    A BODEGA REMOTA

    PRELIMINARES A01 100.00% 100.00%

    $2,047.74 $2,047.74

    TERRACERIAS A03 91.88% 8.12% 100.00%

    $62,029.81 $5,481.95 $67,511.76

    CIMENTACION A04 100.00% 100.00%

    $771,875.81 $771,875.81

    ESTRUCTURA A05 100.00% 100.00%

    $895,668.22 $895,668.22

     ALBAÑILERIA A06 30.42% 69.58% 100.00%

    $177,137.68 $405,168.97 $582,306.65

    ACUMULADO

    PORCENTAJE PERIODO

    PORCENTAJE ACUMULADO

    TOTAL DEL PRESUPUESTO $64,077.55 $777,357.76 $1,072,805.90 $405,168.97

    $64,077.55 $841,435.31 $1,914,241.21 $2,319,410.18

    2.76% 33.52% 46.25% 17.47%

    2.76% 36.28% 82.53% 100.00%

    GERENTES LOPEZ VAZQUEZ, GARCIA, BESAREZ GERENTES LOPEZ VAZQUEZ, GARCIA, BESAREZ

    LOPEZ VAZQUEZ, BESAREZ, GARCIA ONTIVEROS

    PROGRAMA DE EROGACIONES DE LA EJECUCION GENERAL

    Dependencia: UNIVERSIDAD DEL VALLE DE MEXICO

    CAMPUS TUXTLA

    Concurso No. UVM-TUX-0116-003

    Obra:

    Lugar: DIRECCION

    Ciudad:

    Partida

    DE LOS TRABAJOS

    Código

    CONSTRUCCION DE BODEGA REMOTA

    CIUDAD, ESTADO

    dePagina:

    30-jun-2016Fin Obra:

    01-mar-2016Inicio Obra:

    122 días naturalesDuración:

    2016/05/23Fecha:

    Mar-2016 Abr-2016 May-2016

    LOPEZ VAZQUEZ, BESAREZ, GARCIA ONTIVEROS

    PROGRAMA DE EROGACIONES DE LA EJECUCION GENERAL

    Dependencia: UNIVERSIDAD DEL VALLE DE MEXICO

    CAMPUS TUXTLA

    Concurso No. UVM-TUX-0116-003

    Obra:

    Lugar: DIRECCION

    Ciudad:

    DE LOS TRABAJOS

    CONSTRUCCION DE BODEGA REMOTA

    CIUDAD, ESTADO

    1 Pagina: 2

    30-jun-2016Fin Obra:

    01-mar-201Inicio Obra:

    122 días naDuración:

    2016/05/23Fecha:

    Jun-2016 Total