7/31/2019 VAL N 02 - JUNIO 2012 ok
1/27
DATOS DE OBRA
LICITACION LP N 0002-2011-CE-LP-EPS-TACNA SA CONTRATO N 007-2012-300-EPS TACNA S.A. CONTRATANTE ENTIDAD PRESTADORA DE SERVICIOS DE SANEAMIENTO TACNA SA OBRA MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIU
SISTEMA SUMA ALZADA UBICACIN TACNA - TACNA - TACNA
MONTOS PLAZOS
PLAZO PLAZ
SIN IGV CON IGV SIN IGV CON IGV CONTRATO 11,436,152.12 13,494,659.50 10,292,536.91 12,145,193.55 AMP PLAZO N 01
PORCENTAJE 90.00% AMP PLAZO N 02
RESUMEN DE VALORIZACION PLAZO FINAL
%
1 Apr-12 985,348.31 8.1% 73,917.45 19.64 2 May-12 602,268.56 5.0% 29,826.35 255.20 3 Jun-12 893,039.48 7.4%4 Jul-12 607,416.34 5.0%5 Aug-12 504,521.77 4.2%6 Sep-12 746,874.30 6.1%7 Oct-12 979,528.63 8.1%8 Nov-12 1,216,614.52 10.0%9 Dec-12 1,388,494.44 11.4%
10 Jan-13 875,329.71 7.2%11 Feb-13 699,319.70 5.8%12 Mar-13 1,090,023.34 9.0%
PROGRAMADO
MONTO CONTRATOVALOR REFERENCIAL
REDEDUCCIONREAJUSTEVAL BRUTAMESN VAL
7/31/2019 VAL N 02 - JUNIO 2012 ok
2/27
Proyecto
Contrato N 007-2012-300-EPS TACNA S.A.
Contratista
Supervision CONSORCIO CAPLINA
62,641.91 25,276.56 87,918.47
VALORIZACION BRUTA 62,641.91 25,276.56 87,918.47
REAJUSTES 16.64 216.27 232.91
AMORTIZACION POR ADELANTO DIRECTO (5%) 3,132.10 1,263.83 4,395.92
AMORTIZACION POR ADELANTO MATERIALES (10%) 0.00 0.00 0.00
VALORIZACION NETA 59,526.45 24,229.01 83,755.46
IGV 18.00% 10,714.76 4,361.22 15,075.98
TOTAL A FACTURAR 70,241.21 28,590.23 98,831.44
OTROS 0.00 0.00 0.00
TOTAL A PAGAR S/. 70,241.21 28,590.23 98,831.44
COSTO A VALORIZAR : EJECUCION DE OBRA
CALCULO DE FORMA DE PAGOVALORIZACION DE OBRA N 02 A JUNIO 2012
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLEEN LA CIUDAD DE TACNA
CONSORCIO COLLAO
CALCULO DE PAGOVALORIZACIONES S/,
ACUM MESANTERIOR
EN EL MES ACUMULADO
7/31/2019 VAL N 02 - JUNIO 2012 ok
3/27
Proyecto
Contrato N 007-2012-300-EPS TACNA S.A.Contratista
VAL. MES CONC
N
CONTRATO DE OBRA S / IGV 0.00 10,292,536.91
01 May-12 VALORIZACION DE OBRA
EJECUCION DE OBRA 02 Jun-12 VALORIZACION DE OBRA
ANTICIPO SOLICITADO (C / IGV) 0.00 607,259.68 03 Jul-12
ANTICIPO SOLICITADO (S / IGV) 0.00 514,626.85 04 Aug-125.00% 05 Sep-12
06 Oct-12
FECHA DE PAGO: 5/5/2012 07 Nov-12
AMORTIZACION ACTUAL ACUMULADA
LOS MONTOS EN EL CUADRO DE AMORTIZACION NO INCLUYEN IGV
CONTROL DE AMORTIZACION DEL ADELANTO DIRECTO
VALORIZACION DE OBRA N 02 A JUNI
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDA
DATOS GENERALES
CONSORCIO COLLAO
7/31/2019 VAL N 02 - JUNIO 2012 ok
4/27
Proyecto
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD
Contrato N 007-2012-300-EPS TACNA S.A.Contratista
ADELANTO ADELANTO EN OTORGADO EFECTIVO
Adelanto Directo por : EJECUCION DE OBRA 514,626.85 I.G.V. 92,632.83Total 607,259.68
Adelanto Directo TOTAL 514,626.85 I.G.V. 92,632.83
TOTAL S/. 607,259.68
ANTICIPO AMORTIZADO ACUMULADO A AMORTIZACION VALORIZACION DE OBRA N 02 A JUNIO 2012 ACUMULADA
DE ANTICIPO
Amortizacin Adelanto Directo por : EJECUCION DE OBRA 4,395.92 I.G.V. 791.27Total 5,187.19
Amortizacin TOTAL 4,395.92 I.G.V. 791.27
TOTAL ANTICIPO AMORTIZADO 5,187.19
SALDO POR ANTICIPO EN AMORTIZAR EFECTIVO
Saldo por Amortizar Adelanto Directo por : EJECUCION DE OBRA 510,230.92 I.G.V. 91,841.56Total 602,072.48
Saldo por Amortizar Adelanto Directo TOTAL 510,230.92 I.G.V. 91,841.56TOTAL ADELANTO DIRECTO POR AMORTIZAR 602,072.48
CONTROL DE AMORTIZACION DEL ADELANTO DIRECTO
VALORIZACION DE OBRA N 02 A JUNIO 2012
CONSORCIO COLLAO
7/31/2019 VAL N 02 - JUNIO 2012 ok
5/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION D
Contrato N 007-2012-300-EPS TACNA S.A.Contratista
Frmula 1 INSTALACION DE TUBERIAS
01 01 May-12 58,061.47 2,903.07 2,903.07 1.004
02 01 Jun-12 16,137.05 806.85 806.85 1.004
03 01 Jul-12
04 01 Aug-12
74,198.51 3,709.93 3,709.93
V = Monto Valorizado 58,061.47
A = Adelanto Otorgado ( Sin IGV) S/. 183,891.54
C = Monto del Presupuesto Contractual (Sin IGV) S/. 3,677,830.87
Ka = Factor del Mes de Adelanto May-12
Kr = Factor del Mes de Reajuste May-11
Frmula 2 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORI
01 02 May-12 3,169.13 158.46 158.46 1.000
02 02 Jun-12 2,025.00 101.25 101.25 1.00003 02 Jul-1204 02 Aug-12
5,194.13 259.71 259.71
V = Monto Valorizado 3,169.13
A = Adelanto Otorgado ( Sin IGV) S/. 251,891.77
C = Monto del Presupuesto Contractual (Sin IGV) S/. 5,037,835.45
Ka = Factor del Mes de Adelanto May-12
Kr Factor del Mes de Reajuste May 12
REAJUSTES QUE NO CORRESPONDEN POR A
EJECUCION DE OBRA
VALORIZA. N.FORMULA
POLINOMICAN.
MESVALORIZ
AMORTIZACIONES
MONTOVALORZ. (V)
AMORTIZAC.(V*A)/C
AMORT.MENSUAL
K MES ADE(Ka)
TOTALES
ESPECIFICACIONES
VALORIZA. N.FORMULA
POLINOMICAN.
MESVALORIZ MONTO
VALORZ. (V)AMORTIZAC.
(V*A)/CAMORT.
MENSUALK MES ADE
(Ka)
AMORTIZACIONES
CONSORCIO COLLAO
TOTALES
ESPECIFICACIONES
7/31/2019 VAL N 02 - JUNIO 2012 ok
6/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUContrato N 007-2012-300-EPS TACNA S.A.Contratista
Frmula 1 INSTALACION DE TUBERIAS
01 01 May-12 39,707.051 1.004 161.85
02 01 Jun-12 41,033.689 1.004 167.25
03 01 Jul-12 33,722.214
04 02 Aug-12 40,886.097
05 03 Sep-12 50,888.250
06 04 Oct-12 115,650.241
07 05 Nov-12 168,443.256
08 06 Dec-12 199,402.601
09 07 Jan-13 271,942.910
10 08 Feb-13 228,677.631
11 09 Mar-13 324,652.404
12 10 Apr-13 476,352.272
13 11 May-13 457,120.199
14 12 Jun-13 415,965.719
15 13 Jul-13 367,955.116
16 14 Aug-13 433,716.140
17 15 Sep-13 11,715.081
3,677,830.87 329.10
Frmula 2 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
01 02 May-12 0.000 1.000 -
02 02 Jun-12 2,123.800 1.000 0.23
03 02 Jul-12 16,459.473
04 02 Aug-12 33,135.136
05 02 Sep-12 166,827.124
06 02 Oct-12 291,428.321
CALCULO DE REAJUSTES A
VALORIZA. N.FORMULA
POLINOMICA N.MES VALORIZ.
REAJUSTE SEGN AVANCE PROGRAM
TOTALES
VALORIZA. N.FORMULA
POLINOMICA N.MES VALORIZ.
REAJUSTE SEGN AVANCE PROGRAM
MONTOPROGRAMADO
KREAJUSTE V
(K-1)
CONSORCIO COLLAO
MONTOPROGRAMADO
KREAJUSTE V
(K-1)
7/31/2019 VAL N 02 - JUNIO 2012 ok
7/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TAC
Contrato N 007-2012-300-EPS TACNA S.A.
Contratista
ADELANTO S/.OTORGADO
ADELANTO PARA MATERIALES S/. 1,029,253.69 I.G.V. 195,558.20 Total 1,224,811.89
ADELANTO AMORTIZADO ACUMULADO A AMORTIZACION VALORIZACION DE OBRA N 02 A JUNIO 2012 ACUMULADA
Amortizacin ADELANTO PARA MATERIALES S/. 0.00I.G.V. 0.00 Total 0.00
SALDO POR ADELANTO AMORTIZAR PARA MATERIALES
Saldo por Amortizar ADELANTO PARA MATERIALES S/. 1,029,253.69I.G.V. 195,558.20 Total 1,224,811.89
CONTROL DE AMORTIZACION DEL ADELANTO PARA MATERIALES
VALORIZACION DE OBRA N 02 A JUNIO 2012
CONSORCIO COLLAO
7/31/2019 VAL N 02 - JUNIO 2012 ok
8/27
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
Supervisor CONSORCIO CAPLINA
VAL. MES CONCEPTO OTORGADO MONTO AMORTIZ. AMORTIZN VALORIZ. ANTERIOR EN EL ME
01 Jan-11 Formula1 INSTALACION DE MEDIDORES, VALVULA 1,029,253.69 2,025.00 0.00VALVULA DE BRONCE IMPORTADA (Reagrupado 30) 1,029,253.69 0.00
PARCIAL 01 1,029,253.69 2,025.00 0.00 0.00
Contrato
Contratista
AMORTIZACION DEL ADELANTO PARA MATERIALES S/IGV
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMADE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DETACNA
CONTROL DE AMORTIZACION DEL ADELANTO PARA MATERIALES
VALORIZACION DE OBRA N 02 A JUNIO 2012
Proyecto
7/31/2019 VAL N 02 - JUNIO 2012 ok
9/27
Formula 1 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOSIU 30Material VALVULA DE BRONCE IMPORTADA (Reagrupado 30)Adelanto N01 1,029,253.69Fecha Pago 6/5/2012
Sald
ADELANTO Io Ia Saldo
N Coef . % Oct-11 Jun-12 Mes Ir Adelanto01 JUNIO 2012 30 1 0.352 100.000% 361.12 357.90 jun-12 357.90 1,038,513.81 -01 JULIO 2012 30 1 0.352 100.000% 361.12 357.90 jul-12 1,038,513.8101 AGOSTO 2012 30 1 0.352 100.000% 361.12 357.90 ago-1201 ETIEMBRE 201 30 1 0.352 100.000% 361.12 357.90 sep-1201 OCTUBRE 2012 30 1 0.352 100.000% 361.12 357.90 oct-12
0.00
TOTALES S/.
ACUM TOTALES S/.
DEDUCCION DE ADELANTO MATERIALES
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN L
INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
Valorizacin N IU FORIncidencia Reajuste Adelanto
Utilizado
7/31/2019 VAL N 02 - JUNIO 2012 ok
10/27
CONSORCIO COLLAO
Obra
Fecha presupuesto Oct-11 Ubicac
Frmula 1 CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
Monomio Factor Porcentaje (%) Smbolo Indice Descripcin
1 0.275 100.000% M 47 MANO DE OBRA2 0.192 100.000% I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR3 0.184 100.000% A 2 ACERO DE CONSTRUCCION LISO4 0.175 100.000% C 21 CEMENTO PORTLAND TIPO I5 0.079 53.165% MT 49 MAQUINARIA Y EQUIPO IMPORTADO
0.079 46.835% 72 TUBERIA DE PVC
6 0.095 100.000% M 44 MADERA TERCIADA PARA CARPINTERIA1.000
Frmula 1 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
Monomio Factor Porcentaje (%) Smbolo Indice Descripcin
1 0.094 100.000% M 47 MANO DE OBRA2 0.191 100.000% I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR3 0.105 11.429% TT 65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
0.105 88.571% 72 TUBERIA DE PVC PARA AGUA4 0.100 100.000% V 77 VALVULA DE BRONCE NACIONAL
5 0.158 100.000% V 78 VALVULA DE FIERRO FUNDIDO NACIONAL6 0.352 100.000% V 76 VALVULA DE BRONCE IMPORTADA (Reagrupado 30)
1.000
Frmula 1 INSTALACION DE TUBERIAS
Monomio Factor Porcentaje (%) Smbolo Indice Descripcin
1 0.202 100.000% M 47 MANO DE OBRA2 0.192 100.000% I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR3 0.203 100.000% M 49 MAQUINARIA Y EQUIPO IMPORTADO4 0.217 23.502% TA 13 ASFALTO
0.217 76.498% 72 TUBERIA DE PVC PARA AGUA5 0.123 10.569% CA 2 ACERO DE CONSTRUCCION LISO
0.123 89.431% 21 CEMENTO PORTLAND TIPO I6 0.063 100.000% F 32 FLETE TERRESTRE
1.000
Frmula polinmica
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIB
7/31/2019 VAL N 02 - JUNIO 2012 ok
11/27
Ao Enero Febrero Marzo Abril Mayo 2011 723.71 721.31 717.4 766.53 760.69 2012 793.53 792.13 790.22 787.98 789.88
Ao Enero Febrero Marzo Abril Mayo 2011 533.49 578.78 586.17 591.89 583.48 2012 531.59 522.59 506.05 500.27 505.67
Ao Enero Febrero Marzo Abril Mayo 2011 528.61 573.48 580.8 586.47 578.14 2012 526.73 517.8 501.65 496.88 498.41
Ao Enero Febrero Marzo Abril Mayo 2011 515.77 530.2 513.75 517.59 518.18 2012 551.55 543.13 550.56 546.24 555.2
Ao Enero Febrero Marzo Abril Mayo 2011 619.69 623.1 609.6 614.27 613.21
2012 620.63 616.33 621.26 611.54 608.43
Ao Enero Febrero Marzo Abril Mayo 2011 899.42 929.76 926.74 938.83 908.63 2012 837.58 860.62 874.54 856.09 836.45
Ao Enero Febrero Marzo Abril Mayo 2011 651 672.79 668.59 674.82 652.05 2012 593.43 612.88 623.53 608.05 598.55
Ao Enero Febrero Marzo Abril Mayo 2011 841.95 878.61 870.48 877.17 844.33
2012 780.85 808.75 826.61 803.22 795.62
Ao Enero Febrero Marzo Abril Mayo 2011 299.05 297.22 295.68 299.51 295.26 2012 286.43 285.47 284.19 282.7 283.98
Ao Enero Febrero Marzo Abril Mayo 2011 328.44 329.89 332.94 334.51 335 2012 338.18 337.28 339.58 344.29 345.54
Ao Enero Febrero Marzo Abril Mayo
2011 231.86 230.45 230.11 233.09 229.78 2012 211.4 208.78 205.64 204.68 208.33
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
Resultad
Consulta por Tema
136 resultados encontrados de consulta multiplePara los Aos seleccionados : 2012, 2011
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul 1992=100 0)
7/31/2019 VAL N 02 - JUNIO 2012 ok
12/27
Ao Enero Febrero Marzo Abril Mayo 2011 449.87 447.11 444.81 450.56 444.16 2012 512.99 511.28 509.01 506.32 508.62
Ao Enero Febrero Marzo Abril Mayo 2011 383.37 381.61 379.29 382.96 378.87 2012 414.25 413.57 411.72 409.79 411.95
Ao Enero Febrero Marzo Abril Mayo 2011 356 355.5 358.42 366.61 363.73 2012 354.05 354.43 354.39 355.21 357.9
Ao Enero Febrero Marzo Abril Mayo 2011 358.03 359.37 358.3 358.97 356.82
2012 355.55 357.1 357.26 357.75 361.24
Ao Enero Febrero Marzo Abril Mayo 2011 427.41 427.41 423.94 423.94 423.94 2012 438.91 438.91 445.65 445.65 445.65
Ao Enero Febrero Marzo Abril Mayo 2011 592.49 609.99 609.97 617.83 606.76 2012 610.91 621.08 618.3 607.19 609.89
Ao Enero Febrero Marzo Abril Mayo 2011 506.11 506.11 504.82 504.39 504.39
2012 542.76 545.34 566.9 566.04 566.04
Ao Enero Febrero Marzo Abril Mayo 2011 276.17 284.36 283.86 283.02 280.64 2012 284.11 285.84 286.86 286.44 290.26
Ao Enero Febrero Marzo Abril Mayo 2011 489.51 501.56 485.05 487.7 489.01 2012 531.43 524.89 529.49 525.13 534.95
Ao Enero Febrero Marzo Abril Mayo 2011 356.05 357.41 359.92 362.38 362.29 2012 371.1 372.3 375.16 377.15 377.3
Ao Enero Febrero Marzo Abril Mayo 2011 273.94 275.96 278.73 278.73 277.59 2012 285.94 286.51 286.51 286.51 286.51
Ao Enero Febrero Marzo Abril Mayo 2011 353.81 353.76 351.59 353.81 354.47 2012 352.76 352.76 354.29 353.78 353.78
Ao Enero Febrero Marzo Abril Mayo
2011 230.01 229.32 227.69 229.21 227.55 2012 224.05 234.22 233.63 233.03 233.48
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul 1992 100 0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
7/31/2019 VAL N 02 - JUNIO 2012 ok
13/27
Ao Enero Febrero Marzo Abril Mayo 2011 399.02 402.2 397.54 399.93 404.81 2012 439.57 438.3 443.11 445.6 478.01
Ao Enero Febrero Marzo Abril Mayo 2011 547 597.21 594.11 628.75 619.82 2012 567.2 565.3 562.77 559.82 562.35
Ao Enero Febrero Marzo Abril Mayo 2011 417.48 458.78 456.41 462.32 455.75 2012 413.22 411.84 410 407.85 409.69
Ao Enero Febrero Marzo Abril Mayo
2011 186.7 188.69 187.35 187.35 188.17 2012 188.17 192.9 192.9 192.9 200.22
Ao Enero Febrero Marzo Abril Mayo 2011 295.5 295.5 295.5 295.5 295.5 2012 295.99 295.99 295.99 295.99 295.99
Ao Enero Febrero Marzo Abril Mayo 2011 315.61 332.9 347.75 352.25 347.25 2012 290.63 289.66 288.36 286.85 288.15
Ao Enero Febrero Marzo Abril Mayo
2011 398.5 402.07 407.69 411.24 407.02 2012 386.19 391.46 402.41 399.03 402.01
Ao Enero Febrero Marzo Abril Mayo 2011 233.35 233.35 231.38 231.38 231.38 2012 231.38 231.38 231.38 231.38 251.35
Ao Enero Febrero Marzo Abril Mayo 2011 297.41 293.47 291.89 296.89 276.71 2012 261.97 260.92 259.64 258.47 260.47
Ao Enero Febrero Marzo Abril Mayo 2011 418.14 415.01 447.7 453.5 454.3 2012 474.17 472.64 470.38 475.44 477.77
Ao Enero Febrero Marzo Abril Mayo 2011 318.62 323.1 324.99 329.14 328.62 2012 309.3 299.95 298.65 297.31 285.38
Ao Enero Febrero Marzo Abril Mayo 2011 403.28 406.66 406.8 406.8 410.32 2012 418.72 423.63 422.33 416.01 433.15
Ao Enero Febrero Marzo Abril Mayo 2011 209.28 209.28 218.25 218.25 218.25 2012 218.25 218.25 218.25 218.25 218.25
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
(ndice Base Jul.1992=100,0)
7/31/2019 VAL N 02 - JUNIO 2012 ok
14/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA
Contrato N 007-2012-300-EPS TACNA S.A.
Contratista CONSORCIO COLLAO
Supervision de Obra CONSORCIO CAPLINA
MONTOS TOTAL (sin/ IGV) MONTOS TOTAL (sin/ IGV) PORCENT
PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL A
S/ S/ % % S/ S/ %
(1) (2) (3) (4)
May-12 39,707.05 39,707.05 0.39% 0.39% 62,641.91 62,641.91 0.61%
Jun-12 43,157.49 82,864.54 0.42% 0.81% 25,276.56 87,918.47 0.25%
Jul-12 50,181.69 133,046.23
Aug-12 88,005.51 221,051.73
Sep-12 243,511.36 464,563.10Oct-12 470,406.39 934,969.48Nov-12 639,882.01 1,574,851.49Dec-12 849,658.91 2,424,510.40Jan-13 919,330.98 3,343,841.37Feb-13 700,439.23 4,044,280.60Mar-13 861,129.67 4,905,410.27Apr-13 1,043,583.76 5,948,994.03May-13 980,028.85 6,929,022.88Jun-13 945,848.96 7,874,871.84Jul-13 1,010,916.43 8,885,788.27
Aug-13 1,058,181.50 9,943,969.77Sep-13 348,567.15 10,292,536.92
TOTAL 10,292,536.92 1,574,851.49 0.81% 0.81% 87,918.47 0.86%
VALORIZACION DE OBRA N 02 A JUNIO 2012
EJECUCION DE OBRA
CUADRO COMPARATIVO DE AVANCE DE OBRA
MES
PROGRAMADO EJECUTADO
AVANCE DE OBRA
7/31/2019 VAL N 02 - JUNIO 2012 ok
15/27
ProyectoMEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN L
Contrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINA
PROGRAMADO PROG. ACUM. EJECUTADO EJEC ACUM PROGRAMA
-May-12 39,707.05 39,707.05 62,641.91 62,641.91 0Jun-12 43,157.49 82,864.54 25,276.56 87,918.47 0Jul-12 50,181.69
Aug-12 88,005.51Sep-12 243,511.36 Oct-12 470,406.39 Nov-12 639,882.01Dec-12 849,658.91Jan-13 919,330.98 Feb-13 700,439.23 Mar-13 861,129.67 Apr-13 1,043,583.76 May-13 980,028.85 Jun-13 945,848.96 Jul-13 1,010,916.43 Aug-13 1,058,181.50 Sep-13 348,567.15
TOTAL 10,292,536.92 82,864.54 87,918.47 87,918.47 0
GRAFICO COMPARATIVO DE AVANCEVALORIZACION DE OBRA N 02 A JUNIO 2012
MESAVANCE ACUM. (S/ IGV)
0.002,000,000.00
4,000,000.00
6,000,000.00
8,000,000.00
10,000,000.00
12,000,000.00
May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 Ma
S/.
MESES
EJECUCION DE OBRA
PROG. ACUM. EJEC A
7/31/2019 VAL N 02 - JUNIO 2012 ok
16/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto INSTALACION DE TUBERIAS
01 OBRAS PROVISIONALES1.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m und 14.00 1352.1.02 ALMACEN Y GUARDIANIA m2 300.00 57.1.03 OFICINA DE RESIDENTE, SUOERVISION Y COMEDOR DE OBREROS m2 150.00 64.1.04 AGUA PARA LA OBRA m3 1.00 14123.
1.05 BAOS PORTATILES PARA LA OBRA mes 12.00 1546.02 LINEAS DE CONDUCCION2.01 TRABAJOS PRELIMINARES02.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, HERRAMIENTAS Y E glb 0.12 20952.02.01.02 TRAZO, NIVELES Y REPLANTEO CONDUCCION m 1939.15 1.02.01.03 SEALIZACIONES Y SEGURIDAD PEATONAL Y VEHICULAR und 1939.15 7.02.01.04 SEGURIDAD Y VIGILANCIA mes 1.40 24459.2.02 CORTES Y DEMOLICIONES02.02.01 CORTE DE PAVIMENTO m 3878.30 17.02.02.02 DEMOLICION DE PAVIMENTO MIXTO E=0.25M m2 912.08 11.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS DEMOLICI m3 303.24 21.02.02.04 ACOPIO DE MATERIAL EXCEDENTE PROCEDENTE DE DEMOLICIONES A P m3 303.24 27.2.03 MOVIMIENTO DE TIERRAS02.03.01 EXCAVACION DE ZANJA C/MAQ. NORMAL PARA TUBERIAS m 1939.15 13.02.03.02 REFINE Y NIVELACION ZANJA TERRENO NORMAL PARA TUBERIAS m 1939.15 5.
02.03.03 CAMA DE APOYO Y SOBRECAMA P/TUBERIAS m 1939.15 19.02.03.04 RELLENO Y COMPACTACION DE ZANJA P/TUBERIAS m 1939.15 18.02.03.05 ELIMINACION DE MATERIAL EXCEDENTE m3 2063.26 20.2.04 SUMINISTRO E INSTALACION DE TUBERIAS02.04.01 TUBERIA PVC 160 MM C-7.5 ISO 4422 m 1939.15 22.02.04.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS m 1939.15 2.2.05 SUMINISTRO E INSTALACION DE ACCESORIOS02.05.01 TEE H.D. 160 MM X 100MM TIPO LUFLEX ISO 2531 pza 6.00 268.02.05.02 TEE H.D. 160 MM X 160MM TIPO LUFLEX ISO 2531 pza 3.00 293.02.05.03 VALVULA 110 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO pza 1.00 500.02.05.04 VALVULA 160 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO und 6.00 780.03 LINEAS DE ADUCCION3.01 TRABAJOS PRELIMINARES03.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, HERRAMIENTAS Y E glb 0.88 20952.03.01.02 TRAZO, NIVELES Y REPLANTEO ADUCCION m 11222.63 1.
03.01.03 SEALIZACIONES Y SEGURIDAD PEATONAL Y VEHICULAR m 11222.63 7.03.01.04 SEGURIDAD Y VIGILANCIA mes 10.60 24459.3.02 CORTES Y DEMOLICIONES03.02.01 CORTE DE PAVIMENTO m 17457.18 17.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS DEMOLICI m3 464.36 21.03.02.03 ACOPIO DE MATERIAL EXCEDENTE PROCEDENTE DE DEMOLICIONES A P m3 464.36 27.03.02.04 EXCAVACION Y DESMONTAJE DE GRIFO C/INCENDIO m3 300.00 126.3.03 MOVIMIENTO DE TIERRAS03.03.01 EXCAVACION DE ZANJA C/MAQ. NORMAL PARA TUBERIAS m 11222.63 13.03.03.02 REFINE Y NIVELACION ZANJA TERRENO NORMAL PARA TUBERIAS m 11222.63 5.03.03.03 CAMA DE APOYO Y SOBRECAMA P/TUBERIAS m 11222.63 19.03.03.04 RELLENO Y COMPACTACION DE ZANJA P/TUBERIAS m 11222.63 18.03.03.05 ELIMINACION DE MATERIAL EXCEDENTE m3 14058.80 20.3.04 SUMINISTRO E INSTALACION DE TUBERIAS03.04.01 TUBERIA PVC 110 MM C-7.5 ISO 4422 m 1404.20 13.03.04.02 TUBERIA PVC 200 MM C-7.5 ISO 4422 m 4458.89 40.03.04.03 TUBERIA PVC 250 MM C-7.5 ISO 4422 m 528.86 64.03.04.04 TUBERIA PVC 315 MM C-7.5 ISO 4422 m 2669.20 105.
VALORIZACION DE
ITEM UND METRADO PRECIODESCRIPCION
7/31/2019 VAL N 02 - JUNIO 2012 ok
17/27
Pro ecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto INSTALACION DE TUBERIAS
VALORIZACION DE
ITEM UND METRADO PRECIODESCRIPCION03.05.06 CODO HED 250 MM X 45TIPO LUFLEX ISO 2531 pza 1.00 588.03.05.07 CODO HED 250 MM X 90TIPO LUFLEX ISO 2531 pza 2.00 669.03.05.08 CODO HED 315 MM X 45TIPO LUFLEX ISO 2531 pza 1.00 1028.03.05.09 CODO HED 315 MM X 90TIPO LUFLEX ISO 2531 pza 2.00 1046.03.05.10 CODO HED 400 MM X 22.5TIPO LUFLEX ISO 2531 pza 1.00 1199.
03.05.11 CODO HED 400 MM X 45TIPO LUFLEX ISO 2531 pza 3.00 3080.03.05.12 CODO HED 450 MM X 22.5TIPO LUFLEX ISO 2531 pza 3.00 1532.03.05.13 CODO HED 450 MM X 90TIPO LUFLEX ISO 2531 pza 3.00 2286.03.05.14 REDUCCION HE DUCTIL 200 MM X 100 MM ISO 2531LUFLEX und 2.00 276.03.05.15 REDUCCION HE DUCTIL 200 MM X 150 MM ISO 2531LUFLEX und 1.00 277.03.05.16 REDUCCION HE DUCTIL 250 MM X 100 MM ISO 2531LUFLEX und 1.00 363.03.05.17 REDUCCION HE DUCTIL 250 MM X 150 MM ISO 2531LUFLEX und 1.00 366.03.05.18 REDUCCION HE DUCTIL 250 MM X 200 MM ISO 2531LUFLEX und 1.00 370.03.05.19 REDUCCION HE DUCTIL 300 MM X 200 MM ISO 2531LUFLEX und 1.00 539.03.05.20 REDUCCION HE DUCTIL 450 MM X 200 MM ISO 2531LUFLEX und 1.00 1273.03.05.21 REDUCCION HE DUCTIL 450 MM X 315 MM ISO 2531LUFLEX und 1.00 1286.03.05.22 TEE H.D. 100 MM X 100MM TIPO LUFLEX ISO 2531 pza 3.00 218.03.05.23 TEE HED 200 MM X 200MM ISO 2531 LUFLEX und 3.00 538.03.05.24 TEE H.D. 250 MM X 100MM TIPO LUFLEX ISO 2531 pza 4.00 608.03.05.25 TEE HED 250 MM X 250MM ISO 2531 LUFLEX und 2.00 818.
03.05.26 TEE HED 315 MM X 315MM ISO 2531 LUFLEX und 1.00 1259.03.05.27 TEE HED 400 MM X 400MM ISO 2531 LUFLEX und 1.00 2755.03.05.28 TEE HED 450 MM X 450MM ISO 2531 LUFLEX und 1.00 3431.03.05.29 CRUZ H.D. 200 MM X 150 MM TIPO LUFLEX ISO 2531 pza 1.00 514.03.05.30 CRUZ H.D. 150 MM X 100 MM TIPO LUFLEX ISO 2531 pza 1.00 396.03.05.31 VALVULA 110 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO pza 6.00 500.03.05.32 VALVULA 160 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO und 1.00 780.03.05.33 VALVULA 200 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO pza 8.00 1132.03.05.34 VALVULA 250 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO pza 1.00 2160.03.05.35 VALVULA 315 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO pza 4.00 2636.03.05.36 VALVULA 400 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO pza 1.00 5648.04 VARIOS4.01 REPOSICION DE CARPETA ASFALTICA DE 2" m2 8534.19 43.4.02 REPOSICION DE CARPETA CONCRETO DE 4" m2 912.08 55.4.03 REUBICACION DE TUBERIA EXISTENTE glb 2.00 2508.
4.04 SUMINISTRO E INSTALACION DE TUBERIAS PARA RESERVORIO glb 2.00 6834.05 EDUCACION SANITARIA5.01 EDUCACION SANITARIA glb 1.00 10000.
COSTO DIRECTOGASTOS GENERALES 7.5%UTILIDADES 5.0%SUBTOTAL
SUBTOTAL X FR 90.0%IGVTOTAL
7/31/2019 VAL N 02 - JUNIO 2012 ok
18/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
01 INSTALACIONES DE MACROMEDIDORES1.01 INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 6" u 6.00 15723.611.02 INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 8" u 5.00 17247.611.03 INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 10" u 1.00 18971.861.04 INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 10" EN CAM. 2 DE u 1.00 17997.76
1.05 INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 10" EN CAM. AV. A u 1.00 17273.371.06 INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 12" u 1.00 18872.931.07 INST. MACROMEDIDOR ELECTROMAGAG DE 10" u 1.00 14871.861.08 INST. MACROMEDIDOR ELECTROMAGAG DE 12" u 1.00 18877.031.09 INST. MACROMEDIDOR ELECTROMAG. DE 12" C/ACCESOR. P/TUB. LLE u 1.00 21363.601.10 INST. MACROMEDIDOR ULTRASONICO DE 1CANAL EN TUB DE 16" u 1.00 28435.081.11 INST. MACROMEDIDOR ULTRASONICO DE 1 CANAL EN TUB. DE 24" u 1.00 29835.081.12 INST. MACROMEDIDOR ULTRASONICO DE 2 CANALES EN TUB. DE 12" u 1.00 34614.411.13 INST. MACROMEDIDOR ULTRASONICO DE 2 CANALES EN TUB. DE 14" u 1.00 32539.271.14 INST. MACROMEDIDOR ULTRASONICO DE 2 CANALES EN TUB. DE 14" u 1.00 32207.3402 INSTALACIONES DE MICROMEDIDORES2.01 NOTIFICACION DE USUARIOS u 24680.00 3.132.02 INSPECCION DE INSTALACIONES EXTERNAS E INTERNAS u 24680.00 4.622.03 INSTALACION DE MEDIDOR DOMICILIARIO DE 1/2" (MSD) u 23901.00 122.412.04 INSTALACION DE MEDIDOR DOMICILIARIO DE 3/4" (MSD) u 645.00 207.712.05 INSTALACION DE MEDIDOR DOMICILIARIO DE 1" (MSD) u 107.00 478.252.06 INSTALACION DE MEDIDOR DOMICILIARIO DE 2" (MSD) u 25.00 2291.922.07 INSTALACION DE MEDIDOR DOMICILIARIO DE 4" (MSD) u 2.00 4042.0303 INSTALACIONES DE VALVULAS DE AIRE3.01 VALVULA AIRE D=1" SOBRE LINEA DE 3" u 2.00 1048.923.02 VALVULA AIRE D=1" SOBRE LINEA DE 4" u 47.00 1053.923.03 VALVULA AIRE D=1" SOBRE LINEA DE 6" u 13.00 1058.923.04 VALVULA AIRE D=2" SOBRE LINEA DE 8" u 9.00 1588.233.05 VALVULA AIRE D=2" SOBRE LINEA DE 10" u 5.00 1695.763.06 VALVULA AIRE D=2" SOBRE LINEA DE 12" u 4.00 1715.7604 INSTALACIONES DE GRIFOS CONTRA INCENDIOS4.01 GRIFO CONTRAINCENDIO TIPO POSTE DE 2 BOCAS u 300.00 2465.4005 INSTALACIONES DE VALVULAS EN CAMARAS REDUCTORAS DE PRESION5.01 INSTALACION VALVULAS Y ACCESORIOS EN CAMARA REDUCTORA Du 4.00 16487.21
5.02 INSTALACION VALVULAS Y ACCESORIOS EN CAMARA REDUCTORA Du 5.00 17080.955.03 INSTALACION DE VALVULA DE D=4" PARA SECTORIZACION u 5.00 2481.165.04 INSTALACION DE VALVULA DE D=8" PARA SECTORIZACION u 4.00 4289.035.05 INSTALACION DE VALVULA DE D=12" PARA SECTORIZACION u 3.00 5996.375.06 INSTALACION DE VALVULA DE D=14" PARA SECTORIZACION u 1.00 7473.215.07 INSTALACION DE VALVULA DE D=16" PARA SECTORIZACION u 2.00 7588.3106 INSTALACIONES DE VALVULAS EN RESERVORIOS DE CONCRETO ARMADO6.01 RESERVORIO APOYADO R-206.01.01 INSTALACION DE VALVULAS - RESERVORIO R-2 u 1.00 29159.476.02 RESERVORIO APOYADO R-406.02.01 INSTALACION DE VALVULAS - RESERVORIO R-4 u 1.00 8306.896.03 RESERVORIO APOYADO R-506.03.01 INSTALACION DE VALVULAS - RESERVORIO R-5 u 1.00 24410.486.04 RESERVORIO APOYADO R-7
06.04.01 INSTALACION DE VALVULAS - RESERVORIO R-7 u 1.00 3596.2407 EDUCACION SANITARIA7.01 EDUCACION SANITARIA glb 1.00 20000.00
Costo Directo
VALORIZACION D
PRECIO S/.METRADOUNDDESCRIPCIONITEM
7/31/2019 VAL N 02 - JUNIO 2012 ok
19/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDADContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
01 INSTALACION DE MICROMEDIDORES 57,594.31.01 TRABAJOS PRELIMINARES 104.301.01.01 TRAZO Y REPLANTEO m 56.70 1.84 104.31.02 MOVIMIENTO DE TIERRAS 6,766.101.02.01 EXCAVACION DE ZANJA PARA MICROMEDIDORES m3 122.71 26.16 3,210.001.02.02 NIVELACION INTERIOR Y APISONADO MANUAL m2 56.70 3.28 185.901.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 163.20 20.65 3,370.01.03 OBRAS DE CONCRETO SIMPLE 1,308.001.03.01 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON m2 56.70 23.07 1,308.01.04 CONCRETO ARMADO 49,415.701.04.01 CONCRETO F'C= 210 KG/CM2. P/CAM.MACR. m3 62.97 384.73 24,226.401.04.02 ENCOFRADO Y DESENCOFRADO MUROS Y LOSA m2 219.90 45.88 10,089.001.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/C.MUROS Y LO kg 3,214.02 4.48 14,398.801.04.04 CURADO DE CONCRETO m2 219.90 3.19 701.402 INSTALACION DE VALVULAS DE AIRE 33,989.12.01 TRABAJOS PRELIMINARES 147.202.01.01 TRAZO Y REPLANTEO m 80.00 1.84 147.22.02 MOVIMIENTO DE TIERRAS 6,371.202.02.01 EXCAVACION DE ZANJA PARA VALVULAS m3 99.60 29.89 2,977.002.02.02 RELLENO COMPACTADO C/MAT PROPIO C/EQUIPO LIG. m3 41.80 37.57 1,570.4
02.02.03 NIVELACION INTERIOR Y APISONADO MANUAL m2 80.00 3.28 262.402.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 75.14 20.78 1,561.42.03 OBRAS DE CONCRETO SIMPLE 18,228.002.03.01 CONCRETO F'C=175 KG/CM2. P/CAJA DE VALVULA m3 25.93 368.88 9,565.002.03.02 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON m2 80.00 23.07 1,845.602.03.03 ENCOFRADO Y DESENCOF MUROS m2 159.36 39.59 6,309.002.03.04 CURADO DE CONCRETO m2 159.36 3.19 508.32.04 CONCRETO ARMADO 9,242.602.04.01 CONCRETO F'C=210 KG/CM2. P/CAM.VALVULAS m3 5.18 384.73 1,992.902.04.02 ENCOFRADO Y DESENCOFRADO MUROS Y LOSA m2 74.24 45.88 3,406.102.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/C.MUROS Y LO kg 501.12 4.48 2,245.002.04.04 CURADO DE CONCRETO m2 501.12 3.19 1,598.503 SUMINISTRO E INSTALACION DE GRIFO CONTRAINCENDIO 22,828.53.01 REPOSICION DE VEREDA DE CONCRETO DE 4" m2 450.00 50.73 22,828.504 CAMARAS REDUCTORAS DE PRESION 80,147.74.01 TRABAJOS PRELIMINARES 128.604.01.01 TRAZO Y REPLANTEO m 69.93 1.84 128.64.02 MOVIMIENTO DE TIERRAS 9,261.704.02.01 EXCAVACION DE ZANJA PARA CAMARAS REDUCTORAS m3 158.73 29.89 4,744.404.02.02 NIVELACION INTERIOR Y APISONADO MANUAL m2 69.93 3.28 229.304.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 206.35 20.78 4,287.94.03 OBRAS DE CONCRETO SIMPLE 1,613.204.03.01 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON m2 69.93 23.07 1,613.24.04 CONCRETO ARMADO 69,144.004.04.01 CONCRETO F'C=210 KG/CM2. P/CAM. REDUCTORAS P. m3 61.75 384.73 23,757.004.04.02 ENCOFRADO Y DESENCOFRADO MUROS Y LOSA m2 223.56 45.88 10,256.904.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/C.MUROS Y LO kg 7,682.33 4.48 34,416.804.04.04 CURADO DE CONCRETO m2 223.56 3.19 713.105 RESERVORIOS APOYADOS DE CONCRETO ARMADO 1,357,843.3
5.01 CONSTRUCCION DE RESERVORIO APOYADO V=2500m3 744,366.805.01.01 OBRAS PROVISIONALES 17,769.005.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 1,179.48 1,179.405 01 01 02 ALMACEN Y GUARDIANIA 2 200 00 57 26 11 452 0
VALORIZACION DE OBRA
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
7/31/2019 VAL N 02 - JUNIO 2012 ok
20/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDADContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
VALORIZACION DE OBRA
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.05.01.03.01 EXCAVACION P/CIMENTACION C/MAQ T.S.R.H < 3.0 M m3 787.20 4.80 3,778.505.01.03.02 RELLENO Y COMPACTADO PARA ESTRUCTURAS CON MA m3 76.35 18.42 1,406.305.01.03.03 NIVELACION Y COMPACTACION C/RODILLO P/SOLADO m2 219.05 4.69 1,027.305.01.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 984.00 20.78 20,447.505.01.04 OBRAS DE CONCRETO SIMPLE 5,053.405.01.04.01 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON m2 219.05 23.07 5,053.405.01.05 OBRAS DE CONCRETO ARMADO 561,285.005.01.05.01 CIMIENTO DE MURO DE CUBA 60,847.605.01.05.01.01 CONCRETO F'C= 280 KG/CM2 P/ZAPATAS m3 91.55 388.11 35,531.405.01.05.01.02 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ZAPATAS kg 5,701.85 4.44 25,316.205.01.05.02 LOSA DE FONDO 9,486.405.01.05.02.01 CONCRETO F'C= 280 KG/CM2 C/IMPERMEABILIZANTE P/LO m3 16.65 446.41 7,432.705.01.05.02.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO m2 7.25 45.72 331.405.01.05.02.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/LOSAS DE FON kg 387.90 4.44 1,722.205.01.05.03 MURO DE CUBA 412,557.405.01.05.03.01 CONCRETO F'C= 280 KG/CM2 P/MURO DE CUBA m3 253.90 468.14 118,860.705.01.05.03.02 ENCOFRADO Y DESENCOF MURO CIRCULAR DE CUBA m2 1,398.40 97.01 135,658.705.01.05.03.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/MURO CIRCUL kg 34,434.30 4.46 153,576.905.01.05.03.04 CURADO DE CONCRETO m2 1,398.40 3.19 4,460.905.01.05.04 ARTESA DE REBOSE 486.2
05.01.05.04.01 CONCRETO F'C=280 KG/M2 P/ARTESA DE REBOSE H=4.20 m3 0.35 419.04 146.605.01.05.04.02 ENCOFRADO Y DESENCOFRADO P/ARTESA DE REBOSE H m2 2.85 81.07 231.005.01.05.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ARTESA DE RE kg 22.25 4.47 99.405.01.05.04.04 CURADO DE CONCRETO m2 2.85 3.19 9.005.01.05.05 VIGA PERIMETRAL CUBA-CPULA 23,817.105.01.05.05.01 CONCRETO F'C=280 KG/CM2 EN VIGA CIRCULAR CUBA m3 14.65 476.54 6,981.305.01.05.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA CIR m2 58.60 90.73 5,316.705.01.05.05.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/VIGA CIRCULA kg 2,535.15 4.47 11,332.105.01.05.05.04 CURADO DE CONCRETO m2 58.60 3.19 186.905.01.05.06 CUPULA DE RESERVORIO 54,090.105.01.05.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSA EN CUPULA ESF m3 46.25 399.66 18,484.205.01.05.06.02 ENCOFRADO Y DESENCOFRADO EN CUPULA ESFERICA m2 205.90 137.87 28,387.405.01.05.06.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN CUPULA ESF kg 1,289.25 4.58 5,904.705.01.05.06.04 CURADO DE CONCRETO m2 411.80 3.19 1,313.605.01.06 REVESTIMIENTOS 86,774.305.01.06.01 CONFORM. DE FONDO C/IMPERMEABILIZANTE Emin = 2 C m2 219.05 21.24 4,652.6
DE RESERVORIO05.01.06.02 TARRAJEO C/IMPERMEABILIZANTE 1 capa E=2.5CM EN M m2 699.20 30.81 21,542.3
(INCL. VERTEDEROS)05.01.06.03 TARRAJEO C/IMPERMEABILIZANTE 2 capa E=1.5CM EN M m2 699.20 27.95 19,542.605.01.06.04 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 699.20 33.38 23,339.305.01.06.05 REVESTIMIENTO DE CUPULA E=25MM C/MORTERO C:A 1: m2 411.80 21.84 8,993.705.01.06.06 CURADO DE CONCRETO m2 2,728.45 3.19 8,703.705.01.07 CARPINTERIA METALICA 2,646.205.01.07.01 ESCALERA TIPO MARINERO (INTERIOR Y EXTERIOR) m 14.00 111.34 1,558.705.01.07.02 MARCO Y TAPA DE FIERRO C/MECANISM. DE SEGURIDAD und 1.00 364.09 364.005.01.07.03 VENTILACION C/TUBERIA DE FIERRO S/DISEO DE 3" und 4.00 180.85 723.405.01.08 PINTURAS 11,440.405.01.08.01 PINTURA LATEX VINILICO EN LOSA CUPULA m2 205.90 12.64 2,602.5
05.01.08.02 PINTURA LATEX VINILICA EN MURO Y CUBA EXTERIOR 2 M m2 699.20 12.64 8,837.805.01.09 VARIOS 26,492.905.01.09.01 WATER STOP DE NEOPRENE DE 6".PROVISION Y COLOCA m 698.10 37.95 26,492.95 02 CONSTRUCCION DE RESERVORIO APOYADO V 2100 3 613 476 4
7/31/2019 VAL N 02 - JUNIO 2012 ok
21/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDADContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
VALORIZACION DE OBRA
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.05.02.02.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 511.50 1.84 941.105.02.02.03 LIMPIEZA DE TERRENO MANUAL m2 511.50 2.56 1,309.405.02.03 MOVIMIENTO DE TIERRAS 21,296.505.02.03.01 EXCAVACION P/CIMENTACION C/MAQ T.S.R.H < 3.0 M m3 608.05 4.80 2,918.605.02.03.02 RELLENO Y COMPACTADO PARA ESTRUCTURAS CON MA m3 35.50 18.42 653.905.02.03.03 NIVELACION Y COMPACTACION C/RODILLO P/SOLADO m2 411.45 4.69 1,929.705.02.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 760.07 20.78 15,794.205.02.04 OBRAS DE CONCRETO SIMPLE 9,492.105.02.04.01 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON m2 411.45 23.07 9,492.105.02.05 OBRAS DE CONCRETO ARMADO 453,152.005.02.05.01 CIMIENTO DE MURO DE CUBA 79,519.705.02.05.01.01 CONCRETO F'C= 280 KG/CM2 P/ZAPATAS m3 111.50 388.11 43,274.205.02.05.01.02 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ZAPATAS kg 8,163.40 4.44 36,245.505.02.05.02 LOSA DE FONDO 27,558.305.02.05.02.01 CONCRETO F'C= 280 KG/CM2 C/IMPERMEABILIZANTE P/LO m3 52.20 446.41 23,302.605.02.05.02.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO m2 12.80 45.72 585.205.02.05.02.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/LOSAS DE FON kg 826.70 4.44 3,670.505.02.05.03 MURO DE CUBA 227,037.005.02.05.03.01 CONCRETO F'C= 280 KG/CM2 P/MURO DE CUBA m3 137.70 468.14 64,462.805.02.05.03.02 ENCOFRADO Y DESENCOF MURO CIRCULAR DE CUBA m2 835.75 97.01 81,076.1
05.02.05.03.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/MURO CIRCUL kg 17,675.35 4.46 78,832.005.02.05.03.04 CURADO DE CONCRETO m2 835.75 3.19 2,666.005.02.05.04 ARTESA DE REBOSE 486.205.02.05.04.01 CONCRETO F'C=280 KG/M2 P/ARTESA DE REBOSE H=4.20 m3 0.35 419.04 146.605.02.05.04.02 ENCOFRADO Y DESENCOFRADO P/ARTESA DE REBOSE H m2 2.85 81.07 231.005.02.05.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ARTESA DE RE kg 22.25 4.47 99.405.02.05.04.04 CURADO DE CONCRETO m2 2.85 3.19 9.005.02.05.05 VIGA PERIMETRAL CUBA-CPULA 26,366.005.02.05.05.01 CONCRETO F'C=280 KG/CM2 EN VIGA CIRCULAR CUBA m3 13.80 476.54 6,576.205.02.05.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA CIR m2 79.20 90.73 7,185.805.02.05.05.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/VIGA CIRCULA kg 2,763.15 4.47 12,351.205.02.05.05.04 CURADO DE CONCRETO m2 79.20 3.19 252.605.02.05.06 CUPULA DE RESERVORIO 92,184.505.02.05.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSA EN CUPULA ESF m3 77.75 399.66 31,073.505.02.05.06.02 ENCOFRADO Y DESENCOFRADO EN CUPULA ESFERICA m2 381.40 137.87 52,583.605.02.05.06.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN CUPULA ESF kg 1,032.40 4.58 4,728.305.02.05.06.04 CURADO DE CONCRETO m2 1,190.90 3.19 3,798.905.02.06 REVESTIMIENTOS 68,163.005.02.06.01 CONFORM. DE FONDO C/IMPERMEABILIZANTE Emin = 2 C m2 381.40 21.24 8,100.9
DE RESERVORIO05.02.06.02 TARRAJEO C/IMPERMEABILIZANTE 1 capa E=2.5CM EN M m2 410.00 30.81 12,632.1
(INCL. VERTEDEROS)05.02.06.03 TARRAJEO C/IMPERMEABILIZANTE 2 capa E=1.5CM EN M m2 410.00 27.95 11,459.505.02.06.04 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 425.75 33.38 14,211.505.02.06.05 REVESTIMIENTO DE CUPULA E=25MM C/MORTERO C:A 1: m2 762.80 21.84 16,659.505.02.06.06 CURADO DE CONCRETO m2 1,598.55 3.19 5,099.305.02.07 CARPINTERIA METALICA 2,089.505.02.07.01 ESCALERA TIPO MARINERO (INTERIOR Y EXTERIOR) m 9.00 111.34 1,002.005.02.07.02 MARCO Y TAPA DE FIERRO C/MECANISM. DE SEGURIDAD und 1.00 364.09 364.0
05.02.07.03 VENTILACION C/TUBERIA DE FIERRO S/DISEO DE 3" und 4.00 180.85 723.405.02.08 PINTURAS 11,846.805.02.08.01 PINTURA LATEX VINILICO EN LOSA CUPULA m2 511.50 12.64 6,465.305 02 08 02 PINTURA LATEX VINILICA EN MURO Y CUBA EXTERIOR 2 M 2 425 75 12 64 5 381 4
7/31/2019 VAL N 02 - JUNIO 2012 ok
22/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDADContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINAPresupuesto CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
VALORIZACION DE OBRA
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.UTILIDADES 5.00% 77,870.1SUBTOTAL 1,752,078.4
SUBTOTAL X FR 0.9 1,576,870.5IGV 283,836.7TOTAL 1,860,707.2
7/31/2019 VAL N 02 - JUNIO 2012 ok
23/27
Proyecto MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DContrato N 007-2012-300-EPS TACNA S.A.Contratista CONSORCIO COLLAOSupervision CONSORCIO CAPLINA
METRADO PRECIOCODIGO DESCRIPCION UND RESUPUEST
SOLES
OBRAS SECUNDARIAS
01 INSTALACIONES DE TUBERIAS 1.00 3,677,830.8702 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS 1.00 5,037,835.4503 CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO 1.00 1,576,870.59
TOTAL COSTO DIRECTOIGVTOTAL PRESUPUESTO
AVANCE PARCIAL% AVANCE PARCIAL
% AVANCE ACUMULADO
VALORIZACION DE OBRA
7/31/2019 VAL N 02 - JUNIO 2012 ok
24/27
OBRA : MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA P
EN LA CIUDAD DE TACNA
LOCALIZACION : TACNA - TACNA - TACNA
FECHA : 01 DE OCTUBRE DEL 2011
001 INSTALACIONES DE TUBERIAS003 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS004 CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
S/.
GASTOS GENERALES 7.50%UTILIDADES 5.00%SUB TOTAL
SUB TOTAL X FR 0.9IGVTOTAL
ESTUDIOS 2.12%
SUPERVISION Y LIQUIDACION 5.00% (INCLUYE IGV)
IGV 18.00%
PRESUPUESTO TOTAL
Nota : Los precios de los recursos no incluyen I.G.V. son vigentes al : 09/07/2011
HOJA DE RESUMEN
PRESUPUESTO BASE
COSTO DIRECTO
7/31/2019 VAL N 02 - JUNIO 2012 ok
25/27
TABLE OBRA : MEJORAMIENTO Y AMPLIACION INTEGRA
EN LA CIUDAD DE TACNA
LOCALIZACIO : TACNA - TACNA - TACNA
FECHA : 01 DE OCTUBRE DEL 2011
3,632,425.55 001 INSTALACIONES DE TUBERIAS4,975,639.95 003 INSTALACION DE MEDIDORES, VALVULAS,1,557,403.05 004 CONSTRUCCION DE ESTRUCTURAS DE CO
10,165,468.55
GASTOS GENERALES VARIABLES
762,410.14 GASTOS GENERALES FIJOS508,273.43 UTILIDADES11,436,152.12 SUB TOTAL
10,292,536.91 SUB TOTAL X FR1,852,656.64 IGV
12,145,193.55 TOTAL
242,916.29
571,807.61
2,058,507.38
===============38,599,770.50
7/31/2019 VAL N 02 - JUNIO 2012 ok
26/27
DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE
3,632,425.5500RIFOS Y ACCESORIOS 4,320,513.5400CRETO ARMADO 1,557,403.0500
S/. 9,510,342.1400
0.80% 76,082.7400
4.20% 399,434.37003.224675363782% 306,677.660010,292,536.9100
1 10,292,536.91001,852,656.6438
12,145,193.5538
HOJA DE RESUMEN OFERTA
PRESUPUESTO BASE
COSTO DIRECTO
7/31/2019 VAL N 02 - JUNIO 2012 ok
27/27
PLANILLA DE METRADOS
PARTIDA DESCRIPCION UND METRADO
INSTALACION DE TUBERIAS
03.01.03 SEALIZACIONES Y SEGURIDAD PEATONAL Y VEHICULAR m 300.00
AV LOS ANGELES m 300.00
03.02.01 CORTE DE PAVIMENTO m 500.00
AV LOS ANGELES m 500.00
CONCRETO ARMADO
05.02.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00
RESERVORIO R-02A und 1.00
05.02.01.02 ALMACEN Y GUARDIANIA m2 50.00
RESERVORIO R-02A m2 50.00
05.02.01.03 OFICINA DE RESIDENTE, SUPERVISION Y COMEDOR DE OBR m2 10.00
RESERVORIO R-02A m2 10.00
05.02.02.01 MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA O glb 0.20
RESERVORIO R-02A glb 0.20
05.02.02.03 LIMPIEZA DE TERRENO MANUAL m2 511.50
RESERVORIO R-02A m2 511.50