PROYECTO: RED SECUNDARIA Y CONEXIONES DOMICILIARIAS DE LA LOCALIDAD DE CALLODISTRITO: SAN PEDRO DE CHANA
VALORIZACION FINAL DE AVANCE DE OBRA
CONTRACTUAL Avance Acumulado Anterior Avance Actual Avance Acumulado Actual Saldo a EjecutarITEM DESCRIPCION UNIDAD CANT P.U. TOTAL Metrado Monto US$ % Avance Metrado Monto Avance Metrado Monto Saldo Metrado Monto
S/. S/. % Actual S/. % Acumulado S/. % por ejecutar S/.
1.00 OBRAS PRELIMINARES1.01 MOVILIZACION Y DESMOVILIZACION Glb. 1 3,500.00 3,500.00 0.0% 100% 1.00 3,500.00 100% 1.00 3,500.00 0% 0.00 0.001.02 CARTEL DE OBRA Glb. 1 1,038.68 1,038.68 0.0% 100% 1.00 1,038.68 100% 1.00 1,038.68 0% 0.00 0.001.03 REPLANTEO TOPOGRAFICO E ING. DE DETALLE Loc. 1 597.41 597.41 0.0% 100% 1.00 597.41 100% 1.00 597.41 0% 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
2.00 INSTALACION DE POSTES DE FIERRO 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
2.01u 20 70.95 1,419.00 0.0% 100% 20.00 1,419.00 100% 20.00 1,419.00
0% 0.00 0.00
2.02 m3 16 33.57 537.12 0.0% 100% 16.00 537.12 100% 16.00 537.12
0% 0.00 0.00
2.03 u 7 104.27 729.89 0.0% 100% 7.00 729.89 100% 7.00 729.89
0% 0.00 0.00
2.04 u 13 98.28 1,277.64 0.0% 100% 13.00 1,277.64 100% 13.00 1,277.64
0% 0.00 0.00
2.05 m3 15.2 39.12 594.62 0.0% 100% 15.20 594.62 100% 15.20 594.62
0% 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
3.00 INSTALACION DE RETENIDAS 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
3.01m3 5.4 33.57 181.28 0.0% 100% 5.40 181.28 100% 5.40 181.28 0% 0.00 0.00
3.02 INSTALACION DE RETENIDA INCLINADA u 5 52.30 261.50 0.0% 100% 5.00 261.50 100% 5.00 261.50 0% 0.00 0.003.03 INSTALACION DE RETENIDA VERTICAL u 1 64.61 64.61 0.0% 100% 1.00 64.61 100% 1.00 64.61 0% 0.00 0.003.03
m3 5.4 35.18 189.97 0.0% 100% 5.40 189.97 100% 5.40 189.97 0% 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
4.00 MONTAJE DE ARMADOS 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 EN POSTES DE RED SECUNDARIA: 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
4.01 E1 u 8 21.68 173.44 0.0% 100% 8.00 173.44 100% 8.00 173.44 0% 0.00 0.004.02 E2 u 29.65 0.00 0.0% 100% 0.00 0.00 100% 0.00 0.00 0.00 0.004.03 E3 u 13 22.46 291.98 0.0% 100% 13.00 291.98 100% 13.00 291.98 0% 0.00 0.004.04 E4 u 1 35.50 35.50 0.0% 100% 1.00 35.50 100% 1.00 35.50 0% 0.00 0.004.05 E5 u 3 50.33 150.99 0.0% 100% 3.00 150.99 100% 3.00 150.99 0% 0.00 0.004.13 EMPALME EN "T" u 1 15.90 15.90 0.0% 100% 1.00 15.90 100% 1.00 15.90 0% 0.00 0.004.14 EMPALME EN "X" u 1 19.98 19.98 0.0% 100% 1.00 19.98 100% 1.00 19.98 0% 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 COMPRENDE TENDIDO Y PUESTA EN FLECHA DE: 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
5.03 km 0.525 1,145.08 601.17 0.0% 100% 0.53 601.17 100% 0.53 601.17 0% 0.00 0.00
5.04 km 0.3675 920.90 338.43 0.0% 100% 0.37 338.43 100% 0.37 338.43 0% 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
TRANSPORTE DE POSTE DE C.A.C. DE 8m, DE ALMACEN A PUNTO DE IZAJE
EXCAVACION EN TERRENO NORMAL PARA POSTE DE C.A.C. 8 m
IZAJE, DE POSTE DE C.A.C. DE 8 m/200daN, INCLUYE NUMERACION
IZAJE, DE POSTE DE C.A.C. DE 8 m/300daN, INCLUYE NUMERACION
RELLENO Y COMPACTACION PARA CIMENTACION DE POSTE
EXCAVACION DE ZANJA PARA RETENIDA EN TERRENO NORMAL
RELLENO Y COMPACTACION PARA INSTALACION DE BLOQUE DE ANCLAJE
CONDUCTOR AUTOPORTANTE DE ALUMINIO 3X25+16 mm2
CONDUCTOR AUTOPORTANTE DE ALUMINIO 3X16+16 mm2
2 de 2
VALORIZACION FINAL DE AVANCE DE OBRA
CONTRACTUAL Avance Acumulado Anterior Avance Actual Avance Acumulado Actual Saldo a EjecutarITEM DESCRIPCION UNIDAD CANT P.U. TOTAL Metrado Monto US$ % Avance Metrado Monto Avance Metrado Monto Saldo Metrado Monto
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
7.00 PASTORALES LUMINARIAS Y LÁMPARAS 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
7.01 INSTALACION DE PASTORAL DE AoGo u 4 27.08 108.32 0.0% 100% 4.00 108.32 100% 4.00 108.32 0% 0.00 0.007.02 INSTALACION DE LUMINARIA Y LAMPARA u 4 35.50 142.00 0.0% 100% 4.00 142.00 100% 4.00 142.00 0% 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
8.00 CONEXIONES DOMILIARIAS 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.008.01
u 27 108.55 2,930.85 0.0% 100% 27.00 2,930.85 100% 27.00 2,930.85 0% 0.00 0.008.02
u 27 90.34 2,439.18 0.0% 100% 27.00 2,439.18 100% 27.00 2,439.18 0% 0.00 0.00 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.009.00 PRUEBAS Y PUESTA EN SERVICIO 0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0.00 0.009.01 PRUEBAS Y PUESTA EN SERVICIO Loc. 1 2,617.20 2,617.20 0.0% 100% 1.00 2,617.20 100% 1.00 2,617.20 0% 0.00 0.009.02 EXPEDIENTE TECNICO FINAL CONFORME A OBRA km 0.8925 2,085.97 1,861.73 0.0% 100% 0.89 1,861.73 100% 0.89 1,861.73 0% 0.00 0.00
0.00 0.0% 0.00 0.00 0% 0.00 0.00 0% 0.00 0.000.00 0% 0.00 0.00
TOTAL MONTAJE ELECTROMECANICO 22,118.39 0.00 0.0% 100% 22,118.39 100% 22,118.39 0.00 0.00 (No incluiye I.G.V)
INSTALACION DE ACOMETIDA DOMICILIARIA, QUE CONPRENDE : CABLE DE ACOMETIDA, CAJA PORTAMEDIDOR Y MEDIDOR DE ENERGIA ACTIVA
INSTALACION DE ACOMETIDA DOMICILIARIA LARGA (INCL. CAJA Y MEDIDOR DE ENERGIA)
INSTALACION DE ACOMETIDA DOMICILIARIA CORTA (INCL. CAJA Y MEDIDOR DE ENERGIA)