2 153.60 2 0.75 0.25 4.3 1.61 2 2.00 4.30 17.20 Verticales 1/2" 4 6.40 2 51.20
Estribos 3/8" 29 1.80 2 104.40 Estribos 3/8" 29 1.10 2 63.80 Horizontales 3/8" 44 1.50 2 132.00
P -02 2 1.00 0.25 4.3 2.15 2 2.50 4.30 21.50 Verticales 5/8" 10 6.40 2 128.00 Estribos 3/8" 29 2.50 2 145.00 Ganchos 3/8" 29 0.45 6 78.30
CASETAS INGRESO SERVICIOS GENERALES
SECTOR PREPARACION PACIENTES Y COMANDO
122 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec.Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SUB GERENCIA DE ESTUDIOSG.R.I.
C -04 6 0.55 0.15 3.65 1.81 6 1.40 3.65 30.66 Verticales 1/2" 8 5.75 6 276.00 Estribos 3/8" 28 1.40 6 235.20 Estribos 3/8" 28 0.90 6 151.20
INGRESO EMERGENCIA C -01 2 0.60 0.15 3.65 0.66 2 1.50 3.65 10.95 Verticales 1/2" 8 5.75 2 92.00
Estribos 3/8" 26 1.50 2 78.00 Estribos 3/8" 26 0.90 2 46.80
C -04 4 0.55 0.15 3.65 1.20 4 1.40 3.65 20.44 Verticales 1/2" 8 5.75 4 184.00 Estribos 3/8" 28 1.40 4 156.80 Estribos 3/8" 28 0.90 4 100.80
INGRESO PRINCIPAL C -01 4 0.60 0.15 3.65 1.31 4 1.50 3.65 21.90 Verticales 1/2" 8 5.75 4 184.00
Estribos 3/8" 26 1.50 4 156.00 Estribos 3/8" 26 0.90 4 93.60
C -04 6 0.55 0.15 3.65 1.81 6 1.40 3.65 30.66 Verticales 1/2" 8 5.75 6 276.00 Estribos 3/8" 28 1.40 6 235.20 Estribos 3/8" 28 0.90 6 151.20
INGRESO SERVICIOS GENERALES C -04 6 0.55 0.15 3.65 1.81 6 1.40 3.65 30.66 Verticales 1/2" 8 5.75 6 276.00
Estribos 3/8" 28 1.40 6 235.20 Estribos 3/8" 28 0.90 6 151.20
CASETA DE CONTROL PLANTA DE TRATAMIENTO CA 7 0.30 0.15 3.65 1.15 7 0.90 3.65 22.99 Verticales 1/2" 4 5.75 7 161.00
Estribos 3/8" 28 0.90 7 176.40
M3 423.56 M2 4,029.11 ML - 63,849.51 5,159.34 6,455.76 7,970.58 10,176.50
KG - 35,755.73 5,107.75 10,006.42 17,535.28 40,400.71 108,805.88
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
423.56 M3 4,029.11 M2 35,755.73 5,107.75 10,006.42 17,535.28 40,400.71 108,805.88
123de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento 02.03.04 PLACAS
02.03.04.01 PLACAS CONCRETO F`C = 280 KG/CM2
02.03.04.02 PLACAS ENCOFRADO Y DESENCOFRADO
02.03.04.03 PLACAS ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR A
SUBSECTOR A3
PA-1 SOTANO, PRIMER Y SEGUNDO PISO 1 1.90 0.30 12.25 6.98 1 4.40 12.25 53.90 Verticales 3/4" 20 13.33 1 266.50
Verticales 1/2" 6 13.33 1 79.95 Horizontales sotano +1er P (h=7.35) 1/2" 50 4.18 1 209.00 Horizontales sotano + 1er P (h=7.35) 3/8" 41 3.14 1 128.11 Horizontales sotano +1er P tipo "C" 3/8" 49 2.45 1 120.05 Horizontales 2do.P (h=3.4) 1/2" 23 4.18 1 96.14 Horizontales 2do.P 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 23 2.45 1 56.35 empalme 1 3/4" 20 1.00 1 20.00 empalme 2 1/2" 6 1.00 1 6.00
PA-2 SOTANO, PRIMER Y SEGUNDO PISO 1 1.15 0.30 12.25 4.23 1 2.90 12.25 35.53 Verticales 5/8" 18 13.33 1 239.85
Horizontales sotano +1er P (h=7.35) 3/8" 41 2.94 1 119.95 Horizontales sotano +1er P tipo "C" 3/8" 40 1.47 1 58.51 Horizontales 2do. P (h=3.4) 3/8" 25 2.94 1 73.50 Horizontales 2do P tipo "C" 3/8" 25 1.47 1 36.75 empalme 1 5/8" 18 1.00 1 18.00
PA-3 SOTANO, PRIMER Y SEGUNDO PISO 1 2.10 0.30 12.25 7.72 1 4.80 12.25 58.80 Verticales 3/4" 20 13.33 1 266.50
Verticales 1/2" 8 13.33 1 106.60 Horizontales sotano +1er P (h=7.35) 1/2" 50 4.58 1 229.00 Horizontales sotano +1er P (h=7.35) 3/8" 41 3.14 1 128.11 Horizontales sotano +1er P tipo "C" 3/8" 49 2.94 1 144.06 Horizontales 2do.P (h=3.4) 1/2" 23 4.58 1 105.34 Horizontales 2do.P (h=3.4) 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 23 2.94 1 67.62 empalme 1 3/4" 20 1.00 1 20.00 emalme 2 1/2" 8 1.00 1 8.00
PA-4 SOTANO, PRIMER Y SEGUNDO PISO 1 2.30 0.30 12.25 8.45 1 5.20 12.25 63.70 Verticales 3/4" 20 13.33 1 266.50
Verticales 1/2" 10 13.33 1 133.25 Horizontales sotano +1er P (h=7.35) 5/8" 44 4.98 1 219.12 Horizontales sotano +1er P (h=7.35) 3/8" 41 3.14 1 128.11 Horizontales 1er P tipo "C" 3/8" 43 3.43 1 147.49 Horizontales 2do.P (h=3.4) 5/8" 20.00 4.98 1 99.60 Horizontales 2do.P 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 20 3.43 1 68.60 empalme 1 3/4" 20 1.00 1 20.00 empalme 2 1/2" 10 1.00 1 10.00
PA-5 PRIMER Y SEGUNDO PISO 1 2.70 0.30 8.85 7.17 1 6.00 8.85 53.10 Verticales 3/4" 20 10.23 1 204.50
Verticales 1/2" 12 10.23 1 122.70 Horizontales 1er P (h=3.4) 5/8" 27.00 5.78 1 156.06 Horizontales 1er P (h=3.4) 3/8" 32 3.14 1 100.48 Horizontales 1er P tipo "C" 3/8" 26 3.92 1 101.92 Horizontales 2do.P (h=3.4) 5/8" 20.00 5.78 1 115.60 Horizontales 2do.P (h=3.4) 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 20 3.92 1 78.40 empalme 1 3/4" 20 1.00 1 20.00 empalme 2 1/2" 12 1.00 1 12.00
PA-6 PRIMER Y SEGUNDO PISO 1 2.55 0.30 8.85 6.77 1 5.70 8.85 50.44 Verticales 3/4" 20 10.23 1 204.50
Verticales 1/2" 12 10.23 1 122.70 Horizontales 1er P (h=3.4) 5/8" 21.00 5.48 1 115.08 Horizontales 1er P (h=3.4) 3/8" 32 3.14 1 100.48 Horizontales 1er P tipo "C" 3/8" 20 3.92 1 78.40
124de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 2do.P (h=3.4) 5/8" 14.00 5.48 1 76.72 Horizontales 2do.P (h=3.4) 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 14 3.92 1 54.88 empalme 1 3/4" 20 1.00 1 20.00 empalme 2 1/2" 12 1.00 1 12.00
PA-7(P - 19A) PRIMER, Y SEGUNDO PISO 1 1.55 0.30 8.85 4.12 1 3.70 8.85 32.75 Verticales 5/8" 20 10.23 1 204.50
Verticales 3/4" 6 10.23 1 61.35 Horizontales 1er P (h=3.4) 5/8" 27.00 3.48 1 93.96 Horizontales 1er P (h=3.4) 3/8" 32 3.14 1 100.48 Horizontales 1er P tipo "C" 3/8" 26 2.45 1 63.70 Horizontales 2do.P (h=3.4) 5/8" 20.00 3.48 1 69.60 Horizontales 2do.P (h=3.4) 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 20 2.45 1 49.00 Horizontales 2do.P (h=3.4) 5/8" 20.00 3.48 1 69.60 Horizontales 2do.P (h=3.4) 3/8" 25 3.14 1 78.50 Horizontales 2do.P tipo "C" 3/8" 20 2.45 1 49.00 empalme 1 5/8" 20 1.00 1 20.00 empalme 2 3/4" 6 1.00 1 6.00
PA-8 PRIMER Y SEGUNDO PISO 1 2.20 0.30 8.85 5.84 1 5.00 8.85 44.25 Verticales 1" 28 10.23 1 286.30
1 3.15 0.30 8.85 8.36 1 6.60 8.85 58.41 Verticales 3/4" 12 10.23 1 122.70 Verticales 1/2" 24 10.23 1 245.40 Horizontales 1er P (h=3.4) 5/8" 21.00 6.68 1 140.28 Horizontales 1er P (h=3.4) 1/2" 30.00 5.38 1 161.40 Horizontales 1er P (h=3.4) 3/8" 32 2.90 1 92.80 Horizontales 1er P (h=3.4) 3/8" 32 4.06 1 129.92 Horizontales 1er P tipo "C" 3/8" 49 7.35 1 360.15 Horizontales 2do P (h=3.4) 5/8" 14.00 6.68 1 93.52 Horizontales 2do P (h=3.4) 1/2" 23.00 5.38 1 123.74 Horizontales 2do P (h=3.4) 3/8" 25 2.90 1 72.50 Horizontales 2do P (h=3.4) 3/8" 25 4.06 1 101.50 Horizontales 2doP tipo "C" 3/8" 37 7.35 1 271.95
PROLONGACION AL TERCER PISO 1 3.15 0.30 4.9 4.63 1 6.60 4.90 32.34 Verticales 3er piso 1" 10 5.60 1 56.00Verticales 3er piso 3/4" 12 5.60 1 67.20 Verticales 3er piso 1/2" 14 5.60 1 78.40 Horizontales 3er P 5/8" 17.00 6.68 1 113.56 Horizontales 3er P 3/8" 36 1.45 1 52.20 Horizontales 3er P 3/8" 36 2.03 1 73.08 Horizontales 3er P tipo "C" 3/8" 17 7.35 1 124.95
1" 28 1.00 1 28.003/4" 12 1.00 1 12.00 1/2" 24 1.00 1 24.00
PA-9 PRIMER, SEGUNDO Y TERCER PISO PISO 1 3.60 0.30 8.85 9.56 1 7.80 8.85 69.03 Verticales 5/8" 16 13.73 1 219.60
Verticales 1/2" 18 13.73 1 247.05 Horizontales 1er P (h=3.4) 5/8" 21.00 7.48 1 157.08 Horizontales 1er P (h=3.4) 3/8" 32 3.00 1 96.00 Horizontales 1er P tipo "C" 3/8" 20 5.39 1 107.80 Horizontales 2do.P (h=3.4) 5/8" 14.00 7.48 1 104.72 Horizontales 2do.P (h=3.4) 3/8" 25 3.00 1 75.00 Horizontales 2do.P tipo "C" 3/8" 14 5.39 1 75.46 Horizontales 3er.P (h=2.75) 5/8" 11.00 7.48 1 82.28 Horizontales 3er.P (h=2.75) 3/8" 21 3.00 1 63.00 Horizontales 2do.P tipo "C" 3/8" 11 5.39 1 59.29 empalme 1 5/8" 16 1.00 1 16.00 empalme 2 1/2" 18 1.00 1 18.00
PA-10 PRIMER Y SEGUNDO PISO 1 2.70 0.30 8.85 7.17 1 6.00 8.85 53.10 Verticales 3/4" 36 10.23 1 368.10
Horizontales 1er. P (h=3.4) 3/4" 21.00 5.78 1 121.38 Horizontales 1er. P (h=3.4) 3/8" 36 3.14 1 113.04 Horizontales 1er. P tipo "C" 3/8" 20 3.92 1 78.40 Horizontales 2do.P (h=3.4) 3/4" 14.00 5.78 1 80.92 Horizontales 2do.P (h=3.4) 3/8" 25 3.14 1 78.50 Horizontales 2do. P tipo "C" 3/8" 14 3.92 1 54.88 empalme 1 3/4" 36 1.00 1 36.00
125de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento ESCALERA N°16 PA7 PA-7(P - 19A) HASTA DESCANSO NPT +8.95 2 1.55 0.30 9 8.37 2 3.70 9.00 66.60 Verticales 5/8" 20 10.23 2 409.00
Verticales 3/4" 6 10.23 2 122.70 Horizontales hasta 3r P (h=8.05) 5/8" 54.00 3.48 2 375.84 Horizontales hasta 3r P (h=8.05) 3/8" 54.00 3.14 2 339.12 Horizontales hasta 3er P tipo "C" 3/8" 53 2.45 2 259.70 empalme 1 5/8" 20 1.00 2 40.00 empalme 2 3/4" 6 1.00 2 12.00
SUBSECTOR A2 PA-11 PRIMER Y SEGUNDO PISO 1 2.70 0.30 8.55 6.93 1 6.00 8.55 51.30 Verticales 3/4" 20 10.22 1 204.50
Verticales 1/2" 12 10.22 1 122.70 Horizontales 1er. P (h=3.4 desde NFP) 1/2" 30.00 5.78 1 173.40 Horizontales 1er. P 3/8" 25 3.14 1 78.50 Horizontales 1er. P tipo "C" 3/8" 29 3.92 1 113.68 Horizontales 2do. P (h=3.4) 1/2" 25.00 5.78 1 144.50 Horizontales 2do. P 3/8" 25 3.14 1 78.50 Horizontales 2do. P tipo "C" 3/8" 23 3.92 1 90.16
PA-12 PRIMER Y SEGUNDO PISO 1 1.80 0.30 8.55 4.62 1 4.20 8.55 35.91 Verticales 1" 16 10.22 1 163.60
Verticales 1/2" 6 10.22 1 61.35 Horizontales 1er. P (h=3.4 desde NFP) 5/8" 27.00 3.98 1 107.46 Horizontales 1er. P 3/8" 25 2.90 1 72.50 Horizontales 1er. P tipo "C" 3/8" 26 2.45 1 63.70 Horizontales 2do. P (h=3.4) 5/8" 22.00 3.98 1 87.56 Horizontales 2do. P 3/8" 25 2.90 1 72.50 Horizontales 2do. P tipo "C" 3/8" 20 2.45 1 49.00
PA-13 PRIMER , SEGUNDO PISO Y TERCER PISO 1 2.30 0.30 12 8.28 1 5.20 12.00 62.40 Verticales 5/8" 20 13.73 1 274.50
Verticales 1/2" 10 13.73 1 137.25 Horizontales 1er. P (h=3.4 desde NFP) 1/2" 27.00 4.98 1 134.46 Horizontales 1er. P 3/8" 25 3.14 1 78.50 Horizontales 1er. P tipo "C" 3/8" 26 3.43 1 89.18 Horizontales 2do. P (h=3.4) 1/2" 22.00 4.98 1 109.56 Horizontales 2do. P 3/8" 25 3.14 1 78.50 Horizontales 2do. P tipo "C" 3/8" 20 3.43 1 68.60 Horizontales 3er P (h=2.75 ) 1/2" 18.00 4.98 1 89.64 Horizontales 3er P 3/8" 21 3.14 1 65.94 Horizontales 3er P tipo "C" 3/8" 16 3.43 1 54.88
PA-14 PRIMER Y SEGUNDO PISO 1 1.55 0.30 8.55 3.98 1 3.70 8.55 31.64 Verticales 5/8" 1 10.22 20 204.50
Verticales 1/2" 1 10.22 8 81.80 Horizontales 1er P 3/8" 2 1.20 30 72.00 Horizontales 1er P 3/8" 2 1.75 16 56.00 Horizontales 1er P 3/8" 4 0.50 16 32.00 Horizontales 2do. P 3/8" 2 1.20 30 72.00 Horizontales 2do. P 3/8" 2 1.75 16 56.00 Horizontales 2do. P 3/8" 4 0.50 16 32.00
PA-15 PRIMER Y SEGUNDO PISO 1 2.00 0.30 8.55 5.13 1 4.60 8.55 39.33 Verticales 5/8" 24 10.22 1 245.40
Verticales 1/2" 8 10.22 1 81.80 Horizontales 1er. (h=3.4 desde NFP) 1/2" 21.00 4.34 1 91.14 Horizontales 1er. P 3/8" 25 3.30 1 82.50 Horizontales 1er. P tipo "C" 3/8" 20 2.94 1 58.80 Horizontales 2do. P (h=3.4) 1/2" 16.00 4.34 1 69.44 Horizontales 2do. P 3/8" 25 3.30 1 82.50 Horizontales 2do. P tipo "C" 3/8" 14 2.94 1 41.16
PA16 PRIMER, SEGUNDO Y TERCER PISO, CUARTO NI 1 1.65 0.30 14.75 7.30 1 3.90 14.75 57.53 Verticales 3/4" 20 16.48 1 329.50
Verticales 1/2" 6 16.48 1 98.85 Horizontales 1er. P (h=3.4 desde NFP) 5/8" 18.00 3.68 1 66.24 Horizontales 1er. P 3/8" 25 3.14 1 78.50 Horizontales 1er. P tipo "C" 3/8" 17 2.45 1 41.65
126de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 2do. P (h=3.4) 5/8" 13.00 3.68 1 47.84 Horizontales 2do. P 3/8" 25 3.14 1 78.50 Horizontales 2do. P tipo "C" 3/8" 11 2.45 1 26.95 Horizontales 3er P (h=2.75 ) 5/8" 11.00 3.68 1 40.48 Horizontales 3er P 3/8" 21 3.14 1 65.94 Horizontales 3er P tipo "C" 3/8" 9 2.45 1 22.05 Horizontales 4to P (h=2.05 ) 5/8" 9.00 3.68 1 33.12 Horizontales 4to P 3/8" 18 3.14 1 56.52 Horizontales 4to P tipo "C" 3/8" 7 2.45 1 17.15
PLACAS ASCENSOR SECTOR A Area Perimetro
PLACA DE NIVEL +0.70 A NIVEL +17.30 1 1.20 13.4 16.08 1 12.40 13.40 166.16 Verticales nudos 5/8" 44 15.13 1 665.50 1 0.57 16.95 9.66 1 5.60 16.95 94.92 Verticales nudos 3/4" 35 18.63 1 651.88
Verticales 1 (eje 7) 1/2" 14 18.63 1 260.75 Verticales 2 (eje G-//G) 1/2" 20 15.13 1 302.50
5/8" 24.00 5.98 1 143.52
(eje 7) 5/8" 21.00 5.78 1 121.38 (eje // G) 1/2" 30.00 5.98 1 179.40 Estribos horizontales 1er P 3/8" 25 3.40 1 85.00
3/8" 25 3.62 1 90.50 3/8" 25 3.14 1 78.50 3/8" 25 1.20 1 30.00 3/8" 25 3.54 1 88.50
Estribos "C" 1er P 3/8" 23 8.40 1 193.20 Refuerzo Horizontales (eje G ) 2do P (h=3.4) 5/8" 19.00 5.98 1 113.62 (eje 7) 5/8" 16.00 5.78 1 92.48 (eje // G) 1/2" 25.00 5.98 1 149.50 Estribos horizonatles 2do P 3/8" 25 3.40 1 85.00
3/8" 25 3.62 1 90.50 3/8" 25 3.14 1 78.50 3/8" 25 1.20 1 30.00 3/8" 25 3.54 1 88.50
Estribos "C" 2do P 3/8" 17 8.40 1 142.80 Refuerzo Horizontales (eje G ) 3er P (h=2.75) 5/8" 16.00 5.98 1 95.68 (eje 7) 5/8" 13.00 5.78 1 75.14 (eje // G) 1/2" 20.00 5.98 1 119.60 Estribos horizontales 3er P 3/8" 21 3.40 1 71.40
3/8" 21 3.62 1 76.02 3/8" 21 3.14 1 65.94 3/8" 21 1.20 1 25.20 3/8" 21 3.54 1 74.34
Estribos "C" 3er P 3/8" 14 8.40 1 117.60 Refuerzo Horizontales (eje G ) 4to P (h=1.15) 5/8" 8.00 5.98 1 47.84 (eje 7) (h=4.2) 5/8" 19.00 5.78 1 109.82 (eje // G) (h=1.15) 1/2" 10.00 5.98 1 59.80 Estribos horizontales 4to P (h=1.15) 3/8" 13 3.40 1 44.20 (h=1.15) 3/8" 13 3.62 1 47.06 (h=4.2) 3/8" 29 3.14 1 91.06 (h=4.2) 3/8" 29 1.20 1 34.80 (h=4.2) 3/8" 29 3.54 1 102.66 Estribos "C" 4to P (eje G,//G) (h=1.15) 3/8" 6 5.25 1 31.50 Estribos "C" 4to P (eje 7) (h=4.2) 3/8" 17 3.15 1 53.55
SUBSECTOR A1 P - A17 PRIMER PISO AUDITORIO 1 1.20 0.30 5.9 2.12 1 3.00 5.20 15.60 Verticales 3/4" 10 7.53 1 75.25
Horizontales 1er P 3/8" 33 1.28 4 168.70
Horizontales 2do P 3/8" 14 1.28 4 71.57
PRIMER PISO HALL 1 1.20 0.30 4.7 1.69 1 3.00 4.00 12.00 Verticales 3/4" 10 6.27 1 62.75 Horizontales 1er P 3/8" 31 1.28 4 158.47
SECTOR B SUBSECTOR B1 PB41
Refuerzo Horizontales (eje G ) 1er P (h=3.4 desde NFP)
127de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento EJE H,I-9 PRIMER Y SEGUNDO PISO 1 5.95 0.30 9.35 16.69 1 12.50 9.35 116.88 Verticales 3/4" 24 10.73 1 257.40
Verticales 1/2" 34 10.73 1 364.65 Horizontales 1er. P 5/8" 23 12.10 1 278.30 Horizontales 1er. P 3/8" 31 3.34 1 103.54 Horizontales 1er. P tipo C 3/8" 23 8.36 1 192.28 Horizontales 2do. P 5/8" 14 12.10 1 169.40 Horizontales 2do. P 3/8" 22 3.34 1 73.48 Horizontales 2do. P tipo C 3/8" 14 8.36 1 117.04
EJE H,I-9 SOTANO , PRIMER Y SEGUNDO PISO 1 5.95 0.30 14.05 25.08 1 12.50 14.05 175.63 Verticales 3/4" 24 15.03 1 360.60 Verticales 1/2" 34 15.03 1 510.85 Horizontales SOTANO 5/8" 24 12.10 1 290.40 Horizontales SOTANO 3/8" 32 3.34 1 106.88 Horizontales SOTANO tipo C 3/8" 24 8.36 1 200.64 Horizontales 1er. P 5/8" 16 12.10 1 193.60 Horizontales 1er. P 3/8" 24 3.34 1 80.16 Horizontales 1er. P tipo C 3/8" 16 8.36 1 133.76 Horizontales 2do. P 5/8" 14 12.10 1 169.40 Horizontales 2do. P 3/8" 22 3.34 1 73.48 Horizontales 2do. P tipo C 3/8" 14 8.36 1 117.04
PB43 EJE I-10 PRIMER Y SEGUNDO PISO 1 2.00 0.30 9.35 5.61 1 4.60 9.35 43.01 Verticales 3/4" 20 10.73 1 214.50
Verticales 1/2" 8 10.73 1 85.80 Horizontales 1er. P 5/8" 27 4.28 1 115.56 Horizontales 1er. P 3/8" 31 2.54 1 78.74 Horizontales 1er. P tipo C 3/8" 27 1.32 1 35.64 Horizontales 2do. P 5/8" 17 4.28 1 72.76 Horizontales 2do. P 3/8" 22 2.54 1 55.88 Horizontales 2do. P tipo C 3/8" 17 1.32 1 22.44
PB42 ENTRE EJE I-13,14 PRIMER Y SEGUNDO PISO 1 2.85 0.30 9.35 7.99 1 6.30 9.35 58.90 Verticales 1" 8 10.73 1 85.80
Verticales 3/4" 16 10.73 1 171.60 Verticales 1/2" 12 10.73 1 128.70 Horizontales 1er. P 5/8" 27 5.98 1 161.46 Horizontales 1er. P 3/8" 31 2.94 1 91.14 Horizontales 1er. P tipo C 3/8" 27 3.52 1 95.04 Horizontales 2do. P 5/8" 17 5.98 1 101.66 Horizontales 2do. P 3/8" 22 2.94 1 64.68 Horizontales 2do. P tipo C 3/8" 17 3.52 1 59.84
SUBSECTOR B2.1 PB1
EJE B-9,10 SOTANO , PRIMER Y SEGUNDO PISO 2 1.70 0.30 14.05 14.33 2 4.00 14.05 112.40 Verticales 1" 16 15.03 2 480.80Verticales 1/2" 8 15.03 2 240.40 Horizontales SOTANO 5/8" 28 3.68 2 206.08 Horizontales SOTANO 3/8" 32 2.14 2 136.96 Horizontales SOTANO tipo C 3/8" 28 1.76 2 98.56 Horizontales 1er. P 5/8" 20 3.68 2 147.20 Horizontales 1er. P 3/8" 24 2.14 2 102.72 Horizontales 1er. P tipo C 3/8" 20 1.76 2 70.40 Horizontales 2do. P 5/8" 17 3.68 2 125.12 Horizontales 2do. P 3/8" 22 2.14 2 94.16 Horizontales 2do. P tipo C 3/8" 17 1.76 2 59.84
PB4 EJE D-8 SOTANO , PRIMER Y SEGUNDO PISO 1 2.50 0.30 14.05 10.54 1 5.60 14.05 78.68 Verticales 1" 24 15.03 1 360.60
Verticales 1/2" 10 15.03 1 150.25 Horizontales SOTANO 1/2" 34 5.28 1 179.52 Horizontales SOTANO 3/8" 32 5.24 1 167.68 Horizontales SOTANO tipo C 3/8" 34 2.20 1 74.80 Horizontales 1er. P 1/2" 26 5.28 1 137.28 Horizontales 1er. P 3/8" 24 5.24 1 125.76 Horizontales 1er. P tipo C 3/8" 26 2.20 1 57.20 Horizontales 2do. P 1/2" 23 5.28 1 121.44 Horizontales 2do. P 3/8" 22 5.24 1 115.28 Horizontales 2do. P tipo C 3/8" 23 2.20 1 50.60
EJE G-8 PRIMER Y SEGUNDO PISO 1 2.50 0.30 9.35 7.01 1 5.60 9.35 52.36 Verticales 1" 24 10.73 1 257.40Verticales 1/2" 10 10.73 1 107.25 Horizontales 1er. P 1/2" 33 5.28 1 174.24 Horizontales 1er. P 3/8" 31 5.24 1 162.44
128de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 1er. P tipo C 3/8" 33 2.20 1 72.60 Horizontales 2do. P 1/2" 23 5.28 1 121.44 Horizontales 2do. P 3/8" 22 5.24 1 115.28 Horizontales 2do. P tipo C 3/8" 23 2.20 1 50.60
PB2 EJE D-9 SOTANO , PRIMER PISO 1 1.00 1.22 9.95 12.09 1 8.70 9.95 86.56 Verticales 3/4" 20 10.93 1 218.50
Verticales 1/2" 22 10.93 1 240.35 Horizontales SOTANO 5/8" 34 7.76 1 263.98 Horizontales SOTANO 3/8" 32 3.77 1 120.70 Horizontales SOTANO tipo C 3/8" 34 4.84 1 164.56 Horizontales 1er. P 5/8" 26 7.76 1 201.86 Horizontales 1er. P 3/8" 24 3.77 1 90.53 Horizontales 1er. P tipo C 3/8" 26 4.84 1 125.84
PB3 EJE D-10/F-10 SOTANO , PRIMER Y SEGUNDO PISO 2 2.00 0.30 14.05 16.86 2 4.60 14.05 129.26 Verticales 3/4" 20 15.03 2 601.00
Verticales 1/2" 6 15.03 2 180.30 Horizontales SOTANO 1/2" 34 4.28 2 291.04 Horizontales SOTANO 3/8" 32 4.88 2 312.32 Horizontales SOTANO tipo C 3/8" 34 1.32 2 89.76 Horizontales 1er. P 1/2" 26 4.28 2 222.56 Horizontales 1er. P 3/8" 24 4.88 2 234.24 Horizontales 1er. P tipo C 3/8" 26 1.32 2 68.64 Horizontales 2do. P 1/2" 23 4.28 2 196.88 Horizontales 2do. P 3/8" 22 4.88 2 214.72 Horizontales 2do. P tipo C 3/8" 23 1.32 2 60.72
SUBSECTOR B2.3 PB5
EJE B-10´/D-12 SOTANO , PRIMER Y SEGUNDO PISO 2 1.50 0.30 14.05 12.64 2 3.60 14.05 101.16 Verticales 3/4" 16 15.03 2 480.80 Verticales 1/2" 6 15.03 2 180.30 Horizontales SOTANO 1/2" 28 3.28 2 183.68 Horizontales SOTANO 3/8" 32 2.14 2 136.96 Horizontales SOTANO tipo C 3/8" 28 1.32 2 73.92 Horizontales 1er. P 1/2" 20 3.28 2 131.20 Horizontales 1er. P 3/8" 24 2.14 2 102.72 Horizontales 1er. P tipo C 3/8" 20 1.32 2 52.80 Horizontales 2do. P 1/2" 17 3.28 2 111.52 Horizontales 2do. P 3/8" 22 2.14 2 94.16 Horizontales 2do. P tipo C 3/8" 17 1.32 2 44.88
PB6 EJE B-12´ SOTANO , PRIMER Y SEGUNDO PISO 1 2.00 0.30 14.05 8.43 1 4.60 14.05 64.63 Verticales 1" 8 15.03 1 120.20
Verticales 3/4" 8 15.03 1 120.20 Verticales 1/2" 10 15.03 1 150.25 Horizontales SOTANO 1/2" 28 4.28 1 119.84 Horizontales SOTANO 3/8" 32 2.14 1 68.48 Horizontales SOTANO tipo C 3/8" 28 2.20 1 61.60 Horizontales 1er. P 1/2" 20 4.28 1 85.60 Horizontales 1er. P 3/8" 24 2.14 1 51.36 Horizontales 1er. P tipo C 3/8" 20 2.20 1 44.00 Horizontales 2do. P 1/2" 17 4.28 1 72.76 Horizontales 2do. P 3/8" 22 2.14 1 47.08 Horizontales 2do. P tipo C 3/8" 17 2.20 1 37.40
PB9 EJE C-11 SOTANO 1 1.00 1.67 5.35 8.91 1 11.10 5.35 59.38 Verticales 1" 12 6.32 1 75.90
Verticales 5/8" 6 6.32 1 37.95 Verticales 1/2" 26 6.32 1 164.45 Horizontales SOTANO 5/8" 28 10.16 1 284.48 Horizontales SOTANO 3/8" 32 5.04 1 161.28 Horizontales SOTANO tipo C 3/8" 28 6.46 1 180.88
EJE C-11 PRIMER PISO 1 1.00 0.50 4.6 2.28 1 3.00 4.60 13.80 Verticales 1" 24 4.85 1 116.40placa reducida Verticales 1/2" 2 4.85 1 9.70
Horizontales 1er. P 5/8" 26 3.26 1 84.76 Horizontales 1er. P 3/8" 24 5.44 1 130.56 Horizontales 1er. P tipo C 3/8" 26 1.62 1 42.12
PB7 EJE D-10´ SOTANO , PRIMER Y SEGUNDO PISO 1 1.65 0.30 14.05 6.95 1 3.90 14.05 54.79 Verticales 1" 8 15.03 1 120.20
Verticales 3/4" 4 15.03 1 60.10 Verticales 1/2" 6 15.03 1 90.15
129de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales SOTANO 1/2" 28 3.58 1 100.24 Horizontales SOTANO 3/8" 32 2.14 1 68.48 Horizontales SOTANO tipo C 3/8" 28 1.32 1 36.96 Horizontales 1er. P 1/2" 20 3.58 1 71.60 Horizontales 1er. P 3/8" 24 2.14 1 51.36 Horizontales 1er. P tipo C 3/8" 20 1.32 1 26.40 Horizontales 2do. P 1/2" 17 3.58 1 60.86 Horizontales 2do. P 3/8" 22 2.14 1 47.08 Horizontales 2do. P tipo C 3/8" 17 1.32 1 22.44
PB8 EJE D-11 SOTANO 1 1.00 1.52 5.35 8.11 1 10.70 5.35 57.24 Verticales 1" 8 6.32 1 50.60
Verticales 5/8" 6 6.32 1 37.95 Verticales 1/2" 24 6.32 1 151.80 Horizontales SOTANO 1/2" 28 9.18 1 257.04 Horizontales SOTANO 3/8" 32 4.69 1 150.08 Horizontales SOTANO tipo C 3/8" 28 5.28 1 147.84
EJE D-11 PRIMER PISO 1 1.00 0.50 4.6 2.28 1 3.00 4.60 13.80 Verticales 1" 16 4.85 1 77.60placa reducida Verticales 1/2" 6 4.85 1 29.10
Horizontales 1er. P 5/8" 26 3.48 1 90.48 Horizontales 1er. P 3/8" 24 4.69 1 112.56 Horizontales 1er. P tipo C 3/8" 26 1.32 1 34.32
SUB SECTOR B2.2 PB11
EJE F-10´ SOTANO , PRIMER Y SEGUNDO PISO 1 1.65 0.30 14.05 6.95 1 3.90 14.05 54.79 Verticales 5/8" 8 15.03 1 120.20 Verticales 1/2" 8 15.03 1 120.20 Horizontales SOTANO 1/2" 21 3.58 1 75.18 Horizontales SOTANO 3/8" 32 2.14 1 68.48 Horizontales SOTANO tipo C 3/8" 21 1.76 1 36.96 Horizontales 1er. P 1/2" 13 3.58 1 46.54 Horizontales 1er. P 3/8" 24 2.14 1 51.36 Horizontales 1er. P tipo C 3/8" 13 1.76 1 22.88 Horizontales 2do. P 1/2" 11 3.58 1 39.38 Horizontales 2do. P 3/8" 22 2.14 1 47.08 Horizontales 2do. P tipo C 3/8" 11 1.76 1 19.36
PB13 EJE F-11 SOTANO , PRIMER Y SEGUNDO PISO 1 1.00 1.70 14.05 23.81 1 11.90 14.05 167.20 Verticales 3/4" 12 15.03 1 180.30
Verticales 5/8" 6 15.03 1 90.15 Verticales 1/2" 28 15.03 1 420.70 Horizontales SOTANO 1/2" 21 10.16 1 213.36 Horizontales SOTANO 3/8" 32 4.71 1 150.72 Horizontales SOTANO tipo C 3/8" 21 6.16 1 129.36 Horizontales 1er. P 1/2" 13 10.16 1 132.08 Horizontales 1er. P 3/8" 24 4.71 1 113.04 Horizontales 1er. P tipo C 3/8" 13 6.16 1 80.08 Horizontales 2do. P 1/2" 11 10.16 1 111.76 Horizontales 2do. P 3/8" 22 4.71 1 103.62 Horizontales 2do. P tipo C 3/8" 11 6.16 1 67.76
PB12 EJE F-12 SOTANO , PRIMER Y SEGUNDO PISO 1 2.00 0.30 14.05 8.43 1 4.60 14.05 64.63 Verticales 5/8" 12 15.03 1 180.30
Verticales 1/2" 10 15.03 1 150.25 Horizontales SOTANO 1/2" 21 4.28 1 89.88 Horizontales SOTANO 3/8" 32 2.14 1 68.48 Horizontales SOTANO tipo C 3/8" 21 2.20 1 46.20 Horizontales 1er. P 1/2" 13 4.28 1 55.64 Horizontales 1er. P 3/8" 24 2.14 1 51.36 Horizontales 1er. P tipo C 3/8" 13 2.20 1 28.60 Horizontales 2do. P 1/2" 11 4.28 1 47.08 Horizontales 2do. P 3/8" 22 2.14 1 47.08 Horizontales 2do. P tipo C 3/8" 11 2.20 1 24.20
PB10 EJE H-10´/H-11 PRIMER Y SEGUNDO PISO 2 1.70 0.30 9.35 9.54 2 4.00 9.35 74.80 Verticales 5/8" 20 10.73 2 429.00
Verticales 1/2" 8 10.73 2 171.60 Horizontales 1er. P 1/2" 27 3.70 2 199.80 Horizontales 1er. P 3/8" 31 2.34 2 145.08 Horizontales 1er. P tipo C 3/8" 27 1.76 2 95.04 Horizontales 2do. P 1/2" 17 3.70 2 125.80 Horizontales 2do. P 3/8" 22 2.34 2 102.96
130de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontales 2do. P tipo C 3/8" 17 1.76 2 59.84
SUBSECTOR B3
EJE PB14 B-13 SOTANO, PRIMER Y SEGUNDO PISO 1 0.30 1.50 13.65 6.14 1 3.60 13.65 49.14 Verticales sotano 3/4" 12 15.03 1 180.30
Verticales sotano 1/2" 6 15.03 1 90.15 Horizontal Sótano +1P 1/2" 50 3.28 1 164.00 Horizontal Sótano +1P 3/8" 46 2.44 1 112.24 Horizontal 2P 1/2" 11 3.28 1 36.08 Horizontal 2P 3/8" 21 2.44 1 51.24 Horiz. Cimiento 3/8" 8 2.44 1 19.52 Horizontal tipo "C" 3/8" 61 1.47 1 89.67
EJE PB15 B-16 SOTANO 1 0.30 4.40 4.95 6.53 1 9.40 4.95 46.53 Verticales sotano 5/8" 8 6.32 1 50.60
Verticales sotano 1/2" 26 6.32 1 164.45 Horizontal Sótano 1/2" 12 9.08 1 108.96 Horizontal Sótano 3/8" 23 2.44 1 56.12 Horizontal tipo "C" 3/8" 12 6.37 1 76.44 Horiz. Cimiento 3/8" 8 2.44 1 19.52
PRIMER , SEGUNDO Y TERCER PISO 1 0.30 1.00 12.8 3.84 1 2.60 12.80 33.28 Verticales sotano 1" 12 13.55 1 162.60Horizontal 1P 1/2" 28 2.64 1 73.92 Horizontal 2P+3P 1/2" 42 2.64 1 110.88 Horizontal tipo "C" 3/8" 70 1.47 1 102.90
EJE PB16 B-19 SOTANO, PRIMER , SEGUNDO PISO 1 0.30 1.50 13.65 6.14 1 3.60 13.65 49.14 Verticales sotano 3/4" 12 15.03 1 180.30
Verticales sotano 1/2" 6 15.03 1 90.15 Horizontal Sótano +1P 1/2" 50 3.28 1 164.00 Horizontal Sótano +1P 3/8" 46 2.44 1 112.24 Horizontal 2P 1/2" 11 3.28 1 36.08 Horizontal 2P 3/8" 21 2.44 1 51.24 Horiz. Cimiento 3/8" 8 2.44 1 19.52 Horizontal tipo "C" 3/8" 61 1.47 1 89.67
EJE PB17 C-15 SOTANO, PRIMER , SEGUNDO Y TERCER PISO 1 0.30 1.80 17.75 9.59 1 4.20 17.75 74.55 Verticales sotano 1" 16 19.13 1 306.00
Verticales sotano 1/2" 8 19.13 1 153.00 Horizontal Sótano +1P 1/2" 50 3.88 1 194.00 Horizontal Sótano +1P 3/8" 46 2.44 1 112.24 Horizontal 2P+3P 1/2" 44 3.88 1 170.72 Horizontal 2P+3P 3/8" 42 2.44 1 102.48 Horiz. Cimiento 3/8" 8 2.44 1 19.52 Horizontal tipo "C" 3/8" 94 1.96 1 184.24
EJE PB18
D/E & 15/17 SOTANO, PRIMER Y SEGUNDO PISO 4 0.50 1.70 13.65 46.41 4 4.20 13.65 229.32 Verticales hasta2dor nivel 5/8" 6 15.03 4 360.60 Verticales hasta2dor nivel 1" 10 15.03 4 601.00Horizontal Sótano +1P 5/8" 76 8.56 4 2,602.24 Horizontal al 2P 5/8" 16 8.56 4 547.84 Horizontal tipo "C" 3/8" 92 2.56 4 942.08 Horiz. Cimiento 3/8" 8 2.01 4 64.32 Horizontal Sótano +1P 3/8" 46 2.01 4 369.84 Horizontal al 2P+3P 3/8" 42 2.01 4 337.68
SOTANO, PRIMER,SEGUNDO Y TERCER PISO 4 2.00 0.30 17.75 42.60 4 4.00 17.75 284.00 Verticales hasta 3er nivel 5/8" 8 19.13 4 612.00
Verticales hasta 3er nivel 3/4" 4 19.13 4 306.00 Verticales hasta 3er nivel 1" 14 19.13 4 1,071.00Horizontal Sótano +1P 5/8" 76 4.28 4 1,301.12 Horizontal al 2P+3P 5/8" 32 4.28 4 547.84 Horizontal tipo "C" 3/8" 108 1.76 4 760.32 Horiz. Cimiento 3/8" 8 3.19 4 102.08 Horizontal Sótano +1P 3/8" 46 3.19 4 586.96 Horizontal al 2P+3P 3/8" 42 3.19 4 535.92
EJE PB19 18-D&F SOTANO, PRIMER Y SEGUNDO PISO 2 0.50 2.00 13.65 27.30 2 5.00 13.65 136.50 Verticales hasta2dor nivel 5/8" 6 15.03 2 180.30
Verticales hasta2dor nivel 1" 20 15.03 2 601.00Horizontal Sótano +1P 5/8" 76 8.56 2 1,301.12
131de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontal al 2P 5/8" 16 8.56 2 273.92 Horizontal tipo "C" 3/8" 92 3.20 2 588.80 Horiz. Cimiento 3/8" 8 4.02 2 64.32 Horizontal Sótano +1P 3/8" 46 4.02 2 369.84 Horizontal al 2P 3/8" 21 4.02 4 337.68
EJE PB20 E-15 SOTANO, PRIMER,SEGUNDO Y TERCER PISO 1 0.30 3.50 17.75 18.64 1 7.30 17.75 129.58 Verticales hasta 3er nivel 1" 22 19.13 1 420.75
1 0.30 0.85 17.75 4.53 1 2.30 17.75 40.83 Verticales hasta 3er nivel 5/8" 12 19.13 1 229.50 Verticales hasta 3er nivel 1/2" 8 19.13 1 153.00 Horizontal Sótano +1P 5/8" 76 7.28 1 553.28 Horizontal al 2P+3P 5/8" 26 7.28 1 189.28 Horizontal Sótano +1P 3/8" 46 2.42 1 111.32 Horizontal al 2P+3P 3/8" 42 2.42 1 101.64 Horizontal tipo "C" 3/8" 102 4.41 1 449.82 Horiz. Cimiento 3/8" 8 2.42 1 19.36
EJE PB21 E-17 SOTANO, PRIMER,SEGUNDO Y TERCER PISO 1 0.30 3.50 17.75 18.64 1 7.60 17.75 134.90 Verticales hasta 3er nivel 1" 22 19.13 1 420.75
1 0.30 0.85 17.75 4.53 1 2.00 17.75 35.50 Verticales hasta 3er nivel 5/8" 12 19.13 1 229.50 Verticales hasta 3er nivel 1/2" 16 19.13 1 306.00 Horizontal Sótano +1P 5/8" 76 7.28 1 553.28 Horizontal al 2P+3P 5/8" 26 7.28 1 189.28 Horizontal Sótano +1P 1/2" 32 1.94 1 62.08 Horizontal al 2P+3P 1/2" 28 1.94 1 54.32 Horiz. Cimiento 1/2" 8 1.94 1 15.52 Horiz. Cimiento 3/8" 8 2.42 1 19.36 Horizontal Sótano +1P 3/8" 46 2.42 1 111.32 Horizontal al 2P+3P 3/8" 42 2.42 1 101.64 Horizontal tipo "C" 3/8" 102 3.92 1 399.84 Horizontal tipo "C" 3/8" 60 1.47 1 88.20
EJE PB22
E-13&19 SOTANO, PRIMER,SEGUNDO Y TERCER PISO 2 0.30 2.35 17.75 25.03 2 5.30 17.75 188.15 Verticales hasta 3er nivel 1" 16 19.13 2 612.00Verticales hasta 3er nivel 1/2" 12 19.13 2 459.00 Horizontal Sótano +1P 5/8" 76 4.98 2 756.96 Horizontal al 2P+3P 5/8" 26 4.98 2 258.96 Horizontal Sótano +1P 3/8" 46 2.42 2 222.64 Horizontal al 2P+3P 3/8" 42 2.42 2 203.28 Horizontal tipo "C" 3/8" 102 2.94 2 599.76 Horiz. Cimiento 3/8" 8 2.42 2 38.72
EJE PB23 F-13 SOTANO, PRIMER,SEGUNDO Y TERCER PISO 1 0.30 2.50 17.75 13.31 1 5.60 17.75 99.40 Verticales hasta 3er nivel 1" 16 19.13 1 306.00
Verticales hasta 3er nivel 1/2" 12 19.13 1 229.50 Horizontal Sótano 1/2" 12 5.28 1 63.36 Horizontal 1P 5/8" 38 5.28 1 200.64 Horizontal al 2P+3P 1/2" 22 5.28 1 116.16 Horizontal Sótano +1P 3/8" 46 2.42 1 111.32 Horizontal al 2P+3P 3/8" 42 2.42 1 101.64 Horizontal tipo "C" 3/8" 72 2.94 1 211.68 Horiz. Cimiento 3/8" 8 2.42 1 19.36
EJE PB24 D-13 SOTANO, PRIMER,SEGUNDO Y TERCER PISO 2 0.30 2.50 17.75 26.63 2 5.60 17.75 198.80 Verticales hasta 3er nivel 1" 16 19.13 2 612.00
Verticales hasta 3er nivel 1/2" 12 19.13 2 459.00 Horizontal sotano + 1P 5/8" 38 5.28 2 401.28 Horizontal al 2P+3P 1/2" 22 5.28 2 232.32 Horizontal Sótano +1P 3/8" 46 2.42 2 222.64 Horizontal al 2P+3P 3/8" 42 2.42 2 203.28 Horizontal tipo "C" 3/8" 60 2.94 2 352.80 Horiz. Cimiento 3/8" 8 2.42 2 38.72
EJE PB25 G-19 SOTANO 1 0.30 2.70 4.95 4.01 1 6.00 4.95 29.70 Verticales sotano 1" 10 6.32 1 63.25
1 0.30 0.30 4.95 0.45 1 0.90 4.95 4.45 Verticales sotano 5/8" 4 6.32 1 25.30 Verticales sotano 1/2" 14 6.32 1 88.55 Horizontal sotano 1/2" 12 5.68 1 68.16
132de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontal sotano 3/8" 46 4.22 1 194.12 Horizontal tipo "C" 3/8" 12 3.43 1 41.16 Horiz. Cimiento 3/8" 8 4.22 1 33.76
EJE PB26 F-19 SOTANO 1 0.30 5.05 4.95 7.50 1 10.70 4.95 52.96 Verticales sotano 1" 16 6.32 1 101.20
Verticales sotano 1/2" 30 6.32 1 189.75 Horizontal Sótano 1/2" 19 10.14 1 192.66 Horizontal Sótano 3/8" 23 2.44 1 56.12 Horizontal tipo "C" 3/8" 19 7.35 1 139.65 Horiz. Cimiento 3/8" 8 2.44 1 19.52
PRIMER , SEGUNDO Y TERCER PISO 1 0.30 2.50 12.8 9.60 1 5.60 12.80 71.68 Verticales sotano 1" 16 13.55 1 216.80Verticales sotano 1/2" 12 13.55 1 162.60 Horizontal 1P 5/8" 38 5.28 1 200.64 Horizontal 1P 3/8" 23 2.44 1 56.12 Horizontal 2P+3P 1/2" 32 5.28 1 168.96 Horizontal 2P+3P 3/8" 40 2.44 1 97.60 Horizontal tipo "C" 3/8" 70 2.94 1 205.80
SUBSECTOR B4
EJE PB41
H-17.H-23 SOTANO, PRIMER Y SEGUNDO PISO 2 5.95 0.30 14.1 50.34 2 12.50 14.10 352.50 Verticales 3/4" 24 15.08 2 723.60 2 Placas Verticales 1/2" 34 15.08 2 1,025.10
Horiz. Cimiento 3/8" 8 3.32 2 53.12 Horizontal Sótano 3/8" 26 3.32 2 172.64 Horizontal al 1er P 3/8" 26 3.32 2 172.64 Horizontal 2do P 3/8" 24 3.32 2 159.36 Horiz. Cimiento (2) 3/8" 8 8.36 2 133.76 Horizontal Sótano (2) 3/8" 26 8.36 2 434.72 Horizontal al 1er P (2) 3/8" 26 8.36 2 434.72 Horizontal 2do P (2) 3/8" 24 8.36 2 401.28 Refuerzo Long.al 1er P 5/8" 17 7.42 2 252.28 Refuerzo Long 2do P (3) 5/8" 15 7.42 2 222.60
EJE PB42 I-18 PRIMER Y SEGUNDO PISO 1 2.85 0.30 9.5 8.12 1 6.30 9.50 59.85 Verticales 1" 8 10.48 1 83.80
Verticales 3/4" 16 10.48 1 167.60 1 Placa Verticales 1/2" 12 10.48 1 125.70
Horiz. Cimiento 3/8" 7 2.92 1 20.44 Horizontal al 1er P 3/8" 26 2.92 1 75.92 Horizontal 2do P 3/8" 24 2.92 1 70.08 Horiz. Cimiento (2) 3/8" 7 3.52 1 24.64 Horizontal al 1er P (2) 3/8" 26 3.52 1 91.52 Horizontal 2do P (2) 3/8" 24 3.52 1 84.48 Refuerzo Long.al 1er P 5/8" 21 5.98 1 125.58 Refuerzo Long 2do P (3) 5/8" 18 5.98 1 107.64
EJE PB43 I-22 PRIMER Y SEGUNDO PISO 1 2.00 0.30 9.5 5.70 1 4.60 9.50 43.70 Verticales 3/4" 20 10.48 1 209.50
1 Placa Verticales 1/2" 8 10.48 1 83.80 Horiz. Cimiento 3/8" 7 2.54 1 17.78 Horizontal al 1er P 3/8" 26 2.54 1 66.04 Horizontal 2do P 3/8" 24 2.54 1 60.96 Horiz. Cimiento (2) 3/8" 7 1.76 1 12.32 Horizontal al 1er P (2) 3/8" 26 1.76 1 45.76 Horizontal 2do P (2) 3/8" 24 1.76 1 42.24 Refuerzo Long.al 1er P 5/8" 21 4.28 1 89.88 Refuerzo Long 2do P (3) 5/8" 18 4.28 1 77.04
SUBSECTOR B5
EJE P27 B-20 SOTANO, PRIMER Y SEGUNDO PISO 1 1.70 0.30 14 7.14 1 4.00 14.00 56.00 Verticales 3/4" 16 14.98 1 239.60
Verticales 1/2" 8 14.98 1 119.80 Horiz. Cimiento 3/8" 8 2.14 1 17.12 Horizontal Sótano 3/8" 26 2.14 1 55.64 Horizontal al 1er P 3/8" 26 2.14 1 55.64
1 Placa Horizontal 2do P 3/8" 24 2.14 1 51.36 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horizontal Sótano (2) 3/8" 26 1.76 1 45.76
133de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horizontal al 1er P (2) 3/8" 26 1.76 1 45.76 Horizontal 2do P (2) 3/8" 24 1.76 1 42.24 Ref. Long. Sótano 5/8" 14 3.68 1 51.52 Refuerzo Long.al 1er P 5/8" 14 3.68 1 51.52 Refuerzo Long 2do P (3) 5/8" 13 3.68 1 47.84
EJE P28 B-21 SOTANO, PRIMER Y SEGUNDO PISO 1 2.00 0.30 14 8.40 1 4.60 14.00 64.40 Verticales 3/4" 16 14.98 1 239.60
Verticales 1/2" 10 14.98 1 149.75 Horiz. Cimiento 3/8" 8 2.14 1 17.12 Horizontal Sótano 3/8" 26 2.14 1 55.64 Horizontal al 1er P 3/8" 26 2.14 1 55.64
1 Placa Horizontal 2do P 3/8" 24 2.14 1 51.36 Horiz. Cimiento (2) 3/8" 8 2.20 1 17.60 Horizontal Sótano (2) 3/8" 26 2.20 1 57.20 Horizontal al 1er P (2) 3/8" 26 2.20 1 57.20 Horizontal 2do P (2) 3/8" 24 2.20 1 52.80 Ref. Long. Sótano 5/8" 14 4.28 1 59.92 Refuerzo Long.al 1er P 5/8" 14 4.28 1 59.92 Refuerzo Long 2do P (3) 5/8" 13 4.28 1 55.64
EJE PB29 B-22 SOTANO, PRIMER Y SEGUNDO PISO 1 1.50 0.30 14 6.30 1 3.60 14.00 50.40 Verticales 3/4" 16 14.98 1 239.60
Verticales 1/2" 6 14.98 1 89.85 Horiz. Cimiento 3/8" 8 2.14 1 17.12 Horizontal Sótano 3/8" 26 2.14 1 55.64 Horizontal al 1er P 3/8" 26 2.14 1 55.64
1 Placa Horizontal 2do P 3/8" 24 2.14 1 51.36 Horiz. Cimiento (2) 3/8" 8 1.32 1 10.56 Horizontal Sótano (2) 3/8" 26 1.32 1 34.32 Horizontal al 1er P (2) 3/8" 26 1.32 1 34.32 Horizontal 2do P (2) 3/8" 24 1.32 1 31.68 Ref. Long. Sótano 5/8" 14 3.28 1 45.92 Refuerzo Long.al 1er P 5/8" 14 3.28 1 45.92 Refuerzo Long 2do P (3) 5/8" 13 3.28 1 42.64
EJE PB36 B-22 SOTANO, PRIMER Y SEGUNDO PISO 1 1.70 0.30 14 7.14 1 4.00 14.00 56.00 Verticales 1" 8 14.98 1 119.80
Verticales 3/4" 4 14.98 1 59.90 Verticales 1/2" 8 14.98 1 119.80 Horiz. Cimiento 3/8" 8 2.14 1 17.12 Horizontal Sótano 3/8" 26 2.14 1 55.64 Horizontal al 1er P 3/8" 26 2.14 1 55.64
1 Placa Horizontal 2do P 3/8" 24 2.14 1 51.36 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horizontal Sótano (2) 3/8" 26 1.76 1 45.76 Horizontal al 1er P (2) 3/8" 26 1.76 1 45.76 Horizontal 2do P (2) 3/8" 24 1.76 1 42.24 Ref. Long. Sótano 5/8" 27 3.68 1 99.36 Refuerzo Long.al 1er P 5/8" 27 3.68 1 99.36 Refuerzo Long 2do P (3) 1/2" 13 3.68 1 47.84
EJE PB37 B-23 SOTANO, PRIMER Y SEGUNDO PISO 1 1.70 0.30 14 7.14 1 4.00 14.00 56.00 Verticales 1" 8 14.98 1 119.80
Verticales 3/4" 16 14.98 1 239.60 Verticales 1/2" 4 14.98 1 59.90 Horiz. Cimiento 3/8" 8 2.94 1 23.52 Horizontal Sótano 3/8" 26 2.94 1 76.44 Horizontal al 1er P 3/8" 26 2.94 1 76.44
1 Placa Horizontal 2do P 3/8" 24 2.94 1 70.56 Horiz. Cimiento (2) 3/8" 8 0.88 1 7.04 Horizontal Sótano (2) 3/8" 26 0.88 1 22.88 Horizontal al 1er P (2) 3/8" 26 0.88 1 22.88 Horizontal 2do P (2) 3/8" 24 0.88 1 21.12 Ref. Long. Sótano 5/8" 27 3.68 1 99.36 Refuerzo Long.al 1er P 5/8" 27 3.68 1 99.36 Refuerzo Long 2do P (3) 1/2" 13 3.68 1 47.84
134de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
EJE PB30 D-20 SOTANO, PRIMER Y SEGUNDO PISO 1 4.27 0.30 14 17.93 1 9.14 14.00 127.96 Verticales 1" 24 14.98 1 359.40
Verticales 1/2" 20 14.98 1 299.50 Horiz. Cimiento 3/8" 8 3.21 1 25.68 Horizontal Sótano 3/8" 26 3.21 1 83.46 Horizontal al 1er P 3/8" 26 3.21 1 83.46
1 Placa Horizontal 2do P 3/8" 24 3.21 1 77.04 Horiz. Cimiento (2) 3/8" 8 4.40 1 35.20 Horizontal Sótano (2) 3/8" 26 4.40 1 114.40 Horizontal al 1er P (2) 3/8" 26 4.40 1 114.40 Horizontal 2do P (2) 3/8" 24 4.40 1 105.60 Ref. Long. Sótano 1/2" 27 9.66 1 260.82 Refuerzo Long.al 1er P 1/2" 27 9.66 1 260.82 Refuerzo Long 2do P (3) 1/2" 24 9.66 1 231.84
EJE PB31 D-22 SOTANO, PRIMER Y SEGUNDO PISO 1 3.30 0.30 14 13.86 1 7.20 14.00 100.80 Verticales 1" 30 14.98 1 449.25
Verticales 1/2" 14 14.98 1 209.65 Horiz. Cimiento 3/8" 8 3.81 1 30.48 Horizontal Sótano 3/8" 26 3.81 1 99.06 Horizontal al 1er P 3/8" 26 3.81 1 99.06
1 Placa Horizontal 2do P 3/8" 24 3.81 1 91.44 Horiz. Cimiento (2) 3/8" 8 3.08 1 24.64 Horizontal Sótano (2) 3/8" 26 3.08 1 80.08 Horizontal al 1er P (2) 3/8" 26 3.08 1 80.08 Horizontal 2do P (2) 3/8" 24 3.08 1 73.92 Ref. Long. Sótano 1/2" 27 7.60 1 205.20 Refuerzo Long.al 1er P 1/2" 27 7.60 1 205.20 Refuerzo Long 2do P (3) 1/2" 24 7.60 1 182.40
EJE PB38 D-22 SOTANO, PRIMER Y SEGUNDO PISO 2 2.00 0.30 14 16.80 2 4.60 14.00 128.80 Verticales 3/4" 16 14.98 2 479.20 F-22 Verticales 1/2" 10 14.98 2 299.50
Horiz. Cimiento 3/8" 8 2.14 2 34.24 Horizontal Sótano 3/8" 26 2.14 2 111.28 Horizontal al 1er P 3/8" 26 2.14 2 111.28
2 Placa Horizontal 2do P 3/8" 24 2.14 2 102.72 Horiz. Cimiento (2) 3/8" 8 2.20 2 35.20 Horizontal Sótano (2) 3/8" 26 2.20 2 114.40 Horizontal al 1er P (2) 3/8" 26 2.20 2 114.40 Horizontal 2do P (2) 3/8" 24 2.20 2 105.60 Ref. Long. Sótano 5/8" 21 4.28 2 179.76 Refuerzo Long.al 1er P 5/8" 21 4.28 2 179.76 Refuerzo Long 2do P (3) 1/2" 13 4.28 2 111.28
EJE PB39 D-24 SOTANO, PRIMER Y SEGUNDO PISO 1 2.50 0.30 14 10.50 1 5.60 14.00 78.40 Verticales 3/4" 20 14.98 1 299.50
Verticales 1/2" 12 14.98 1 179.70 Horiz. Cimiento 3/8" 8 2.54 1 20.32 Horizontal Sótano 3/8" 26 2.54 1 66.04 Horizontal al 1er P 3/8" 26 2.54 1 66.04
1 Placa Horizontal 2do P 3/8" 24 2.54 1 60.96 Horiz. Cimiento (2) 3/8" 8 2.64 1 21.12 Horizontal Sótano (2) 3/8" 26 2.64 1 68.64 Horizontal al 1er P (2) 3/8" 26 2.64 1 68.64 Horizontal 2do P (2) 3/8" 24 2.64 1 63.36 Ref. Long. Sótano 5/8" 27 5.28 1 142.56 Refuerzo Long.al 1er P 5/8" 27 5.28 1 142.56 Refuerzo Long 2do P (3) 1/2" 13 5.28 1 68.64
EJE PB32 F-20 SOTANO, PRIMER Y SEGUNDO PISO 1 2.00 0.30 14 8.40 1 4.60 14.00 64.40 Verticales 1" 20 14.98 1 299.50
Verticales 1/2" 10 14.98 1 149.75 Horiz. Cimiento 3/8" 8 2.14 1 17.12 Horizontal Sótano 3/8" 26 2.14 1 55.64 Horizontal al 1er P 3/8" 26 2.14 1 55.64
1 Placa Horizontal 2do P 3/8" 24 2.14 1 51.36
135de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento Horiz. Cimiento (2) 3/8" 8 2.20 1 17.60 Horizontal Sótano (2) 3/8" 26 2.20 1 57.20 Horizontal al 1er P (2) 3/8" 26 2.20 1 57.20 Horizontal 2do P (2) 3/8" 24 2.20 1 52.80 Ref. Long. Sótano 5/8" 27 4.28 1 115.56 Refuerzo Long.al 1er P 5/8" 27 4.28 1 115.56
Refuerzo Long 2do P (3) 1/2" 13 4.28 1 55.64
EJE PB35 F-21 SOTANO, PRIMER Y SEGUNDO PISO 1 2.85 0.40 14 15.96 1 6.50 14.00 91.00 Verticales 1" 24 14.98 1 359.40
Verticales 1/2" 12 14.98 1 179.70 Horiz. Cimiento 3/8" 8 5.70 1 45.60 Horizontal Sótano 3/8" 26 5.70 1 148.20 Horizontal al 1er P 3/8" 26 5.70 1 148.20
1 Placa Horizontal 2do P 3/8" 24 5.70 1 136.80 Horiz. Cimiento (2) 3/8" 8 3.24 1 25.92 Horizontal Sótano (2) 3/8" 26 3.24 1 84.24 Horizontal al 1er P (2) 3/8" 26 3.24 1 84.24 Horizontal 2do P (2) 3/8" 24 3.24 1 77.76 Ref. Long. Sótano 5/8" 40 6.00 1 240.00 Refuerzo Long.al 1er P 5/8" 40 6.00 1 240.00 Refuerzo Long 2do P (3) 1/2" 13 6.00 1 78.00
EJE PB33 F-22 SOTANO, PRIMER Y SEGUNDO PISO 1 1.65 0.30 14 6.93 1 3.90 14.00 54.60 Verticales 1" 12 14.98 1 179.70
Verticales 1/2" 8 14.98 1 119.80 Horiz. Cimiento 3/8" 8 2.14 1 17.12 Horizontal Sótano 3/8" 26 2.14 1 55.64 Horizontal al 1er P 3/8" 26 2.14 1 55.64
1 Placa Horizontal 2do P 3/8" 24 2.14 1 51.36 Horiz. Cimiento (2) 3/8" 8 1.76 1 14.08 Horizontal Sótano (2) 3/8" 26 1.76 1 45.76 Horizontal al 1er P (2) 3/8" 26 1.76 1 45.76 Horizontal 2do P (2) 3/8" 24 1.76 1 42.24 Ref. Long. Sótano 5/8" 27 3.58 1 96.66 Refuerzo Long.al 1er P 5/8" 27 3.58 1 96.66 Refuerzo Long 2do P (3) 1/2" 13 3.58 1 46.54
EJE PB39 + CB62 F-23 SOTANO Y PRIMER PISO 1 5.25 0.30 9.9 15.59 1 11.10 9.90 109.89 Verticales 3/4" 20 10.88 1 217.50
Verticales 1/2" 12 10.88 1 130.50 Horiz. Cimiento 3/8" 8 3.83 1 30.64 Horizontal Sótano 3/8" 26 3.83 1 99.58 Horizontal al 1er P 3/8" 26 3.83 1 99.58
1 Placa Horizontal 2do P 3/8" 24 3.83 1 91.92 Horiz. Cimiento (2) 3/8" 8 6.60 1 52.80 Horizontal Sótano (2) 3/8" 26 6.60 1 171.60 Horizontal al 1er P (2) 3/8" 26 6.60 1 171.60 Horizontal 2do P (2) 3/8" 24 6.60 1 158.40 Ref. Long. Sótano 5/8" 27 10.16 1 274.32 Refuerzo Long.al 1er P 5/8" 27 10.16 1 274.32
EJE PB40 G-24 SOTANO, PRIMER Y SEGUNDO PISO 1 3.08 0.30 14 12.91 1 6.75 14.00 94.50 Verticales 1" 8 14.98 1 119.80
Verticales 3/4" 12 14.98 1 179.70 Verticales 1/2" 16 14.98 1 239.60 Horiz. Cimiento 3/8" 8 2.54 1 20.32 Horizontal Sótano 3/8" 26 2.54 1 66.04 Horizontal al 1er P 3/8" 26 2.54 1 66.04
1 Placa Horizontal 2do P 3/8" 24 2.54 1 60.96 Horiz. Cimiento (2) 3/8" 8 3.52 1 28.16 Horizontal Sótano (2) 3/8" 26 3.52 1 91.52 Horizontal al 1er P (2) 3/8" 26 3.52 1 91.52 Horizontal 2do P (2) 3/8" 24 3.52 1 84.48 Ref. Long. Sótano 5/8" 27 6.42 1 173.34 Refuerzo Long.al 1er P 5/8" 27 6.42 1 173.34 Refuerzo Long 2do P (3) 1/2" 13 6.42 1 83.46
136de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento EJE PB34
H-19,H-22 PRIMER Y SEGUNDO PISO 2 1.70 0.30 14 14.28 2 4.00 14.00 112.00 Verticales 3/4" 12 14.98 2 359.40 Verticales 1/2" 8 14.98 2 239.60 Horiz. Cimiento 3/8" 8 2.14 2 34.24 Horizontal al 1er P 3/8" 26 2.14 2 111.28
2 Placas Horizontal 2do P 3/8" 24 2.14 2 102.72 Horiz. Cimiento (2) 3/8" 8 1.76 2 28.16 Horizontal al 1er P (2) 3/8" 26 1.76 2 91.52 Horizontal 2do P (2) 3/8" 24 1.76 2 84.48 Refuerzo Long.al 1er P 5/8" 21 3.68 2 154.56 Refuerzo Long 2do P (3) 1/2" 18 3.68 2 132.48
PLACAS DE ESCALERAS
PLACAS ESCALERA 1
Area Perimetro PLACA EN SOTANO 1 16.52 5.3 87.56 1 111.80 5.30 592.54 Verticales nudos 3/4" 126 7.40 1 932.40
5/8" 40 7.40 1 296.00 Verticales Ext. Sotano 5/8" 113 6.90 1 779.70 Verticales Int. Sotano 1/2" 225 6.90 1 1,552.50 Ref Vertical sotano 5/8" 34 3.75 1 127.50
Verticales Int. Sotano 1/2" 8 6.90 3 165.60 1/2" 16 6.90 2 220.80 1/2" 8 6.90 2 110.40 1/2" 16 6.90 2 220.80 1/2" 14 6.90 1 96.60 1/2" 4 6.90 2 55.20 1/2" 24 6.90 2 331.20
Horizontales muros exter. Sot 3/8" 54 7.80 2 842.40 3/8" 54 14.10 2 1,522.80
Horizontales muros int.. Sot 3/8" 54 1.65 3 267.30 3/8" 54 4.90 1 264.60 3/8" 54 7.40 1 399.60 3/8" 54 3.10 1 167.40 3/8" 54 1.55 1 83.70 3/8" 54 3.80 2 410.40 3/8" 54 1.35 1 72.90 3/8" 54 1.05 1 56.70
PLACA PISOS SUPERIORES 1 10.35 18.05 186.82 1 106.60 18.05 1924.13 Verticales nudos 3/4" 126 22.35 1 2,816.10 5/8" 40 22.35 1 894.00
Verticales pisos superiores 1/2" 8 22.35 4 715.20 1/2" 46 22.35 1 1,028.10 1/2" 34 3.75 1 127.50 1/2" 10 22.35 1 223.50 1/2" 22 19.65 1 432.30 1/2" 16 19.65 2 628.80 1/2" 16 19.65 2 628.80 1/2" 8 19.65 2 314.40 1/2" 6 19.65 2 235.80 1/2" 16 19.65 2 628.80 1/2" 18 19.65 2 707.40 1/2" 24 19.65 2 943.20 1/2" 4 19.65 2 157.20
Horizontales pisos superiores 3/8" 182 7.40 3 4,040.40 3/8" 182 13.70 2 4,986.80 3/8" 182 1.65 3 900.90 3/8" 182 4.90 1 891.80 3/8" 182 3.10 1 564.20 3/8" 182 1.55 1 282.10 3/8" 182 3.80 2 1,383.20 3/8" 182 1.35 1 245.70 3/8" 182 1.05 1 191.10
Estribos en todos los niveles 3/8" 117 1.00 53 6,201.00 PLACAS ESCALERA 2
Area Perimetro PLACA DE NIVEL -3.15 A NIVEL +14.30 1 6.05 18.05 109.20 1 62.80 18.05 1133.54 Verticales nudos 3/4" 44 21.35 1 939.40
5/8" 52 21.35 1 1,110.20 Verticales 1/2" 28 21.35 1 597.80
137de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento 1/2" 26 21.35 1 555.10 5/8" 4 21.35 1 85.40 1/2" 14 21.35 1 298.90 1/2" 10 21.35 1 213.50 1/2" 10 21.35 1 213.50 1/2" 10 21.35 1 213.50 1/2" 22 21.35 1 469.70 1/2" 10 21.35 3 640.50 1/2" 10 21.35 1 213.50 1/2" 16 21.35 1 341.60 1/2" 12 21.35 1 256.20 1/2" 4 21.35 4 341.60
Horizontales 3/8" 182 6.35 2 2,311.40 3/8" 182 1.95 3 1,064.70 3/8" 182 7.90 1 1,437.80 3/8" 182 5.70 1 1,037.40 3/8" 182 1.60 1 291.20 3/8" 182 1.25 1 227.50 3/8" 182 1.05 1 191.10 3/8" 182 1.30 1 236.60
Estribos en todos los niveles 3/8" 91 1.00 27 2,457.00 PLACAS ESCALERA 3
Area Perimetro PLACA DE NIVEL -3.15 A NIVEL +14.30 1 6.05 18.05 109.20 1 62.80 18.05 1133.54 Verticales nudos 3/4" 44 21.35 1 939.40
5/8" 52 21.35 1 1,110.20 Verticales 1/2" 28 21.35 1 597.80
138de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento 1/2" 26 21.35 1 555.10 5/8" 4 21.35 1 85.40 1/2" 14 21.35 1 298.90 1/2" 10 21.35 1 213.50 1/2" 10 21.35 1 213.50 1/2" 10 21.35 1 213.50 1/2" 22 21.35 1 469.70 1/2" 10 21.35 3 640.50 1/2" 10 21.35 1 213.50 1/2" 16 21.35 1 341.60 1/2" 12 21.35 1 256.20 1/2" 4 21.35 4 341.60
Horizontales 3/8" 182 6.35 2 2,311.40 3/8" 182 1.95 3 1,064.70 3/8" 182 7.90 1 1,437.80 3/8" 182 5.70 1 1,037.40 3/8" 182 1.60 1 291.20 3/8" 182 1.25 1 227.50 3/8" 182 1.05 1 191.10 3/8" 182 1.30 1 236.60
Estribos en todos los niveles 3/8" 91 1.00 27 2,457.00 PLACAS ESCALERAS 4 Y 5
Area Perimetro PLACA DE NIVEL -3.15 A NIVEL +19.5 1 12.76 23.25 296.67 1 129.41 23.25 3008.78 Verticales nudos 3/4" 168 26.55 1 4,460.40
1 7.60 23.25 176.70 1 80.80 23.25 1878.60 5/8" 140 26.55 1 3,717.00 Verticales 1/2" 46 26.55 1 1,221.30
1/2" 56 26.55 1 1,486.80 5/8" 16 26.55 4 1,699.20 1/2" 26 26.55 3 2,070.90 1/2" 10 26.55 9 2,389.50 1/2" 12 26.55 2 637.20 1/2" 16 26.55 4 1,699.20 1/2" 12 26.55 5 1,593.00 1/2" 18 26.55 2 955.80 1/2" 22 26.55 3 1,752.30 1/2" 8 26.55 8 1,699.20 1/2" 6 26.55 2 318.60
Horizontales 3/8" 234 17.55 1 4,106.70 3/8" 234 6.35 6 8,915.40 3/8" 234 8.95 1 2,094.30 3/8" 234 5.70 1 1,333.80 3/8" 234 4.00 1 936.00 3/8" 234 1.25 1 292.50 3/8" 234 5.00 1 1,170.00 3/8" 234 5.70 1 1,333.80 3/8" 234 1.95 6 2,737.80 3/8" 234 1.45 2 678.60 3/8" 234 1.25 2 585.00 3/8" 234 2.00 1 468.00 3/8" 234 2.20 1 514.80 3/8" 234 2.05 1 479.70 3/8" 234 1.80 2 842.40 3/8" 234 1.60 2 748.80
Estribos en todos los niveles 3/8" 117 1.00 95 11,115.00 PLACAS ESCALERA 6
Area Perimetro PLACA DE NIVEL -3.15 A NIVEL +14.30 1 6.05 18.05 109.20 1 62.80 18.05 1133.54 Verticales nudos 3/4" 44 21.35 1 939.40
5/8" 52 21.35 1 1,110.20 Verticales 1/2" 28 21.35 1 597.80
1/2" 26 21.35 1 555.10 5/8" 4 21.35 1 85.40 1/2" 14 21.35 1 298.90 1/2" 10 21.35 1 213.50 1/2" 10 21.35 1 213.50
139de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento 1/2" 10 21.35 1 213.50 1/2" 22 21.35 1 469.70 1/2" 10 21.35 3 640.50 1/2" 10 21.35 1 213.50 1/2" 16 21.35 1 341.60 1/2" 12 21.35 1 256.20 1/2" 4 21.35 4 341.60
Horizontales 3/8" 182 6.35 2 2,311.40 3/8" 182 1.95 3 1,064.70 3/8" 182 7.90 1 1,437.80 3/8" 182 5.70 1 1,037.40 3/8" 182 1.60 1 291.20 3/8" 182 1.25 1 227.50 3/8" 182 1.05 1 191.10 3/8" 182 1.30 1 236.60
Estribos en todos los niveles 3/8" 91 1.00 27 2,457.00 PLACAS ESCALERA 7
Area Perimetro PLACA DE NIVEL +1.45 A NIVEL +14.30 1 6.05 13.45 81.37 1 62.80 13.45 844.66 Verticales nudos 3/4" 44 16.75 1 737.00
5/8" 52 16.75 1 871.00 Verticales 1/2" 28 16.75 1 469.00
1/2" 26 16.75 1 435.50 5/8" 4 16.75 1 67.00 1/2" 14 16.75 1 234.50 1/2" 10 16.75 1 167.50 1/2" 10 16.75 1 167.50 1/2" 10 16.75 1 167.50 1/2" 22 16.75 1 368.50 1/2" 10 16.75 3 502.50 1/2" 10 16.75 1 167.50 1/2" 16 16.75 1 268.00 1/2" 12 16.75 1 201.00 1/2" 4 16.75 4 268.00
Horizontales 3/8" 136 6.35 2 1,727.20 3/8" 136 1.95 3 795.60 3/8" 136 7.90 1 1,074.40 3/8" 136 5.70 1 775.20 3/8" 136 1.60 1 217.60 3/8" 136 1.25 1 170.00 3/8" 136 1.05 1 142.80 3/8" 136 1.30 1 176.80
Estribos en todos los niveles 3/8" 68 1.00 27 1,836.00 PLACAS ESCALERA 9
Perimetro PLACA DE NIVEL -3.10 A NIVEL +8.95 1 1.70 0.30 12.8 6.53 1 1.70 0.30 12.80 6.53 Verticales 5/8" 20 13.28 1 265.50
Verticales 5/8" 48 1.05 1 50.40 Verticales 1/2" 10 13.28 1 132.75
Horizontales 3/8" 48 3.68 1 176.64 Horizontales 3/8" 58 2.40 1 139.20 Horiz. Tipo C 3/8" 48 7.90 1 379.20
PLACAS ASCENSOR SECTOR A
Area Perimetro PLACA DE NIVEL +0.70 A NIVEL +14.30 1 1.62 17.2 27.86 1 16.50 17.20 283.80 Verticales nudos 3/4" 22 20.50 1 451.00
Verticales 1/2" 16 20.50 1 328.00 1/2" 18 20.50 1 369.00 1/2" 20 20.50 1 410.00
Horizontales 3/8" 172 3.20 2 1,100.80 3/8" 172 3.00 1 516.00
Estribos en todos los niveles 3/8" 86 1.00 5 430.00 3/8" 86 1.30 1 111.80 3/8" 86 0.60 1 51.60
M3 2,075.65 M2 18,347.91 ML - 138,381.98 65,527.58 37,925.54 22,843.73 9,864.20
KG - 77,493.91 64,872.30 58,784.59 50,256.20 39,160.87 290,567.87
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
2,075.65 18,347.91 77,493.91 64,872.30 58,784.59 50,256.20 39,160.87 290,567.87
140de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
02.03.05 MUROS DE CONTENCION
02.03.05.01 MUROS DE CONTENCION CONCRETO F`C = 280 KG/CM2
02.03.05.02 MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO
02.03.05.03 MUROS DE CONTENCION ACERO DE REFUERZO Fy=4200 kg/cm2
M-1 ENTRE EJE 30 y 31
BASE 1 32.35 8.50 0.90 247.48 1 32.35 2 0.90 58.23 Longitud. Inferior 5/8" 44 36.55 1 1,608.20
Transver. Inferior 1" 109 9.70 1 1,057.30
Transver. Inf. Adic. 1" 109 3.00 1 327.00
Longitud. Superior 5/8" 44 36.55 1 1,608.20
Transver. Superior 1" 109 9.70 1 1,057.30
Transver. Sup. Adic. 1" 109 3.00 1 327.00
TALON 1 32.35 0.70 1.20 27.17 1 32.35 2 1.20 77.64 Verticales 3/4" 130 11.60 1 1,508.00
Verticales 1" 144 11.60 1 1,670.40
Horizontales 5/8" 12 36.55 1 438.60
MURO 1 32.35 0.50 8.05 130.21 1 32.35 2 8.05 520.84 Verticales 1" 144 6.10 1 878.40
Verticales 1" 144 3.80 1 547.20
Horizontales 5/8" 66 36.55 1 2,412.30
M-2 ENTRE EJE 30 y 31
BASE 1 18.62 8.50 0.90 142.44 1 18.62 2 0.90 33.52 Longitud. Inferior 5/8" 44 21.82 1 960.08
Transver. Inferior 1" 64 9.70 1 620.80
Transver. Inf. Adic. 1" 64 3.00 1 192.00
Longitud. Superior 5/8" 44 21.82 1 960.08
Transver. Superior 1" 64 9.70 1 620.80
Transver. Sup. Adic. 1" 64 3.00 1 192.00
TALON 1 18.62 0.70 1.20 15.64 1 18.62 2 1.20 44.69 Verticales 3/4" 75 11.60 1 870.00
Verticales 1" 83 11.60 1 962.80
Horizontales 5/8" 12 21.82 1 261.84
MURO 1 18.62 0.50 8.05 74.95 1 18.62 2 8.05 299.78 Verticales 1" 83 6.10 1 506.30
Verticales 1" 83 3.80 1 315.40
Horizontales 5/8" 66 21.82 1 1,440.12
M-3" ENTRE EJE 30 y 31
BASE 1 8.30 7.50 0.90 56.03 1 8.30 2 0.90 14.94 Longitud. Inferior 5/8" 39 9.50 1 370.50
Transver. Inferior 3/4" 38 8.70 1 330.60
Transver. Inf. Adic. 3/4" 38 3.00 1 114.00
Longitud. Superior 5/8" 39 9.50 1 370.50
Transver. Superior 3/4" 38 8.70 1 330.60
Transver. Sup. Adic. 3/4" 38 3.00 1 114.00
TALON 1 8.30 0.70 1.00 5.81 1 8.30 2 1.00 16.60 Verticales 3/4" 28 10.70 1 299.60
Verticales 1" 24 10.70 1 256.80
Horizontales 5/8" 10 9.50 1 95.00
MURO 1 8.30 0.52 7.35 31.42 1 8.30 2 7.35 122.01 Verticales 1" 24 6.10 1 146.40
141de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Verticales 1" 24 3.80 1 91.20
Horizontales 5/8" 62 9.50 1 589.00
M-3 ENTRE EJE G-H
BASE 1 12.55 7.50 0.90 84.71 1 12.55 2 0.90 22.59 Longitud. Inferior 5/8" 39 14.75 1 575.25
Transver. Inferior 3/4" 57 8.70 1 495.90
Transver. Inf. Adic. 3/4" 57 3.00 1 171.00
Longitud. Superior 5/8" 39 14.75 1 575.25
Transver. Superior 3/4" 57 8.70 1 495.90
Transver. Sup. Adic. 3/4" 57 3.00 1 171.00
TALON 1 12.55 0.70 1.00 8.79 1 12.55 2 1.00 25.10 Verticales 3/4" 42 10.70 1 449.40
Verticales 1" 36 10.70 1 385.20
Horizontales 5/8" 10 14.75 1 147.50
MURO 1 12.55 0.52 7.35 47.50 1 12.55 2 7.35 184.49 Verticales 1" 36 6.10 1 219.60
Verticales 1" 36 3.80 1 136.80
Horizontales 5/8" 62 14.75 1 914.50
M-4 ENTRE EJE G-H
BASE 1 5.30 7.50 0.90 35.78 1 5.30 2 0.90 9.54 Longitud. Inferior 5/8" 39 6.50 1 253.50
Transver. Inferior 3/4" 25 8.70 1 217.50
Transver. Inf. Adic. 3/4" 25 3.00 1 75.00
Longitud. Superior 5/8" 39 6.50 1 253.50
Transver. Superior 3/4" 25 8.70 1 217.50
Transver. Sup. Adic. 3/4" 25 3.00 1 75.00
TALON 1 5.30 0.70 1.00 3.71 1 5.30 2 1.00 10.60 Verticales 3/4" 18 10.70 1 192.60
Verticales 1" 16 10.70 1 171.20
Horizontales 5/8" 10 6.50 1 65.00
MURO 1 5.30 0.52 7.35 20.06 1 5.30 2 7.35 77.91 Verticales 1" 16 6.10 1 97.60
Verticales 1" 16 3.80 1 60.80
Horizontales 5/8" 62 6.50 1 403.00
M-5 EJE 27 ENTRE G Y H area
TALON 1 7.70 0.22 1.00 1.69 1 7.70 2 1.00 15.40 Verticales 3/4" 31 8.75 1 271.25
Verticales 1" 26 8.75 1 227.50
MURO 1 7.70 0.46 7.60 27.21 1 7.70 2 7.60 117.04 Verticales 1" 26 7.30 1 189.80
Verticales 1" 26 4.95 1 128.70
Horizontales 5/8" 64 8.90 1 569.60
M-6 EJE 27 ENTRE G Y H area
MURO 1 5.75 0.42 7.60 18.14 1 5.75 2 7.60 87.40 Verticales 3/4" 20 8.75 1 175.00
Verticales 3/4" 20 8.75 1 175.00
Verticales adic. 3/4" 20 2.95 1 59.00
Verticales adic. 3/4" 20 2.40 1 48.00
Verticales adic. 3/4" 20 4.10 1 82.00
Horizontales 5/8" 52 6.95 1 361.40
M-7 EN EJE I ENTRE 25-27
MURO 1 12.90 0.40 7.60 39.22 1 12.90 2 7.60 196.08 Verticales inter. 3/4" 43.00 8.60 1 369.80
Verticales ext. 3/4" 43.00 8.60 1 369.80
Refuerzos Vert. Superior 3/4" 54.00 4.35 1 234.90
Refuerzos Vert. Medio 3/4" 43.00 2.95 1 126.85
142de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Refuerzos Vert. Inferior 3/4" 43.00 2.50 1 107.50
Horizontales 5/8" 50.00 13.30 1 665.00
M-7' EN EJE 24 ENTRE I & J
BASE 1 6.00 3.60 0.80 17.28 1 6.00 2 0.80 9.60 Longitud. Inferior 5/8" 16 7.20 1 115.20
1 3.60 1 0.80 2.88 Transver. Inferior 5/8" 25 4.80 1 120.00
Longitud. Superior 1/2" 16 7.20 1 115.20
Transver. Superior 1/2" 25 4.80 1 120.00
MURO 1 6.00 0.40 7.35 17.64 1 6.00 2 7.35 88.20 Verticales inter. 3/4" 20.00 8.65 1 173.00
Verticales ext. 3/4" 20.00 8.65 1 173.00
Refuerzos Vert. Superior 3/4" 25.00 4.50 1 112.50
Refuerzos Vert. Medio 3/4" 20.00 2.56 1 51.20
Refuerzos Vert. Inferior 3/4" 20.00 2.30 1 46.00
Horizontales 5/8" 50.00 6.50 1 325.00
M-09 EN EJE 23 ENTRE H-I
MURO 1 5.75 0.30 5.35 9.23 1 5.75 2 5.35 61.53 Verticales inter. 3/4" 19.00 6.40 1 121.60
Verticales ext. 3/4" 19.00 6.40 1 121.60
Ref. Vertical 3/4" 19.00 3.60 1 68.40
Horizontales 1/2" 62.00 6.15 1 381.30
M-09 EN EJE I ENTRE 23-24
MURO 1 7.55 0.30 5.35 12.12 1 7.55 2 5.35 80.79 Verticales inter. 3/4" 25.00 6.40 1 160.00
Verticales ext. 3/4" 25.00 6.40 1 160.00
Ref. Vertical 3/4" 25.00 3.60 1 90.00
Horizontales 1/2" 62.00 7.95 1 492.90
MUROS EN PLATEA
M-10 EN EJE 8 ENTRE EJES B-F
MURO EN SECTOR B 1 6.20 0.30 5.35 9.95 1 6.20 2 5.35 66.34 Verticales inter. 3/4" 22.00 6.40 1 140.80
Verticales ext. 3/4" 22.00 6.40 1 140.80
Refuerzos Vert. Superior 3/4" 11.00 2.00 1 22.00
Refuerzos Vert. Medio 3/4" 22.00 3.00 1 66.00
Refuerzos Vert. Inferior 3/4" 22.00 3.40 1 74.80
1 4.70 0.30 5.35 7.54 1 4.70 2 5.35 50.29 Verticales inter. 3/4" 17.00 6.40 1 108.80
Verticales ext. 3/4" 17.00 6.40 1 108.80
Refuerzos Vert. Superior 3/4" 9.00 2.00 1 18.00
Refuerzos Vert. Medio 3/4" 17.00 3.00 1 51.00
Refuerzos Vert. Inferior 3/4" 17.00 3.40 1 57.80
1 6.90 0.30 5.35 11.07 1 6.90 2 5.35 73.83 Verticales inter. 3/4" 24.00 6.40 1 153.60
Verticales ext. 3/4" 24.00 6.40 1 153.60
Refuerzos Vert. Superior 3/4" 13.00 2.00 1 26.00
Refuerzos Vert. Medio 3/4" 24.00 3.00 1 72.00
Refuerzos Vert. Inferior 3/4" 24.00 3.40 1 81.60
1 6.60 0.30 5.35 10.59 1 6.60 2 5.35 70.62 Verticales inter. 3/4" 23.00 6.40 1 147.20
Verticales ext. 3/4" 23.00 6.40 1 147.20
Refuerzos Vert. Superior 3/4" 12.00 2.00 1 24.00
Refuerzos Vert. Medio 3/4" 23.00 3.00 1 69.00
143de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Refuerzos Vert. Inferior 3/4" 23.00 3.40 1 78.20
Horizontales 5/8" 36.00 29.60 1 1,065.60
M-10 EN EJE F ENTRE EJES 8-12
MURO 2 6.90 0.30 5.35 22.15 2 6.90 2 5.35 147.66 Verticales inter. 3/4" 24.00 6.40 1 153.60
Verticales ext. 3/4" 24.00 6.40 1 153.60
Refuerzos Vert. Superior 3/4" 13.00 2.00 1 26.00
Refuerzos Vert. Medio 3/4" 24.00 3.00 1 72.00
Refuerzos Vert. Inferior 3/4" 24.00 3.40 1 81.60
2 4.85 0.30 5.35 15.57 2 4.85 2 5.35 103.79 Verticales inter. 3/4" 17.00 6.40 1 108.80
Verticales ext. 3/4" 17.00 6.40 1 108.80
Refuerzos Vert. Superior 3/4" 9.00 2.00 1 18.00
Refuerzos Vert. Medio 3/4" 17.00 3.00 1 51.00
Refuerzos Vert. Inferior 3/4" 17.00 3.40 1 57.80
Horizontales 5/8" 36.00 29.60 1 1,065.60
M-10 EN EJE 12 ENTRE EJES F-G
MURO 1 6.90 0.30 5.35 11.07 1 6.90 2 5.35 73.83 Verticales inter. 3/4" 24.00 6.40 1 153.60
Verticales ext. 3/4" 24.00 6.40 1 153.60
Refuerzos Vert. Superior 3/4" 13.00 2.00 1 26.00
Refuerzos Vert. Medio 3/4" 24.00 3.00 1 72.00
Refuerzos Vert. Inferior 3/4" 24.00 3.40 1 81.60
Horizontales 5/8" 36.00 8.00 1 288.00
M-10 EN EJE G ENTRE EJES 13-14
MURO 1 3.60 0.30 5.35 5.78 1 3.60 2 5.35 38.52 Verticales inter. 3/4" 13.00 6.40 1 83.20
Verticales ext. 3/4" 13.00 6.40 1 83.20
Refuerzos Vert. Superior 3/4" 7.00 2.00 1 14.00
Refuerzos Vert. Medio 3/4" 13.00 3.00 1 39.00
Refuerzos Vert. Inferior 3/4" 13.00 3.40 1 44.20
Horizontales 5/8" 36.00 4.40 1 158.40
M-10 ENTRE EJES F-G y 13-14
MURO 1 7.20 0.30 5.35 11.56 1 7.20 2 5.35 77.04 Verticales inter. 3/4" 25.00 6.40 1 160.00
Verticales ext. 3/4" 25.00 6.40 1 160.00
Refuerzos Vert. Superior 3/4" 13.00 2.00 1 26.00
Refuerzos Vert. Medio 3/4" 25.00 3.00 1 75.00
Refuerzos Vert. Inferior 3/4" 25.00 3.40 1 85.00
Horizontales 5/8" 36.00 8.00 1 288.00
M-10 EN EJE H ENTRE 13-15
MURO 1 2.95 0.30 5.35 4.73 1 2.95 2 5.35 31.57 Verticales inter. 3/4" 11.00 6.40 1 70.40
Verticales ext. 3/4" 11.00 6.40 1 70.40
Refuerzos Vert. Superior 3/4" 6.00 2.00 1 12.00
Refuerzos Vert. Medio 3/4" 11.00 3.00 1 33.00
Refuerzos Vert. Inferior 3/4" 11.00 3.40 1 37.40
1 6.55 0.30 5.35 10.51 1 6.55 2 5.35 70.09 Verticales inter. 3/4" 23.00 6.40 1 147.20
Verticales ext. 3/4" 23.00 6.40 1 147.20
Refuerzos Vert. Superior 3/4" 12.00 2.00 1 24.00
144de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Refuerzos Vert. Medio 3/4" 23.00 3.00 1 69.00
Refuerzos Vert. Inferior 3/4" 23.00 3.40 1 78.20
Horizontales 5/8" 36.00 11.50 1 414.00
M-10 EN EJE H ENTRE 15-17
MURO 1 28.30 0.30 5.35 45.42 1 28.30 2 5.35 302.81 Verticales inter. 3/4" 95.00 6.40 1 608.00
Verticales ext. 3/4" 95.00 6.40 1 608.00
Refuerzos Vert. Superior 3/4" 48.00 2.00 1 96.00
Refuerzos Vert. Medio 3/4" 95.00 3.00 1 285.00
Refuerzos Vert. Inferior 3/4" 95.00 3.40 1 323.00
M-10 EN EJE H ENTRE 17-18
MURO 1 6.55 0.30 5.35 10.51 1 6.55 2 5.35 70.09 Verticales inter. 3/4" 23.00 6.40 1 147.20
Verticales ext. 3/4" 23.00 6.40 1 147.20
Refuerzos Vert. Superior 3/4" 12.00 2.00 1 24.00
Refuerzos Vert. Medio 3/4" 23.00 3.00 1 69.00
Refuerzos Vert. Inferior 3/4" 23.00 3.40 1 78.20
Horizontales 5/8" 36.00 7.90 1 284.40
M-10 EN EJE 18 ENTRE H-G
MURO 1 4.65 0.30 5.35 7.46 1 4.65 2 5.35 49.76 Verticales inter. 3/4" 17.00 6.40 1 108.80
Verticales ext. 3/4" 17.00 6.40 1 108.80
Refuerzos Vert. Superior 3/4" 9.00 2.00 1 18.00
Refuerzos Vert. Medio 3/4" 17.00 3.00 1 51.00
Refuerzos Vert. Inferior 3/4" 17.00 3.40 1 57.80
Horizontales 5/8" 36.00 5.45 1 196.20
M-10 ENTRE EJES H-G y 18-22
MURO 1 21.95 0.30 5.35 35.23 1 21.95 2 5.35 234.86 Verticales inter. 3/4" 74.00 6.40 1 473.60
Verticales ext. 3/4" 74.00 6.40 1 473.60
Refuerzos Vert. Superior 3/4" 38.00 2.00 1 76.00
Refuerzos Vert. Medio 3/4" 74.00 3.00 1 222.00
Refuerzos Vert. Inferior 3/4" 74.00 3.40 1 251.60
Horizontales 5/8" 36.00 22.75 1 819.00
M-10 EN EJE 22 ENTRE H-G
MURO 1 4.65 0.30 5.35 7.46 1 4.65 2 5.35 49.76 Verticales inter. 3/4" 17.00 6.40 1 108.80
Verticales ext. 3/4" 17.00 6.40 1 108.80
Refuerzos Vert. Superior 3/4" 9.00 2.00 1 18.00
Refuerzos Vert. Medio 3/4" 17.00 3.00 1 51.00
Refuerzos Vert. Inferior 3/4" 17.00 3.40 1 57.80
Horizontales 5/8" 36.00 5.45 1 196.20
M-10 EN EJE H ENTRE 22-23
MURO 1 6.30 0.30 5.35 10.11 1 6.30 2 5.35 67.41 Verticales inter. 3/4" 22.00 6.40 1 140.80
Verticales ext. 3/4" 22.00 6.40 1 140.80
Refuerzos Vert. Superior 3/4" 12.00 2.00 1 24.00
Refuerzos Vert. Medio 3/4" 22.00 3.00 1 66.00
Refuerzos Vert. Inferior 3/4" 22.00 3.40 1 74.80
145de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Horizontales 5/8" 36.00 5.45 1 196.20
M-12 EN EJE B ENTRE EJES 7-8
BASE 1 8.28 5.30 0.80 35.11 1 8.28 2 0.80 13.25 Longitud. Inferior 5/8" 28 9.48 1 265.44
1 5.30 2 0.80 8.48 Transver. Inferior 3/4" 29 6.50 1 188.50
Longitud. Superior 5/8" 28 9.48 1 265.44
Transver. Superior 3/4" 29 6.50 1 188.50
Ref. Horizontales 3/4" 14 1.95 1 27.30
MURO 1 6.70 0.35 5.10 11.96 1 6.70 2 5.10 68.34 Verticales inter. 1" 21 6.20 1 130.20
Refuerzo Vertical 1" 21 4.00 1 84.00
Refuerzo Vertical 1" 21 2.90 1 60.90
Verticales ext. 3/4" 24 8.90 1 213.60
Horizontales 1/2" 42 7.30 1 306.60
TALON 1 6.70 0.60 0.80 3.22 1 6.70 2 0.80 10.72 Horizontales 5/8" 6 7.50 1 45.00
M-13 EN EJE 7 ENTRE EJES A-B
BASE 1 5.55 3.60 0.60 11.99 1 5.55 2 0.60 6.66 Longitud. Inferior 5/8" 16 6.35 1 101.60
Transver. Inferior 5/8" 24 4.40 1 105.60
Longitud. Superior 5/8" 16 6.35 1 101.60
Transver. Superior 5/8" 29 4.40 1 127.60
MURO 1 6.30 0.30 4.45 8.41 1 6.30 2 4.45 56.07 Verticales inter. 3/4" 27 6.45 1 174.15
Verticales ext. 3/4" 27 6.40 1 172.80
Ref. Verticales 3/4" 27 2.55 1 68.85
Horizontales 1/2" 36 6.90 1 248.40
TALON 1 6.30 0.40 0.80 2.02 1 6.30 2 0.80 10.08 Horizontales 1/2" 6 6.90 1 41.40
M-14A ENTRE EJES A-B y 3-4
BASE 1 12.05 3.80 0.60 27.47 1 12.05 2 0.60 14.46 Longitud. Inferior 5/8" 17 13.85 1 235.45
1 3.80 2 0.60 4.56 Transver. Inferior 5/8" 50 4.60 1 230.00
Longitud. Superior 5/8" 17 13.85 1 235.45
Transver. Superior 3/4" 36 4.60 1 165.60
MURO 1 10.55 0.30 3.95 12.50 1 10.55 2 3.95 83.35 Verticales 3/4" 44 5.05 1 222.20
Verticales 1/2" 44 5.05 1 222.20
Ref. Verticales 3/4" 43 2.40 1 103.20
Horizontales 3/4" 32 1.85 1 59.20
Horizontales 1/2" 32 10.95 1 350.40
M-14A EN EJE 4 ENTRE EJES A-B
BASE 1 0.75 1.65 0.60 0.74 1 0.75 2 0.60 0.90 Longitud. Inferior 5/8" 8 1.55 1 12.40
Transver. Inferior 5/8" 4 2.45 1 9.80
Longitud. Superior 5/8" 8 3.55 1 28.40
Transver. Superior 3/4" 4 2.45 1 9.80
MURO 1 2.30 0.30 3.95 2.73 1 2.30 2 3.95 18.17 Verticales 3/4" 11 5.05 1 55.55
Verticales 1/2" 11 5.05 1 55.55
Ref. Verticales 3/4" 11 2.40 1 26.40
Horizontales 3/4" 8 1.85 1 14.80
Horizontales 1/2" 32 2.70 1 86.40
M-14 EN EJE A ENTRE EJES 4-7
BASE 1 19.95 3.30 0.60 39.50 1 19.95 2 0.60 23.94 Longitud. Inferior 5/8" 15 22.75 1 341.25
146de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
1 3.30 1 0.60 1.98 Transver. Inferior 5/8" 81 4.10 1 332.10
Longitud. Superior 5/8" 15 22.75 1 341.25
Transver. Superior 5/8" 81 4.10 1 332.10
MURO 1 21.90 0.30 3.95 25.95 1 21.90 2 3.95 173.01 Verticales inter. 3/4" 74 5.90 1 436.60
Verticales ext. 1/2" 89 5.95 1 529.55
Ref. Verticales 3/4" 74 2.75 1 203.50
Horizontales 1/2" 32 23.40 1 748.80
TALON 1 21.90 0.40 0.80 7.01 1 21.90 2 0.80 35.04 Horizontales 1/2" 6 23.40 1 140.40
M-15 EN INGRESO
BASE 1 21.90 2.35 0.60 30.88 1 21.90 2 0.60 26.28 Longitud. Inferior 5/8" 11 24.70 1 271.70
1 2.35 2 0.60 2.82 Transver. Inferior 5/8" 89 3.15 1 280.35
Longitud. Superior 5/8" 11 24.70 1 271.70
Transver. Superior 5/8" 89 3.15 1 280.35
MURO 1 21.90 0.20 2.45 10.73 1 21.90 2 2.45 107.31 Verticales 1/2" 73 4.73 1 345.29
Verticales 5/8" 110 3.75 1 412.50
Horizontales 3/8" 18 24.30 1 437.40
TALON 1 21.90 0.40 0.40 3.50 1 21.90 2 0.40 17.52 Horizontales 1/2" 4 24.30 1 97.20
M-16 EN EJE A - ENTRADA
BASE 1 30.17 2.50 0.60 45.25 1 30.17 2 0.60 36.20 Longitud. Inferior 5/8" 11 34.97 1 384.67
Transver. Inferior 5/8" 122 3.30 1 402.60
Longitud. Superior 5/8" 11 34.97 1 384.67
Transver. Superior 5/8" 122 3.30 1 402.60
TALON 1 30.17 0.50 0.80 12.07 1 30.17 2 0.80 48.27 Vertical(Muro Talon) 5/8" 101 5.85 1 590.85
Longitudinal caras 5/8" 6 34.97 1 209.82
MURO 1 30.17 0.30 2.35 21.27 1 30.17 2 2.35 141.80 Verticales 1/2" 121 3.45 1 417.45
Longitudinal caras 1/2" 16 6.55 1 104.80
LATERALES 2 CARAS Area= 1 2.21 2 1.00 4.41
M-17 EN EJE A en 3-5
BASE 1 19.32 3.80 0.60 44.05 1 19.32 2 0.60 23.18 Longitud. Inferior 5/8" 17 23.12 1 393.04
Transver. Inferior 5/8" 98 4.60 1 450.80
Longitud. Superior 5/8" 17 23.12 1 393.04
Transver. Superior 5/8" 79 4.60 1 363.40
TALON 1 19.32 0.60 1.00 11.59 1 19.32 2 1.00 38.64 Long. Espalda 5/8" 5 23.12 1 115.60
Long. Frente 5/8" 5 23.12 1 115.60
MURO 1 19.32 0.51 3.60 35.51 1 19.32 2 3.60 139.10 Verticales espalda 3/4" 65 5.60 1 364.00
Verticales frente 3/4" 97 5.70 1 552.90
Long. Espalda 5/8" 30 23.12 1 693.60
Long. Frente 5/8" 30 23.12 1 693.60
Lateral 2 caras Area= 1 4.12 2 1.00 8.25
M 18 EN EJE A en 6 y 8
BASE 1 18.95 4.70 0.80 71.25 1 18.95 2 0.80 30.32 Longitud. Inferior 5/8" 25 22.75 1 568.75
Transver. Inferior 5/8" 69 5.50 1 379.50
Trans. Ref. Inferior 5/8" 69 1.65 1 113.85
Longitud. Superior 5/8" 25 22.75 1 568.75
147de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Transver. Superior 5/8" 96 5.50 1 528.00
TALON 1 18.95 0.80 1.40 21.22 1 18.95 2 1.40 53.06 Vertical frente 3/4" 95 2.61 1 247.95
Vert Ref. espalda 3/4" 64 4.70 1 300.80
Long. Frente 5/8" 7 22.75 1 159.25
Long. Frente 5/8" 7 22.75 1 159.25
MURO 1 18.95 0.49 4.60 42.28 1 18.95 2 4.60 174.34 Verticales espalda 3/4" 64 7.35 1 470.40
Verticales frente 3/4" 64 5.75 1 368.00
Long. Espalda 5/8" 19 22.75 1 432.25
Long. Frente 5/8" 19 22.75 1 432.25
Lateral 2 caras Area= 1 6.00 2 1.00 12.00
M-19 EN EJE A en 8 y 12
BASE 1 28.43 5.40 0.80 122.82 1 28.43 2 0.80 45.49 Longitud. Inferior 5/8" 28 33.23 1 930.44
Transver. Inferior 5/8" 144 6.20 1 892.80
Trans. Ref. Inferior 5/8" 144 2.75 1 396.00
Longitud. Superior 5/8" 28 33.23 1 930.44
Transver. Superior 5/8" 144 6.20 1 892.80
TALON 1 28.43 1.00 1.60 45.49 1 28.43 2 1.60 90.98 Vertical frente 3/4" 143 2.80 1 400.40
Vert Ref. espalda 3/4" 143 4.90 1 700.70
Long. Frente 5/8" 8 33.23 1 265.84
Long. Frente 5/8" 8 33.23 1 265.84
MURO 1 28.43 0.47 5.20 69.48 1 28.43 2 5.20 295.67 Verticales espalda 3/4" 143 8.12 1 1,161.16
Verticales frente 3/4" 95 6.34 1 602.30
Long. Espalda 5/8" 21 33.23 1 697.83
Long. Frente 5/8" 23 33.23 1 764.29
Lateral 2 caras Area= 1 6.80 2 1.00 13.60
M-20 EN EJE A en 13 y 17
BASE 1 28.43 5.90 0.80 134.19 1 28.43 2 0.80 45.49 Longitud. Inferior 5/8" 31 33.23 1 1,030.13
Transver. Inferior 3/4" 144 6.70 1 964.80
Trans. Ref. Inferior 3/4" 144 3.25 1 468.00
Longitud. Superior 5/8" 31 33.23 1 1,030.13
Transver. Superior 5/8" 144 6.70 1 964.80
TALON 1 28.43 1.20 2.00 68.23 1 28.43 2 2.00 113.72 Vertical frente 3/4" 143 3.20 1 457.60
Vert Ref. espalda 1 3/4" 95 4.90 1 465.50
Vert Ref. espalda 2 3/4" 95 6.40 1 608.00
Long. Espalda 5/8" 10 33.23 1 332.30
Long. Frente 5/8" 10 33.23 1 332.30
MURO 1 28.43 0.46 5.80 76.51 1 28.43 2 5.80 329.79 Verticales espalda 3/4" 143 10.70 1 1,530.10
Verticales frente 3/4" 95 6.95 1 660.25
Long. Espalda T1 5/8" 14 33.23 1 465.22
Long. Frente T1 5/8" 14 33.23 1 465.22
Long. Espalda T2 5/8" 8 33.23 1 265.84
Long. Frente T2 5/8" 8 33.23 1 265.84
Lateral 2 caras Area= 1 7.45 2 1.00 14.90
M-21 EN EJE A en 17 y 23
BASE 1 37.90 6.80 0.80 206.18 1 37.90 2 0.80 60.64 Longitud. Inferior 5/8" 26 43.70 1 1,136.20
Transver. Inferior 1" 128 7.60 1 972.80
1 empalme
148de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Trans. Ref. Inferior 1" 137 4.10 1 561.70
Longitud. Superior 5/8" 35 43.70 1 1,529.50
Transver. Superior 5/8" 191 7.60 1 1,451.60
TALON 1 37.90 1.20 2.20 100.06 1 37.90 2 2.20 166.76 Vertical frente 3/4" 190 3.40 1 646.00
Vert Ref. espalda 1 3/4" 169 5.15 1 870.35
149de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTAL
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Long-Perim Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"Elemento
Vert Ref. espalda 2 3/4" 169 6.60 1 1,115.40
Long. Espalda 5/8" 11 43.70 1 480.70
Long. Frente 5/8" 11 43.70 1 480.70
MURO 1 37.90 0.46 5.80 100.35 1 37.90 2 5.80 439.64 Verticales espalda 3/4" 169 10.86 1 1,835.34
Verticales frente 3/4" 127 7.01 1 890.27
Long. Espalda T1 5/8" 14 43.70 1 611.80
Long. Frente T1 5/8" 14 43.70 1 611.80
Long. Espalda T2 5/8" 10 43.70 1 437.00
Long. Frente T2 5/8" 10 43.70 1 437.00
Lateral 2 caras Area= 1 8.40 2 1.00 16.80
M-22 EN EJE A en 24 y 29
BASE 1 34.87 7.80 0.80 217.59 1 34.87 2 0.80 55.79 Longitud. Inferior 5/8" 40 40.67 1 1,626.80
Transver. Inferior 1" 176 8.60 1 1,513.60
Trans. Ref. Inferior 1" 176 4.10 1 721.60
Longitud. Superior 5/8" 40 40.67 1 1,626.80
Transver. Superior 5/8" 176 8.60 1 1,513.60
TALON 1 34.87 1.40 2.60 126.93 1 34.87 2 2.60 181.32 Vertical frente 3/4" 175 3.80 1 665.00
Vert Ref. espalda 1 1" 130 6.15 1 799.50
Vert Ref. espalda 2 1" 130 7.60 1 988.00
Long. Espalda 5/8" 13 40.67 1 528.71
Long. Frente 5/8" 13 40.67 1 528.71
MURO 1 34.87 0.45 7.00 109.84 1 34.87 2 7.00 488.18 Verticales espalda 1" 130 11.88 1 1,544.40
Verticales frente 3/4" 117 7.61 1 890.37
Long. Espalda T1 5/8" 13 40.67 1 528.71
Long. Frente T1 5/8" 13 40.67 1 528.71
Long. Espalda T2 5/8" 6 40.67 1 244.02
Long. Frente T2 5/8" 6 40.67 1 244.02
Long. Espalda T3 5/8" 10 40.67 1 406.70
Long. Frente T3 5/8" 10 40.67 1 406.70
Lateral 2 caras Area= 1 9.40 2 1.00 18.80
M-24 ENTRE EJE J-N
BASE 1 70.13 2.35 0.60 98.88 1 70.13 2 0.60 84.16 Longitud. Inferior 5/8" 11 77.93 1 857.23
Transver. Inferior 5/8" 282 3.15 1 888.30
Longitud. Superior 5/8" 11 77.93 1 857.23
Transver. Superior 5/8" 282 3.15 1 888.30
TALON 1 70.13 0.40 0.40 11.22 1 70.13 2 0.40 56.10 Verticales 1/2" 234 4.50 1 1,053.00
Horizontales 1/2" 4 78.33 1 313.32
MURO 1 70.13 0.20 2.45 34.36 1 70.13 2 2.45 343.64 Verticales 5/8" 351 3.30 1 1,158.30
Horizontales 3/8" 18 77.53 1 1,395.54
M3 3,371.29 M2 8,009.61 ML - 1,832.94 6,170.16 66,189.74 38,525.34 18,763.00
KG - 1,026.45 6,108.46 102,594.10 84,755.75 74,489.11 268,973.86
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS
3,371.29 8,009.61 1,026.45 6,108.46 102,594.10 84,755.75 74,489.11 268,973.86
1 empalme
1 empalme
150 de 336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE MALLA ELECTROSOLDADA
Descripción
CONCRETO ENCOFRADO
N° Dimensiones Dimensiones
Part. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial
LOSA PARA PISO CON MALLA ELECTROSOLDADA E=15cm
CONCRETO PARA PISO
SECTOR A area
area de piso 1,689.90 0.15 253.49
menos area de columnas y placas -23.00 0.15 -3.45
SECTOR B
B2,B3,B5
area total de platea 4664.40 0.15 699.66
menos TRAGALUZ B2 -57.38 0.15 -8.61
menos TRAGALUZ B3 -21.16 0.15 -3.17
menos TRAGALUZ B5 -57.75 0.15 -8.66
menos area de columnas -32.63 0.15 -4.89
menos area de placas -42.93 0.15 -6.44
menos area de placas escalera -55.03 0.15 -8.25
area de piso en acelerador lineal -240.24 0.15 -36.04
B1 Y B4
area total 1532.83 0.15 229.92
menos area de columnas y placas -24.83 0.15 -3.72
ENCOFRADO PARA PISO
Bloques en Platea 1 50.4 0.75 37.80
Bloque 1 1 44.2 0.75 33.15
Bloque 2 1 44.1 0.75 33.08
Bloque 3 1 35.7 0.75 26.78
Bloque 4 1 25.15 0.75 18.86
Bloque 5 1 24.2 0.75 18.15
Bloque 6 1 36.55 0.75 27.41
Bloque 7, Bloque 8 1 12.35 0.75 9.26
Bloque 9 1 21.35 0.75 16.01
Bloque 10,Bloque 11 1 9.05 0.75 6.79
Bloque A-B1-B4 (friso) 1 526 0.15 78.90
M3 623.59 M2 306.19
% DE DESPERDICIOS 0% 1154.8215
623.59
Descripción
ACERO
N° DimensionesTOTALPart. FORMA D N. Elem Longitud N° Vec.
EJE Elemento
0 MALLA ELECTROSOLDADA densidad
kgxm2
SECTOR A - B malla 4157.29 1.00 1 4157.29
traslapes 0.30m 0.17 706.74
M2 4,864.03
area de influencia
151de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
02.03.06 VIGAS
02.03.06.01 VIGAS CONCRETO F`C = 280 KG/CM2 Superficie
02.03.06.03 VIGAS ENCOFRADO Y DESENCOFRADO de contacto
02.03.06.05 VIGAS ACERO DE REFUERZO Fy=4200 kg/cm2
SECTOR B2
SOTANO
v Eje B - VES-101(.30x2.0)B2 1 14.70 0.30 2.00 6.24 1 14.70 3.80 55.86 Positivos 5/8" 3 16.30 1 48.90
Del 8 al 10 Central 1/2" 10 15.10 1 151.00
Negativos 5/8" 3 16.30 1 48.90
Estribos 1/2" 39 4.80 1 187.20
v Eje C - VES-102(.30x.70)B2 2 14.70 0.30 0.70 6.17 2 14.70 1.20 35.28 Positivos 3/4" 3 16.30 2 97.80
v Eje E - VES-102(.30x.70) B8 5/8" 4 5.70 2 45.60
Central 1/2" 2 15.10 2 60.40
Negativos 3/4" 3 16.30 2 97.80
5/8" 2 1.85 2 7.40
3/4" 3 3.00 2 18.00
5/8" 2 3.60 2 14.40
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 46 2.20 2 202.40
v Eje D - VES-103(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
5/8" 2 5.70 1 11.40
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
3/4" 2 6.40 1 12.80
5/8" 2 6.40 1 12.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 29 2.20 1 63.80
v Eje 9 - VES-104(.30x.70)B2 1 29.40 0.30 0.70 6.17 1 29.40 1.20 35.28 Positivos 5/8" 4 33.00 1 132.00
5/8" 1 5.70 1 5.70
5/8" 4 5.40 1 21.60
Central 1/2" 2 30.60 1 61.20
Negativos 5/8" 4 33.00 1 132.00
5/8" 2 2.45 1 4.90
5/8" 4 3.80 1 15.20
5/8" 4 4.20 1 16.80
5/8" 4 3.80 1 15.20
5/8" 1 2.15 1 2.15
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
v Eje 10 - VES-105(.30x.70)B2 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 5/8" 3 32.70 1 98.10
Central 1/2" 2 30.30 1 60.60
Negativos 5/8" 3 32.70 1 98.10
5/8" 2 3.50 1 7.00
152de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 2 4.85 1 9.70
5/8" 1 3.80 1 3.80
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 45 2.20 1 99.00
v Eje 10 - VES-106(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 1 5.70 1 5.70
1/2" 1 5.40 1 5.40
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 3.90 1 7.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
v Eje 11 - VES-107(.30x.70)B2 1 14.70 0.30 0.70 1.06 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
3/4" 3 2.25 1 6.75
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
3/4" 3 2.25 1 6.75
5/8" 3 2.00 1 6.00
Estribos 3/8" 20 2.20 1 44.00
Estribos 3/8" 17 2.20 1 37.40
v Eje 12 - VES-108(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 2 5.70 1 11.40
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 4.00 1 8.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 11 2.20 1 24.20
v Eje B - VES-109(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 4 2.75 1 11.00
5/8" 2 3.90 1 7.80
3/4" 4 3.35 1 13.40
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 38 2.20 1 83.60
v Eje C - VES-110(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 2 2.15 1 4.30
3/4" 4 3.80 1 15.20
3/4" 2 2.15 1 4.30
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
v Eje D - VES-111(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 4 3.05 1 12.20
153de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 2 3.00 1 6.00
3/4" 4 3.40 1 13.60
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
EN LOSA SOBRE CAMARAS FRIGORIFICAS
VC-01(.15x.25) 2 4.70 0.15 0.25 0.35 2 4.70 0.50 4.70 Positivos 1/2" 4 5.10 2 40.80
Estribos 3/8" 36 1.00 2 72.00
VC-01(.15x.25) 2 3.35 0.15 0.25 0.25 2 3.35 0.50 3.35 Positivos 1/2" 4 4.15 2 33.20
Estribos 3/8" 27 1.00 2 54.00
PRIMER PISO
Eje B - VE-101(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
3/4" 2 2.25 1 4.50
3/4" 2 2.25 1 4.50
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 4 2.65 1 10.60
3/4" 4 4.30 1 17.20
3/4" 2 2.00 1 4.00
3/4" 2 2.00 1 4.00
3/4" 1 20.00 1 20.00
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 34 2.20 1 74.80
Eje C - VE-102(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 4 260.80
Eje E - VE-102(.30x.70)B2 1 14.70 0.30 0.70 1 14.70 1.20 5/8" 2 5.70 4 45.60
Eje F - VE-102(.30x.70)B3 1 14.70 0.30 0.70 1 14.70 1.20 5/8" 2 5.70 4 45.60
Eje H - VE-102(.30x.70)B4 1 14.70 0.30 0.70 1 14.70 1.20 Central 1/2" 2 15.10 4 120.80
Negativos 3/4" 4 16.30 4 260.80
5/8" 2 2.15 4 17.20
3/4" 4 3.50 4 56.00
Estribos 3/8" 46 2.20 4 404.80
Estribos 3/8" 46 2.20 4 404.80
Eje D - VE-103(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
5/8" 1 7.30 1 7.30
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 2 16.30 1 32.60
5/8" 2 2.15 1 4.30
3/4" 4 2.65 1 10.60
3/4" 2 2.25 1 4.50
3/4" 2 1.90 1 3.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 29 2.20 1 63.80
Eje H - VE-104(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
3/4" 4 2.95 1 11.80
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 4 4.30 1 17.20
Estribos 3/8" 9 2.20 1 19.80
Estribos 3/8" 29 2.20 1 63.80
Estribos 3/8" 44 2.20 1 96.80
154de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Eje 10 - VE-108(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 1 5.40 1 5.40
1/2" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 3.80 1 7.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje 11 - VE-111(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
5/8" 3 5.40 1 16.20
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 2.15 1 4.30
5/8" 3 2.80 1 8.40
5/8" 3 1.80 1 5.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 18 2.20 1 39.60
Eje 12 - VE-112(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 1 5.40 1 5.40
1/2" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 3 3.80 1 11.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje 8 - VE-105(.30x.70)B2 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 3 48.10 1 144.30
Central 1/2" 2 45.10 1 90.20
Negativos 3/4" 3 48.10 1 144.30
3/4" 3 5.30 1 15.90
5/8" 1 2.25 1 2.25
3/4" 3 4.20 1 12.60
5/8" 3 3.90 1 11.70
5/8" 3 5.40 1 16.20
5/8" 1 4.50 1 4.50
5/8" 3 3.80 1 11.40
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 43 2.20 1 94.60
Eje 9 - VE-106(.30x.70)B2 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 4 48.10 1 192.40
3/4" 1 5.40 1 5.40
Central 1/2" 2 45.10 1 90.20
Negativos 3/4" 4 48.10 1 192.40
5/8" 2 2.12 1 4.24
3/4" 16 3.80 1 60.80
5/8" 2 3.80 1 7.60
Estribos 3/8" 44 2.20 1 96.80
155de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 44 2.20 1 96.80
Eje 10 - VE-107(.30x.70)B2 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 3 48.10 1 144.30
5/8" 1 3.85 1 3.85
Central 1/2" 2 45.10 1 90.20
Negativos 3/4" 3 48.10 1 144.30
3/4" 2 3.80 1 7.60
3/4" 3 4.85 1 14.55
5/8" 2 2.25 1 4.50
3/4" 3 4.85 1 14.55
3/4" 1 3.80 1 3.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje 10 - VE-109(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 2.15 1 4.30
3/4" 3 3.80 1 11.40
5/8" 2 2.15 1 4.30
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje 11 - VE-110(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
3/4" 2 2.25 1 4.50
5/8" 2 3.50 1 7.00
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 4 2.50 1 10.00
3/4" 2 2.25 1 4.50
3/4" 4 4.50 1 18.00
5/8" 2 3.50 1 7.00
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 41 2.20 1 90.20
Eje 12 - VE-113(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 4 2.16 1 8.64
3/4" 3 3.80 1 11.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 18 2.20 1 39.60
Eje B - VE-114(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 3 15.95 1 47.85
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 3 15.95 1 47.85
156de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 2 2.00 1 4.00
3/4" 3 2.00 1 6.00
5/8" 2 3.90 1 7.80
5/8" 2 2.25 1 4.50
3/4" 3 2.25 1 6.75
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 38 2.20 1 83.60
Eje C - VE-115(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
5/8" 2 2.15 1 4.30
3/4" 4 3.80 1 15.20
5/8" 4 2.15 1 8.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Eje D - VE-116(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
5/8" 4 2.25 1 9.00
5/8" 2 3.10 1 6.20
5/8" 4 2.25 1 9.00
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Eje F - VE-117(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 2 3.20 1 6.40
5/8" 2 2.90 1 5.80
5/8" 2 3.55 1 7.10
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
Eje G - VE-118(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
5/8" 2 5.35 1 10.70
5/8" 2 5.70 1 11.40
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 4 3.50 1 14.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Eje H - VE-119(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 4 3.25 1 13.00
5/8" 4 4.30 1 17.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
SEGUNDO PISO
Eje B - VE-201(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 9.00 1 27.00
157de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 9.00 1 9.00
3/4" 3 7.20 1 21.60
5/8" 2 3.86 1 7.72
5/8" 3 2.25 2 13.50
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 17.50 1 52.50
5/8" 3 3.80 1 11.40
3/4" 3 4.30 1 12.90
3/4" 3 2.25 1 6.75
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 34 2.20 1 74.80
Eje C - VE-202(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 1
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 4 16.30 1 65.20
5/8" 1 5.70 1 5.70
5/8" 2 3.26 1 6.52
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 17.50 1 70.00
5/8" 4 3.25 1 13.00
5/8" 4 4.50 1 18.00
5/8" 2 3.50 1 7.00
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje E - VE-202A(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 Central 1/2" 2 15.10 1 30.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.26 1 6.52
5/8" 2 3.26 1 6.52
Negativos 5/8" 4 18.70 1 74.80
5/8" 4 5.55 1 22.20
5/8" 2 3.50 1 7.00
5/8" 4 5.85 1 23.40
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje D - VE-203(.30x.70)B2 3 14.70 0.30 0.70 9.26 3 14.70 1.20 52.92 Positivos 5/8" 4 16.30 3 195.60
Eje F - VE-203(.30x.70)B2 3 1.20 0.30 0.25 0.27 3 1.20 0.30 5/8" 2 3.26 3 19.56
Eje G - VE-203(.30x.70)B2 Central 1/2" 2 15.10 3 90.60
Negativos 5/8" 4 17.50 3 210.00
5/8" 2 3.49 3 20.94
5/8" 4 4.35 3 52.20
5/8" 4 5.55 3 66.60
Estribos 3/8" 13 1.30 3 50.70
Estribos 3/8" 46 2.20 3 303.60
Estribos 3/8" 46 2.20 3 303.60
Eje H - VE-204(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.86 1 7.72
5/8" 2 2.25 1 4.50
158de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 17.50 1 70.00
5/8" 2 2.25 1 4.50
5/8" 4 4.65 1 18.60
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 9 1.30 1 11.70
Estribos 3/8" 29 2.20 1 63.80
Estribos 3/8" 44 2.20 1 96.80
Eje 10 - VE-208(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
1/2" 1 3.80 1 3.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje 11 - VE-211(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 2 5.40 1 10.80
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
1/2" 1 1.95 1 1.95
1/2" 1 5.80 1 5.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 18 2.20 1 39.60
Eje 12 - VE-212(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 1 3.80 1 3.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje 8 - VE-205(.30x.70)B2 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 3 48.10 1 144.30
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 3 48.10 1 144.30
3/4" 3 5.30 1 15.90
5/8" 3 4.20 1 12.60
5/8" 2 3.80 1 7.60
3/4" 3 5.30 1 15.90
5/8" 2 3.80 1 7.60
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 43 2.20 1 94.60
Eje 9 - VE-206(.30x.70)B2 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
5/8" 4 3.80 1 15.20
5/8" 4 3.80 1 15.20
5/8" 4 3.80 1 15.20
3/4" 4 3.80 1 15.20
159de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 4 3.80 1 15.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 44 2.20 1 96.80
Eje 10 - VE-207(.30x.70)B2 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 3 48.10 1 144.30
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 1 5.40 1 5.40
5/8" 2 2.25 1 4.50
5/8" 2 2.25 1 4.50
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 3 49.30 1 147.90
5/8" 2 3.80 1 7.60
3/4" 3 4.80 1 14.40
5/8" 2 2.25 2 9.00
3/4" 3 4.80 1 14.40
1/2" 1 3.80 1 3.80
5/8" 2 3.20 1 6.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 1.30 1 16.90
Eje 10 - VE-209(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 3.25 1 6.50
5/8" 3 3.80 1 11.40
5/8" 2 3.25 1 6.50
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 1.30 1 16.90
Eje 11 - VE-210(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 2 13.00
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 18.70 1 74.80
5/8" 2 3.25 1 6.50
5/8" 4 3.80 1 15.20
5/8" 2 3.25 1 6.50
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
160de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Eje 12 - VE-213(.30x.70)B2 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 3.25 1 6.50
5/8" 3 3.80 1 11.40
5/8" 2 3.25 1 6.50
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 1.30 1 16.90
Eje B - VE-214(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 4 2.75 1 11.00
5/8" 2 4.30 1 8.60
5/8" 4 3.60 1 14.40
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 38 2.20 1 83.60
Eje C - VE-215(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 2 3.80 1 7.60
5/8" 2 2.15 2 8.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Eje D - VE-216(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 2 3.15 1 6.30
5/8" 2 3.10 1 6.20
5/8" 2 3.50 1 7.00
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Eje F - VE-217(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 3 15.95 1 47.85
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 3 15.95 1 47.85
5/8" 2 3.10 1 6.20
5/8" 2 3.50 2 14.00
Estribos 3/8" 39 2.20 2 171.60
Estribos 3/8" 39 2.20 2 171.60
Eje G - VE-218(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 2 3.50 1 7.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Eje H - VE-219(.30x.70)B2 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
161de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 2 3.20 1 6.40
5/8" 3 4.25 1 12.75
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
SECTOR B3
SOTANO
v Eje B - VES-101(.30x2.00)B3 1 41.10 0.30 2.00 14.45 1 41.10 3.80 156.18 Positivos 1" 3 45.70 1 137.10
Central 1/2" 10 42.70 1 427.00
Negativos 1" 3 45.70 1 137.10
1" 3 11.75 1 35.25
1" 3 15.05 1 45.15
Estribos 1/2" 20 4.80 1 96.00
Estribos 1/2" 6 4.80 1 28.80
Estribos 1/2" 11 4.80 1 52.80
Estribos 1/2" 5 4.80 1 24.00
Estribos 1/2" 12 4.80 1 57.60
Estribos 1/2" 14 4.80 1 67.20
Estribos 1/2" 5 4.80 1 24.00
Estribos 1/2" 17 4.80 1 81.60
Estribos 1/2" 21 4.80 1 100.80
v Eje C - VES-102(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 3/4" 3 45.70 1 137.10
5/8" 2 5.40 1 10.80
5/8" 2 5.70 1 11.40
3/4" 1 5.70 1 5.70
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
3/4" 3 3.90 1 11.70
3/4" 3 4.50 1 13.50
3/4" 2 2.00 1 4.00
3/4" 1 3.60 1 3.60
3/4" 2 4.30 1 8.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
v Eje D - VES-103(.30x.70)B3 2 14.40 0.30 0.70 6.05 2 14.40 1.20 34.56 Positivos 3/4" 3 16.00 2 96.00
Eje F - VES-103(.30x.70)B3 2 12.30 0.30 1.50 8.37 2 12.30 2.80 68.88 1" 3 13.90 2 83.40
2 14.40 0.30 0.70 6.05 2 14.40 1.20 34.56 3/4" 3 16.00 2 96.00
3/4" 2 5.70 2 22.80
5/8" 2 5.70 2 22.80
Central 1/2" 8 16.00 2 256.00
1/2" 8 13.90 2 222.40
Negativos 3/4" 3 34.40 2 206.40
3/4" 3 3.90 2 23.40
3/4" 3 2.65 2 15.90
162de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 2 2.00 2 8.00
1" 3 14.30 2 85.80
3/4" 3 2.65 2 15.90
5/8" 2 2.00 2 8.00
3/4" 3 3.60 2 21.60
Diagonales 1" 16 5.85 2 187.20
1" 16 5.85 2 187.20
1" 16 5.85 2 187.20
1" 16 5.85 2 187.20
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 46 2.20 2 202.40
Estribos 1/2" 15 3.50 2 105.00
Estribos 3/8" 46 1.20 2 110.40
Estribos 3/8" 46 1.20 2 110.40
Estribos 1/2" 15 3.50 2 105.00
Estribos 3/8" 46 1.20 2 110.40
Estribos 3/8" 46 1.20 2 110.40
Estribos 3/8" 33 2.20 2 145.20
Estribos 3/8" 33 2.20 2 145.20
v Eje E - VES-104(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
5/8" 4 5.70 1 22.80
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
5/8" 2 1.90 1 3.80
5/8" 4 3.60 1 14.40
5/8" 2 1.95 1 3.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
v Eje E - VES-105(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
5/8" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
5/8" 2 3.15 1 6.30
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 46 2.20 1 101.20
v Eje G - VES-106(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 3/4" 3 45.70 1 137.10
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
5/8" 1 2.00 1 2.00
3/4" 2 3.30 1 6.60
5/8" 2 4.45 1 8.90
5/8" 2 3.40 1 6.80
Estribos 3/8" 26 2.20 1 57.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
v Eje H - VES-107(.30x.70)B3 1 13.00 0.30 0.70 2.73 1 13.00 1.20 15.60 Positivos 5/8" 3 14.00 1 42.00
163de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Central 1/2" 2 13.40 1 26.80
Negativos 5/8" 3 14.00 1 42.00
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 38 2.20 1 83.60
v Eje 13 - VES-108(.30x.70)B3 1 14.70 0.30 1.50 6.61 1 14.70 2.80 41.16 Positivos 1" 3 16.30 1 48.90
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Central 1/2" 8 15.10 1 120.80
5/8" 3 15.45 1 46.35
1/2" 1 5.70 1 5.70
1/2" 1 5.40 1 5.40
1/2" 2 13.35 1 26.70
Negativos 1" 3 16.00 1 48.00
5/8" 3 16.70 1 50.10
5/8" 2 2.65 1 5.30
5/8" 2 3.85 1 7.70
Diagonales 1" 8 6.31 1 50.48
1" 8 6.31 1 50.48
1" 8 6.31 1 50.48
1" 8 6.31 1 50.48
Estribos 1/2" 17 3.80 1 64.60
Estribos 3/8" 56 1.00 1 56.00
Estribos 3/8" 56 1.00 1 56.00
Estribos 1/2" 17 3.80 1 64.60
Estribos 3/8" 56 1.00 1 56.00
Estribos 3/8" 56 1.00 1 56.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
v Eje 14 - VES-109(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
5/8" 1 5.70 1 5.70
5/8" 1 4.75 1 4.75
5/8" 1 5.40 1 5.40
3/4" 1 5.70 1 5.70
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
5/8" 2 3.80 1 7.60
5/8" 2 3.70 1 7.40
5/8" 2 4.35 1 8.70
5/8" 2 4.65 1 9.30
5/8" 4 3.30 1 13.20
5/8" 1 1.95 1 1.95
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 46 2.20 1 101.20
v Eje 15 - VES-110(.30x.70)B3 2 14.40 0.30 0.70 6.05 2 14.40 1.20 34.56 Positivos 1" 3 16.30 2 97.80
v Eje 17 - VES-110(.30x.70)B3 2 14.70 0.30 1.50 13.23 2 14.70 2.80 82.32 Central 5/8" 1 5.70 2 11.40
2 14.40 0.30 0.70 6.05 2 14.40 1.20 34.56 5/8" 4 33.80 2 270.40
5/8" 2 15.20 2 60.80
164de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 1 7.30 2 14.60
5/8" 1 7.30 2 14.60
3/4" 1 5.70 2 11.40
1/2" 2 45.10 2 180.40
Negativos 5/8" 4 34.40 2 275.20
1" 3 15.70 2 94.20
5/8" 3 3.20 2 19.20
5/8" 4 2.70 2 21.60
5/8" 4 2.00 2 16.00
5/8" 2 2.60 2 10.40
3/4" 2 3.55 2 14.20
5/8" 1 3.55 2 7.10
Diagonales 1" 8 6.31 2 100.96
1" 8 6.31 2 100.96
1" 8 6.31 2 100.96
1" 8 6.31 2 100.96
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 25 3.80 2 190.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 25 3.80 2 190.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 46 2.20 2 202.40
v Eje 16 - VES-111(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
3/4" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
3/4" 2 3.55 1 7.10
5/8" 2 3.55 1 7.10
5/8" 2 1.95 1 3.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
v Eje 16 - VES-112(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
5/8" 2 5.70 1 11.40
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
5/8" 1 1.95 1 1.95
3/4" 2 3.55 1 7.10
5/8" 1 1.95 1 1.95
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
v Eje 18 - VES-113(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 44.35 1 177.40
3/4" 1 5.40 1 5.40
5/8" 1 4.75 1 4.75
5/8" 1 5.40 1 5.40
165de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
3/4" 1 5.70 1 5.70
Central 1/2" 2 41.65 1 83.30
Negativos 5/8" 4 44.35 1 177.40
5/8" 4 2.10 1 8.40
5/8" 1 2.80 1 2.80
3/4" 3 3.70 1 11.10
5/8" 2 4.25 1 8.50
5/8" 2 4.75 1 9.50
5/8" 4 3.50 1 14.00
Estribos 3/8" 18 2.20 1 39.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
V Eje 19 - VES-114(.30x.70)B3 1 2.85 0.30 0.70 0.60 1 2.85 1.20 3.42 Positivos 1" 3 16.30 1 48.90
1 14.70 0.30 1.50 6.61 1 14.70 2.80 41.16 Central 5/8" 3 3.80 1 11.40
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 3 31.10 1 93.30
5/8" 2 13.40 1 26.80
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
5/8" 1 5.40 1 5.40
1/2" 2 40.45 1 80.90
Negativos 5/8" 3 28.75 1 86.25
1" 3 15.70 1 47.10
5/8" 3 2.40 1 7.20
5/8" 1 2.40 1 2.40
5/8" 2 3.80 1 7.60
Diagonales 1" 6 5.60 1 33.60
1" 6 5.60 1 33.60
1" 6 5.65 1 33.90
1" 6 5.65 1 33.90
Estribos 3/8" 24 2.20 1 52.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 25 3.80 1 95.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 26 3.80 1 98.80
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
v Eje G 16,17 - VES-115(.30x.70)B3 2 6.30 0.30 0.70 2.65 2 6.30 1.20 15.12 Positivos 5/8" 4 6.30 2 50.40
Central 1/2" 2 6.30 2 25.20
Negativos 5/8" 3 6.30 2 37.80
Estribos 3/8" 41 2.20 2 180.40
PRIMER PISO
Eje B - VE-101(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 5/8" 3 45.70 1 137.10
1/2" 1 5.35 1 5.35
166de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1/2" 1 5.25 1 5.25
Central 1/2" 2 42.70 1 85.40
Negativos 5/8" 3 45.70 1 137.10
5/8" 3 2.95 1 8.85
5/8" 2 4.10 1 8.20
1/2" 1 3.60 1 3.60
5/8" 1 4.00 1 4.00
5/8" 3 3.60 1 10.80
5/8" 2 4.10 1 8.20
5/8" 3 2.85 1 8.55
Estribos 3/8" 33 2.20 1 72.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 37 2.20 1 81.40
Eje C - VE-102(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 3/4" 3 45.70 1 137.10
3/4" 1 5.40 1 5.40
5/8" 1 5.70 1 5.70
5/8" 2 5.00 1 10.00
5/8" 1 5.70 1 5.70
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
5/8" 1 1.90 1 1.90
3/4" 3 3.90 1 11.70
3/4" 3 4.50 1 13.50
5/8" 1 3.40 1 3.40
3/4" 2 3.60 1 7.20
3/4" 3 4.30 1 12.90
3/4" 1 3.00 1 3.00
5/8" 1 1.95 1 1.95
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 28 2.20 1 61.60
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Eje D - VE-103(.30x.70)B3 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 3/4" 3 17.00 1 51.00
1 12.30 0.30 1.50 5.54 1 12.30 2.80 34.44 5/8" 3 5.70 1 17.10
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Central 1/2" 2 15.80 1 31.60
Negativos 3/4" 3 17.00 1 51.00
5/8" 1 1.90 1 1.90
3/4" 3 3.90 1 11.70
3/4" 3 2.65 1 7.95
1" 3 14.90 1 44.70
Central 1/2" 8 10.00 1 80.00
Negativos 1" 3 12.35 1 37.05
3/4" 3 17.00 1 51.00
Positivos tramo 1
Positivos tramo 2
Positivos tramo 3
167de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 3 5.70 1 17.10
Central 1/2" 2 15.80 1 31.60
Negativos 3/4" 3 17.00 1 51.00
5/8" 2 2.20 1 4.40
3/4" 3 3.90 1 11.70
3/4" 3 2.65 1 7.95
Diagonales 1" 16 5.85 1 93.60
1" 16 5.85 1 93.60
1" 16 5.85 1 93.60
1" 16 5.85 1 93.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 23 3.80 1 87.40
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 23 3.80 1 87.40
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje E - VE-104(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
5/8" 2 5.70 1 11.40
5/8" 2 5.70 1 11.40
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
5/8" 2 1.95 1 3.90
3/4" 2 3.60 1 7.20
5/8" 2 1.90 1 3.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje E - VE-105(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
5/8" 2 5.70 1 11.40
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
3/4" 2 2.80 1 5.60
5/8" 2 3.75 1 7.50
5/8" 2 1.90 1 3.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 46 2.20 1 101.20
Eje G - VE-106(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 3/4" 3 45.70 1 137.10
5/8" 2 5.70 1 11.40
5/8" 1 5.70 1 5.70
5/8" 1 4.35 1 4.35
5/8" 2 5.40 1 10.80
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
5/8" 1 1.90 1 1.90
3/4" 2 3.60 1 7.20
5/8" 1 3.60 1 3.60
Positivos tramo 3
168de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 2 3.30 1 6.60
5/8" 1 3.45 1 3.45
5/8" 2 4.45 1 8.90
5/8" 2 3.35 1 6.70
5/8" 2 2.25 1 4.50
Estribos 3/8" 46 0.20 1 9.20
Estribos 3/8" 46 0.20 1 9.20
Estribos 3/8" 37 0.20 1 7.40
Estribos 3/8" 41 0.20 1 8.20
Estribos 3/8" 40 0.20 1 8.00
Estribos 3/8" 44 0.20 1 8.80
Eje H - VE-107(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 5/8" 3 45.70 1 137.10
5/8" 2 5.35 1 10.70
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
5/8" 2 2.35 1 4.70
5/8" 2 3.95 1 7.90
5/8" 2 3.90 1 7.80
5/8" 2 3.75 1 7.50
5/8" 2 3.85 1 7.70
5/8" 1 2.30 1 2.30
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 42 2.20 1 92.40
Eje 13 - VE-108(.30x.70)B3 (0.50*1.50) 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 3 17.00 1 51.00
1 14.70 0.30 1.50 6.61 1 14.70 2.80 41.16 5/8" 1 5.40 1 5.40
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 1 5.70 1 5.70
Central 1/2" 2 15.80 1 31.60
Negativos 5/8" 3 17.00 1 51.00
5/8" 1 3.90 1 3.90
5/8" 1 2.50 1 2.50
1" 3 17.30 1 51.90
Central 1/2" 8 11.40 1 91.20
Negativos 1" 3 13.70 1 41.10
5/8" 3 17.00 1 51.00
5/8" 1 5.70 1 5.70
5/8" 1 5.40 1 5.40
Central 1/2" 2 15.80 1 31.60
Negativos 5/8" 3 17.00 1 51.00
5/8" 1 1.90 1 1.90
5/8" 1 3.90 1 3.90
5/8" 3 2.50 1 7.50
Diagonales 1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
Positivos tramo 1
Positivos tramo 2
Positivos tramo 3
169de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1" 8 6.30 1 50.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 25 3.80 1 95.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 26 3.80 1 98.80
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje 14 - VE-109(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
5/8" 2 5.40 1 10.80
5/8" 1 5.70 1 5.70
5/8" 1 4.75 1 4.75
5/8" 1 5.40 1 5.40
5/8" 2 5.70 1 11.40
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
5/8" 4 3.90 1 15.60
5/8" 2 3.80 1 7.60
5/8" 2 4.35 1 8.70
5/8" 2 4.65 1 9.30
5/8" 2 3.30 1 6.60
5/8" 3 1.95 1 5.85
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 46 2.20 1 101.20
Eje 15 - VE-110(.30x.70)B3 (0.50*1.50) 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 4 17.00 1 68.00
1 14.70 0.30 1.50 6.61 1 14.70 2.80 41.16 3/4" 1 5.70 1 5.70
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 1 5.70 1 5.70
Central 1/2" 2 15.80 1 31.60
Negativos 5/8" 4 17.00 1 68.00
5/8" 4 3.70 1 14.80
3/4" 4 2.70 1 10.80
1" 3 17.30 1 51.90
Central 1/2" 8 11.40 1 91.20
Negativos 1" 3 13.70 1 41.10
5/8" 3 17.00 1 51.00
5/8" 1 5.70 1 5.70
5/8" 1 5.40 1 5.40
Central 1/2" 2 15.80 1 31.60
Negativos 5/8" 4 17.00 1 68.00
5/8" 4 3.70 1 14.80
3/4" 4 2.70 1 10.80
Positivos tramo 1
Positivos tramo 2
Positivos tramo 3
170de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Diagonales 1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 25 3.80 1 95.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 26 3.80 1 98.80
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje 16 - VE-111(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
3/4" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
5/8" 1 1.95 1 1.95
5/8" 2 3.55 1 7.10
5/8" 4 1.95 1 7.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 16 - VE-112(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
5/8" 2 1.92 1 3.84
5/8" 2 3.55 1 7.10
5/8" 2 1.92 1 3.84
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 18 - VE-113(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
5/8" 2 5.70 1 11.40
5/8" 1 5.40 1 5.40
5/8" 1 4.75 1 4.75
5/8" 1 5.40 1 5.40
5/8" 2 5.70 1 11.40
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
5/8" 1 1.90 1 1.90
5/8" 4 3.90 1 15.60
5/8" 3 3.70 1 11.10
5/8" 2 4.15 1 8.30
5/8" 3 4.65 1 13.95
5/8" 4 3.60 1 14.40
5/8" 2 1.95 1 3.90
171de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje 17 - VE-110A(.30x.70)B3 (0.50*1.50) 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 4 17.00 1 68.00
1 14.70 0.30 1.50 6.61 1 14.70 2.80 41.16 5/8" 1 5.40 1 5.40
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 1 5.70 1 5.70
Central 1/2" 2 15.80 1 31.60
Negativos 5/8" 3 17.00 1 51.00
5/8" 1 1.90 1 1.90
5/8" 2 3.70 1 7.40
5/8" 2 2.70 1 5.40
1" 3 17.30 1 51.90
Central 1/2" 8 11.40 1 91.20
Negativos 1" 3 13.70 1 41.10
5/8" 3 17.00 1 51.00
5/8" 1 5.70 1 5.70
5/8" 1 5.40 1 5.40
Central 1/2" 2 15.80 1 31.60
Negativos 5/8" 3 17.00 1 51.00
5/8" 1 1.90 1 1.90
5/8" 2 3.70 1 7.40
5/8" 2 2.70 1 5.40
Diagonales 1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
1" 8 6.30 1 50.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 25 3.80 1 95.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 26 3.80 1 98.80
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje Entre F-G VE-115(.30x.70)B3 1 6.30 0.30 0.70 1.32 1 6.30 1.20 7.56 Positivos 5/8" 4 6.90 1 27.60
Central 1/2" 2 6.30 1 12.60
Negativos 5/8" 3 6.90 1 20.70
Estribos 3/8" 34 2.20 1 74.80
Eje Entre F-G VE-115(.30x.70)B3 1 12.30 0.30 0.70 2.58 1 12.30 1.20 14.76 Positivos 5/8" 3 13.90 1 41.70
Central 1/2" 2 12.70 1 25.40
Negativos 5/8" 3 13.90 1 41.70
Estribos 3/8" 34 2.20 1 74.80
Estribos 3/8" 34 2.20 1 74.80
Positivos tramo 1
Positivos tramo 2
Positivos tramo 3
172de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SEGUNDO PISO
Eje B - VE-201(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 5/8" 3 45.70 1 137.10
1/2" 1 5.35 1 5.35
1/2" 1 12.50 1 12.50
1/2" 1 5.25 1 5.25
Central 1/2" 2 42.70 1 85.40
Negativos 5/8" 3 45.70 1 137.10
5/8" 2 4.10 1 8.20
5/8" 2 2.90 1 5.80
5/8" 3 3.80 1 11.40
3/4" 2 4.40 1 8.80
5/8" 3 3.80 1 11.40
5/8" 2 4.10 1 8.20
5/8" 2 2.90 1 5.80
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 37 2.20 1 81.40
Eje C - VE-202(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 3/4" 3 45.70 1 137.10
5/8" 3 7.30 1 21.90
5/8" 2 5.70 2 22.80
5/8" 1 5.00 1 5.00
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
5/8" 1 1.90 1 1.90
1" 3 2.00 1 6.00
3/4" 2 4.50 2 18.00
5/8" 2 3.40 1 6.80
5/8" 1 1.90 2 3.80
Estribos 3/8" 44 2.20 2 193.60
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 35 2.20 2 154.00
Estribos 3/8" 40 2.20 2 176.00
Estribos 3/8" 43 2.20 2 189.20
Estribos 3/8" 46 2.20 2 202.40
Eje D - VE-203(.30x.70)B3 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Positivos 3/4" 3 43.30 1 129.90
1 12.30 0.50 1.50 9.23 1 12.30 3.00 36.90 3/4" 1 5.70 2 11.40
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 1 7.30 2 14.60
Central 1/2" 2 32.00 1 64.00
1/2" 2 12.30 4 98.40
1" 3 12.30 2 73.80
1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.22 1 135.66
3/4" 2 1.85 2 7.40
Diagonales 1" 16 5.85 1 93.60
1" 16 5.85 1 93.60
173de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1" 16 5.85 1 93.60
1" 16 5.85 1 93.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 23 0.20 1 4.60
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 23 0.20 1 4.60
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 46 0.20 1 9.20
Estribos 3/8" 46 0.20 1 9.20
Eje E - VE-204(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
5/8" 1 16.30 1 16.30
3/4" 1 5.70 1 5.70
3/4" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
3/4" 3 2.20 2 13.20
3/4" 3 3.60 1 10.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje E - VE-205(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
5/8" 2 5.70 1 11.40
3/4" 2 2.40 1 4.80
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
3/4" 3 2.40 1 7.20
3/4" 3 2.80 1 8.40
3/4" 2 3.75 1 7.50
3/4" 3 1.90 1 5.70
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 46 2.20 1 101.20
Eje G - VE-206(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 3/4" 3 45.70 1 137.10
5/8" 2 5.70 1 11.40
5/8" 1 5.70 1 5.70
5/8" 1 4.60 1 4.60
5/8" 2 5.40 1 10.80
Central 1/2" 2 42.70 1 85.40
Negativos 3/4" 3 45.70 1 137.10
5/8" 1 1.95 1 1.95
3/4" 2 3.60 1 7.20
3/4" 2 3.30 1 6.60
3/4" 2 3.40 1 6.80
3/4" 3 4.30 1 12.90
5/8" 2 3.60 1 7.20
3/4" 2 7.30 1 14.60
3/4" 2 3.25 1 6.50
3/4" 3 2.25 1 6.75
174de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Eje H - VE-207(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 5/8" 3 45.70 1 137.10
1/2" 1 5.35 1 5.35
1/2" 1 5.40 1 5.40
Central 1/2" 2 42.70 1 85.40
Negativos 5/8" 3 45.70 1 137.10
5/8" 1 2.35 1 2.35
5/8" 3 3.95 1 11.85
5/8" 3 3.70 1 11.10
5/8" 1 2.75 1 2.75
5/8" 3 3.35 1 10.05
5/8" 3 3.60 1 10.80
5/8" 1 2.40 1 2.40
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 42 2.20 1 92.40
Eje 13 - VE-208(.30x.70)B3 2 14.40 0.30 0.70 6.05 2 14.40 1.20 34.56 Positivos 5/8" 3 16.30 2 97.80
Eje 19 - VE-208(.30x.70)B3 2 14.70 0.50 1.50 22.05 2 14.70 3.00 88.20 Central 5/8" 2 15.20 2 60.80
2 14.40 0.30 0.70 6.05 2 14.40 1.20 34.56 5/8" 3 35.75 2 214.50
5/8" 2 13.40 2 53.60
5/8" 1 5.40 2 10.80
5/8" 1 5.70 2 11.40
5/8" 1 5.70 2 11.40
5/8" 1 5.40 2 10.80
1/2" 2 45.10 2 180.40
Negativos 5/8" 3 35.40 2 212.40
1" 3 15.70 4 188.40
5/8" 3 3.95 2 23.70
5/8" 1 3.20 2 6.40
5/8" 1 3.20 2 6.40
5/8" 1 4.00 2 8.00
Diagonales 1" 8 5.80 2 92.80
1" 8 5.80 2 92.80
1" 8 5.80 2 92.80
1" 8 5.80 2 92.80
Estribos 3/8" 44 2.20 2 193.60
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 25 4.20 2 210.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 26 4.20 2 218.40
175de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 28 1.00 2 56.00
Estribos 3/8" 44 2.20 2 193.60
Estribos 3/8" 46 2.20 2 202.40
Eje 14 - VE-209(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
5/8" 1 5.40 1 5.40
5/8" 1 5.70 1 5.70
5/8" 1 4.75 1 4.75
5/8" 1 4.40 1 4.40
5/8" 2 5.70 1 11.40
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
5/8" 1 1.90 1 1.90
5/8" 3 3.90 1 11.70
5/8" 2 2.60 1 5.20
5/8" 2 3.80 1 7.60
5/8" 3 4.40 1 13.20
3/4" 3 4.70 1 14.10
5/8" 2 3.40 1 6.80
5/8" 2 1.95 1 3.90
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 46 2.20 1 101.20
Eje 15 - VE-210(.30x.70)B3 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Positivos 5/8" 4 35.75 1 143.00
1 14.70 0.50 1.50 11.02 1 14.70 3.00 44.10 Central 1/2" 2 31.90 1 63.80
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 4 35.75 1 143.00
5/8" 2 13.40 1 26.80
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
5/8" 2 5.70 1 11.40
3/4" 1 5.70 1 5.70
1/2" 2 58.80 1 117.60
Negativos 5/8" 4 35.75 1 143.00
5/8" 4 2.50 1 10.00
1" 3 15.70 2 94.20
5/8" 2 2.25 1 4.50
5/8" 2 3.70 1 7.40
5/8" 1 2.25 1 2.25
Diagonales 1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 25 4.20 1 105.00
176de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 25 4.20 1 105.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 16 - VE-211(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.32 1 6.64
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 17.50 1 70.00
5/8" 1 2.20 1 2.20
5/8" 3 3.55 1 10.65
5/8" 2 3.30 1 6.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje 16 - VE-212(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
5/8" 2 3.32 1 6.64
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 17.50 1 70.00
5/8" 2 3.30 1 6.60
5/8" 2 3.55 1 7.10
5/8" 2 2.15 1 4.30
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 18 - VE-213(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
5/8" 1 5.70 1 5.70
5/8" 1 5.40 1 5.40
5/8" 1 4.75 1 4.75
5/8" 1 5.40 1 5.40
5/8" 1 5.70 1 5.70
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
5/8" 1 2.25 1 2.25
3/4" 2 3.90 1 7.80
5/8" 2 3.70 1 7.40
5/8" 2 4.15 1 8.30
5/8" 2 4.65 1 9.30
3/4" 2 3.60 1 7.20
5/8" 1 2.25 1 2.25
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
177de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 46 2.20 1 101.20
Eje 17 - VE-210A(.30x.70)B3 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Positivos 1" 3 16.30 1 48.90
1 14.70 0.50 1.50 11.02 1 14.70 3.00 44.10 Central 5/8" 2 15.20 1 30.40
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 4 35.75 1 143.00
5/8" 2 13.40 1 26.80
3/4" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
3/4" 1 5.70 1 5.70
1/2" 2 14.70 4 117.60
Negativos 5/8" 4 35.40 1 141.60
3/4" 3 15.70 1 47.10
3/4" 4 5.20 1 20.80
3/4" 4 8.35 1 33.40
5/8" 3 8.35 1 25.05
5/8" 3 2.25 1 6.75
Diagonales 1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 23 4.20 1 96.60
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 23 4.20 1 96.60
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje F - VE-203A(.30x.70)B3 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Positivos 3/4" 3 34.40 1 103.20
1 12.30 0.50 1.50 9.23 1 12.30 3.00 36.90 Central 5/8" 2 26.00 1 52.00
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 5/8" 2 12.80 1 25.60
5/8" 2 5.70 1 11.40
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
3/4" 1 5.70 1 5.70
1/2" 2 12.30 4 98.40
Negativos 3/4" 3 34.60 1 103.80
5/8" 2 2.20 1 4.40
3/4" 2 3.60 1 7.20
3/4" 2 2.65 1 5.30
Diagonales 1" 16 5.15 1 82.40
1" 16 5.15 1 82.40
1" 16 5.15 1 82.40
1" 16 5.15 1 82.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 23 4.20 1 96.60
178de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 23 4.20 1 96.60
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 26 1.00 1 26.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
TERCER PISO
Eje 13 - VE-308(.30x.70)B3 1 0.90 0.30 0.25 0.07 1 0.90 0.30 0.27 Positivos 1" 3 16.30 1 48.90
1 7.20 0.30 0.70 1.51 1 7.20 1.20 8.64 Central 1/2" 2 15.20 1 30.40
1 14.70 0.50 1.50 11.02 1 14.70 3.00 44.10 1/2" 2 15.20 0.00
1 6.90 0.30 0.70 1.45 1 6.90 1.20 8.28 5/8" 3 18.50 1 55.50
1 0.90 0.30 0.25 0.07 1 0.90 0.30 0.27 1/2" 2 15.70 1 31.40
1/2" 2 31.20 1 62.40
5/8" 2 3.31 1 6.62
5/8" 2 3.31 1 6.62
Negativos 5/8" 3 21.10 1 63.30
1" 3 16.30 1 48.90
5/8" 2 3.30 1 6.60
5/8" 2 2.70 1 5.40
5/8" 2 2.70 1 5.40
5/8" 2 3.30 1 6.60
Diagonales 1" 8 5.50 1 44.00
1" 8 5.50 1 44.00
1" 8 5.55 1 44.40
1" 8 5.55 1 44.40
Estribos 3/8" 10 1.30 1 13.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 25 4.20 1 105.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 26 4.20 1 109.20
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 28 1.00 1 28.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 10 1.30 1 13.00
Eje 14 - VE-309(.30x.70)B3 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 3 48.10 1 144.30
1/2" 1 5.40 1 5.40
1/2" 1 5.55 1 5.55
1/2" 1 5.20 1 5.20
1/2" 1 5.55 1 5.55
1/2" 2 5.55 1 11.10
1/2" 1 5.70 1 5.70
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 3 48.10 1 144.30
1/2" 2 4.00 1 8.00
1/2" 2 4.00 1 8.00
1/2" 2 3.95 1 7.90
3/4" 2 4.00 1 8.00
179de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1/2" 1 3.70 1 3.70
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 15 - VE-310(.30x.70)B3 1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 Positivos 1" 3 16.30 1 48.90
1 14.70 0.50 1.50 11.02 1 14.70 3.00 44.10 Central 1/2" 2 15.20 1 30.40
1 14.40 0.30 0.70 3.02 1 14.40 1.20 17.28 1/2" 2 15.20 1 30.40
5/8" 4 34.00 1 136.00
1/2" 2 15.50 1 31.00
1/2" 2 45.10 1 90.20
Negativos 5/8" 4 34.40 1 137.60
1" 3 15.70 1 47.10
5/8" 1 1.95 1 1.95
5/8" 2 3.30 1 6.60
Diagonales 1" 8 5.45 1 43.60
1" 8 5.45 1 43.60
1" 8 5.45 1 43.60
1" 8 5.45 1 43.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 25 4.20 1 105.00
Estribos 3/8" 27 1.00 1 27.00
Estribos 3/8" 27 1.00 1 27.00
Estribos 3/8" 25 4.20 1 105.00
Estribos 3/8" 27 1.00 1 27.00
Estribos 3/8" 27 1.00 1 27.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 16 - VE-311(.30x.70)B3 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 4 8.10 1 32.40
3/4" 2 5.70 1 11.40
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 4 8.10 1 32.40
Estribos 3/8" 46 2.20 1 101.20
Eje 16 - VE-312(.30x.70)B3 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 4 8.10 1 32.40
5/8" 2 5.70 1 11.40
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 4 8.10 1 32.40
5/8" 1 2.25 1 2.25
Estribos 3/8" 46 2.20 1 101.20
Eje B - VE-301(.30x.70)B3 1 26.70 0.30 0.70 5.61 1 26.70 1.20 32.04 Positivos 5/8" 4 29.30 1 117.20
5/8" 1 2.20 1 2.20
5/8" 1 4.40 1 4.40
5/8" 1 2.20 1 2.20
Central 1/2" 2 27.50 1 55.00
Negativos 5/8" 4 29.30 1 117.20
5/8" 2 2.20 1 4.40
180de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 3 3.80 1 11.40
5/8" 3 4.40 1 13.20
5/8" 3 3.80 1 11.40
5/8" 2 2.20 1 4.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Eje C - VE-302(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 5/8" 4 45.70 1 182.80
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.30 1 6.60
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.30 1 6.60
3/4" 2 3.30 1 6.60
Central 1/2" 2 42.70 1 85.40
Negativos 5/8" 4 48.10 1 192.40
5/8" 2 3.30 1 6.60
5/8" 2 4.00 1 8.00
1" 4 4.50 1 18.00
5/8" 2 2.80 1 5.60
5/8" 2 3.50 1 7.00
5/8" 2 3.70 1 7.40
5/8" 2 3.50 1 7.00
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje D - VE-303(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 5.70 1 5.70
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 5.70 1 5.70
5/8" 2 3.32 1 6.64
5/8" 2 3.25 1 6.50
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 3.30 1 6.60
3/4" 2 3.70 1 7.40
5/8" 2 3.20 1 6.40
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje D - VE-303A(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 5.70 1 5.70
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 6.05 1 6.05
5/8" 2 3.32 1 6.64
5/8" 2 3.30 1 6.60
Central 1/2" 2 15.10 1 30.20
181de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 3.30 1 6.60
3/4" 2 3.70 1 7.40
5/8" 2 3.30 1 6.60
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje E - VE-304(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 5.70 1 5.70
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 5.70 1 5.70
5/8" 2 3.32 1 6.64
5/8" 2 3.25 1 6.50
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 3.30 1 6.60
3/4" 2 3.70 1 7.40
5/8" 2 3.20 1 6.40
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje E - VE-305(.30x.70)B3 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 6.05 1 12.10
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 5.70 1 11.40
5/8" 2 4.05 1 8.10
5/8" 2 4.05 1 8.10
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 18.70 1 74.80
5/8" 2 2.00 1 4.00
5/8" 4 13.00 1 52.00
5/8" 1 18.70 1 18.70
5/8" 3 3.20 1 9.60
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje G - VE-306(.30x.70)B3 1 41.10 0.30 0.70 8.63 1 41.10 1.20 49.32 Positivos 5/8" 4 45.70 1 182.80
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 12.00 1 24.00
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.32 1 6.64
5/8" 2 3.50 1 7.00
Central 1/2" 2 42.70 1 85.40
Negativos 5/8" 4 18.70 1 74.80
5/8" 2 3.30 1 6.60
5/8" 1 3.70 1 3.70
1/2" 2 3.50 1 7.00
5/8" 4 3.60 1 14.40
3/4" 2 4.45 1 8.90
5/8" 2 4.45 1 8.90
182de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 1 3.30 1 3.30
5/8" 2 3.50 1 7.00
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 1.30 1 16.90
Eje H - VE-307(.30x.70)B3 1 26.70 0.30 0.70 5.61 1 26.70 1.20 32.04 Positivos 5/8" 4 29.30 1 117.20
Central 1/2" 2 27.50 1 55.00
Negativos 5/8" 4 29.30 1 117.20
5/8" 1 2.15 1 2.15
3/4" 2 3.80 1 7.60
3/4" 2 3.95 1 7.90
5/8" 2 2.15 1 4.30
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 43 2.20 1 94.60
SECTOR B5
SOTANO
v Eje B - VES-101(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
Central 3/8" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/8" 3 4.70 1 14.10
3/8" 3 2.40 1 7.20
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 43 2.20 1 94.60
v Eje C - VES-102(.30x.70)B5 3 14.70 0.30 0.70 9.26 3 14.70 1.20 52.92 Positivos 3/4" 4 7.90 3 94.80
v Eje D - VES-103(.30x.70)B5 3/4" 1 5.70 3 17.10
v Eje E - VES-104(.30x.70)B5 3/4" 1 5.70 3 17.10
Central 3/8" 2 15.10 3 90.60
Negativos 3/4" 4 16.30 3 195.60
3/4" 4 3.50 3 42.00
Estribos 3/8" 46 2.20 3 303.60
Estribos 3/8" 46 2.20 3 303.60
v Eje H - VES-107(.30x.70)B5 1 14.70 0.30 0.70 1.57 1 14.70 1.20 17.64 Positivos 3/4" 4 16.00 1 64.00
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.00 1 64.00
3/4" 4 2.50 1 10.00
3/4" 4 4.50 1 18.00
Estribos 3/8" 33 2.20 1 72.60
Estribos 3/8" 9 2.20 1 19.80
v Eje 20 - VES-108(.30x.70)B5 2 10.05 0.30 0.70 4.22 2 10.05 1.20 24.12 Positivos 5/8" 4 11.65 2 93.20
v Eje 20 - VES-112(.30x.70)B5
Central 1/2" 2 10.45 2 41.80
183de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Negativos 5/8" 4 11.65 2 93.20
5/8" 2 2.30 2 9.20
Estribos 3/8" 16 2.20 2 70.40
Estribos 3/8" 46 2.20 2 202.40
v Eje 21 - VES-110(.30x.70)B5 1 10.05 0.30 0.70 1.51 1 10.05 1.20 12.06 Positivos 3/4" 5 11.65 1 58.25
Central 1/2" 2 10.45 1 20.90
Negativos 3/4" 5 1.60 1 8.00
3/4" 23 2.20 1 50.60
Estribos 3/8" 16 2.20 1 35.20
Estribos 3/8" 35 2.20 1 77.00
v Eje 22 - VES-114(.30x.70)B5 1 43.50 0.30 0.70 7.26 1 43.50 1.20 52.20 Positivos 5/8" 5 48.10 1 240.50
Central 3/8" 2 45.10 1 90.20
Negativos 5/8" 5 48.10 1 240.50
5/8" 2 1.80 1 3.60
5/8" 4 5.20 1 20.80
5/8" 4 5.20 1 20.80
5/8" 2 3.80 1 7.60
Estribos 3/8" 20 2.20 1 44.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 41 2.20 1 90.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
v Eje 23 - VES-115(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 4 48.10 1 192.40
Central 3/8" 2 45.10 1 90.20
Negativos 3/4" 4 48.10 1 192.40
5/8" 4 4.50 1 18.00
5/8" 2 3.70 1 7.40
3/4" 3 4.20 1 12.60
3/4" 2 3.80 1 7.60
3/4" 3 3.20 1 9.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 42 2.20 1 92.40
v Eje 24 - VES-116(.30x.70)B5 1 43.50 0.30 0.70 7.67 1 43.50 1.20 52.20 Positivos 3/4" 4 48.10 1 192.40
3/4" 2 1.50 1 3.00
3/4" 1 1.50 1 1.50
Central 3/8" 2 45.10 1 90.20
Negativos 3/4" 4 48.10 1 192.40
3/4" 2 2.30 1 4.60
3/4" 3 2.30 1 6.90
5/8" 2 4.00 1 8.00
5/8" 2 3.60 1 7.20
3/4" 4 5.50 1 22.00
3/4" 4 4.50 1 18.00
Estribos 3/8" 35 2.20 1 77.00
184de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
Eje F - VES-105(.30x.70)B5 1 9.75 0.30 0.70 2.05 1 9.75 1.20 11.70 Positivos 5/8" 3 4.05 1 12.15
3/4" 3 8.50 1 25.50
3/4" 1 5.70 1 5.70
Central 3/8" 2 12.35 1 24.70
Negativos 3/4" 4 13.55 1 54.20
3/4" 4 2.60 1 10.40
5/8" 2 1.80 1 3.60
Estribos 3/8" 20 2.20 1 44.00
Estribos 3/8" 46 2.20 1 101.20
v Eje G - VES-106(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
3/4" 1 5.40 1 5.40
3/4" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
3/4" 2 3.50 1 7.00
Estribos 3/8" 28 2.20 1 61.60
Estribos 3/8" 46 2.20 1 101.20
v Eje 20 - VES-109(.30x.70)B5 1 14.70 0.30 0.70 2.26 1 14.70 1.20 17.64 Positivos 3/4" 5 16.30 1 81.50
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 5 16.30 1 81.50
3/4" 2 2.20 1 4.40
3/4" 2 3.80 1 7.60
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
v Eje 22 - VES-113(.30x.70)B5 1 14.70 0.30 0.70 2.37 1 14.70 1.20 17.64 Positivos 3/4" 5 16.30 1 81.50
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 5 16.30 1 81.50
3/4" 3 2.05 1 6.15
3/4" 3 4.35 1 13.05
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 41 2.20 1 90.20
v Eje 21 - VES-111(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 5 16.30 1 81.50
3/4" 4 3.50 1 14.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
v Eje B - VES-117(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
5/8" 2 3.00 1 6.00
5/8" 2 2.00 1 4.00
5/8" 2 3.00 1 6.00
Central 3/8" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 4 3.10 1 12.40
185de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
3/4" 3 6.00 1 18.00
Estribos 3/8" 33 2.20 1 72.60
Estribos 3/8" 33 2.20 1 72.60
v Eje C - VES-118(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 5 15.95 1 79.75
5/8" 2 5.70 1 11.40
5/8" 2 5.05 1 10.10
Central 3/8" 2 14.75 1 29.50
Negativos 3/4" 5 15.95 1 79.75
3/4" 4 3.80 1 15.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 43 2.20 1 94.60
v Eje D - VES-119(.30x.70)B5 1 10.70 0.30 0.70 2.25 1 10.70 1.20 12.84 Positivos 3/4" 4 13.70 1 54.80
Central 1/2" 2 13.10 1 26.20
Negativos 3/4" 4 13.70 1 54.80
3/4" 2 2.50 1 5.00
3/4" 3 3.60 1 10.80
3/4" 2 2.50 1 5.00
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
v Eje F - VES-120(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 5 15.95 1 79.75
5/8" 2 2.50 1 5.00
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 5 15.95 1 79.75
3/4" 4 2.50 1 10.00
1/2" 2 2.50 1 5.00
3/4" 4 2.50 1 10.00
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
v Eje G- VES-117A(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 3 15.95 1 47.85
Central 3/8" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
5/8" 1 3.80 1 3.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 43 2.20 1 94.60
PRIMER PISO
Eje B - VE-101(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 5 7.20 1 36.00
3/4" 5 9.00 1 45.00
3/4" 4 6.50 1 26.00
3/4" 1 2.20 1 2.20
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 5 16.30 1 81.50
3/4" 2 3.20 1 6.40
3/4" 4 6.50 1 26.00
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 43 2.20 1 94.60
Eje C - VE-102(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
5/8" 2 3.70 1 7.40
186de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje D - VE-103(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
3/4" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
5/8" 1 3.70 1 3.70
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje E - VE-104(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 3 3.70 1 11.10
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje F - VE-105(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 3 2.00 1 6.00
3/4" 3 3.00 1 9.00
Estribos 3/8" 18 2.20 1 39.60
Estribos 3/8" 46 2.20 1 101.20
Eje G - VE-106(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 3 16.30 1 48.90
5/8" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 3 16.30 1 48.90
5/8" 2 1.90 1 3.80
3/4" 2 3.70 1 7.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje H - VE-107(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 5 16.30 1 81.50
3/4" 4 5.15 1 20.60
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 5 16.30 1 81.50
3/4" 4 3.95 1 15.80
5/8" 1 3.95 1 3.95
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 33 2.20 1 72.60
Estribos 3/8" 9 2.20 1 19.80
Eje 20 - VE-108(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 1 5.70 1 5.70
1/2" 1 3.70 1 3.70
1/2" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 1.90 1 3.80
5/8" 3 3.70 1 11.10
1/2" 1 1.85 1 1.85
Estribos 3/8" 46 2.20 1 101.20
187de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 46 2.20 1 101.20
Eje 21 - VE-110(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 5 16.30 1 81.50
3/4" 2 2.50 1 5.00
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 5 16.30 1 81.50
5/8" 3 3.70 1 11.10
3/4" 4 2.50 1 10.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 35 2.20 1 77.00
Eje 22- VE-112(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1/2" 1 5.70 1 5.70
1/2" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 16.30 1 48.90
5/8" 2 1.90 1 3.80
3/4" 3 3.70 1 11.10
1/2" 1 1.80 1 1.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 22- VE-114(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 5 48.10 1 240.50
5/8" 1 5.70 1 5.70
5/8" 2 7.00 1 14.00
5/8" 2 5.45 1 10.90
5/8" 1 5.70 1 5.70
5/8" 1 5.40 1 5.40
Central 1/2" 2 45.10 1 90.20
Negativos 3/4" 5 48.10 1 240.50
3/4" 3 4.95 1 14.85
3/4" 3 4.95 1 14.85
3/4" 1 3.90 1 3.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 23- VE-115(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 4 48.10 1 192.40
3/4" 4 5.30 1 21.20
Central 1/2" 2 45.10 1 90.20
Negativos 3/4" 4 48.10 1 192.40
3/4" 2 4.00 1 8.00
3/4" 4 4.95 1 19.80
5/8" 2 3.30 1 6.60
5/8" 2 3.80 1 7.60
3/4" 2 2.15 1 4.30
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
188de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Eje 24- VE-116(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 3/4" 5 48.10 1 240.50
5/8" 1 5.00 1 5.00
3/4" 3 5.50 1 16.50
Central 1/2" 2 45.10 1 90.20
Negativos 3/4" 5 48.10 1 240.50
3/4" 3 5.80 1 17.40
3/4" 2 4.30 1 8.60
3/4" 4 5.20 1 20.80
3/4" 4 4.00 1 16.00
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
Eje 20- VE-109(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 3 4.00 1 12.00
5/8" 2 4.00 1 8.00
Estribos 3/8" 37 0.20 1 7.40
Estribos 3/8" 41 0.20 1 8.20
Eje 21- VE-111(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 16.30 1 65.20
5/8" 3 5.70 1 17.10
5/8" 1 5.70 1 5.70
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 4 16.30 1 65.20
3/4" 2 3.70 1 7.40
3/4" 1 1.95 1 1.95
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 22- VE-113(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
3/4" 1 1.80 1 1.80
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 16.30 1 65.20
3/4" 3 3.30 1 9.90
3/4" 3 4.15 1 12.45
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 41 2.20 1 90.20
Eje B- VE-117(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 5 15.95 1 79.75
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 5 15.95 1 79.75
3/4" 3 3.15 1 9.45
3/4" 3 6.00 1 18.00
3/4" 3 3.00 1 9.00
Estribos 3/8" 30 0.20 1 6.00
Estribos 3/8" 33 0.20 1 6.60
189de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Eje C - VE-118(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
3/4" 1 5.70 1 5.70
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 3 3.90 1 11.70
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 43 2.20 1 94.60
Eje D - VE-119(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
5/8" 3 3.50 1 10.50
3/4" 2 3.15 1 6.30
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Eje F - VE-120(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
3/4" 2 3.40 1 6.80
3/4" 2 3.10 1 6.20
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 4 3.40 1 13.60
3/4" 1 2.90 1 2.90
3/4" 4 3.10 1 12.40
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
Eje G - VE-120(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 3/4" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 2 2.25 1 4.50
3/4" 3 3.80 1 11.40
3/4" 2 2.20 1 4.40
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 43 2.20 1 94.60
Eje H - VE-122(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 3 3.20 1 9.60
5/8" 3 3.20 1 9.60
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
SEGUNDO PISO
Eje B - VE-201(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 7.20 1 28.80
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 3/4" 3 9.00 1 27.00
5/8" 1 9.00 1 9.00
5/8" 2 2.30 1 4.60
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 2 17.50 1 35.00
3/4" 4 4.50 1 18.00
3/4" 4 7.90 1 31.60
1" 1 3.60 1 3.60
190de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
3/4" 1 3.60 1 3.60
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 13 1.30 1 16.90
Eje C - VE-202(.30x.70)B5 3 14.70 0.30 0.70 9.26 3 14.70 1.20 52.92 Positivos 5/8" 4 16.30 3 195.60
Eje D - VE-203(.30x.70)B5 3 1.20 0.30 0.25 0.27 3 1.20 0.30 1.08 5/8" 2 2.30 3 13.80
Eje G - VE-206(.30x.70)B5 Central 1/2" 2 15.10 3 90.60
Negativos 5/8" 3 17.50 3 157.50
5/8" 1 1.90 3 5.70
5/8" 2 3.70 3 22.20
5/8" 2 3.00 3 18.00
Estribos 3/8" 46 2.20 3 303.60
Estribos 3/8" 46 2.20 3 303.60
Estribos 3/8" 13 1.30 3 50.70
Eje F - VE-205(.30x.70)B5 2 14.70 0.30 0.70 6.17 2 14.70 1.20 35.28 Positivos 5/8" 3 16.30 2 97.80
Eje E - VE-204(.30x.70)B5 2 1.20 0.30 0.25 0.18 2 1.20 0.30 0.72 1/2" 1 5.70 2 11.40
Central 1/2" 2 15.10 2 60.40
Negativos 5/8" 3 17.50 2 105.00
5/8" 1 1.90 2 3.80
3/4" 3 3.70 2 22.20
5/8" 2 3.25 2 13.00
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 46 2.20 2 202.40
Estribos 3/8" 13 2.20 2 57.20
Eje H - VE-207(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 3/4" 4 16.30 1 65.20
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
Central 1/2" 2 15.10 1 30.20
Negativos 3/4" 4 17.50 1 70.00
5/8" 2 5.35 1 10.70
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 33 2.20 1 72.60
Estribos 3/8" 9 2.20 1 19.80
Estribos 3/8" 13 2.20 1 28.60
Eje 20 - VE-208(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.30 1 6.60
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 17.50 1 52.50
1/2" 1 3.70 1 3.70
5/8" 2 3.30 1 6.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje 21 - VE-210(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 2.75 1 5.50
1/2" 1 5.70 1 5.70
5/8" 2 2.30 1 4.60
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 5 17.50 1 87.50
3/4" 4 5.15 1 20.60
191de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 3 2.30 1 6.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 13 1.30 1 16.90
Eje 22 - VE-212(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 17.50 1 52.50
1/2" 1 3.70 1 3.70
5/8" 2 3.30 1 6.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 1.30 1 16.90
Eje 22 - VE-214(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 1 12.70 1 12.70
1/2" 1 5.70 1 5.70
5/8" 2 3.25 1 6.50
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 49.30 1 197.20
1/2" 1 3.70 1 3.70
3/4" 4 4.95 1 19.80
3/4" 2 4.95 1 9.90
5/8" 1 4.95 1 4.95
1/2" 2 4.00 1 8.00
5/8" 2 3.30 1 6.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 2.20 1 28.60
Eje 23 - VE-215(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 4 48.10 1 192.40
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 4 48.10 1 192.40
1/2" 1 2.25 1 2.25
5/8" 2 3.90 1 7.80
5/8" 2 3.80 1 7.60
5/8" 2 3.80 1 7.60
3/4" 2 3.80 1 7.60
1/2" 2 3.80 1 7.60
5/8" 1 2.15 1 2.15
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 44 2.20 1 96.80
Eje 24 - VE-216(.30x.70)B5 1 43.50 0.30 0.70 9.13 1 43.50 1.20 52.20 Positivos 5/8" 5 48.10 1 240.50
192de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1/2" 1 4.35 1 4.35
1/2" 1 2.95 1 2.95
1/2" 1 3.50 1 3.50
Central 1/2" 2 45.10 1 90.20
Negativos 5/8" 5 48.10 1 240.50
5/8" 4 5.70 1 22.80
3/4" 2 4.25 1 8.50
1/2" 1 3.90 1 3.90
1/2" 1 4.35 1 4.35
3/4" 4 5.20 1 20.80
3/4" 3 3.95 1 11.85
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 41 2.20 1 90.20
Eje 20 - VE-209(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 3.25 1 6.50
5/8" 2 4.55 1 9.10
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 2.50 1 5.00
3/4" 1 2.50 1 2.50
5/8" 2 3.30 1 6.60
5/8" 1 4.00 1 4.00
5/8" 2 3.20 1 6.40
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 1.30 1 16.90
Eje 21 - VE-211(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 3 16.30 1 48.90
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 2 5.70 1 11.40
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 1 5.70 1 5.70
5/8" 2 3.25 1 6.50
5/8" 3 3.25 1 9.75
Central 1/2" 2 15.10 1 30.20
Negativos 5/8" 3 18.70 1 56.10
5/8" 2 4.45 1 8.90
5/8" 2 3.35 1 6.70
1/2" 2 3.70 1 7.40
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 41 2.20 1 90.20
Estribos 3/8" 13 1.30 1 16.90
Eje 22 - VE-213(.30x.70)B5 1 14.70 0.30 0.70 3.09 1 14.70 1.20 17.64 Positivos 5/8" 4 10.65 1 42.60
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 3 6.95 1 20.85
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36
193de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 2 3.25 0 0.00
5/8" 2 4.45 0 0.00
Central 1/2" 2 15.10 0 0.00
Negativos 5/8" 4 18.70 0 0.00
5/8" 2 4.45 0 0.00
5/8" 4 3.35 0 0.00
Estribos 3/8" 13 1.30 0 0.00
Estribos 3/8" 40 2.20 0 0.00
Estribos 3/8" 41 2.20 0 0.00
Estribos 3/8" 13 1.30 0 0.00
Eje B - VE-217(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 3 15.95 1 47.85
5/8" 3 2.90 1 8.70
Estribos 3/8" 31 2.20 1 68.20
Estribos 3/8" 30 2.20 1 66.00
Eje C - VE-218(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 3 15.95 1 47.85
1/2" 1 9.15 0 0.00
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 3 15.95 1 47.85
5/8" 2 3.80 1 7.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 43 2.20 1 94.60 Eje D - VE-219(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 3 6.60 1 19.80
Estribos 3/8" 38 2.20 1 83.60
Estribos 3/8" 38 2.20 1 83.60
Eje F - VE-220(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 3/4" 4 15.95 1 63.80
3/4" 2 6.65 1 13.30
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
Eje G - VE-221(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
5/8" 3 6.85 1 20.55
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 3 15.95 1 47.85
5/8" 1 2.45 1 2.45
5/8" 2 3.80 1 7.60
1/2" 1 2.45 1 2.45
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 43 2.20 1 94.60
Eje H - VE-218(.30x.70)B5 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 4 15.95 1 63.80
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 4 15.95 1 63.80
5/8" 2 6.40 1 12.80
194de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 39 2.20 1 85.80
SECTOR A1
PRIMER PISO
Eje H - VE-101(.30x.70)A1 1 18.40 0.30 0.70 3.86 1 18.40 1.20 22.08 Positivos 5/8" 3 21.00 1 63.00
Central 1/2" 2 19.20 1 38.40
Negativos 5/8" 3 21.00 1 63.00
Estribos 3/8" 21 2.20 1 46.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 21 2.20 1 46.20
Estribos 3/8" 22 2.20 1 48.40
Eje I - VE-102(.30x.70)A1 1 14.35 0.30 0.70 3.01 1 14.35 1.20 17.22 Positivos 5/8" 3 15.95 1 47.85
Central 1/2" 2 14.75 1 29.50
Negativos 5/8" 3 15.95 1 47.85
1/2" 1 3.60 1 3.60
Estribos 3/8" 46 3.60 1 165.60
Estribos 3/8" 44 3.60 1 158.40
Eje 1 - VE-103(.30x.70)A1 1 10.40 0.30 0.70 2.18 1 10.40 1.20 12.48 Positivos 5/8" 3 12.00 1 36.00
Central 1/2" 2 10.80 1 21.60
Negativos 5/8" 3 12.00 1 36.00
Estribos 3/8" 22 2.20 1 48.40
Estribos 3/8" 43 2.20 1 94.60
Eje 2 - VE-104(.30x.70)A1 1 10.40 0.30 0.70 2.18 1 10.40 1.20 12.48 Positivos 5/8" 3 12.00 1 36.00
1/2" 2 4.80 1 9.60
Central 1/2" 2 10.80 1 21.60
Negativos 5/8" 3 0.60 1 1.80
5/8" 3 3.50 1 10.50
Estribos 3/8" 20 2.20 1 44.00
Estribos 3/8" 42 2.20 1 92.40
Eje I - VE-106(.30x.70)A1 2 4.35 0.30 0.70 1.83 2 4.35 1.20 10.44 Positivos 5/8" 3 4.95 2 29.70
Eje I' - VE-106(.30x.70)A1 Central 1/2" 2 4.35 2 17.40
Negativos 5/8" 3 4.95 2 29.70
Estribos 3/8" 24 2.20 2 105.60
Eje 3 - VE-105(.30x.70)A1 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 3 8.10 1 24.30
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 5 8.10 1 40.50
5/8" 3 4.50 1 13.50
Estribos 3/8" 46 2.20 1 101.20
Eje 4 - VE-107(.30x.70)A1 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 3 8.10 1 24.30
5/8" 2 3.00 1 6.00
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 3 8.10 1 24.30
Estribos 3/8" 46 2.20 1 101.20
SECTOR A2
PRIMER PISO
Eje H - VE-101(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 4 18.00 1 72.00
5/8" 3 6.35 1 19.05
5/8" 4 5.40 1 21.60
Central 1/2" 2 22.70 1 45.40
195de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Negativos 5/8" 4 24.50 1 98.00
5/8" 2 2.20 1 4.40
5/8" 4 3.80 1 15.20
5/8" 2 3.80 1 7.60
1/2" 2 2.20 1 4.40
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 44 2.20 1 96.80
Diagonal - VE-102(.30x.70)A2 1 15.50 0.30 0.70 3.25 1 15.50 1.20 18.60 Positivos 5/8" 3 17.10 1 51.30
5/8" 2 5.40 1 10.80
Central 1/2" 2 15.90 1 31.80
Negativos 5/8" 3 17.10 1 51.30
5/8" 2 3.90 1 7.80
Estribos 3/8" 47 2.20 1 103.40
Estribos 3/8" 47 2.20 1 103.40
Eje E - VE-103(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
1/2" 1 5.70 1 5.70
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
5/8" 2 5.45 1 10.90
5/8" 2 3.80 1 7.60
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje G - VE-104(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 3/4" 3 24.50 1 73.50
Central 1/2" 2 22.70 1 45.40
Negativos 3/4" 3 24.50 1 73.50
3/4" 4 4.90 1 19.60
5/8" 2 3.00 1 6.00
3/4" 2 2.10 1 4.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 36 2.20 1 79.20
Eje F - VE-105(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 3/4" 3 24.50 1 73.50
5/8" 1 5.70 1 5.70
3/4" 2 5.70 1 11.40
5/8" 1 5.70 1 5.70
Central 1/2" 2 22.70 1 45.40
Negativos 3/4" 3 24.50 1 73.50
3/4" 3 3.50 1 10.50
3/4" 3 3.50 1 10.50
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 4 - VE-107(.30x.70)A2 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 5/8" 4 32.70 1 130.80
1/2" 1 5.00 1 5.00
Central 1/2" 2 30.30 1 60.60
Negativos 3/4" 3 32.70 1 98.10
3/4" 1 3.50 1 3.50
196de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
3/4" 4 4.65 1 18.60
3/4" 3 4.65 1 13.95
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 40 2.20 1 88.00
Eje 5 - VE-108(.30x.70)A2 1 26.73 0.30 0.70 5.61 1 26.73 1.20 32.08 Positivos 3/4" 3 29.33 1 87.99
3/4" 1 5.70 1 5.70
Central 1/2" 2 27.53 1 55.06
Negativos 3/4" 3 29.33 1 87.99
3/4" 2 3.60 1 7.20
3/4" 5 3.70 1 18.50
3/4" 3 3.70 1 11.10
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje 6 - VE-109(.30x.70)A2 1 24.27 0.30 0.70 5.10 1 24.27 1.20 29.12 Positivos 3/4" 3 26.87 1 80.61
5/8" 3 5.70 1 17.10
5/8" 1 4.35 1 4.35
5/8" 2 6.25 1 12.50
Central 1/2" 2 25.07 1 50.14
Negativos 3/4" 3 26.87 1 80.61
3/4" 4 4.75 1 19.00
3/4" 3 3.40 1 10.20
Estribos 3/8" 15 2.20 1 33.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Eje 7 - VE-110(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 4 24.50 1 98.00
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
5/8" 3 5.50 1 16.50
5/8" 3 5.15 1 15.45
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 38 2.20 1 83.60
SEGUNDO PISO
Eje H - VE-201(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
5/8" 1 5.40 1 5.40
1/2" 1 5.40 1 5.40
1/2" 1 5.10 1 5.10
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
1/2" 1 2.40 1 2.40
5/8" 2 3.80 1 7.60
5/8" 2 3.80 1 7.60
1/2" 1 2.40 1 2.40
Estribos 3/8" 44 2.20 1 96.80
197de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 43 2.20 1 94.60
VE-202(.30x.70)A2 1 15.50 0.30 0.70 3.25 1 15.50 1.20 18.60 Positivos 5/8" 3 17.10 1 51.30
1/2" 1 6.05 1 6.05
Central 1/2" 2 15.90 1 31.80
Negativos 5/8" 3 17.10 1 51.30
1/2" 1 3.75 1 3.75
Estribos 3/8" 47 2.20 1 103.40
Estribos 3/8" 47 2.20 1 103.40
Eje E - VE-203(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 1 5.70 1 5.70
5/8" 2 3.25 1 6.50
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 25.70 1 77.10
5/8" 2 3.25 1 6.50
5/8" 2 5.50 1 11.00
1/2" 1 3.80 1 3.80
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje G - VE-204(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 3/4" 3 24.50 1 73.50
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 3/4" 1 8.30 1 8.30
Central 1/2" 2 22.70 1 45.40
Negativos 3/4" 3 25.70 1 77.10
5/8" 2 3.25 1 6.50
3/4" 5 5.00 1 25.00
5/8" 2 3.10 1 6.20
5/8" 2 4.10 1 8.20
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 36 2.20 1 79.20
Eje F - VE-205(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 4 24.50 1 98.00
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 1 5.70 1 5.70
5/8" 2 5.70 1 11.40
1/2" 2 5.70 1 11.40
5/8" 2 3.25 1 6.50
Central 1/2" 2 22.70 1 45.40
Negativos 3/4" 3 25.70 1 77.10
5/8" 2 3.25 1 6.50
5/8" 2 3.75 1 7.50
3/4" 2 3.75 1 7.50
3/4" 2 2.25 1 4.50
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Eje 4 - VE-207(.30x.70)A2 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 5/8" 4 32.70 1 130.80
198de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1/2" 1 7.95 1 7.95
Central 1/2" 2 30.30 1 60.60
Negativos 3/4" 3 32.70 1 98.10
3/4" 1 3.50 1 3.50
3/4" 4 4.65 1 18.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 40 2.20 1 88.00
Eje 5 - VE-208(.30x.70)A2 1 26.73 0.30 0.70 5.61 1 26.73 1.20 32.08 Positivos 5/8" 4 29.33 1 117.32
1/2" 2 5.70 1 11.40
1/2" 1 5.70 1 5.70
1/2" 2 5.70 1 11.40
Central 1/2" 2 27.53 1 55.06
Negativos 5/8" 4 29.33 1 117.32
1/2" 1 3.60 1 3.60
3/4" 2 3.70 1 7.40
5/8" 2 3.70 1 7.40
5/8" 4 3.70 1 14.80
1/2" 1 1.90 1 1.90
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje 6 - VE-209(.30x.70)A2 1 24.27 0.30 0.70 5.10 1 24.27 1.20 29.12 Positivos 5/8" 4 26.87 1 107.48
5/8" 2 5.70 1 11.40
1/2" 1 4.35 1 4.35
5/8" 1 5.40 1 5.40
Central 1/2" 2 25.07 1 50.14
Negativos 5/8" 4 26.87 1 107.48
5/8" 1 4.60 1 4.60
3/4" 3 4.75 1 14.25
5/8" 2 3.40 1 6.80
5/8" 2 2.25 1 4.50
Estribos 3/8" 15 2.20 1 33.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Eje 7 - VE-210(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 4 24.50 1 98.00
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
5/8" 3 5.50 1 16.50
5/8" 1 5.15 1 5.15
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 38 2.20 1 83.60
TERCER PISO
Eje E - VE-301(.30x.70)A2 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 3 8.10 1 24.30
1/2" 1 5.70 1 5.70
199de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 4 8.10 1 32.40
Estribos 3/8" 46 2.20 1 101.20
Eje F - VE-302(.30x.70)A2 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 4 8.10 1 32.40
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 3 8.10 1 24.30
5/8" 1 2.25 1 2.25
Estribos 3/8" 46 2.20 1 101.20
Eje H - VE-306(.30x.70)A2 1 7.80 0.30 0.70 1.64 1 7.80 1.20 9.36 Positivos 5/8" 3 8.40 1 25.20
Central 1/2" 2 7.80 1 15.60
Negativos 5/8" 3 8.40 1 25.20
1/2" 1 1.90 1 1.90
1/2" 1 1.90 1 1.90
Estribos 3/8" 44 0.20 1 8.80
Eje G - VE-303(.30x.70)A2 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 3 8.10 1 24.30
1/2" 1 3.20 1 3.20
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 3 8.10 1 24.30
5/8" 5 2.25 1 11.25
Estribos 3/8" 36 2.20 1 79.20
Eje 6 - VE - 304(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
5/8" 4 4.75 1 19.00
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 44 2.20 1 96.80
Eje 7 - VE - 305(.30x.70)A2 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
1/2" 1 5.45 1 5.45
1/2" 1 5.60 1 5.60
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 38 2.20 1 83.60
Positivos 5/8" 4 8.10 2 64.80
SECTOR A3
PRIMER PISO
Eje A - VE-101(.30x.70)A3 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 3/4" 3 24.50 1 73.50
Central 1/2" 2 22.70 1 45.40
Negativos 3/4" 3 24.50 1 73.50
3/4" 3 3.40 1 10.20
3/4" 3 3.95 1 11.85
3/4" 3 4.80 1 14.40
1/2" 1 2.05 1 2.05
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 37 2.20 1 81.40
Eje B - VE-102(.30x.70)A3 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 5/8" 4 32.70 1 130.80
1/2" 1 5.70 1 5.70
200de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
1/2" 1 5.70 1 5.70
1/2" 1 5.70 1 5.70
1/2" 1 5.40 1 5.40
Central 1/2" 2 30.30 1 60.60
Negativos 5/8" 3 32.70 1 98.10
5/8" 4 3.70 1 14.80
5/8" 4 3.70 1 14.80
5/8" 4 3.65 1 14.60
5/8" 2 2.20 1 4.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Eje E - VE-103(.30x.70)A3 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
1/2" 1 5.70 1 5.70
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 4 24.50 1 98.00
5/8" 2 5.50 1 11.00
5/8" 1 3.95 1 3.95
1/2" 1 1.90 1 1.90
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje D - VE-104(.30x.70)A3 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 3/4" 4 32.70 1 130.80
1/2" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
5/8" 1 5.70 1 5.70
Central 1/2" 2 30.30 1 60.60
Negativos 3/4" 3 32.70 1 98.10
3/4" 3 3.70 1 11.10
5/8" 1 3.15 1 3.15
3/4" 5 5.25 1 26.25
3/4" 2 1.90 1 3.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 46 2.20 1 101.20
Eje B - VE-105(.30x.70)A3 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 3 8.10 1 24.30
entre A-B 1/2" 1 5.70 1 5.70
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 3 8.10 1 24.30
Estribos 3/8" 46 2.20 1 101.20
Eje 3 - VE-106(.30x.70)A3 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
1/2" 1 5.70 1 5.70
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
5/8" 4 5.55 1 22.20
1/2" 1 2.90 1 2.90
Estribos 3/8" 27 2.20 1 59.40
201de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 27 2.20 1 59.40
Eje 4 - VE-107(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 31.15 1 93.45
5/8" 2 5.70 1 11.40
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 3 31.15 1 93.45
5/8" 2 4.60 1 9.20
5/8" 1 3.15 1 3.15
5/8" 2 6.30 1 12.60
Estribos 3/8" 26 2.20 1 57.20
Estribos 3/8" 27 2.20 1 59.40
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 13 2.20 1 28.60
Estribos 3/8" 16 2.20 1 35.20
Eje 5 - VE-108(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 31.15 1 93.45
5/8" 2 4.15 1 8.30
5/8" 2 5.70 1 11.40
1/2" 2 5.40 1 10.80
1/2" 1 4.20 1 4.20
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 3 31.15 1 93.45
1/2" 1 1.90 1 1.90
5/8" 5 4.65 1 23.25
5/8" 3 3.70 1 11.10
5/8" 2 3.40 1 6.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 41 2.20 1 90.20
Eje 6 - VE-109(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 4 31.15 1 124.60
1/2" 2 5.05 1 10.10
5/8" 2 5.40 1 10.80
1/2" 1 4.20 1 4.20
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 4 31.15 1 124.60
1/2" 1 2.15 1 2.15
5/8" 4 5.85 1 23.40
5/8" 1 3.40 1 3.40
5/8" 2 3.70 1 7.40
1/2" 1 1.95 1 1.95
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 34 2.20 1 74.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 40 2.20 1 88.00
Eje 7 - VE-110(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 31.15 1 93.45
1/2" 1 5.40 1 5.40
Central 1/2" 2 28.75 1 57.50
202de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Negativos 5/8" 3 31.15 1 93.45
1/2" 1 2.50 1 2.50
1/2" 1 2.00 1 2.00
1/2" 1 2.00 1 2.00
1/2" 1 3.55 1 3.55
1/2" 1 3.15 1 3.15
Estribos 3/8" 26 2.20 1 57.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 37 2.20 1 81.40
SEGUNDO PISO
Eje A - VE-201(.30x.70)A3 1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 Positivos 3/4" 4 24.50 1 98.00
1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 3/4" 3 3.25 1 9.75
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 4 26.90 1 107.60
5/8" 2 4.47 1 8.94
3/4" 3 6.80 1 20.40
5/8" 1 3.95 1 3.95
5/8" 1 4.80 1 4.80
5/8" 2 3.15 1 6.30
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 42 2.20 1 92.40
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 13 1.30 1 16.90
Eje B - VE-202(.30x.70)A3 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 5/8" 4 32.70 1 130.80
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 2 5.70 1 11.40
1/2" 1 5.70 1 5.70
1/2" 1 5.70 1 5.70
1/2" 2 5.40 1 10.80
5/8" 4 3.15 1 12.60
Central 1/2" 2 30.30 1 60.60
Negativos 5/8" 4 33.90 1 135.60
3/4" 1 3.70 1 3.70
5/8" 2 3.70 1 7.40
5/8" 3 3.70 1 11.10
5/8" 2 3.65 1 7.30
3/4" 2 3.15 1 6.30
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 13 1.30 1 16.90
Eje E - VE-203(.30x.70)A3 1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 Positivos 5/8" 4 24.50 1 98.00
1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 1/2" 1 5.70 1 5.70
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 25.70 1 77.10
5/8" 2 4.35 1 8.70
203de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 3 5.50 1 16.50
5/8" 2 3.95 1 7.90
1/2" 1 2.25 1 2.25
Estribos 3/8" 13 1.30 1 16.90
Estribos 3/8" 36 2.20 1 79.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Eje D - VE-204(.30x.70)A3 1 29.10 0.30 0.70 6.11 1 29.10 1.20 34.92 Positivos 5/8" 3 32.70 1 98.10
1/2" 1 5.70 1 5.70
1/2" 1 5.70 1 5.70
1/2" 1 5.70 1 5.70
3/4" 2 5.70 1 11.40
Central 1/2" 2 30.30 1 60.60
Negativos 5/8" 3 32.70 1 98.10
3/4" 2 3.70 1 7.40
5/8" 1 3.70 1 3.70
1/2" 1 3.15 1 3.15
3/4" 3 5.25 1 15.75
5/8" 1 2.15 1 2.15
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 46 2.20 1 101.20
VE-205(.30x.70)A3 1 7.50 0.30 0.70 1.58 1 7.50 1.20 9.00 Positivos 5/8" 3 8.10 1 24.30
1/2" 1 5.70 1 5.70
Central 1/2" 2 7.50 1 15.00
Negativos 5/8" 3 8.10 1 24.30
Estribos 3/8" 46 2.20 1 101.20
Eje 3 - VE-206(.30x.70)A3 1 21.90 0.30 0.70 4.60 1 21.90 1.20 26.28 Positivos 5/8" 3 24.50 1 73.50
Central 1/2" 2 22.70 1 45.40
Negativos 5/8" 3 24.50 1 73.50
5/8" 2 5.55 1 11.10
Estribos 3/8" 27 2.20 1 59.40
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 26 2.20 1 57.20
Eje 4 - VE-207(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 31.15 1 93.45
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 2.30 1 4.60
1/2" 2 4.90 1 9.80
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 3 32.35 1 97.05
5/8" 2 4.60 1 9.20
1/2" 1 3.15 1 3.15
5/8" 5 5.05 1 25.25
5/8" 2 2.60 1 5.20
Estribos 3/8" 21 2.20 1 46.20
Estribos 3/8" 25 2.20 1 55.00
Estribos 3/8" 34 2.20 1 74.80
Estribos 3/8" 46 2.20 1 101.20
204de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 12 2.20 1 26.40
Estribos 3/8" 15 2.20 1 33.00
Estribos 3/8" 13 1.30 1 16.90
Eje 5 - VE-208(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 31.15 1 93.45
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 1/2" 2 5.35 1 10.70
1/2" 1 5.70 1 5.70
1/2" 1 5.40 1 5.40
5/8" 3 3.00 1 9.00
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 3 32.35 1 97.05
1/2" 1 1.90 1 1.90
5/8" 2 3.60 1 7.20
5/8" 2 3.70 1 7.40
1/2" 1 3.40 1 3.40
5/8" 2 3.00 1 6.00
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 13 1.30 1 16.90
Eje 6 - VE-209(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 31.15 1 93.45
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 5.05 1 10.10
5/8" 1 5.40 1 5.40
5/8" 2 2.30 1 4.60
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 3 32.35 1 97.05
1/2" 1 2.20 1 2.20
5/8" 5 5.75 1 28.75
1/2" 1 3.00 1 3.00
5/8" 1 3.40 1 3.40
5/8" 2 3.00 1 6.00
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 34 2.20 1 74.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 40 2.20 1 88.00
Estribos 3/8" 13 1.30 1 16.90
Eje 7 - VE-210(.30x.70)A3 1 27.55 0.30 0.70 5.79 1 27.55 1.20 33.06 Positivos 5/8" 3 23.65 1 70.95
1 1.20 0.30 0.25 0.09 1 1.20 0.30 0.36 5/8" 2 7.45 1 14.90
5/8" 2 2.30 1 4.60
Central 1/2" 2 28.75 1 57.50
Negativos 5/8" 3 32.35 1 97.05
1/2" 1 2.80 1 2.80
1/2" 1 5.90 1 5.90
5/8" 2 3.15 1 6.30
Estribos 3/8" 25 2.20 1 55.00
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 44 2.20 1 96.80
Estribos 3/8" 37 2.20 1 81.40
Estribos 3/8" 13 1.30 1 16.90
205de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
TERCER PISO
Eje E - VE-301(.30x.70)A3 2 7.50 0.30 0.70 3.15 2 7.50 1.20 18.00 Positivos 5/8" 3 8.10 2 48.60
Eje D - VE-301(.30x.70)A3 1/2" 1 5.70 2 11.40
Central 1/2" 2 7.50 2 30.00
Negativos 5/8" 3 8.10 2 48.60
Estribos 3/8" 46 2.20 2 202.40
Eje 6 - VE-302(.30x.70)A3 1 8.60 0.30 0.70 1.81 1 8.60 1.20 10.32 Positivos 5/8" 3 9.20 1 27.60
Central 1/2" 2 8.60 1 17.20
Negativos 5/8" 3 9.20 1 27.60
1/2" 1 3.40 1 3.40
Estribos 3/8" 43 2.20 1 94.60
Eje 7 - VE-303(.30x.70)A3 1 8.60 0.30 0.70 1.81 1 8.60 1.20 10.32 Positivos 5/8" 3 9.20 1 27.60
Central 1/2" 2 8.60 1 17.20
Negativos 5/8" 3 9.20 1 27.60
Estribos 3/8" 29 2.20 1 63.80
Estribos 3/8" 11 2.20 1 24.20
SECTOR C
VSE-101 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 5/8" 2 9.55 1 19.10
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 2 7.95 1 15.90
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 4 1.65 1 6.60
3/8" 2 7.15 1 14.30
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 21 1.70 1 35.70
Estribos 3/8" 21 1.70 1 35.70
VSE-102 1 1.00 0.25 0.20 0.05 1 1.00 0.25 0.25 5/8" 2 8.75 1 17.50
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 2 7.95 1 15.90
1 3.05 0.25 0.50 0.38 1 3.05 0.75 2.29 5/8" 2 1.65 1 3.30
3/8" 2 7.15 1 14.30
Estribos 3/8" 10 1.10 1 11.00
Estribos 3/8" 21 1.70 1 35.70
Estribos 3/8" 20 1.70 1 34.00
VSE-103 1 1.00 0.25 0.20 0.05 1 1.00 0.25 0.25 5/8" 2 8.75 1 17.50
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 2 7.95 1 15.90
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 2 1.65 1 3.30
3/8" 2 7.15 1 14.30
Estribos 3/8" 10 1.10 1 11.00
Estribos 3/8" 21 1.70 1 35.70
Estribos 3/8" 21 1.70 1 35.70
VSE-104 1 3.35 0.25 0.25 0.21 1 3.35 0.25 0.84 5/8" 4 7.85 1 31.40
1 3.35 0.25 0.25 0.21 1 3.35 0.25 0.84 Estribos 3/8" 28 1.20 1 33.60
Estribos 3/8" 28 1.20 1 33.60
VSE-105 5/8" 2 8.75 1 17.50
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 2 7.95 1 15.90
1 3.35 0.25 0.50 0.42 1 3.35 0.75 2.51 5/8" 2 7.95 1 15.90
3/8" 2 7.15 1 14.30
Estribos 3/8" 8 1.70 1 13.60
Estribos 3/8" 21 1.70 1 35.70
VSE-106 2 3.23 0.25 0.45 0.73 2 3.23 0.65 4.19 5/8" 4 8.13 2 65.04
2 3.20 0.25 0.45 0.72 2 3.20 0.65 4.16 3/8" 2 7.33 2 29.32
206de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 25 1.60 4 160.00
Estribos 3/8" 25 1.60 4 160.00
VSE-106 1 1.80 0.25 0.45 0.20 1 1.80 0.65 1.17 5/8" 4 10.45 1 41.80
1 2.55 0.25 0.45 0.29 1 2.55 0.65 1.66 3/8" 2 9.65 1 19.30
1 1.80 0.25 0.45 0.20 1 1.80 0.65 1.17 Estribos 3/8" 18 1.60 1 28.80
1 1.28 0.25 0.45 0.14 1 1.28 0.65 0.83 Estribos 3/8" 22 1.60 1 35.20
Estribos 3/8" 18 1.60 1 28.80
Estribos 3/8" 15 1.60 1 24.00
VSE-106 1 2.10 0.25 0.45 0.24 1 2.10 0.65 1.37 5/8" 4 6.90 1 27.60
1 3.25 0.25 0.45 0.37 1 3.25 0.65 2.11 3/8" 2 6.10 1 12.20
Estribos 3/8" 19 1.60 1 30.40
Estribos 3/8" 25 1.60 1 40.00
VSE-106 1 1.50 0.25 0.45 0.17 1 1.50 0.65 0.98 5/8" 4 2.95 1 11.80
3/8" 2 2.15 1 4.30
Estribos 3/8" 16 1.60 1 25.60
VSE-107 1 6.68 0.25 0.60 1.00 1 6.68 0.95 6.35 5/8" 6 8.13 1 48.78
3/8" 2 7.33 1 14.66
Estribos 3/8" 42 1.90 1 79.80
VSE-107 1 3.75 0.25 0.60 0.56 1 3.75 0.95 3.56 5/8" 6 10.45 1 62.70
1 5.00 0.25 0.60 0.75 1 5.00 0.95 4.75 3/8" 2 9.65 1 19.30
Estribos 3/8" 28 1.90 1 53.20
Estribos 3/8" 34 1.90 1 64.60
VSE-110 1 4.40 0.25 0.50 0.55 1 4.40 0.25 1.10 5/8" 6 18.71 1 112.26
1 1.81 0.25 0.50 0.23 1 1.81 0.75 1.36 3/8" 2 15.91 1 31.82
1 2.14 0.25 0.50 0.27 1 2.14 0.75 1.61 Estribos 3/8" 26 1.70 1 44.20
1 1.80 0.25 0.50 0.23 1 1.80 0.75 1.35 Estribos 3/8" 15 1.70 1 25.50
1 4.24 0.25 0.50 0.53 1 4.24 0.75 3.18 Estribos 3/8" 17 1.70 1 28.90
Estribos 3/8" 15 1.70 1 25.50
Estribos 3/8" 25 1.70 1 42.50
VSE-102 25 1.00 0.25 0.20 1.25 25 1.00 0.25 6.25 5/8" 4 1.95 25 195.00
Estribos 3/8" 10 1.10 25 275.00
SECTOR D
VCH-1 2 1.00 0.25 0.40 0.20 2 1.00 0.55 1.10 5/8" 4 8.13 1 32.52
1 4.45 0.25 0.40 0.45 1 4.45 0.55 2.45 Estribos 3/8" 11 1.50 2 33.00
1 3.20 0.25 0.40 0.32 1 3.20 0.55 1.76 Estribos 3/8" 34 1.50 1 51.00
1 3.75 0.25 0.40 0.38 1 3.75 0.55 2.06 Estribos 3/8" 26 1.50 1 39.00
Estribos 3/8" 29 1.50 1 43.50
VCH-2 2 1.00 0.25 0.40 0.20 2 1.00 0.55 1.10 5/8" 4 8.13 1 32.52
1 4.45 0.25 0.40 0.45 1 4.45 0.55 2.45 Estribos 3/8" 11 1.50 2 33.00
1 3.20 0.25 0.40 0.32 1 3.20 0.55 1.76 Estribos 3/8" 34 1.50 1 51.00
1 3.75 0.25 0.40 0.38 1 3.75 0.55 2.06 Estribos 3/8" 26 1.50 1 39.00
Estribos 3/8" 29 1.50 1 43.50
VCH-3 2 1.00 0.25 0.40 0.20 2 1.00 0.55 1.10 5/8" 4 8.13 1 32.52
1 5.15 0.25 0.40 0.52 1 5.15 0.55 2.83 Estribos 3/8" 11 1.50 2 33.00
Estribos 3/8" 39 1.50 1 58.50
VCH-4 2 1.00 0.25 0.40 0.20 2 1.00 0.55 1.10 5/8" 4 8.13 1 32.52
1 5.15 0.25 0.40 0.52 1 5.15 0.55 2.83 Estribos 3/8" 11 1.50 2 33.00
Estribos 3/8" 39 1.50 1 58.50
207de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
VCH-5 2 1.00 0.25 0.40 0.20 2 1.00 0.55 1.10 5/8" 4 8.13 1 32.52
1 5.15 0.25 0.40 0.52 1 5.15 0.55 2.83 Estribos 3/8" 11 1.50 2 33.00
Estribos 3/8" 39 1.50 1 58.50
VCH-6 2 1.00 0.25 0.40 0.20 2 1.00 0.55 1.10 5/8" 4 8.13 1 32.52
1 5.15 0.25 0.40 0.52 1 5.15 0.55 2.83 Estribos 3/8" 11 1.50 2 33.00
Estribos 3/8" 39 1.50 1 58.50
SECTOR E
VE-101 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 2 19.00 1 38.00
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 1/2" 1 19.50 1 19.50
5/8" 2 1.60 1 3.20
5/8" 2 17.50 1 35.00
1/2" 1 17.50 1 17.50
3/8" 2 16.70 1 33.40
Estribos 3/8" 10 1.20 2 24.00
Estribos 3/8" 24 1.80 4 172.80
VE-102 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 3 17.50 1 52.50
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 5/8" 1 2.25 1 2.25
5/8" 3 19.00 1 57.00
3/8" 2 16.70 1 33.40
Estribos 3/8" 10 1.20 2 24.00
Estribos 3/8" 24 1.80 4 172.80
VE-103 1 1.00 0.30 0.20 0.06 1 1.00 0.30 0.30 5/8" 3 5.75 1 17.25
1 3.30 0.30 0.50 0.49 1 3.30 0.80 2.64 5/8" 2 6.50 1 13.00
1 1.05 0.30 0.50 0.16 1 1.05 0.80 0.84 1/2" 1 6.50 1 6.50
5/8" 3 2.25 1 6.75
3/8" 2 4.95 1 9.90
Estribos 3/8" 10 1.20 1 12.00
Estribos 3/8" 29 1.80 1 52.20
Estribos 3/8" 11 1.80 1 19.80
VE-104 1 1.00 0.30 0.20 0.06 1 1.00 0.30 0.30 5/8" 3 5.75 1 17.25
1 3.30 0.30 0.50 0.49 1 3.30 0.80 2.64 5/8" 2 6.50 1 13.00
1 1.05 0.30 0.50 0.16 1 1.05 0.80 0.84 1/2" 1 6.50 1 6.50
5/8" 3 2.25 1 6.75
3/8" 2 4.95 1 9.90
Estribos 3/8" 10 1.20 1 12.00
Estribos 3/8" 29 1.80 1 52.20
Estribos 3/8" 11 1.80 1 19.80
VE-105 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 3 17.50 1 52.50
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 5/8" 3 2.25 1 6.75
5/8" 3 19.00 1 57.00
3/8" 2 16.70 1 33.40
Estribos 3/8" 7 1.20 2 16.80
Estribos 3/8" 24 1.80 4 172.80
VE-106 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 2 19.00 1 38.00
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 1/2" 1 19.50 1 19.50
5/8" 2 1.60 1 3.20
5/8" 2 17.50 1 35.00
1/2" 1 17.50 1 17.50
3/8" 2 16.70 1 33.40
208de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 7 1.20 2 16.80
Estribos 3/8" 24 1.80 4 172.80
VE-107 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 3 19.00 1 57.00
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 5/8" 3 17.50 1 52.50
5/8" 2 1.60 2 6.40
3/8" 2 16.70 1 33.40
Estribos 3/8" 10 1.20 2 24.00
Estribos 3/8" 24 1.80 4 172.80
VE-108 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 3 19.00 1 57.00
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 5/8" 3 17.50 1 52.50
5/8" 2 1.60 2 6.40
3/8" 2 16.70 1 33.40
Estribos 3/8" 10 1.20 2 24.00
Estribos 3/8" 24 1.80 4 172.80
VE-109 1 1.00 0.30 0.20 0.06 1 1.00 0.30 0.30 5/8" 3 5.75 1 17.25
1 3.30 0.30 0.50 0.49 1 3.30 0.80 2.64 5/8" 2 6.50 1 13.00
1 1.05 0.30 0.50 0.16 1 1.05 0.80 0.84 1/2" 1 6.50 1 6.50
5/8" 3 2.25 1 6.75
3/8" 2 4.95 1 9.90
Estribos 3/8" 10 1.20 1 12.00
Estribos 3/8" 29 1.80 1 52.20
Estribos 3/8" 11 1.80 1 19.80
VE-110 1 1.00 0.30 0.20 0.06 1 1.00 0.30 0.30 5/8" 3 5.75 1 17.25
1 3.30 0.30 0.50 0.49 1 3.30 0.80 2.64 5/8" 2 6.50 1 13.00
1 1.05 0.30 0.50 0.16 1 1.05 0.80 0.84 1/2" 1 6.50 1 6.50
5/8" 3 2.25 1 6.75
3/8" 2 4.95 1 9.90
Estribos 3/8" 10 1.20 1 12.00
Estribos 3/8" 29 1.80 1 52.20
Estribos 3/8" 11 1.80 1 19.80
VE-111 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 3 19.00 1 57.00
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 5/8" 3 17.50 1 52.50
5/8" 2 1.60 2 6.40
3/8" 2 16.70 1 33.40
Estribos 3/8" 10 1.20 2 24.00
Estribos 3/8" 24 1.80 4 172.80
VE-112 2 1.00 0.30 0.20 0.12 2 1.00 0.30 0.60 5/8" 3 19.00 1 57.00
4 3.30 0.30 0.50 1.98 4 3.30 0.80 10.56 5/8" 3 17.50 1 52.50
5/8" 2 1.60 2 6.40
3/8" 2 16.70 1 33.40
Estribos 3/8" 10 1.20 2 24.00
Estribos 3/8" 24 1.80 4 172.80
SECTOR F
VF-101 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 3/4" 3 7.78 1 23.34
1 2.25 0.25 0.70 0.39 1 2.25 1.15 2.59 3/4" 2 5.02 1 10.04
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 3/4" 1 3.40 1 3.40
3/4" 1 3.55 1 3.55
5/8" 2 1.60 2 6.40
3/4" 3 14.30 1 42.90
209de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
3/8" 2 9.90 1 19.80
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 30 2.10 1 63.00
VF-102 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 3/4" 3 13.20 1 39.60
1 2.25 0.25 0.70 0.39 1 2.25 1.15 2.59 3/4" 1 2.80 2 5.60
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 3/4" 1 3.40 1 3.40
3/4" 3 11.70 1 35.10
3/8" 2 9.90 1 19.80
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 30 2.10 1 63.00
VF-103 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 3/4" 3 13.20 1 39.60
1 2.25 0.25 0.70 0.39 1 2.25 1.15 2.59 3/4" 1 3.15 2 6.30
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 3/4" 1 3.40 1 3.40
3/4" 3 11.70 1 35.10
3/8" 2 9.90 1 19.80
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 30 2.10 1 63.00
VF-104 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 3/4" 3 7.78 1 23.34
1 2.25 0.25 0.70 0.39 1 2.25 1.15 2.59 3/4" 2 5.02 1 10.04
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 3/4" 1 3.40 1 3.40
3/4" 1 3.55 1 3.55
5/8" 2 1.60 2 6.40
3/4" 3 14.30 1 42.90
3/8" 2 9.90 1 19.80
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 30 2.10 1 63.00
VF-105 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 3/4" 3 7.78 1 23.34
1 2.25 0.25 0.70 0.39 1 2.25 1.15 2.59 3/4" 2 5.02 1 10.04
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 3/4" 1 3.40 1 3.40
3/4" 1 3.55 1 3.55
5/8" 2 1.60 2 6.40
3/4" 3 14.30 1 42.90
3/8" 2 9.90 1 19.80
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 21 2.10 1 44.10
Estribos 3/8" 30 2.10 1 63.00
VF-106 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 5/8" 3 26.60 1 79.80
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 5/8" 2 1.60 2 6.40
1 4.25 0.25 0.70 0.74 1 4.25 1.15 4.89 5/8" 3 25.10 1 75.30
1 4.55 0.25 0.70 0.80 1 4.55 1.15 5.23 3/8" 2 24.30 1 48.60
1 5.45 0.25 0.70 0.95 1 5.45 1.15 6.27 Estribos 3/8" 10 0.20 2 4.00
Estribos 3/8" 30 0.20 1 6.00
Estribos 3/8" 27 0.20 1 5.40
Estribos 3/8" 28 1.10 1 30.80
Estribos 3/8" 31 2.10 1 65.10
210de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
VF-107 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50 3/4" 2 21.65 1 43.30
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 5/8" 3 4.60 1 13.80
1 4.25 0.25 0.70 0.74 1 4.25 1.15 4.89 3/4" 1 3.40 3 10.20
1 4.55 0.25 0.70 0.80 1 4.55 1.15 5.23 5/8" 2 1.60 2 6.40
1 5.45 0.25 0.70 0.95 1 5.45 1.15 6.27 3/8" 2 24.30 1 48.60
5/8" 3 25.10 2 150.60
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 27 2.10 1 56.70
Estribos 3/8" 28 2.10 1 58.80
Estribos 3/8" 31 2.10 1 65.10
VF-108 2 1.00 0.25 0.20 0.10 2 1.00 0.25 0.50
1 5.15 0.25 0.70 0.90 1 5.15 1.15 5.92 3/4" 2 26.60 1 53.20
1 4.25 0.25 0.70 0.74 1 4.25 1.15 4.89 3/4" 1 3.40 3 10.20
1 4.55 0.25 0.70 0.80 1 4.55 1.15 5.23 5/8" 2 1.60 2 6.40
1 5.45 0.25 0.70 0.95 1 5.45 1.15 6.27 3/8" 2 24.30 1 48.60
5/8" 3 25.10 2 150.60
Estribos 3/8" 10 1.10 2 22.00
Estribos 3/8" 30 2.10 1 63.00
Estribos 3/8" 27 2.10 1 56.70
Estribos 3/8" 28 2.10 1 58.80
Estribos 3/8" 31 2.10 1 65.10
CASETA 1
VC1-101 1 1.65 0.15 0.20 0.05 1 1.65 0.15 0.25 3/8" 4 3.30 1 13.20
1 0.65 0.15 0.20 0.02 1 0.65 0.15 0.10 Estribos 3/8" 15 0.90 1 13.50
Estribos 3/8" 9 0.90 1 8.10
VC1-103 1 1.65 0.15 0.20 0.05 1 1.65 0.15 0.25 3/8" 4 3.30 1 13.20
1 0.65 0.15 0.20 0.02 1 0.65 0.15 0.10 Estribos 3/8" 15 0.90 1 13.50
Estribos 3/8" 9 0.90 1 8.10
VC1-104 1 1.65 0.15 0.20 0.05 1 1.65 0.15 0.25 3/8" 4 3.30 1 13.20
1 0.65 0.15 0.20 0.02 1 0.65 0.15 0.10 Estribos 3/8" 15 0.90 1 13.50
Estribos 3/8" 9 0.90 1 8.10
VC1-105 2 0.65 0.30 0.20 0.08 2 0.65 0.30 0.39 5/8" 6 8.25 1 49.50
2 3.45 0.30 0.20 0.41 2 3.45 0.30 2.07 Estribos 3/8" 9 1.20 2 21.60
Estribos 3/8" 27 1.20 2 64.80
VC1-106 2 0.65 0.15 0.40 0.08 2 0.65 0.55 0.72 5/8" 4 8.25 1 33.00
2 3.45 0.15 0.40 0.41 2 3.45 0.55 3.80 Estribos 3/8" 9 1.30 2 23.40
Estribos 3/8" 27 1.30 2 70.20
CASETA 2
VC2-101 1 4.05 0.50 0.20 0.41 1 4.05 0.50 2.03 5/8" 6 4.35 1 26.10
Estribos 3/8" 31 1.60 1 49.60
VC2-102 1 4.05 0.25 0.20 0.20 1 4.05 0.25 1.01 1/2" 4 4.35 1 17.40
Estribos 3/8" 31 1.10 1 34.10
VC2-103 1 4.05 0.50 0.20 0.41 1 4.05 0.50 2.03 5/8" 6 4.35 1 26.10
Estribos 3/8" 31 1.60 1 49.60
VC2-104 1 5.35 0.40 0.20 0.43 1 5.35 0.40 2.14 1/2" 6 5.65 1 33.90
Estribos 3/8" 16 1.40 1 22.40
Estribos 3/8" 18 1.40 1 25.20
VC2-105 1 5.35 0.40 0.20 0.43 1 5.35 0.40 2.14 1/2" 6 5.65 1 33.90
211de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 16 1.40 1 22.40
Estribos 3/8" 18 1.40 1 25.20
CASETA 3
VC3-101 ( 2 Und) 4 0.90 0.25 0.50 0.45 4 0.90 0.75 2.70 5/8" 8 18.05 2 288.80
2 5.80 0.25 0.50 1.45 2 5.80 0.75 8.70 Estribos 3/8" 9 1.70 4 61.20
2 1.35 0.25 0.50 0.34 2 1.35 0.75 2.03 Estribos 3/8" 37 1.70 2 125.80
2 6.05 0.25 0.50 1.51 2 6.05 0.75 9.08 Estribos 3/8" 19 1.70 2 64.60
Estribos 3/8" 38 1.70 2 129.20
VC3-102 ( 4 Und) 8 0.90 0.15 0.25 0.27 8 0.90 0.15 1.08 1/2" 4 5.85 4 93.60
4 2.75 0.15 0.25 0.41 4 2.75 0.15 1.65 Estribos 3/8" 9 1.00 8 72.00
Estribos 3/8" 23 1.00 4 92.00
CASETA 4
VC4-101 1 4.05 0.50 0.20 0.41 1 4.05 0.70 2.83 5/8" 6 4.35 1 26.10
Estribos 3/8" 31 1.60 1 49.60
VC4-102 1 4.05 0.50 0.20 0.41 1 4.05 0.70 2.83 5/8" 6 4.35 1 26.10
Estribos 3/8" 31 1.60 1 49.60
VC4-103 1 1.90 0.40 0.20 0.15 1 1.90 0.60 1.14 1/2" 6 5.00 1 30.00
1 1.40 0.40 0.20 0.11 1 1.40 0.60 0.84 Estribos 3/8" 17 1.40 1 23.80
Estribos 3/8" 14 1.40 1 19.60
VC4-104 1 1.90 0.40 0.20 0.15 1 1.90 0.60 1.14 1/2" 6 5.00 1 30.00
1 1.40 0.40 0.20 0.11 1 1.40 0.60 0.84 Estribos 3/8" 17 1.40 1 23.80
Estribos 3/8" 14 1.40 1 19.60
CASETA CONTROL PLANTA DE TRATAMIENTO
VA-3 2 4.50 0.18 0.30 0.49 2 4.50 0.48 4.32 1/2" 4 4.35 2 34.80
Estribos 3/8" 30 1.16 2 69.60
VA-3 2 3.50 0.18 0.30 0.38 2 3.50 0.48 3.36 1/2" 4 4.35 2 34.80
Estribos 3/8" 24 1.16 2 55.68
CAJAS DE ASCENSOR Y ESCALERAS
ESCALERA 1
VE1-101 - 201 - 301 15 0.80 0.25 0.60 1.80 15 0.80 1.20 14.40 3/4" 5 14.10 3 211.50
3 1.35 0.25 0.60 0.61 3 1.35 1.20 4.86 3/8" 2 13.30 3 79.80
3 2.60 0.25 0.60 1.17 3 2.60 1.20 9.36 Estribos 3/8" 8 1.90 15 228.00
Estribos 3/8" 14 1.90 3 79.80
Estribos 3/8" 14 1.90 3 79.80
VE1-103 - 203 - 303 3 5.56 0.25 0.60 2.50 3 5.56 1.20 20.02 3/4" 5 6.76 3 101.40
3/8" 2 5.96 3 35.76
Estribos 3/8" 29 1.90 3 165.30
D-D 9 1.35 0.15 0.60 1.09 9 1.35 0.75 9.11 5/8" 3 1.95 9 52.65
3/8" 2 1.95 9 35.10
Estribos 3/8" 7 2.90 9 182.70
VE1-401 3 0.80 0.25 0.60 0.36 3 0.80 1.20 2.88 3/4" 5 10.90 1 54.50
1 1.35 0.25 0.60 0.20 1 1.35 1.20 1.62 3/8" 2 10.90 1 21.80
1 2.60 0.25 0.60 0.39 1 2.60 1.20 3.12 Estribos 3/8" 8 1.90 3 45.60
Estribos 3/8" 14 1.90 1 26.60
Estribos 3/8" 14 1.90 1 26.60
VE1-403 1 6.61 0.25 0.60 0.99 1 6.61 1.20 7.93 3/4" 5 7.80 1 39.00
3/8" 2 7.80 1 15.60
Estribos 3/8" 35 1.90 1 66.50
212de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
D-D 4to piso 2 1.35 0.15 0.60 0.24 2 1.35 0.75 2.03 5/8" 3 1.95 2 11.70
3/8" 2 1.95 2 7.80
Estribos 3/8" 7 2.90 2 40.60
VE1-101 CUARTO DE MAQUINAS 4 3.00 0.20 0.60 1.44 4 3.00 1.15 13.80 3/4" 5 4.20 4 84.00
3/8" 2 4.20 4 33.60
Estribos 3/8" 16 1.80 4 115.20
D-D CUARTO DE MAQUINAS 2 1.35 0.15 0.60 0.24 2 1.35 0.75 2.03 5/8" 3 1.95 2 11.70
3/8" 2 1.95 2 7.80
Estribos 3/8" 7 2.90 2 40.60
ESCALERA 2
VE2-101 - 201 - 301 - 401 4 1.80 0.20 0.60 0.86 4 1.80 1.20 8.64 5/8" 6 7.95 4 190.80
4 1.00 0.20 0.60 0.48 4 1.00 1.20 4.80 3/8" 2 7.15 4 57.20
4 2.00 0.20 0.60 0.96 4 2.00 1.20 9.60 Estribos 3/8" 10 1.80 4 72.00
4 1.50 0.20 0.60 0.72 4 1.50 1.20 7.20 Estribos 3/8" 6 1.80 4 43.20
Estribos 3/8" 11 1.80 4 79.20
Estribos 3/8" 9 1.80 4 64.80
VE2-103 - 203 - 303 3 5.65 0.25 0.60 2.54 3 5.65 1.20 20.34 5/8" 6 6.80 3 122.40
3/8" 2 6.00 3 36.00
Estribos 3/8" 27 1.90 3 153.90
VE2-200 - 300 - 400 3 1.00 0.20 0.60 0.36 3 1.00 1.15 3.45 3/4" 4 1.80 3 21.60
3/8" 2 1.80 3 10.80
Estribos 3/8" 6 1.80 3 32.40
ESCALERA 3
VE3-101 - 201 - 301 - 401 4 2.15 0.20 0.60 1.03 4 2.15 1.20 10.32 3/4" 4 8.30 4 132.80
4 0.80 0.20 0.60 0.38 4 0.80 1.20 3.84 3/8" 2 7.50 4 60.00
4 0.80 0.20 0.60 0.38 4 0.80 1.20 3.84 Estribos 3/8" 12 1.80 4 86.40
4 0.80 0.20 0.60 0.38 4 0.80 1.20 3.84 Estribos 3/8" 5 1.80 4 36.00
Estribos 3/8" 5 1.80 4 36.00
Estribos 3/8" 5 1.80 4 36.00
VE3-103 - 203 - 303 3 5.60 0.25 0.60 2.52 3 5.60 1.20 20.16 5/8" 6 6.75 3 121.50
3/8" 2 5.95 3 35.70
Estribos 3/8" 27 1.90 3 153.90
VE3-200 - 300 - 400 3 1.00 0.20 0.60 0.36 3 1.00 1.15 3.45 3/4" 4 1.80 3 21.60
3/8" 2 1.80 3 10.80
Estribos 3/8" 6 1.80 3 32.40
ESCALERAs 4 Y 5
VE4-101 - 201 - 301 6 2.00 0.20 0.60 1.44 6 2.00 1.15 13.80 3/4" 4 30.50 3 366.00
18 0.80 0.20 0.60 1.73 18 0.80 1.15 16.56 3/8" 2 29.70 3 178.20
3 1.00 0.20 0.60 0.36 3 1.00 1.15 3.45 Estribos 3/8" 11 1.80 6 118.80
3 1.05 0.20 0.60 0.38 3 1.05 1.15 3.62 Estribos 3/8" 5 1.80 18 162.00
3 3.00 0.20 0.60 1.08 3 3.00 1.15 10.35 Estribos 3/8" 6 1.80 3 32.40
Estribos 3/8" 7 1.80 3 37.80
Estribos 3/8" 16 1.80 3 86.40
VE4-103 - 203 - 303 6 5.60 0.25 0.60 5.04 6 5.60 1.20 40.32 5/8" 6 6.75 6 243.00
3/8" 2 5.95 6 71.40
Estribos 3/8" 29 1.90 6 330.60
D-D 9 0.80 0.15 0.60 0.65 9 0.80 0.75 5.40 5/8" 3 1.40 9 37.80
3/8" 2 1.40 9 25.20
Estribos 3/8" 4 2.90 9 104.40
213de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
D-D 6 1.00 0.15 0.60 0.54 6 1.00 0.75 4.50 5/8" 3 1.60 6 28.80
3/8" 2 1.60 6 19.20
Estribos 3/8" 5 2.90 6 87.00
D-D 6 1.70 0.15 0.60 0.92 6 1.70 0.75 7.65 5/8" 3 2.30 6 41.40
3/8" 2 2.30 6 27.60
Estribos 3/8" 9 2.90 6 156.60
VE4-401 1 3.00 0.20 0.60 0.36 1 3.00 1.15 3.45 3/4" 4 13.55 1 54.20
2 0.80 0.20 0.60 0.19 2 0.80 1.15 1.84 3/8" 2 12.75 1 25.50
2 2.00 0.20 0.60 0.48 2 2.00 1.15 4.60 Estribos 3/8" 16 1.80 1 28.80
Estribos 3/8" 5 1.80 2 18.00
Estribos 3/8" 11 1.80 2 39.60
VE5-401 1 2.00 0.20 0.60 0.24 1 2.00 1.15 2.30 3/4" 4 13.55 1 54.20
2 0.80 0.20 0.60 0.19 2 0.80 1.15 1.84 3/8" 2 12.75 1 25.50
1 1.80 0.20 0.60 0.22 1 1.80 1.15 2.07 Estribos 3/8" 11 1.80 1 19.80
1 1.00 0.20 0.60 0.12 1 1.00 1.15 1.15 Estribos 3/8" 5 1.80 2 18.00
1 1.05 0.20 0.60 0.13 1 1.05 1.15 1.21 Estribos 3/8" 10 1.80 1 18.00
Estribos 3/8" 6 1.80 1 10.80
Estribos 3/8" 7 1.80 1 12.60
VE4-402 1 1.75 0.20 0.60 0.21 1 1.75 1.15 2.01 5/8" 6 6.75 1 40.50
1 1.69 0.20 0.60 0.20 1 1.69 1.15 1.94 3/8" 2 5.95 1 11.90
Estribos 3/8" 10 1.80 1 18.00
Estribos 3/8" 10 1.80 1 18.00
VE5-402 2 1.00 0.20 0.60 0.24 2 1.00 1.15 2.30 5/8" 6 5.40 1 32.40
3/8" 2 4.60 1 9.20
Estribos 3/8" 6 1.80 2 21.60
VE5 - LOSA DE PISO ASCENSORES 1 3.00 0.20 0.65 0.39 1 3.00 1.25 3.75 5/8" 6 3.80 1 22.80
3/8" 2 3.80 1 7.60
Estribos 3/8" 16 1.90 1 30.40
1 4.35 0.20 0.65 0.57 1 4.35 1.25 5.44 5/8" 6 5.15 1 30.90
3/8" 2 5.15 1 10.30
Estribos 3/8" 23 1.90 1 43.70
1 1.50 0.20 0.65 0.20 1 1.50 1.25 1.88 5/8" 6 2.30 1 13.80
3/8" 2 2.30 1 4.60
Estribos 3/8" 9 1.90 1 17.10
1 2.85 0.20 0.65 0.37 1 2.85 1.25 3.56 5/8" 6 3.65 1 21.90
3/8" 2 3.65 1 7.30
Estribos 3/8" 16 1.90 1 30.40
1 3.65 0.20 0.65 0.47 1 3.65 1.25 4.56 5/8" 6 4.45 1 26.70
3/8" 2 4.45 1 8.90
Estribos 3/8" 20 1.90 1 38.00
VE5 - LOSA DE TECHO ASCENSORES 1 3.00 0.20 0.65 0.39 1 3.00 1.25 3.75 5/8" 6 3.80 1 22.80
3/8" 2 3.80 1 7.60
Estribos 3/8" 16 1.90 1 30.40
1 4.35 0.20 0.65 0.57 1 4.35 1.25 5.44 5/8" 6 5.15 1 30.90
3/8" 2 5.15 1 10.30
Estribos 3/8" 23 1.90 1 43.70
1 1.50 0.20 0.65 0.20 1 1.50 1.25 1.88 5/8" 6 2.30 1 13.80
3/8" 2 2.30 1 4.60
214de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 9 1.90 1 17.10
1 2.85 0.20 0.65 0.37 1 2.85 1.25 3.56 5/8" 6 3.65 1 21.90
3/8" 2 3.65 1 7.30
Estribos 3/8" 16 1.90 1 30.40
1 3.65 0.20 0.65 0.47 1 3.65 1.25 4.56 5/8" 6 4.45 1 26.70
3/8" 2 4.45 1 8.90
Estribos 3/8" 20 1.90 1 38.00
D-D EN PISO DE CUARTO DE MAQUINA 2 1.70 0.15 0.60 0.31 2 1.70 0.75 2.55 5/8" 3 2.30 2 13.80
3/8" 2 2.30 2 9.20
Estribos 3/8" 9 2.90 2 52.20
D-D EN TECHO DE CUARTO DE MAQUI 2 1.70 0.15 0.60 0.31 2 1.70 0.75 2.55 5/8" 3 2.30 2 13.80
3/8" 2 2.30 2 9.20
Estribos 3/8" 9 2.90 2 52.20
ESCALERA 6
VE6-101 - 201 - 301 - 401 4 2.15 0.20 0.60 1.03 4 2.15 1.20 10.32 3/4" 4 8.30 4 132.80
12 0.80 0.20 0.60 1.15 12 0.80 1.20 11.52 3/8" 2 7.50 4 60.00
Estribos 3/8" 12 1.80 4 86.40
Estribos 3/8" 5 1.80 12 108.00
VE6-103 - 203 - 303 3 5.55 0.25 0.60 2.50 3 5.55 1.20 19.98 5/8" 6 6.75 3 121.50
3/8" 2 5.95 3 35.70
Estribos 3/8" 27 1.90 3 153.90
VE6-200 - 300 - 400 3 1.60 0.20 0.60 0.58 3 1.60 1.15 5.52 3/4" 4 2.40 3 28.80
3/8" 2 2.40 3 14.40
Estribos 3/8" 9 1.80 3 48.60
ESCALERA 7
VE7-101 - 201 - 301 - 401 4 1.50 0.20 0.60 0.72 4 1.50 1.20 7.20 3/4" 4 8.30 4 132.80
4 2.00 0.20 0.60 0.96 4 2.00 1.20 9.60 3/8" 2 7.50 4 60.00
4 1.00 0.20 0.60 0.48 4 1.00 1.20 4.80 Estribos 3/8" 9 1.80 4 64.80
4 1.80 0.20 0.60 0.86 4 1.80 1.20 8.64 Estribos 3/8" 11 1.80 4 79.20
Estribos 3/8" 6 1.80 4 43.20
Estribos 3/8" 10 1.80 4 72.00
VE7-103 - 203 - 303 3 5.55 0.25 0.60 2.50 3 5.55 1.20 19.98 5/8" 6 6.75 3 121.50
3/8" 2 5.95 3 35.70
Estribos 3/8" 27 1.90 3 153.90
VE7-200 - 300 2 1.60 0.20 0.60 0.38 2 1.60 1.15 3.68 3/4" 4 2.40 2 19.20
3/8" 2 2.40 2 9.60
Estribos 3/8" 9 1.80 2 32.40
D-D 4 1.00 0.20 0.60 0.48 4 1.00 0.80 3.20 5/8" 3 1.60 4 19.20
3/8" 2 1.60 4 12.80
Estribos 3/8" 5 2.90 4 58.00
SECTOR B1
PRIMER PISO
VB1-103(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 3/4" 2 40.90 1 81.80
5/8" 1 40.90 1 40.90
Central 1/2" 2 37.90 1 75.80
Negativos 3/4" 3 40.90 1 122.70
3/4" 3 4.60 1 13.80
5/8" 2 3.50 1 7.00
215de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
5/8" 1 3.80 1 3.80
5/8" 1 3.80 1 3.80
3/4" 3 4.00 1 12.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
VB1-101(.30x.70) 1 39.05 0.30 0.70 1 39.05 1.20 Positivos 3/4" 3 43.65 1 130.95
Central 3/8" 2 40.65 1 81.30
Negativos 3/4" 2 43.65 1 87.30
3/4" 1 2.30 1 2.30
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 20 2.20 1 44.00
VB1-102(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 1" 2 40.90 1 81.80
5/8" 2 5.70 1 11.40
Central 1/2" 2 37.90 1 75.80
Negativos 1" 2 40.90 1 81.80
1" 1 2.10 1 2.10
1" 3 5.00 1 15.00
1" 2 3.60 1 7.20
1" 2 5.85 1 11.70
5/8" 1 3.95 1 3.95
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
VB1-104/109(.30x.70) 2 7.50 0.30 0.70 2 7.50 1.20 Positivos 5/8" 3 9.10 2 54.60
Central 3/8" 2 8.50 2 34.00
Negativos 3/4" 2 13.60 2 54.40
3/4" 1 3.30 2 6.60
Estribos 3/8" 40 2.20 2 176.00
Estribos 3/8" 12 2.20 2 52.80
VB1-105/106/107/108(.30x.70) 4 13.20 0.30 0.70 4 13.20 1.20 Positivos 5/8" 3 14.80 4 177.60
Central 3/8" 2 13.60 4 108.80
Negativos 3/4" 2 14.80 4 118.40
3/4" 2 3.30 4 26.40
Estribos 3/8" 40 2.20 4 352.00
Estribos 3/8" 38 2.20 4 334.40
Estribos 3/8" 12 2.20 4 105.60
216de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
SECTOR B4
PRIMER PISO
VB4-103(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 3/4" 2 40.90 1 81.80
5/8" 1 40.90 1 40.90
Central 1/2" 2 37.90 1 75.80
Negativos 3/4" 3 40.90 1 122.70
3/4" 3 4.60 1 13.80
5/8" 2 3.50 1 7.00
5/8" 1 3.80 1 3.80
5/8" 1 3.80 1 3.80
3/4" 3 4.00 1 12.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
VB4-101(.30x.70) 1 39.05 0.30 0.70 1 39.05 1.20 Positivos 3/4" 3 43.65 1 130.95
Central 3/8" 2 40.65 1 81.30
Negativos 3/4" 2 43.65 1 87.30
3/4" 1 2.60 1 2.60
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 20 2.20 1 44.00
VB4-102(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 1" 2 40.90 1 81.80
5/8" 2 5.70 1 11.40
Central 1/2" 2 37.90 1 75.80
Negativos 1" 2 40.90 1 81.80
1" 1 2.10 1 2.10
1" 3 5.00 1 15.00
1" 2 3.60 1 7.20
1" 2 5.85 1 11.70
5/8" 1 3.95 1 3.95
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
VB2-104/109(.30x.70) 2 7.50 0.30 0.70 2 7.50 1.20 Positivos 5/8" 3 9.10 2 54.60
Central 3/8" 2 8.50 2 34.00
Negativos 3/4" 2 13.60 2 54.40
3/4" 1 3.30 2 6.60
Estribos 3/8" 40 2.20 2 176.00
217de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 12 2.20 2 52.80
VB2-105/106/107/108(.30x.70) 4 13.20 0.30 0.70 4 13.20 1.20 Positivos 5/8" 3 14.80 4 177.60
Central 3/8" 2 13.60 4 108.80
Negativos 3/4" 2 14.80 4 118.40
3/4" 2 3.30 4 26.40
Estribos 3/8" 40 2.20 4 352.00
Estribos 3/8" 38 2.20 4 334.40
Estribos 3/8" 12 2.20 4 105.60
SECTOR B1
SEGUNDO PISO
VB1-201(.30x.70) 1 39.05 0.30 0.70 1 39.05 1.20 Positivos 3/4" 3 43.65 1 130.95
Central 3/8" 2 40.65 1 81.30
Negativos 3/4" 2 43.65 1 87.30
3/4" 1 2.30 1 2.30
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 20 2.20 1 44.00
VB1-203(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 3/4" 2 40.90 1 81.80
5/8" 1 40.90 1 40.90
Central 1/2" 2 37.90 1 75.80
Negativos 3/4" 3 40.90 1 122.70
3/4" 3 4.60 1 13.80
5/8" 2 3.50 1 7.00
5/8" 1 3.80 1 3.80
5/8" 1 3.80 1 3.80
3/4" 3 4.00 1 12.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
VB1-202(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 1" 2 40.90 1 81.80
5/8" 2 5.70 1 11.40
Central 1/2" 2 37.90 1 75.80
Negativos 1" 2 40.90 1 81.80
1" 1 2.10 1 2.10
1" 3 5.00 1 15.00
1" 2 3.60 1 7.20
1" 2 5.85 1 11.70
5/8" 1 3.95 1 3.95
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 39 2.20 1 85.80
218de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
VB1-204/209(.30x.70) 2 7.50 0.30 0.70 2 7.50 1.20 Positivos 5/8" 3 9.10 2 54.60
Central 3/8" 2 8.50 2 34.00
Negativos 3/4" 2 13.60 2 54.40
3/4" 1 3.30 2 6.60
Estribos 3/8" 40 2.20 2 176.00
Estribos 3/8" 12 2.20 2 52.80
VB1-205/206/207/208(.30x.70) 4 13.20 0.30 0.70 4 13.20 1.20 Positivos 5/8" 3 14.80 4 177.60
Central 3/8" 2 13.60 4 108.80
Negativos 3/4" 2 14.80 4 118.40
3/4" 2 3.30 4 26.40
Estribos 3/8" 40 2.20 4 352.00
Estribos 3/8" 38 2.20 4 334.40
Estribos 3/8" 12 2.20 4 105.60
ALEROS area
1 56.00 0.47 1.00 1 56.00 7.35 longitudinal 5/8" 12 59.60 1 715.20
3/8" 12 59.00 1 708.00
Estribos 1/2" 224 4.70 1 1,052.80
Estribos 3/8" 47 2.11 5 495.85
Estribos 3/8" 224 0.62 1 138.88
SECTOR B4
SEGUNDO PISO
VB4-201(.30x.70) 1 39.05 0.30 0.70 1 39.05 1.20 Positivos 3/4" 3 43.65 1 130.95
Central 3/8" 2 40.65 1 81.30
Negativos 3/4" 2 43.65 1 87.30
3/4" 1 2.60 1 2.60
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
3/4" 1 4.25 1 4.25
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 45 2.20 1 99.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 20 2.20 1 44.00
VB4-203(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 3/4" 2 40.90 1 81.80
5/8" 1 40.90 1 40.90
Central 1/2" 2 37.90 1 75.80
Negativos 3/4" 3 40.90 1 122.70
3/4" 3 4.60 1 13.80
5/8" 2 3.50 1 7.00
5/8" 1 3.80 1 3.80
5/8" 1 3.80 1 3.80
3/4" 3 4.00 1 12.00
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
ENTRE LAS VIGAS VB1-204/205/206/207/208/209(.30x.70)
Se esta tomando detalles para esta viga de VB4 - 201(0.30x0.70) debido a que no hay detalles en los planos
219de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 46 2.20 1 101.20
VB4-202(.30x.70) 1 36.30 0.30 0.70 1 36.30 1.20 Positivos 1" 2 40.90 1 81.80
5/8" 2 5.70 1 11.40
Central 1/2" 2 37.90 1 75.80
Negativos 1" 2 40.90 1 81.80
1" 1 2.10 1 2.10
1" 3 5.00 1 15.00
1" 2 3.60 1 7.20
1" 2 5.85 1 11.70
5/8" 1 3.95 1 3.95
Estribos 3/8" 46 2.20 1 101.20
Estribos 3/8" 39 2.20 1 85.80
Estribos 3/8" 43 2.20 1 94.60
Estribos 3/8" 35 2.20 1 77.00
Estribos 3/8" 46 2.20 1 101.20
VB4-204/209(.30x.70) 2 7.50 0.30 0.70 2 7.50 1.20 Positivos 5/8" 3 9.10 2 54.60
Central 3/8" 2 8.50 2 34.00
Negativos 3/4" 2 13.60 2 54.40
3/4" 1 3.30 2 6.60
Estribos 3/8" 40 2.20 2 176.00
Estribos 3/8" 12 2.20 2 52.80
VB4-205/206/207/208(.30x.70) 4 13.20 0.30 0.70 4 13.20 1.20 Positivos 5/8" 3 14.80 4 177.60
Central 3/8" 2 13.60 4 108.80
Negativos 3/4" 2 14.80 4 118.40
3/4" 2 3.30 4 26.40
Estribos 3/8" 40 2.20 4 352.00
Estribos 3/8" 38 2.20 4 334.40
Estribos 3/8" 12 2.20 4 105.60
ALEROS area
1 56.00 0.47 1.00 1 56.00 7.35 longitudinal 5/8" 12 59.60 1 715.20
3/8" 12 59.00 1 708.00
Estribos 1/2" 224 4.70 1 1,052.80
Estribos 3/8" 47 2.11 5 495.85
Estribos 3/8" 224 0.62 1 138.88
AUDITORIO
PRIMER PISO
VA(0.15x0.30)A1 12 6.90 0.15 0.30 12 6.90 0.75 Positivos 1/2" 4 7.50 12 360.00
Estribos 3/8" 33 1.10 12 435.60
8 2.85 0.15 0.30 8 2.85 0.75 Positivos 1/2" 4 3.45 8 110.40
Estribos 3/8" 17 1.10 8 149.60
VAU1(0.3x0.50)A1 4 6.90 0.30 0.50 4 6.90 1.30 Positivos 5/8" 4 7.50 4 120.00
Estribos 3/8" 33 1.80 4 237.60
4 2.85 0.30 0.50 4 2.85 1.30 Positivos 5/8" 4 3.45 4 55.20
Estribos 3/8" 17 1.80 4 122.40
VAU2(0.30x0.70)A1 4 6.90 0.30 0.70 4 6.90 1.70 Positivos 5/8" 4 7.50 4 120.00
Positivos 1/2" 2 7.50 2 30.00
Estribos 3/8" 33 2.20 4 290.40
ENTRE LAS VIGAS VB1-204/205/206/207/208/209(.30x.70)
220de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart.Nro Vec.
Longitud Ancho Altura ParcialNro Vec.
Long Altura Parcial FORMA DN. Elem
LongitudN° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
TOTALES M3 1,297.99 M2 7,633.68 ML - 97,809.20 17,273.45 38,289.58 21,734.15 6,944.91
KG - 54,773.15 17,100.72 59,348.85 47,815.13 27,571.29 206,609.14
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0%
1,297.99 7,633.68 54,773.15 17,100.72 59,348.85 47,815.13 27,571.29 206,609.14
221de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
02.03.07 LOSAS MACIZAS
02.03.07.01 LOSAS MACIZAS CONCRETO F`C = 280 KG/CM2
02.03.07.02 LOSAS MACIZAS ENCOFRADO Y DESENCOFRADO
02.03.07.03 LOSAS MACIZAS ACERO DE REFUERZO Fy=4200 kg/cm2
SOTANO
LOSA ENTRE EJES 13-14 / 15-17 y C-D 1 6.90 6.90 0.20 9.52 1 6.90 6.90 47.61
1 1.10 6.90 0.20 1.52 1 1.10 6.90 7.59
2 5.70 6.90 0.20 15.73 2 5.70 6.90 78.66
Sentido horizontal Baston 1/2" 1 1.80 34 60.30
Acero Positivo 1/2" 1 7.50 34 251.25
Acero Positivo 1/2" 2 6.30 34 422.10
Acero Negativo 3/8" 4 3.05 34 408.70
Acero Negativo 3/8" 2 3.30 34 221.10
Acero Negativo 1/2" 3 3.90 45 526.50
Sentido vertical Acero Positivo 1/2" 1 7.50 121 907.50
Baston 1/2" 1 1.80 64 115.46
LOSA ENTRE EJES 17-18 y D-E 1 6.90 6.90 0.20 9.52 1 6.90 6.90 47.61
Sentido horizontal Baston 1/2" 1 1.80 34 60.30
Acero Positivo 1/2" 1 7.50 45 337.50
Sentido vertical Acero Positivo 1/2" 1 7.50 45 337.50
LOSA ENTRE EJES 16-17 y F-G 1 5.70 2.45 0.20 2.79 1 5.70 2.45 13.97
Sentido horizontal 1/2" 2 6.30 11 141.75
Sentido vertical 1/2" 2 3.05 28 167.75
LOSA ENTRE EJES 20-22 y B-D 4 6.90 6.90 0.20 38.09 4 6.90 6.90 190.44
Sentido horizontal Baston 1/2" 2 1.80 80 286.46
Acero Positivo 1/2" 2 7.50 93 1,395.00
Acero Negativo 3/8" 1 3.30 93 306.90
Acero Negativo 1/2" 1 4.30 93 399.90
Sentido vertical Acero Positivo 1/2" 2 7.50 93 1,395.00
Acero Negativo 3/8" 1 3.30 93 306.90
Acero Negativo 1/2" 1 4.30 93 399.90
Baston 1/2" 2 1.80 80 286.46
LOSA SECTOR E 4 1.00 1.15 0.20 0.92 4 1.00 1.15 4.60
8 3.30 1.15 0.20 6.07 8 3.30 1.15 30.36
8 1.00 3.30 0.20 5.28 8 1.00 3.30 26.40
Sentido horizontal 3/8" 2 16.70 10 350.70
1/2" 1 1.80 65 117.00
3/8" 1 1.35 131 176.85
Sentido vertical 3/8" 2 16.85 9 303.30
1/2" 1 1.60 131 209.60
3/8" 1 1.35 9 12.15
LOSA SECTOR F 2 1.00 1.00 0.20 0.40 2 1.00 1.00 2.00
Nro Vec.
Nro Vec.
222de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
2 1.00 1.15 0.20 0.46 2 1.00 1.15 2.30
1 3.25 1.00 0.20 0.65 1 3.25 1.00 3.25
1 5.90 1.00 0.20 1.18 1 5.90 1.00 5.90
2 1.00 5.80 0.20 2.32 2 1.00 5.80 11.60
4 1.00 4.55 0.20 3.64 4 1.00 4.55 18.20
2 1.00 5.15 0.20 2.06 2 1.00 5.15 10.30
1 3.25 1.15 0.20 0.75 1 3.25 1.15 3.74
1 5.90 1.15 0.20 1.36 1 5.90 1.15 6.79
Sentido horizontal 3/8" 2 11.90 10 232.05
1/2" 1 1.70 199 339.15
3/8" 2 1.45 199 578.55
Sentido vertical 3/8" 2 23.45 9 422.10
1/2" 1 1.90 45 85.02
3/8" 1 1.40 68 95.20
LOSA SOBRE CAMARAS FRIGORIFICAS
1 4.30 3.35 0.15 2.16 1 4.30 3.35 14.41
Sentido horizontal Acero Positivo 1/2" 1 4.15 21 89.23
Acero Negativo 1/2" 1 4.15 21 89.23
Sentido vertical Baston 1/2" 2 1.60 17 53.60
Acero Negativo 1/2" 1 5.10 17 85.43
PRIMER PISO
LOSA ENTRE EJES 13-14 / 15-17 y C-D 1 6.90 6.90 0.20 9.52 1 6.90 6.90 47.61
1 1.10 6.90 0.20 1.52 1 1.10 6.90 7.59
2 5.70 6.90 0.20 15.73 2 5.70 6.90 78.66
Sentido horizontal Baston 1/2" 1 1.80 34 60.30
Acero Positivo 1/2" 1 7.50 34 251.25
Acero Positivo 1/2" 2 6.30 34 422.10
Acero Negativo 1/2" 1 3.90 45 175.50
Sentido vertical Acero Positivo 1/2" 1 7.50 121 907.50
Baston 1/2" 1 1.80 56 100.80
LOSA ENTRE EJES 17-18 y D-E 1 6.90 6.90 0.20 9.52 1 6.90 6.90 47.61
Baston 1/2" 1 1.80 34 60.30
Acero Positivo 1/2" 1 7.50 45 337.50
Sentido vertical Acero Positivo 1/2" 1 7.50 45 337.50
LOSA ENTRE EJES 6-7 y G-H 1 4.40 2.40 0.20 2.11 1 4.40 2.40 10.56
1 2.25 4.50 0.20 2.03 1 2.25 4.50 10.13
Sentido horizontal 1/2" 2 4.90 11 107.80
1/2" 3 2.55 22 164.48
Sentido vertical 1/2" 2 7.50 10 153.75
3/8" 2 2.70 10 52.65
LOSA ENTRE EJES 16-17 y F-G 1 5.70 2.45 0.20 2.79 1 5.70 2.45 13.97
Sentido horizontal 1/2" 2 6.30 11 141.75
223de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
Sentido vertical 1/2" 2 3.00 28 165.00
LOSA ENTRE EJES 20-22 y B-D 4 6.90 6.90 0.20 38.09 4 6.90 6.90 190.44
Sentido horizontal Baston 1/2" 2 1.80 80 286.46
Acero Positivo 1/2" 2 7.50 93 1,395.00
Acero Negativo 3/8" 1 3.30 93 306.90
Acero Negativo 1/2" 1 4.30 93 399.90
Sentido vertical Acero Positivo 1/2" 2 7.50 93 1,395.00
Acero Negativo 3/8" 1 3.30 93 306.90
Acero Negativo 1/2" 1 4.30 93 399.90
Baston 1/2" 2 1.80 80 286.46
SECTOR D 2 1.00 1.00 0.20 0.40 2 1.00 1.00 2.00
2 4.45 1.00 0.20 1.78 2 4.45 1.00 8.90
2 3.20 1.00 0.20 1.28 2 3.20 1.00 6.40
2 3.75 1.00 0.20 1.50 2 3.75 1.00 7.50
2 1.00 1.00 0.20 0.40 2 1.00 1.00 2.00
1 1.00 5.15 0.20 1.03 1 1.00 5.15 5.15
1 4.45 5.15 0.20 4.58 1 4.45 5.15 22.92
1 3.20 5.15 0.20 3.30 1 3.20 5.15 16.48
1 3.75 5.15 0.20 3.86 1 3.75 5.15 19.31
1 1.00 5.15 0.20 1.03 1 1.00 5.15 5.15
Sentido horizontal Acero Positivo 3/8" 2 15.80 5 158.00
Acero Negativo 3/8" 2 15.80 5 158.00
Baston 1/2" 2 1.85 26 95.27
Acero Positivo 3/8" 1 15.80 26 406.85
Acero Negativo 3/8" 1 15.80 26 406.85
Sentido vertical Acero Positivo 3/8" 2 8.05 5 80.50
Acero Negativo 3/8" 2 8.05 5 80.50
Baston 1/2" 2 1.85 57 210.90
Acero Positivo 3/8" 1 8.05 57 458.85
Acero Negativo 3/8" 1 8.05 57 458.85
SECTOR C
SUB ESTACION + CISTERNA 1 10.40 0.60 0.20 1.25 1 10.40 0.60 6.24
1 8.25 0.60 0.20 0.99 1 8.25 0.60 4.95
1 2.80 0.60 0.20 0.34 1 2.80 0.60 1.68
1 20.10 0.60 0.20 2.41 1 20.10 0.60 12.06
1 16.65 0.60 0.20 2.00 1 16.65 0.60 9.99
1 20.80 0.60 0.20 2.50 1 20.80 0.60 12.48
Sentido horizontal Acero Positivo 3/8" 1 11.95 3 35.85
Acero Negativo 3/8" 1 11.95 3 35.85
Acero Positivo 3/8" 1 10.85 3 32.55
Acero Negativo 3/8" 1 10.85 3 32.55
224de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
Acero Positivo 3/8" 1 3.20 3 9.60
Acero Negativo 3/8" 1 3.20 3 9.60
Acero Positivo 3/8" 1 23.70 3 71.10
Acero Negativo 3/8" 1 23.70 3 71.10
Acero Positivo 3/8" 1 19.05 3 57.15
Acero Negativo 3/8" 1 19.05 3 57.15
Acero Positivo 3/8" 1 24.05 3 72.15
Acero Negativo 3/8" 1 24.05 3 72.15
Sentido vertical Acero Positivo 1/2" 1 1.85 26 48.10
Acero Negativo 3/8" 1 1.65 26 42.90
Acero Positivo 1/2" 1 1.65 21 34.03
Acero Negativo 3/8" 1 1.25 21 25.78
Acero Positivo 1/2" 1 1.65 7 11.55
Acero Negativo 3/8" 1 1.25 7 8.75
Acero Positivo 1/2" 1 1.65 50 82.91
Acero Negativo 3/8" 1 1.25 50 62.81
Acero Positivo 1/2" 1 1.65 42 68.68
Acero Negativo 3/8" 1 1.25 42 52.03
Acero Positivo 1/2" 1 1.65 52 85.80
Acero Negativo 3/8" 1 1.25 52 65.00
CASETA 4 2 16.55 0.90 0.25 7.45 2 16.55 0.90 29.79
2 3.75 0.90 0.25 1.69 2 3.75 0.90 6.75
Sentido horizontal Acero Positivo 3/8" 2 18.95 5 170.55
Acero Negativo 3/8" 2 18.95 5 170.55
Acero Positivo 3/8" 2 5.95 5 53.55
Acero Negativo 3/8" 2 5.95 5 53.55
Sentido vertical Acero Positivo 1/2" 2 1.75 41 144.81
Acero Negativo 3/8" 2 1.55 41 128.26
Acero Positivo 1/2" 2 1.75 9 32.81
225de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
Acero Negativo 3/8" 2 1.55 9 29.06
SEGUNDO PISO
SECTOR A
LOSA ENTRE EJES 3-7 y A-D 1 1.20 2.10 0.25 0.63 1 1.20 2.10 2.52
2 1.20 1.20 0.25 0.72 2 1.20 1.20 2.88
3 6.90 1.20 0.25 6.21 3 6.90 1.20 24.84
1 1.20 5.70 0.25 1.71 1 1.20 5.70 6.84
2 1.20 6.90 0.25 4.14 2 1.20 6.90 16.56
Sentido horizontal 3/8" 2 24.30 5 243.00
1/2" 2 2.00 48 191.00
3/8" 1 2.00 48 95.50
Sentido vertical 3/8" 1 3.90 5 19.50
1/2" 2 2.00 51 203.00
3/8" 1 2.00 51 101.50
3/8" 2 21.90 5 219.00
empalme 1 3/8" 1 3.00 1 3.00
empalme 2 3/8" 1 3.00 1 3.00
LOSA ENTRE EJES 3-4 y D-G 1 1.20 2.95 0.25 0.89 1 1.20 2.95 3.54
2 1.20 6.90 0.25 4.14 2 1.20 6.90 16.56
Sentido horizontal 3/8" 1 2.00 41 81.75
1/2" 2 2.00 41 163.50
Sentido vertical 3/8" 2 18.30 5 183.00
empalme 1 3/8" 1 2.00 1 2.00
SECTOR B
LOSA ENTRE EJES 8-10 y B-H 2 1.20 1.20 0.25 0.72 2 1.20 1.20 2.88
6 1.20 6.90 0.25 12.42 6 1.20 6.90 49.68
1 7.15 1.20 0.25 2.15 1 7.15 1.20 8.58
Sentido horizontal 3/8" 2 7.15 5 71.50
3/8" 1 2.00 103 205.00
1/2" 2 2.00 103 410.00
Sentido vertical 3/8" 1 2.00 17 33.75
1/2" 2 2.00 17 67.50
3/8" 2 45.90 5 459.00
empalme 1 3/8" 1 6.00 1 6.00
LOSA ENTRE EJES 10-12 y B-H 1 6.55 1.20 0.25 1.96 1 6.55 1.20 7.86
1 6.90 1.20 0.25 2.07 1 6.90 1.20 8.28
2 6.85 1.20 0.25 4.11 2 6.85 1.20 16.44
2 6.95 1.20 0.25 4.17 2 6.95 1.20 16.68
2 1.20 5.65 0.25 3.39 2 1.20 5.65 13.56
Sentido horizontal 3/8" 2 14.35 17 487.90
3/8" 1 2.00 27 54.50
1/2" 2 2.00 27 109.00
226de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
Sentido vertical 3/8" 1 2.00 100 199.75
1/2" 2 2.00 100 399.50
3/8" 2 11.60 5 116.00
empalme 1 3/8" 1 3.00 1 3.00
LOSA ENTRE EJES 13-19 y B-H 1 6.60 1.20 0.25 1.98 1 6.60 1.20 7.92
1 6.90 1.20 0.25 2.07 1 6.90 1.20 8.28
4 5.70 1.20 0.25 6.84 4 5.70 1.20 27.36
Sentido horizontal 3/8" 2 7.20 5 72.00
3/8" 2 7.25 5 72.50
3/8" 2 12.30 11 270.60
Sentido vertical 3/8" 1 2.00 61 122.50
1/2" 2 2.00 61 245.00
3/8" 1 1.50 56 84.00
1/2" 2 1.50 56 168.00
empalme 1 3/8" 1 2.00 1 2.00
LOSA ENTRE EJES 18-19 y B-C 1 6.90 6.90 0.25 11.90 1 6.90 6.90 47.61
Sentido horizontal Acero Positivo 1/2" 1 7.50 45 337.50
Baston 1/2" 1 1.80 34 60.30
Sentido vertical Acero Positivo 1/2" 1 7.50 45 337.50
Baston 1/2" 1 1.80 34 60.30
LOSA ENTRE EJES 20-22 y B-H 3 6.90 1.20 0.25 6.21 3 6.90 1.20 24.84
3 6.55 1.20 0.25 5.90 3 6.55 1.20 23.58
2 1.20 5.65 0.25 3.39 2 1.20 5.65 13.56
Sentido horizontal 3/8" 1 14.35 17 243.95
3/8" 1 2.00 27 54.50
1/2" 2 2.00 27 109.00
Sentido vertical 3/8" 1 2.00 100 199.75
1/2" 2 2.00 100 399.50
3/8" 1 11.60 5 58.00
empalme 1 3/8" 1 2.00 1 2.00
LOSA ENTRE EJES 22-24 y B-H 1 6.60 1.20 0.25 1.98 1 6.60 1.20 7.92
2 1.15 1.20 0.25 0.69 2 1.15 1.20 2.76
6 1.20 6.90 0.25 12.42 6 1.20 6.90 49.68
Sentido horizontal 3/8" 2 7.15 5 71.50
3/8" 1 2.00 103 205.00
1/2" 2 2.00 103 410.00
Sentido vertical 3/8" 1 2.00 15 31.00
1/2" 2 2.00 15 62.00
3/8" 2 45.90 5 459.00
empalme 1 3/8" 1 6.00 1 6.00
LOSA ENTRE EJES 6-7 y G-H 1 4.40 2.40 0.20 2.11 1 4.40 2.40 10.56
227de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
1 2.25 4.50 0.20 2.03 1 2.25 4.50 10.13
Sentido horizontal 1/2" 2 4.90 11 107.80
1/2" 3 2.55 22 164.48
Sentido vertical 1/2" 2 7.50 10 153.75
3/8" 2 2.70 10 52.65
LOSA ENTRE EJES 16-17 y F-G 1 5.70 2.45 0.20 2.79 1 5.70 2.45 13.97
Sentido horizontal 1/2" 2 6.30 11 141.75
Sentido vertical 1/2" 2 3.00 28 165.00
TERCER PISO
TECHO SECTOR A
LOSA ENTRE EJES 6-7 y D-E 1 8.15 6.90 0.20 11.25 1 8.15 6.90 56.24
Sentido horizontal 1/2" 2 7.51 53 801.51
Sentido vertical 1/2" 2 8.51 45 765.90
LOSA ENTRE EJES 6-7 y E-G 1 14.10 6.90 0.20 19.46 1 14.10 6.90 97.29
Sentido horizontal 1/2" 2 7.51 93 1,397.63
Sentido vertical 1/2" 2 15.00 45 1,350.00
LOSA ENTRE EJES 6-7 y G-H 1 3.00 4.50 0.20 2.70 1 3.00 4.50 13.50
Sentido horizontal 5/8" 2 3.00 19 114.00
Sentido vertical 5/8" 2 4.50 29 261.00
TECHO SECTOR B
LOSA ENTRE EJES 13-19 y B-H 4 6.90 1.20 0.25 8.28 4 6.90 1.20 33.12
4 1.20 1.20 0.25 1.44 4 1.20 1.20 5.76
8 1.20 6.90 0.25 16.56 8 1.20 6.90 66.24
4 5.70 1.20 0.25 6.84 4 5.70 1.20 27.36
4 1.20 5.70 0.25 6.84 4 1.20 5.70 27.36
4 1.20 6.90 0.25 8.28 4 1.20 6.90 33.12
Sentido horizontal 3/8" 2 8.70 23 400.20
3/8" 1 2.00 137 274.00
1/2" 2 2.00 137 548.00
3/8" 2 12.30 11 270.60
3/8" 1 2.00 125 250.00
1/2" 2 2.00 125 500.00
Sentido vertical 3/8" 2 31.50 11 693.00
3/8" 1 2.00 68 136.00
1/2" 2 2.00 68 272.00
3/8" 2 29.10 11 640.20
3/8" 1 2.00 44 88.00
1/2" 2 2.00 44 176.00
TECHO 1 7.95 1.60 0.20 2.54 1 7.95 1 1.60 12.72 LONGITUDINALES 1/2" 16 8.35 1 133.60
228de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
TRANSVERSALES 3/8" 80 2.00 1 160.00
1 4.70 2.40 0.20 2.26 1 4.70 1 2.40 11.28 LONGITUDINALES 1/2" 24 5.10 1 122.40
TRANSVERSALES 3/8" 48 2.80 1 134.40
ALEROS PLUVIALES
ALEROS DEL SEGUNDO PISO
SECTOR A
Cara Exterior 1 70.50 0.15 0.50 5.29 2 70.50 0.50 70.50
Cara Interior 1 65.40 0.15 0.50 4.91 2 65.40 0.50 65.40
Acero transversal Exterior 3/8" 1 0.90 352 316.35
Interior 3/8" 1 0.75 262 196.20
Acero Longitudinal Exterior 3/8" 1 70.50 3 211.50
Interior 3/8" 1 65.40 2 130.80
SECTOR B
SECTOR B2
Cara Exterior 1 79.50 0.15 0.80 9.54 2 79.50 0.80 127.20
Cara Interior 1 74.70 0.15 0.75 8.40 2 74.70 0.75 112.05
Acero transversal Exterior 1/2" 1 1.10 397 436.15
Interior 3/8" 1 1.10 299 328.68
Acero Longitudinal Exterior 3/8" 1 79.50 5 397.50
Interior 3/8" 1 74.70 3 224.10
ALEROS EN DUCTOS
Cara Exterior 1 40.50 0.15 0.80 4.86 2 40.50 0.80 64.80
Cara Interior 1 40.00 0.15 0.75 4.50 2 40.00 0.75 60.00
Acero transversal Exterior 1/2" 1 1.10 201 221.65
Interior 3/8" 1 1.10 160 176.00
Acero Longitudinal Exterior 3/8" 1 40.50 5 202.50
Interior 3/8" 1 40.00 3 120.00
SECTOR B3
Cara Exterior 1 23.40 0.15 0.50 1.76 2 23.40 0.50 23.40
Cara Interior 1 25.40 0.15 0.45 1.71 2 25.40 0.45 22.86
Acero transversal Exterior 3/8" 1 0.90 116 104.40
Interior 3/8" 1 0.70 102 71.12
Acero Longitudinal Exterior 3/8" 1 23.40 3 70.20
Interior 3/8" 1 25.40 2 50.80
SECTOR B5
Cara Exterior 1 79.50 0.15 0.80 9.54 2 79.50 0.80 127.20
Cara Interior 1 74.70 0.15 0.75 8.40 2 74.70 0.75 112.05
Acero transversal Exterior 1/2" 1 1.10 397 436.15
Interior 3/8" 1 1.10 299 328.68
Acero Longitudinal Exterior 3/8" 1 79.50 5 397.50
229de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
Interior 3/8" 1 74.70 3 224.10
ALEROS EN DUCTOS
Cara Exterior 1 40.50 0.15 0.80 4.86 2 40.50 0.80 64.80
Cara Interior 1 40.00 0.15 0.75 4.50 2 40.00 0.75 60.00
Acero transversal Exterior 1/2" 1 1.10 201 221.65
Interior 3/8" 1 1.10 160 176.00
Acero Longitudinal Exterior 3/8" 1 40.50 5 202.50
Interior 3/8" 1 40.00 3 120.00
area
1 56.00 0.47 1.00 26.32 1 56.00 7.35 411.60 longitudinal 5/8" 12 59.60 1 715.20
3/8" 12 59.00 1 708.00
Estribos 1/2" 224 4.70 1 1,052.80
Estribos 3/8" 47 2.11 5 495.85
Estribos 3/8" 224 0.62 1 138.88
ALEROS DEL TERCER PISO
2 48.00 0.15 0.50 7.20 4 48.00 0.50 96.00
2 45.80 0.15 0.50 6.87 4 45.80 0.50 91.60
1 75.80 0.15 0.50 5.69 2 75.80 0.50 75.80
1 71.40 0.15 0.50 5.36 2 71.40 0.50 71.40
Acero transversal Exteriror 1 3/8" 2 0.90 239 430.20
3/8" 2 0.75 192 288.00
Exteriror 2 3/8" 2 0.90 228 410.40
3/8" 2 0.75 183 274.80
Interior 1 3/8" 1 0.90 378 340.20
3/8" 1 0.75 303 227.40
Interior 2 3/8" 1 0.90 356 320.40
3/8" 1 0.75 286 214.20
Acero Longitudinal Exteriror 1 3/8" 5 53.60 1 268.00
Exteriror 2 3/8" 5 51.40 1 257.00
Interior 1 3/8" 5 84.40 1 422.00
Interior 2 3/8" 5 79.00 1 395.00
CAJAS DE ESCALERAS Y ASCENSORES
ESCALERA 1
SOTANO A TERCER PISO 3 1.65 6.61 0.25 8.18 3 1.65 1 6.61 32.72 LONGIT. SUPERIOR 1/2" 7 7.40 3 155.40
3 2.55 6.61 0.25 12.64 3 2.55 1 6.61 50.57 LONGIT. INFERIOR 1/2" 9 7.40 3 199.80
LONGIT. SUP E INF. 1/2" 13 7.30 3 284.70
TRANSV. SUPERIOR 1/2" 27 5.25 3 425.25
TRANSV. INFERIOR 1/2" 34 5.25 3 535.50
CUARTO PISO 1 5.90 6.61 0.25 9.75 1 5.90 1 6.61 39.00 LONGIT. SUP. E INF. 1/2" 60 7.40 1 444.00
ENTRE LAS VIGAS VB1-204/205/206/207/208/209(.30x.70)
230de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
1 2.65 6.61 0.25 4.38 1 2.65 1 6.61 17.52 LONGIT. SUP. E INF. 1/2" 28 7.40 1 207.20
LONGIT. SUP E INF. 1/2" 14 7.30 1 102.20
TRANSV. SUP. E INF 1/2" 68 9.50 1 646.00
PISO CUARTO DE MAQUINAS 1 3.00 1.81 0.25 1.36 1 3.00 1 1.81 5.43 LONGIT. SUP. E INF. 1/2" 30 7.40 1 222.00
1 3.00 4.60 0.25 3.45 1 3.00 1 4.60 13.80 TRANSV. SUP. E INF 1/2" 20 3.82 1 76.40
TRANSV. SUP. E INF 1/2" 46 3.82 1 175.72
TECHO CUARTO DE MAQUINAS 1 3.00 1.81 0.25 1.36 1 3.00 1 1.81 5.43 LONGIT. SUP. E INF. 1/2" 30 7.40 1 222.00
1 3.00 4.60 0.25 3.45 1 3.00 1 4.60 13.80 TRANSV. SUP. E INF 1/2" 20 3.82 1 76.40
TRANSV. SUP. E INF 1/2" 46 3.82 1 175.72
ESCALERA 2
SOTANO A TERCER PISO 3 1.80 5.55 0.25 7.49 3 1.80 1 5.55 29.97 LONGIT. SUP E INF. 1/2" 18 6.35 3 342.90
TRANSV. SUP. E INF. 1/2" 46 2.55 3 351.90
CUARTO PISO 1 5.55 5.95 0.25 8.26 1 5.55 1 5.95 33.02 LONGIT. SUP E INF. 1/2" 56 6.35 1 355.60
TRANSV. SUP. E INF. 1/2" 48 7.55 1 362.40
ESCALERA 3
SOTANO A TERCER PISO 3 1.75 5.55 0.25 7.28 3 1.75 1 5.55 29.14 LONGIT. SUP E INF. 1/2" 9 6.35 3 171.45
TRANSV. SUP. E INF. 1/2" 28 2.60 3 218.40
LONGIT. SUP E INF. 1/2" 7 6.35 3 133.35
TRANSV. SUP. E INF. 1/2" 23 2.60 3 179.40
CUARTO PISO 1 5.55 5.95 0.25 8.26 1 5.55 1 5.95 33.02 LONGIT. SUP E INF. 1/2" 56 6.35 1 355.60
TRANSV. SUP. E INF. 1/2" 48 7.90 1 379.20
ESCALERA 4
SOTANO A TERCER PISO 3 1.60 5.55 0.25 6.66 3 1.60 1 5.55 26.64 LONGIT. SUP E INF. 1/2" 16 6.35 3 304.80
TRANSV. SUP. E INF. 1/2" 46 2.45 3 338.10
CUARTO PISO 1 6.95 5.55 0.25 9.64 1 6.95 1 5.55 38.57 LONGIT. SUP E INF. 1/2" 70 6.35 1 444.50
1 4.40 2.85 0.25 3.14 1 4.40 1 2.85 12.54 TRANSV. SUP. E INF. 1/2" 56 7.75 1 434.00
LONGIT. SUP E INF. 1/2" 44 3.65 1 160.60
TRANSV. SUP. E INF. 1/2" 30 5.00 1 150.00
ESCALERA 5
SOTANO A TERCER PISO 3 1.60 5.55 0.25 6.66 3 1.60 1 5.55 26.64 LONGIT. SUP E INF. 1/2" 16 6.35 3 304.80
TRANSV. SUP. E INF. 1/2" 46 2.45 3 338.10
CUARTO PISO 1 11.35 5.55 0.25 15.75 1 11.35 1 5.55 62.99 LONGIT. SUP E INF. 1/2" 114 6.35 1 723.90
-1 1.00 1.75 0.25 -0.44 -1 1.00 1 1.75 -1.75 TRANSV. SUP. E INF. 1/2" 56 12.15 1 680.40
-1 1.15 2.00 0.25 -0.58 -1 1.15 1 2.00 -2.30
231de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
ASCENSOR ENTRE ESC.4 Y ESC.5
SOTANO A TERCER PISO 6 2.00 2.85 0.25 8.55 6 2.00 1 2.85 34.20 LONGIT. SUP E INF. 1/2" 20 3.65 6 438.00
TRANSV. SUP. E INF. 1/2" 30 8.40 3 756.00
3 3.00 5.55 0.25 12.49 3 3.00 1 5.55 49.95 LONGIT. SUP E INF. 1/2" 30 6.35 3 571.50
TRANSV. SUP. E INF. 1/2" 56 3.80 3 638.40
CUARTO PISO 1 4.00 5.55 0.20 4.44 1 4.00 1 5.55 22.20 LONGIT. SUP. E INF. 1/2" 102 6.35 1 647.70
1 3.20 5.55 0.20 3.55 1 3.20 1 5.55 17.76 TRANSV. SUP. E INF 1/2" 74 11.60 1 858.40
1 3.00 5.55 0.20 3.33 1 3.00 1 5.55 16.65
PISO CUARTO DE MAQUINAS 1 3.20 5.55 0.20 3.55 1 3.20 1 5.55 17.76 LONGIT. SUP. E INF. 1/2" 32 6.35 1 203.20
TRANSV. SUP. E INF 1/2" 56 4.00 1 224.00
TECHO CUARTO DE MAQUINAS 1 3.20 5.55 0.20 3.55 1 3.20 1 5.55 17.76 LONGIT. SUP. E INF. 1/2" 32 6.35 1 203.20
TRANSV. SUP. E INF 1/2" 56 4.00 1 224.00
ESCALERA 6
SOTANO A TERCER PISO 3 1.75 5.55 0.25 7.28 3 1.75 1 5.55 29.14 LONGIT. SUP E INF. 1/2" 9 6.35 3 171.45
TRANSV. SUP. E INF. 1/2" 28 2.60 3 218.40
LONGIT. SUP E INF. 1/2" 7 6.35 3 133.35
TRANSV. SUP. E INF. 1/2" 23 2.60 3 179.40
CUARTO PISO 1 5.55 5.95 0.25 8.26 1 5.55 1 5.95 33.02 LONGIT. SUP E INF. 1/2" 56 6.35 1 355.60
TRANSV. SUP. E INF. 1/2" 48 7.90 1 379.20
ESCALERA 7
SOTANO A TERCER PISO 3 1.75 5.55 0.25 7.28 3 1.75 1 5.55 29.14 LONGIT. SUP E INF. 1/2" 9 6.35 3 171.45
TRANSV. SUP. E INF. 1/2" 28 2.60 3 218.40
LONGIT. SUP E INF. 1/2" 7 6.35 3 133.35
TRANSV. SUP. E INF. 1/2" 23 2.60 3 179.40
CUARTO PISO 1 5.55 5.95 0.25 8.26 1 5.55 1 5.95 33.02 LONGIT. SUP E INF. 1/2" 56 6.35 1 355.60
TRANSV. SUP. E INF. 1/2" 48 7.90 1 379.20
ENCOFRADO DE FRISO N° long Ancho
SOTANO
Eje B 1 58.80 0.25 14.70
Eje D 1 40.70 0.25 10.18
Eje F 1 26.20 0.25 6.55
Eje 10 ,12 ,19 y 22 4 14.10 0.25 14.10
232de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
Eje 25 1 35.33 0.25 8.83
PRIMER PISO
SECTOR A
Eje A 1 23.00 0.25 5.75
Eje E 1 21.30 0.25 5.33
Eje H/I 1 43.00 0.25 10.75
Eje 1 y 2 1 12.40 0.25 3.10
Eje 3 y 4 1 50.30 0.25 12.58
Eje 7 1 36.35 0.25 9.09
SECTOR B1
Eje J 1 56.1 0.25 14.02
SECTOR B4
Eje J 1 56.1 0.25 14.02
SECTOR B2
Eje 8,10 y 12 1 110.3 0.25 27.58
Eje B,D,F y H 1 71.2 0.25 17.80
SECTOR B3
Eje 15,17 1 14.4 0.25 3.60
Eje B,D,F y H 1 97.3 0.25 24.33
SECTOR B5
Eje 19,22,24 1 102.33 0.25 25.58
Eje B,D,F y H 1 63.5 0.25 15.88
SEGUNDO PISO
SECTOR A
Eje A 1 27.90 0.25 6.98
Eje H/I 1 23.10 0.25 5.78
Eje 3 y 4 1 49.20 0.25 12.30
Eje 7 1 48.50 0.25 12.13
SECTOR B1
Eje J 1 56.1 0.25 14.02
SECTOR B4
Eje J 1 56.1 0.25 14.02
233de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
Part. Longitud Ancho Altura Parcial Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Nro Vec.
SECTOR B2
ducto 1 11.7 0.25 2.93
Eje B 1 28.8 0.25 7.20
Eje D y F ducto 2 13.3 0.25 6.65
Eje 8,10 y 12 1 122.3 0.25 30.58
Eje H 1 21.7 0.25 5.43
SECTOR B3
Eje 15,17 1 14.4 0.25 3.60
Eje B,D,F y H 1 97.3 0.25 24.33
SECTOR B5
Eje 19,22,24 1 102.33 0.25 25.58
Eje B,D,F y H 1 63.5 0.25 15.88
TERCER PISO
SECTOR B3
Eje 12 y 20 2 31.50 0.25 15.75
Eje 15 y 17 2 26.10 0.25 13.05
Eje C y G 2 26.10 0.25 13.05
Eje B y H 2 23.20 0.25 11.60
TOTALES M3 726.62 M2 4,850.46 ML - 24,589.21 48,139.69 1,090.20 - -
KG - 13,769.96 47,658.30 1,689.81 - -
% DE DESPERDICIOS 5% % DE DESPERDICIOS 0% % DE DESPERDICIOS
762.95 4,850.46 - 13,769.96 47,658.30 1,689.81 - -
234de336
ACERO
TOTAL
235de336
ACERO
TOTAL
236de336
ACERO
TOTAL
237de336
ACERO
TOTAL
238de336
ACERO
TOTAL
239de336
ACERO
TOTAL
240de336
ACERO
TOTAL
241de336
ACERO
TOTAL
242de336
ACERO
TOTAL
243de336
ACERO
TOTAL
244de336
ACERO
TOTAL
245de336
ACERO
TOTAL
246de336
ACERO
TOTAL
63,118.06
63,118.06
247de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
02.03.08 LOSAS ALIGERADAS EN UN SENTIDO
02.03.08.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2
02.03.08.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO
02.03.08.03 LOSA ALIGERADA ACERO DE REFUERZO Fy=4200 kg/cm2
02.03.08.04 LOSA ALIGERADA LADRILLO HUECO 15 x 30 x 30 cm.
SECTOR B
SOTANO
Entre Ejes 13-19 y B-HEntre Ejes 13-14 y G-H 1 3.30 6.90 0.10 2.28 1 3.30 6.90 22.77 Baston 3/8" 1 1.05 17 17.85
Acero Positivo 1/2" 1 3.90 17 66.30 Temperatura 1/4" 1 3.30 12 39.60
Entre Ejes 15-16 y F-G 1 5.70 6.90 0.10 3.93 1 5.70 6.90 39.33 Baston 1/2" 1 1.65 17 28.05 Acero Positivo 3/8" 2 6.30 17 214.20 Temperatura 1/4" 1 7.50 22 165.00
Entre Ejes 15-17 y F-G 2 5.70 6.90 0.10 7.87 2 5.70 6.90 78.66 Acero Positivo 1/2" 2 6.30 17 214.20 Acero Intermedio 3/8" 2 4.50 17 153.00 Acero Negativo 1/2" 1 2.80 17 47.60 Acero Negativo 1/2" 1 3.50 17 59.50 Temperatura 1/4" 1 7.50 45 337.50
Entre Ejes 18-22 y F-G 3 6.90 2.25 0.10 4.66 3 6.90 2.25 46.58 3/8" 1 4.30 52 223.60 1/2" 1 4.95 52 257.40 1/2" 1 2.85 52 148.20
Temperatura 1/4" 1 7.50 26 195.00 SECTOR E Entre Ejes 28''- 30 y D''-E'' 12 3.30 3.30 0.10 13.07 6 3.30 3.30 65.34 Baston 1/2" 2 2.30 21 96.60
4 3.30 0.90 0.10 1.19 2 3.30 0.90 5.94 Acero Positivo 1/2" 2 7.50 21 315.00 4 0.90 2.40 0.10 0.86 2 0.90 2.40 4.32 Acero Negativo 1/2" 3 2.30 21 144.90
Baston 1/2" 1 2.20 24 52.80 Baston 1/2" 1 2.45 24 58.80
Acero Positivo 1/2" 1 4.95 24 118.80 Temperatura 1/4" 1 14.70 33 485.10 Temperatura 1/4" 1 4.80 37 177.60
SECTOR F 1 3.25 5.80 0.10 1.88 1 3.25 5.80 18.85 Baston 1/2" 1 2.35 17 39.95 1 5.90 5.80 0.10 3.42 1 5.90 5.80 34.22 Acero Positivo 1/2" 1 7.30 17 124.10 2 3.25 4.55 0.10 2.96 2 3.25 4.55 29.58 Acero Intermedio 1/2" 1 4.60 17 78.20 1 3.40 4.55 0.10 1.55 1 3.40 4.55 15.47 Acero Negativo 1/2" 1 3.05 17 51.85 1 5.90 4.55 0.10 2.68 1 5.90 4.55 26.85 Acero Negativo 1/2" 1 2.45 17 41.65 1 3.25 5.15 0.10 1.67 1 3.25 5.15 16.74 Acero Positivo 1/2" 2 5.05 17 171.70 1 5.90 5.15 0.10 3.04 1 5.90 5.15 30.39 Acero Negativo 1/2" 1 2.35 17 39.95
Acero Negativo 1/2" 1 2.05 17 34.85 Acero Positivo 1/2" 1 6.65 17 113.05 Acero Negativo 1/2" 1 2.80 17 47.60 Acero Negativo 1/2" 1 2.10 17 35.70
Acero Intermedio 3/8" 1 3.95 17 67.15 Baston 1/2" 1 2.50 17 42.50 Baston 1/2" 1 2.35 6 14.10
Acero Positivo 1/2" 1 7.30 6 43.80 Acero Intermedio 1/2" 1 4.60 6 27.60
Baston 1/2" 1 1.35 6 8.10 Baston 3/8" 1 1.35 6 8.10
Acero Positivo 1/2" 1 5.05 6 30.30 Acero Negativo 1/2" 1 2.80 6 16.80 Acero Negativo 1/2" 1 2.10 6 12.60 Acero Positivo 1/2" 1 6.80 6 40.80
Acero Intermedio 3/8" 1 3.95 6 23.70 Baston 1/2" 1 2.50 6 15.00
Nro Vec.
248de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Temperatura 1/4" 1 9.90 61 603.90 Temperatura 1/4" 1 6.25 17 106.25
Entre Ejes 20-22 y B-G Entre Ejes 20-22 y F-G 1 6.90 2.25 0.10 1.55 1 6.90 2.25 15.53 3/8" 1 4.30 34 146.20
1 6.55 2.25 0.10 1.47 1 6.55 2.25 14.74 1/2" 1 4.95 34 168.30 1/2" 1 2.85 34 96.90
Temperatura 1/4" 1 14.35 8 114.80 PRIMER PISO SECTOR A Y B2,B3,B5 Entre Ejes 1-7 y E-J Entre Ejes 1-2 y H-I 1 3.75 6.00 0.10 2.25 1 3.75 6.00 22.50 1/2" 1 6.45 15 96.75
3/8" 2 3.30 15 99.00 1/2" 1 4.35 15 65.25
Temperatura 1/4" 1 6.60 14 92.40 Entre Ejes 1-2 y I-J 1 3.75 3.50 0.10 1.31 1 3.75 3.50 13.13 Baston 3/8" 2 1.30 9 23.40
Acero Positivo 1/2" 1 4.10 9 36.90 Temperatura 1/4" 1 4.35 13 56.55
Entre Ejes 7-8 y B-C 1 6.20 2.25 0.10 1.40 1 6.20 2.25 13.95 Baston 3/8" 2 1.10 16 35.20 Acero Positivo 1/2" 1 2.85 30 85.50 Temperatura 1/4" 1 6.85 8 54.80
Entre Ejes 13-19 y B-H Entre Ejes 15-16 y F-G 1 5.70 6.90 0.10 3.93 1 5.70 6.90 39.33 Baston 1/2" 1 1.55 17 26.35
Acero Positivo 1/2" 1 6.30 17 107.10 Acero Intermedio 3/8" 1 4.70 17 79.90
Temperatura 1/4" 1 7.50 22 165.00 Entre Ejes 9-23 y H-I Entre Ejes 9-15 y H-I 5 6.90 5.35 0.10 18.46 5 6.90 5.35 184.58 Baston 1/2" 2 1.40 86 240.80
Acero Positivo 1/2" 1 5.95 86 511.70 Acero Intermedio 3/8" 1 4.35 86 374.10
Temperatura 1/4" 1 36.30 20 726.00 Entre Ejes 17-23 y H-I 5 6.90 5.35 0.10 18.46 5 6.90 5.35 184.58 Baston 1/2" 2 1.40 86 240.80
Acero Positivo 1/2" 1 5.95 86 511.70 Acero Intermedio 3/8" 1 4.35 86 374.10
Temperatura 1/4" 1 36.30 20 726.00 Entre Ejes 15-17 y G-H 2 5.70 3.15 0.10 3.59 2 5.70 3.15 35.91 Baston 3/8" 2 1.10 29 63.80
Acero Positivo 1/2" 1 3.75 29 108.75
Temperatura 1/4" 1 12.30 12 147.60 SECTOR C GRUPO ELECTROGENO 1 3.35 6.85 0.10 2.29 1 3.35 6.85 22.95 Acero Positivo 3/8" 2 1.20 17 41.04
1 3.34 6.85 0.10 2.29 1 3.34 6.85 22.88 Acero Positivo 1/2" 1 2.25 17 38.48 Acero Negativo 3/8" 1 7.45 17 127.40 Temperatura 1/4" 1 7.35 26 191.10
SUB ESTACION 1 0.40 3.75 0.10 0.15 1 0.40 3.75 1.50 Acero Positivo 3/8" 1 1.20 23 27.96 1 3.35 3.75 0.10 1.26 1 3.35 3.75 12.56 Acero Positivo 1/2" 1 1.80 23 41.94 1 3.34 3.75 0.10 1.25 1 3.34 3.75 12.52 Acero Positivo 1/2" 1 2.25 23 52.43 1 0.40 5.15 0.10 0.21 1 0.40 5.15 2.06 Acero Negativo 3/8" 1 8.45 23 196.89 1 3.35 5.15 0.10 1.73 1 3.35 5.15 17.25 Temperatura 1/4" 1 10.65 27 287.55 1 3.34 5.15 0.10 1.72 1 3.34 5.15 17.20 1 0.40 0.40 0.10 0.02 1 0.40 0.40 0.16 1 3.35 0.40 0.10 0.13 1 3.35 0.40 1.34 1 3.34 0.40 0.10 0.13 1 3.34 0.40 1.34
CASETA 1 1 2.20 0.35 0.10 0.08 1 2.20 0.35 0.77 Acero Positivo 3/8" 1 3.60 19 67.68
2 2.20 3.45 0.10 1.52 2 2.20 3.45 15.18 Acero Negativo 3/8" 1 3.30 19 62.04 1 2.20 0.25 0.10 0.06 1 2.20 0.25 0.55 Temperatura 1/4" 1 7.95 12 95.40 1 0.65 0.35 0.10 0.02 1 0.65 0.35 0.23
249de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
2 0.65 3.45 0.10 0.45 2 0.65 3.45 4.49 1 0.65 0.25 0.10 0.02 1 0.65 0.25 0.16
CASETA 2 1 3.35 2.20 0.10 0.74 1 3.35 2.20 7.37 Acero Positivo 3/8" 1 1.35 10 13.91 1 3.35 1.90 0.10 0.64 1 3.35 1.90 6.37 Acero Positivo 3/8" 1 1.25 10 12.88
Acero Negativo 1/2" 1 4.05 10 41.72 Temperatura 1/4" 1 5.35 12 64.20
CASETA 3 1 3.15 5.80 0.10 1.83 1 3.15 5.80 18.27 Acero Positivo 1/2" 1 2.25 35 79.43 1 3.15 2.25 0.10 0.71 1 3.15 2.25 7.09 Acero Positivo 1/2" 1 2.25 35 79.43 1 3.15 6.05 0.10 1.91 1 3.15 6.05 19.06 Acero Negativo 1/2" 1 5.55 35 195.92
Temperatura 1/4" 1 16.50 14 231.00 CASETA 4 1 3.35 3.70 0.10 1.24 1 3.35 3.70 12.40 Acero Positivo 3/8" 1 1.35 10 13.91
Acero Positivo 3/8" 1 1.35 10 13.91 Acero Negativo 1/2" 1 4.05 10 41.72 Temperatura 1/4" 1 4.70 12 56.40
SEGUNDO PISO SECTOR B Entre Ejes 13-19 y B-H Entre Ejes 15-17 y F-G 2 5.70 6.90 0.10 7.87 2 5.70 6.90 78.66 Acero negativo 1/2" 2 3.90 19 148.20
Acero negativo 3/8" 4 3.05 19 231.80 Acero Positivo 1/2" 2 6.30 19 239.40 Acero Intermedio 3/8" 2 4.50 19 171.00 Baston 1/2" 2 1.55 19 58.90 Temperatura 1/4" 2 7.50 22 330.00
Entre Ejes 15-17 y G-H 2 5.70 6.90 0.10 7.87 2 5.70 6.90 78.66 Acero Positivo 1/2" 1 6.30 17 107.10 Acero negativo 1/2" 1 3.50 19 66.50 Acero negativo 1/2" 1 2.80 19 53.20 Acero Positivo 1/2" 1 6.30 19 119.70 Temperatura 1/4" 2 7.50 22 330.00
TERCER PISO Entre Ejes 6-7 y G-H 1 4.40 2.40 0.10 1.06 1 4.40 2.40 10.56 Temperatura 1/4" 1 4.40 9 39.60
TOTALES M3 140.64 M2 1,330.81 ML 5,818.35 2,883.69 6,299.18 - - -
KG 1,454.59 1,614.87 6,236.19 - - - 9,305.65
% DE DESPERDICIOS 5% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0% 0%
147.67 1,330.81 1,454.59 1,614.87 6,236.19 - - - 9,305.65
Nro de ladrillo de techo 20x30x30 1,330.81 x 8.5 = 11,312
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERON° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho
Coeficiente
Parcial Nro Vec. Long Ancho Parcial Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
1 2 Elemento02.03.09 LOSAS ALIGERADAS EN DOS SENTIDOS
02.03.09.01 LOSAS ALIGERADA CONCRETO F`C = 210 KG/CM2 02.03.09.02 LOSAS ALIGERADA ENCOFRADO Y DESENCOFRADO 02.03.09.03 LOSA ALIGERADA ACERO DE REFUERZO Fy=4200 kg/cm2 02.03.09.04 LOSA ALIGERADA LADRILLO HUECO 20 x 30 x 30 cm.
SOTANO
Entre Ejes 8-10 y B-F Sentido horizontal Entre Ejes 8-10 y B-C 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 3 1.90 69 393.30 Entre Ejes 8-10 y C-D 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 3/8" 1 1.90 69 131.10 Entre Ejes 8-10 y D-E 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Positivo 1/2" 2 7.50 69 1,035.00
250de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Entre Ejes 8-10 y E-F 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Intermedio 1/2" 1 5.70 69 393.30 Acero Negativo 3/8" 2 3.30 69 455.40 Acero Negativo 1/2" 1 4.30 69 296.70 Temperatura 1/4" 1 14.70 109 1,602.30
Sentido vertical Baston 1/2" 2 1.90 35 133.00 Acero Positivo 1/2" 4 7.50 35 1,050.00
Acero Intermedio 1/2" 3 5.70 35 598.50 Acero Intermedio 1/2" 1 5.75 35 201.25 Acero Negativo 3/8" 6 3.30 35 693.00 Acero Negativo 1/2" 3 4.30 35 451.50
Baston 1/2" 2 1.75 35 122.50 Temperatura 1/4" 1 29.10 54 1,571.40
Entre Ejes 10-12 y B-D Sentido horizontal Entre Ejes 10-12 y B-C 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 1/2" 2 1.90 35 133.00
1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 3/8" 2 1.90 35 133.00 Entre Ejes 10-12 y C-D 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Acero Positivo 1/2" 1 7.15 35 250.25
1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Acero Positivo 1/2" 1 7.50 35 262.50 Acero Intermedio 1/2" 1 5.15 35 180.25 Acero Intermedio 1/2" 1 5.50 35 192.50 Acero Negativo 3/8" 1 3.30 35 115.50 Acero Negativo 1/2" 2 4.30 35 301.00 Temperatura 1/4" 1 14.35 54 774.90
Sentido vertical Baston 1/2" 2 1.90 67 254.60 Baston 3/8" 2 1.90 67 254.60
Acero Positivo 1/2" 2 7.50 67 1,005.00 Acero Intermedio 1/2" 2 5.70 67 763.80 Acero Negativo 3/8" 2 3.30 67 442.20 Acero Negativo 1/2" 1 4.30 67 288.10 Temperatura 1/4" 1 14.70 107 1,572.90
Acero Adicional 3/8" 12 1.65 1 19.80 Entre Ejes 13-19 y B-E Sentido horizontal Entre Ejes 13-19 y B-C 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 35 133.00
2 5.70 6.90 0.14 11.01 2 5.70 6.90 78.66 Baston 3/8" 2 1.90 35 133.00 Acero Positivo 1/2" 4 7.50 35 1,050.00 Acero Positivo 1/2" 2 6.30 35 441.00
Acero Intermedio 1/2" 4 5.70 35 798.00 Acero Intermedio 3/8" 2 4.50 35 315.00 Acero Negativo 3/8" 2 3.30 35 231.00 Acero Negativo 1/2" 1 4.30 35 150.50 Acero Negativo 3/8" 8 3.05 35 854.00 Acero Negativo 1/2" 4 3.90 35 546.00 Temperatura 1/4" 1 41.10 27 1,109.70
Entre Ejes 13-19 y C-D 1 5.80 6.90 0.14 5.60 1 5.80 6.90 40.02 Acero Negativo 3/8" 2 3.30 35 231.00 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Negativo 1/2" 1 4.30 35 150.50
Acero Positivo 1/2" 3 7.50 35 787.50 Acero Intermedio 1/2" 3 5.70 35 598.50 Acero Negativo 3/8" 6 3.05 35 640.50 Acero Negativo 1/2" 3 3.90 35 409.50
Baston 1/2" 1 1.90 35 66.50 Baston 3/8" 1 1.90 35 66.50
Temperatura 1/4" 3 7.50 27 607.50 Entre Ejes 13-19 y D-E 3 6.90 6.90 0.14 20.00 3 6.90 6.90 142.83 Baston 1/2" 4 1.90 17 129.20
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80
251de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 14.70 27 396.90
Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 7.50 27 202.50
Entre Ejes 13-19 y E-F 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 4 1.90 35 266.00 Acero Positivo 1/2" 2 7.50 35 525.00
Acero Intermedio 1/2" 2 5.70 35 399.00 Acero Negativo 3/8" 2 3.30 35 231.00 Acero Negativo 1/2" 1 4.30 35 150.50 Temperatura 1/4" 1 14.70 54 793.80
Entre Ejes 13-19 y F-G 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.05 17 103.70 Acero Negativo 1/2" 1 3.90 17 66.30 Temperatura 1/4" 1 14.70 27 396.90
Baston 1/2" 3 1.90 17 96.90 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 13-19 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Negativo 1/2" 1 3.25 17 55.25 Acero Negativo 1/2" 1 2.55 17 43.35 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 3.90 17 66.30 Acero Negativo 1/2" 1 3.05 17 51.85 Acero Negativo 1/2" 1 3.50 17 59.50 Acero Negativo 1/2" 1 2.80 17 47.60 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 7.50 54 405.00 Sentido vertical Entre Ejes 13-14 y B-G Baston 1/2" 3 1.90 17 96.90
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 4 7.50 17 510.00
Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 4 4.30 17 292.40 Acero Negativo 3/8" 8 3.30 17 448.80 Temperatura 1/4" 1 29.40 27 793.80
Entre Ejes 14-15 y B-H Baston 1/2" 3 1.90 17 96.90 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 6 7.50 17 765.00 Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 1/2" 5 4.30 17 365.50
252de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 3/8" 10 3.30 17 561.00 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 15-17 y B-C Baston 1/2" 2 1.90 29 110.20 Acero Positivo 1/2" 1 7.50 29 217.50
Acero Intermedio 1/2" 1 5.70 29 165.30 Acero Negativo 1/2" 1 4.30 29 124.70 Acero Negativo 3/8" 2 3.30 29 191.40 Temperatura 1/4" 1 7.50 45 337.50
Entre Ejes 17-18 y B-H Baston 1/2" 3 1.90 17 96.90 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 5 7.50 17 637.50 Acero Intermedio 1/2" 5 5.70 17 484.50 Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 10 3.30 17 561.00 Temperatura 1/4" 1 36.60 27 988.20
Entre Ejes 18-19 y B-G Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 5 7.50 17 637.50
Acero Intermedio 1/2" 5 5.70 17 484.50 Acero Negativo 1/2" 4 4.30 17 292.40 Acero Negativo 3/8" 8 3.30 17 448.80 Temperatura 1/4" 1 36.30 27 980.10
Entre Ejes 20-22 y B-G Sentido horizontal Entre Ejes 20-22 y B-C 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60
1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 20-22 y C-D 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 20-22 y F-G 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 2 4.30 17 146.20 Acero Negativo 3/8" 1 3.30 17 56.10 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Temperatura 1/4" 1 14.35 27 387.45
Sentido vertical Entre Ejes 20-22 y B-D Baston 1/2" 2 1.90 34 129.20
Baston 3/8" 2 1.90 34 129.20 Acero Positivo 1/2" 2 7.50 34 510.00
Acero Intermedio 1/2" 2 5.70 34 387.60 Acero Negativo 1/2" 1 4.30 34 146.20
253de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 3/8" 2 3.30 34 224.40 Temperatura 1/4" 1 14.70 53 779.10
Entre Ejes 20-22 y F-G Baston 1/2" 1 1.90 34 64.60 Baston 3/8" 1 1.90 34 64.60
Acero Positivo 1/2" 1 7.50 34 255.00 Acero Intermedio 1/2" 1 5.70 34 193.80
Temperatura 1/4" 1 7.50 29 217.50 Entre Ejes 22-24 y B-H Sentido horizontal Entre Ejes 22-24 y B-C 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Acero Adicional 1/2" 6 1.65 1 9.90 Entre Ejes 22-24 y C-D 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Acero Adicional 1/2" 6 1.65 1 9.90 Entre Ejes 22-24 y D-E 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 22-24 y E-F 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 22-24 y F-G 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 22-24 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Acero Adicional 1/2" 6 1.65 1 9.90 Sentido vertical Entre Ejes 22-24 y B-H Baston 1/2" 3 1.90 35 199.50
254de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Baston 3/8" 1 1.90 35 66.50 Acero Positivo 1/2" 6 7.50 35 1,575.00
Acero Intermedio 1/2" 6 5.70 35 1,197.00 Acero Negativo 1/2" 5 4.30 35 752.50 Acero Negativo 3/8" 10 3.30 35 1,155.00 Temperatura 1/4" 1 43.50 54 2,349.00
SECTOR PREPARACION DE PACIENTES (SOTANO) Sentido horizontal Entre Ejes 25-27 y G-H 1 12.65 6.90 0.14 12.22 1 12.65 6.90 87.29 Baston 1/2" 2 1.90 17 64.60
Acero Positivo 1/2" 1 6.50 17 110.50 Acero Positivo 1/2" 1 7.25 17 123.25
Acero Intermedio 1/2" 1 4.25 17 72.25 Acero Intermedio 1/2" 1 4.95 17 84.15 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 13.20 27 356.40
Sentido vertical Baston 1/2" 2 1.90 32 121.60 Entre Ejes 25-27 y G-H Acero Positivo 1/2" 2 7.25 32 464.00
Temperatura 1/4" 1 7.20 50 360.00 PRIMER PISO Entre Ejes 3-7 y A-E Sentido horizontal Entre Ejes 3-7 y A-B 1 6.90 3.30 0.14 3.19 1 6.90 3.30 22.77 Baston 1/2" 2 1.90 6 22.80
3 6.90 5.70 0.14 16.52 3 6.90 5.70 117.99 Baston 3/8" 2 1.90 6 22.80 Acero Positivo 1/2" 3 7.50 6 135.00
Acero Intermedio 1/2" 3 5.70 6 102.60 Acero Negativo 1/2" 2 4.30 6 51.60 Acero Negativo 3/8" 4 3.30 6 79.20 Temperatura 1/4" 1 21.90 9 197.10
Baston 1/2" 2 1.90 8 30.40 Baston 3/8" 2 1.90 8 30.40
Acero Positivo 1/2" 1 7.50 8 60.00 Acero Intermedio 1/2" 4 5.70 8 182.40 Acero Negativo 1/2" 3 4.30 8 103.20 Acero Negativo 3/8" 2 3.30 8 52.80 Acero Negativo 1/2" 2 3.30 8 52.80 Acero Positivo 3/8" 4 7.50 8 240.00 Temperatura 1/4" 1 29.10 12 349.20
Entre Ejes 3-7 y B-C 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 2 3.30 17 112.20 Acero Positivo 3/8" 4 7.50 17 510.00 Temperatura 1/4" 1 29.10 27 785.70
Entre Ejes 3-7 y C-D 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 4 7.50 17 510.00 Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 1/2" 6 3.30 17 336.60 Acero Positivo 3/8" 4 7.50 17 510.00
Acero adic. 3/8" 7 2.70 3 56.70 Temperatura 1/4" 1 29.10 27 785.70
255de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Entre Ejes 3-7 y D-E 1 6.90 3.30 0.14 3.19 1 6.90 3.30 22.77 Baston 1/2" 2 1.90 8 30.40 1 6.90 6.55 0.14 6.33 1 6.90 6.55 45.20 Baston 3/8" 2 1.90 8 30.40
Acero Positivo 1/2" 1 7.50 8 60.00 Acero Intermedio 1/2" 4 5.70 8 182.40 Acero Negativo 1/2" 3 4.30 8 103.20 Acero Negativo 3/8" 2 3.30 8 52.80 Acero Negativo 1/2" 2 3.30 8 52.80 Acero Positivo 3/8" 4 7.50 8 240.00 Temperatura 1/4" 1 29.10 12 349.20
Baston 1/2" 2 1.90 8 30.40 Baston 3/8" 2 1.90 8 30.40
Acero Positivo 1/2" 3 7.50 8 180.00 Acero Intermedio 1/2" 3 5.70 8 136.80 Acero Negativo 1/2" 2 4.30 8 68.80 Acero Negativo 3/8" 4 3.30 8 105.60 Temperatura 1/4" 1 21.90 12 262.80
Sentido vertical Entre Ejes 3-4 y A-E Baston 3/8" 2 1.10 17 37.40
Acero Positivo 1/2" 2 3.90 17 132.60 Acero Negativo 1/2" 4 2.55 17 173.40 Acero Negativo 1/2" 2 3.25 17 110.50 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 21.90 27 591.30
Entre Ejes 4-5 y A-E Baston 1/2" 1 1.60 17 27.20 Acero Positivo 1/2" 1 6.30 17 107.10
Acero Intermedio 3/8" 1 4.50 17 76.50 Acero Negativo 1/2" 6 3.30 17 336.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Baston 3/8" 1 1.90 17 32.30 Baston 1/2" 1 1.90 17 32.30
Temperatura 1/4" 1 27.55 27 743.85 Entre Ejes 5-6 y A-E Baston 1/2" 1 1.60 17 27.20
Acero Positivo 1/2" 1 6.30 17 107.10 Acero Intermedio 3/8" 1 4.50 17 76.50 Acero Negativo 1/2" 6 3.30 17 336.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Baston 3/8" 1 1.90 17 32.30 Baston 1/2" 1 1.90 17 32.30
Temperatura 1/4" 1 27.55 27 743.85 Entre Ejes 6-7 y A-E Baston 1/2" 1 1.60 17 27.20
Acero Positivo 1/2" 1 6.30 17 107.10 Acero Intermedio 3/8" 1 4.50 17 76.50 Acero Negativo 1/2" 6 3.30 17 336.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Positivo 1/2" 2 7.50 17 255.00
256de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Baston 3/8" 1 1.90 17 32.30 Baston 1/2" 1 1.90 17 32.30
Temperatura 1/4" 1 27.55 27 743.85 Entre Ejes 1-7 y E-J Sentido horizontal Entre Ejes 4-7 y E-F 3 6.90 6.90 0.14 20.00 3 6.90 6.90 142.83 Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 2 4.30 17 146.20 Acero Negativo 1/2" 4 3.30 17 224.40 Temperatura 1/4" 1 21.90 27 591.30
Entre Ejes 4-7 y F-G 3 6.90 6.90 0.14 20.00 3 6.90 6.90 142.83 Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 3 7.50 17 382.50 Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 2 4.30 17 146.20 Acero Negativo 3/8" 4 3.30 17 224.40 Temperatura 1/4" 1 21.90 27 591.30
Entre Ejes 4-7 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 4 1.90 17 129.20 Baston 3/8" 4 1.90 17 129.20
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 3/8" 2 5.70 17 193.80 Acero Intermedio 1/2" 1 5.70 17 96.90
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 2-4 y H-I 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Acero Positivo 1/2" 1 7.50 17 127.50
1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Acero Intermedio 1/2" 1 5.30 17 90.10 Acero Negativo 5/8" 1 6.50 17 110.50 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 4.95 17 84.15 Baston 1/2" 1 1.90 17 32.30
Temperatura 1/4" 1 14.35 27 387.45 Entre Ejes 4-5 y H-I 1 6.90 5.70 0.14 5.51 1 6.90 5.70 39.33 Baston 1/2" 2 1.90 11 41.80
Baston 3/8" 2 1.90 11 41.80 Acero Positivo 1/2" 1 7.50 11 82.50
Acero Intermedio 1/2" 1 5.70 11 62.70 Baston 1/2" 1 1.90 6 11.40 Baston 3/8" 1 1.40 6 8.40
Acero Positivo 1/2" 1 7.50 6 45.00 Acero Intermedio 1/2" 1 5.70 6 34.20
Temperatura 1/4" 1 7.50 22 165.00 Sentido vertical Entre Ejes 2-4 y E-F Baston 1/2" 2 1.90 34 129.20
Acero Positivo 5/8" 1 7.50 34 255.00 Acero Intermedio 1/2" 1 5.30 34 180.20
Temperatura 1/4" 1 7.50 53 397.50 Entre Ejes 4-5 y E-G Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 1/2" 2 3.30 17 112.20
257de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 4-5 y G-H Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Baston 5/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 3/8" 2 5.70 17 193.80
Temperatura 1/4" 1 7.50 27 202.50 Entre Ejes 4-5 y H-I Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 1 6.50 17 110.50
Acero Intermedio 3/8" 1 5.50 17 93.50 Baston 1/2" 1 1.60 17 27.20
Temperatura 1/4" 1 7.50 27 202.50 Entre Ejes 5-6 y E-H Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 2 4.30 17 146.20 Acero Negativo 1/2" 4 3.30 17 224.40 Temperatura 1/4" 1 21.90 27 591.30
Entre Ejes 6-7 y E-H Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 1/2" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 8-10 y B-H Sentido horizontal Entre Ejes 8-10 y B-H 12 6.90 6.90 0.14 79.98 12 6.90 6.90 571.32 Baston 1/2" 2 1.90 104 395.20
Baston 3/8" 2 1.90 104 395.20 Baston adic. 1/2" 7 1.90 3 39.90
Acero Positivo 1/2" 2 7.50 104 1,560.00 Acero Intermedio 1/2" 2 5.70 104 1,185.60 Acero Negativo 1/2" 1 4.30 104 447.20 Acero Negativo 3/8" 2 3.30 104 686.40 Temperatura 1/4" 1 14.70 165 2,425.50
Sentido vertical Entre Ejes 8-9 y B-H Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Baston adic. 1/2" 7 1.90 1 13.30
Acero Positivo 1/2" 6 7.50 17 765.00 Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 10 3.30 17 561.00 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 9-10 y B-H Baston 1/2" 4 1.90 17 129.20 Baston adic. 1/2" 6 1.90 1 11.40
Acero Positivo 1/2" 6 7.50 17 765.00 Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 7 3.30 17 392.70 Acero Negativo 1/2" 1 3.30 17 56.10 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 10-12 y B-H Sentido horizontal
258de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Entre Ejes 10-12 y B-D 2 6.55 6.90 0.14 12.65 2 6.55 6.90 90.39 Baston 1/2" 2 1.90 35 133.00 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 3/8" 2 1.90 35 133.00
Acero Positivo 1/2" 1 7.15 35 250.25 Acero Intermedio 1/2" 1 5.35 35 187.25 Acero Negativo 1/2" 2 4.30 35 301.00 Acero Negativo 3/8" 1 3.30 35 115.50 Acero Positivo 1/2" 1 7.50 35 262.50
Acero Intermedio 1/2" 1 5.70 35 199.50 Temperatura 1/4" 1 14.35 54 774.90
Entre Ejes 10-12 y F-H 2 6.55 6.90 0.14 12.65 2 6.55 6.90 90.39 Baston 1/2" 2 1.90 35 133.00 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 3/8" 2 1.90 35 133.00
Acero Positivo 1/2" 1 7.15 35 250.25 Acero Intermedio 1/2" 1 5.35 35 187.25 Acero Negativo 1/2" 2 4.30 35 301.00 Acero Negativo 3/8" 1 3.30 35 115.50 Acero Positivo 1/2" 1 7.50 35 262.50
Acero Intermedio 1/2" 1 5.70 35 199.50 Temperatura 1/4" 1 14.35 54 774.90
Sentido vertical Entre Ejes 10-12 y B-D Baston 1/2" 2 1.90 34 129.20
Baston 3/8" 2 1.90 34 129.20 Baston adic. 3/8" 6 1.90 2 22.80
Acero Positivo 1/2" 2 7.50 34 510.00 Acero Intermedio 1/2" 2 5.70 34 387.60 Acero Negativo 1/2" 1 4.30 34 146.20 Acero Negativo 3/8" 2 3.30 34 224.40 Temperatura 1/4" 1 14.70 53 779.10
Entre Ejes 10-11 y F-H Baston 1/2" 1 1.90 16 30.40 Baston 3/8" 1 1.90 16 30.40
Baston adic. 3/8" 6 1.90 3 34.20 Acero Positivo 1/2" 2 7.50 16 240.00
Acero Intermedio 1/2" 2 5.70 16 182.40 Acero Negativo 1/2" 1 4.30 16 68.80 Acero Negativo 3/8" 2 3.30 16 105.60
Baston 3/8" 1 1.90 16 30.40 Temperatura 1/4" 1 14.70 25 367.50
Entre Ejes 11-12 y F-H Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Baston adic. 3/8" 6 1.90 1 11.40 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 13-19 y B-H Sentido horizontal Entre Ejes 13-19 y B-C 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 35 133.00
2 5.70 6.90 0.14 11.01 2 5.70 6.90 78.66 Baston 3/8" 2 1.90 35 133.00 Acero Positivo 1/2" 4 7.50 35 1,050.00 Acero Positivo 1/2" 2 6.30 35 441.00
Acero Intermedio 1/2" 4 5.70 35 798.00 Acero Intermedio 3/8" 2 4.50 35 315.00 Acero Negativo 3/8" 2 3.30 35 231.00 Acero Negativo 1/2" 1 4.30 35 150.50 Acero Negativo 3/8" 8 3.05 35 854.00 Acero Negativo 1/2" 4 3.90 35 546.00
259de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Temperatura 1/4" 1 41.10 27 1,109.70 Entre Ejes 13-19 y C-D 1 5.80 6.90 0.14 5.60 1 5.80 6.90 40.02 Acero Negativo 3/8" 2 3.30 35 231.00
2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Negativo 1/2" 1 4.30 35 150.50 Acero Positivo 1/2" 3 7.50 35 787.50
Acero Intermedio 1/2" 3 5.70 35 598.50 Acero Negativo 3/8" 6 3.05 35 640.50 Acero Negativo 1/2" 3 3.90 35 409.50
Baston 1/2" 1 1.90 35 66.50 Baston 3/8" 1 1.90 35 66.50
Temperatura 1/4" 3 7.50 27 607.50 Entre Ejes 13-19 y D-E 3 6.90 6.90 0.14 20.00 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60
Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 14.70 27 396.90
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 7.50 27 202.50
Entre Ejes 13-19 y E-F 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 35 133.00 Baston 1/2" 2 1.90 35 133.00
Acero Positivo 1/2" 2 7.50 35 525.00 Acero Intermedio 1/2" 2 5.70 35 399.00 Acero Negativo 3/8" 2 3.30 35 231.00 Acero Negativo 1/2" 1 4.30 35 150.50 Temperatura 1/4" 1 14.70 54 793.80
Entre Ejes 13-19 y F-G 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 17 64.60 Baston 1/2" 1 1.90 17 32.30
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 1/2" 1 3.05 17 51.85 Acero Negativo 1/2" 1 3.90 17 66.30 Temperatura 1/4" 1 14.70 27 396.90
Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Negativo 1/2" 1 4.30 17 73.10 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 13-19 y G-H 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 1.90 35 133.00 Baston 3/8" 2 1.90 35 133.00
Acero Positivo 1/2" 2 7.50 35 525.00 Acero Intermedio 1/2" 2 5.70 35 399.00 Acero Negativo 3/8" 2 3.30 35 231.00 Acero Negativo 1/2" 1 4.30 35 150.50 Temperatura 1/4" 1 14.70 54 793.80
Sentido vertical Entre Ejes 13-14 y B-H Baston 1/2" 2 1.90 17 64.60
260de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 5 7.50 17 637.50
Acero Intermedio 1/2" 5 5.70 17 484.50 Acero Negativo 3/8" 10 3.30 17 561.00 Acero Negativo 1/2" 5 4.30 17 365.50 Temperatura 1/4" 1 36.60 27 988.20
Entre Ejes 14-15 y B-H Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 6 7.50 17 765.00 Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 3/8" 10 3.30 17 561.00 Acero Negativo 1/2" 5 4.30 17 365.50 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 15-17 y B-C Baston 1/2" 1 1.90 29 55.10 Baston 3/8" 1 1.90 29 55.10
Acero Positivo 1/2" 1 7.50 29 217.50 Acero Intermedio 1/2" 1 5.70 29 165.30 Acero Negativo 3/8" 2 3.30 29 191.40 Acero Negativo 1/2" 1 4.30 29 124.70 Temperatura 1/4" 1 7.50 45 337.50
Entre Ejes 17-18 y B-H Baston 1/2" 2 1.90 35 133.00 Baston 3/8" 2 1.90 35 133.00
Acero Positivo 1/2" 5 7.50 35 1,312.50 Acero Intermedio 1/2" 5 5.70 35 997.50 Acero Negativo 3/8" 6 3.30 35 693.00 Acero Negativo 1/2" 5 4.30 35 752.50 Temperatura 1/4" 1 36.60 27 988.20
Entre Ejes 18-19 y B-H Baston 1/2" 2 1.90 35 133.00 Baston 3/8" 2 1.90 35 133.00
Acero Positivo 1/2" 6 7.50 35 1,575.00 Acero Intermedio 1/2" 6 5.70 35 1,197.00 Acero Negativo 3/8" 6 3.30 35 693.00 Acero Negativo 1/2" 5 4.30 35 752.50 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 20-22 y B-H Sentido horizontal Entre Ejes 20-22 y B-D 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 35 133.00
2 6.55 6.90 0.14 12.65 2 6.55 6.90 90.39 Baston 3/8" 2 1.90 35 133.00 Acero Positivo 1/2" 1 7.50 35 262.50
Acero Intermedio 1/2" 1 5.70 35 199.50 Acero Negativo 1/2" 2 4.30 35 301.00 Acero Negativo 3/8" 1 3.30 35 115.50 Acero Positivo 1/2" 1 7.15 35 250.25
Acero Intermedio 1/2" 1 5.35 35 187.25 Temperatura 1/4" 1 14.35 54 774.90
Entre Ejes 20-22 y F-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 35 133.00 2 6.55 6.90 0.14 12.65 2 6.55 6.90 90.39 Baston 3/8" 2 1.90 35 133.00
Acero Positivo 1/2" 1 7.50 35 262.50 Acero Intermedio 1/2" 1 5.70 35 199.50 Acero Negativo 1/2" 2 4.30 35 301.00 Acero Negativo 3/8" 1 3.30 35 115.50 Acero Positivo 1/2" 1 7.15 35 250.25
Acero Intermedio 1/2" 1 5.35 35 187.25 Temperatura 1/4" 1 14.35 54 774.90
Sentido vertical Entre Ejes 20-22 y B-D Baston 1/2" 2 1.90 34 129.20
261de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Baston 3/8" 2 1.90 34 129.20 Acero Positivo 1/2" 2 7.50 34 510.00
Acero Intermedio 1/2" 2 5.70 34 387.60 Acero Negativo 1/2" 1 4.30 34 146.20 Acero Negativo 3/8" 2 3.30 34 224.40 Temperatura 1/4" 1 14.70 53 779.10
Entre Ejes 20-22 y F-H Baston 1/2" 2 1.90 34 129.20 Baston 3/8" 2 1.90 34 129.20
Acero Positivo 1/2" 2 7.50 34 510.00 Acero Intermedio 1/2" 2 5.70 34 387.60 Acero Negativo 1/2" 1 4.30 34 146.20 Acero Negativo 3/8" 1 3.30 34 112.20 Temperatura 1/4" 1 14.70 53 779.10
Entre Ejes 22-24 y B-H Sentido horizontal Entre Ejes 22-24 y B-H 12 6.90 6.90 0.14 79.98 12 6.90 6.90 571.32 Baston 1/2" 2 1.90 104 395.20
Baston 3/8" 2 1.90 104 395.20 Acero Positivo 1/2" 2 7.50 104 1,560.00
Acero Intermedio 1/2" 2 5.70 104 1,185.60 Acero Negativo 1/2" 1 4.30 104 447.20 Acero Negativo 3/8" 2 3.30 104 686.40 Temperatura 1/4" 1 14.70 165 2,425.50
Sentido vertical Entre Ejes 22-24 y B-H Baston 1/2" 2 1.90 35 133.00
Baston 3/8" 2 1.90 35 133.00 Baston adic. 3/8" 6 1.90 4 45.60
Acero Positivo 1/2" 6 7.50 35 1,575.00 Acero Intermedio 1/2" 6 5.70 35 1,197.00 Acero Negativo 1/2" 5 4.30 35 752.50 Acero Negativo 3/8" 6 3.30 35 693.00 Temperatura 1/4" 1 43.50 54 2,349.00
Entre Ejes 9-23 y H-J¨ Sentido horizontal Entre Ejes 9-15 y I-J 5 6.90 7.20 0.14 34.78 5 6.90 7.20 248.40 Baston 1/2" 2 3.55 18 127.80
2 6.40 1.75 0.14 3.14 2 6.40 1.75 22.40 Baston 1/2" 2 2.65 18 95.40 Acero Positivo 1/2" 1 40.15 18 722.70
Acero Intermedio 1/2" 1 7.45 18 134.10 Acero Intermedio 1/2" 4 5.70 18 410.40 Acero Negativo 1/2" 4 4.30 18 309.60 Acero Negativo 3/8" 8 3.30 18 475.20 Temperatura 1/4" 5 7.51 27 1,013.85 Temperatura 1/4" 2 6.40 6 76.80
Entre Ejes 17-23 y H-I 5 6.90 7.20 0.14 34.78 5 6.90 7.20 248.40 Baston 1/2" 2 3.55 18 127.80 2 6.40 1.75 0.14 3.14 2 6.40 1.75 22.40 Baston 1/2" 2 2.65 18 95.40
Acero Positivo 1/2" 1 40.15 18 722.70 Acero Intermedio 1/2" 1 7.45 18 134.10 Acero Intermedio 1/2" 4 5.70 18 410.40 Acero Negativo 1/2" 4 4.30 18 309.60 Acero Negativo 3/8" 8 3.30 18 475.20 Temperatura 1/4" 5 7.51 27 1,013.85 Temperatura 1/4" 2 6.40 6 76.80
Sentido Vertical Entre Ejes 9-23 y H - J Baston 1/2" 2 1.52 170 516.80
Acero Positivo 1/2" 1 13.20 170 2,244.00 Acero Intermedio 3/8" 1 3.40 170 578.00 Acero Negativo 1/2" 2 2.70 170 918.00
262de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 1/2" 1 3.50 170 595.00 Baston 3/8" 2 3.10 170 1,054.00
Temperatura 1/4" 1 38.00 28 1,064.00
Sentido horizontal Entre Ejes 9-15 y H-I 5 6.90 5.35 0.14 25.84 5 6.90 5.35 184.58 Baston 1/2" 6 1.90 13 148.20
Acero Positivo 1/2" 1 36.80 13 478.40 Acero Intermedio 1/2" 1 28.50 13 370.50 Acero Negativo 1/2" 1 23.80 13 309.40 Acero Negativo 3/8" 8 13.20 13 1,372.80 Temperatura 1/4" 5 7.50 20 750.00
Entre Ejes 17-23 y H-I 5 6.90 7.20 0.14 34.78 5 6.90 7.20 248.40 Baston 1/2" 6 1.90 18 205.20 Acero Positivo 1/2" 1 36.80 18 662.40
Acero Intermedio 1/2" 1 28.50 18 513.00 Acero Negativo 1/2" 1 23.80 18 428.40 Acero Negativo 3/8" 8 13.20 18 1,900.80 Temperatura 1/4" 5 7.50 28 1,050.00
Sentido Vertical Entre Ejes 9-23 y H - J Baston 1/2" 2 1.52 170 516.80
Acero Positivo 1/2" 1 13.20 170 2,244.00 Acero Intermedio 3/8" 1 3.40 170 578.00 Acero Negativo 1/2" 2 2.70 170 918.00 Acero Negativo 1/2" 1 3.50 170 595.00
Baston 3/8" 2 3.10 170 1,054.00 Temperatura 1/4" 1 38.00 28 1,064.00
SEGUNDO PISO SECTOR A Entre Ejes 3--7 y A-E Sentido horizontal Entre Ejes 3-7 y A-B 1 6.90 3.30 0.14 3.19 1 6.90 3.30 22.77 Baston 1/2" 2 3.00 6 36.00
3 6.90 5.70 0.14 16.52 3 6.90 5.70 117.99 Baston 3/8" 2 3.00 6 36.00 Acero Positivo 1/2" 2 8.70 6 104.40
Acero Intermedio 1/2" 3 5.70 6 102.60 Acero Negativo 1/2" 2 4.30 6 51.60 Acero Negativo 3/8" 4 3.30 6 79.20 Acero Positivo 1/2" 1 7.50 6 45.00 Temperatura 1/4" 1 21.90 9 197.10
Baston 1/2" 1 1.90 8 15.20 Baston 3/8" 1 1.90 8 15.20
Acero Positivo 1/2" 3 7.50 8 180.00 Acero Intermedio 1/2" 4 5.70 8 182.40 Acero Negativo 1/2" 3 4.30 8 103.20 Acero Negativo 3/8" 6 3.30 8 158.40 Acero Positivo 1/2" 1 8.70 8 69.60
Baston 1/2" 1 3.00 8 24.00 Baston 3/8" 1 3.00 8 24.00
Temperatura 1/4" 1 29.10 12 349.20 Entre Ejes 3-7 y B-C 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 3 4.30 17 219.30
263de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 3/8" 6 3.30 17 336.60 Acero Positivo 1/2" 1 8.70 17 147.90
Baston 1/2" 1 3.00 17 51.00 Baston 3/8" 1 3.00 17 51.00
Temperatura 1/4" 1 29.10 27 785.70 Entre Ejes 3-7 y C-D 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 1/2" 2 3.30 17 112.20
Baston 1/2" 1 3.00 17 51.00 Baston 3/8" 1 3.00 17 51.00
Acero Positivo 1/2" 1 8.70 19 165.30 Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 2 4.30 19 163.40 Acero Negativo 1/2" 4 3.30 19 250.80 Temperatura 1/4" 1 29.10 27 785.70
Entre Ejes 3-7 y D-E 1 6.90 3.30 0.14 3.19 1 6.90 3.30 22.77 Baston 1/2" 2 1.90 8 30.40 3 6.90 6.55 0.14 18.98 3 6.90 6.55 135.59 Baston 3/8" 2 1.90 8 30.40
Acero Positivo 1/2" 4 7.50 8 240.00 Acero Intermedio 1/2" 4 5.70 8 182.40 Acero Negativo 1/2" 3 4.30 8 103.20 Acero Negativo 3/8" 6 3.30 8 158.40 Temperatura 1/4" 1 29.10 12 349.20
Baston 1/2" 1 3.00 8 24.00 Baston 3/8" 1 3.00 8 24.00
Acero Positivo 1/2" 1 8.70 8 69.60 Acero Intermedio 1/2" 3 5.70 8 136.80 Acero Negativo 1/2" 2 4.30 8 68.80 Acero Negativo 1/2" 2 3.30 8 52.80 Acero Negativo 3/8" 2 3.30 8 52.80 Acero Positivo 1/2" 2 7.50 8 120.00
Baston 1/2" 1 1.90 8 15.20 Baston 3/8" 1 1.90 8 15.20
Temperatura 1/4" 1 21.90 12 262.80 Sentido vertical Entre Ejes 3-4 y A-E Baston 1/2" 2 1.20 17 40.80
Acero Positivo 1/2" 2 3.90 17 132.60 Acero Negativo 1/2" 2 3.25 17 110.50 Acero Negativo 1/2" 2 2.55 17 86.70 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 21.90 27 591.30
Entre Ejes 4-5 y A-E Baston 1/2" 1 3.00 17 51.00 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 3/8" 1 4.50 17 76.50 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 3/8" 6 3.30 17 336.60
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
264de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Temperatura 1/4" 1 27.55 27 743.85 Entre Ejes 5-6 y A-E Baston 1/2" 1 3.00 17 51.00
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 3/8" 1 4.50 17 76.50
Acero Positivo 1/2" 1 7.15 17 121.55 Acero Intermedio 1/2" 1 5.35 17 90.95
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Acero Negativo 1/2" 3 4.30 18 232.20 Acero Negativo 3/8" 4 3.30 18 237.60 Acero Negativo 1/2" 2 3.30 18 118.80 Acero Positivo 1/2" 2 7.50 18 270.00
Acero Intermedio 1/2" 2 5.70 18 205.20 Temperatura 1/4" 1 27.55 27 743.85
Entre Ejes 6-7 y A-E Baston 1/2" 1 3.00 17 51.00 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 3/8" 1 4.50 17 76.50 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Acero Negativo 1/2" 3 4.30 18 232.20 Acero Negativo 3/8" 4 3.30 18 237.60 Acero Negativo 1/2" 2 3.30 18 118.80 Acero Positivo 1/2" 2 7.50 18 270.00
Acero Intermedio 1/2" 2 5.70 18 205.20 Temperatura 1/4" 1 27.55 27 743.85
Entre Ejes 4--7 y E-I Sentido horizontal Entre Ejes 4-7 y E-F 3 6.90 6.90 0.14 20.00 3 6.90 6.90 142.83 Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 2 4.30 17 146.20 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 1/2" 2 3.30 17 112.20 Acero Negativo 1/2" 1 3.30 17 56.10 Acero Positivo 1/2" 2 7.50 17 255.00
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 21.90 27 591.30 Entre Ejes 4-7 y F-G 3 6.90 6.90 0.14 20.00 3 6.90 6.90 142.83 Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Positivo 1/2" 1 7.50 20 150.00
Baston 1/2" 1 1.90 20 38.00 Baston 3/8" 1 1.90 20 38.00
Acero Negativo 1/2" 1 4.30 20 86.00 Acero Negativo 3/8" 2 3.30 20 132.00 Acero Negativo 1/2" 1 3.30 20 66.00 Acero Negativo 3/8" 2 4.30 20 172.00 Acero Positivo 1/2" 1 7.50 20 150.00
Acero Intermedio 1/2" 1 5.70 20 114.00 Temperatura 1/4" 1 21.90 27 591.30
Entre Ejes 4-6 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60
265de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 4-6 y H-I 2 6.90 4.55 0.14 8.79 2 6.90 4.55 62.79 Baston 1/2" 2 1.90 6 22.80 Baston 3/8" 2 1.90 6 22.80
Acero Positivo 1/2" 2 7.50 6 90.00 Acero Intermedio 1/2" 2 5.70 6 68.40 Acero Negativo 1/2" 1 4.30 6 25.80 Acero Negativo 3/8" 2 3.30 6 39.60
Baston 1/2" 1 1.90 12 22.80 Acero Positivo 1/2" 1 7.50 12 90.00
Acero Intermedio 1/2" 1 5.70 12 68.40 Acero Negativo 1/2" 1 4.30 12 51.60 Acero Negativo 3/8" 2 3.30 12 79.20 Acero Positivo 1/2" 1 4.60 12 55.20
Baston 3/8" 1 1.40 12 16.80 Temperatura 1/4" 1 14.70 27 396.90
Sentido vertical Entre Ejes 4-5 y H-I Baston 1/2" 1 1.90 0.00
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 3/8" 6 3.30 17 336.60 Acero Positivo 1/2" 1 6.50 17 110.50
Acero Intermedio 1/2" 1 5.05 17 85.85 Baston 1/2" 1 1.60 17 27.20
Temperatura 1/4" 1 29.10 27 785.70 Entre Ejes 5-6 y H-I Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 3 7.50 17 382.50
Acero Intermedio 1/2" 3 5.70 17 290.70 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 3/8" 6 3.30 17 336.60 Acero Positivo 1/2" 1 3.90 17 66.30
Baston 3/8" 1 1.10 17 18.70 Temperatura 1/4" 1 26.30 27 710.10
Entre Ejes 6-7 y H-I Baston 1/2" 2 1.90 17 64.60 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
SECTOR B Entre Ejes 8-10 y B-H Sentido horizontal Entre Ejes 8-10 y B-C 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 23 98.90 Acero Negativo 3/8" 2 3.30 23 151.80
266de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Positivo 1/2" 1 7.50 23 172.50 Acero Intermedio 1/2" 1 5.70 23 131.10
Baston 1/2" 1 1.90 23 43.70 Baston 3/8" 1 1.90 23 43.70
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 8-10 y C-D 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Positivo 1/2" 1 7.50 17 127.50 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 8-10 y D-E 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 3.00 17 102.00
Baston 3/8" 2 3.00 17 102.00 Acero Positivo 1/2" 2 8.70 17 295.80
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 8-10 y E-F 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 3.00 17 102.00 Baston 3/8" 2 3.00 17 102.00
Acero Positivo 1/2" 2 8.70 17 295.80 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 8-10 y F-G 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 3.00 17 51.00 Baston 3/8" 1 3.00 17 51.00
Acero Positivo 1/2" 1 8.70 17 147.90 Acero Intermedio 1/2" 2 5.70 17 193.80
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 8-10 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30 Baston 1/2" 1 3.00 19 57.00 Baston 3/8" 1 3.00 19 57.00
Acero Positivo 1/2" 1 8.70 19 165.30 Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Temperatura 1/4" 1 14.70 27 396.90
Sentido vertical Entre Ejes 8-9 y B-H Baston 1/2" 1 1.90 19 36.10
Baston 3/8" 1 1.90 19 36.10 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 4 4.30 21 361.20
267de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 3/8" 8 3.30 21 554.40 Acero Positivo 1/2" 3 7.50 21 472.50
Acero Intermedio 1/2" 3 5.70 21 359.10 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 43.50 27 1,174.50 Entre Ejes 9-10 y B-H Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90 Acero Positivo 1/2" 4 7.50 17 510.00
Acero Intermedio 1/2" 5 5.70 17 484.50 Acero Negativo 1/2" 4 4.30 17 292.40 Acero Negativo 3/8" 8 3.30 17 448.80 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Baston 1/2" 1 1.90 19 36.10 Baston 3/8" 1 1.90 19 36.10
Temperatura 1/4" 1 43.50 27 1,174.50 Entre Ejes 10-12 y B-H Sentido horizontal Entre Ejes 10-12 y B-C 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 1/2" 2 1.90 17 64.60
1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 10-12 y C-D 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 1/2" 2 1.90 17 64.60 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.15 17 121.55 Acero Intermedio 1/2" 1 5.35 17 90.95 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 10-12 y F-G 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 1/2" 2 1.90 17 64.60 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.15 17 121.55 Acero Intermedio 1/2" 1 5.35 17 90.95 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 10-12 y G-H 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 1/2" 2 1.90 17 64.60
268de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.35 17 90.95 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Temperatura 1/4" 1 14.35 27 387.45
Sentido vertical Entre Ejes 10-11 y B-D Baston 1/2" 2 3.00 16 96.00
Baston 3/8" 2 3.00 16 96.00 Acero Positivo 1/2" 2 8.70 16 278.40
Acero Intermedio 1/2" 2 5.70 16 182.40 Acero Negativo 1/2" 1 4.30 16 68.80 Acero Negativo 3/8" 2 3.30 16 105.60 Temperatura 1/4" 1 14.70 25 367.50
Entre Ejes 10-11 y F-H Baston 1/2" 1 3.00 21 63.00 Baston 3/8" 1 3.00 21 63.00
Acero Positivo 1/2" 1 8.70 21 182.70 Acero Intermedio 1/2" 2 5.70 21 239.40 Acero Negativo 1/2" 1 4.30 21 90.30 Acero Negativo 3/8" 2 3.30 21 138.60 Acero Positivo 1/2" 1 7.50 21 157.50
Baston 1/2" 1 1.90 21 39.90 Baston 3/8" 1 1.90 21 39.90
Temperatura 1/4" 1 14.70 25 367.50 Entre Ejes 11-12 y B-D Baston 1/2" 1 3.00 21 63.00
Baston 3/8" 1 3.00 21 63.00 Acero Positivo 1/2" 1 8.70 21 182.70
Acero Intermedio 1/2" 1 5.70 21 119.70 Acero Negativo 1/2" 1 4.30 21 90.30 Acero Negativo 3/8" 2 3.30 21 138.60 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 3.00 17 51.00 Baston 3/8" 1 3.00 17 51.00
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 11-12 y F-H Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Baston 1/2" 1 1.90 19 36.10 Baston 3/8" 1 1.90 19 36.10
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 13-19 y B-H Sentido horizontal Entre Ejes 13-18 y B-C 3 6.90 6.90 0.14 20.00 3 6.90 6.90 142.83 Baston 1/2" 1 1.90 21 39.90
2 5.70 6.90 0.14 11.01 2 5.70 6.90 78.66 Baston 3/8" 1 1.90 21 39.90 Acero Positivo 1/2" 1 7.50 21 157.50
Acero Intermedio 1/2" 1 5.70 21 119.70 Acero Negativo 1/2" 1 4.30 21 90.30 Acero Negativo 3/8" 2 3.30 21 138.60
269de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 4 3.90 17 265.20 Acero Negativo 3/8" 8 3.05 17 414.80 Acero Positivo 1/2" 2 6.30 17 214.20 Temperatura 1/4" 1 33.90 27 915.30
Entre Ejes 13-19 y C-D 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 1 1.90 17 32.30 2 5.70 6.90 0.14 11.01 2 5.70 6.90 78.66 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 1 3.90 19 74.10 Acero Negativo 3/8" 2 3.05 19 115.90 Acero Positivo 1/2" 1 6.30 19 119.70 Acero Negativo 1/2" 1 3.50 19 66.50 Acero Negativo 3/8" 2 2.80 19 106.40 Acero Positivo 1/2" 1 6.30 17 107.10 Acero Negativo 1/2" 1 3.50 17 59.50 Acero Negativo 3/8" 2 2.80 17 95.20 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 3.90 17 66.30 Acero Negativo 3/8" 2 3.05 17 103.70
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 41.10 27 1,109.70 Entre Ejes 13-19 y D-E 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 8 1.90 17 258.40
Acero Positivo 1/2" 4 7.50 17 510.00 Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 2 4.30 17 146.20 Acero Negativo 3/8" 4 3.30 17 224.40 Temperatura 1/4" 2 14.70 27 793.80
Entre Ejes 13-15 y E-F 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 17 32.30 Baston 1/2" 1 1.90 17 32.30
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Baston 1/2" 1 1.90 19 36.10 Baston 1/2" 1 1.90 19 36.10
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 17-19 y E-F 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60
Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 1/2" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 13-15 y F-G 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80
270de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 17-19 y F-G 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60 Acero Positivo 1/2" 2 7.50 17 255.00
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 13-15 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 18 34.20 Baston 3/8" 1 1.90 18 34.20
Acero Positivo 1/2" 1 7.50 18 135.00 Acero Intermedio 1/2" 1 5.70 18 102.60 Acero Negativo 1/2" 1 4.30 18 77.40 Acero Negativo 3/8" 2 3.30 18 118.80 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 3.90 17 66.30 Acero Negativo 3/8" 2 3.05 17 103.70 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 17-19 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 20 86.00 Acero Negativo 3/8" 2 3.30 20 132.00 Acero Positivo 1/2" 1 7.50 20 150.00
Acero Intermedio 1/2" 1 5.70 20 114.00 Baston 1/2" 1 1.90 20 38.00 Baston 3/8" 1 1.90 20 38.00
Temperatura 1/4" 1 14.70 27 396.90 Sentido vertical Entre Ejes 13-14 y B-H Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 4 7.50 17 510.00
Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 3/8" 6 3.30 17 336.60 Acero Negativo 1/2" 2 4.30 18 154.80 Acero Negativo 3/8" 4 3.30 18 237.60 Acero Positivo 1/2" 1 7.50 18 135.00
Acero Intermedio 1/2" 1 5.70 18 102.60 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 43.50 27 1,174.50 Entre Ejes 14-15 y B-H Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 6 7.50 17 765.00
Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 10 3.30 17 561.00 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 15-16 y B-D Baston 1/2" 1 1.90 29 55.10 Baston 3/8" 1 1.90 29 55.10
Acero Positivo 1/2" 1 7.50 29 217.50 Acero Intermedio 1/2" 2 5.70 29 330.60
271de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 1/2" 1 4.30 29 124.70 Acero Negativo 3/8" 2 3.30 29 191.40 Acero Positivo 1/2" 1 8.70 29 252.30
Baston 1/2" 1 3.00 29 87.00 Baston 3/8" 1 3.00 29 87.00
Temperatura 1/4" 1 14.70 45 661.50 Entre Ejes 16-17 y B-D Baston 1/2" 1 1.90 29 55.10
Baston 3/8" 1 1.90 29 55.10 Acero Positivo 1/2" 1 7.50 29 217.50
Acero Intermedio 1/2" 2 5.70 29 330.60 Acero Negativo 1/2" 1 4.30 29 124.70 Acero Negativo 3/8" 2 3.30 29 191.40 Acero Positivo 1/2" 1 8.70 29 252.30
Baston 1/2" 1 3.00 29 87.00 Baston 3/8" 1 3.00 29 87.00
Temperatura 1/4" 1 14.70 45 661.50 Entre Ejes 17-18 y B-H Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 6 7.50 17 765.00
Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 10 3.30 17 561.00 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 18-19 y B-H Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 10 3.30 17 561.00 Acero Positivo 1/2" 5 7.50 17 637.50
Acero Intermedio 1/2" 5 5.70 17 484.50 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 36.30 27 980.10 Entre Ejes 20-22 y B-H Sentido horizontal Entre Ejes 20-22 y B-C 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 1 1.90 19 36.10
1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 1 1.90 19 36.10 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 14.35 27 387.45 Entre Ejes 20-22 y C-D 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60
1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.70 17 96.90 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 20-22 y F-G 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90
272de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.15 17 121.55
Acero Intermedio 1/2" 1 5.70 17 96.90 Temperatura 1/4" 1 14.35 27 387.45
Entre Ejes 20-22 y G-H 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 19 72.20 1 6.55 6.90 0.14 6.33 1 6.55 6.90 45.20 Baston 3/8" 2 1.90 19 72.20
Acero Positivo 1/2" 1 7.50 19 142.50 Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 7.15 19 135.85
Acero Intermedio 1/2" 1 5.70 19 108.30 Temperatura 1/4" 1 14.35 27 387.45
Sentido vertical Entre Ejes 20-21 y B-D Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 1 8.70 19 165.30
Acero Intermedio 1/2" 1 5.70 19 108.30 Baston 1/2" 1 3.00 19 57.00 Baston 3/8" 1 3.00 19 57.00
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 20-21 y F-H Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 7.50 17 127.50
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 21-22 y B-D Baston 1/2" 2 3.00 16 96.00
Baston 3/8" 2 3.00 16 96.00 Acero Positivo 1/2" 2 8.70 16 278.40
Acero Intermedio 1/2" 2 5.70 16 182.40 Acero Negativo 1/2" 1 4.30 16 68.80 Acero Negativo 3/8" 2 3.30 16 105.60 Temperatura 1/4" 1 14.70 25 367.50
Entre Ejes 21-22 y F-H Baston 1/2" 1 3.00 16 48.00 Baston 3/8" 1 3.00 16 48.00
Acero Positivo 1/2" 1 8.70 16 139.20 Acero Intermedio 1/2" 2 5.70 16 182.40 Acero Negativo 1/2" 1 4.30 16 68.80 Acero Negativo 3/8" 2 3.30 16 105.60 Acero Positivo 1/2" 1 7.50 16 120.00
Baston 1/2" 1 1.90 16 30.40 Baston 3/8" 1 1.90 16 30.40
Temperatura 1/4" 1 14.70 25 367.50 Entre Ejes 22-24 y B-H Sentido horizontal Entre Ejes 22-24 y B-C 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 17 32.30
273de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 8.70 17 147.90
Baston 1/2" 1 3.00 17 51.00 Baston 3/8" 1 3.00 17 51.00
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 22-24 y C-D 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Acero Positivo 1/2" 1 8.70 17 147.90
Baston 1/2" 1 3.00 17 51.00 Baston 3/8" 1 3.00 17 51.00
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 22-24 y D-E 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 1 4.30 20 86.00 Acero Negativo 3/8" 2 3.30 20 132.00 Acero Positivo 1/2" 1 8.70 20 174.00
Acero Intermedio 1/2" 1 5.70 20 114.00 Baston 1/2" 1 3.00 20 60.00 Baston 3/8" 1 3.00 20 60.00
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 22-24 y E-F 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 3.00 17 102.00
Baston 3/8" 2 3.00 17 102.00 Acero Positivo 1/2" 2 8.70 17 295.80
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 17 73.10 Acero Negativo 3/8" 2 3.30 17 112.20 Temperatura 1/4" 1 14.70 27 396.90
Entre Ejes 22-24 y F-G 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 2 8.70 19 330.60
Acero Intermedio 1/2" 2 5.70 19 216.60 Baston 1/2" 1 3.00 19 57.00 Baston 3/8" 1 3.00 19 57.00
Temperatura 1/4" 1 14.70 27 396.90 Entre Ejes 22-24 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 2 5.70 17 193.80 Acero Negativo 1/2" 1 4.30 19 81.70 Acero Negativo 3/8" 2 3.30 19 125.40 Acero Positivo 1/2" 2 8.70 19 330.60
Acero Intermedio 1/2" 2 5.70 19 216.60
274de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Baston 1/2" 1 3.00 19 57.00 Baston 3/8" 1 3.00 19 57.00
Temperatura 1/4" 1 14.70 27 396.90 Sentido vertical Entre Ejes 22-23 y B-H Baston 1/2" 1 3.00 17 51.00
Baston 3/8" 1 3.00 17 51.00 Acero Positivo 1/2" 1 8.70 17 147.90
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 2 4.30 19 163.40 Acero Negativo 3/8" 4 3.30 19 250.80 Acero Positivo 1/2" 1 7.50 19 142.50
Acero Intermedio 1/2" 1 5.70 19 108.30 Acero Positivo 1/2" 4 7.50 17 510.00
Acero Intermedio 1/2" 4 5.70 17 387.60 Acero Negativo 1/2" 3 4.30 17 219.30 Acero Negativo 3/8" 6 3.30 17 336.60
Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 43.50 27 1,174.50 Entre Ejes 23-24 y B-H Baston 1/2" 2 1.90 17 64.60
Baston 3/8" 2 1.90 17 64.60 Acero Positivo 1/2" 6 7.50 17 765.00
Acero Intermedio 1/2" 6 5.70 17 581.40 Acero Negativo 1/2" 5 4.30 17 365.50 Acero Negativo 3/8" 10 3.30 17 561.00 Temperatura 1/4" 1 43.50 27 1,174.50
Entre Ejes 9-23 y H-J¨ Sentido horizontal Entre Ejes 9-15 y I-J 5 6.90 7.20 0.14 34.78 5 6.90 7.20 248.40 Baston 1/2" 2 3.55 18 127.80
2 6.40 1.75 0.14 3.14 2 6.40 1.75 22.40 Baston 1/2" 2 2.65 18 95.40 Acero Positivo 1/2" 1 40.15 18 722.70
Acero Intermedio 1/2" 1 7.45 18 134.10 Acero Intermedio 1/2" 4 5.70 18 410.40 Acero Negativo 1/2" 4 4.30 18 309.60 Acero Negativo 3/8" 8 3.30 18 475.20 Temperatura 1/4" 5 7.51 27 1,013.85 Temperatura 1/4" 2 6.40 6 76.80
Entre Ejes 17-23 y H-I 5 6.90 7.20 0.14 34.78 5 6.90 7.20 248.40 Baston 1/2" 2 3.55 18 127.80 2 6.40 1.75 0.14 3.14 2 6.40 1.75 22.40 Baston 1/2" 2 2.65 18 95.40
Acero Positivo 1/2" 1 40.15 18 722.70 Acero Intermedio 1/2" 1 7.45 18 134.10 Acero Intermedio 1/2" 4 5.70 18 410.40 Acero Negativo 1/2" 4 4.30 18 309.60 Acero Negativo 3/8" 8 3.30 18 475.20 Temperatura 1/4" 5 7.51 27 1,013.85 Temperatura 1/4" 2 6.40 6 76.80
Sentido Vertical Entre Ejes 9-23 y H - J Baston 1/2" 2 1.52 170 516.80
Acero Positivo 1/2" 1 13.20 170 2,244.00 Acero Intermedio 3/8" 1 3.40 170 578.00 Acero Negativo 1/2" 2 2.70 170 918.00 Acero Negativo 1/2" 1 3.50 170 595.00
Baston 3/8" 2 3.10 170 1,054.00 Temperatura 1/4" 1 38.00 28 1,064.00
Sentido horizontal Entre Ejes 9-15 y H-I 5 6.90 5.35 0.14 25.84 5 6.90 5.35 184.58 Baston 1/2" 6 1.90 13 148.20
275de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Positivo 1/2" 1 36.80 13 478.40 Acero Intermedio 1/2" 1 28.50 13 370.50 Acero Negativo 1/2" 1 23.80 13 309.40 Acero Negativo 3/8" 8 13.20 13 1,372.80 Temperatura 1/4" 5 7.50 20 750.00
Entre Ejes 17-23 y H-I 5 6.90 7.20 0.14 34.78 5 6.90 7.20 248.40 Baston 1/2" 6 1.90 18 205.20 Acero Positivo 1/2" 1 36.80 18 662.40
Acero Intermedio 1/2" 1 28.50 18 513.00 Acero Negativo 1/2" 1 23.80 18 428.40 Acero Negativo 3/8" 8 13.20 18 1,900.80 Temperatura 1/4" 5 7.50 28 1,050.00
Sentido Vertical Entre Ejes 9-23 y H - J Baston 1/2" 2 1.52 170 516.80
Acero Positivo 1/2" 1 13.20 170 2,244.00 Acero Intermedio 3/8" 1 3.40 170 578.00 Acero Negativo 1/2" 2 2.70 170 918.00 Acero Negativo 1/2" 1 3.50 170 595.00
Baston 3/8" 2 3.10 170 1,054.00 Temperatura 1/4" 1 38.00 28 1,064.00
TERCER PISO SECTOR A Entre Ejes 6-7 y D-E Sentido horizontal 1 6.90 6.55 0.14 6.33 1 6.90 6.55 45.20 Baston 1/2" 2 1.90 16 60.80
Acero Positivo 5/8" 1 7.50 16 120.00 Acero Intermedio 1/2" 1 5.70 16 91.20
Temperatura 1/4" 1 7.50 25 187.50 Sentido vertical Baston 1/2" 2 1.90 17 64.60
Acero Positivo 5/8" 1 7.15 17 121.55 Acero Intermedio 1/2" 1 5.35 17 90.95
Temperatura 1/4" 1 7.15 27 193.05 Entre Ejes 6-7 y E-H Sentido horizontal Entre Ejes 6-7 y E-F 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60
Acero Positivo 5/8" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90
Temperatura 1/4" 1 7.50 25 187.50 Entre Ejes 6-7 y F-G 1 6.90 6.90 0.14 6.67 1 6.90 6.90 47.61 Baston 1/2" 2 1.90 17 64.60
Acero Positivo 5/8" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90
Temperatura 1/4" 1 7.50 25 187.50 Entre Ejes 6-7 y G-H 1 6.90 4.50 0.14 4.35 1 6.90 4.50 31.05 Baston 1/2" 2 1.90 11 41.80
Acero Positivo 5/8" 1 7.50 11 82.50 Acero Intermedio 1/2" 1 5.70 11 62.70
Temperatura 1/4" 1 7.50 17 127.50 Sentido vertical
Baston 1/2" 2 1.90 11 41.80 Baston 3/8" 2 1.90 11 41.80
Acero Positivo 1/2" 3 7.50 11 247.50 Acero Intermedio 1/2" 3 5.70 11 188.10 Acero Negativo 1/2" 2 4.30 11 94.60 Acero Negativo 3/8" 4 3.30 11 145.20 Temperatura 1/4" 1 19.50 17 331.50
Baston 1/2" 2 1.90 7 26.60 Baston 3/8" 2 1.90 7 26.60
Acero Positivo 1/2" 2 7.50 7 105.00
276de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Intermedio 1/2" 2 5.70 7 79.80 Acero Negativo 1/2" 1 4.30 7 30.10 Acero Negativo 3/8" 2 3.30 7 46.20 Temperatura 1/4" 1 14.70 9 132.30
Baston 3/8" 2 1.40 7 19.60 Acero Positivo 3/8" 1 5.00 7 35.00 Temperatura 1/4" 1 5.00 9 45.00
SECTOR B Entre Ejes 13-19 y B-H Sentido horizontal Entre Ejes 14-18 y B-C 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 1 1.90 20 38.00
2 5.70 6.90 0.14 11.01 2 5.70 6.90 78.66 Baston 3/8" 1 1.90 20 38.00 Acero Positivo 1/2" 1 7.50 20 150.00
Acero Intermedio 1/2" 1 5.70 20 114.00 Acero Negativo 1/2" 1 3.05 20 61.00 Acero Negativo 3/8" 1 3.90 20 78.00 Acero Positivo 1/2" 2 6.30 17 214.20 Acero Negativo 1/2" 2 3.05 17 103.70 Acero Negativo 3/8" 2 3.90 17 132.60 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 26.70 27 720.90 V Entre Ejes 13-19 y C-D 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 3.00 35 210.00
Baston 3/8" 2 3.00 35 210.00 Acero Positivo 1/2" 2 8.70 35 609.00
Acero Intermedio 1/2" 2 5.70 35 399.00 Acero Negativo 1/2" 1 4.30 35 150.50 Acero Negativo 3/8" 2 3.30 35 231.00 Temperatura 1/4" 1 14.70 54 793.80
v Entre Ejes 13-19 y D-E 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 3.00 35 210.00 Baston 3/8" 2 3.00 35 210.00
Acero Positivo 1/2" 2 8.70 35 609.00 Acero Intermedio 1/2" 2 5.70 35 399.00 Acero Negativo 1/2" 1 4.30 35 150.50 Acero Negativo 3/8" 2 3.30 35 231.00 Temperatura 1/4" 1 14.70 54 793.80
v Entre Ejes 13-19 y E-F 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 3.00 35 210.00 Baston 3/8" 2 3.00 35 210.00
Acero Positivo 1/2" 2 8.70 35 609.00 Acero Intermedio 1/2" 2 5.70 35 399.00 Acero Negativo 1/2" 1 4.30 35 150.50 Acero Negativo 3/8" 2 3.30 35 231.00 Temperatura 1/4" 1 14.70 54 793.80
v Entre Ejes 13-19 y F-G 4 6.90 6.90 0.14 26.66 4 6.90 6.90 190.44 Baston 1/2" 2 3.00 35 210.00 Baston 3/8" 2 3.00 35 210.00
Acero Positivo 1/2" 4 8.70 35 1,218.00 Acero Intermedio 1/2" 4 5.70 35 798.00 Acero Negativo 1/2" 2 4.30 35 301.00 Acero Negativo 3/8" 4 3.30 35 462.00 Temperatura 1/4" 1 14.70 54 793.80
v Entre Ejes 14-18 y G-H 2 6.90 6.90 0.14 13.33 2 6.90 6.90 95.22 Baston 1/2" 2 1.90 17 64.60 2 5.70 6.90 0.14 11.01 2 5.70 6.90 78.66 Baston 3/8" 2 1.90 17 64.60
Acero Positivo 1/2" 2 7.50 17 255.00 Acero Intermedio 1/2" 2 5.70 17 193.80
277de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Negativo 1/2" 3 3.90 17 198.90 Acero Negativo 1/2" 3 3.05 17 155.55 Acero Positivo 1/2" 2 6.30 17 214.20 Temperatura 1/4" 1 26.70 27 720.90
Sentido vertical v Entre Ejes 13-14 y C-G Baston 1/2" 2 3.00 18 108.00
Baston 3/8" 2 3.00 18 108.00 Acero Positivo 1/2" 2 8.70 18 313.20
Acero Intermedio 1/2" 4 5.70 18 410.40 Acero Negativo 1/2" 3 4.30 18 232.20 Acero Negativo 3/8" 6 3.30 18 356.40 Acero Positivo 1/2" 2 7.50 18 270.00 Temperatura 1/4" 1 29.10 27 785.70
v Entre Ejes 14-15 y B-H Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Acero Positivo 1/2" 1 7.50 17 127.50 Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 5 4.30 19 408.50 Acero Negativo 3/8" 10 3.30 19 627.00 Acero Positivo 1/2" 4 7.50 19 570.00
Acero Intermedio 1/2" 4 5.70 19 433.20 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 43.50 27 1,174.50 v Entre Ejes 15-16 y B-H Baston 1/2" 1 1.90 14 26.60
Baston 3/8" 1 1.90 14 26.60 Acero Positivo 1/2" 1 8.70 14 121.80
Acero Intermedio 1/2" 1 5.70 14 79.80 Baston 1/2" 1 3.00 14 42.00 Baston 3/8" 1 3.00 14 42.00
Temperatura 1/4" 1 7.50 22 165.00 Entre Ejes 16-17 y B-C Baston 1/2" 1 1.90 14 26.60
Baston 3/8" 1 1.90 14 26.60 Acero Positivo 1/2" 1 8.70 14 121.80
Acero Intermedio 1/2" 1 5.70 14 79.80 Baston 1/2" 1 3.00 14 42.00 Baston 3/8" 1 3.00 14 42.00
Temperatura 1/4" 1 7.50 22 165.00 Entre Ejes 15-17 y G-H Baston 1/2" 1 1.90 31 58.90
Baston 3/8" 1 1.90 31 58.90 Acero Positivo 1/2" 1 8.70 31 269.70
Acero Intermedio 1/2" 1 5.70 31 176.70 Baston 1/2" 1 3.00 31 93.00 Baston 3/8" 1 3.00 31 93.00
Temperatura 1/4" 1 7.50 45 337.50 V Entre Ejes 17-18 y B-H Baston 1/2" 1 1.90 17 32.30
Baston 3/8" 1 1.90 17 32.30 Acero Positivo 1/2" 1 7.50 17 127.50
Acero Intermedio 1/2" 1 5.70 17 96.90 Acero Negativo 1/2" 5 4.30 19 408.50 Acero Negativo 3/8" 10 3.30 19 627.00 Acero Positivo 1/2" 4 7.50 19 570.00
Acero Intermedio 1/2" 4 5.70 19 433.20 Acero Positivo 1/2" 1 7.50 17 127.50
278de336
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97TOTALPart. Longitud Ancho
Coeficiente
Parcial
Nro Vec.
Long Ancho Altura Parcial FORMA D N. Elem Longitud
N° Vec.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
ElementoNro Vec.
Acero Intermedio 1/2" 1 5.70 17 96.90 Baston 1/2" 1 1.90 17 32.30 Baston 3/8" 1 1.90 17 32.30
Temperatura 1/4" 1 43.50 27 1,174.50 V Entre Ejes 18-19 y C-G Baston 1/2" 2 3.00 18 108.00
Baston 3/8" 2 3.00 18 108.00 Acero Positivo 1/2" 2 8.70 18 313.20
Acero Intermedio 1/2" 4 5.70 18 410.40 Acero Negativo 1/2" 3 4.30 18 232.20 Acero Negativo 3/8" 6 3.30 18 356.40 Acero Positivo 1/2" 2 7.50 18 270.00 Temperatura 1/4" 1 29.10 27 785.70
TOTALES M3 1,977.39 M2 - 14,076.59 ML 115,575.65 66,396.90 204,407.15 1,009.15 - - 387,388.85
KG 28,893.91 37,182.26 202,363.08 1,564.18 - - 270,003.44
% DE DESPERDICIOS 5% % DE DESPERDICIOS % DE DESPERDICIOS
2,076.26 14,076.59 28,893.91 37,182.26 202,363.08 1,564.18 - - 270,003.44
Nro de ladrillo de techo 20x30x30 14,076.59 x 6.5 = 91,497.83
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
02.03.12 POZOS SUMIDEROS
02.03.12.01 POZOS SUMIDEROS CONCRETO F`C = 210 KG/CM2
02.03.12.02 POZOS SUMIDEROS ENCOFRADO Y DESENCOFRADO
02.03.12.03 POZOS SUMIDEROS ACERO DE REFUERZO Fy=4200 kg/cm2
POZO DE AGUAS GRISES 1
Area
BASE 1 6.17 0.30 1.85 1 8.82 1 0.30 2.65 LONGITUDINALES 1/2" 16 2.00 1 32.00
TRANSVERSALES 1/2" 16 2.00 1 32.00
MUROS
1 1.39 3.15 4.37 1 7.56 1 3.15 23.81 VERTICALES 1/2" 38 4.15 1 157.70
1 6.30 1 3.15 19.85 VERTICALES 1/2" 32 4.15 1 132.80
HORIZONTALES 1/2" 16 7.56 1 120.96
HORIZONTALES 1/2" 16 6.30 1 100.80
TECHO 1 4.54 0.20 0.91 1 4.54 1 4.54 LONGITUDINALES 3/8" 20 2.00 1 40.00
TRANSVERSALES 3/8" 20 2.00 1 40.00
CASETA
BASE 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 7 2.10 1 14.70
TRANSVERSALES 1/2" 7 1.95 1 13.65
MUROS
2 1.55 0.15 0.70 2.17 2 1.55 2 0.70 4.34 VERTICALES 1/2" 8 1.10 2 17.60
HORIZONTALES 1/2" 4 1.95 2 15.60
1 1.40 0.15 0.70 0.98 1 1.40 2 0.70 1.96 VERTICALES 1/2" 7 1.10 1 7.70
HORIZONTALES 1/2" 4 1.80 1 7.20
TECHO 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 8 2.10 1 16.80
TRANSVERSALES 1/2" 9 1.95 1 17.55
POZO DE AGUAS GRISES 2
Area
BASE 1 6.17 0.30 1.85 1 8.82 1 0.30 2.65 LONGITUDINALES 1/2" 16 2.00 1 32.00
TRANSVERSALES 1/2" 16 2.00 1 32.00
MUROS
1 1.39 2.03 2.81 1 7.56 1 2.03 15.35 VERTICALES 1/2" 31 3.03 1 93.93
1 6.30 1 2.03 12.79 HORIZONTALES 1/2" 11 7.56 1 83.16
TECHO 1 4.54 0.20 0.91 1 4.54 1 4.54 LONGITUDINALES 3/8" 20 2.00 1 40.00
TRANSVERSALES 3/8" 20 2.00 1 40.00
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
CASETA
BASE 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 7 2.10 1 14.70
TRANSVERSALES 1/2" 7 1.95 1 13.65
MUROS
2 1.55 0.15 0.70 2.17 2 1.55 2 0.70 4.34 VERTICALES 1/2" 8 1.10 2 17.60
HORIZONTALES 1/2" 4 1.95 2 15.60
1 1.40 0.15 0.70 0.98 1 1.40 2 0.70 1.96 VERTICALES 1/2" 7 1.10 1 7.70
HORIZONTALES 1/2" 4 1.80 1 7.20
TECHO 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 8 2.10 1 16.80
TRANSVERSALES 1/2" 9 1.95 1 17.55
POZO DE AGUAS NEGRAS 1
Area
BASE 1 6.17 0.30 1.85 1 8.82 1 0.30 2.65 LONGITUDINALES 1/2" 16 2.00 1 32.00
TRANSVERSALES 1/2" 16 2.00 1 32.00
MUROS
1 1.39 3.15 4.37 1 7.56 1 3.15 23.81 VERTICALES 1/2" 38 4.15 1 157.70
1 6.30 1 3.15 19.85 VERTICALES 1/2" 32 4.15 1 132.80
HORIZONTALES 1/2" 16 7.56 1 120.96
HORIZONTALES 1/2" 16 6.30 1 100.80
TECHO 1 4.54 0.20 0.91 1 4.54 1 4.54 LONGITUDINALES 1/2" 20 2.00 1 40.00
TRANSVERSALES 1/2" 20 2.00 1 40.00
CASETA
BASE 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 7 2.10 1 14.70
TRANSVERSALES 1/2" 7 1.95 1 13.65
MUROS
2 1.55 0.15 0.70 2.17 2 1.55 2 0.70 4.34 VERTICALES 1/2" 8 1.10 2 17.60
HORIZONTALES 1/2" 4 1.95 2 15.60
1 1.40 0.15 0.70 0.98 1 1.40 2 0.70 1.96 VERTICALES 1/2" 7 1.10 1 7.70
HORIZONTALES 1/2" 4 1.80 1 7.20
TECHO 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 8 2.10 1 16.80
TRANSVERSALES 1/2" 9 1.95 1 17.55
POZO DE AGUAS NEGRAS 2
Area
BASE 1 11.37 0.30 3.41 1 8.82 1 0.30 2.65 LONGITUDINALES 1/2" 16 3.00 1 48.00
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
TRANSVERSALES 1/2" 16 3.00 1 48.00
MUROS
1 2.02 3.03 6.11 1 10.71 1 3.03 32.45 VERTICALES 1/2" 54 4.03 1 217.62
1 9.45 1 3.03 28.63 VERTICALES 1/2" 48 4.03 1 193.44
HORIZONTALES 1/2" 16 10.71 1 171.36
HORIZONTALES 1/2" 16 9.45 1 151.20
TECHO 1 4.54 0.20 0.91 1 4.54 1 4.54 LONGITUDINALES 1/2" 20 3.00 1 60.00
TRANSVERSALES 1/2" 20 3.00 1 60.00
CASETA
BASE 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 7 2.10 1 14.70
TRANSVERSALES 1/2" 7 1.95 1 13.65
MUROS
2 1.55 0.15 0.70 2.17 2 1.55 2 0.70 4.34 VERTICALES 1/2" 8 1.10 2 17.60
HORIZONTALES 1/2" 4 1.95 2 15.60
1 1.40 0.15 0.70 0.98 1 1.40 2 0.70 1.96 VERTICALES 1/2" 7 1.10 1 7.70
HORIZONTALES 1/2" 4 1.80 1 7.20
TECHO 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 8 2.10 1 16.80
TRANSVERSALES 1/2" 9 1.95 1 17.55
POZO DE AGUA DE LLUVIAS 1
Area
BASE 1 36.41 0.30 10.92 1 8.82 1 0.30 2.65 LONGITUDINALES 1/2" 16 6.40 1 102.40
TRANSVERSALES 1/2" 16 6.40 1 102.40
MUROS
1 3.91 3.60 14.06 1 20.16 1 3.60 72.58 VERTICALES 1/2" 101 4.60 1 464.60
1 18.90 1 3.60 68.04 VERTICALES 1/2" 95 4.60 1 437.00
HORIZONTALES 1/2" 18 20.16 1 362.88
HORIZONTALES 1/2" 18 18.90 1 340.20
TECHO 1 32.26 0.20 6.45 1 32.26 1 32.26 LONGITUDINALES 1/2" 20 6.80 1 136.00
TRANSVERSALES 1/2" 20 6.80 1 136.00
CASETA
BASE 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 7 2.10 1 14.70
TRANSVERSALES 1/2" 7 1.95 1 13.65
MUROS
2 1.55 0.15 0.70 2.17 2 1.55 2 0.70 4.34 VERTICALES 1/2" 8 1.10 2 17.60
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
HORIZONTALES 1/2" 4 1.95 2 15.60
1 1.40 0.15 0.70 0.98 1 1.40 2 0.70 1.96 VERTICALES 1/2" 7 1.10 1 7.70
HORIZONTALES 1/2" 4 1.80 1 7.20
TECHO 1 1.55 1.70 0.20 0.53 1 6.50 1 0.20 1.30 LONGITUDINALES 1/2" 8 2.10 1 16.80
TRANSVERSALES 1/2" 9 1.95 1 17.55
POZO DE AGUA DE LLUVIAS 2-3-4
Area
BASE 3 18.14 0.30 16.33 3 8.82 1 0.30 7.94 LONGITUDINALES 1/2" 16 4.80 3 230.40
TRANSVERSALES 1/2" 16 4.80 3 230.40
MUROS
3 2.65 3.01 23.89 3 20.16 1 3.01 182.04 VERTICALES 1/2" 101 4.01 3 1,215.03
3 18.90 1 3.01 170.67 VERTICALES 1/2" 95 4.01 3 1,142.85
HORIZONTALES 1/2" 16 20.16 3 967.68
HORIZONTALES 1/2" 16 18.90 3 907.20
TECHO 3 15.25 0.20 9.15 3 15.25 1 45.74 LONGITUDINALES 1/2" 20 4.80 3 288.00
TRANSVERSALES 1/2" 20 4.80 3 288.00
CASETA
BASE 3 1.55 1.70 0.20 1.58 3 6.50 1 0.20 3.90 LONGITUDINALES 1/2" 7 2.10 3 44.10
TRANSVERSALES 1/2" 7 1.95 3 40.95
MUROS
6 1.55 0.15 0.70 6.51 6 1.55 2 0.70 13.02 VERTICALES 1/2" 8 1.10 6 52.80
HORIZONTALES 1/2" 4 1.95 6 46.80
3 1.40 0.15 0.70 2.94 3 1.40 2 0.70 5.88 VERTICALES 1/2" 7 1.10 3 23.10
HORIZONTALES 1/2" 4 1.80 3 21.60
TECHO 3 1.55 1.70 0.20 1.58 3 6.50 1 0.20 3.90 LONGITUDINALES 1/2" 8 2.10 3 50.40
TRANSVERSALES 1/2" 9 1.95 3 52.65
POZO DE AGUAS NEGRAS
Area
BASE 1 1.77 0.15 0.27 1 1.00 LONGITUDINALES 1/2" 5 1.20 1 6.00
TRANSVERSALES 1/2" 5 1.20 1 6.00
MUROS
1 0.64 1.50 0.96 1 3.78 1.65 6.24 VERTICALES 3/8" 19 1.80 1 34.20
1 4.73 1.65 7.80
HORIZONTALES 3/8" 8 3.78 1 30.24
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
TECHO 1 1.77 0.15 0.27 1 1.77 1.00 1.77 LONGITUDINALES 1/2" 5 1.20 1 6.00
TRANSVERSALES 1/2" 5 1.20 1 6.00
CASETA DE BOMBEO
BASE 1 1.00 1.00 0.15 0.15 LONGITUDINALES 1/2" 4 1.30 1 5.20
TRANSVERSALES 1/2" 4 1.15 1 4.60
MUROS
2 1.15 0.65 0.15 0.35 1 0.80 1.30 1.04 VERTICALES 3/8" 5 0.65 3 9.75
1 1.30 0.65 0.15 0.20 3 0.80 1.00 2.40 HORIZONTALES 3/8" 3 1.15 3 10.35
2 0.80 1.15 1.84
TECHO 1 1.15 1.30 0.15 0.17 1 1.00 1.00 1.00 LONGITUDINALES 1/2" 5 1.30 1 6.50
TRANSVERSALES 1/2" 6 1.15 1 6.90
TOTALES M3 147.04 M2 880.46 ML - 244.54 10,707.87 - - -
KG - 136.94 10,600.79 - - - 10,737.73
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0% 0%
147.04 880.46 - 136.94 10,600.79 - - - 10,737.73
HOJA DE METRADOS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
02 ESTRUCTURAS
02.03 OBRAS DE CONCRETO ARMADO
Descripción
CONCRETO ENCOFRADO Y DESENCOFRADO ACERO
N° Dimensiones Dimensiones Dimensiones 0.25 0.56 0.99 1.55 2.2 3.97
TOTALPart. Nro Vec. Longitud Ancho Altura Parcial Nro Vec. Longitud Ancho Altura Parcial FORMA D N. Elem Longitud N° Vec. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Elemento
02.03.13 DUCTO DE COCINA
02.03.13.01 DUCTO DE COCINA CONCRETO F`C = 210 KG/CM2
02.03.13.02 DUCTO DE COCINA ENCOFRADO Y DESENCOFRADO
02.03.13.03 DUCTO DE COCINA ACERO DE REFUERZO Fy=4200 kg/cm2
area
BASE 1 33.08 1.00 0.40 13.23 1 32.40 1 0.40 12.96 X 1/2" 8 8.75 2 140.00
Y 1/2" 22 2.40 2 105.60
X1 1/2" 23 3.20 2 147.20
Y1 1/2" 11 8.25 2 181.50
MUROS
MCC-01 1 5.55 0.40 2.10 4.66 1 5.55 2 2.10 23.31 VERTICAL 1/2" 22 3.15 2 138.60
HORIZONTAL 1/2" 9 6.35 2 114.30
MCC-01 1 5.85 0.40 2.10 4.91 1 5.85 2 2.10 24.57 VERTICAL 1/2" 24 3.15 2 151.20
HORIZONTAL 1/2" 9 6.65 2 119.70
MCC-01 1 2.40 0.40 2.10 2.02 1 2.40 2 2.10 10.08 VERTICAL 1/2" 10 3.15 2 63.00
HORIZONTAL 1/2" 9 3.20 2 57.60
MCC-01 1 7.45 0.40 2.10 6.26 1 7.45 2 2.10 31.29 VERTICAL 1/2" 30 3.15 2 189.00
HORIZONTAL 1/2" 9 8.25 2 148.50
MCC-01 1 7.95 0.40 2.10 6.68 1 7.95 2 2.10 33.39 VERTICAL 1/2" 32 3.15 2 201.60
HORIZONTAL 1/2" 9 8.75 2 157.50
MCC-01 1 1.60 0.40 5.80 3.71 1 1.60 2 5.80 18.56 VERTICAL 1/2" 7 6.85 2 95.90
HORIZONTAL 1/2" 24 2.40 2 115.20
area
TECHO 1 33.08 1.00 0.25 8.27 1 33.08 1 1.00 33.08 X 1/2" 8 8.75 2 140.00
1 32.40 1 0.25 8.10 Y 1/2" 22 2.40 2 105.60
X1 1/2" 23 3.20 2 147.20
Y1 1/2" 11 8.25 2 181.50
TOTALES M3 49.74 M2 195.34 ML - - 2,700.70 - - - 2,700.70
KG - - 2,673.69 - - - 2,673.69
% DE DESPERDICIOS 0% % DE DESPERDICIOS 0% % DE DESPERDICIOS 0% 0% 0% 0% 0% 0%
49.74 195.34 - - 2,673.69 - - - 2,673.69
285de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.04 TIJERAL TM-01 (ANG. DE 21/2"x21/2"x3/16") H = 0.45 ml
TIJERAL V-01 (BRIDAS TC 75x75x4.5mm) H = 0.45 ml
Sector A2 y A3 fV-01 ml 4 4.183 1.0299 17.23
ml 11 7.65 1.0369 87.25
ml 14 2.85 1.0369 41.37
Sector B2
V-01 ml 32 7.05 1.0634 239.90
Sector B3 2do piso
V-01 ml 4 5.31 21.26
Sector B3 3er piso
V-.01 ml 26 7.85 204.23
Sector B5
V-01 ml 32 7.05 1.0634 239.90
Sector C
V-01 ml 7 7.3233 51.26
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.03.03.05 TIJERAL TM-03 (ANG. DE 21/2"x21/2"x3/16") H = 0.45 ml
TIJERAL V-02 (BRIDAS TC 75x75x4.5mm) H = 0.45 ml
Sector A
Sector A2 y A3 h fV-02 ml 2 4.333 1.0165 8.81
ml 2 11.508 1.0165 23.40
Sector B2 h
V-02 ml 4 10 1.03 41.28
Sector B5 h
V-02 ml 4 10 1.03 41.28
Sector B3 3er piso
V-02 ml 8 11.00 88.00
Sector B3 2do piso
V-02 ml 4 5.1 1.05 21.42
Sector C
V-02 ml 2 10.3309 20.66
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.02 TIJERAL TM-02 (ANG. DE 21/2"x21/2"x3/16") H = 0.45 ml
TIJERAL VA (TC 75x75xx3mm) H = 0.45 ml
Sector B1 f
VA ml 5 4.58 1.00 22.88
VA ml 5 3.37 1.00 16.86
Sector B2
V-A ml 14 7.05 1.0634 104.96
Sector B3 2do piso
V-A ml 2 7.15 14.30
286de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Sector B3 3er piso
V-A ml 20 7.05 141.00
V-A ml 4 6.00 24.00
Sector B4 f
VA ml 5 4.58 1.00 22.88
VA ml 5 3.37 1.00 16.86
Sector B5
V-A ml 12 7.05 1.0634 89.96
Sector A2 y A3 fVA ml 1 5.85 1.00 5.85
VA ml 2 5.583 1.00 11.166
VA ml 1 2.25 1.00 2.25
VA ml 3 5.35 1.00 16.05
VA ml 2 1.55 1.00 3.1
VA ml 2 6.85 1.00 13.7
VA ml 4 7.05 1.00 28.2
Sector C
V-A ml 1 2.14 2.14
2 6.6 13.2
Sector D
V-A ml 1 6.45 6.45
Sector F
V-A ml 1 1.01 1.01
ml 1 5.45 5.45
Caseta Nro 3
V-A ml 2 3.45 6.9
ml 1 3.55 3.55
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.07 TIJERAL TM-07
TIJERAL V-03 (BRIDAS TC 100x100x4.5mm) H = 0.45 ml
Auditorio
V-03 Und. 1 14.61 14.61
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.04 TIJERAL TM-01,03,04,06
TIJERAL V-04 (BRIDAS TC 100x100x4.5mm) H = 0.45 ml
Sector B1
V-04 20 3.15 1.03 64.89
V-04 10 4.4 1.03 45.32
Sector B4
V-04 20 3.15 1.03 64.89
V-04 10 4.4 1.03 45.32
Sector C
V-04 ml 1 4.9028 4.90
1 5.0058 5.01
287de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
1 5.1397 5.14
1 3.4608 3.46
1 7.107 7.11
1 2.5132 2.51
1 5.3972 5.40
Sector D
V-04 ml 4 2.678 10.71
4 3.8522 15.41
Sector E
V-04 ml 8 4.7895 38.32
4 6.798 27.19
Sector F
V-04 ml 6 4.7895 28.74
4 6.7465 26.99
2 4.738 9.48
Caseta N°03
ml 4 2.472 9.89
6 1.6892 10.14
TOTALES ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.14 ARRIOSTRE DE 3/8"
ARRIOSTRE DE VIGUETAS TC 50x50x3mm
Sector B1
TC 50x50x3mm ml 20 3.12 1.05 65.52
TC 50x50x3mm ml 10 2.25 1.05 23.63
TC 50x50x3mm ml 10 1.98 1.05 20.79
Sector B2 fTC 50x50x3mm ml 4 2.2 1.03 9.08
TC 50x50x3mm ml 4 4.58 1.03 18.91
TC 50x50x3mm ml 36 7 1.03 260.06
TC 50x50x3mm ml 4 2.32 1.03 9.58
TC 50x50x3mm ml 4 4.69 1.03 19.36
Sector B3 3er piso
TC 50x50x3mm ml 34 7.75 263.37
TC 50x50x3mm ml 8 5.13 41.02
TC 50x50x3mm ml 8 2.51 20.07
TC 50x50x3mm ml 8 5.02 40.15
TC 50x50x3mm ml 8 2.45 19.64
Sector B3 2do piso
TC 50x50x3mm ml 2 3.58 1.05 7.52
TC 50x50x3mm ml 2 2.92 1.05 6.13
TC 50x50x3mm ml 1 3.52 1.05 3.70
Sector B4
TC 50x50x3mm ml 20 3.12 1.05 65.52
TC 50x50x3mm ml 10 2.25 1.05 23.63
TC 50x50x3mm ml 10 1.98 1.05 20.79
sector B5 fTC 50x50x3mm ml 4 2.2 1.03 9.08
TC 50x50x3mm ml 4 4.58 1.03 18.91
TC 50x50x3mm ml 36 7 1.03 260.06
TC 50x50x3mm ml 4 2.32 1.03 9.58
TC 50x50x3mm ml 4 4.69 1.03 19.36
288de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Sector A2 y A3 fTC 50x50x3mm ml 2 2.76 1.030 5.68
TC 50x50x3mm ml 2 2.48 1.037 5.14
TC 50x50x3mm ml 2 5.58 1.030 11.49
TC 50x50x3mm ml 2 5.02 1.037 10.41
TC 50x50x3mm ml 1 11.75 1.030 12.10
TC 50x50x3mm ml 2 10.17 1.037 21.09
TC 50x50x3mm ml 8 10.35 1.037 85.85
TC 50x50x3mm ml 6 3.2 1.037 19.91
Sector AUDITORIO
TC 50x50x3mm ml 6 14.04 84.23
Sector C
TC 50x50x3mm ml 1 3.47 3.47
3 2.37 7.11
8 7.28 58.26
4 4.53 18.13
4 2.21 8.86
Sector D -
TC 50x50x3mm ml 4 2.63 10.51
4 1.80 7.21
Sector E -
TC 50x50x3mm ml 8 2.37 18.95
4 4.64 18.54
Sector F -
TC 50x50x3mm ml 4 4.64 18.54
4 3.55 14.21
2 4.02 8.03
6 3.19 19.16
6 1.55 9.27
2 1.96 3.91
Caseta Nro 3
TC 50x50x3mm ml 8 1.67 13.35
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.15 ARRIOSTRE DE VIGUETAS DE DIAM. 1/2"
TENSOR Ø5/8"
Sector B1
Tensor de 5/8" ml 20 3.29 1.050 69.09
Tensor de 5/8" ml 10 3.17 1.050 33.29
Tensor de 5/8" ml 10 2.69 1.050 28.25
Sector B2 fTensor de 5/8" ml 34 3.34 1.030 116.95
Tensor de 5/8" ml 2 2.85 1.030 5.87
Sector B3 3er piso
Tensor de 5/8" ml 6 15.18 91.08
Tensor de 5/8" ml 4 3.85 15.40
Tensor de 5/8" ml 8 3.63 29.04
Sector B3 2do piso
Tensor de 5/8" ml 2 3.78 1.050 7.94
Tensor de 5/8" ml 2 5.1 1.050 10.71
Tensor de 5/8" ml 2 3.86 1.050 8.11
Sector B4
Tensor de 5/8" ml 20 3.29 1.050 69.09
289de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Tensor de 5/8" ml 10 3.17 1.050 33.29
Tensor de 5/8" ml 10 2.69 1.050 28.25
sector B5 fTensor de 5/8" ml 34 3.34 1.030 116.95
Tensor de 5/8" ml 2 2.85 1.030 5.87
Sector A2 y A3 fTensor de 5/8" ml 2 4.44 1.030 9.15
Tensor de 5/8" ml 2 3.76 1.037 7.80
Tensor de 5/8" ml 4 3.67 1.037 15.22
Tensor de 5/8" ml 4 3.4 1.037 14.10
Tensor de 5/8" ml 4 3.46 1.037 14.35
Tensor de 5/8" ml 4 3.49 1.037 14.47
Sector Auditorio ml 4 3.89 15.56
ml 4 4.93
Sector C 8 3.35 26.80
Sector D 4 3.40 13.60
Sector E 8 3.40 27.20
Sector F 8 3.00 24.00
Tensor Caseta 10 2.30 23.00
2 1.70 3.40
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.10 COBERTURA CON LAMINA TERMOACUSTICA TRAPEZOIDAL LIVIANA DE 2 mm
COBERTURA CON LAMINA CALAMINON TL
Sector B1
Cobertura calaminon TI m2 1 11.80 35.50 418.90
Sector B2 area fCobertura calaminon TI m2 1 678.25 1 1.037 703.25
Cobertura calaminon TI m2 1 228.26 2 1.037 473.35
Cobertura calaminon TI m2 1 58.99 1 1.037 61.16
Cobertura calaminon TI m2 1 49.39 1 1.037 51.21
Sector B3 2do piso
Cobertura calaminon TI m2 1 1.00 11.00 6.09 66.98
m2 1 1.00 9.40 5.20 48.91
m2 2 1.00 5.60 5.20 58.28
m2 2 1.00 5.15 6.09 62.72
Sector B3 3er piso
Cobertura calaminon TI m2 2 1.00 35.30 9.02 636.81
m2 2 1.00 18.50 9.02 333.74
m2 2 1.00 30.50 8.69 530.09
Sector B4
Cobertura calaminon TI m2 1 11.80 35.50 418.90
Sector B5 area fCobertura calaminon TI m2 1 678.25 1 1.037 703.25
Cobertura calaminon TI m2 1 228.26 2 1.037 473.35
Cobertura calaminon TI m2 1 58.99 1 1.037 61.16
Cobertura calaminon TI m2 1 49.39 1 1.037 51.21
Sector A2 y A3 fCobertura calaminon TI m2 1 15.65 44.7 1.037 725.34
290de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Cobertura calaminon TI m2 1 8.15 22.1 1.037 186.75
Sector C
Cobertura calaminon TI m2 1 15.85 21.30 337.61
m2 1 8.65 8.35 72.23
Sector D
Cobertura calaminon TI m2 1 13.60 6.85 93.16
Sector E
Cobertura calaminon TI m2 1 15.80 15.80 249.64
Cobertura Techo 1 m2 1 26.07 26.07
Sector F
Cobertura calaminon TI m2 1 22.65 11.10 251.41
Cobertura Techo 2 m2 1 13.90 13.90
CASETA DE INGRESO N° 01
Cobertura calaminon TI m2 1 15.75 4.75 74.81
CASETAN° 03 m2 1 38.10 38.10
TOTALES Total m2
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.17 COLUMNAS METALICAS CM-1 DE 6"x6"x3mm
COLUMNAS METALICAS CM DE 6"x6"x4.5mm
TIPICO CM 1
Sector A2 y A3 ml 17 1.00 17.00
Sector B1 ml 30 0.85 25.50
Sector B2 ml 28 1.00 28.00
Sector B3 (3ER PISO) ml 22 1.00 22.00
Sector B3 (2DO PISO) ml 8 1.00 8.00
Sector B4 ml 30 0.85 25.50
Sector B5 ml 28 1.00 28.00
Sector C ml 14 1.00 14.00
Sector D ml 8 0.55 4.40
Sector E ml 12 0.75 9.00
Sector F ml 12 0.75 9.00
Caseta N°03 ml 12 0.50 6.00
TIPICO CM 2
Sector A2 Y A3 ml 8 3.85 30.80
ml 2 1.91 3.82
ml 16 2.97 47.46
Sector B1 ml 15 1.60 24.00
Sector B2 ml 19 3.50 66.50
Sector B3 (3ER PISO) ml 20 3.20 64.00
Sector B3 (2DO PISO) ml 4 3.20 12.80
Sector B4 ml 15 1.60 24.00
Sector B5 ml 19 3.50 66.50
Sector C ml 6 3.20 19.20
Sector D ml 2 1.65 3.30
Sector E ml 5 3.00 15.00
Sector F ml 12 3.00 36.00
Caseta N°03 ml 5 1.15 5.75
TOTALES Total ml
Descripción
VOLUMEN
Tiene 4 metros mas porque tiene un techo un metro mas elevado.Se adiciona 4 mas por el techo 2 que sube un metro mas.Se adiciona 4 mas por el techo 2 que sube un metro mas.
Tiene 4 metros mas porque tiene un techo un metro mas elevado.Se adiciona 4 mas por el techo 2 que sube un metro mas.Se adiciona 4 mas por el techo 2 que sube un metro mas.
291de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
N°Descripción
Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.32 COLUMNAS METALICAS CIRCULAR ø 10" SCH 40
Sector B1 ml 6 7.80 46.80
24 3.95 94.80
Sector B4 ml 6 7.80 46.80
24 3.95 94.80
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.33 BASE PARA COLUMNAS CIRCUALRES
Sector B1 Und. 6 1.00 6.00
Sector B4 Und. 6 1.00 6.00
TOTALES Total und
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Ancho Altura Parcial
02.04.34 ANCLAJE PARA COLUMNAS CIRCULARES
Sector B1 Und. 6 7.00 42.00
Sector B4 Und. 6 7.00 42.00
292de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
TOTALES Total und
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.11 VIGUETA METALICA VM-01,02,03
CORREA C10"x3"x4.5
Sector B1
correa C 10"x3"x4.5mm ml 40 4.70 188.00
correa C 10"x3"x4.5mm ml 10 41.16 411.56
correa C 10"x3"x4.5mm ml 5 27.16 135.82
Sector B2
correa C 10"x3"x4.5mm ml 7 7.15 50.05
correa C 10"x3"x4.5mm ml 14 7.15 100.10
correa C 10"x3"x4.5mm ml 2 24.74 49.48
correa C 10"x3"x4.5mm ml 2 24.42 48.84
correa C 10"x3"x4.5mm ml 28 6.93 194.04
correa C 10"x3"x4.5mm ml 14 7.15 100.10
correa C 10"x3"x4.5mm ml 2 24.51 49.02
correa C 10"x3"x4.5mm ml 2 24.45 48.90
correa C 10"x3"x4.5mm ml 56 7.15 400.40
correa C 10"x3"x4.5mm ml 7 5.95 41.65
Sector B3 3er piso
correa C 10"x3"x4.5mm ml 12 49.88 598.50
correa C 10"x3"x4.5mm ml 4 41.48 165.90
correa C 10"x3"x4.5mm ml 8 48.90 391.20
Sector B3 do piso
correa C 10"x3"x4.5mm ml 2 19.50 39.00
correa C 10"x3"x4.5mm ml 1 14.50 14.50
Sector B4 0.00
correa C 10"x3"x4.5mm ml 40 4.70 188.00
correa C 10"x3"x4.5mm ml 10 41.16 411.56
correa C 10"x3"x4.5mm ml 5 27.16 135.82
Sector B5
correa C 10"x3"x4.5mm ml 7 7.15 50.05
correa C 10"x3"x4.5mm ml 14 7.15 100.10
correa C 10"x3"x4.5mm ml 2 24.74 49.48
correa C 10"x3"x4.5mm ml 2 24.42 48.84
correa C 10"x3"x4.5mm ml 28 6.93 194.04
correa C 10"x3"x4.5mm ml 14 7.15 100.10
correa C 10"x3"x4.5mm ml 2 24.51 49.02
correa C 10"x3"x4.5mm ml 2 24.45 48.90
correa C 10"x3"x4.5mm ml 56 7.15 400.40
correa C 10"x3"x4.5mm ml 7 5.95 41.65
Sector A2 y A3
correa C 10"x3"x4.5mm ml 1 41.48 41.48
correa C 10"x3"x4.5mm ml 1 7.90 7.90
correa C 10"x3"x4.5mm ml 2 57.74 115.48
correa C 10"x3"x4.5mm ml 2 32.09 64.18
correa C 10"x3"x4.5mm ml 2 11.73 23.46
correa C 10"x3"x4.5mm ml 2 39.55 79.10
correa C 10"x3"x4.5mm ml 2 16.26 32.52
correa C 10"x3"x4.5mm ml 2 37.94 75.88
correa C 10"x3"x4.5mm ml 2 4.86 9.72
correa C 10"x3"x4.5mm ml 1 11.34 11.34
correa C 10"x3"x4.5mm ml 2 20.76 41.52
293de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
correa C 10"x3"x4.5mm ml 1 48.44 48.44
correa C 10"x3"x4.5mm ml 4 21.36 85.44
correa C 10"x3"x4.5mm ml 2 49.84 99.68
Sector AUDITORIO
Correa C10"x3"x4.5 ml 26.00 7.00 182.00
Sector C
Correa C10"x3"x4.5 ml 8.00 7.50 60.00
14.00 18.50 259.00
6.00 9.60 57.60
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
CORREA C6."x3"x4.5
Sector D
C6"x3"x4.5mm ml 6 9.50 57.00
4 5.50 22.00
Sector E
Correa C6"x3"x4.5 ml 1.00 21.00 21.00
1.00 29.80 29.80
1.00 39.00 39.00
1.00 48.22 48.22
1.00 57.22 57.22
Sector F
Correa C6"x3"x4.5 ml 1.00 60.00 60.00
1.00 50.80 50.80
1.00 41.63 41.63
1.00 32.40 32.40
1.00 3.60 3.60
1.00 12.20 12.20
Caseta Nro 3
Correa C6"x3"x4.5 ml 1 35.17 35.17
1 32.32 32.32
2 3.55 7.10
4 3.45 13.80
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
SEGMENTOS DE APOYO C4"x2"x3mm
Sector A2 y A3 Und. 153 153.00
Sector B2 Und. 252 252.00
Sector B1 Und. 120 120.00
Sector B3 3er piso
Correa C4"x2"x3mm en V-01 Und. 26 7 182.00
Correa C4"x2"x3mm en V-02 Und. 8 7 56.00
Sector B3 2do piso
Und. 16 16.00
Sector B4 Und. 120 120.00
Sector B5 Und. 252 252.00
Sector AUDITORIO
Und. 13.00 13.00
294de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Sector C
Correa C4"x2"x3mm Und. 67.00 67.00
Sector D
Correa C4"x2"x3mm Und. 18.00 18.00
Sector E
Correa C4"x2"x3mm Und. 48.00 48.00
Sector F
Correa C4"x2"x3mm Und. 52.00 52.00
Caseta Nro 3
Correa C4"x2"x3mm und. 28.00 28.00
TOTALES Total und
VIGUETA TIPICA TC 75x75x4.5mm
Sector E TECHO 1 ml 4 4.95 19.80
ml 4 3.57 14.28
Sector F TECHO 2 ml 2 5.10 10.20
ml 2 2.80
ml 4 1.70 6.80
ml 1 2.50 2.50
TOTALES Total ml
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
UNION COLUMNA VIGA TIPO I
-
SECTOR B2 Und. 4
SECTOR B3 Und. 4
SECTOR B5 Und. 4
TOTALES Total und
UNION COLUMNA VIGA TIPO II
SECTOR A2 Und. 2
SECTOR B1 Und. 10
SECTOR B2 Und. 4
SECTOR B3 Und. 12
SECTOR B4 Und. 10
SECTOR B5 Und. 4
SECTOR C Und. 5
SECTOR D Und. 4
SECTOR E Und. 8
SECTOR E CUBRERA MET. Und. 4
SECTOR F Und. 4
SECTOR F CUBRERA MET. Und. 4
CASETA N°3 Und. 4
TECHO MET. B(3) I Und. 2
TECHO MET. B(3) II Und. 2
TOTALES Total und
295de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
UNION COLUMNA VIGA TIPO III
SECTOR A2 Und. 4
TOTALES Total und
UNION COLUMNA VIGA TIPO IV
SECTOR A2 Und. 1
SECTOR B1 Und. 5
SECTOR B4 Und. 5
SECTOR F Und. 2
CASETA N°3 Und. 2
TECHO MET. B(3) I Und. 1
TECHO MET. B(3) II Und. 1
TOTALES Total und
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
TAPA PL 4.5
Uno en cada columna Und. 369 369.00
TOTALES Total und
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.35 ANCLAJE PARA COLUMNAS CM EN VIGAS O LOSAS
Und. 369 1.00 369.00
TOTALES Total und
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.36 ANCLAJE PARA COLUMNAS CM CON TIJERAL O VIGA METALICA
ANCLAJE COLUMNAS CM -TIJERAL PL 6"x6"x8mm
Sector A2 y A3
Anclado a 1 tijeral Und. 17 1.00 17.00
Anclado a 2 tijerales Und. 2 2.00 4.00
Anclado a 3 tijerales Und. 3 3.00 9.00
Sector B1
Anclado a 1 tijeral Und. 30 1.00 30.00
Sector B2
Anclado a 1 tijeral Und. 28 1.00 28.00
Anclado a 2 tijerales Und. 4 2.00 8.00
Anclado a 3 tijerales Und. 4 3.00 12.00
Sector B3
Anclado a 1 tijeral Und. 20 1.00 20.00
Anclado a 2 tijerales Und. 4 2.00 8.00
Anclado a 3 tijerales Und. 6 3.00 18.00
Anclado a 4 tijerales Und. 4 4.00 16.00
Sector B4
Anclado a 1 tijeral Und. 30 1.00 30.00
ANCLAJE COLUMNAS METALICAS DE 5/8"Øx10"
296de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Sector B5
Anclado a 1 tijeral Und. 28 1.00 28.00
Anclado a 2 tijerales Und. 4 2.00 8.00
Anclado a 3 tijerales Und. 4 3.00 12.00
Sector C
Anclado a 1 tijeral Und. 14 1.00 14.00
Anclado a 2 tijerales Und. 2 2.00 4.00
Sector D
Anclado a 1 tijeral Und. 8 1.00 8.00
Anclado a 3 tijerales Und. 2 3.00 6.00
Sector E
Anclado a 1 tijeral Und. 12 1.00 12.00
Anclado a 3 tijerales Und. 5 3.00 15.00
Sector F
Anclado a 1 tijeral Und. 12 1.00 12.00
Anclado a 2 tijerales Und. 6 2.00 12.00
Anclado a 3 tijerales Und. 6 3.00 18.00
Caseta N°03
Anclado a 1 tijeral Und. 12 1.00 12.00
Anclado a 3 tijerales Und. 3 3.00 9.00
Anclado a 4 tijerales Und. 4 4.00 16.00
TOTALES Total und
ANCLAJE COLUMNAS CM -TIJERAL PL 125x100x8mm
Sector A2 y A3
Anclado a 2 tijerales Und. 3 2.00 6.00
Anclado a 3 tijerales Und. 6 3.00 18.00
Anclado a 4 tijerales Und. 12 4.00 48.00
Sector B1
Anclado a 3 tijerales Und. 10 3.00 30.00
Anclado a 4 tijerales Und. 5 4.00 20.00
Sector B2
Anclado a 2 tijerales Und. 2 2.00 4.00
Anclado a 3 tijerales Und. 4 3.00 12.00
Anclado a 4 tijerales Und. 6 4.00 24.00
Sector B3
Anclado a 3 tijerales Und. 4 3.00 12.00
Anclado a 4 tijerales Und. 6 4.00 24.00
Sector B4
Anclado a 3 tijerales Und. 10 3.00 30.00
Anclado a 4 tijerales Und. 5 4.00 20.00
Sector B5
Anclado a 2 tijerales Und. 2 2.00 4.00
Anclado a 3 tijerales Und. 4 3.00 12.00
Anclado a 4 tijerales Und. 6 4.00 24.00
Sector C
Anclado a 3 tijerales Und. 2 3.00 6.00
Anclado a 4 tijerales Und. 2 4.00 8.00
TOTALES Total und
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
Se adiciona 4 mas por el techo 2 que sube un metro mas.
297de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
PARTIDA : 02.04 ESTRUCTURAS METALICAS
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura ParcialDescripción
02.04.37 CASETA METALICA PARA EQUIPOS REFRIGERACION CAMARAS
Glob 1 1.00 1.00
TOTALES Total glob
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.38 DUCTO TECNICO METALICO
Ml 89.5 1.00 89.50
TOTALES Total ml
Descripción
VOLUMEN
N° Dimensiones
Part. Und. Vez Longitud Ancho Altura Parcial
02.04.39 ESCALERA METALICA SEGÚN DISENO
Ml 26 1.00 26.00
TOTALES Total ml
298de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
902.41
VOLUMEN
Dimensiones
Total
244.85
VOLUMEN
Dimensiones
Total
299de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
572.71
VOLUMEN
Dimensiones
Total
14.61
VOLUMEN
Dimensiones
Total
300de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
430.80
VOLUMEN
Dimensiones
Total
301de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
1,748.87
VOLUMEN
Dimensiones
Total
302de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
877.81
VOLUMEN
Dimensiones
Total
303de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
7,222.29
VOLUMEN
Dimensiones
Total
615.52
VOLUMEN
304de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
Dimensiones
Total
283.20
VOLUMEN
Dimensiones
Total
12.00
VOLUMEN
Dimensiones
Total
305de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
84.00
VOLUMEN
Dimensiones
Total
306de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
6,139.76
VOLUMEN
Dimensiones
Total
563.26
VOLUMEN
Dimensiones
Total
307de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
1,377.00
53.58
VOLUMEN
Dimensiones
Total
12.00
79.00
308de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
4.00
17.00
VOLUMEN
Dimensiones
Total
369.00
VOLUMEN
Dimensiones
Total
369.00
VOLUMEN
Dimensiones
Total
309de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
386.00
302.00
VOLUMEN
Dimensiones
Total
310de336
PLANILLA DE METRADOS - ESTRUCTURAS
PROYECTO: IMPLEMENTACION DEL INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
VOLUMEN
Dimensiones
Total
1.00
VOLUMEN
Dimensiones
Total
89.50
VOLUMEN
Dimensiones
Total
26.00
311de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
SOTANO
SECTOR B
B2-S-101 AC-12 CORREDOR 60.80 28.70 39.00 60.80
B2-S-102 AC-12 CUARTO TECNICO 6.55 9.60 10.50 6.55
B2-S-103 AC-04 SH 2.48 6.10 6.90 2.48
B2-S-106 AC-02 JEFATURA 12.15 13.50 14.40 12.15
B2-S-107 AC-02 CONTROL 11.80 13.20 14.10 11.80
B2-S-108 AC-02 AREA TECNICA APOYO ADMINISTRATIVO 7.90 10.80 11.70 7.90
B2-S-110 AC-04 LIMPIEZA 2.48 6.10 6.90 2.48
B2-S-111 AC-04 SH 2.48 6.10 6.90 2.48
B2-S-112 AC-04 SH 2.48 6.10 6.90 2.48
B2-S-113 AC-12 ALMACEN 1 32.35 21.60 23.40 32.35
B2-S-114 AC-12 ALMACEN 2 32.00 21.60 23.40 32.00
B2-S-115-109-104-105 AC-12 CORREDOR - RECEPCION - ESPERA 134.70 63.90 82.80 134.70
B2-S-116 AC-12 ALMACEN 3 32.00 21.60 23.40 32.00
B2-S-117 AC-12 ALMACEN 4 31.30 21.40 23.20 31.30
B2-S-118 AC-12 ALMACEN 5 32.40 21.90 23.70 32.40
B2-S-119 AC-12 ALMACEN 6 33.60 22.80 24.60 33.60
B2-S-120 AC-12 ALMACEN 7 33.50 22.20 24.00 33.50
B2-S-122 AC-02 CONTROL DE INGRESO E INSUMOS 5.20 8.40 9.30 5.20
B3-S-101-101A-102 AC-01 HALL-RECEPCION-ESPERA 144.50 39.70 58.30 144.50
B3-S-101b AC-02 SECRETARIA 11.20 7.80 13.80 11.20
B3-S-103 AC-02 CONSULTORIO 15.70 9.30 10.20 15.70
B3-S-104 AC-02 CONSULTORIO 15.70 9.30 10.20 15.70
B3-S-105 AC-02 JEFATURA 13.15 13.60 15.30 13.15
B3-S-105A AC-04 SH 2.95 7.00 7.80 2.95
B3-S-106 AC-02 REUNIONES 13.30 14.10 15.00 13.30
B3-S-106A AC-10 ESCLUSA 4.40 8.50 10.50 4.40
B3-S-107 AC-04 SS.HH. 9.25 12.00 12.90 9.25
B3-S-108 AC-04 SS.HH. 9.25 12.00 12.90 9.25
B3-S-109 AC-02 ESPERA PACIENTES HOSPITALIZADOS 33.60 22.80 24.00 33.60
B3-S-110 AC-01a CORREDOR 33.50 24.00 35.10 33.50
B3-S-111 AC-01a CORREDOR 60.10 51.35 57.60 60.10
B3-S-112 AC-11 LAVATORIOS 10.10 9.80 14.40 10.10
B3-S-113 AC-04 SS.HH. 10.15 19.00 19.90 10.15
B3-S-114 AC-04 SS.HH. 10.15 19.00 19.90 10.15
B3-S-115 AC-11 COMEDOR PERSONAL 49.20 24.65 28.20 49.20
B3-S-116-125 AC-11 COCINA - AREA SERVICIO 112.30 47.40 59.70 112.30
B3-S-116A AC-04 LIMPIEZA 2.37 5.60 6.40 2.37
B3-S-117 AC-11 NUTRICIONISTA 8.40 10.40 12.10 8.40
B3-S-117A AC-04 SS.HH. 3.00 7.10 7.90 3.00
B3-S-118 AC-11 DEPOSITO VAJILLAS 9.30 11.60 12.50 9.30
B3-S-119 AC-14 LAVADO VAJILLAS 12.05 13.20 14.10 12.05
B3-S-120 AC-12 CAMARAS 15.30 15.00 16.00 15.30
B3-S-121 AC-14 DESPENSA 11.50 12.90 13.80 11.50
B3-S-122 AC-11 RECEPCION - CLASIFICACION 8.00 10.05 11.70 8.00
B3-S-123 AC-14 RESIDUOS SOLIDOS 5.10 8.40 9.30 5.10
312de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-S-124 AC-14 LIMPIEZA 3.80 7.30 8.10 3.80
B3-S-126 AC-14 LAVADO CARRITOS 5.20 8.30 9.30 5.20
B3-S-127 AC-01A CORREDOR-ESPERA 190.45 103.95 135.75 190.45
B3-S-128 AC-14 LAVADO CARRITOS 7.12 10.00 11.00 7.12
B3-S-129 AC-11 RECEPCION ROPA SUCIA 5.75 7.20 10.00 5.75
B3-S-130 AC-04 SS.HH. 2.05 5.30 6.10 2.05
B3-S-131 AC-11 CLASIFICACION - PESAJE 9.30 10.70 12.70 9.30
B3-S-132 - 133 AC-11 REMOJADO - SECADO - PLANCHADO 55.50 32.60 38.70 55.50
B3-S-134 AC-02 REPARACION COSTURA 6.50 9.60 10.50 6.50
B3-S-135 AC-04 SS.HH. 2.05 5.30 6.10 2.05
B3-S-136 AC-04 LIMPIEZA 2.05 5.30 6.10 2.05
B3-S-137 AC-02 ALMACEN ROPA LIMPIA 16.80 17.30 19.30 16.80
B3-S-138 AC-02 ENTREGA ROPA LIMPIA 11.65 12.30 14.30 11.65
B3-S-138 AC-04 LIMPIEZA 2.30 6.00 6.80 2.30
B3-S-139 AC-02 RECEPCION PRODUCTOS 17.64 11.45 18.30 17.64
B3-S-139 AC-04 RESIDUOS SOLIDOS 1.87 5.20 6.00 1.87
B3-S-140 AC-03 ESCLUSA 4.25 6.80 8.80 4.25
AC-01A CORREDOR 3.14 6.10 8.10 3.14
B3-S-141-142 AC-01A CORREDOR 50.80 63.30 50.80
B3-S-141A AC-04 VESTIDOR 2.30 6.40 7.20 2.30
B3-S-141B AC-04 VESTIDOR 2.30 6.40 7.20 2.30
B3-S-143 AC-03 PRODUCTO TERMINADO 5.70 9.00 9.90 5.70
B3-S-144 AC-03 PRODUCTO SEMIELABORADO 5.70 9.00 9.90 5.70
B3-S-145 AC-03 ESCLUSA 3.50 6.00 7.80 3.50
B3-S-146 AC-03 PESAJE 5.55 6.90 9.60 5.55
B3-S-147 AC-03 MATERIAL REFRIGERADO 4.50 7.80 8.70 4.50
B3-S-148 AC-03 MATERIAL ACORD 4.50 7.80 8.70 4.50
B3-S-149 AC-01 CORREDOR 4.52 9.00 10.80 4.52
B3-S-149a AC-01A CORREDOR 2.70 3.20 6.90 2.70
B3-S-150 AC-04 SS.HH. 2.20 5.50 6.30 2.20
B3-S-151 AC-04 SS.HH. 2.20 5.50 6.30 2.20
B3-S-152 AC-03 LAVADO Y ESTERILIZACION 9.25 12.00 12.90 9.25
B3-S-153 AC-02 SECRETARIA 6.85 9.30 11.10 6.85
B3-S-154 AC-02 JEFATURA 10.70 11.60 13.50 10.70
B3-S-155 AC-10 FORMULA MAGISTRAL 11.95 14.40 15.30 11.95
B3-S-156 AC-10 ESTACION DE ENFERMERAS 11.60 14.10 15.00 11.60
B3-S-157 AC-10 DOSIS UNITARIA 15.10 15.70 16.50 15.10
B3-S-158 AC-01A HALL 19.00 15.25 23.40 19.00
B3-S-159 AC-10 LABORATORIO MEZCLAS INTRAVENOSAS 10.00 12.00 12.90 10.00
B3-S-160 AC-03 LABORATORIO CITOSTATICOS 11.50 12.90 13.80 11.50
B3-S-160A AC-03 ESCLUSA 3.85 7.20 8.10 3.85
B3-S-161 AC-03 LABORATORIO CITOSTATICOS 11.50 12.90 13.80 11.50
B3-S-161A AC-03 ESCLUSA 3.85 7.20 8.10 3.85
B3-S-162 AC-03 LABORATORIO FORMULAS PARENTALES 11.50 12.90 13.80 11.50
B3-S-162A AC-03 ESCLUSA 3.85 7.20 8.10 3.85
B3-S-163 AC-10 ALMACEN LABORATORIOS 6.10 9.90 10.80 6.10
B3-S-164 AC-01A DESPACHO Y EMBALAJE 7.40 5.10 11.00 7.40
B3-S-165 AC-01A CARGA / DESCLUSA 7.50 5.10 11.00 7.50
313de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-S-166 AC-12 HALL 27.50 12.55 26.50 27.50
B3-S-167 AC-12 ALMACEN TEMP.AMB.VOLUMEN MAYOR 45.10 26.70 28.20 45.10
B3-S-168 AC-02 ALMACEN TEMP.AMB.VOLUMEN MENOR 32.30 23.70 25.20 32.30
B3-S-169 AC-12 ALMACEN TEMP.AMB.CONTROLADA 24.20 19.60 21.10 24.20
B3-S-170 AC-01A CORREDOR 42.70 49.05 59.20 42.70
B3-S-171 AC-02 OFICINA ADMINISTRATIVA 25.40 19.70 20.60 25.40
B3-S-172 AC-02 OFICINA EVALUACIONES Y SALA DE TRABAJO 17.90 16.90 17.80 17.90
B3-S-173 AC-12 ANTECAMARA 6.85 8.40 11.10 6.85
B3-S-173A AC-12 CAMARA FRIA 5.60 9.30 10.20 5.60
B3-S-173B AC-12 CAMARA FRIA 5.60 9.30 10.20 5.60
B3-S-174 AC-10 CORREDOR 3.75 5.70 9.30 3.75
B3-S-175 AC-10 PRODUCTOS FISCALIZADOS 3.85 7.20 8.10 3.85
B3-S-176 AC-10 PRODUCTOS PARA DEVOLUCION 3.85 7.20 8.10 3.85
B3-S-177 AC-10 PRODUCTOS EN CUARENTENA 5.82 9.60 10.50 5.82
B3-S-178 AC-10 CORREDOR 3.75 5.70 9.30 3.75
B3-S-179 AC-10 PRODUCTOS INFLAMABLES 5.82 9.60 10.50 5.82
B3-S-180 AC-10 PRODUCTOS PELIGROSOS 3.85 7.20 8.10 3.85
B3-S-181 AC-10 PRODUCTOS FOTOSENSIBLES 3.85 7.20 8.10 3.85
B3-S-182 AC-04 RESIDUOS SOLIDOS 2.10 5.40 6.20 2.10
B3-S-183 AC-04 LIMPIEZA 3.10 7.30 8.10 3.10
B3-S-184 AC-04 SS.HH. 2.15 5.50 6.30 2.15
B3-S-185 AC-04 SS.HH. 2.15 5.50 6.30 2.15
B3-S-187 AC-01 HALL ASCENSORES 16.35 14.35 18.70 16.35
B3-S-189 AC-01A LIMPIO 6.10 9.50 10.50 6.10
B3-S-190 AC-01A SUCIO 6.10 9.50 10.50 6.10
B3-S-191 AC-01A VESTUARIO ASCENSORES 17.95 9.45 18.30 17.95
B5-S-101 - 118 AC-01A CORREDOR 65.70 48.85 63.25 65.70
B5-S-102 AC-12 CUARTO TECNICO 9.30 13.50 14.40 9.30
B5-S-103 AC-02 OFICINA INTERPRETACION DE CRITERIOS 19.70 17.10 18.00 19.70
B5-S-104 - 105 AC-01A CAMILLAS - ESTAC DE ENFERMERAS 66.80 26.35 34.45 66.80
B5-S-106 - 107 AC-03 TRABAJO LIMPIO - TRABAJO SUCIO 15.95 19.65 20.70 15.95
B5-S-108 AC-01A CORREDOR 7.60 10.60 16.50 7.60
B5-S-109 AC-08 ROPA LIMPIA 5.20 8.40 9.30 5.20
B5-S-110 AC-02 MATERIALES E INSUMOS 5.20 8.40 9.30 5.20
B5-S-111 AC-02 MATERIALES E INSUMOS 5.20 8.40 9.30 5.20
B5-S-112 AC-04 VESTIDOR SS.HH 3.15 6.70 7.50 3.15
B5-S-113 AC-15 RECUPERACION 16.30 14.90 16.80 16.30
B5-S-114 AC-04 TRESIDUOS SOLIDOS 2.00 5.00 5.80 2.00
B5-S-115 AC-04 LIMPIEZA 4.45 7.90 8.70 4.45
B5-S-116 AC-04 VESTIDOR SS.HH 7.80 10.80 11.70 7.80
B5-S-117 AC-04 VESTIDOR SS.HH 7.80 10.80 11.70 7.80
B5-S-119 AC-02 OFICINA FISICO 16.60 15.90 16.80 16.60
B5-S-120 AC-02 DOSIMETRIA CONTROL DE CALIDAD 16.50 15.90 16.80 16.50
B5-S-121 AC-02 PLANIFICACION 16.10 15.60 16.50 16.10
B5-S-122 AC-04 VESTIDOR SS.HH 9.25 17.00 17.90 9.25
B5-S-123 AC-04 VESTIDOR SS.HH 9.12 17.00 17.90 9.12
B5-S-124 AC-1A HALL 33.70 17.00 27.70 33.70
314de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B5-S-125 AC-16 COMANDO 7.95 10.50 11.70 7.95
B5-S-126 AC-09 TOMOGRAFIA 33.05 22.20 23.40
B5-S-127 AC-09 SALA DE BRAQUITERAPIA 34.20 29.20 30.40
B5-S-128 AC-16 COMANDO 8.30 10.80 12.00 8.30
B5-S-129 AC-14 EQUIPOS 8.25 10.80 12.00 8.25
B5-S-130 AC-03 PREPARACION PACIENTES 11.50 13.60 14.50 11.50
B5-S-131 AC-04 VESTIDOR SS.HH 3.50 7.00 7.80 3.50
B5-S-132 AC-04 VESTIDOR SS.HH 3.50 7.00 7.80 3.50
B5-S-133 AC-03 PREPARACION PACIENTES 11.65 13.70 14.60 11.65
B5-S-134 AC-01A HALL 43.20 21.85 31.50 43.20
B5-S-135 AC-09 COMANDO 25.35 12.35 19.80
B5-S-136 AC-13 ACELERADOR LINEAL 2 64.95 42.10 43.60
B5-S-137 AC-13 ACELERADOR LINEAL 1 65.60 42.70 44.20
B5-S-138 AC-03 PREPARACION PACIENTES 7.90 10.80 11.70 7.90
B5-S-139 AC-04 VESTIDOR SS.HH 3.75 8.50 9.30 3.75
B5-S-140 AC-04 VESTIDOR SS.HH 3.75 8.50 9.30 3.75
B5-S-141 AC-03 PREPARACION PACIENTES 7.85 10.80 11.70 7.85
B5-S-142 AC-01 CORREDOR 21.80 23.70 29.75 21.80
B5-S-143 AC-04 SS.HH VESTIDOR PERSONAL ADMINISTRACION 21.75 31.60 32.50 21.75
B5-S-144 AC-04 SS.HH VESTIDOR PERSONAL ADMINISTRACION 23.45 36.70 37.60 23.45
B5-S-145 AC-04 SS.HH VESTIDOR ENFERMERAS 12.40 22.95 23.85 12.40
B5-S-146 AC-04 SS.HH VESTIDOR ENFERMERAS 11.50 21.45 22.35 11.50
B5-S-147 AC-02 LIMPIEZA 2.40 5.55 6.35 2.40
B5-S-148 AC-01A CORREDOR 69.90 53.75 64.40 69.90
B5-S-149 AC-04 SS.HH VESTIDOR MEDICO DAMAS 32.65 49.40 50.30 32.65
B5-S-150 AC-04 SS.HH VESTIDOR MEDICO HOMBRES 30.76 48.70 49.60 30.76
B5-S-151 AC-02 ZONA DEUDOS 13.40 13.60 15.30 13.40
B5-S-152 AC-04 SS.HH 2.30 6.10 6.90 2.30
B5-S-153 AC-01A CORREDOR 70.95 45.10 63.90 70.95
B5-S-154 AC-04 SS.HH 2.48 6.10 6.90 2.48
B5-S-155 AC-04 SS.HH 2.48 6.10 6.90 2.48
B5-S-156 AC-02 JEFATURA 13.40 14.40 15.30 13.40
B5-S-157 AC-04 SS.HH 2.48 6.10 6.90 2.48
B5-S-158 AC-02 SECRETARIA 6.55 9.60 10.50 6.55
B5-S-159 AC-02 REGISTROS INFORMES 6.55 9.60 10.50 6.55
B5-S-160 AC-10 LABORATORIO HISTOPATOLOGIA / INMUN 21.40 17.90 18.90 21.40
B5-S-161 AC-10 FIJ / COL / CORTE 10.60 13.10 14.10 10.60
B5-S-162 AC-08 ALMACEN DE MATERIALES E INSUMOS 5.70 9.00 9.90 5.70
B5-S-163 AC-10 LAVADO ESTERILIZACION 10.35 12.60 13.50 10.35
B5-S-164 AC-04 SS.HH 2.50 6.70 7.50 2.50
B5-S-165 AC-04 RESIDUOS SOLIDOS 2.65 6.40 7.20 2.65
B5-S-166 AC-04 LIMPIEZA 3.70 8.80 9.60 3.70
B5-S-167 AC-02 MUSEO 6.75 9.90 10.80 6.75
B5-S-168 AC-08 ARCHIVO DE LAMINAS 5.25 8.50 9.40 5.25
B5-S-169 AC-10 SALA MICROSCOPIAS PRELIMINAR 16.65 15.80 16.80 16.65
B5-S-170 AC-10 PROCESAMIENTO DE MUESTRAS 16.70 15.80 16.80 16.70
B5-S-171 AC-10 NECROPSIAS 33.30 22.20 24.00 33.30
B5-S-172 AC-12 CAMARA FRIA 8.05 11.40 11.40 8.05
315de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B5-S-173 AC-10 PREPARACION DE CADAVERES 12.20 12.70 14.70 12.20
B5-S-174 AC-08 RECEPCION ENTREGA DE CADAVERES 19.70 15.20 18.00 19.70
B5-S-175 AC-12 CUARTO TECNICO 9.15 12.00 12.90 9.15
PRIMER PISO
SECTOR A
A1-101 AC-02 HALL 75.65 19.27 38.42 75.65
A1-102 AC-02 AUDITORIO 201.24 57.10 60.90 201.24
A1-103 AC-11 KITCHENETE 16.90 17.10 18.90 16.90
A1-104 AC-12 DEPOSITO 12.10 13.40 14.30 12.10
A1-105 AC-04 SS.HH. 9.80 12.00 12.90 9.80
A1-106 AC-04 SS.HH. 9.80 12.00 12.90 9.80
A1-107 AC-12 CUARTO TECNICO 15.30 15.10 16.00 15.30
A1-108 AC-03 CAFETERIA 145.00 45.50 57.20 145.00
A1-109 AC-03 ATENCION 12.90 6.50 14.60 12.90
A1-110 AC-11 COCINA 8.30 10.40 12.00 8.30
A1-111 AC-12 HALL ESCALERA 10 39.50 28.55 32.40 39.50
A2-101 AC-01 ESPERA 30.25 15.55 24.30 30.25
A2-102 AC-02 CONTROL RECEPCION 7.10 7.75 10.70 7.10
A2-103 AC-04 SS.HH VARONES 7.90 10.80 11.70 7.90
A2-104 AC-04 SS.HH DISCAPACITADOS 5.20 8.30 9.30 5.20
A2-105 AC-04 SS.HH. DAMAS 7.90 10.80 11.70 7.90
A2-106 AC-01a CORREDOR 107.30 74.15 101.30 107.30
A2-107 AC-01a ESTACION ENFERMERAS 9.00 4.35 12.30 9.00
A2-107 AC-04 SS.HH 2.49 6.10 6.90 2.49
A2-108 AC-02 JEFATURA 17.40 18.00 18.90 17.40
A2-108 AC-03 TRABAJO SUCIO 4.00 7.35 8.25 4.00
A2-109 AC-04 SS.HH 2.49 6.10 6.90 2.49
A2-109 AC-03 TRABAJO LIMPIO 4.00 7.35 8.25 4.00
A2-110 AC-02 CONSULTORIO 17.90 16.30 17.30 17.90
A2-111 AC-03 SALA REFUERZO 17.90 16.30 17.30 17.90
A2-112 AC-03 TOPICO 20.60 18.70 19.70 20.60
A2-113 AC-03 HIDRATACION NIÑOS 15.13 15.80 16.80 15.13
A2-114 AC-03 BOX NIÑOS 12.60 13.40 14.40 12.60
A2-115 AC-03 BOX ADULTOS 13.50 13.90 14.90 13.50
A2-116 AC-03 BOX ADULTOS 13.50 13.90 14.90 13.50
A2-117 AC-03 BOX ADULTOS 13.25 13.90 14.90 13.25
A2-118 AC-15 RECUPERACION 38.33 23.00 26.10 38.33
A2-119 AC-04 SS.HH 2.48 6.10 6.90 2.48
A2-120 AC-04 SS.HH 2.48 6.10 6.90 2.48
A2-121 AC-03 HABITACION ADULTOS 16.10 15.50 16.50 16.10
A2-122 AC-12 CUARTO TECNICO 7.90 10.80 11.70 7.90
A2-123 AC-04 RESIDUOS SOLIDOS 3.83 7.30 8.10 3.83
A2-124 AC-04 LIMPIEZA 3.83 7.30 8.10 3.83
A2-125 AC-04 SS.HH. VESTIDOR 7.46 16.60 17.50 7.46
A2-126 AC-04 SS.HH. VESTIDOR 7.46 16.60 17.50 7.46
A2-127 AC-08 ALMACEN MATERIALES E INSUMOS 7.90 10.80 11.70 7.90
A2-128 AC-02 ESTAR PERSONAL 19.40 18.30 19.20 19.40
316de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
A2-129 AC-04 ROPA SUCIA 3.49 7.00 7.80 3.49
A2-130 AC-04 ROPA LIMPIA 3.49 7.00 7.80 3.49
A2-131 AC-04 CTO SEPTICO 3.42 7.00 7.80 3.42
0.00
A3-101 AC-04 SS.HH 5.13 8.40 9.30 5.13
A3-102 AC-04 SS.HH 5.19 8.40 9.30 5.19
A3-103 AC-01a ESPERA 73.08 34.38 45.63 73.08
A3-104 AC-02 ADMISION 7.09 7.65 10.80 7.09
A3-105 AC-02 CAJA 6.89 9.80 10.80 6.89
A3-106 AC-02 TRIAJE 17.34 17.00 18.00 17.34
A3-110 AC-02 FARMACIA 16.18 15.60 16.50 16.18
A3-111 AC-02 SIS 12.47 13.50 14.40 12.47
A3-112 AC-02 REFERENCIA / CONTRAREFERENCIA 12.56 13.50 14.40 12.56
A3-113-124 AC-01a CORREDOR 90.54 35.85 66.90 90.54
A3-114 AC-03 TRAUMA CHOCK 23.70 18.90 20.40 23.70
A3-115 AC-03 FILTRO 5.05 8.60 9.60 5.05
A3-116 AC-03 AISLADO 12.73 13.70 14.70 12.73
A3-117 AC-01a TRABAJO DE ENFERMERAS 26.35 6.55 21.60 26.35
A3-118 AC-03 TRABAJO LIMPIO 5.27 7.05 9.30 5.27
A3-119 AC-04 SS.HH 2.40 6.10 6.90 2.40
A3-120 AC-04 LAVACHATAS 2.40 6.10 6.90 2.40
A3-121 AC-03 TRABAJO SUCIO 5.04 6.90 9.00 5.04
A3-122 AC-03 OBSERVACION 39.12 24.40 26.40 39.12
A3-123 AC-04 SS.HH 2.40 6.10 6.90 2.40
A3-125 AC-03 TOPICO MEDICINA 19.20 15.00 18.00 19.20
A3-126 AC-03 TOPICO GINECOLOGIA 17.80 16.10 17.10 17.80
A3-127 AC-04 SS.HH 3.97 7.90 8.70 3.97
A3-128 AC-04 TOPICO CIRUGIA ONCOLOGICA 18.70 13.65 17.70 18.70
A3-129 AC-02 ECOGRAFIA 13.40 14.30 15.30 13.40
A3-130 AC-09 RX 8.64 6.00 12.00 8.64
A3-131 AC-10 TOMA DE MUESTRAS 7.83 10.80 11.70 7.83
A3-132 AC-02 ESTAR PERSONAL 16.18 15.60 16.50 16.18
A3-133 AC-01a CORREDOR 48.25 40.20 48.30 48.25
A3-133A AC-01a CORREDOR 15.30 14.05 18.10 15.30
A3-134 AC-01a HALL 7.80 7.20 12.90 7.80
A3-135 AC-04 LIMPIEZA 3.10 7.30 8.10 3.10
A3-136 AC-12 ALMACEN MATERIALES E INSUMOS 4.82 8.50 9.30 4.82
A3-137 AC-12 ALMACEN ROPA LIMPIA 4.82 8.50 9.30 4.82
A3-138 AC-04 SS.HH 2.48 6.10 6.90 2.48
A3-139 AC-04 SS.HH 2.48 6.10 6.90 2.48
A3-140 AC-04 RESIDUOS SOLIDOS 2.48 6.10 6.90 2.48
A3-141 AC-08 ROPA SUCIA 2.48 6.10 6.90 2.48
SECTOR B
B1-101 AC-01 HALL PRINCIPAL 113.30 46.65 67.35 113.30
B1-102 AC-01 CITAS - CAJA 20.10 13.20 18.00 20.10
B1-103 AC-12 CUARTO TECNICO COMUNICACIONES 8.90 11.70 12.60 8.90
317de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B1-104 AC-04 LIMPIEZA 2.05 5.80 6.60 2.05
B1-105 AC-04 SS.HH. VARONES 16.60 15.80 16.80 16.60
B1-106 AC-04 SS.HH. DISCAPACITADOS 5.20 8.10 9.30 5.20
B1-107 AC-04 SS.HH. DAMAS 16.60 16.10 17.10 16.60
B1-108 AC-04 DEPOSITO 2.10 6.10 6.90 2.10
B1-109 AC-04 SS.HH 9.25 12.00 12.90 9.25
B1-110 AC-04 SS.HH 9.20 12.00 12.90 9.20
B2-101 AC-01 ESPERA 90.70 37.20 47.50
B2-103 AC-01A ESTACION ENFERMERAS 8.10 4.05 11.35
B2-104 AC-03 TRABAJO LIMPIO 3.75 7.05 7.95
B2-105 AC-03 TRABAJO SUCIO 4.00 7.35 8.25
B2-106 AC-02 TRIAJE 15.50 15.20 16.20
B2-107 AC-02 MATERIALES E INSUMOS 2.50 6.10 6.90
B2-108 AC-02 SERVIVIO SOCIAL 5.20 8.40 9.30
B2-109 AC-02 SERVIVIO SOCIAL 5.20 8.40 9.30
B2-110 AC-04 SS.HH 2.50 6.10 6.90
B2-111 AC-02 SIS 11.85 13.50 14.50
B2-112-119-120-131 AC-01 CORREDOR 189.42 138.30
B2-113 AC-03 ACERVO DOCUMENTARIO 18.95 17.30 18.30
B2-114 AC-03 HISTORIAS CLINICAS 67.00 33.10 34.10
B2-115 AC-02 CONSULTORIO CIRUGIA GINECOLOGIA 14.10 13.50 15.30
B2-116 AC-04 SS.HH 1.85 4.90 5.70
B2-117 AC-02 CONSULTORIO CIRUGIA ABDOMEN 16.20 15.50 16.50
B2-118 AC-02 CONSULTORIO CIRUGIA CABEZA CUELLO 16.10 15.80 16.80
B2-121 AC-02 CONSULTORIO ANASTESIOLOGO 16.15 15.50 16.50
B2-122 AC-02 CONSULTORIO CIRUGIA TORAX NEUROCIRUGIA 16.20 15.50 16.50
B2-123 AC-02 CONSULTORIO UROLOGIA 14.10 13.50 15.30
B2-124 AC-04 SS.HH 1.85 4.90 5.70
B2-125 AC-02 CONSULTORIO HEMATOLOGIA 16.20 15.50 16.50
B2-126 AC-02 CONSULTORIO GASTROENTEROLOGIA 16.20 15.50 16.50
B2-127 AC-02 CONSULTORIO MEDICINA ONCOLOGICA 16.20 15.50 16.50
B2-128 AC-01A ESTACION ENFERMERAS 8.10 4.45 11.35
B2-129 AC-03 TRABAJO SUCIO 4.00 7.35 8.25
B2-130 AC-03 TRABAJO LIMPIO 3.75 7.05 7.95
B2-132 AC-02 ALMACEN MATERIAL MEDICO 15.65 15.20 16.20
B2-133 AC-02 CONSULTORIO MEDICINA PEDIATRICA 16.20 15.50 16.50
B2-134 AC-02 CONSULTORIO TRATAMIENTO DOLOR 15.84 15.50 16.50
B2-135 AC-02 CONSULTORIO PREVENTORIO HOMBRES 2 16.10 15.50 16.50
B2-136 AC-02 CONSULTORIO PREVENTORIO HOMBRES 1 16.20 15.50 16.50
B2-137 AC-02 CONSULTORIO PREVENTORIO MUJERES 1 16.20 15.50 16.50
B2-138 AC-04 SS.HH 2.49 8.10 8.90
B2-139 AC-02 CONSULTORIO PREVENTORIO MUJERES 1 15.90 16.40 17.40
B2-140 AC-04 SS.HH 2.49 6.10 6.90
B2-141 AC-01 ESPERA 60.60 33.75 46.15
B2-142 AC-04 SS.HH HOMBRES 3.85 7.20 8.10
318de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B2-143 AC-04 SS.HH MUJERES 3.85 7.20 8.10
B2-144 AC-04 RESIDUOS SOLIDOS 3.85 7.30 8.10
B2-145 AC-04 LIMPIEZA 3.85 7.30 8.10
B2-146 AC-04 SS.HH. PERSONAL VARONES 7.65 10.90 11.70
B2-147 AC-04 SS.HH. PERSONAL DAMAS 7.90 10.90 11.70
B2-148 AC-12 CUARTO TECNICO 9.20 12.60 13.50
B2-149 AC-12 CUARTO TECNICO COMUNICACIONES 20.80 20.80 21.70
B2-150 AC-01A CORREDOR 84.15 66.25 74.20
B3-101 AC-01 VESTIBULO - HALL PRINCIPAL 466.80 90.40 151.25
B3-102 AC-02 MODULO INFORMACION ORIENTACION 14.75 12.25 15.80
B3-103 AC-02 MOBUTS 10.30 12.70 13.60
B3-104 AC-01 ESPERA 103.70 15.40 44.20
B3-105 AC-02 BIBLIOTECA VIRTUAL 12.60 9.90 15.30
B3-106 AC-02 SEGUIMIENTO FARMACOTECA 6.75 8.25 10.50
B3-107 AC-02 FARMACOTECA VIGILANCIA 6.75 8.25 10.50
B3-108 AC-02 DESPACHO RECETA 6.45 9.60 10.50
B3-109 AC-02 RECEPCION RECETAS 6.90 9.90 10.80
B3-110 AC-02 CAJA 6.90 9.90 10.80
B3-111 AC-02 ALMACEN STOCK DIARIO 45.80 27.50 30.00
AC-01 CORREDOR 7.70 12.00 12.90
B3-112 - 113 AC-01 CORREDOR - SECRETARIA ESPERA 20.15 18.15 22.50
B3-114 AC-02 JEFATURA 12.00 14.80 15.70
B3-115 AC-04 SS.HH 2.50 6.10 6.90
B3-116 AC-02 SISMED 7.40 11.10 12.00
B3-117 - 122 AC-01A CORREDOR 66.00 77.55 82.20
B3-118 AC-02 OFICINA ADMINISTRATIVA 20.80 16.80 18.60
B3-119 AC-02 ARCHIVO 5.60 9.90 10.80
B3-120 AC-04 SS.HH 2.15 5.50 6.30
B3-121 AC-04 SS.HH 2.15 5.50 6.30
B3-123 AC-04 LIMPIEZA 4.30 7.70 8.50
B3-124 AC-01 ESPERA 55.10 28.10 37.90
B3-125 AC-04 SS.HH 3.80 7.30 8.10
B3-126 AC-02 ESTACION DE ENFERMERAS 8.05 5.30 11.60
B3-127 AC-01A CORREDOR 71.90 48.75 69.90
B3-128 AC-04 SS.HH 3.80 7.30 8.10
B3-129 AC-02 SECRETARIA 18.15 13.25 17.80
B3-130 AC-02 JEFATURA 16.50 15.80 16.80
B3-131 AC-02 SALA DE REUNIONES 20.30 17.90 18.90
B3-132 AC-02 ARCHIVO 13.05 14.20 15.10
B3-133 AC-02 HALL 16.15 9.80 16.50
B3-134 AC-02 VESTIDOR 3.75 7.30 8.10
B3-135 AC-04 SS.HH 3.80 7.30 8.10
B3-136 AC-02 SALA GABINETES 12.30 13.50 14.40
B3-136 AC-01A CORREDOR 102.70 73.50 88.70
B3-137 AC-02 CONTROL 12.35 13.20 14.40
319de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-138 AC-09 RESONANCIA MAGNETICA 50.10 27.30 28.80
B3-139 AC-01A HALL 14.05 11.50 17.10
B3-140 AC-04 SS.HH. VESTIDOR 5.10 8.50 9.30
B3-141 AC-02 PREPARACION PACIENTES 10.60 13.20 14.10
B3-142 AC-09 TOMOGRAFIA 34.75 24.00 25.50
B3-143 AC-02 CONTROL 7.95 10.50 11.70
B3-144 AC-02 EQUIPO 7.90 10.80 11.70
B3-145 AC-01A CORREDOR 26.80 20.10 29.10
B3-146 AC-09 FLUOROSCOPIA 21.10 19.90 22.50
B3-147 AC-09 CONTROL 3.55 7.30 8.10
B3-148 AC-04 SS.HH 2.80 6.70 7.50
B3-149 AC-09 RAYOS X 21.10 19.90 22.50
B3-150 AC-09 CONTROL 3.55 7.30 8.10
B3-151 AC-04 SS.HH 2.80 6.70 7.50
B3-152 AC-02 HALL 20.15 12.60 22.80
B3-153 AC-03 PREPARACION PACIENTES 13.60 14.10 15.00
B3-154 AC-03 REPOSO 26.85 24.90 26.10
B3-155 AC-09 RADIOLOGIA INTERVENCION 37.00 23.40 24.90
B3-156 AC-09 CONTROL 7.30 9.90 11.10
B3-157 AC-02 EQUIPO 11.95 14.30 15.30
B3-158 AC-04 VESTIDOR SS.HH 3.80 7.30 8.10
B3-159 AC-04 VESTIDOR SS.HH 5.70 8.95 9.75
B3-160 AC-04 VESTIDOR SS.HH 5.70 8.95 9.75
B3-161 AC-04 VESTIDOR SS.HH 8.80 17.90 18.80
B3-162 AC-04 VESTIDOR SS.HH 8.80 17.90 18.80
B3-163 AC-04 LIMPIEZA 3.80 7.30 8.10
B3-164 AC-04 RESIDUOS SOLIDOS 3.80 7.30 8.10
B3-165 AC-02 ESPERA PACIENTES HOSPITALIZADOS 33.65 19.80 24.00
B3-166 AC-02 MAMOGRAFIA 13.40 14.30 15.30
B3-167 AC-04 SS.HH 2.50 6.10 6.90
B3-168 AC-02 MAMOGRAFIA 13.40 14.30 15.30
B3-169 AC-04 SS.HH 2.50 6.10 6.90
B3-170 AC-02 HALL 30.80 22.10 30.80
B3-171 AC-02 CUARTO CALIENTE 6.55 9.60 10.50
B3-172 AC-02 EQUIPOS 10.20 12.40 13.40
B3-173 AC-09 SALA DE GANMAGRAFIA 26.40 19.70 21.20
B3-174 AC-02 CONTROL 8.85 11.30 12.50
B3-175 AC-03 PREPARACION PACIENTES 17.95 16.70 17.60
B3-176 AC-04 SS.HH 3.50 7.00 7.80
B3-177 AC-02 REPOSO 8.45 11.50 12.40
B3-178 AC-08 ROPA LIMPIA 6.00 9.30 10.20
B3-179 AC-08 ROPA SUCIA 4.20 8.10 9.00
B3-180 AC-02 ECOGRAFIA 21.60 17.20 19.00
B3-181 AC-04 SS.HH 4.80 9.10 9.90
B3-182 AC-02 ARCHIVO DE PLACAS 15.85 15.60 16.50
B3-183 AC-02 OFICINA DE INTERPRETACION DE CRITERIOS 20.60 17.60 19.50
320de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-184 AC-01 ASCENSORES PUBLICOS 17.45 16.55 18.80
B3-188 AC-01A LIMPIO 6.20 9.50 10.50
B3-189 AC-01A SUCIO 6.20 9.50 10.50
B3-190 AC-01A ASCENSORES PACIENTES 17.25 14.50 17.50
B4-102 AC-02 CITAS / CAJA 9.60 10.65 12.90
B4-103 AC-04 SS.HH 9.20 12.00 12.90
B4-104 AC-04 SS.HH 9.20 12.00 12.90
B4-105 AC-02 RECLINATORIO 27.90 20.10 21.60
B4-106 AC-02 DEPOSITO 2.30 5.80 6.60
B4-107 AC-04 SS.HH. DAMAS 16.60 16.20 17.10
B4-108 AC-04 SS.HH DISCAPACITADOS 5.20 8.30 9.30
B4-109 AC-04 SS-HH. VARONES 16.60 15.90 16.80
B4-110 AC-02 LIMPIEZA 2.05 5.80 6.60
B5-101 AC-01 ESPERA 11.85 32.85 49.95
B5-102 AC-01 ESPERA 27.40 13.05 21.30
B5-103 AC-02 RECEPCION 11.80 10.35 14.70
B5-104 AC-04 SS.HH 2.50 6.10 6.90
B5-105 AC-02 CORREDOR 9.55 13.20 15.00
B5-106 AC-10 TOMA DE MUESTRAS 1 6.50 9.60 10.50
B5-107 AC-10 TOMA DE MUESTRAS 2 6.50 9.60 10.50
B5-108 AC-10 TOMA DE MUESTRAS 3 6.50 9.60 10.50
B5-109 AC-04 LIMPIEZA 2.10 5.20 6.00
B5-110 AC-10 TOMA DE MUESTRAS ESPECIAL 11.30 13.50 14.40
B5-111 AC-10 TOMA DE MUESTRAS 3 5.30 8.70 9.60
B5-112 AC-01a CORREDOR 66.40 50.20 63.00
B5-113 AC-10 LABORATORIO 18.00 16.80 17.70
B5-114 AC-08 ALMACEN INSUMOS 7.80 12.00 12.90
B5-115 AC-10 LAVADO ESTERILIZACION 10.00 13.20 14.10
B5-116 AC-04 LIMPIEZA 3.75 8.50 9.30
B5-117 AC-04 SS.H - M 2.50 6.10 6.90
B5-118 AC-04 SS.H - H 2.50 6.10 6.90
B5-119 AC-04 RESIDUOS SOLIDOS 2.50 6.10 6.90
B5-120 AC-02 FILTROS 4.00 6.40 8.40
AC-01 CORREDOR 3.00 5.05 9.30
B5-121 AC-10 LABORATORIO MICROBIOLOGIA 22.80 20.30 21.30
B5-122 AC-10 PREPARACION DE MEDIOS 9.20 12.60 13.50
B5-123 AC-10 LABORATORIO 17.50 16.10 17.10
B5-124 AC-10 LABORATORIO 19.00 16.70 17.70
B5-125 AC-10 CLASIFICACION DE MUESTRAS 13.30 14.30 15.30
B5-126 AC-02 REGISTRO INFORMATICO DE LABORATORIO 13.30 15.50 16.50
B5-127 AC-02 JEFATURA 15.40 16.00 16.20
B5-128 AC-04 SS.HH 2.50 6.10 6.90
B5-129 AC-01 ESPERA 24.75 13.45 21.60
B5-130 AC-08 RECEPCION 7.50 6.45 11.70
321de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B5-131 AC-10 TRANSFUSION 14.20 18.30 19.20
B5-132 AC-04 SS.HH 2.40 6.10 6.90
B5-133 AC-01 CORREDOR 78.05 63.60 76.50
B5-134 AC-04 RESIDUOS SOLIDOS 2.50 6.10 6.90
B5-135 AC-04 LIMPIEZA 2.50 6.10 6.90
B5-136 AC-04 SS.HH / V 2.50 6.10 6.90
B5-137 AC-04 SS.HH / H 2.50 6.10 6.90
B5-138 AC-02 OFICINA ADMINISTRATIVA 13.20 14.40 15.30
B5-139 AC-05 AREA DE DISTRIBUCION 10.30 11.00 13.80
B5-140 AC-14 CONGELADOR 6.60 9.60 10.50
B5-141 AC-14 CONGELADOR 6.50 9.60 10.50
B5-142 AC-10 LAVADO Y ESTERILIZACION 10.70 12.60 14.40
B5-143 AC-08 ALMACEN 7.90 10.80 11.70
B5-144 AC-10 PREPARACION DE MEDIOS 7.90 10.80 11.70
B5-145 AC-10 LABORATORIO INMUNOLOGIA 21.60 19.50 21.30
B5-146 AC-10 RECEPCION MUESTRAS 5.30 7.80 9.60
B5-148 AC-01A CORREDOR 69.60 56.35 64.00
B5-149 AC-12 CUARTO TECNICO COMUNICACIONES 7.90 11.30 12.20
SECTOR C
C-101 AC-12 SUBESTACION 34.50 22.40 24.20 34.50
C-102 AC-12 TABLEROS 28.25 20.60 22.40 28.25
C-103 AC-12 GRUPO ELECTROGENO 49.20 25.20 28.80 49.20
C-104 AC-12 CALDEROS 143.30 47.20 50.80 143.30
SECTOR D
D-101 AC-12 OXIGENO 23.90 18.40 19.90 23.90
D-102 AC-12 VACIO 16.95 15.40 17.20 16.95
D-103 AC-12 CUARTO TECNICO COMUNICACIONES 5.50 8.90 9.90 5.50
D-104 AC-12 GASES INDUSTRIALES 5.65 8.40 9.90 5.65
D-105 AC-12 GASES MEDICINALES 8.65 11.00 12.50 8.65
SECTOR E
E-101 AC-12 TALLER 4 12.40 13.10 14.10 12.40
E-102 AC-12 TALLER 3 12.60 13.40 14.40 12.60
E-103 AC-12 TALLER 2 12.60 13.40 14.40 12.60
E-103 AC-12 MOLDES 12.00 13.10 14.10 12.00
E-104 AC-12 TALLER 1 13.08 13.70 14.70 13.08
E-105 AC-12 DEPOSITO LIMPIEZA 6.10 9.90 10.80 6.10
E-106 AC-12 DEPOSITO MUEBLES 6.10 9.90 10.80 6.10
E-107 AC-12 DEPOSITO JARDINERIA 6.10 9.90 10.80 6.10
E-108 AC-12 DEPOSITO ALBAÑILERIA 6.10 9.90 10.80 6.10
E-109 AC-12 VIGILANCIA 12.10 13.10 14.10 12.10
E-110 AC-12 CHOFERES 12.10 13.10 14.10 12.10
E-111 AC-12 HALL 13.70 12.07 16.87 13.70
E-112 AC-12 ADMINISTRACION 16.10 15.80 16.80 16.10
E-113 AC-12 IMPRESIÓN Y FOTOCOPIA 7.90 10.80 11.70 7.90
E-114 AC-12 DIRECCION EJECUTIVA 15.50 14.80 15.80 15.50
E-115 AC-12 JEFATURA 15.65 14.90 15.90 15.65
322de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
E-116 AC-04 LIMPIEZA 2.50 6.10 6.90 2.50
E-117 AC-04 SS.HH 2.50 6.10 6.90 2.50
E-118 AC-04 SS.HH 2.50 6.10 6.90 2.50
SECTOR F 0.00
F-101-1012-103 AC-12 ZONA CONTENEDORES 164.30 85.75 97.50 164.30
F-104 AC-12 OFICINA CONTROL 7.90 10.80 11.70 7.90
F-105 AC-12 LAVADO DE CARROS 5.40 7.05 9.30 5.40
F-108 AC-12 RECICLAJE 9.10 11.30 12.30 9.10
F-110 AC-12 LIMPIEZA 2.50 5.90 6.90 2.50
F-112 AC-04 SS.HH 7.50 15.80 16.70 7.50
CASETA 1 0.00
AC-02 CONTROL 5.00 7.40 9.10 5.00
AC-02 SS.HH 2.55 6.10 6.90 2.55
CASETA 2 0.00
AC-02 CONTROL 5.00 7.40 9.10 5.00
AC-02 SS.HH 2.55 6.10 6.90 2.55
CASETA 3 0.00
AC-02 CONTROL 5.00 7.40 9.10 5.00
AC-02 SS.HH 2.55 6.10 6.90 2.55
CASETA 4 0.00
AC-02 CONTROL 5.00 7.40 9.10 5.00
AC-02 SS.HH 2.55 6.10 6.90 2.55
2,507.86SEGUNDO PISO
SECTOR A
A1-201 AC-12 HALL 20.70 16.60 22.90
A1-202 AC-02 ESPERA 37.10 17.20 28.10
A1-203 AC-02 CONTROL 10.00 7.90 12.70
A1-204 AC-04 SS.HH. 2.40 5.95 6.75
A1-205 AC-04 SS.HH. 2.40 5.95 6.75
A1-206 AC-12 CORREDOR 8.45 10.70 15.20
A1-207 AC-02 MONITOREO GENERAL 30.35 22.50 23.50
A1-207 AC-11 CTO DE COMUNICACIONES 6.48 5.48 6.48
A1-208 AC-12 MONITOREO DE SERVIDORES 12.85 10.85 12.85
A1-209 AC-12 SERVIDORES 22.10 21.10 22.10
A1-210 AC-12 SALA TECNICA 9.60 7.60 9.60
A2-201 -213 AC-01 CORREDOR 63.18 50.35 69.30
A2-202 AC-02 DEPTO ENFERMERIA 24.95 22.15 24.00
A2-202A AC-02 DIRECCION 8.27 10.95 11.80
A2-203 AC-02 GESTION CONTROL REGIONAL 25.32 22.15 24.00
A2-203A AC-02 DIRECCION 8.13 10.95 11.80
A2-204 AC-02 EPIDEMIOLOGIA/ ESTADISTICA 25.90 22.45 24.30
A2-204A AC-02 DIRECCION 8.40 10.95 11.80
A2-205 AC-02 PROMOCION SALUD 23.78 22.15 24.00
A2-205A AC-02 DIRECCION 8.32 10.95 11.80
323de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
A2-206 AC-02 CONTROL CANCER 25.18 22.45 24.30
A2-206A AC-02 DIRECCION 8.05 10.20 11.05
A2-207 AC-02 SALA DE REUNIONES 12.00 13.70 14.70
A2-208 AC-02 SALA DE REUNIONES 11.96 13.70 14.70
A2-209 AC-02 RECEPCION -CONTROL 6.75 8.25 10.50
A2-210 AC-02 ENCARGAT 6.70 9.70 10.60
A2-211 AC-04 SS.HH. 2.40 5.95 6.75
A2-212 AC-04 SS.HH. 2.40 5.95 6.75
A2-214 AC-04 SS.HH. 2.34 5.50 6.30
A2-215 AC-02 AULA CAPACITACION 29.30 20.70 21.90
A2-216 AC-02 AULA CAPACITACION 29.25 21.10 22.30
A2-217 AC-02 MODULOS INTERNET 27.70 21.50 22.50
A2-218 AC-02 LIBROS Y REVISTAS 14.80 13.70 16.40
A2-219 AC-02 SALA LECTURA 36.93 22.60 26.20
A2-220 AC-02 ESPERA 12.00 13.70 14.70
A2-221 AC-02 SALA DE INVESTIGACIONES MULTIPLE 30.60 21.50 22.50
A2-222 AC-12 DEPOSITO 1.85 4.90 5.70
A2-223 AC-04 SH 2.48 6.10 6.90
A2-224 AC-04 SH 2.48 6.10 6.90
A2-225 AC-02 SECRETARIA 6.75 8.25 10.50
A2-226 AC-02 DIRECCION EJECUTIVA 6.00 9.10 10.00
A3-201 AC-02 HALL 33.00 16.50 23.70
A3-202 AC-02 ORGANO DE CONTROL 26.22 22.45 24.30
A3-202A AC-02 DIRECCION 8.40 10.95 11.80
A3-203 AC-02 SECRETARIA 15.00 13.40 17.40
A3-204 AC-02 ESPERA 13.30 15.80 19.80
A3-205 AC-11 KITCHEN 4.85 8.10 9.00
A3-206 AC-02 POOL ADMINISTRATIVO 25.35 20.25 21.30
A3-207 AC-02 DIRECCION 11.50 12.90 13.80
A3-208 AC-04 SH 2.48 6.10 6.90
A3-209 AC-02 SALA DE REUNIONES 15.80 12.70 16.50
A3-210 AC-02 ORGANO DE ASESORAMIENTO 42.35 25.80 26.70
A3-211 AC-02 OFICINA DE GESTION DE CALIDAD 7.90 10.90 11.70
A3-212 AC-02 OFICINA DE PLANEAMIENTO Y PRESUPUESTO 7.90 10.90 11.70
A3-213 AC-02 CORREDOR 18.10 20.80 29.10
A3-214 AC-02 UNIDAD ECONOMIA 27.30 23.80 25.70
A3-214A AC-02 DIRECCION 7.10 9.90 10.80
A3-215 AC-02 UNIDAD ADMINISTRATIVA 22.30 20.70 22.60
A3-215A AC-02 DIRECCION 6.98 9.90 10.80
A3-216 AC-02 RECURSOS HUMANOS 22.30 20.70 22.60
A3-216A AC-02 DIRECCION 7.20 9.90 10.80
A3-217 AC-02 OFICINA INFORMATICA 22.15 20.70 22.60
A3-217A AC-02 DIRECCION 7.00 9.90 10.80
A3-218 AC-02 UNIDAD LOGISTICA 27.18 23.40 25.30
A3-218A AC-02 DIRECCION 7.20 9.90 10.80
324de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
A3-219 AC-01 CORREDOR 99.50 73.55 101.80
A3-220 AC-04 SH PERONAL 16.18 15.60 16.50
A3-221 AC-04 SH PERONAL 16.18 15.60 16.50
A3-222 AC-04 SH 2.48 6.10 6.90
A3-223 AC-04 SH 2.48 6.10 6.90
SECTOR B
B1-201 AC-01 ESPERA 47.30 22.55 33.30
B1-202 AC-01 CONTROL 7.60 4.70 11.40
B1-203 AC-02 MATERIALES INSUMOS 6.85 10.10 11.10
B1-204 AC-01 CORREDOR 41.55 40.55 56.40
B1-205 AC-03 TOPICO 13.90 14.40 15.30
B1-206 AC-10 RECEPCION MEDIC-CITOS 13.90 14.40 15.30
B1-207 AC-10 LAVADO Y ESTERILIZACION 13.90 14.40 15.30
B1-208 AC-04 SEPTICO 2.60 6.30 7.10
B1-209 AC-04 RESIDUOS SOLIDOS 2.60 6.30 7.10
B1-210 AC-02 JEFATURA 14.00 14.40 15.30
B1-211 AC-04 SS.HH 2.80 6.30 7.20
B1-212 AC-02 ESTAR PERSONAL 12.70 13.80 14.70
B1-213 AC-04 SS.HH VESTIDOR DAMAS 6.85 15.00 15.90
B1-214 AC-04 LIMPIEZA 2.60 6.30 7.10
B1-215 AC-04 SS.HH VESTIDOR VARONES 6.80 15.75 16.65
B1-216 AC-15 QUIMIOTERAPIA ADULTOS 225.50 70.80 89.00
B1-217-218-219 AC-02 ESTAC. ENFERMERAS 19.15 11.60 24.50
B1-220 AC-02 AREA CANALIZACION 19.80 18.40 19.30
B1-221 AC-04 SS.HH 2.50 6.10 6.90
B1-222 AC-04 SS.HH 2.50 6.10 6.90
B1-223 AC-04 SS.HH 2.50 6.10 6.90
B1-224 AC-04 SS.HH 2.50 6.10 6.90
B2-201 AC-01 CORREDOR 65.15 53.05 62.40
B2-202 AC-12 CUARTO TECNICO 6.45 9.60 10.50
B2-203 AC-07 CORREDOR 68.00 48.25 64.80
B2-204 AC-06 SALA DE PROCEDIMIENTOS 3 31.90 22.50 23.70
B2-205 AC-06 SALA DE PROCEDIMIENTOS 2 31.90 22.50 23.70
B2-206 AC-06 SALA DE PROCEDIMIENTOS 1 31.90 22.50 23.70
B2-207 AC-04 VESTIDOR 10.15 19.00 19.90
B2-208 AC-04 VESTIDOR 10.15 19.00 19.90
B2-209 AC-04 RESIDUOS SOLIDOS 1.85 4.90 5.70
B2-210 AC-08 ROPA SUCIA 1.60 4.60 5.40
B2-211 AC-02 DEPOSITO EQUIPOS 11.90 15.20 16.20
B2-212 AC-10 PREPARACION PACIENTE 10.35 13.10 14.10
B2-213 AC-10 ESTERILIZACION ENDOSCOPIA 10.60 13.10 14.10
B2-214 AC-04 VESTIDOR PACIENTE 10.15 19.00 19.90
B2-215 AC-04 VESTIDOR PACIENTE 10.15 19.00 19.90
B2-216 AC-04 LIMPIEZA 2.75 6.10 6.90
B2-217 AC-08 ROPA LIMPIA 3.15 6.50 7.30
325de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B2-218 AC-04 LAVACHATAS 2.95 6.40 7.20
B2-219 AC-04 SS.HH 2.32 5.80 6.60
B2-220 AC-07 CORREDOR SEMIRIGIDO 39.10 26.00 39.30
B2-221-222 AC-07 ESTACION ENFERMERAS - TRABAJO SUCIO 14.00 13.35 16.80
B2-223 AC-04 SH 2.50 6.10 6.90
B2-224 AC-04 SEPTICO 2.50 6.10 6.90
B2-225 AC-07 TRABAJO LIMPIO 14.00 13.35 16.80
B2-226 AC-15 RECUPERACION 84.50 44.50 47.20
B2-227 AC-02 OFICINA ANASTESIOLOGO 15.95 15.60 16.50
B2-228 AC-02 ESTAR MEDICO 2.50 6.10 6.90
B2-229 AC-04 RQ 2.50 6.10 6.90
B2-230 AC-04 SS.HH 15.95 14.00 16.50
B2-231 AC-04 VESTIDOR 11.00 20.60 21.50
B2-232 AC-04 VESTIDOR 14.30 22.70 23.60
B2-233 - 237 AC-07 CORREDOR RIGIDO - RX 77.00 40.90 52.80
B2-234 AC-05 SALA IND. ANEST 13.00 14.10 15.00
B2-235 AC-02 ALMACEN ANESTESIA 7.90 10.80 11.70
B2-236 AC-02 EQUIPOS 11.80 13.20 14.10
B2-238 AC-02 MATERIAL ESTERIL 7.90 10.70 11.70
B2-239 AC-06 SALA DE OPERACIONES 4 33.60 20.85 23.65
B2-240 AC-06 SALA DE OPERACIONES 3 33.60 20.85 23.65
B2-241 AC-06 SALA DE OPERACIONES 2 33.60 20.85 23.65
B2-242 AC-06 SALA DE OPERACIONES 1 33.60 20.85 23.65
B2-243 AC-07 CORREDOR 36.60 60.10 66.00
B2-244 AC-01A CORREDOR 39.10 31.35 39.30
B2-245 AC-12 CUARTO TECNICO 8.60 11.90 12.80
B2-246 AC-04 CUARTO LIMPIEZA 2.35 5.50 6.30
B2-247 AC-12 CUARTO TECNICO 8.60 12.90 13.80
B2-248 AC-03 PRE LAVADO INSTRUMENTOS 16.20 15.60 16.50
B2-249 AC-08 ROPA SUCIA 3.20 6.90 7.70
B2-250 AC-08 RESIDUOS SOLIDOS 3.00 6.50 7.30
B3-201 AC-01 HALL 121.10 75.30 93.10
B3-202 AC-04 LIMPIEZA 2.50 6.10 6.90
B3-203 AC-01 ESPERA 42.40 23.20 31.40
B3-204 AC-04 SS.HH 2.85 6.10 6.90
B3-205 AC-04 SS.HH 2.85 6.10 6.90
B3-206 AC-01 CORREDOR 14.10 26.70 31.20
B3-207 AC-02 SALA DE JUNTAS 22.30 18.40 19.30
B3-208 AC-02 ESTAR MEDICO 14.10 14.40 15.30
B3-209 AC-02 JEFATURA ENFERMERIA 14.60 14.70 15.60
B3-210 AC-04 SS.HH 2.35 5.50 6.30
B3-211 AC-02 JEFATURA MEDICA 15.15 14.20 15.90
B3-212 AC-04 SS.HH 2.35 5.50 6.30
B3-213 AC-01A CORREDOR 85.10 74.75 80.80
B3-214 AC-01A CORREDOR 9.45 9.50 17.10
326de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-215 AC-04 SS.HH 2.15 5.50 6.30
B3-216 AC-04 SS.HH 2.15 5.50 6.30
B3-217 AC-04 VESTIDOR 7.00 13.00 13.80
B3-218 AC-04 VESTIDOR 7.00 136.00 136.80
B3-219 AC-04 LIMPIEZA 2.85 6.10 6.90
B3-220 AC-04 RESIDUOS SOLIDOS 2.85 6.10 6.90
B3-221 AC-10 FILTRO 3.90 7.60 8.40
B3-222 AC-10 TRABAJO 77.80 32.70 39.60
B3-223 AC-10 ALMACEN MATERIAL ESTERIL 50.10 24.50 28.80
B3-224 AC-10 ENTREGA DE MATERIAL ESTERIL 12.75 11.10 14.40
B3-225 AC-10 FILTRO 4.20 8.00 8.90
B3-226 AC-10 PREPARACION Y EMPAQUE 72.60 31.00 39.90
B3-227-228 AC-10 LAVADO DESINFECCION / RECEPCION CLASIFICACION 39.55 26.60 27.60
B3-229 AC-10 PREPARACION SOLUCIONES 13.40 14.40 15.30
B3-230 AC-10 ALMACEN ROPA LIMPIA 18.90 17.60 18.60
B3-231 AC-10 FILTRO 5.15 10.20 12.00
B3-232 AC-04 LIMPIEZA 3.11 6.70 7.50
B3-233 AC-04 RESIDUOS SOLIDOS 3.15 6.70 7.50
B3-234 AC-01A CORREDOR 9.55 10.70 17.10
B3-235 AC-02 JEFATURA 14.00 13.90 15.60
B3-236 AC-04 SS.HH 2.50 6.10 6.90
B3-237 AC-04 SS.HH 2.20 5.50 6.30
B3-238 AC-04 SS.HH 2.20 5.50 6.30
B3-239 AC-04 VESTIDOR 7.00 12.90 13.80
B3-240 AC-04 VESTIDOR 7.00 12.90 13.80
B3-241 AC-10 LVADO CARRITOS 7.90 10.70 11.70
B3-242 AC-01a CORREDOR 113.10 75.25 95.20
B3-243 AC-02 ESPERA FAMILIAR 18.70 17.80 19.50
B3-244 AC-04 SS.HH 2.50 6.10 6.90
B3-245 AC-02 RECEPCION- CONTROL-ADMISION 14.50 11.75 15.60
B3-246 AC-07 CORREDOR 35.40 15.75 35.20
B3-247 AC-05 EVALUACION PRE-ANESTESICA 21.10 17.05 18.25
B3-248 AC-05 PREPRACION DE MATERIALES E INSTRUMENTOS QUIRURGICOS 16.20 15.50 16.50
B3-249 AC-05 READAPTACION DE MEDIOS 17.60 16.20 17.20
B3-250-251-252 AC-07 ESTACION DE ENFERMERAS -TRABAJO LIMPIO -TRABAJO SUCIO 32.35 16.50 28.85
B3-253 AC-07 CORREDOR 32.40 24.50 33.30
B3-254 AC-03 RECUPERACION 65.65 36.00 38.70
B3-255 AC-03 ENDOSCOPIA 1 18.95 16.50 17.70
B3-256 AC-03 ENDOSCOPIA 2 18.95 16.50 17.70
B3-257 AC-03 ENDOSCOPIA 3 18.95 16.50 17.70
B3-258 AC-03 CITOSCOPIA 18.95 16.50 17.70
B3-259 AC-02 ESPERA FAMILIAR 20.90 16.45 18.25
B3-260 AC-04 SS.HH 2.50 6.10 6.90
B3-261 AC-07 RECEPCION- CONTROL-ADMISION 20.40 13.90 17.75
B3-262 AC-07 CORREDOR 34.10 24.55 34.90
B3-263 AC-07 CAMILLAS 16.20 11.90 15.95
327de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-264 AC-04 LIMPIEZA 2.65 6.50 7.30
B3-265 AC-04 SS.HH 2.75 6.30 7.10
B3-266 AC-02 OFICINA ENFERMERAS 16.20 15.60 16.50
B3-267 AC-02 JEFATURA 18.25 17.30 18.20
B3-268 AC-02 REUNIONES 17.40 15.90 17.60
B3-268A AC-04 SS.HH 2.50 6.10 6.90
B3-269 AC-01A CORREDOR 103.65 73.30 93.90
B3-270 AC-12 CUARTO TECNICO COMUNICACIONES 9.15 12.30 13.20
B3-271 AC-12 CUARTO TECNICO ELECTRICAS 6.55 9.60 10.50
B3-273 AC-01A LIMPIPO 5.90 9.10 10.10
B3-274 AC-01A SUCIO 5.90 9.10 10.10
B3-275 AC-01A ASCENSORES PACIENTES 17.25 14.50 17.50
B3-278 AC-01 ASCENSORES PUBLICOS 17.35 16.40 18.70
B4-201-202-206 AC-01 ESPERA - CONTROL - CORREDOR 96.40 67.80 86.40
B4-203 AC-02 MATERIALES E INSUMOS 6.85 10.10 11.10
B4-204 AC-04 SS.HH 2.50 6.10 6.90
B4-205 AC-04 SS.HH 2.50 6.10 6.90
B4-207 AC-15 QUIMIOTERAPIA NIÑOS 225.50 70.80 89.00
B4-208-209-210 AC-02 ESTACION ENFERMERAS 19.15 11.60 24.50
B4-211 AC-02 AREA CANALIZACION 19.90 18.60 19.60
B4-213 AC-04 SS.HH 2.50 6.10 6.90
B4-214 AC-04 SS.HH 2.50 6.10 6.90
B4-215 AC-03 TOPICO 13.90 14.40 15.30
B4-216 AC-10 RECEP-MEDIC-CITOS 13.90 14.40 15.30
B4-217 AC-10 LAVADO Y ESTERILIZACION 13.90 14.40 15.30
B4-218 AC-04 SEPTICO 2.60 6.30 7.10
B4-219 AC-04 RESIDUOS SOLIDOS 2.60 6.30 7.10
B4-220 AC-02 JEFATURA 14.00 14.40 15.30
B4-221 AC-04 SS.HH 2.80 6.40 7.20
B4-222 AC-02 ESTAR PERSONAL 12.40 13.50 14.40
B4-223 AC-04 SS HH. VESTIDOR DAMAS 6.80 15.75 16.65
B4-224 AC-04 LIMPIEZA 2.60 6.30 7.10
B4-225 AC-04 SS HH. VESTIDOR VARONES 6.80 15.75 16.65
B5-201 AC-01 CORREDOR 65.50 57.25 62.60
B5-202 AC-12 CUARTO TECNICO 8.60 11.40 12.30
B5-203 AC-02 INFORME FAMILIARES 8.30 10.30 12.10
B5-204 AC-02 RECEPCION- CONTROL - INFORMES 8.70 8.80 12.70
B5-205 AC-02 CORREDOR 31.90 20.15 32.90
B5-206 AC-04 LIMPIEZA 2.50 6.10 6.90
B5-207 AC-04 ROPA SUCIA 2.50 6.10 6.90
B5-208 AC-04 RESIDUOS SOLIDOS 3.10 6.70 7.50
B5-209 AC-04 SS.HH. VESTIDOR 13.00 19.40 20.30
B5-210 AC-04 SS.HH. VESTIDOR 13.00 19.40 20.30
B5-211 AC-10 LABORATORIO 16.00 15.50 16.50
328de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B5-212 AC-05 REPOSTERO 15.90 15.60 16.50
B5-213 AC-08 DEPOSITO INSUMOS 15.90 15.60 16.50
B5-214 AC-02 ALMACEN EQUIPOS 16.20 15.60 16.50
B5-215 AC-02 CAMBIO ROPA FAMILIARES 10.00 12.00 12.90
B5-216 AC-04 SEPTICO 5.50 9.70 10.50
B5-217 AC-01A CORREDOR 58.30 47.95 54.60
B5-218 AC-15 FILTRO 13.25 13.05 15.45
B5-219 AC-15 AISLADO 18.20 16.50 17.70
B5-220 AC-08 ROPERIA 8.95 12.15 13.05
B5-221 AC-03 ESTACION ENFERMERAS 9.80 7.05 13.50
B5-222 AC-03 TRABAJO SUCIO 5.20 8.40 9.30
B5-223 AC-03 TRABAJO LIMPIO 5.20 8.40 9.30
B5-224 AC-15 UCI 124.50 47.10 55.65
B5-225 AC-15 FILTRO 13.25 13.05 15.45
B5-226 AC-15 AISLADO 18.20 16.50 17.70
B5-227 AC-08 ROPERIA 8.95 12.15 13.05
B5-228 AC-03 ESTACION ENFERMERAS 9.80 7.05 13.50
B5-229 AC-03 TRABAJO SUCIO 5.20 8.40 9.30
B5-230 AC-03 TRABAJO LIMPIO 5.20 8.40 9.30
B5-231 AC-15 UCIN 195.80 59.35 67.90
B5-232 AC-15 FILTRO 10.50 11.10 13.50
B5-233 AC-15 FILTRO 10.20 10.80 14.10
B5-234 AC-15 AISLADO 20.15 17.00 18.20
B5-235 AC-03 ESTACION ENFERMERAS 11.15 7.65 14.10
B5-236 AC-03 TRABAJO SUCIO 5.20 8.40 9.30
B5-237 AC-03 TRABAJO LIMPIO 5.20 8.40 9.30
B5-238 AC-08 ROPERIA 10.35 13.20 14.10
B5-239 AC-15 UCI - UCIN 135.00 45.55 53.20
B5-240 AC-01A CORREDOR 69.50 59.65 64.00
B5-241 AC-12 CUARTO TECNICO 11.20 13.50 14.40
TERCER PISO
SECTOR A
A1-301 AC-12 HALL 21.04 17.55 23.20
A2-302 AC-02 HABITACION 14.55 14.10 15.80
A2-303 AC-04 SS.HH 3.83 7.30 8.10
A2-304 AC-02 HABITACION 14.60 14.20 15.90
A2-305 AC-04 SS.HH 3.83 7.30 8.10
A2-305 AC-02 CORREDOR 60.45 54.90 61.50
A2-306 AC-02 ESTAR 18.05 14.00 19.20
A2-307 AC-11 KITCHENETE 4.30 4.20 8.40
A2-308 AC-02 HABITACION 14.60 14.50 16.20
A2-309 AC-04 SS.HH 3.83 7.30 8.10
A2-310 AC-02 HABITACION 14.50 14.20 15.90
A2-311 AC-04 SS.HH 3.83 7.30 8.10
SECTOR B
329de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-301.342 AC-01 CORREDOR 145.15 85.55 136.50
B3-302 AC-02 ESPERA 27.50 12.30 21.60
B3-303 AC-04 SS.HH 7.90 10.80 11.70
B3-304 AC-04 SS.HH 7.90 10.80 11.70
B3-305 AC-02 CITAS / ALTAS 10.60 13.10 14.10
B3-306 - 372 AC-01 CORREDOR 86.25 51.30 78.80
B3-307 AC-01A ESTACION ENFERMERAS 11.00 11.00 14.00
B3-308 AC-03 TRABAJO LIMPIO 5.00 8.40 9.30
B3-309 AC-03 TRABAJO SUCIO 5.00 8.40 9.30
B3-310 AC-04 SS.HH 3.40 6.90 7.70
B3-311 AC-04 LAVACHATAS 3.40 6.90 7.70
B3-312 AC-04 SEPTICO 3.40 6.90 7.70
B3-313 AC-05 REPOSTERO 11.30 15.45 16.35
B3-314 AC-02 ESCLUSA 4.00 6.25 8.25
B3-315 AC-02 AISLADO 13.10 13.40 15.30
B3-316 AC-04 SS.HH 2.50 6.00 6.90
B3-317 AC-02 1 CAMA 13.45 13.20 15.30
B3-318 AC-04 SS.HH 2.50 6.00 6.90
B3-319 AC-02 1 CAMA 13.45 13.20 15.30
B3-320 AC-04 SS.HH 2.50 6.00 6.90
B3-321 AC-02 1 CAMA 13.45 13.20 15.30
B3-322 AC-04 SS.HH 2.50 6.00 6.90
B3-323 AC-02 1 CAMA 13.45 13.20 15.30
B3-324 AC-04 SS.HH 2.50 6.00 6.90
B3-325 AC-02 1 CAMA 13.45 13.20 15.30
B3-326 AC-04 SS.HH 2.50 6.00 6.90
B3-327 AC-02 2 CAMAS 22.75 19.65 21.75
B3-328 AC-04 SS.HH 2.30 6.05 6.95
B3-329 AC-02 2 CAMAS 21.70 19.50 21.60
B3-330 AC-04 SS.HH 2.30 6.05 6.95
B3-331 AC-02 2 CAMAS 21.70 19.50 21.60
B3-332 AC-04 SS.HH 2.30 6.05 6.95
B3-333 AC-02 2 CAMAS 21.70 19.50 21.60
B3-334 AC-04 SS.HH 2.30 6.05 6.95
B3-335 AC-02 2 CAMAS 21.70 19.50 21.60
B3-336 AC-04 SS.HH 2.30 6.05 6.95
B3-337 AC-02 2 CAMAS 21.70 19.50 21.60
B3-338 AC-04 SS.HH 2.30 6.05 6.95
B3-339 AC-02 2 CAMAS 21.70 19.50 21.60
B3-340 AC-04 SS.HH 2.30 6.05 6.95
B3-341 AC-03 TOPICO 25.40 20.55 21.75
B3-342 AC-01 CORREDOR 87.40 50.50 78.00
B3-343 AC-01A ESTACION ENFERMERAS 11.00 3.00 14.00
B3-344 AC-03 TRABAJO LIMPIO 5.20 8.40 9.30
B3-345 AC-03 TRABAJO SUCIO 5.20 8.40 9.30
B3-346 AC-04 SS.HH 3.40 6.90 7.70
330de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-347 AC-04 LAVACHATAS 3.40 6.90 7.70
B3-348 AC-04 SEPTICO 3.40 6.90 7.70
B3-349 AC-05 REPOSTERO 15.80 15.45 16.35
B3-350 AC-02 1 CAMA 13.20 13.20 15.30
B3-351 AC-04 SS.HH 2.50 6.00 6.90
B3-352 AC-02 1 CAMA 13.20 13.20 15.30
B3-353 AC-04 SS.HH 2.50 6.00 6.90
B3-354 AC-02 1 CAMA 13.20 13.20 15.30
B3-355 AC-04 SS.HH 2.50 6.00 6.90
B3-356 AC-02 1 CAMA 13.20 13.20 15.30
B3-357 AC-04 SS.HH 2.50 6.00 6.90
B3-358 AC-02 1 CAMA 13.20 13.20 15.30
B3-359 AC-04 SS.HH 2.50 6.00 6.90
B3-360 AC-02 1 CAMA 13.20 13.20 15.30
B3-361 AC-04 SS.HH 2.50 6.00 6.90
B3-362 AC-02 2 CAMAS 22.20 19.65 21.75
B3-363 AC-04 SS.HH 2.30 6.05 6.95
B3-364 AC-02 2 CAMAS 21.70 19.50 21.60
B3-365 AC-04 SS.HH 2.30 6.05 6.95
B3-366 AC-02 2 CAMAS 21.70 19.50 21.60
B3-367 AC-04 SS.HH 2.30 6.05 6.95
B3-368 AC-02 2 CAMAS 21.70 19.50 21.60
B3-369 AC-04 SS.HH 2.30 6.05 6.95
B3-370 AC-02 2 CAMAS 21.70 19.50 21.60
B3-371 AC-04 SS.HH 2.30 6.05 6.95
B3-372 AC-02 2 CAMAS 21.70 19.50 21.60
B3-373 AC-04 SS.HH 2.30 6.05 6.95
B3-374 AC-02 2 CAMAS 21.70 19.50 21.60
B3-375 AC-04 SS.HH 2.30 6.05 6.95
B3-376 AC-03 TOPICO 25.50 20.55 21.75
B3-378 AC-04 SS .HH. PERSONAL 4.50 7.90 8.70
B3-379 AC-04 SS .HH. PERSONAL 4.50 7.90 8.70
B3-380 AC-02 SALA DE REUNIONES 18.75 16.70 17.70
B3-381 AC-02 JEFATURA 13.40 14.30 15.30
B3-382 AC-04 SS.HH 3.15 6.70 7.50
B3-383 AC-04 LIMPIEZA 3.15 6.70 7.50
B3-384 AC-01 CAMILLA Y SILLA DE RUEDAS 15.00 10.40 16.10
B3-385 AC-12 CUARTO TECNICO 7.10 10.00 10.90
B3-386 AC-04 RESIDUOS SOLIDOS 4.20 7.60 8.50
B3-387 AC-12 CUARTO TECNICO 10.60 13.20 14.10
B3-388 AC-08 ROPA SUCIA 5.20 8.50 9.30
B3-389 AC-08 ROPA LIMPIA 5.20 8.50 9.30
B3-391 AC-01 ASCENSORES PUBLICOS 17.50 16.25 18.80
B3-393 AC-01A LIMPIO 5.90 9.10 10.10
B3-394 AC-01A SUCIO 5.90 9.10 10.10
B3-395 AC-01 ASCENSORES PACIENTES 17.25 14.50 17.50
331de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
TOTALES 2,507.86
TOTALES
332de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
SOTANO
SECTOR B
B2-S-101 AC-12 CORREDOR 60.80 28.70 39.00 60.80
B2-S-102 AC-12 CUARTO TECNICO 6.55 9.60 10.50 6.55
B2-S-103 AC-04 SH 2.48 6.10 6.90 2.48
B2-S-106 AC-02 JEFATURA 12.15 13.50 14.40 12.15
B2-S-107 AC-02 CONTROL 11.80 13.20 14.10 11.80
B2-S-108 AC-02 AREA TECNICA APOYO ADMINISTRATIVO 7.90 10.80 11.70 7.90
B2-S-110 AC-04 LIMPIEZA 2.48 6.10 6.90 2.48
B2-S-111 AC-04 SH 2.48 6.10 6.90 2.48
B2-S-112 AC-04 SH 2.48 6.10 6.90 2.48
B2-S-113 AC-12 ALMACEN 1 32.35 21.60 23.40 32.35
B2-S-114 AC-12 ALMACEN 2 32.00 21.60 23.40 32.00
B2-S-115-109-104-105 AC-12 CORREDOR - RECEPCION - ESPERA 134.70 63.90 82.80 134.70
B2-S-116 AC-12 ALMACEN 3 32.00 21.60 23.40 32.00
B2-S-117 AC-12 ALMACEN 4 31.30 21.40 23.20 31.30
B2-S-118 AC-12 ALMACEN 5 32.40 21.90 23.70 32.40
B2-S-119 AC-12 ALMACEN 6 33.60 22.80 24.60 33.60
B2-S-120 AC-12 ALMACEN 7 33.50 22.20 24.00 33.50
B2-S-122 AC-02 CONTROL DE INGRESO E INSUMOS 5.20 8.40 9.30 5.20
B3-S-101-101A-102 AC-01 HALL-RECEPCION-ESPERA 144.50 39.70 58.30 144.50
B3-S-101b AC-02 SECRETARIA 11.20 7.80 13.80 11.20
B3-S-103 AC-02 CONSULTORIO 15.70 9.30 10.20 15.70
B3-S-104 AC-02 CONSULTORIO 15.70 9.30 10.20 15.70
B3-S-105 AC-02 JEFATURA 13.15 13.60 15.30 13.15
B3-S-105A AC-04 SH 2.95 7.00 7.80 2.95
B3-S-106 AC-02 REUNIONES 13.30 14.10 15.00 13.30
B3-S-106A AC-10 ESCLUSA 4.40 8.50 10.50 4.40
B3-S-107 AC-04 SS.HH. 9.25 12.00 12.90 9.25
B3-S-108 AC-04 SS.HH. 9.25 12.00 12.90 9.25
B3-S-109 AC-02 ESPERA PACIENTES HOSPITALIZADOS 33.60 22.80 24.00 33.60
B3-S-110 AC-01a CORREDOR 33.50 24.00 35.10 33.50
B3-S-111 AC-01a CORREDOR 60.10 51.35 57.60 60.10
B3-S-112 AC-11 LAVATORIOS 10.10 9.80 14.40 10.10
B3-S-113 AC-04 SS.HH. 10.15 19.00 19.90 10.15
B3-S-114 AC-04 SS.HH. 10.15 19.00 19.90 10.15
B3-S-115 AC-11 COMEDOR PERSONAL 49.20 24.65 28.20 49.20
B3-S-116-125 AC-11 COCINA - AREA SERVICIO 112.30 47.40 59.70 112.30
B3-S-116A AC-04 LIMPIEZA 2.37 5.60 6.40 2.37
333de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-S-117 AC-11 NUTRICIONISTA 8.40 10.40 12.10 8.40
B3-S-117A AC-04 SS.HH. 3.00 7.10 7.90 3.00
B3-S-118 AC-11 DEPOSITO VAJILLAS 9.30 11.60 12.50 9.30
B3-S-119 AC-14 LAVADO VAJILLAS 12.05 13.20 14.10 12.05
B3-S-120 AC-12 CAMARAS 15.30 15.00 16.00 15.30
B3-S-121 AC-14 DESPENSA 11.50 12.90 13.80 11.50
B3-S-122 AC-11 RECEPCION - CLASIFICACION 8.00 10.05 11.70 8.00
B3-S-123 AC-14 RESIDUOS SOLIDOS 5.10 8.40 9.30 5.10
B3-S-124 AC-14 LIMPIEZA 3.80 7.30 8.10 3.80
B3-S-126 AC-14 LAVADO CARRITOS 5.20 8.30 9.30 5.20
B3-S-127 AC-01A CORREDOR-ESPERA 190.45 103.95 135.75 190.45
B3-S-128 AC-14 LAVADO CARRITOS 7.12 10.00 11.00 7.12
B3-S-129 AC-11 RECEPCION ROPA SUCIA 5.75 7.20 10.00 5.75
B3-S-130 AC-04 SS.HH. 2.05 5.30 6.10 2.05
B3-S-131 AC-11 CLASIFICACION - PESAJE 9.30 10.70 12.70 9.30
B3-S-132 - 133 AC-11 REMOJADO - SECADO - PLANCHADO 55.50 32.60 38.70 55.50
B3-S-134 AC-02 REPARACION COSTURA 6.50 9.60 10.50 6.50
B3-S-135 AC-04 SS.HH. 2.05 5.30 6.10 2.05
B3-S-136 AC-04 LIMPIEZA 2.05 5.30 6.10 2.05
B3-S-137 AC-02 ALMACEN ROPA LIMPIA 16.80 17.30 19.30 16.80
B3-S-138 AC-02 ENTREGA ROPA LIMPIA 11.65 12.30 14.30 11.65
B3-S-138 AC-04 LIMPIEZA 2.30 6.00 6.80 2.30
B3-S-139 AC-02 RECEPCION PRODUCTOS 17.64 11.45 18.30 17.64
B3-S-139 AC-04 RESIDUOS SOLIDOS 1.87 5.20 6.00 1.87
B3-S-140 AC-03 ESCLUSA 4.25 6.80 8.80 4.25
AC-01A CORREDOR 3.14 6.10 8.10 3.14
B3-S-141-142 AC-01A CORREDOR 50.80 63.30 50.80
B3-S-141A AC-04 VESTIDOR 2.30 6.40 7.20 2.30
B3-S-141B AC-04 VESTIDOR 2.30 6.40 7.20 2.30
B3-S-143 AC-03 PRODUCTO TERMINADO 5.70 9.00 9.90 5.70
B3-S-144 AC-03 PRODUCTO SEMIELABORADO 5.70 9.00 9.90 5.70
B3-S-145 AC-03 ESCLUSA 3.50 6.00 7.80 3.50
B3-S-146 AC-03 PESAJE 5.55 6.90 9.60 5.55
B3-S-147 AC-03 MATERIAL REFRIGERADO 4.50 7.80 8.70 4.50
B3-S-148 AC-03 MATERIAL ACORD 4.50 7.80 8.70 4.50
B3-S-149 AC-01 CORREDOR 4.52 9.00 10.80 4.52
B3-S-149a AC-01A CORREDOR 2.70 3.20 6.90 2.70
B3-S-150 AC-04 SS.HH. 2.20 5.50 6.30 2.20
B3-S-151 AC-04 SS.HH. 2.20 5.50 6.30 2.20
B3-S-152 AC-03 LAVADO Y ESTERILIZACION 9.25 12.00 12.90 9.25
334de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-S-153 AC-02 SECRETARIA 6.85 9.30 11.10 6.85
B3-S-154 AC-02 JEFATURA 10.70 11.60 13.50 10.70
B3-S-155 AC-10 FORMULA MAGISTRAL 11.95 14.40 15.30 11.95
B3-S-156 AC-10 ESTACION DE ENFERMERAS 11.60 14.10 15.00 11.60
B3-S-157 AC-10 DOSIS UNITARIA 15.10 15.70 16.50 15.10
B3-S-158 AC-01A HALL 19.00 15.25 23.40 19.00
B3-S-159 AC-10 LABORATORIO MEZCLAS INTRAVENOSAS 10.00 12.00 12.90 10.00
B3-S-160 AC-03 LABORATORIO CITOSTATICOS 11.50 12.90 13.80 11.50
B3-S-160A AC-03 ESCLUSA 3.85 7.20 8.10 3.85
B3-S-161 AC-03 LABORATORIO CITOSTATICOS 11.50 12.90 13.80 11.50
B3-S-161A AC-03 ESCLUSA 3.85 7.20 8.10 3.85
B3-S-162 AC-03 LABORATORIO FORMULAS PARENTALES 11.50 12.90 13.80 11.50
B3-S-162A AC-03 ESCLUSA 3.85 7.20 8.10 3.85
B3-S-163 AC-10 ALMACEN LABORATORIOS 6.10 9.90 10.80 6.10
B3-S-164 AC-01A DESPACHO Y EMBALAJE 7.40 5.10 11.00 7.40
B3-S-165 AC-01A CARGA / DESCLUSA 7.50 5.10 11.00 7.50
B3-S-166 AC-12 HALL 27.50 12.55 26.50 27.50
B3-S-167 AC-12 ALMACEN TEMP.AMB.VOLUMEN MAYOR 45.10 26.70 28.20 45.10
B3-S-168 AC-02 ALMACEN TEMP.AMB.VOLUMEN MENOR 32.30 23.70 25.20 32.30
B3-S-169 AC-12 ALMACEN TEMP.AMB.CONTROLADA 24.20 19.60 21.10 24.20
B3-S-170 AC-01A CORREDOR 42.70 49.05 59.20 42.70
B3-S-171 AC-02 OFICINA ADMINISTRATIVA 25.40 19.70 20.60 25.40
B3-S-172 AC-02 OFICINA EVALUACIONES Y SALA DE TRABAJO 17.90 16.90 17.80 17.90
B3-S-173 AC-12 ANTECAMARA 6.85 8.40 11.10 6.85
B3-S-173A AC-12 CAMARA FRIA 5.60 9.30 10.20 5.60
B3-S-173B AC-12 CAMARA FRIA 5.60 9.30 10.20 5.60
B3-S-174 AC-10 CORREDOR 3.75 5.70 9.30 3.75
B3-S-175 AC-10 PRODUCTOS FISCALIZADOS 3.85 7.20 8.10 3.85
B3-S-176 AC-10 PRODUCTOS PARA DEVOLUCION 3.85 7.20 8.10 3.85
B3-S-177 AC-10 PRODUCTOS EN CUARENTENA 5.82 9.60 10.50 5.82
B3-S-178 AC-10 CORREDOR 3.75 5.70 9.30 3.75
B3-S-179 AC-10 PRODUCTOS INFLAMABLES 5.82 9.60 10.50 5.82
B3-S-180 AC-10 PRODUCTOS PELIGROSOS 3.85 7.20 8.10 3.85
B3-S-181 AC-10 PRODUCTOS FOTOSENSIBLES 3.85 7.20 8.10 3.85
B3-S-182 AC-04 RESIDUOS SOLIDOS 2.10 5.40 6.20 2.10
B3-S-183 AC-04 LIMPIEZA 3.10 7.30 8.10 3.10
B3-S-184 AC-04 SS.HH. 2.15 5.50 6.30 2.15
B3-S-185 AC-04 SS.HH. 2.15 5.50 6.30 2.15
B3-S-187 AC-01 HALL ASCENSORES 16.35 14.35 18.70 16.35
B3-S-189 AC-01A LIMPIO 6.10 9.50 10.50 6.10
335de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B3-S-190 AC-01A SUCIO 6.10 9.50 10.50 6.10
B3-S-191 AC-01A VESTUARIO ASCENSORES 17.95 9.45 18.30 17.95
B5-S-101 - 118 AC-01A CORREDOR 65.70 48.85 63.25 65.70
B5-S-102 AC-12 CUARTO TECNICO 9.30 13.50 14.40 9.30
B5-S-103 AC-02 OFICINA INTERPRETACION DE CRITERIOS 19.70 17.10 18.00 19.70
B5-S-104 - 105 AC-01A CAMILLAS - ESTAC DE ENFERMERAS 66.80 26.35 34.45 66.80
B5-S-106 - 107 AC-03 TRABAJO LIMPIO - TRABAJO SUCIO 15.95 19.65 20.70 15.95
B5-S-108 AC-01A CORREDOR 7.60 10.60 16.50 7.60
B5-S-109 AC-08 ROPA LIMPIA 5.20 8.40 9.30 5.20
B5-S-110 AC-02 MATERIALES E INSUMOS 5.20 8.40 9.30 5.20
B5-S-111 AC-02 MATERIALES E INSUMOS 5.20 8.40 9.30 5.20
B5-S-112 AC-04 VESTIDOR SS.HH 3.15 6.70 7.50 3.15
B5-S-113 AC-15 RECUPERACION 16.30 14.90 16.80 16.30
B5-S-114 AC-04 TRESIDUOS SOLIDOS 2.00 5.00 5.80 2.00
B5-S-115 AC-04 LIMPIEZA 4.45 7.90 8.70 4.45
B5-S-116 AC-04 VESTIDOR SS.HH 7.80 10.80 11.70 7.80
B5-S-117 AC-04 VESTIDOR SS.HH 7.80 10.80 11.70 7.80
B5-S-119 AC-02 OFICINA FISICO 16.60 15.90 16.80 16.60
B5-S-120 AC-02 DOSIMETRIA CONTROL DE CALIDAD 16.50 15.90 16.80 16.50
B5-S-121 AC-02 PLANIFICACION 16.10 15.60 16.50 16.10
B5-S-122 AC-04 VESTIDOR SS.HH 9.25 17.00 17.90 9.25
B5-S-123 AC-04 VESTIDOR SS.HH 9.12 17.00 17.90 9.12
B5-S-124 AC-1A HALL 33.70 17.00 27.70 33.70
B5-S-125 AC-16 COMANDO 7.95 10.50 11.70 7.95
B5-S-126 AC-09 TOMOGRAFIA 33.05 22.20 23.40
B5-S-127 AC-09 SALA DE BRAQUITERAPIA 34.20 29.20 30.40
B5-S-128 AC-16 COMANDO 8.30 10.80 12.00 8.30
B5-S-129 AC-14 EQUIPOS 8.25 10.80 12.00 8.25
B5-S-130 AC-03 PREPARACION PACIENTES 11.50 13.60 14.50 11.50
B5-S-131 AC-04 VESTIDOR SS.HH 3.50 7.00 7.80 3.50
B5-S-132 AC-04 VESTIDOR SS.HH 3.50 7.00 7.80 3.50
B5-S-133 AC-03 PREPARACION PACIENTES 11.65 13.70 14.60 11.65
B5-S-134 AC-01A HALL 43.20 21.85 31.50 43.20
B5-S-135 AC-09 COMANDO 25.35 12.35 19.80
B5-S-136 AC-13 ACELERADOR LINEAL 2 64.95 42.10 43.60
B5-S-137 AC-13 ACELERADOR LINEAL 1 65.60 42.70 44.20
B5-S-138 AC-03 PREPARACION PACIENTES 7.90 10.80 11.70 7.90
B5-S-139 AC-04 VESTIDOR SS.HH 3.75 8.50 9.30 3.75
B5-S-140 AC-04 VESTIDOR SS.HH 3.75 8.50 9.30 3.75
336de336
PLANILLA DE METRADOS - ARQUITECTURAPROYECTO: INSTITUTO REGIONAL DE ENFERMEDADES NEOPLASICAS DE LA MACRO REGION DEL CENTRO DEL PERU
DATOS PISOS
CO
DIG
O
CLA
VE AMBIENTE
AR
EA
PER
IMET
RO
S/P
UER
TAS
PER
IMET
RO
FALS
O P
ISO
B5-S-141 AC-03 PREPARACION PACIENTES 7.85 10.80 11.70 7.85
B5-S-142 AC-01 CORREDOR 21.80 23.70 29.75 21.80
B5-S-143 AC-04 SS.HH VESTIDOR PERSONAL ADMINISTRACION 21.75 31.60 32.50 21.75
B5-S-144 AC-04 SS.HH VESTIDOR PERSONAL ADMINISTRACION 23.45 36.70 37.60 23.45
B5-S-145 AC-04 SS.HH VESTIDOR ENFERMERAS 12.40 22.95 23.85 12.40
B5-S-146 AC-04 SS.HH VESTIDOR ENFERMERAS 11.50 21.45 22.35 11.50
B5-S-147 AC-02 LIMPIEZA 2.40 5.55 6.35 2.40
B5-S-148 AC-01A CORREDOR 69.90 53.75 64.40 69.90
B5-S-149 AC-04 SS.HH VESTIDOR MEDICO DAMAS 32.65 49.40 50.30 32.65
B5-S-150 AC-04 SS.HH VESTIDOR MEDICO HOMBRES 30.76 48.70 49.60 30.76
B5-S-151 AC-02 ZONA DEUDOS 13.40 13.60 15.30 13.40
B5-S-152 AC-04 SS.HH 2.30 6.10 6.90 2.30
B5-S-153 AC-01A CORREDOR 70.95 45.10 63.90 70.95
B5-S-154 AC-04 SS.HH 2.48 6.10 6.90 2.48
B5-S-155 AC-04 SS.HH 2.48 6.10 6.90 2.48
B5-S-156 AC-02 JEFATURA 13.40 14.40 15.30 13.40
B5-S-157 AC-04 SS.HH 2.48 6.10 6.90 2.48
B5-S-158 AC-02 SECRETARIA 6.55 9.60 10.50 6.55
B5-S-159 AC-02 REGISTROS INFORMES 6.55 9.60 10.50 6.55
B5-S-160 AC-10 LABORATORIO HISTOPATOLOGIA / INMUN 21.40 17.90 18.90 21.40
B5-S-161 AC-10 FIJ / COL / CORTE 10.60 13.10 14.10 10.60
B5-S-162 AC-08 ALMACEN DE MATERIALES E INSUMOS 5.70 9.00 9.90 5.70
B5-S-163 AC-10 LAVADO ESTERILIZACION 10.35 12.60 13.50 10.35
B5-S-164 AC-04 SS.HH 2.50 6.70 7.50 2.50
B5-S-165 AC-04 RESIDUOS SOLIDOS 2.65 6.40 7.20 2.65
B5-S-166 AC-04 LIMPIEZA 3.70 8.80 9.60 3.70
B5-S-167 AC-02 MUSEO 6.75 9.90 10.80 6.75
B5-S-168 AC-08 ARCHIVO DE LAMINAS 5.25 8.50 9.40 5.25
B5-S-169 AC-10 SALA MICROSCOPIAS PRELIMINAR 16.65 15.80 16.80 16.65
B5-S-170 AC-10 PROCESAMIENTO DE MUESTRAS 16.70 15.80 16.80 16.70
B5-S-171 AC-10 NECROPSIAS 33.30 22.20 24.00 33.30
B5-S-172 AC-12 CAMARA FRIA 8.05 11.40 11.40 8.05
B5-S-173 AC-10 PREPARACION DE CADAVERES 12.20 12.70 14.70 12.20
B5-S-174 AC-08 RECEPCION ENTREGA DE CADAVERES 19.70 15.20 18.00 19.70
B5-S-175 AC-12 CUARTO TECNICO 9.15 12.00 12.90 9.15
TOTALES 3,035.14