Registro de Pozos M 612 Combinada

download Registro de Pozos M 612 Combinada

of 70

Transcript of Registro de Pozos M 612 Combinada

  • 7/23/2019 Registro de Pozos M 612 Combinada

    1/70CHUBUTUni

    ReCir

    Te

    RMFue

    RMRMRM

    LODOFu

    Pe

    De

    TipDiaFonFonUlti

    PriProProCor

    Fec

    Municipio: C P CP

  • 7/23/2019 Registro de Pozos M 612 Combinada

    2/70

    Latitud

    A

    RGENTINA

    @

    @

    @

    @ @ @ @

    Location

    Unit

    Number

    Time

    LoggerOnBottom

    Time

    Circ

    ulationStopped

    Max

    imumRecordedTemperatures

    RMF@MRT

    RM

    @MRT

    RMC

    Sou

    rceRMF

    RMC@MeasuredTemperature

    RMF@MeasuredTemperature

    RM

    @MeasuredTemperature

    SourceOfSamplePH

    FluidLoss

    Viscosity

    Density

    MUD TypeFluidInHole

    BitS

    ize

    Cas

    ingLogger

    Cas

    ingDrillerSize@Depth

    Top

    LogInterval

    Bott

    omLogInterval

    LoggerDepth

    Dep

    thDriller

    Run

    Number

    LoggingDate

    Y=2.596.081,42

    CAS

    YPF.Ch.M612

    YPF S.A.

    NIVELTERRENO

    Elev.:

    Elev.:

    584.92m

    Locacion:

    Pozo:

    Compania:

    LOCACION

    Latitud

    Lo

    ngitud

    Ref.Permanente:

    @

    @

    @ @ @ @

    CAS

    30

    64

    18:15

    9

    Dec2003

    10:00

    9

    Dec2003

    92

    92

    92

    degC

    92

    @

    0.850

    92

    @

    0.945

    PRENSA

    PR

    ENSA

    21degC

    @

    3.430ohm.m

    21degC

    @

    2.290ohm.m

    21degC

    @

    2.500ohm.m

    PO

    ZO

    9

    6.5cm3

    55s

    1.12g/cm3

    PH

    PA

    8.750in

    40

    2m

    400.1m

    @

    9.625in

    40

    2m

    25

    50.6m

    25

    53m

    25

    50m

    1 9

    Dec2003

    RMC

    PH

    584.92m

    590.62m

    590.42m

    NIVELTERRENO

    0.0

    m

    NIVELTERRENO

    A

    RGENTINA

    AR0100005567

    adNo.

    Locacion

    istroFondo

    ulacionFinal

    Hora

    Hora

    p.MaximaMedida

    @T.Fdo.

    [email protected].

    nte:RMF

    @Temp.

    @Temp.

    @Temp.

    nteMuestraDeLodo

    didas

    nsidad

    Viscosidad

    DeLodo

    etroTrepano

    doTuberiaRegistro

    doTuberiaPerforador

    aLectura

    eraLectura

    .Registro

    .Perforador

    ridaNo.

    ha

    AMP

    O:

    ZO:

    O

    B.V.

    N.T.

    M.R.

    sobrenivelref.

    Reg.MedidoDesd

    e:

    PerforacionMedidaDesde:

    Y=2.596.081,42

    CH

    UB

    U

    T

    MYB

    UR

    G

    YPF.Ch

    .M

    612

    YPF

    S.A

    .

    Equipo

    ROVIN

    CIA:

    X=4.940.045,77

    PAIS:

    AA26

    UWI:

    COMBINADA

    ESCALA:1

    /2

    00

    AITLDL

    CALI

    CNLBH

    RFT

    ST

  • 7/23/2019 Registro de Pozos M 612 Combinada

    3/70

    Depth Control Remarks

    Primera Carrera en el Pozo y Perfil de Referencia de Profundidad.

    Procedimiento Standard de Control de Profundidad de Schlumberger aplicado en esta Carrera.

    Estiramiento de Cable entre Perfil subiendo y bajando: 3.2 metros.

    "

    Trepano de 8 1/2" desde Fondo hasta 1726 metros.

    Maxima Desviacion del Pozo 4,5 grados @ 2316 metros provisto por el Cliente.

    Coordenadas Definitivas.

    Datos Adicionales de Lodo: Cl= 600 ppm, Ca= 60 ppm.

    Ultima Circulacion termino el dia 09/12/2003 a hrs 10:00.

    Esquema de Pozo segun Datos del Perforador.

    AIT y DSLT corrido desentralizado usando Standoff de 1,5".

    Herramienta corrida segun Diagrama.

    Primera Carrera en el Pozo y Perfil de Referencia de Profundidad.

    AA265: OS5:

    4: OS4:

    RFT3: OS3:

    ST2: OS2:

    AITLDLCALICNLBH1: OS1:

    LIMITACION DE RESPONSABILIDADLA UTILIZACION Y CONFIANZA EN LOS DATOS AQUI GRABADOS POR PARTE DE LA NOMBRADA COMPANIA (Y POR CUALQUIERADE SUS SUBSIDIARIAS, AFILIADAS, REPRESENTANTES, AGENTES, CONSULTORES Y EMPLEADOS) ESTA SUJETA A LOSTERMINOS Y CONDICIONES ACORDADOS ENTRE SCHLUMBERGER Y LA COMPANIA, INCLUYENDO: (a) RESTRICCIONES EN ELUSO DE LOS DATOS GRABADOS; (b) LIMITACION DE RESPONSABILIDAD Y REVOCACION DE GARANTIAS EN RELACION A LAUTILIZACION Y CONFIANZA EN LOS DATOS GRABADOS POR PARTE DE LA COMPANIA, Y (c) LA SOLA Y TOTALRESPONSABILIDAD DEL CLIENTE POR CUALQUIER INTERPRETACION HECHA O DECISION BASADA EN EL USO DE ESTOS DATOS.

    OTROS SERVICIOS # 2ROS SERVICIOS # 1

    SERVACIONES: CORRIDA # 1 OBSERVACIONES: CORRIDA # 2

    DEPTH SUMMARY LISTING

    Depth System Equipment

    Depth Control Parameters

    Date Created: 9DEC2003 20:4

    Depth Measuring Device

    pe: IDWB

    rial Number: 4858

    libration Date: 06Jun2003

    librator Serial Number: 5969

    libration Cable Type: 742PXS

    heel Correction 1: 6

    heel Correction 2: 6

    Tension Device

    Type: CMTDB/A

    Serial Number: 1686

    Calibration Date: 10Sep2003

    Calibrator Serial Number: 1028

    Calibration Gain: 0.86

    Calibration Offset: 319.00

    Logging Cable

    Type: 742PX

    Serial Number: 71269

    Length: 4720.13 M

    Conveyance Method: Wireline

    Rig Type: LAND

    g Sequence: First Log In the Well

    g Up Length At Surface: 72.30 M

    g Up Length At Bottom: 72.30 M

    g Up Length Correction: 0.00 M

    etch Correction: 3.20 M

    ol Zero Check At Surface: 0.20 M

    @

    @ @ @ @

  • 7/23/2019 Registro de Pozos M 612 Combinada

    4/70

    11.1LTC

    HK

    11.1

    12.1

    18.TBN

    C

    CMG

    FLT NT NT NW

    19.CHK

    H0

    7.1UH7.3US

    12.HRDHRDHRD

    13.HILT13.MC

    14.HRCC

    16.HGNS

    16.Neutr16.Neutr

    18.Gamm18.HM

    HGNS18.ToolS

    TelSt

    1.5

    1.5Stan

    0

    CORRIDA #1 CORRIDA #2

    hasta Caneria Guia.

    FPHI= SPHI desde Fondo hasta 1745 mts, FPHI= DPHZ desde 1745 mts

    Lecturas de LDL y CNL afectadas por mal Caliper.

    Lecturas de AIT afectadas a 2280 mts por Formacion muy Resistiva.

    LDL,BHC y CNL corrido desde Fondo hasta Caneria Guia.

    FNUM= 0.62, FEXP= 2.15 utilizado para el Calculo de Rwa.

    CNL corrido en Modo SANDSTONE..

    0 mVEL DEL LODO: NIVEL DEL LODO:11C0305RSION DEL PROGRAMA: VERSION DEL PROGRAMA:

    DEN DE SERVICIO: ORDEN DE SERVICIO:

    INTERVALO REGISTRADO INTERVALO REGISTRADOCOMIENZO COMIENZOFINAL FINAL

    DESCRIPCION DEL EQUIPOCORRIDA # 1 CORRIDA # 2

    DOWNHOLE

    19.CHK

    20.HQ

    18.ToolSTelSt

    19.CTE

    SURFACER

    BS

    WITM (

  • 7/23/2019 Registro de Pozos M 612 Combinada

    5/70

    Cota: 584.9

    Altura Mesa:

    Zapato @ 40

    AA

    asing 9

    Nivel RefereNivel Terr

    2.3 Lb/

    Schlumbe

    ALL LENGTHMEASUREMENTS R

    MAXIMUM STRIN

    4.8SR

    TOOL0.0Tens

    MudAccel

    HTEN HD

    0.0SP SE

    2.4Power

    TempInduc

    4.8DSLT

    5.9LS6.1LH6.2LSF

    .

    1.5Stan

    1.5Stan

    1.5Stan

    1.5Stan

    Stan

    YPF.Ch.M

  • 7/23/2019 Registro de Pozos M 612 Combinada

    6/70

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    Integrated Hole/Cement Volume Summary Hole Volume = 90.59 m3

    Cement Volume = 57.64 m3 (assuming 5.50 in casing O.D.)

    Computed from 2550.0 m to 400.2 m

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

    PIP SUMMARYIntegrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    MAXIS Field Log

    TRAMO PRINCIPAL

    Nivel M

    repano

    Trepano

    8 1/2" @

    8 3/4" @ 1726

    2550

  • 7/23/2019 Registro de Pozos M 612 Combinada

    7/70

    425

    400

    CHEQUEO DE CALIPER EN CASING: 9.01"

    ZAPATO @ 402 metros

    AITH 10 Inch Investigation (AHT10)

    (OHMM)0 10

    AITH 20 Inch Investigation (AHT20)(OHMM)0 10

    AITH 30 Inch Investigation (AHT30)(OHMM)0 10

    AITH 60 Inch Investigation (AHT60)(OHMM)0 10

    AITH 90 Inch Investigation (AHT90)(OHMM)0 10

    Bit Size (BS)

    (IN) 16

    Std. Res. Density Porosity (DPHZ

    (V/V)0.4

    Caliper (HCAL)(IN) 16

    Std. Res. Formation Pe (PEFZ)( 5

    RWA (RWA)(OHMM) 1

    StuckStretch(STIT)

    (M)0 20

    SP (SP)(MV) 20

    Sonic Porosity (SPHI)(V/V)0.4

    Env.Corr.Thermal Neutron Porosi(TNPH)

    (V/V)0.4

    Tension(TENS)

    (LBF)0 1000

    GasFrom DPHZ to TNPH

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

  • 7/23/2019 Registro de Pozos M 612 Combinada

    8/70

    475

    450

  • 7/23/2019 Registro de Pozos M 612 Combinada

    9/70

    TENS525

    TNPH

    SPHISP

    STIA

    RWASTIT

    PEFZ

    500

  • 7/23/2019 Registro de Pozos M 612 Combinada

    10/70

    575

    AHT10AHT20AHT30AHT60AHT90

    550

    BS

    DPHZ

    HCAL

  • 7/23/2019 Registro de Pozos M 612 Combinada

    11/70

    625

    600

  • 7/23/2019 Registro de Pozos M 612 Combinada

    12/70

    700

    675

    650

  • 7/23/2019 Registro de Pozos M 612 Combinada

    13/70

    750

    725

  • 7/23/2019 Registro de Pozos M 612 Combinada

    14/70

    800

    775

  • 7/23/2019 Registro de Pozos M 612 Combinada

    15/70

    850

    825

  • 7/23/2019 Registro de Pozos M 612 Combinada

    16/70

    925

    875

    900

  • 7/23/2019 Registro de Pozos M 612 Combinada

    17/70

    975

    950

  • 7/23/2019 Registro de Pozos M 612 Combinada

    18/70

    1025

    1000

  • 7/23/2019 Registro de Pozos M 612 Combinada

    19/70

    1075

    1050

  • 7/23/2019 Registro de Pozos M 612 Combinada

    20/70

    1125

    1150

    1100

  • 7/23/2019 Registro de Pozos M 612 Combinada

    21/70

    1200

    1175

  • 7/23/2019 Registro de Pozos M 612 Combinada

    22/70

    1250

    1225

  • 7/23/2019 Registro de Pozos M 612 Combinada

    23/70

    1300

    TNPHTENS

    SPHISP

    STITSTIA

    RWAPEFZ

    1275

  • 7/23/2019 Registro de Pozos M 612 Combinada

    24/70

    1350

    1375

    AHT10AHT20AHT30

    AHT60AHT90

    BS

    DPHZ

    1325

    HCAL

  • 7/23/2019 Registro de Pozos M 612 Combinada

    25/70

    1425

    1400

  • 7/23/2019 Registro de Pozos M 612 Combinada

    26/70

    1475

    1450

  • 7/23/2019 Registro de Pozos M 612 Combinada

    27/70

    1525

    1500

  • 7/23/2019 Registro de Pozos M 612 Combinada

    28/70

    1575

    1550

  • 7/23/2019 Registro de Pozos M 612 Combinada

    29/70

    1650

    1600

    1625

  • 7/23/2019 Registro de Pozos M 612 Combinada

    30/70

    1700

    1675

  • 7/23/2019 Registro de Pozos M 612 Combinada

    31/70

    1750

    1725

  • 7/23/2019 Registro de Pozos M 612 Combinada

    32/70

    1800

    1775

  • 7/23/2019 Registro de Pozos M 612 Combinada

    33/70

    1850

    1875

    1825

    1850

  • 7/23/2019 Registro de Pozos M 612 Combinada

    34/70

    1925

    1900

  • 7/23/2019 Registro de Pozos M 612 Combinada

    35/70

    AHT10AHT20

    AHT30AHT60

    AHT90

    1975

    BS

    DPHZ

    HCAL

    1950

    TNPHTENS

    SPHI

    STITSTIASP

    RWAPEFZ

  • 7/23/2019 Registro de Pozos M 612 Combinada

    36/70

    2025

    2000

  • 7/23/2019 Registro de Pozos M 612 Combinada

    37/70

    2100

    2075

    2050

  • 7/23/2019 Registro de Pozos M 612 Combinada

    38/70

    2150

    2125

  • 7/23/2019 Registro de Pozos M 612 Combinada

    39/70

    2200

    2175

  • 7/23/2019 Registro de Pozos M 612 Combinada

    40/70

    2250

    2225

  • 7/23/2019 Registro de Pozos M 612 Combinada

    41/70

    2300

    2325

    2275

  • 7/23/2019 Registro de Pozos M 612 Combinada

    42/70

    AHT10AHT20

    AHT30AHT60

    2375 AHT90

    BS

    DPHZ

    HCAL

    PEFZRWA

    STITSTIA

    SPSPHISPHI

    TENSTNPH

    2350

  • 7/23/2019 Registro de Pozos M 612 Combinada

    43/70

    2425

    2400

  • 7/23/2019 Registro de Pozos M 612 Combinada

    44/70

    2475

    2450

  • 7/23/2019 Registro de Pozos M 612 Combinada

    45/70

    2525

    2500

  • 7/23/2019 Registro de Pozos M 612 Combinada

    46/70

    Parameters

    DLIS Name Description ValueHAITH: Array Induction Tool H

    AHBHM Array Induction Borehole Correction Mode 2_COMPUTESTANDOFFAHBHV Array Induction Borehole Correction Code Version Number 880AHBLM Array Induction Basic Logs Mode 6_ONE_TWO_AND_FOURAHBLV Array Induction Basic Logs Code Version Number 108

    AHCDE Array Induction Casing Detection Enable YESAHCEN Array Induction Tool Centering Flag (in Borehole) ECCENTEREDAHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21AHMRF Array Induction Mud Resistivity Factor 1.000AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21AHRFV Array Induction Radial Profiling Code Version Number 700AHRPV Array Induction Radial Parametrization Code Version Number 223AHSAP Array Induction Suspend Answer Product Processing 0_NOSUSPENSIONAHSTA Array Induction Tool Standoff 1.500 inAHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21ARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90BHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCFEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source DPHZGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMF

    CAVERNAFrom BS to HCAL

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

    AITH 10 Inch Investigation (AHT10)(OHMM)0 10

    AITH 20 Inch Investigation (AHT20)(OHMM)0 10

    AITH 30 Inch Investigation (AHT30)(OHMM)0 10

    AITH 60 Inch Investigation (AHT60)

    (OHMM)0 10

    AITH 90 Inch Investigation (AHT90)(OHMM)0 10

    Bit Size (BS)(IN) 16

    Std. Res. Density Porosity (DPHZ(V/V)0.4

    Caliper (HCAL)(IN) 16

    Std. Res. Formation Pe (PEFZ)( 5

    RWA (RWA)

    (OHMM) 1

    StuckStretch(STIT)

    (M)0 20

    SP (SP)(MV) 20

    Sonic Porosity (SPHI)(V/V)0.4

    Env.Corr.Thermal Neutron Porosi(TNPH)

    (V/V)0.4

    Tension

    (TENS)(LBF)

    0 1000

    GasFrom DPHZ to TNPH

    REVOQUEFrom HCAL to BS

    CAVERNA

    2550

    FONDO @ 2553 metros

  • 7/23/2019 Registro de Pozos M 612 Combinada

    47/70

    mat: COMBINADA Vertical Scale: 1:200 Graphics File Created: 09Dec2003 21:2

    SOCN Standoff Distance 0.125 inSOCO Standoff Correction Option YES

    ALLRES: Basic Resistivity TransformsARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90RTCO RTCO Rt Invasion Correction YES

    RWA: Apparent Water ResistivityARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90FEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source DPHZRTCO RTCO Rt Invasion Correction YES

    HOLEV: Integrated Hole/Cement VolumeBHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPMATR Rock Matrix for Neutron Porosity Corrections SANDSHT Surface Hole Temperature 27.000 degC

    STI: Stuck Tool IndicatorSTKT STI Stuck Threshold 0.762 m

    TDD Total Depth Driller 2550.0 mTDL Total Depth Logger 2553.0 mSystem and Miscellaneous

    BS Bit Size 8.750 inBSAL Borehole Salinity 660.0 ppmCSIZ Current Casing Size 9.625 inCWEI Casing Weight 32.300 lbm/ftDFD Drilling Fluid Density 1.120 g/cm3FSAL Formation SalinityMST Mud Sample Temperature 21.400 degCRMFS Resistivity of Mud Filtrate Sample 2.290 ohm.mRW Resistivity of Connate Water 1.000 ohm.mTD Total Depth 2550.0 mTWS Temperature of Connate Water Sample 37.778 degC

    OP System Version: 11C0305MCM

    MATR Rock Matrix for Neutron Porosity Corrections SANDRTCO RTCO Rt Invasion Correction YESSHT Surface Hole Temperature 27.000 degCSPDR SP Drift 0.010 mV/mSPNV SP Next Value 30.000 mV

    DSLTFTB: Digitizing Sonic Logging ToolCDTS CDeltaT Shale 100.0 us/ftDTF DeltaT Fluid 189.0 us/ftDTM DeltaT Matrix 56.000 us/ftSPFS Sonic Porosity Formula RHSPSO Sonic Porosity Source DT

    HILTBFTB: High resolution Integrated Logging ToolDTBHFL Borehole Fluid Type WATERBHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degC

    BSCO Borehole Salinity Correction Option YESCCCO Casing & Cement Thickness Correction Option NODHC Density Hole Correction BSFD Fluid Density 1.000 g/cm3FEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source DPHZFSCO Formation Salinity Correction Option NOGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPHSCO Hole Size Correction Option YESMATR Rock Matrix for Neutron Porosity Corrections SANDMCCO Mud Cake Correction Option YES

    MCOR Mud Correction NATUMDEN Matrix Density 2.650 g/cm3MWCO Mud Weight Correction Option YESNAAC HRDD APS Activation Correction OFFNMT HILT Nuclear Mud Type NOBARITENPRM HRDD Processing Mode STDRESNSAR HRDD Depth Sampling Rate 1.000 inPTCO Pressure/Temperature Correction Option YESSDAT Standoff Data Source SOCNSHT Surface Hole Temperature 27.000 degCSOCN Standoff Distance 0.125 inSOCO Standoff Correction Option YES

  • 7/23/2019 Registro de Pozos M 612 Combinada

    48/70

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    AITH 10 Inch Investigation (AHT10)

    AITH 20 Inch Investigation (AHT20)(OHMM)0 10

    AITH 30 Inch Investigation (AHT30)(OHMM)0 10

    AITH 60 Inch Investigation (AHT60)(OHMM)0 10

    AITH 90 Inch Investigation (AHT90)(OHMM)0 10

    Bit Size (BS) Std. Res. Density Porosity (DPHZ

    Caliper (HCAL)(IN) 16

    Std. Res. Formation Pe (PEFZ)( 5

    RWA (RWA)(OHMM) 1

    StuckStretch(STIT)

    (M)0 20

    SP (SP)(MV) 20

    Sonic Porosity (SPHI)(V/V)0.4

    Env.Corr.Thermal Neutron Porosi(TNPH)

    (V/V)0.4

    Tension(TENS)

    GasFrom DPHZ to TNPH

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    PIP SUMMARYIntegrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

    Integrated Hole/Cement Volume Summary Hole Volume = 4.00 m3

    Cement Volume = 2.24 m3 (assuming 5.50 in casing O.D.)

    Computed from 2534.8 m to 2438.5 m

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_017LUP FN:20 PRODUCER 09Dec2003 18:11 2564.0 M 2384.5 M

    FAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    OP System Version: 11C0305

    MAXIS Field Log

    TRAMO REPETIDO

  • 7/23/2019 Registro de Pozos M 612 Combinada

    49/70STITSTIA

    SPSPHI

    TNPHTENS

    2475

    .0 1000

    2450

  • 7/23/2019 Registro de Pozos M 612 Combinada

    50/70

    AITH 10 Inch Investigation (AHT10)

    (OHMM)0 10

    AITH 20 Inch Investigation (AHT20)(OHMM)0 10

    AITH 30 Inch Investigation (AHT30)(OHMM)0 10

    AITH 60 Inch Investigation (AHT60)(OHMM)0 10

    AITH 90 Inch Investigation (AHT90)OHMM0 10

    Bit Size (BS)

    (IN) 16

    Std. Res. Density Porosity (DPHZ

    (V/V)0.4

    Caliper (HCAL)(IN) 16

    Std. Res. Formation Pe (PEFZ)( 5

    RWA (RWA)(OHMM) 1

    StuckStretch(STIT)

    (M)0 20

    SP (SP)MV 20

    Sonic Porosity (SPHI)(V/V)0.4

    Env.Corr.Thermal Neutron Porosi(TNPH)

    (V/V)0.4

    Tension(TENS)

    (LBF)0 1000

    GasFrom DPHZ to TNPH

    FR_TNPH

    2525

    AHT10

    AHT20AHT30

    AHT60AHT90

    BS

    DPHZ

    HCAL 2500

    PEFZ

  • 7/23/2019 Registro de Pozos M 612 Combinada

    51/70

    FEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source SPHIGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMF

    GTSE Generalized Temperature Selection TEMPMATR Rock Matrix for Neutron Porosity Corrections SANDRTCO RTCO Rt Invasion Correction YESSHT Surface Hole Temperature 27.000 degCSPDR SP Drift 0.000 mV/mSPNV SP Next Value 0.000 mV

    DSLTFTB: Digitizing Sonic Logging ToolCDTS CDeltaT Shale 100.0 us/ftDO Depth Offset 2.8 mDTF DeltaT Fluid 189.0 us/ftDTM DeltaT Matrix 56.000 us/ftSPFS Sonic Porosity Formula RHSPSO Sonic Porosity Source DT

    HILTBFTB: High resolution Integrated Logging ToolDTBHFL Borehole Fluid Type WATERBHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCBSCO Borehole Salinity Correction Option YESCCCO Casing & Cement Thickness Correction Option NODHC Density Hole Correction BSDO Depth Offset 2.8 mFD Fluid Density 1.000 g/cm3FEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source SPHIFSCO Formation Salinity Correction Option NOGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPHSCO Hole Size Correction Option YESMATR Rock Matrix for Neutron Porosity Corrections SAND

    MCCO Mud Cake Correction Option YESMCOR Mud Correction NATUMDEN Matrix Density 2.650 g/cm3

    Parameters

    DLIS Name Description ValueHAITH: Array Induction Tool H

    AHBHM Array Induction Borehole Correction Mode 2_COMPUTESTANDOFFAHBHV Array Induction Borehole Correction Code Version Number 880AHBLM Array Induction Basic Logs Mode 6_ONE_TWO_AND_FOURAHBLV Array Induction Basic Logs Code Version Number 108AHCDE Array Induction Casing Detection Enable YESAHCEN Array Induction Tool Centering Flag (in Borehole) ECCENTEREDAHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21AHMRF Array Induction Mud Resistivity Factor 1.000AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21

    AHRFV Array Induction Radial Profiling Code Version Number 700AHRPV Array Induction Radial Parametrization Code Version Number 223AHSAP Array Induction Suspend Answer Product Processing 0_NOSUSPENSIONAHSTA Array Induction Tool Standoff 1.500 inAHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21ARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90BHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCDO Depth Offset 2.8 mFEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

  • 7/23/2019 Registro de Pozos M 612 Combinada

    52/70

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_017LUP FN:20 PRODUCER 09Dec2003 18:11 2564.0 M 2384.5 M

    FAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    mat: COMBINADA Vertical Scale: 1:200 Graphics File Created: 09Dec2003 21:5

    CSIZ Current Casing Size 9.625 inCWEI Casing Weight 32.300 lbm/ftDFD Drilling Fluid Density 1.120 g/cm3DO Depth Offset 2.8 mFSAL Formation SalinityMST Mud Sample Temperature 21.400 degCRMFS Resistivity of Mud Filtrate Sample 2.290 ohm.m

    RW Resistivity of Connate Water 1.000 ohm.mTD Total Depth 2550.0 mTWS Temperature of Connate Water Sample 37.778 degC

    MAXIS Field Log

    ANALISIS DE REPETIBILIDAD

    NAAC HRDD APS Activation Correction OFFNMT HILT Nuclear Mud Type NOBARITENPRM HRDD Processing Mode STDRESNSAR HRDD Depth Sampling Rate 1.000 inPTCO Pressure/Temperature Correction Option YESSDAT Standoff Data Source SOCNSHT Surface Hole Temperature 27.000 degCSOCN Standoff Distance 0.125 inSOCO Standoff Correction Option YES

    DTCH: DTS Telemetry ToolDO Depth Offset 2.8 m

    ALLRES: Basic Resistivity TransformsARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90DO Depth Offset 2.8 mRTCO RTCO Rt Invasion Correction YES

    RWA: Apparent Water ResistivityARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90DO Depth Offset 2.8 mFEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source SPHIRTCO RTCO Rt Invasion Correction YES

    HOLEV: Integrated Hole/Cement VolumeBHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCDO Depth Offset 2.8 mGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPMATR Rock Matrix for Neutron Porosity Corrections SANDSHT Surface Hole Temperature 27.000 degC

    STI: Stuck Tool IndicatorDO Depth Offset 2.8 mSTKT STI Stuck Threshold 0.762 mTDD Total Depth Driller 2550.0 mTDL Total Depth Logger 2552.0 m

    System and MiscellaneousBS Bit Size 8.500 inBSAL Borehole Salinity 660.0 ppmCSIZ Current Casing Size 9.625 inCWEI Casing Weight 32.300 lbm/ft

  • 7/23/2019 Registro de Pozos M 612 Combinada

    53/70

    AHT10_REP Curve (AHT10_REP)(OHMM)0 10

    AHT90_REP Curve (AHT90_REP)(OHMM)0 10

    BS_REP Curve (BS_REP)(IN) 16

    DPHZ_REP Curve (DPHZ_REP)(V/V)0.4

    HCAL_REP Curve (HCAL_REP)(IN) 16

    PEFZ_REP Curve (PEFZ_REP)( 5

    RWA_REP Curve (RWA_REP)

    (OHMM) 1

    SP_REP Curve (SP_REP)(MV) 20

    SPHI_REP Curve (SPHI_REP)(V/V)0.4

    TNPH_REP Curve (TNPH_REP)(V/V)0.4

    TENS_REPCurve(TENS_

    REP)(LBF)

    0 1000

    Gas

    From DPHZ to TNPH

    From HCAL to BS

    BSBS_REP2450

    DPHZ

    DPHZ_REP

    HCAL

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    Integrated Hole/Cement Volume Summary Hole Volume = 4.00 m3

    Cement Volume = 2.24 m3 (assuming 5.50 in casing O.D.) Computed from 2534.8 m to 2438.5 m

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_017LUP FN:20 PRODUCER 09Dec2003 18:11 2564.0 M 2384.5 M

    FAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

    Output DLIS FilesHAIT .050 FN:39 09Dec2003 21:56 2535.0 M 2435.6 M

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3Time Mark Every 60 S

  • 7/23/2019 Registro de Pozos M 612 Combinada

    54/70

    2500

    2475

    AHT10

    AHT90

    AHT90_REP

    AHT10_REP

  • 7/23/2019 Registro de Pozos M 612 Combinada

    55/70

    Parameters

    DLIS Name Description Value

    AHT10_REP Curve (AHT10_REP)(OHMM)0 10

    AHT90_REP Curve (AHT90_REP)(OHMM)0 10

    BS_REP Curve (BS_REP)(IN) 16

    DPHZ_REP Curve (DPHZ_REP)(V/V)0.4

    HCAL_REP Curve (HCAL_REP)(IN) 16

    PEFZ_REP Curve (PEFZ_REP)( 5

    RWA_REP Curve (RWA_REP)(OHMM) 1

    SP_REP Curve (SP_REP)(MV) 20

    SPHI_REP Curve (SPHI_REP)(V/V)0.4

    TNPH_REP Curve (TNPH_REP)(V/V)0.4

    Curve(TENS_

    REP)(LBF)

    0 1000

    GasFrom DPHZ to TNPH

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

    TENS_REPCurve

    2525

  • 7/23/2019 Registro de Pozos M 612 Combinada

    56/70

    BHT Bottom Hole Temperature (used in calculations) 92.000 degCBSCO Borehole Salinity Correction Option YESCCCO Casing & Cement Thickness Correction Option NODHC Density Hole Correction BSDO Depth Offset 2.8 mFD Fluid Density 1.000 g/cm3FEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source SPHIFSCO Formation Salinity Correction Option NOGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPHSCO Hole Size Correction Option YESMATR Rock Matrix for Neutron Porosity Corrections SANDMCCO Mud Cake Correction Option YESMCOR Mud Correction NATUMDEN Matrix Density 2.650 g/cm3MWCO Mud Weight Correction Option YESNAAC HRDD APS Activation Correction OFFNMT HILT Nuclear Mud Type NOBARITE

    NPRM HRDD Processing Mode STDRESNSAR HRDD Depth Sampling Rate 1.000 inPTCO Pressure/Temperature Correction Option YESSDAT Standoff Data Source SOCNSHT Surface Hole Temperature 27.000 degCSOCN Standoff Distance 0.125 inSOCO Standoff Correction Option YES

    DTCH: DTS Telemetry ToolDO Depth Offset 2.8 m

    ALLRES: Basic Resistivity TransformsARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90DO Depth Offset 2.8 mRTCO RTCO Rt Invasion Correction YES

    RWA: Apparent Water ResistivityARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90DO Depth Offset 2.8 m

    FEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source SPHIRTCO RTCO Rt Invasion Correction YES

    : rray n uc on oo AHBHM Array Induction Borehole Correction Mode 2_COMPUTESTANDOFFAHBHV Array Induction Borehole Correction Code Version Number 880AHBLM Array Induction Basic Logs Mode 6_ONE_TWO_AND_FOURAHBLV Array Induction Basic Logs Code Version Number 108AHCDE Array Induction Casing Detection Enable YESAHCEN Array Induction Tool Centering Flag (in Borehole) ECCENTEREDAHFRSV Array Induction Response Set Version for Four ft Resolution 40.70.24.21AHMRF Array Induction Mud Resistivity Factor 1.000AHORSV Array Induction Response Set Version for One ft Resolution 40.70.24.21AHRFV Array Induction Radial Profiling Code Version Number 700AHRPV Array Induction Radial Parametrization Code Version Number 223AHSAP Array Induction Suspend Answer Product Processing 0_NOSUSPENSIONAHSTA Array Induction Tool Standoff 1.500 inAHTRSV Array Induction Response Set Version for Two ft Resolution 40.70.24.21ARTS AIT Rt Selection (for ALLRES computation) AITH_TWORESA90

    BHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCDO Depth Offset 2.8 mFEXP Form Factor Exponent 2.150FNUM Form Factor Numerator 0.620FPHI Form Factor Porosity Source SPHIGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPMATR Rock Matrix for Neutron Porosity Corrections SANDRTCO RTCO Rt Invasion Correction YESSHT Surface Hole Temperature 27.000 degCSPDR SP Drift 0.000 mV/mSPNV SP Next Value 0.000 mV

    DSLTFTB: Digitizing Sonic Logging ToolCDTS CDeltaT Shale 100.0 us/ftDO Depth Offset 2.8 mDTF DeltaT Fluid 189.0 us/ftDTM DeltaT Matrix 56.000 us/ftSPFS Sonic Porosity Formula RHSPSO Sonic Porosity Source DT

    HILTBFTB: High resolution Integrated Logging ToolDTBHFL Borehole Fluid Type WATERBHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCBSCO Borehole Salinity Correction Option YES

  • 7/23/2019 Registro de Pozos M 612 Combinada

    57/70

    Integrated Hole/Cement Volume Summary Hole Volume = 3.38 M3

    Cement Volume = 2.53 M3 (assuming 5.50 IN casing O.D.)

    Computed from 455.4 M to 400.2 M using data channel(s) HCAL

    Output DLIS FilesFAULT AIT_SONIC_TLD_MCFL_015LUP FN:16 PRODUCER 09Dec2003 16:57 455.4 M 394.2 M

    FAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

    Output DLIS FilesHAIT .050 FN:39 09Dec2003 21:56

    OP System Version: 11C0305MCM

    TH 11C0305 DSLTFTB OP11KP1

    MAXIS Field Log

    CHEQUEO EN CAERIA

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    mat: COMBINADA_REP Vertical Scale: 1:200 Graphics File Created: 09Dec2003 21:5

    HOLEV: Integrated Hole/Cement VolumeBHS Borehole Status OPENBHT Bottom Hole Temperature (used in calculations) 92.000 degCDO Depth Offset 2.8 mGCSE Generalized Caliper Selection HCALGDEV Average Angular Deviation of Borehole from Normal 0.000 degGGRD Geothermal Gradient 0.018 degC/mGRSE Generalized Mud Resistivity Selection AHMFGTSE Generalized Temperature Selection TEMPMATR Rock Matrix for Neutron Porosity Corrections SANDSHT Surface Hole Temperature 27.000 degC

    STI: Stuck Tool IndicatorDO Depth Offset 2.8 mTDL Total Depth Logger 2552.0 m

    System and MiscellaneousBS Bit Size 8.500 inBSAL Borehole Salinity 660.0 ppmCSIZ Current Casing Size 9.625 inCWEI Casing Weight 32.300 lbm/ftDFD Drilling Fluid Density 1.120 g/cm3DO Depth Offset 2.8 mFSAL Formation SalinityMST Mud Sample Temperature 21.400 degCRMFS Resistivity of Mud Filtrate Sample 2.290 ohm.mRW Resistivity of Connate Water 1.000 ohm.mTD Total Depth 2550.0 mTWS Temperature of Connate Water Sample 37.778 degC

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_017LUP FN:20 PRODUCER 09Dec2003 18:11 2564.0 M 2384.5 M

    FAULT AIT_SONIC_TLD_MCFL_033PUP FN:31 PRODUCER 09Dec2003 21:07 2558.5 M 392.0 M

  • 7/23/2019 Registro de Pozos M 612 Combinada

    58/70425

    400

    Changed Parameter Summary

    DLIS Name New Value Previous Value Depth & TimeBS 8.750 IN 8.750 IN 455.4 16:57:57

    Bit Size (BS)(IN) 16

    Caliper (HCAL)(IN) 16

    SP (SP)(MV) 20

    Tension(TENS)(LBF)

    0 1000

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

    CHEQUEO DE CALIPER EN CASING: 9.01"

  • 7/23/2019 Registro de Pozos M 612 Combinada

    59/70

    Parameters

    DLIS Name Description ValueHAITH: Array Induction Tool H

    SPNV SP Next Value 0 MVHOLEV: Integrated Hole/Cement Volume

    FCD Future Casing (Outer) Diameter 5.5 INHVCS Integrated Hole Volume Caliper Selection HCAL

    System and Miscellaneous

    Bit Size (BS)(IN) 16

    Caliper (HCAL)(IN) 16

    SP (SP)(MV) 20

    Tension(TENS)(LBF)

    0 1000

    REVOQUEFrom HCAL to BS

    CAVERNAFrom BS to HCAL

    PIP SUMMARYIntegrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

    450

  • 7/23/2019 Registro de Pozos M 612 Combinada

    60/70

    Bit Size (BS)

    (IN) 16

    DeltaT (DT)

    (US/F)150

    Caliper (HCAL)(IN) 16

    Tension(TENS)

    (LBF)0 1000

    250

    CHEQUEO DE SONICO EN CANERIA: 57 uSec/f

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_027LUP FN:24 PRODUCER 09Dec2003 20:34 365.8 M 196.5 M

    Output DLIS FilesFAULT AIT_SONIC_TLD_MCFL_015LUP FN:16 PRODUCER 09Dec2003 16:57

    OP System Version: 11C0305MCM

    TH 11C0305 DSLTFTB OP11KP1TBFTB 11C0305 DTCH 11C0305

    mat: CALI_CHECK Vertical Scale: 1:200 Graphics File Created: 09Dec2003 16:5

    .TD Total Depth 2550 M

    Caliper (HCAL)

    SP (SP)(MV) 20

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

  • 7/23/2019 Registro de Pozos M 612 Combinada

    61/70

    OP System Version: 11C0305MCM

    T 11C0305 DSLTBB OP11KP1TD 11C0305 DTCH 11C0305

    mat: CALI_CHECK Vertical Scale: 1:200 Graphics File Created: 09Dec2003 23:0

    Parameters

    DLIS Name Description ValueHAITH: Array Induction Tool H

    SPDR SP Drift 0.000 mV/mSPNV SP Next Value 0.000 mV

    DSLTFTB: Digitizing Sonic Logging ToolDDEL Digitizing Delay 200 usDIVL DSLT Depth Sampling Interval 20DRCS DSLT DLIS Recording Size 100DSIN Digitizing Sample Interval 10DTFS DSLC Telemetry Frame Size 236DWCO Digitizing Word Count 100GAI Manual Gain 40MAHTR Manual High Threshold Reference 140MGAI Maximum Gain 60MNHTR Minimum High Threshold Reference 120NMSG Near Minimum Sliding Gate 280 usNMXG Near Maximum Sliding Gate 750 usRATE Firing Rate R15SFAF Sonic Formation Attenuation Factor 0 dB/mSGCL Sliding Gate Closing DeltaT 250 us/ftSGDT Sliding Gate DeltaT 65 us/ftSGW Sliding Gate Width 80 usSLEV Signal Level for AGC 5000WMOD Waveform Firing Mode FULL

    System and MiscellaneousBS Bit Size 8.750 in

    Integrated Cement Volume Major Pip Every 1 M3Time Mark Every 60 S

    Bit Size (BS)(IN) 16

    DeltaT (DT)(US/F)150

    Caliper (HCAL)(IN) 16

    SP (SP)(MV) 20

    Tension(TENS)(LBF)

    0 1000

    PIP SUMMARY

    Integrated Hole Volume Minor Pip Every 0.1 M3Integrated Hole Volume Major Pip Every 1 M3

    Integrated Cement Volume Minor Pip Every 0.1 M3Integrated Cement Volume Major Pip Every 1 M3

    Time Mark Every 60 S

    275

  • 7/23/2019 Registro de Pozos M 612 Combinada

    62/70

    Phase 7 0 0.2244 N/A N/A N/A N/A DEGPhase 6 0 0.06097 N/A N/A N/A N/A DEGPhase 5 0 0.1703 N/A N/A N/A N/A DEGPhase 4 0 0.03806 N/A N/A N/A N/A DEGPhase 3 0 0.01548 N/A N/A N/A N/A DEGPhase 2 0 0.01098 N/A N/A N/A N/A DEGPhase 1 0 0.5171 N/A N/A N/A N/A DEGPhase 0 0 0.4998 N/A N/A N/A N/A DEGTest Loop Gain Magnitude 7 0 1.030 N/A N/A N/A N/A VTest Loop Gain Magnitude 6 0 1.008 N/A N/A N/A N/A V

    Test Loop Gain Magnitude 5 0 0.9995 N/A N/A N/A N/A VTest Loop Gain Magnitude 4 0 1.003 N/A N/A N/A N/A VTest Loop Gain Magnitude 3 0 1.023 N/A N/A N/A N/A VTest Loop Gain Magnitude 2 0 1.020 N/A N/A N/A N/A VTest Loop Gain Magnitude 1 0 1.018 N/A N/A N/A N/A VTest Loop Gain Magnitude 0 0 1.018 N/A N/A N/A N/A Vter: 16Oct2003 16:15y Induction Tool H Wellsite Calibration Test Loop Gain Correction

    Array Induction Temperature Ze 0 0.0002728 0.0002662 0.0002874 0.00002117 N/A VArray Induction Temperature Pl 0.9150 0.9204 0.9204 0.9218 0.001379 N/A VArray Induction SPA Zero 0 0.2783 0.2735 0.2892 0.01573 N/A MVArray Induction SPA Plus 990.5 993.4 993.4 994.9 1.481 N/A MVter: 16Oct2003 16:15 Before: 9Dec2003 16:41 After: 9Dec2003 20:41y Induction Tool H Wellsite Calibration Electronics Calibration Check Auxilliary

    Phase 7 0 46.02 46.03 42.16 3.872 N/A DEGPhase 6 0 49.62 49.70 46.46 3.235 N/A DEGPhase 5 0 49.56 49.63 46.40 3.232 N/A DEGPhase 4 0 51.54 51.63 48.49 3.141 N/A DEGPhase 3 0 58.08 58.18 55.13 3.050 N/A DEGPhase 2 0 58.89 58.99 55.94 3.049 N/A DEG

    R Sonde Error Correction 5 0 12.06 N/A N/A N/A N/A MM/MR Sonde Error Correction 4 0 25.74 N/A N/A N/A N/A MM/MR Sonde Error Correction 3 0 61.90 N/A N/A N/A N/A MM/M

    R Sonde Error Correction 2 0 106.1 N/A N/A N/A N/A MM/MR Sonde Error Correction 1 0 150.7 N/A N/A N/A N/A MM/MR Sonde Error Correction 0 0 74.02 N/A N/A N/A N/A MM/Mter: 16Oct2003 16:15y Induction Tool H Wellsite Calibration Sonde Error Correction

    Measurement MasterNominal Before After Change Limit Units

    Calibration and Check Summary

    Input DLIS FilesFAULT AIT_SONIC_TLD_MCFL_027LUP FN:24 PRODUCER 09Dec2003 20:34 365.8 M 196.5 M

    Phase 2 0 58.89 58.99 55.94 3.049 N/A DEGPhase 1 0 62.78 62.88 59.90 2.984 N/A DEGPhase 0 0 63.82 63.92 60.95 2.965 N/A DEGThru Cal Magnitude 7 0 1.539 1.554 1.553 0.001654 N/A VThru Cal Magnitude 6 0 2.087 2.111 2.120 0.009863 N/A VThru Cal Magnitude 5 0 2.088 2.111 2.120 0.009143 N/A VThru Cal Magnitude 4 0 1.432 1.448 1.454 0.005524 N/A VThru Cal Magnitude 3 0 0.7630 0.7716 0.7750 0.003464 N/A VThru Cal Magnitude 2 0 0.6755 0.6833 0.6874 0.004060 N/A VThru Cal Magnitude 1 0 1.356 1.371 1.377 0.005659 N/A VThru Cal Magnitude 0 0 0.6611 0.6685 0.6714 0.002851 N/A Vter: 16Oct2003 16:15 Before: 9Dec2003 16:41 After: 9Dec2003 20:41y Induction Tool H Wellsite Calibration Electronics Calibration Check Thru Cal Mag. & Phase

    MAXIS Field Log

    CALIBRACIONES

  • 7/23/2019 Registro de Pozos M 612 Combinada

    63/70

    Pe Magnesium 2.650 2.636 Pe Aluminum 2.570 2.563 Rho Magnesium 1.686 1.686 G/C3Rho Aluminum 2.596 2.599 G/C3ter: 6Dec2003 16:20

    h resolution Integrated Logging ToolDTS Master Calibration Inversion results

    ZAxis Acceleration 9.810 N/A 9.798 N/A N/A N/A M/S2ore: 9Dec2003 16:46h resolution Integrated Logging ToolDTS Wellsite Calibration Accelerometer Calibration

    CFTC Background 33.15 33.15 32.23 32.12 0.1170 4.973 CPSCNTC Background 32.38 32.38 32.92 32.37 0.5498 4.857 CPSter: 24Sep2003 16:48 Before: 9Dec2003 16:42 After: 9Dec2003 20:50

    h resolution Integrated Logging ToolDTS Wellsite Calibration Zero Measurement

    Gamma Ray (Calibrated) 160.0 N/A 160.0 N/A N/A 15.00 GAPIGamma Ray (Jig Bkg) 159.5 N/A 159.5 N/A N/A 14.50 GAPIGamma Ray Background 30.00 N/A 56.00 N/A N/A N/A GAPIore: 9Dec2003 10:48 After: Calibration not doneh resolution Integrated Logging ToolDTS Wellsite Calibration Detector Calibration

    HILT Caliper Plus Measurement 12.00 N/A 11.41 N/A N/A N/A INHILT Caliper Zero Measurement 8.000 N/A 7.033 N/A N/A N/A INore: 9Dec2003 10:49h resolution Integrated Logging ToolDTS Wellsite Calibration HILT Caliper Calibration

    Raw B2 Resistivity 3830 N/A 3821 N/A N/A N/A OHMRaw B1 Resistivity 3830 N/A 3789 N/A N/A N/A OHMRaw B0 Resistivity 3875 N/A 3839 N/A N/A N/A OHMore: 9Dec2003 10:55h resolution Integrated Logging ToolDTS Wellsite Calibration MCFL Calibration

    LS Average Deviation 0 0.4601 %SS Max Deviation 0 0.4838 %SS Average Deviation 0 0.1634 %

    BS Max Deviation 0 1.100 %BS Average Deviation 0 0.4388 %ter: 6Dec2003 16:20

    h resolution Integrated Logging ToolDTS Master Calibration Deviation Summary

    LS Crystal Resolution 9.442 N/A 9.397 N/A N/A N/A %SS Crystal Resolution 10.92 N/A 10.97 N/A N/A N/A %BS Crystal Resolution 12.95 N/A 12.90 N/A N/A N/A %ore: 9Dec2003 16:45h resolution Integrated Logging ToolDTS Wellsite Calibration Crystal Quality Resolutions Calibration

    LS PM High Voltage (Command) 1873 N/A 1867 N/A N/A N/A VSS PM High Voltage (Command) 1973 N/A 1968 N/A N/A N/A VBS PM High Voltage (Command) 1761 N/A 1797 N/A N/A N/A V

    ore: 9Dec2003 16:45h resolution Integrated Logging ToolDTS Wellsite Calibration Photomultiplier High Voltages Calibrations

    LS Window Sum 1300 N/A 1302 N/A N/A N/A CPSLS Window Ratio 0.2973 N/A 0.3030 N/A N/A N/ASS Window Sum 11240 N/A 11210 N/A N/A N/A CPSSS Window Ratio 0.4777 N/A 0.4793 N/A N/A N/ABS Window Sum 12780 N/A 12800 N/A N/A N/A CPSBS Window Ratio 0.7611 N/A 0.7606 N/A N/A N/Aore: 9Dec2003 16:45h resolution Integrated Logging ToolDTS Wellsite Calibration Stab Measurement Summary

    Fine Mag, Real, Imag 2 0 1.049 N/A N/A N/A N/AFine Mag, Real, Imag 1 0 1.049 N/A N/A N/A N/AFine Mag, Real, Imag 0 0 1.049 N/A N/A N/A N/ACoarse Mag, Real, Imag 2 0 1.049 N/A N/A N/A N/A

    Coarse Mag, Real, Imag 1 0 1.049 N/A N/A N/A N/ACoarse Mag, Real, Imag 0 0 1.048 N/A N/A N/A N/Ater: 16Oct2003 16:15y Induction Tool H Wellsite Calibration Mud Gain Correction

    X Sonde Error Correction 7 0 6.740 N/A N/A N/A N/A MM/MX Sonde Error Correction 6 0 1.024 N/A N/A N/A N/A MM/MX Sonde Error Correction 5 0 6.923 N/A N/A N/A N/A MM/MX Sonde Error Correction 4 0 22.96 N/A N/A N/A N/A MM/MX Sonde Error Correction 3 0 3.602 N/A N/A N/A N/A MM/MX Sonde Error Correction 2 0 113.2 N/A N/A N/A N/A MM/MX Sonde Error Correction 1 0 341.1 N/A N/A N/A N/A MM/MX Sonde Error Correction 0 0 41.41 N/A N/A N/A N/A MM/MR Sonde Error Correction 7 0 2.187 N/A N/A N/A N/A MM/M

    on e rror orrec on .

    h resolution Integrated Logging ToolDTS Wellsite Calibration MCFL Calibration

  • 7/23/2019 Registro de Pozos M 612 Combinada

    64/70

    Before

    Master

    After

    Before

    Master

    After

    Before

    Master

    After

    Before

    Master

    After

    Before

    Master

    After

    Before

    Master

    After

    Before

    Master

    After

    Before

    1.554

    1.539

    2.120

    2.111

    2.087

    2.120

    2.111

    2.088

    1.454

    1.448

    1.432

    0.7750

    0.7716

    0.7630

    0.6874

    0.6833

    0.6755

    1.377

    1.371

    1.356

    0.6714

    0.6685

    1.415

    1.955

    1.955

    1.337

    0.7040

    0.6230

    1.270

    0.6050

    46.03

    46.02

    46.46

    49.70

    49.62

    46.40

    49.63

    49.56

    48.49

    51.63

    51.54

    55.13

    58.18

    58.08

    55.94

    58.99

    58.89

    59.90

    62.88

    62.78

    60.95

    63.92

    53.00

    57.00

    57.00

    59.00

    65.00

    66.00

    70.00

    71.00

    rmal Housing Size 3.375 IN.TB Water Temperature 11.0 DEGC.

    HGNS Neutron Master Calibration was done with the following parameters :

    GLSVJ source activity is acceptable.

    CNTC/CFTC (Tank) 2.159 2.300 Thermal Far Corr. (Tank) 2793 2465 CPSThermal Near Corr. (Tank) 6031 5670 CPSter: 24Sep2003 16:48

    h resolution Integrated Logging ToolDTS Master Calibration Tank Measurement

    CNTC/CFTC (Tank) 2.159 2.300 Thermal Far Corr. (Tank) 2793 2465 CPSThermal Near Corr. (Tank) 6031 5670 CPSter: 24Sep2003 16:48

    h resolution Integrated Logging ToolDTS Master Calibration Tank Measurement

    .

    Array Induction Tool H / Equipment Identification

    Primary Equipment:Rm/SP Bottom Nose AHRM AArray Induction Sonde AHIS BA 265

    Auxiliary Equipment:

    Phase

    Master

    Value

    0.6611

    Thru Cal Magnitude V Nominal Value

    63.82

    Phase DEG Nominal

    Electronics Calibration Check Thru Cal Mag. & Phase

    Array Induction Tool H Wellsite Calibration

  • 7/23/2019 Registro de Pozos M 612 Combinada

    65/70

    Value

    106.1

    150.7

    74.02

    R Sonde Error Correction MM/M

    66.00

    (Minimum)

    114.0

    (Minimum)

    231.0

    111.0

    (Nominal)

    159.0

    (Nominal)

    56.00

    156.0

    (Maximum)

    204.0

    (Maximum)

    119.0

    Value

    113.2

    341.1

    41.41

    X Sonde Error Correction MM/M

    350.0

    (Minimum)

    625.0

    (Minimum)

    2250

    0

    (Nominal)

    0

    (Nominal)

    0

    350.0

    (Maximum)

    625.0

    (Maximum)

    2250

    r: 16Oct2003 16:15

    1.030

    1.008

    0.9995

    1.003

    1.023

    1.020

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    0.2244

    0.06097

    0.1703

    0.03806

    0.01548

    0.01098

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    Sonde Error Correction

    Array Induction Tool H Wellsite Calibration

    Value

    1.018

    1.018

    Test Loop Gain Magnitude V

    0.9500

    (Minimum)

    0.9500

    1.000

    (Nominal)

    1.000

    1.050

    (Maximum)

    1.050

    Value

    0.5171

    0.4998

    Phase DEG

    3.000

    (Minimum)

    3.000

    0

    (Nominal)

    0

    3.000

    (Maximum)

    3.000

    e

    e

    r

    Array Induction Temperature Plus V

    inimum)

    .8700(Nominal)

    0.9150(Maximum)

    0.9600

    Value

    0.9218

    0.9204

    0.9204

    Phase

    After

    Before

    Master

    Array Induction Temperature Zero V

    (Minimum)

    0.05000(Nominal)

    0(Maximum)

    0.05000

    Value

    0.0002874

    0.0002662

    0.0002728

    e

    e

    r

    Array Induction SPA Plus MV

    inimum)

    41.0(Nominal)

    990.5(Maximum)

    1040

    Value

    994.9

    993.4

    993.4

    Phase

    After

    Before

    Master

    Array Induction SPA Zero MV

    (Minimum)

    50.00(Nominal)

    0(Maximum)

    50.00

    Value

    0.2892

    0.2735

    After 1.553

    (Minimum)

    60.00 %(Nominal) (Maximum)

    140.0 %

    42.16

    (Minimum)

    Nom 60.00(Nominal) (Maximum)

    Nom + 60.00

    9Dec2003 20:41

    r: 16Oct2003 16:15 Before: 9Dec2003 16:41

    0.2783

    Electronics Calibration Check Auxilliary

    Array Induction Tool H Wellsite Calibration

    9Dec2003 20:41

    r: 16Oct2003 16:15 Before: 9Dec2003 16:41

    Test Loop Gain Correction

    Array Induction Tool H Wellsite Calibration

  • 7/23/2019 Registro de Pozos M 612 Combinada

    66/70Value Test Loop Gain Magnitude V Value Phase DEG

    r: 16Oct2003 16:15

    e

    r

    Array Induction Temperature Plus V

    inimum)

    .8700(Nominal)

    0.9150(Maximum)

    0.9600

    Value

    0.9204

    Phase

    Master

    Array Induction Temperature Zero V

    (Minimum)

    0.05000(Nominal)

    0(Maximum)

    0.05000

    Value

    0.0002728

    e

    r

    Array Induction SPA Plus MV

    inimum)

    41.0(Nominal)

    990.5(Maximum)

    1040

    Value

    993.4

    Phase

    Master

    Array Induction SPA Zero MV

    (Minimum)

    50.00(Nominal)

    0(Maximum)

    50.00

    r: 16Oct2003 16:15

    Phase

    Master

    Master

    Master

    Master

    Master

    Master

    Master

    Master

    Value

    1.539

    2.087

    2.088

    1.432

    0.7630

    0.6755

    1.356

    0.6611

    Thru Cal Magnitude V

    (Minimum)

    60.00 %(Nominal) (Maximum)

    140.0 %

    Nominal

    1.415

    1.955

    1.955

    1.337

    0.7040

    0.6230

    1.270

    0.6050

    Value

    46.02

    49.62

    49.56

    51.54

    58.08

    58.89

    62.78

    63.82

    Phase DEG

    (Minimum)

    Nom 60.00(Nominal) (Maximum)

    Nom + 60.00

    Nominal

    53.00

    57.00

    57.00

    59.00

    65.00

    66.00

    70.00

    71.00

    Electronics Calibration Check Thru Cal Mag. & Phase

    Value

    0.2783

    Electronics Calibration Check AuxilliaryArray Induction Tool H Master Calibration

    Test Loop Gain Correction

    Array Induction Tool H Master Calibration

    r: 16Oct2003 16:15

    Value

    1.049

    1.049

    1.048

    Coarse Mag, Real, Imag

    (Minimum)

    0.8000

    (Minimum)0.8000

    (Minimum)

    0.8000

    (Nominal)

    1.000

    (Nominal)1.000

    (Nominal)

    1.000

    (Maximum)

    1.200

    (Maximum)1.200

    (Maximum)

    1.200

    Value

    1.049

    1.049

    1.049

    Fine Mag, Real, Imag

    (Minimum)

    0.8000

    (Minimum)0.8000

    (Minimum)

    0.8000

    (Nominal)

    1.000

    (Nominal)1.000

    (Nominal)

    1.000

    (Maximum)

    1.200

    (Maximum)1.200

    (Maximum)

    1.200

    r: 16Oct2003 16:15

    2.187

    8.449

    12.06

    25.74

    61.90

    (Minimum)

    5.000

    (Minimum)

    5.000

    (Minimum)

    4.000

    (Minimum)

    15.00

    (Minimum)

    39.00

    i i

    (Nominal)

    0

    (Nominal)

    10.00

    (Nominal)

    14.00

    (Nominal)

    25.00

    (Nominal)

    64.00

    i l

    (Maximum)

    5.000

    (Maximum)

    15.00

    (Maximum)

    24.00

    (Maximum)

    35.00

    (Maximum)

    89.00

    i

    6.740

    1.024

    6.923

    22.96

    3.602

    (Minimum)

    30.00

    (Minimum)

    30.00

    (Minimum)

    50.00

    (Minimum)

    63.00

    (Minimum)

    250.0

    i i

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    i l

    (Maximum)

    30.00

    (Maximum)

    30.00

    (Maximum)

    50.00

    (Maximum)

    63.00

    (Maximum)

    250.0

    i

    Mud Gain Correction

    Array Induction Tool H Wellsite Calibration

    Electronics Calibration Check Thru Cal Mag. & Phase

    Array Induction Tool H Master Calibration

  • 7/23/2019 Registro de Pozos M 612 Combinada

    67/70

    Value

    1.049

    1.049

    1.048

    Coarse Mag, Real, Imag

    0.8000

    (Minimum)

    0.8000

    (Minimum)

    0.8000

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    1.200

    (Maximum)

    1.200

    (Maximum)

    1.200

    Value

    1.049

    1.049

    1.049

    Fine Mag, Real, Imag

    0.8000

    (Minimum)

    0.8000

    (Minimum)

    0.8000

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    1.200

    (Maximum)

    1.200

    (Maximum)

    1.200

    r: 16Oct2003 16:15

    2.187

    8.449

    12.06

    25.74

    61.90

    106.1

    (Minimum)

    5.000

    (Minimum)

    5.000

    (Minimum)

    4.000

    (Minimum)

    15.00

    (Minimum)

    39.00

    (Minimum)

    66.00

    (Minimum)

    114.0

    (Nominal)

    0

    (Nominal)

    10.00

    (Nominal)

    14.00

    (Nominal)

    25.00

    (Nominal)

    64.00

    (Nominal)

    111.0

    (Nominal)

    159.0

    (Maximum)

    5.000

    (Maximum)

    15.00

    (Maximum)

    24.00

    (Maximum)

    35.00

    (Maximum)

    89.00

    (Maximum)

    156.0

    (Maximum)

    204.0

    6.740

    1.024

    6.923

    22.96

    3.602

    113.2

    (Minimum)

    30.00

    (Minimum)

    30.00

    (Minimum)

    50.00

    (Minimum)

    63.00

    (Minimum)

    250.0

    (Minimum)

    350.0

    (Minimum)

    625.0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Maximum)

    30.00

    (Maximum)

    30.00

    (Maximum)

    50.00

    (Maximum)

    63.00

    (Maximum)

    250.0

    (Maximum)

    350.0

    (Maximum)

    625.0

    Mud Gain Correction

    Array Induction Tool H Master Calibration

    Value

    150.7

    74.02

    R Sonde Error Correction MM/M

    114.0

    (Minimum)

    231.0

    159.0

    (Nominal)

    56.00

    204.0

    (Maximum)

    119.0

    Value

    341.1

    41.41

    X Sonde Error Correction MM/M

    625.0

    (Minimum)

    2250

    0

    (Nominal)

    0

    625.0

    (Maximum)

    2250

    r: 16Oct2003 16:15

    1.030

    1.008

    0.9995

    1.003

    1.023

    1.020

    1.018

    .

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Minimum)

    0.9500

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Nominal)

    1.000

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    (Maximum)

    1.050

    0.2244

    0.06097

    0.1703

    0.03806

    0.01548

    0.01098

    0.5171

    .

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Minimum)

    3.000

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Nominal)

    0

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    (Maximum)

    3.000

    Sonde Error Correction

    Array Induction Tool H Master Calibration

  • 7/23/2019 Registro de Pozos M 612 Combinada

    68/70

    e

    e

    Gamma Ray Background GAPI Value

    56.00

    Phase

    Before

    Gamma Ray (Jig Bkg) GAPI Value

    159.5

    Phase

    Before

    Gamma Ray (Calibrated) GAPI Value

    e: 9Dec2003 10:49

    e

    e

    HILT Caliper Zero Measurement IN

    inimum)

    .000(Nominal)

    8.000(Maximum)

    10.00

    Value

    7.033

    Phase

    Before

    HILT Caliper Plus Measurement IN

    (Minimum)

    9.000(Nominal)

    12.00(Maximum)

    15.00

    e: 9Dec2003 10:55

    e

    e

    Raw B0 Resistivity OHMM

    inimum)

    565(Nominal)

    3875(Maximum)

    4185

    Value

    3839

    Phase

    Before

    Raw B1 Resistivity OHMM

    (Minimum)

    3524(Nominal)

    3830(Maximum)

    4136

    Value

    3789

    Phase

    Before

    Raw B2 Resistivi ty OHMM

    (Minimum)

    3524(Nominal)

    3830(Maximum)

    4136

    e: 9Dec2003 16:45

    e

    e

    BS Crystal Resolution %

    inimum)

    1.95(Nominal)

    12.95(Maximum)

    13.95

    Value

    12.90

    Phase

    Before

    SS Crystal Resolution %

    (Minimum)

    9.920(Nominal)

    10.92(Maximum)

    11.92

    Value

    10.97

    Phase

    Before

    LS Crystal Resolution %

    (Minimum)

    8.442(Nominal)

    9.442(Maximum)

    10.44

    e: 9Dec2003 16:45

    inimum)

    661(Nominal)

    1761(Maximum)

    1861(Minimum)

    1873(Nominal)

    1973(Maximum)

    2073(Minimum)

    1773(Nominal)

    1873(Maximum)

    1973

    Value

    9.397

    Crystal Quality Resolutions Calibration

    High resolution Integrated Logging ToolDTS Wellsite Calibration

    Value

    3821

    MCFL Calibration

    High resolution Integrated Logging ToolDTS Wellsite Calibration

    Value

    11.41

    HILT Caliper Calibration

    High resolution Integrated Logging ToolDTS Wellsite Calibration

    160.0

    Detector Calibration

    High resolution Integrated Logging ToolDTS Wellsite Calibration

    High resolution Integrated Logging ToolDTS / Equipment Identification

    Primary Equipment:HILT highResolution Mechanical Sonde HRMS B 704HILT Rxo Gammaray Device HRGD B 1773HILT Nuclear BackScatter Detector HILT HILT Nuclear ShortSpacing Detector HILT HILT Nuclear LongSpacing Detector HILT Micro Cylindrically Focused Log Device MCFL GR Logging Source GLS VJ 5045

    HILT High Res. Control Cartridge HRCC B 704

    Auxiliary Equipment:

    r: 16Oct2003 16:15

    (Minimum) (Nominal) (Maximum) (Minimum) (Nominal) (Maximum)

    e

    e

    BS PM High Voltage (Command) V

    661 1761 1861

    Value

    1797

    Phase

    Before

    SS PM High Voltage (Command) V

    1873 1973 2073

    Value

    1968

    Phase

    Before

    LS PM High Voltage (Command) V

    1773 1873 1973

    e: 9Dec2003 16:45

    e

    e

    BS Window Sum CPS

    inimum)2150

    (Nominal)12780

    (Maximum)13420

    Value

    12800

    Phase

    Before

    SS Window Sum CPS

    (Minimum)10680

    (Nominal)11240

    (Maximum)11800

    Value

    11210

    Phase

    Before

    LS Window Sum CPS

    (Minimum)1235

    (Nominal)1300

    (Maximum)1365

    Value

    1302

    e

    e

    BS Window Ratio

    inimum)

    .7231(Nominal)

    0.7611(Maximum)

    0.7992

    Value

    0.7606

    Phase

    Before

    SS Window Ratio

    (Minimum)

    0.4538(Nominal)

    0.4777(Maximum)

    0.5016

    Value

    0.4793

    Phase

    Before

    LS Window Ratio

    (Minimum)

    0.2825(Nominal)

    0.2973(Maximum)

    0.3122

    Value

    0.3030

    Stab Measurement Summary

    High resolution Integrated Logging ToolDTS Wellsite Calibration

    Value

    1867

    Photomultiplier High Voltages Calibrations

    High resolution Integrated Logging ToolDTS Wellsite Calibration

  • 7/23/2019 Registro de Pozos M 612 Combinada

    69/70r: 24Sep2003 16:48

    e

    r

    Thermal Near Corr. (Tank) CPS

    inimum)

    000(Nominal)

    6031(Maximum)

    7200

    Value

    5670

    Phase

    Master

    Thermal Far Corr. (Tank) CPS

    (Minimum)

    2075(Nominal)

    2793(Maximum)

    3125

    Value

    2465

    Phase

    Master

    CNTC/CFTC (Tank)

    (Minimum)

    2.120(Nominal)

    2.159(Maximum)

    2.540

    r: 24Sep2003 16:48

    e

    r

    Thermal Near Corr. (Tank) CPS

    inimum)

    000(Nominal)

    6031(Maximum)

    7200

    Value

    5670

    Phase

    Master

    Thermal Far Corr. (Tank) CPS

    (Minimum)

    2075(Nominal)

    2793(Maximum)

    3125

    Value

    2465

    Phase

    Master

    CNTC/CFTC (Tank)

    (Minimum)

    2.120(Nominal)

    2.159(Maximum)

    2.540

    r: 6Dec2003 16:20

    e

    r

    BS Max Deviation %

    inimum)

    1.600(Nominal)

    0(Maximum)

    1.600

    Value

    1.100

    Phase

    Master

    SS Max Deviation %

    (Minimum)

    2.500(Nominal)

    0(Maximum)

    2.500

    Value

    0.4838

    Phase

    Master

    LS Max Deviation %

    (Minimum)

    3.500(Nominal)

    0(Maximum)

    3.500

    Value

    1.473

    e

    r

    BS Average Deviation %

    inimum)

    0.6000(Nominal)

    0(Maximum)

    0.6000

    Value

    0.4388

    Phase

    Master

    SS Average Deviation %

    (Minimum)

    1.000(Nominal)

    0(Maximum)

    1.000

    Value

    0.1634

    Phase

    Master

    LS Average Deviation %

    (Minimum)

    1.500(Nominal)

    0(Maximum)

    1.500

    r: 6Dec2003 16:20

    r

    inimum)

    .470(Nominal)

    2.570(Maximum)

    2.670

    2.563 Master

    (Minimum)

    2.550(Nominal)

    2.650(Maximum)

    2.750

    2.636

    Value

    0.4601

    Deviation Summary

    High resolution Integrated Logging ToolDTS Master Calibration

    Value

    2.300

    Tank MeasurementHigh resolution Integrated Logging ToolDTS Master Calibration

    Value

    2.300

    Tank Measurement

    High resolution Integrated Logging ToolDTS Master Calibration

    e

    r

    Pe Aluminum Value

    2.563

    Phase

    Master

    Pe Magnesium Value

    2.636

    e

    r

    Rho Aluminum G/C3

    inimum)

    .586(Nominal)

    2.596(Maximum)

    2.606

    Value

    2.599

    Phase

    Master

    Rho Magnesium G/C3

    (Minimum)

    1.676(Nominal)

    1.686(Maximum)

    1.696

    e

    e

    ZAxis Acceleration M/S2

    inimum)

    .610(Nominal)

    9.810(Maximum)

    10.01

    e

    e

    r

    CNTC Background CPS

    inimum).000

    (Nominal)32.38

    (Maximum)40.00

    Value

    32.37

    32.92

    32.38

    Phase

    After

    Before

    Master

    CFTC Background CPS

    (Minimum)5.000

    (Nominal)33.15

    (Maximum)40.00

    Value

    32.12

    32.23

    e: 9Dec2003 10:48 After: Calibration not done

    inimum)

    0(Nominal)

    30.00(Maximum)

    120.0

    N/A After

    (Minimum)

    145.0(Nominal)

    159.5(Maximum)

    174.0

    N/A After

    (Minimum)

    145.0(Nominal)

    160.0(Maximum)

    175.0

    N/A

    33.15

    Zero Measurement

    High resolution Integrated Logging ToolDTS Wellsite Calibration

    9Dec2003 20:50

    r: 24Sep2003 16:48 Before: 9Dec2003 16:42

    Value

    9.798

    Accelerometer Calibration

    High resolution Integrated Logging ToolDTS

    Wellsite Calibration

    e: 9Dec2003 16:46

    Value

    1.686

    Inversion results

    High resolution Integrated Logging ToolDTS Master Calibration

    NOT DONE NOT DONE NOT DONE

  • 7/23/2019 Registro de Pozos M 612 Combinada

    70/70

    COMBINADA

    ESCALA: 1/200

    YPF S.A.

    YPF.Ch.M612MYBURGCHUBUTARGENTINA

    2550.6 m

    2553 m

    2550 m

    590.62 m

    590.42 m

    584.92 m

    MPANIA:

    ZO:MPO:

    S:

    PRIMERA LECTURA

    PROFUNDIDAD PERFIL

    PROF. PERFORADOR

    BUJE DE VASTAGO

    MESA ROTATIVA

    NIVEL TERRENO

    OVINCIA: