RECUPERACION LINEAS DE FLUJO AEREAS DE LOS POZOS SACHA 68, SACHA 124 Y SACHA 186. O.T.: 9074 REPORTE DIARIO DE AVANCE PROYECTO REVISION: FECHA: 3/14/2012 REPORTE No. ITEM DESCRIPCIÓN UNID. CANTIDAD AVANCE ANTERIOR AVANCE DIARIO AVANCE PROYECTO L.P.P CONSTRUCCIÒN C001 Recuperaciòn de tuberìas de lìneas reemplazadas diàmetros NPS (2", 4", 6" y 8") Mt 5,000.00 0.00 0.00 0.00 C002 Tanquero 2500 GAL dìa 8.00 0.00 0.00 0.00 AVANCE GLOBAL DEL PROYECTO PORCENTAJE RETRASO (-) Y/O ADELANTO (+) DE OBRA: PROGRAMADO VS. REAL CURVA DE CONTROL: PROGRAMADO VS. AVANCE REAL LISTADO DE PERSONAL Y EQUIPOS REPORTE DE PERSONAL No. H-H / DIA H-H /ANT. H-H ACUM REPORTE DE EQUIPO ESTADO CANTIDAD SUPERINTENDENTE 1 3 0 3 BRAZO HIDRAULICO OK 1 SUPERVISOR MECANICO 1 10 0 10 CAMION 3 TON OK 1 SOLDADOR SEGUNDA 1 10 0 10 CAMIONETA OK 1 ESMERILADOR 1 10 0 10 MOTOSOLDADORA OK 1 AYUDANTES 2 20 0 20 EQUIPO DE OXICORTE OK 1 OPERADOR EQUIPO PESADO 1 10 0 10 HERRAMIENTAS MECANICAS OK 1 AYUDANTE DE OPERADOR 1 10 0 10 GUARDIA 1 10 0 10 TOTAL HORAS LLUVIA HOY ANTERIOR MAÑANA 0 0 TARDE 0 0 0 TOTAL TOTAL PERSONAL (HORAS EFECTIVAS) 9 83 0 83 CHARLA DE SEGURIDAD ACTIVIDADES DIARIAS ACTIVIDADES PROGRAMADAS OBSERVACIONES COMENTARIOS CLIENTE REPORTE FOTOGRAFICO ELABORADO POR: REVISADO POR: APROBADO POR: SUPERVISOR QA/QC SUPERINTENDENTE OPERACIONES RIO NAPO FECHA: 14-Mar-12 FECHA: 14-Mar-12 FECHA: 14-Ma 1 4 - M a r 1 5 - M a r 1 6 - M a r 1 7 - M a r 1 8 - M a r 1 9 - M a r 2 0 - M a r 2 1 - M a r 2 2 - M a r 2 3 - M a r 2 4 - M a r 2 5 - M a r 2 6 - M a r 2 7 - M a r 2 8 - M a r 2 9 - M a r 3 0 - M a r 3 1 - M a r 1 - A p r 2 - A p r 3 - A p r 4 - A p r 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Transcript of RDO 01-01-2012 (1) mod

Page 1: RDO 01-01-2012 (1) mod

O.T.: 9074 REPORTE DIARIO DE AVANCE PROYECTO REVISION: 1FECHA: 3/14/2012 REPORTE No. 12

ITEM DESCRIPCIÓN UNID. CANTIDAD AVANCE DIARIO

L.P.P CONSTRUCCIÒNC001 Recuperaciòn de tuberìas de lìneas reemplazadas diàmetros NPS (2", 4", 6" y Mt 5,000.00 0.00 0.00 0.00 0.00%

C002 Tanquero 2500 GAL dìa 8.00 0.00 0.00 0.00 0.00%

AVANCE GLOBAL DEL PROYECTO 0.00%PORCENTAJE RETRASO (-) Y/O ADELANTO (+) DE OBRA: PROGRAMADO VS. REAL

CURVA DE CONTROL: PROGRAMADO VS. AVANCE REAL

LISTADO DE PERSONAL Y EQUIPOS

REPORTE DE PERSONAL No. H-H / DIA H-H /ANT.H-H ACUMREPORTE DE EQUIPO ESTADO CANTIDAD

SUPERINTENDENTE 1 3 0 3 BRAZO HIDRAULICO OK 1 10SUPERVISOR MECANICO 1 10 0 10 CAMION 3 TON OK 1 10SOLDADOR SEGUNDA 1 10 0 10 CAMIONETA OK 1 10ESMERILADOR 1 10 0 10 MOTOSOLDADORA OK 1 10AYUDANTES 2 20 0 20 EQUIPO DE OXICORTE OK 1 10OPERADOR EQUIPO PESADO 1 10 0 10 HERRAMIENTAS MECANICAS OK 1 10AYUDANTE DE OPERADOR 1 10 0 10GUARDIA 1 10 0 10

TOTAL 60

HORAS LLUVIA HOY ANTERIOR ACUMULADOMAÑANA 0 0 0

TARDE 0 0 00 TOTAL 0

TOTAL PERSONAL (HORAS EFECTIVAS) 9 83 0 83 CHARLA DE SEGURIDAD

ACTIVIDADES DIARIAS ACTIVIDADES PROGRAMADAS

OBSERVACIONES COMENTARIOS CLIENTE

REPORTE FOTOGRAFICO

ELABORADO POR: REVISADO POR: APROBADO POR:SUPERVISOR QA/QC SUPERINTENDENTE OPERACIONES RIO NAPO

FECHA: 14-Mar-12 FECHA: 14-Mar-12 FECHA: 14-Mar-12

RECUPERACION LINEAS DE FLUJO AEREAS DE LOS POZOS SACHA 68, SACHA 124 Y SACHA 186.

AVANCE ANTERIOR

AVANCE PROYECTO

AVANCE POR ACTIVIDAD

HORAS EFECTIVAS HOY

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar

30-Mar

31-Mar

1-Apr

2-Apr

3-Apr

4-Apr

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

REAL

EJECUTADO

Page 2: RDO 01-01-2012 (1) mod

O.T.: 9074 REPORTE DIARIO DE AVANCE PROYECTO REVISION: 1FECHA: 3/14/2012 REPORTE No. 12

ITEM DESCRIPCIÓN UNID. CANTIDAD AVANCE DIARIO

L.P.P CONSTRUCCIÒNC001 Recuperaciòn de tuberìas de lìneas reemplazadas diàmetros NPS (2", 4", 6" y Mt 5,000.00 0.00 0.00 0.00 0.00%

C002 Tanquero 2500 GAL dìa 8.00 0.00 0.00 0.00 0.00%

AVANCE GLOBAL DEL PROYECTO 0.00%PORCENTAJE RETRASO (-) Y/O ADELANTO (+) DE OBRA: PROGRAMADO VS. REAL

CURVA DE CONTROL: PROGRAMADO VS. AVANCE REAL

LISTADO DE PERSONAL Y EQUIPOS

REPORTE DE PERSONAL No. H-H / DIA H-H /ANT.H-H ACUMREPORTE DE EQUIPO ESTADO CANTIDAD

SUPERINTENDENTE 1 3 0 3 BRAZO HIDRAULICO OK 1 10SUPERVISOR MECANICO 1 10 0 10 CAMION 3 TON OK 1 10SOLDADOR SEGUNDA 1 10 0 10 CAMIONETA OK 1 10ESMERILADOR 1 10 0 10 MOTOSOLDADORA OK 1 10AYUDANTES 2 20 0 20 EQUIPO DE OXICORTE OK 1 10OPERADOR EQUIPO PESADO 1 10 0 10 HERRAMIENTAS MECANICAS OK 1 10AYUDANTE DE OPERADOR 1 10 0 10GUARDIA 1 10 0 10

TOTAL 60

HORAS LLUVIA HOY ANTERIOR ACUMULADOMAÑANA 0 0 0

TARDE 0 0 00 TOTAL 0

TOTAL PERSONAL (HORAS EFECTIVAS) 9 83 0 83 CHARLA DE SEGURIDAD

ACTIVIDADES DIARIAS ACTIVIDADES PROGRAMADAS

OBSERVACIONES COMENTARIOS CLIENTE

REPORTE FOTOGRAFICO

ELABORADO POR: REVISADO POR: APROBADO POR:SUPERVISOR QA/QC SUPERINTENDENTE OPERACIONES RIO NAPO

FECHA: 14-Mar-12 FECHA: 14-Mar-12 FECHA: 14-Mar-12

RECUPERACION LINEAS DE FLUJO AEREAS DE LOS POZOS SACHA 68, SACHA 124 Y SACHA 186.

AVANCE ANTERIOR

AVANCE PROYECTO

AVANCE POR ACTIVIDAD

HORAS EFECTIVAS HOY

14-Mar

15-Mar

16-Mar

17-Mar

18-Mar

19-Mar

20-Mar

21-Mar

22-Mar

23-Mar

24-Mar

25-Mar

26-Mar

27-Mar

28-Mar

29-Mar

30-Mar

31-Mar

1-Apr

2-Apr

3-Apr

4-Apr

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

REAL

EJECUTADO

Page 3: RDO 01-01-2012 (1) mod

PROGRAMACIÓN VS. AVANCE REAL1 2 3 4 5 6 7 8 9 10

FECHA 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar

AVANCE DIARIO 4.87% 4.87% 4.87% 4.87% 4.87% 4.87% 4.87% 4.87% 4.36% 4.36%

AVANCE ACUMULADO 4.87% 9.74% 14.60% 19.47% 24.34% 29.21% 34.07% 38.94% 43.30% 47.67%

EJECUTADO DIARIO

EJECUTADO ACUMULADO

14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Row 7

EJE-CU-TADO

Page 4: RDO 01-01-2012 (1) mod

PROGRAMACIÓN VS. AVANCE REAL11 12 13 14 15 16 17 18 19 20 21 22

24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr

4.36% 4.36% 4.36% 4.36% 4.36% 4.36% 4.36% 4.36% 4.36% 4.36% 4.36% 4.36%

52.03% 56.39% 60.75% 65.11% 69.47% 73.83% 78.19% 82.56% 86.92% 91.28% 95.64% 100.00%

14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Row 7

EJE-CU-TADO

Page 5: RDO 01-01-2012 (1) mod

14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Row 7

EJE-CU-TADO

Page 6: RDO 01-01-2012 (1) mod

OFERTA No. SEMEG-ORN-LPP-MEC-2012-06 CRONOGRAMA VALORADO DE OBRA

DISCIPLINA: MECANICA Mar-12 Apr-12

FECHA: JOYA DE LOS SACHAS, 01 DE MARZO DEL 2012

14-M

ar

15-M

ar

16-M

ar

17-M

ar

18-M

ar

19-M

ar

20-M

ar

21-M

ar

22-M

ar

23-M

ar

24-M

ar

25-M

ar

26-M

ar

27-M

ar

28-M

ar

29-M

ar

30-M

ar

31-M

ar

1-Ap

r

2-Ap

r

3-Ap

r

4-Ap

r

CLIENTE: ORN CEM

PROYECTO:RECUPERACION LINEAS DE FLUJO AEREAS DE LOS POZOS SACHA 68, SACHA 124 Y SACHA 186.

REV:. 1

ITEM L.P.P SERVICIO UNIDAD CANTIDAD VALOR IVA 0% SUBTOTAL IVA 0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

M043 Recuperaciòn de tuberìas de lìneas reemplazadas diàmetros NPS (2", 4", 6" y 8") Mt 5,000.00 12.30 61,500.00### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

EQ30 Tanquero 2500 GAL diario 8.00 324.73 2,597.84325 325 325 325 325 325 325 325

TOTAL IVA 0% $ 64,097.84

3,12

0.18

3,12

0.18

3,12

0.18

3,12

0.18

3,12

0.18

3,12

0.18

3,12

0.18

3,12

0.18

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

2,79

5.45

TIEMPO DE OBRA Y ENTREGA DEL DOSSIER DE CALIDAD: 22 DIAS

3,12

0.18

6,24

0.37

9,36

0.55

12,4

80.7

4

15,6

00.9

2

18,7

21.1

1

21,8

41.2

9

24,9

61.4

8

27,7

56.9

3

30,5

52.3

9

33,3

47.8

4

36,1

43.2

9

38,9

38.7

5

41,7

34.2

0

44,5

29.6

6

47,3

25.1

1

50,1

20.5

7

52,9

16.0

2

55,7

11.4

8

58,5

06.9

3

61,3

02.3

9

64,0

97.8

4

SEMEG CIA. LTDA. 4.87

%

4.87

%

4.87

%

4.87

%

4.87

%

4.87

%

4.87

%

4.87

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

4.36

%

FIRMA DEL OFERENTE

4.87

%

9.74

%

14.6

0%

19.4

7%

24.3

4%

29.2

1%

34.0

7%

38.9

4%

43.3

0%

47.6

7%

52.0

3%

56.3

9%

60.7

5%

65.1

1%

69.4

7%

73.8

3%

78.1

9%

82.5

6%

86.9

2%

91.2

8%

95.6

4%

100.

00%

Page 7: RDO 01-01-2012 (1) mod

OFERTA No. SEMEG-ORN-LPP-MEC-2012-06

DISCIPLINA: MECANICA

FECHA: JOYA DE LOS SACHAS, 01 DE MARZO DEL 2012

CLIENTE: ORN CEM

PROYECTO:RECUPERACION LINEAS DE FLUJO AEREAS DE LOS POZOS SACHA 68, SACHA 124 Y SACHA 186.

ITEM L.P.P SERVICIO

M043 Recuperaciòn de tuberìas de lìneas reemplazadas diàmetros NPS (2", 4", 6" y 8")

EQ30 Tanquero 2500 GAL

NOTAS: LA OFERTA CONSIDERA EXCLUSIVAMENTE LA RECUPERACION DE LAS LINEAS DE FLUJO AEREAS.

TIEMPO DE OBRA: 22 DIAS

SEMEG CIA. LTDA.FIRMA DEL OFERENTE

Page 8: RDO 01-01-2012 (1) mod

RECUPERACION LINEAS DE FLUJO AEREAS DE LOS POZOS SACHA 68, SACHA 124 Y SACHA 186.REV:.

SERVICIO UNIDAD CANTIDAD VALOR IVA 0%

Recuperaciòn de tuberìas de lìneas reemplazadas diàmetros NPS (2", 4", 6" y 8") Mt 5,000.00 12.30

dìa 8.00 324.73TOTAL IVA 0%

LA OFERTA CONSIDERA EXCLUSIVAMENTE LA RECUPERACION DE LAS LINEAS DE FLUJO AEREAS.

Page 9: RDO 01-01-2012 (1) mod

1

SUBTOTAL IVA 0%

61,500.00

2,597.84$ 64,097.84