STORES FACULTY - Central Railwaycr.indianrailways.gov.in/cris/uploads/files/1517393647660... ·...
Transcript of STORES FACULTY - Central Railwaycr.indianrailways.gov.in/cris/uploads/files/1517393647660... ·...
-
1.
के्षत्रीय रेल प्रशिक्षण संस्थान भुसावल
भंडार संकाय STORES FACULTY
प्रश्नबैंक QUESTION BANK
कूट ख़ोलिये /Decode the Following
S.No. Short Form Long Form
1 PCMM Principal Chief Materials Manager
2 AMRS Additional Member Railway Stores
3 ADRS Additional Director Railway Stores
4 ACASH Association of Corporation and Apex Societies of Handlooms
5 AGM Additional General Manager
6 PCCM Principal Chief Commercial Manager
7 PFA Principal Financial Adviser
8 PCPO Principal Chief Personnel Officer
9 PCOM Principal Chief Operations Manager
10 PCMD Principal Chief Medical Director
11 PCE Principal Chief Engineer
12 PCME Principal Chief Mechanical Engineer
13 PCSTE Principal Chief Signal and Telecommunication Engineer
14 PCEE Principal Chief Electrical Engineer
15 DSC Digital Signature Certificate
16 DRR Daily Receipt Register
17 EMD & SD Earnest Money Deposit and Security Deposit
18 FRPS Firms performance and registration section
19 IMMS Integrated Material Management System
20 IRCON Indian Railway Constructions International Limited
21 IRSS Indian Railway Stores Services
22 NTH National Test House
23 RDSO Research Designs and Standards Organization
24 HSN Harmonised System of Nomenclature
25 FSN Fast Moving slow moving and non-moving
26 ICF Integral Coach Factory , Perambur (Chennai)
27 IP & CP Interim Period & Contract Period
28 IRICEN Indian Railway Institute of Civil Engineering
29 LD &DC Liquidated Damages & Denial Clause
30 PAC Proprietary Article Certificate/Public Accounts Committee
31 PWB Parcel way Bill
32 RC & RGC Rate Contract and Running Contract
33 RO &CIRO Receipt order and Centralized Inspection Receipt order
-
1.
34 RWF Rail Wheel Factory ,Yelehanka, Bangluru
35 RR Railway receipt
36 DT Depot Transfer
37 IRIMEE Indian Railway Institute of Mechanical & Electrical Engineering
38 MMTC Mineral Metal Trading Corporation
39 PAC Proprietary Article Certificate
40 DQA Director of Quality Assurance
41 POL Petroleum , Oil & Lubricant
42 DCRC Death Cum Retirement Gratuity
43 ADFM Assistant Divisional Finance Manager
44 ADMM Assistant Divisional Material Manager
45 ADRM Additional Divisional Railway Manager
46 AEN Assistant Engineer
47 AFM Assistant Finance Manager
48 AIS Advance Intimation sheet
49 AIRF All India Railway Men‘s Federation
50 AMM Assistant Material Manager
51 AMPS Assistant Manager ,Printing and Stationary
52 APO Assistant Personnel Manager
53 ASTM American Society of Testing Material
54 AWM Assistant Workshop Manager
55 BDL Below Danger Level
56 BS Buffer Stock
57 BSS British Standard and Specification
58 BT Bulletin Tender
59 C&AG Comptroller & Auditor General of India
60 CAT Central Administrative Tribunal
61 CORE Central organization for Railway Electrification
62 CCO Chief Claim Officer
63 CCO Chief Claim Manager
64 CDMS Chief Depot Materials Superintends
65 CEE Chief Electrical Engineer
66 CIF Cost Insurance and Freight
67 Gem Government e- Marketplace
68 CMD Chief Medical Director
69 DOI &DMI Director of Inspection and Director of Metallurgical Inspection
70 CMM Chief Materials Manager
71 CMO Chief Medical Officer
72 CMS Chief Medical Superintendent
73 HOER Hours Of Employment Regulation
74 DLW Diesel Locomotive Works ,Varanasi
-
1.
74 DDRS Deputy Director Railway Stores
75 CONCOR Container Corporation of India Limited
76 CORE Central Organisation for Railway Electrification
77 CP Contract Period
78 CPO Chief Personnel Officer
79 CPRO Chief Public Relation Officer
80 CRB Chairman Railway Board
81 BAR Book Average Rate
82 CRWS Coach Rehabilitation Workshop, BPL
83 CRIS Centre For Railway Information System
84 AIS &ES Advance Intimation sheet & Estimate sheet
85 CRS Commissioner for Railway Safety
86 CSC Chief Security Commissioner
87 GST Goods and Service Tax
88 CSTE Chief Signal and Tele-communication Engineer
89 CTE Chief Track Engineer
90 CVC Chief Vigilance Commissioner
91 CVI Chief vigilance Inspector
92 CVO Chief Vigilance Officer
93 CWM Chief Workshop Manager
94 DCW Diesel Components Works
95 DCM Divisional Commercial Manager
96 DDO Direct Demanding Officer
97 DEE Divisional Electrical Engineer
98 DEMU Diesel Electric Multiple Unit
99 DEN Divisional Engineer
100 DF Development Fund
101 DFCCI Dedicated Freight Corridor Corporation of India Limited
102 DFM Divisional Finance Manager
103 DGS & D Directorate General of Supplies & Disposal
104 DGTD Director General of Technical Development
105 DME Divisional Mechanical Engineer
106 CMTD Compulsory Monthly Thrift Deposit
107 DMI Director of Metallurgical Inspection
108 DMM Divisional Material Manager
109 DMO Divisional Medical Officer
110 DMRC Delhi Metro Rail Corporation
111 DMS Depot Material Superintendent
112 DMU Diesel Multiple Unit
113 DLMW Diesel Locomotive Modernisation Works ,Patiala
114 DO Delivery Order
-
1.
115 DOPT Department Of Personnel & Training
116 DP Delivery Period
117 DQA Director Quality Assurance
118 DRF Depreciation Reserve Fund
119 DRM Divisional Railway Manager
120 DRR Daily Receipt Resister
121 DSS Depot Stock Sheet
122 DT Depot Transfer
123 Dy.CMM Deputy Chief Material Manager
124 Dy.CPO Deputy Chief Personnel Officer
125 DY.CVO Deputy Chief Vigilance Officer
126 EDPM Electronic Data Processing Manager
127 EDRS Executive Director Railway Stores
128 ELS Electric Loco Shed
129 ELW Electric Loco Workshop
130 EMD Earnest Money Deposit
131 EMU Electric Multiple Unit
132 EOQ Economic Order Quantity
133 CLW Chittaranjan Locomotive Works
134 FAS Freight Accounting System/Free Along Shore
135 FDP Free Delivery Period
136 FE Foreign Exchange
137 FIFO First In First Out
138 FOB Free On Board
139 FOIS Freight Operations Information System
140 FOR Free On Rail
141 GATT General Agreement on Tariffs & Trade
142 GM General Manager
143 GT Global Tender
144 HAG Higher Administrative Grade
145 HAL Hindustan Aluminium Limited
146 HCL Hindustan Copper Limited ,Kolkata
147 HZL Hindustan Zink Limited
148 IC Inspection Certificate
149 IEEMA Indian Electrical & Electronics Manufactures Associations
150 IISCO Indian Iron & Steel Company
151 IRAS Indian Railway Accounts Services
152 IRCA Indian Railway Conference Association
153 IRCON Indian Railway Construction International Limited
154 IRICEN Indian Railway Institute Of Civil Engineering ,Pune
155 IRCTC Indian Railway Catering & Tourism Corporation
-
1.
156 IRFC Indian Railway Finance Corporation
157 IRIEEN Indian Railway Institute of Electrical Engineering ,Nasik
158 IRIEME Indian Railway Institutes Of Electrical & Mechanical Engineering,
159 IRISTE Indian Railway Institute Of Signal & Tele-communication Engineering, Secunderabad
160 IRITM Indian Railway Institute Of Transport Management, Lucknow
161 IRS Indian Railway Standards
162 IRPS Indian Railway Personnel Services
163 IREM Indian Railway Establishment Manual
164 IRTS Indian Railway Traffic Services
165 IRWO Indian Railway Welfare Organisation
166 ISA Inspector Of Stores Accounts
167 ISI Indian Standards Institute
168 ISO Indian Standard Organisation
169 ISS Indian Standard Specification
170 ITCC Income Tax Clearance Certificate
171 ITI Indian Telephone Industries
172 GD General Damages
173 JAG Junior Administrative Grade
174 JCM Joint Consultive Machinery
175 KRCL Konkan Railway Corporation Limited
176 KVIC Khadi Village Industries Corporation
177 LAN Local Area Network
178 LC Letter of Credit
179 LD Liquidated Damages
180 LDCE Limited Departmental Competitive Examination
181 LP Local Purchase
182 LT Limited Tender
183 LT & SLT Limited Tender and special Limited Tender
184 M & P Machinery & Plant
185 MA Modification Advice
186 MACPS Modified Assured Carrier Progression Scheme
187 MCDO Monthly Confidential Demi-Official
188 MEMU Main (line) Electric Multiple Unit
189 MR Minister Of Railways
190 MOSR Minister Of State of Railways
191 MMTC Mineral Metal Trading Corporation
192 MMIS Materials Management Information System
193 MODVAT Modified Value Added Tax
194 MPS Manager Printing & Stationary
195 MRVC Mumbai Rail Vikas Corporation
-
1.
196 MSME Micro Small & Medium Enterprises
197 NAIR National Academy Of Indian Railways
198 NEFT National Electronic Fund Transfer
199 NFIR National Federation Of Indian Railwaymen
200 NIC National Informatics Centre
201 NLC No Loss Certificate
202 NOC No Objection Certificate
203 NRM Normal Recoupment Memo
204 NRUCC National Railway Users Consultative Council
205 NSIC National Small Industries Corporation
206 NTC National Textile Corporation
207 AAC Average Annual Consumption /Anticipated Annual Consumption
208 NTES National Train Enquiry System
209 NTH National Test House
210 OSD Officer On Special Duty
211 P.L.NO. Price List Number
212 PAC Proprietary Article Certificate
213 ERM Emergency Recoupment Memo
214 PD Periodical Demand
215 PHOD Principal Head OF Department
216 PNM Permanent Negotiating Machinery
217 PNR Passenger Name Record
218 POL Petroleum , Oil & Lubricant
219 PO Purchase Order
220 PPP Public Private Partnership
221 PREM Participation of Railway Employee in Management
222 PRS Passenger Reservation System
223 PSU Public Sector Undertaking
224 PUs Production Units
225 PVC Price Variation Clause
226 PWB Parcel way Bill
227 QAP Quality Assurance Programme
228 QMS Quality Management System
229 RAC Reservation Against Cancellation
230 RC Rate Contract
231 RCF Rail Coach Factory ,Kapurthala
232 RCT Railway Claims Tribunal , Chennai
233 RDSO Research Designs and Standards Organisation
234 RGC Running Contract
235 RINL Rashatriya Ispat Nigam Limited
236 RITES Rail India Technical and Economic Services
-
1.
237 RLDA Rail Land Development Authority
238 RLO Railway Liaison Officer
240 RMC Railway Material Consignment
241 COFMOW Central Organisation for Modernisation of Workshop
242 ROB Road Over Bridge
243 RP Reserve Price
244 RPF Railway Protection Force
245 RRB Railway Recruitment Board
246 RRT Railway Rates Tribunal
247 RSF Railway Safety Fund
248 RSK Rail Spring Karkhana ,Gwalior
249 RTM Railway Transport Museum ,New Delhi
250 RSP Rolling Stock Programme
251 RUB Road Under Bridge
252 RVNL Rail Vikas Nigam Limited
253 TISCO Tata Iron & Steel Company
254 TOR Turn Over Ratio
255 SAB Stores Account Branch
256 SAG Senior Administrative Grade
257 SAIL Steel Authority of India Limited
258 SBF Staff Benefit Fund
259 SDGM Senior Deputy General Manager
260 SF Standard Form
261 SINT-P Stores -in- Transit-purchase
262 SINT-DT Stores -in- Transit-Depot Transfer
263 SMM Senior Material Manager
264 SOP Schedule Of Powers
265 SPO Senior Personnel Officer
266 Sr.AFA Senior Assistant Financial Advisor
267 Sr.DCM Senior Divisional Commercial Manager
268 Sr.DEN. Senior Divisional Engineer
269 Sr.DFM. Senior Divisional Financial Manager
270 Sr.DME. Senior Divisional Mechanical Engineer
271 Sr.DMM Senior Divisional Material Manager
272 Sr.DMO. Senior Divisional Medical Officer
273 Sr.DOM Senior Divisional Operating Manager
274 Sr.DSTE. Senior Divisional Signal and Tele-communication Engineer
275 Sr.MPS Senior Manager Printing & Stationary
276 SSI Small Scale Industries
277 T & P Tools & Plant
278 TC Tender Committee
-
1.
279 VAT Value Added Tax
280 WAO Workshop Account Officer
281 WM Works Manager
282 WMS Workshop Manufacturing Suspense
283 WTA Wheel Tyre & Axle
284 ZRTI Zonal Railway Training Institute
ररक्त स्थानो को भरे Fill in the blanks
1) ERM के माध्यम स े -------------- महीने की मात्रा प्रावधन ककया जाता ह ै (6 माह )
ERM can be placed for maximum _______months quantity.
2) सामान की बुककग कक कदनाांक स े------- मलहन ेमे दावा करना चलहए (6 माह )
Claim should be lodged within _____months from the date of booking the consignment.
3) वो सामालि जो आसानी से बाजार मे उपिब्ध ह ै------------- मलहने मे तथा लनमााण सामालि ------------ मलहने मे
जोलखम खररद होनी चलहये. (6 माह /9 माह)
Risk purchase for the items easily available in the market should be made within_____ months
& manufactured items within ______months.
4 खररद आदशे मे ----------------------- अांक होते ह।ै (17)
PO No. consists -------------- digits.
5) एस.एस.11 यह -------------------- सामिी के लिए बनाया जाता ह।ै (रद्दी/scrap)
SS-11 is prepared for ------------------------------------------- material.
6) --------------- माह स ेकम सामिी को BDL कहा जाता ह ै। (3 माह)
BDL stock is considered stock below -------------------------- months.
7) LD --------------------- के लिए िगाया जाता ह।ै (लविांलबत आपूती/Delayed Supply)
LD is charged for ---------------------------------------------.
8) एि.डी के लविांलबत आपूती मुल्य का ---------------- प्रलतशत/माह दर से वसुिा जाता ह।ै ( 2 %)
LD is charged at the rate of ------------ % per month of value of delayed supply .
9) GD फर्मसा से ---------------- तब िगाया जाता ह ै। (एि.डी वसुिा नही जाता/LD can not be levied)
GD is charged to firm when --------------- .
10). सुरक्षा लनधी खररद आदशे के मुल्य का ---------------- प्रलतशत दर स ेवसुिा जाता ह।ै (10 %)
SD is charged at the rate of ------------ % of PO value.
11) WAG-9 यह -------------- फेज िोको ह।ै
WAG-9 is a--------------------- phase loco. (Three)
12) जेम यह ----------------------- मांत्रािय व्दारा बनाया गया ह।ै( इिेक्ट्रालनकी और सचुना प्रौधौलगकी मांत्राि)
GeM is designed by Ministry of -------------(Ministry Of Electronics & Information Technology)
13) रेल्व ेमे िुप ए अलधकाररयों की लनयुलक्तयाां ------------------व्दारा की जाती ह।ै
-------------------------- appoints Group ‗A‘ officers in Railway. ( President/UPSC)
14) सिफेररक एसीड की जारी एांव प्राप्ती की युनीट ------------- ह ै । (51)
-
1.
Accountal unit of sulphuric acid is -------------
15) पी.एि क्रमाांक मे --------- अांक होते ह ै। (8 )
PL number consists of ---------- digit
16 ) सामान की बुकींक की कदनाांक स े---------- मलहने मे दावा करना चाहीये ।
Claim can be lodged --------- months from date of booking. ( 6 month )
17) डी.एस. 8 ------------ के प्रयोग मे आता ह ै।
DS-8 note is used for ______________ ( Returned stores)
18 ) दये कदनाांक के बाद प्राप्त सामिी के लिए अधीकतम ------ ए.डी वसुिा जाता ह ै। (10 % )
After due date of receipt of material, maximum LD can be recovered -------
19) लनलवदा सलमती मे -------------------- सद्सस्य होते ह ै । (03)
Tender committee consists of --------- members.
20) क्रय आदशे में ----------- अांक होते ह ै।
Purchase order consists of --------digit. ( 17 )
21) मुख्यािय में वररष्ठ सामिी प्रबांधक का लनवीदये मांगवाने की शक्तीया रुपय े------ तक ह ै। ( 8 िाख तक)
SMM HQ power of tender invitation is Rs.---------
22)डीपो मे ए.एम.एम की नॉन स्टॉक में स्थानीय खरीद की क्षमता रुपये ---- तक ह ै। ( 3 िाख तक)
AMM depot can purchase non stock item upto Rs.. -------------
23 ) -------- कैटेगरी की सामिी ए.ए.सी. मुल्य के 70% भाग कां न्ज़ुम करती ह ै। (ए केटेगरी )
----------category items consume 70% of AAC value.
24) मुल्यसुची क्रमाक 23.56.4581 मे चेक लडजीट_____ह/ै ( 1 )
In Price List number23564581 check digit is ________
25) मुल्यसुची सांखया के प्रथम दो अांको को _________कह्ते ह ै/ ( मेन िुप)
In Price List number first two digit is called _________
26) ए.एम.एम.(ईि.एस) अजलन भांडार डीपो का डीपो कोड -------- ह ै
The depot code of AMM(ELS)AJNI is _______________ ( 29 )
27)स्टेश्नरी िुप ---- ह ै group of stationary items is ________ ( 83 )
28) िुप ---------- यह रकद्द सामलि के िीए होता ह ै /
The group _____ is for scrap material ( 98 )
29)युलनट कोड यह -----अांक का होता ह.ै
Unit code is in ______________digit . (दो )
30) मध्य रेल्व ेमें ,प्रालतपूती शीट को ------------ भी कहा जाता ह ै। (इस्टीमेटशीट)
In central Railway Stock Recoupment Sheet (SRS)is also called as--------------------
31) एस 1539 वाउचर को ----------------- भी कहा जाता ह ै। ( डी.एस 8 नोट )
S-1539 voucher is also called as -------------------------------
32) एस.एम.एम.(सामान्य) करी रोड भांडार डीपो का डीपो कोड ------- ह ै। (01)
Depot code of SMM(General) ,curry Road depot is -------------
33) ए शे्रणी मद का स्टॉक सत्यापन अनुसूची ----- महीने मे एक बार होता ह ै। ( 6 )
-
1.
Stock verification schedule of ‗A‘ category item is once in ---------months
34) ईंधन तेि पीएि मुख्य समुह मे --------- वर्गगकृत ह ै। ( 92 )
Fuel oil is classified under PL Main group No------------
35) बुक राांन्सफर प्राप्ती का काडा कोड --------- ह.ै ( 43 )
Book transfer code is ----
36) मॉर्डना कोच फौकरी -----------स्थीत ह ै। (रायबरेलि)
Modern Rail coach Factory is situated at -----------
37) र्डब्िुएजी -9 िोको मे ‖जी‖ --------- के िीय ेह ै। (गुडस)
In WAG-9 Loco, ―G‖ stands for __________________
38) ट्र्न ओवर रेश्यो -------- और साि भर के लनगाम का 100 का अनूपात (अांलतम शेष/Closing balance)
Turn over ratio is the ratio between --------------- and issue during the year x 100
39) आई.एम.एम.आय.आई.एस. का नाम ---------------- ह ै। ( IMMS)
Immis has been renamed as -----------------------------
40)क्र्य आदशे सांख्या मे ---- अांक होते ह.ै ( 17 )
Purchase order consisting -----digits
41) डीपो का प्र्दशन ----- द्सरारा मापा जाता ह ै
Depot performance is measured by ----- ( Turn over ratio )
42)उप.मु.सा.प्र.(केरेज एांव वौगन)माटुांगा भांडार डीपो का डीपो कोड ( 02 )
The depot code of DYCMM(CWE) Matunga is ------
43) सेट का अकौटि कोड----ह ै ( 03 )
Accountal unit for set is --------
प्रश्न (3) कथन सही ह ैया गित लिख े Write True or False
1 रेल्व ेबोडा मे कूि 06 सदस्य होते ह ै ।
Railway Board consisting total 06 members -------------------- (F)
2 मध्य रेल्व ेके महाप्रबांधक श्री वी. के .जनै ह।ै
General Manger of Central Railway is Shri V.K.Jain --------------------- (F)
3 प्रथम शे्रणी ए पास का रांग सफेद ह ै।
Colour of First Class‖ A‘ pass is white ---------------------- (F)
4 डीज़ि इांजन की सामिी के पी.एि .10 से 19 ह ै।
PL group of Diesel engine is from 10 to 19 ---------------------- (T)
5 ए.एम.एम. भांडार सामिी की लनिामी करत ेह ै।
AMM can auction the scrap material. ------------------------(F)
6 गेट पास लबना भी डीपो स ेसामिी बाहर लनकािी जा सकती ह ै।
Without gate pass the material can be drawn out from depot. --------------- (F)
7 अिोकेशन कोड मे 10 अांक होत ेह ै।
There are 10 digits in Allocation code. ----------------- (F)
8 आई.एम.एम.आय.एस. के आने से काया धीमा हुआ ह ै।
The work becomes slow from introduction of IMMIS. ----------------- (F)
-
1.
9 साधारणतहा बफर स्टॉक 4 महीने का होता ह ै।
Normally buffer stock is for 4 months. ---------------- (F)
10 बी कैटेगरी की सामिी ए.ए.सी के 80% मुल्य क्ट्न्जुम करती ह ै।
Uses value of ‗B ‗category items is 80 % of AAC ----------------- (F)
11. मयाादते लनलवदा बुिाने से पुवा महाप्रबांधक का अनुमोदन िेना आवश्यक ह.ै
Prior approval of General Manager is necessary for invitation of Limited Tenders.______ (F)
12 साधारणत: बफर स्टॉक 6 माह का होता ह ै।
Normally buffer stock is considered for 6 months ________ (F)
13) सामलि डीपो से लबना गेट पास लनगाम ककया जाता ह ै.---------
Without gate pass material can be drawn from depot ________ (F)
14) भांडार लवभाग के क्षेत्रीय रेि सांगठ्न प्रमुख प्रमुसाप्र ह ै. ________
The Zonal Railway organization of stores department is headed by PCMM ________ (T)
15) सवाालधक एि.डी आपुती आदशे का मुल्य 10% ह ै --------
Maximum LD imposed for delay supply is 10% ________ (T)
16) खाररज ककया गया लनगाम पत्र को तूरांत रद करना पडता ह ै/ -----------
Cancelled issue note should be destroyed immediately ________ (F)
17) लजस अनुबांधका मुल्य 1 िाख रु तक होता ह ैउसपर L.D. नही िगता ________ Liquidated
damages is not imposed on the contract value upto Rupees one lakh _______ (F)
18) भारत सरकार के सभी मांत्राियों के लिए सामान्य माि एवां सेवाएां GeM व्दारा --------
खररदी जाती ह।ै Common goods & services are being procured from GeM in all
Ministries of Govt. of India. ------------ (T)
19) िॉट बनाने के लिए स्कॅ्रप डपेो मे स्कॅ्रप रेि जमा ककया जाता ह।ै--------
Scrap rails are collected in scrap depots to form a lot.--------- (F)
20) डी.लज.एस.अ ॅन्ड डी . अभी बांद ककया गया ह।ै --------
DGS&D is now closed. ---------- (T)
21) खररद आदशे को पुरा न करने पर असफि फमा से LD वसुिा जाता ह।ै ------------
LD is charged on firms, who fails to comply a PO. ------------ (T)
22) एच.एस.एन. कोड के अनुसार लज.एस.टी. की दर लनलित की जाती ह।ै --------
GST rates are decided based on HSN codes.---------- (T)
23) BOXN-HL वैगनों की दरुुस्ती भुसावि मे की जाती ह।ै -------
BOXN-HL wagons are repaired at Bhusawal. ------- (T)
24) मध्य रेि के केरेज तथा वॅगन की सभी मदें एस.एम.एम.(एस.) भुसावि के डपेो मे भांडारण की जाती ह।ै
--------
C&W items of whole C.R. are stocked at SMM/S/BSL.--------- (F)
25) नॉन स्टॉक मदों के लिए लप.ए.सी. पर भांडार अलधकारी हस्ताक्षर कर सकते ह।ै --------
Stores officer can sign PAC for Non-stock items. ----------- (F)
-
1.
26)सामिी के मुल्य के अनुसार उप-मुख्य सामिी प्रबांधक(ए.सी.एि) भुसावि मध्य रेि का सबस ेबडा डपेो ह।ै -- ----
Dy.CMM ACL/BSL is the stock value wise biggest depot of C.R.---------- (F)
27)रेि सामिी की खररद भारत सरकार के सावाजनीक खररद पॉलिसी के तहत ककया जाता ह।ै-------
Railway procurement is done as per public procurement policy of--------- (T)
27) अिोकेशन कोड मे 8 अांक होते ह ै । Allocation code is digit ________ (T)
28) रेल्व ेखरीद वार्गषक कैिेंडर प्रणलि पर आधारीत ह ै------------
Railway procurement is based on annual calendar system----- (T)
29) ए शे्रणी मदो का बफर स्टॉक कक मात्रा 1 माह की िी जाती ह ै--------
A cat items having buffer stock of 1 months (T)
30) एम.यु.एफ.यह ए.ए.सी. का 10 वा लहस्सा ह-ै----- MUF is 10th part of AAC -------- (F)
31) सुरक्षा जमा क्रय आदशे के सांतोषजनक लनष्पादन हतेु एकत्रीत की जाती ह-ै----- (T)
Security deposit is collected from firm for satisfactory completion of purchase order-------
32)लवज्ञापीत लनलवदाए वेबसाईट पर प्रकाशीत कर रह ेह ैफीर भी समाचार पत्रोमे प्रकाशन अलनवाया ह—ै
All advertise tenders are published on website, even then publishing their details in newspaper
is mandatory ---------- (T)
33) खरीद आदशे जारी करने स ेपहिे 50% सुरक्षा जमा ,जमा ककया जाता ह ै ------
Security deposit to the tune of 50% is collected from venders ,before placing order---- (F)
34) वीद्युत इांजन की सामिी के पी.एि .20 से 29 ह ै। ------
PL group of Electric engine is from 20 to 29 ------ (T)
35) लबड शीट पर आर.लप.एफ. का हस्ताक्षर नही होता Bid sheet is not signed by RPF------ (T)
35) भांडार कोड दो भाग मे ह ै Stores code is in two parts ------ ( T )
36)कारखाना द्सरारा प्राप्त रददी सामिी को डी.एस 8 नोट पर िेख ेपर लिया जाता ह ै ----- Scrap received
from the and workshops is accounted for through DS-8 NOTE ------- ( T ).
37) चािान यह डीपो मे िखेा –जोखा करने का लनगाम वाउचर ह-ै-----
Challan is a issue account for voucher of the depot ---- (F)
38)पी.पी.सी अनुभाग द्सरारा आर.ओ. लनगाम ककया जाता ह-ै---
PPC section issue the Receipt Order------- (F)
39) भांडार लनदशेािय यह रेि मांत्रािय मे महालनदशेक के अांतगात आता ह-ै-----
In Railway Board Stores directorate is under Director General railway stores ------- (T)
40) क्षेत्रीय स्तर पर भांडार सांघटन के प्रमुख प्रमुसाप्र होते ह ै-------
The Zonal Railway Organization of stores department is headed by PCMM---- (T)
41) व.मां.सा.प्र.भांगार सामिी की लनिामी करते -----------
Sr.DMM can auction scrap materials ------ (T )
42) पी.ए.सी प्रमाांण पत्र भांडार लवभाग द्वारा जारी ककया जाता ----------
PAC certificate is issued by stores department -------- ( F )
-
1.
43) मध्य रेल्व ेके महाप्रबांधक श्री डी.के.शमाा ह।ै
General Manger of Central Railway is Shri D.K.Sharma -------- ( T )
44)आरडीएसओ द्वारा लनरीक्षीत सामिी को डीपो अलधकारी अलस्वकु्रत नही ककया जाता -------------
The depot officer has no power to reject the RDSO inspected materials _______ ( F )
45) डीपो अलधकारी एि.डी मे छुट द ेसकते ह ै ---------
LD Can be waived by Depot officer ________ ( T )
46) ररस्क पचेस मे दोषी फमा को भी लनलवदा दनेा चालहए ---------
In risk purchase defaulter firm can be given tender inquiry. ________ ( T )
47) स्टाफ सेि की मदो का सवे ककया जाता ह ै ----------
Items for staff sale has to be surveyed . ________ ( F )
48) ) डीपो की कायाक्षमता को टी.ओ.आर द्सरारा.मापा जाता ह ै ----------
unit of measuring the efficiency of Depot is TOR ________ ( T )
भाग बी स ेसही उत् तर चनुकर उत् तर के कॉिम में लिखें। Select correct answer from Part B & write in answer column. (A)
भाग ए Part A उत् तर Answer भाग बी Part B
ररजवा प्राईस Reserve price G A वाषीक आवश्यकताएां
Annual requirement
स्पेशि लिलमटेड टेंडर
Special limited tender
E B मालसक आवश्यकताएां
Monthly requirement
CIRO F C एकि आपुती स्त्रोत
Single supply source
जोलखम खररद Risk
Purchase
H D इांवेंटरी कां रोि Inventory
control
SS- 11 I E लनलवदाओं का प्रकार
Tender type
DS-8 J F सामिी का स्थानाांतरण
Transit material
AAC A G लनिामी बीक्री Auction
sale
MUF B H असफि आपुती Failed
supplies
VED D I भांगार मदें Scrap item
PAC C J वापस की गई सामिी
Return stores
-
1.
( B)
भाग ― ए ― उत्तर भाग ― बी ―
ररवसा ऑक्ट्शन Reverse
Auction
D A सवेक्षण समीती मे छुट Exempted from
survey committee
सुपुर्द्गी आदशे Delivery
order
J B के. जी.KG
स्टीि मद Steel Item G C स्टॉक वेरीफयर stock verifier
सेि इश्य ुनोट Sale Issue
Note
F D खररद की लवलध A method of
procurment
स्टॉकीग़ यूनीट Stocking
unit
B E 8 डीजीट
ट्नीग बोरीग Turning
boaring
A F काडा कोड Card code-58
आई आर ई पी एस IREPS I G पी.एि मुख्य िुपP.L.Group -90
भांडार सत्यापन Stock
Verification
C H फ्री ऑन रेि (एफओआर)
आवांटन सांख्या Allocation E I भारतीय रेल्व ेप्रोकयूरमेंट पोट्िा
पी.ओ. मे सुपुर्द्गी Delivery
condition in PO
H J लवक्री एांव लनिामी Sale & Auction
( C )
भाग ― ए ― Part A उत्तर Answer भाग ― बी ― Part B
स्टॉक सत्यापन Stock
verification
F A स्क्रप डीलिवरी Scrap
delivery
प्राप्ती आदशे Receipt order C B बेयरीग Bearing
एबीसी एनािेसीस ABC
analysis
I C प्राप्ती लवभाग Receiving
section
सेि इश्य ुनोट Sale issue note A D रेट काांन्ट्र्कट Rate contract
रेक्ट्शन मोटर Traction Motor E E ईिेक्ट्रीक िोको Electric
loco
फ्री ऑन रेि Free on Rail J F ए.एस.वी ASV
बीड शीट Bid Sheet G G नीिामी वीक्री Auction Sale
मेन िुप 85 Main group 85 B H लनरीक्षण एजेन्सी Inspection
sale
जेम GEM D I इांनवेंरी कां रोि Inventory
Control
आर.आय टी.ई.एस RITES H J डीिेवरी टमा Delivery Term
-
1.
सही उत्तर लिख ेSelect correct answer
1) रेल्व ेबोडा मे भांडार लनदशेािय------- के अांतगात आता ह ै ( A )
Stores Directorate in Railway Board is under -------------------------
A) महालनदशेक (आर.एस)Director General(RS) B) सद्सस्य रक्ट्शन Member Traction
B)सद्सस्य यातायात Member Traffic D) सद्सस्य कामीक Member Staff
2) खररद मुल्य रु ----से अधीक होने पर खुिी लनलवदा अपनाई जाती ह ै ( B )
Open Tender is adopted when purchase value is more than Rs.------
A) 10 िाख lakhs B) 25 िाख lakhs
B) 5 िाख lakhs D) 30 िाख lakhs
3) भांडार कोड के कीतने भाग होते ह ैstores code in how many parts ----------- ( A )
A) 2 B ) 1 B) 4 D) 3
4) लनलवदा सलमती खररद मुल्य रु-------- के उपर होन ेपर अपनाई जाती ह ै ( D )
The cases are dealt by tender committee when purchase value is more than Rs--- A) 5 Lakhs B ) 10 lakhs B) 15 lakhs D ) 45 lakhs
5) A शे्रणी मदो का प्रतीशत कुि उपभोग मुल्य का ------ होता ह ै . ( B )
A category items represents -----percentage of total consumption value . A) 50 B ) 90 B) 70 D ) 10
6) आठ अांको वािा मुल्यसुलच क्रमाांक मे .23.25.4581 ------------- ह.ै ( A )
In eight digit Price List number 23.25.4581 is ------------
A) लवद्युत मद Electrical item B) लडजि मद Diesel item
B) स्टेशनरी मद Stationary item D ) एस और टी S & T item
7) आठ अांको वािा मुल्यसुलच क्रमाांक मे 85.01.1812 , 181 क्ट्या ह ै----------------- ( C )
In 8 digit PL NO.85.01.1812,181 is called -------------
A) मेन िुप Main group B ) सब िुप Sub group
C ) चके लडजीट Check digit D) ईनम ेसे कोई नही None of the above
8 ) क्षेत्रीय स्तर पर भांडार सांघटन के प्रमुख ------ होते ह ै ( C )
Principal Head of stores Department on a Zonal Railway is—-----------
A )मुख्य सामिी प्रबांधक chief Materials Manager B ) सद्सस्य याांत्रीक Member Mechanical
C ) प्रमुख मुसाप्र Principal CMM D ) मुख्य सीओएस Chief COS
9) पी.एि क्रमाांक मे सब िुप----------द्वारा दशााया जाता ह.ै ( B )
In PL. NO. the subgroup to be represented by ---------
A)) पहिे दो अांक First two digits B) लतसरा और चौथा अांक 3rd & 4th digits
C) पाचवा और छटःअांक 5th & 6th digits D) दसुरा और लतसरा अांक2nd & 3rd digits
9) बफर स्टाक ------ के कारण रखा जाता ह ै Buffer stock is provided -----------( A )
A) आकस्मात आवश्क्तको पुरा करन ेहते ुTo meet unforeseen requirements
B) दसुरे लडपो को भजेने हते ुTo supply items to other Depots
C) चोरी गये माि कक पुती हतेु To make shortfall due to theft
D) स्थलनय खररद करने हतेु To arrange local purchase
-
1.
10) यदी मयााकदत/खुलि लनलवदा मे एकही लनलवदा प्राप्त होती ह ैतो उसे ----- कहते ह ै ( A )
Only one offer received in respect of Limited/Open tender is called --------
A) एकि लनलवदा Single offer B) डीिेड लनलवदा Delayed offer
C) अांसोलिलसटेड लनलवदा Unsolicited offer D) गैर लसवकृत लनलवदा Unapproved offer
11) पी.ए.सी. यह ------------- के मदो खररद हतेु जारी कक जाती ( A )
PAC is to be issued for the item required to be purchased from ----
A) एकि फमा Single firm only B) अनुमोकदत फमा Approved firms only
C) आरडीएओ अनुमोकदत फमा RDSO Approved firms only D) ईनम ेसे कोई नही None of above
12) उपभोक्ता को जरुरीत नही ऐसी सामिी----- के द्वारा भांडार लडपो को िौटाई जाती ( C )
Item not required by user can be returned to stores depot on ---------------
A) लवक्री नोट Sale issue note B) मायनस लनगाम नोट Minus issue note
C)डी.एस. 8 नोट DS-8 Note D) मागपत्र Indent
13) जल्दी आपुती के द्वारा लनिीत कक जाती ---------- ( C )
Purchase finalized on the criteria of ―EARLY DELIVERY ― is known as------
A) लपएसी खररद PAC purchase B) लवशेष खररद Special purchase
C ) समय प्राथलमकता खररद Time preference Purchase
D) दरेरसे खररद Delayed purchase
14) यह लनलवदा सलमती के सद्सस्य नही होते ------------- ( D )
Following is not the member of Tender committee for finalization of Tender----
A)उपभोकता लवभाग के अलधकारी Officer of consuming department
B) भांडार लवभाग के अलधकारी Officer of Stores department
C) िेखा लवभाग के अलधकारी Officer of Accounts department
D ) ईनम ेसे कोई नही None of above
15) खररद का उदशे्य ------- ह ै Which is the objective of purchasing _________( D )
A) सलह समय पर सही मात्रा Right quantity at right time
B) सलह मुल्य पर सही गुणवत्ता Right quality at right price
C) सलह स्तोत्र और सही समय Right source & delivery at right place
D) उपरोक्त सभी All of above
16) पीछि े24 मलहनों से लनगाम नही कीया गया सामिी को क्ट्या कहते ह-ै------- ( A )
Stores with no issues over 24 months are called as ------------------
A) अलधशेष Surplus B) लनष्क्रीय inactive
C) ओवर स्टाकOverstock D) ईनम ेसे कोई नही None of the above
17) सामिी अलधशेष होन ेके कारण Surplus stock may be due ------------------ ( D )
A)पिाांट एवां ईकयूपमेंट के आकार मे पररवतान होना Change in structure or plant and equipment B)
नयी गुणवत्ता िाग ुकरना Introduction of new standard
C)नयी कायाप्रणािी िाग ुकरना Introduction of new procedure
D) उपरोक्त सभी All of the above
-
1.
18) क्रय के उदशेय लनम्न मे से क्ट्या ह ैWhich is/are the objective of purchasing ------ ( D )
A) सही समय पर सही मात्रा की क्रय करना Right quality at right time
B) सही मुल्य पर सही गुणवत्ता की क्रय करना Right quality at right price
C) सही स्तोत्र स े सही स्थाांन पर आपुती करना Right source and delivery at right place
D ) उपरोक्त सभी All of the above
19) अचि अलधशेष ईनम ेसे कौनसी सामिी को माना जाता ह ैDead surplus is item-------------( D )
A) जो 12 महीनों से लनगाम नही हुआ Not issued for 12 months
B) जो 24 महीनों से लनगाम नही हुआ Not issued for 24 months
C) 24 महीनों से लनगाम नही हुआ ,आगे 12 महीनों मे माांगा नही जायेगा
Not issued for 24 months and there is no likely demand in next 12 months
D) लपछिे 24 महीनों स ेलनगाम नही हुआ ,आगे 24 महीनों मे लनगाम नही होगा
Not issued for 24 months and there is no likely demand in next 24 months
सांलक्षप् त में उत् तर लिखें। Write in Short.
1. टना ओवर रेशो । TOR
2. ए.बी.सी. अनािसेीस । ABC analysis
3. पीएि का एकत्रीकरण । Unification of PL
4. िॉट बनाना । Lot formation
5. भांडार का मांडिीकरण । Divisionalization of stores depot
6. दर ठेका । Rate contract
7. चािु ठेका । Running contract
8. सवेक्षण शीट क्ट्या ह ैWhat is Survey Sheet?
9. लिलववडतेटेड Liquidated Damages
10. बफर स्टाक Buffer stock
11. जोलखम खररद Risk purchase
12. बयाना रकम Earnest Money
13. सूरक्षा जमा Security Deposit
14. भांडार सांरक्षण क्ट्या ह ै ? What is preservation of Stores?
15. डीपो मे गैर स्टाक माांगपत्र प्राप्त होने पर डीपो की कायालवलध लिख े?
Write the procedure in the depot after receiving Non stock Indent ?
16. सांक्रमन भांडार Stores in Transit.
17. डीपो का प्रारांलभक शेष रु 6 करोड ह ै,प्राप्ती 94 करोड ह ैऔर अांलतम शेष 3 करोड ह ैटना ओवर रेशो
लनकाि?ेOpening Balance is Rs.6 Corers ,total receipt is 94 crores and closing balance is
Rs. 3 crores .What is TOR ?
18. इांवेंरी कां रोि क्ट्या ह ै What is Inventory Control ?
19. खररद उचांत Purchase suspense
20. सव ेकलमटी Survey committee.
21. लवक्री उचांत Sale suspense.
-
1.
22. स्टॉक मदो का सांलहताकरण । Codification of stock items
23. आरक्षीत मुल्य क्ट्या ह ै What is Reserve price ?
24. कद.01.07.2017 को 120 मेरीक टन मेिटींग़ रदी सामिी रु7000 /- प्रती मेरीक टन इस दर स ेबेचा गया
.बयाना राशी और शेष राशी बताय े120 Metric tons scrap melting is sold in auction sale of on
01.07.2017 at rate 7000/-per metric tons .What is EMD ?what are the balance amount ?
25. कद.01.01.2016 को डीपो का प्रारांलभक शेष रु 8 करोड ह ै .वषा 2016-17 कक प्राप्ती रु.58 करोड ह ै . टना
ओवर रेशो 10% ह ै . वषा का लनगाम क्ट्या ह ै Opening balance of depot on 01.01.2016 is 8 corers
.Receipt during the year 2016-2017 is 58 corers.TOR achieved is10% .Find out the issue made during the year
26..ईनवेंटरी लनयांत्रण मे वीईडी वीशे्लशन के मह्त्व िीख े।What is the importance of VED analysis in
Inventory Control
27 ) स्र्कैप सामग़्री के िॉट के गठ्ण करते समय िी जाने वािी सावधानीयॉ का उल्िेख करे ।
Which are the precautions should be taken at the time of formation of scrap lot ?
28).सांयुक्त लनरीक्षण Joint Inspection of scrap lot
29).डीपो स्तर पर स्थानीय खरीद । Local purchase of material in Depot
30) मोडू्यस 11 पध्द्सती स्पष्ट करे Explain modulus 11 method ?
31)स्टाक मद ेऔर गैर- स्टाक मदों का अांतर स्पष्ट करे
Write difference between stock item and non- stock item?
32 ) क्षेत्रीय रेल्व ेमे भांडार लवभाग का सांगठन लिख े?
Write the stores structure at Zonal Railway level ?
33) रेल्व े बोडा मे भांडार लवभाग का सांगठन लिख े?
Write the stores structure at Railway Board level?
लवस् तार से उत् तर लिखें। Write in Detail.
1) रेल्व ेमे लनलवदाओं के कोई तीन प्रकार । Any three modes of tendering in Railways.
2) भांगार सामिी डपेो मे प्राप्त होने से लडलिवरी तक की प्रकक्रया स्पष्ट करें। Explain procedure after receipt
of scrap material up to delivery of material.
3) लनलवदाओ के प्रकार और उनके प्रयोग ।
What are the types of tender & when it is applicable?
-
1.
4) भांडार डीपो के प्रालप्त लवभाग में आयी सामिी की प्राप्ती और उसके िेखाकरण का उल्िेख करे । Explain
procedure for receipt of material, its accountal & payment to firm.
5)ररलसलवग लवभाग मे सामलि प्रालप्त की पध्दती लवस्तार से लिख े?
Write procedure of Receiving section section after receiving material ?
6) भांडार डीपो का िेआउट लिखे ? Explain the Layout of stores depot ?
7) ए केटेगरर सूरक्षा मद का स्टाक 600 नग ह,ैकवडा डु्यज 100 नग कद.31.03.2017 .ठेका अवधी की मात्रा
कद.01.01.2018 से 31.12.2018 लनकािे. AAC of A category Safety item is 600 Nos. The covered
dues is 100 Nos.stock on hand on 31.03.2017 is 100 Nos . What is the contract period requirement . and contract period from the 01.01.2018 to 31.12.2018 ?
8)लनलवदाओ के प्रकार लिख े?मयााकदत लनलवदा लिख े?
Write the types of Tender ? Explain limited Tenders ?
9) दर ठेका और चािु ठेका क्ट्या ह ैWhat is Rate contract & Running contract ?
10) भंडार विभाग के कार्य विखे What are the main functions of Materials Management
Departments/stores Departments ?
11) लडपो खुिने स े बांद होन े तक लड.एम.एस के काया लिख े /Describe duties of DMS of ward from
opening of stores depot to closing of stores depot.
12) एलसड ,िकडी ,कॉच ,कपडा का सांरक्षण कैसे ककया जाता हEैxplain preservation of acid, timber
,glass ,cloth and paint?
13) एक लडपो मे लनम्नलिखीत मद ेस्टाक की गयी ह ै /ईनका ए,बी.सी वगीकरण करे? The following items
are stocked in the depot. Classify the items as A,B & C
ITEM VALUE
1 10,000
2 28,00,000
3 3,00,000
4 45,000
5 90,000
6 55,000
7 18,000
8 6,00,000
9 1,40,000
10 6000
11 1,50,000
12 10,200
13 14,000
14 20,000
15 28,000
16 16,000
17 15,000
18 16000
19 3500
20 4000
-
1.
14) सामिी प्र्बांधन के अलधकतम-न्युनतम पदध्ती स्पष्ट करे ?
Explain minima and maxima method in material management ?
15) लप.ए.सी. क्ट्या ह ै? सामिी कक खरीद एकि लनलवदा पर कैसे की जाती ह?ै
What is a PAC? Explain how material are purchased on single tender ?
16) िेजर अनुभाग का काया लिख ेWrite the function of Ledger of ledger section ?
17) बयाना राशी और सुरक्षा राशी स्पष्ट करे Explain EMD & SD ?