Transcript of Presentation MSW Plant
-
8/11/2019 Presentation MSW Plant
1/30
-
8/11/2019 Presentation MSW Plant
2/30
WEALTH
FROMWASTE
-
8/11/2019 Presentation MSW Plant
3/30
UPL HAS ALWAYS MADE A CONSCIOUS
EFFORT IN MAINTAINING AND IMPROVING
STANDARDS OF ENVIRONMENT.
TO ENSURE SIGNIFICANT CONTRIBUTION
TOWARDS THIS UNIVERSAL GOAL, UPL
CONCEIVED & ESTABLISHED
UPL ENVIRONMENTAL
INFRASTRUCTURE GROUP
-
8/11/2019 Presentation MSW Plant
4/30
Meeting the Environmental
Challenge!Over the years, the UPL Group has developed insight & expertise in
following sub-sectors:
CETPsPlant at Jodhpur & Ankleshwar in the name of Enviro Technology
Ltd
Hazardous Waste Management TSDF
Plant at Ankleshwar by the name of BEIL, at Nalagarh by thename of SSWML at Kerla by the name of KEIL
Recycle and Reuse of Industrial Waste Water
At Vapi Recycle of Waste water from ETP GUJARAT HEAVY
CHEMICALS
Recycle and Reuse of Sewage STPs
Plant at Ludhiana for 100 MLD & 55 MLD Allotted to UPL group of Co.
Gharpure , At Haridwar with the capacity of 29 MLD. And at
PuneLavasa for 2.4 MLD .
Desalination Plants
-
8/11/2019 Presentation MSW Plant
5/30
Meeting the Environmental
Challenge!Over the years, the UPL Group has developed insight & expertise in
following sub-sectors:
Biomethanation from Industrial Effluent
At Reliance Inds. Patalganga Maharastra
Biomethanation from Organic Waste (MSW)
Plant at Ankleshwar ( 5 MT/day of Kitchen waste) gas
generation of 200 m3 / day Municipal Solid Waste Processing Disposal
Asia biggest site at Mumbai for 4500 MT / day alloted to UPL group
of Co.
Waste to EnergyAt Ahmedabad with the capacity of 600 TPD and At Jodhpur with the
capacity of 150 MT per Day
Integrated Waste Management (IWM)
Specialized Consultancy Projects
R D Development of Pilot Plants
-
8/11/2019 Presentation MSW Plant
6/30
-
8/11/2019 Presentation MSW Plant
7/30
-
8/11/2019 Presentation MSW Plant
8/30
WASTE TO ENERGY
Refuse DerivedFuel (RDF)
DJai Power Ltd.Executing
Waste to Energy Project atAhmedabad from 500
TPD MSW
-
8/11/2019 Presentation MSW Plant
9/30
MUNICIPAL SOLID WASTE PROCESSING & DISPOSAL
CIDCO, Maharashtra:
-Aerobic Composting (Windrow)- Treatment of 55 MT/day of MSW
- Capacity of Landfill : 15.5 years
- BOOT Project for 3 years
-
8/11/2019 Presentation MSW Plant
10/30
Pelletization
ERF - Fluff & PelletsProximate Analysis ofERF:
Moisture : 3 - 8 %
Ash Content : 12 - 20 %
Volatile Matter : 50 - 65%
Fixed Carbon : 12 - 18 %
Gross Calorific Value :3000 - 3500 Kcal/kg -Can be compared withE Grade Coal of SCCL
RDF F l i S f ll d i th f ll i t f B il /
-
8/11/2019 Presentation MSW Plant
11/30
Bio-methanisa
tion
Biogas
RDF Fuel is Successfully used in the following types of Boilers /
Furnaces
Textile Mills Boilers
Steel Re-Rolling furnaces
Pharmaceutical boilers
Process Industries
-
8/11/2019 Presentation MSW Plant
12/30
A TYPICAL LAYOUT OF WINDROW COMPOSTING FACILITY
AT JODHPUR
-
8/11/2019 Presentation MSW Plant
13/30
-
8/11/2019 Presentation MSW Plant
14/30
-
8/11/2019 Presentation MSW Plant
15/30
Gorai Dumping Ground - At Initial Stage
C i f Sh Pil
-
8/11/2019 Presentation MSW Plant
16/30
Construction of Sheet Pile
-
8/11/2019 Presentation MSW Plant
17/30
Receiving, Relocating, Leveling, Reformation and
Dressing of Existing MSW
-
8/11/2019 Presentation MSW Plant
18/30
Construction of
Gas Wells/ Dual
Wells
Laying ManifoldSystem for Leachate
and Gas Collection.
-
8/11/2019 Presentation MSW Plant
19/30
Laying of Liner System on Slopping Area
-
8/11/2019 Presentation MSW Plant
20/30
Laying of Liner System & Temporary Cover
Temporary
LDPE Cover forMonsoon
-
8/11/2019 Presentation MSW Plant
21/30
Supply and Installation of Gas
Flaring Station
C i f P h R d d B d W ll
-
8/11/2019 Presentation MSW Plant
22/30
Construction of Pathways, Road and Boundary Wall
-
8/11/2019 Presentation MSW Plant
23/30
-
8/11/2019 Presentation MSW Plant
24/30
-
8/11/2019 Presentation MSW Plant
25/30
Gorai Project - After Completion (model view)
-
8/11/2019 Presentation MSW Plant
26/30
CURRENT STATUS OF MSW
-
8/11/2019 Presentation MSW Plant
27/30
WORKING MODEL OF MSW PLANT
Waste Receivin Area
Manual Removal of Materials
Windrow Static Piles
Maturation
Pre arator Section
Curin Section
Refinement Section
FrontEnd Loader
Recyclables, Bulky Items, Cardboard, etc.
CONVE
YOR
SYSTEM
WindrowTurner
Usable Com ostRejects to
LandfillTractor Loader & Trolley
Duel Trommel /Screening Machine
Vibro-screens / Cyclone separator
MSW Processing & Composting Facility
-
8/11/2019 Presentation MSW Plant
28/30
MSW Processing & Composting Facility
-
8/11/2019 Presentation MSW Plant
29/30
Treatment Material Dosage
E solution Culture : 1 ltr./day
Jaggery : 2.5 kg/day
Saniol ( Deodorant) : 6 ltr./day
Flyex ( Fly/Mosquitoes Control) : 25
kg/day Herbal Liquid( Sanitizer) : 1 ltr/day
-
8/11/2019 Presentation MSW Plant
30/30
SHIVALIK SOLID WASTE
MANAGEMENT LTD.UPL
Group of Companies
Dedicated to Clean Environment