Ppi Tubería Encamisada
Click here to load reader
description
Transcript of Ppi Tubería Encamisada
7/17/2019 Ppi Tubería Encamisada
http://slidepdf.com/reader/full/ppi-tuberia-encamisada 1/1
PROJECT: CCGT
Lichterfelde
TYPE % I.P. DATE SIGNATURE I.P. DATE SIGNATURE I.P. DATE SIGNATURE
1
1.1 R D C
1.2 UNE‐EN ISO 15614 R D C
1.3 UNE‐EN 287‐1 R D C
1.4 A/PROCEDURE NoBo R D C
1.5 A/PROCEDURE NoBo R D C
1.6 PI‐107 R D C
2
2.1 EN 10204 3.1 VISUAL 100 M R C
2.2 EN 10204 2.2 VISUAL 100 M R C
3
3.1 PO‐215 VISUAL 100 M M
3.2 PI‐101/UNE‐EN 970/ EN
12062 VISUAL 100 M M C
3.3 A/PROCEDURE NoBo
/EN 571‐1 MT 100 M R C
3.4
A/PROCEDURE NoBo
/EN 1435/
EN
1714/EN
1713
RT 100 M R C
3.5 A/DRAWING/ISO 2768‐1
UNE‐EN 13445‐4 DIMENSIONAL 100 M R
4
4.1 A/DRAWING/ISO 2768‐1
UNE‐EN 13445‐4 DIMENSIONAL 100 H H C
4.2 HIDRAULIC TEST PED 97/23/CE 100 H H
4.3 A/DRAWING 100 R
4.4 PED 97/23/CE R C
4.5 1A5Y‐A1‐YM_‐IP‐IICEM‐9235 VISUAL 100 M C
4.6 1A5Y‐A1‐YM_‐IP‐IICEM‐9235 VISUAL 100 M
4.7 PO‐203 H C
5 1A5Y‐A1‐YM_‐IP‐IICEM‐9235 H H C
CLIENT
DATE:
SIGNATURE
EQUIPMENTS or COMPONENTS KKS AFFECTED BY THIS ITP:
DIMENSIONAL CONTROL AND LIMITS OF SUPPLY
IDENTIFICATION MARKING CONTROL
CE STAMP/ APPLICABLE REGULATION CONTROL
BLASTING AND PAINTING CONTROL
ITP DOCUMENT IDENTIFICATION (KKS):
SUPPLY DESCRIPTION: CONDENSER
REV. 00
Nº ITP: 15/346‐01
CONTROL OF PACKING FOR SHIPMENT
DOCUMENTATION CONTROL
MANUFACTURER SPECIFIC IPP
WELDERS AND NDT PERSONNEL QUALIFICATION
WELDING PROCEDURE QUALIFICATIONS
PROCEDURE FOR RT
FINAL INSPECTION
PROCEDURE FOR HYDRAULIC TEST
RECEPTION
OF
MATERIALS
BASE MATERIALS
FILLER AND OTHER MATERIALS
MANUFACTURING
CONTROL OF MATERIAL IDENTIFICATION
VISUAL INSPECTION OF WELDS
PT/MT WELDS INSPECTION
RT/UT WELDS
INSPECTION
DIMENSIONAL CONTROL OF TUBESHEET AND SUPPORT PLATES
CLIENT CERTIFICATE /
REPORT
INSPECTION POINT SIGNATURE
DESCRIPTION
BEFORE MANUFACTURING
Inspection
Points
keys
(I.P.):
D: DOC. FOR APPROVAL W: WITNESS POINT
PRIOR
TO
MANUFACT.
M:
RANDOM INSPECTION
R: DOCUMENT REVIEW H: HOLD POINT
Criterio aceptación s/ EN ISO 5817B
CAT. IV / MOD. G
NOTES
INSPECTION AND TEST PROGRAM (ITP)
GENERAL NOTES:
(1) Samples will cover all the welders involved
MANUF./SUPPLIER
DATE:
SIGNATURE
SHIPPING RELEASE
C: CERTIFICATE REQUIRED
ITEM
Nº
STANDARD / NORM /
PROCEDURE
INSPECTIONMANUF./SUPPLIER IBERDROLA IC
PROCEDURE FOR PT/MT
IBERDROLA IC
DATE:
SIGNATURE