108133_53751_EJEMPLO DE PU

123
CATÁLOGO DE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA "SELECCIÓN" Código Descripción Unid. Costo EQ. Y HERRAMIENTA BAI0001 COMPACTADOR BAILARINA HR $46.13 EQ. Y HERRAMIENTA EAN0001 ANDAMIO METALICO DE 2 X 2 PZA $50.00 EQ. Y HERRAMIENTA EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR $66.00 MATERIALES MAAR0016 ARMADURA SOLDADA CASTILLO ARMEX 15X15-4 MT $19.00 MATERIALES MAAR0017 ARMADURA SOLDADA CASTILLO ARMEX 15X20-4 MT $19.20 MATERIALES MAGU0010 AGUA M3 $12.00 MATERIALES MALA0180 ALAMBRE RECOCIDO No. 18 KG $13.00 MATERIALES MALA0190 ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.) TON $12,000.00 MATERIALES MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT $20.00 MATERIALES MBAR0009 VARILLA No.2.5 (5/16") FY=4200KG/CM2. TON $13,000.00 MATERIALES MCEM0010 MORTERO HIDRAULICO TON $1,440.00 MATERIALES MCEM0050 CALHIDRA TON $1,680.00 MATERIALES MCEM0060 CEMENTO GRIS EN SACOS TON $2,120.00 MATERIALES MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG $22.00 MATERIALES MCOM0010 DIESEL LT $20.00 MATERIALES MDUE0001 DUELA 3/4" X 4" X 8´ PT $0.00 MATERIALES MEZ0002 MORTERO MORTERO - ARENA PROPORCION 1:5 M3 $1,194.54 MATERIALES MEZ0005 MORTERO CEMENTO-ARENA 1:6 M3 $1,056.96 MATERIALES MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 $1,194.54 MATERIALES MHIL0001 HILO DE PLAST.P/TRAZO EN CARRETE CAL.10 ML $0.00 MATERIALES MIMP0001 LT $0.00 MATERIALES MJUNT0001 SACO $0.00 MATERIALES MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT $0.00 MATERIALES MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT $0.00 MATERIALES MMAD0047 MADERA PINO DE 3a. EN POLÍN DE 4"X4" REG PT $0.00 MATERIALES MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT $0.00 MATERIALES MMAL0050 MALLA ELECTROSOLDADATECNOMALLA 6X6-10/10 M2 $16.56 MATERIALES MMAL0080 MALLA ELECTROSOLDADA TECNOMALLA 6X6-6/6 M2 $16.56 MATERIALES MMAL0090 MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8 M2 $16.56 MATERIALES MMEM0001 M2 $0.00 MATERIALES MMOR0060 MORTERO TOLTECA TON $1,440.00 MANO DE OBRA. MOMM01 PEON JOR $218.91 MANO DE OBRA. MOMM30 OFICIAL ALBANIL JOR $365.98 MANO DE OBRA. MOMM32 OFICIAL PINTOR JOR $365.98 MATERIALES MPET0040 ARENA P/CONCRETOS M3 $150.00 MATERIALES MPET0170 GRAVA P/CONCRETOS 3/4" M3 $150.00 MATERIALES MPGP0001 PEGAPISO GRIS MARCA PERDURA STONE SACO $0.00 MATERIALES MPIN0001 PINTURA ESMALTE CUB $1,500.00 MATERIALES MPIN0060 PINTURA COLOR BLANCA BERLINTE CUB $1,053.00 MATERIALES MPIN0069 SELLADOR VINILICO LT $0.00 MATERIALES MPIS0240 PISO VITROMEX BCO. 2 AMERICAS 33X33 CM M2 $96.52 MATERIALES MRES0051 YESO DE RESANADOR KG $1.13 MATERIALES MSEL0001 SELLADOR PASA AISLAFLEX SELLO LT $0.00 IMPERMEABILIZANTE AISLAFLEX 5 A, MARCA PASA. JUNTEADOR GRIS CON ARENA MARCA PERDURA STONE, SACO DE 10 K MEMBRANA DE FIBRA DE POLIESTER#5 PARA IMPERMEABILIZACIÓN

description

este es un ejemplo de un precio unitario

Transcript of 108133_53751_EJEMPLO DE PU

CATLOGOCATLOGO DE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTALISTA DE ELEMENTO CONST.No.TIPO"SELECCIN"CdigoDescripcinUnid.Costo1MATERIALESEQ. Y HERRAMIENTABAI0001COMPACTADOR BAILARINAHR$46.132MANO DE OBRA.EQ. Y HERRAMIENTAEAN0001ANDAMIO METALICO DE 2 X 2PZA$50.003EQ. Y HERRAMIENTAEQ. Y HERRAMIENTAEQGA003REVOLVEDORA MIPSA-KOHLER 1 SACOHR$66.004SUBCONTRATOSMATERIALESMAAR0016ARMADURA SOLDADA CASTILLO ARMEX 15X15-4MT$19.005MATERIALESMAAR0017ARMADURA SOLDADA CASTILLO ARMEX 15X20-4MT$19.20MATERIALESMAGU0010AGUAM3$12.00MATERIALESMALA0180ALAMBRE RECOCIDO No. 18KG$13.00MATERIALESMALA0190ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.)TON$12,000.00** Al seleccionar la celda de "SELECCIN" B5, Se muestra la cejilla del FILTRO, para verificar el tipo de elemento constructivo.MATERIALESMARM0018ARMADURA SOLDADA CASTILLO ARMEX 15X25-4MT$20.00MATERIALESMBAR0009VARILLA No.2.5 (5/16") FY=4200KG/CM2.TON$13,000.00MATERIALESMCEM0010MORTERO HIDRAULICOTON$1,440.00MATERIALESMCEM0050CALHIDRATON$1,680.00MATERIALESMCEM0060CEMENTO GRIS EN SACOSTON$2,120.00MATERIALESMCLA0021CLAVO DE 2 1/2" A 3 1/2"KG$22.00MATERIALESMCOM0010DIESELLT$20.00MATERIALESMDUE0001DUELA 3/4" X 4" X 8PT$0.00MATERIALESMEZ0002MORTERO MORTERO - ARENA PROPORCION 1:5M3$1,194.54MATERIALESMEZ0005MORTERO CEMENTO-ARENA 1:6M3$1,056.96MATERIALESMEZ0011MEZCLA MORTERO-ARENA 1:5M3$1,194.54MATERIALESMHIL0001HILO DE PLAST.P/TRAZO EN CARRETE CAL.10ML$0.00MATERIALESMIMP0001IMPERMEABILIZANTE AISLAFLEX 5 A, MARCA PASA.LT$0.00MATERIALESMJUNT0001JUNTEADOR GRIS CON ARENA MARCA PERDURA STONE, SACO DE 10 KSACO$0.00MATERIALESMMAD0044MADERA PINO DE 3a.EN TABLON DE 11/2"X12"PT$0.00MATERIALESMMAD0045MADERA PINO DE 3a. EN BARROTE DE 2"X4"PT$0.00MATERIALESMMAD0047MADERA PINO DE 3a. EN POLN DE 4"X4" REGPT$0.00MATERIALESMMAD0049MADERA DUELA DE PINO DE 1a. EN CONTACTOPT$0.00MATERIALESMMAL0050MALLA ELECTROSOLDADATECNOMALLA 6X6-10/10M2$16.56MATERIALESMMAL0080MALLA ELECTROSOLDADA TECNOMALLA 6X6-6/6M2$16.56MATERIALESMMAL0090MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8M2$16.56MATERIALESMMEM0001MEMBRANA DE FIBRA DE POLIESTER#5 PARA IMPERMEABILIZACINM2$0.00MATERIALESMMOR0060MORTERO TOLTECATON$1,440.00MANO DE OBRA.MOMM01PEONJOR$218.91MANO DE OBRA.MOMM30OFICIAL ALBANILJOR$365.98MANO DE OBRA.MOMM32OFICIAL PINTORJOR$365.98MATERIALESMPET0040ARENA P/CONCRETOSM3$150.00MATERIALESMPET0170GRAVA P/CONCRETOS 3/4"M3$150.00MATERIALESMPGP0001PEGAPISO GRIS MARCA PERDURA STONESACO$0.00MATERIALESMPIN0001PINTURA ESMALTECUB$1,500.00MATERIALESMPIN0060PINTURA COLOR BLANCA BERLINTECUB$1,053.00MATERIALESMPIN0069SELLADOR VINILICOLT$0.00MATERIALESMPIS0240PISO VITROMEX BCO. 2 AMERICAS 33X33 CMM2$96.52MATERIALESMRES0051YESO DE RESANADORKG$1.13MATERIALESMSEL0001SELLADOR PASA AISLAFLEX SELLOLT$0.00MATERIALESMTAB0070TABIQUE COMUN BARRO R.R. DE 7X14X28 CM.MILL$3,000.00MATERIALESMTAB0090TABICON DE CEMENTO VIBRO BLOCK 7X14X28CMMILL$5,000.00MATERIALESMVAR0009VARILLA No.3 (3/8") FY=4200 KG/CM2.TON$13,000.00MATERIALESMVAR0012VARILLA No.4 (1/2") FY=4200 KG/CM2TON$13,000.00MATERIALESMVAR0013VARILLA No.5 (5/8") FY=4200 KG/CM2.TON$13,000.00MATERIALESMVAR0014VARILLA No.6 (3/4") FY=4200 KG/CM2.TON$13,000.00MATERIALESMVAR0015VARILLA No.8 (1") FY=4200 KG/CM2.TON$13,000.00MATERIALESMVAR0016VARILLA No.10(11/4") FY=4200KG/CM2.TON$13,000.00MATERIALESMVAR0017VARILLA NO.12(11/2") FY=4200KG/CM2.TON$13,000.00MATERIALESPUR0001PUERTA METALICA 0.70 X 2.10PZA$0.00EQ. Y HERRAMIENTAVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR$45.00MATERIALESMPETO200PIEDRA DE CORTE P/MAMPOSTERIAM3$32.00

REND.

CATLOGO DE CONCEPTOS CON RENDIMIENTO POR ETAPA

CdigoDescripcin Corta.Texto completoUnidadcuadrillaRend.unidad

DEMOLICIONESDEM0001DEM. CIMIENTOS DE PIEDRA.DEMOLICION A MANO DE CIMIENTOS DE PIEDRA BRASA, SIN INCLUIR ACARREOS, HASTA 1.50 M DE PROFUNDIDAD.M3CUADRILLA 001 (1 PEON)1.50M3/JORDEM0002DEM. CIM. CONC. ARM. S/REC. ACERO.DEMOLICION A MANO DE CIMIENTOS DE CONCRETO ARMADO, SIN INCLUIR ACARREOS Y SIN RECUPERACIN DE ACERO.M3CUADRILLA 001 (1 PEON)0.60M3/JORDEM0004DEM. MUROS DE ADOBE Y TEPETATEDEMOLICION DE MUROS DE ADOBE Y TEPETATE DE 30 A 40 CM DE ESPESOR, A MANO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURAM3CUADRILLA 001 (1 PEON)5.50M3/JORDEM0009DEM. MURO TAB/BLOCK 14 CM. SIN/REC.DEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, SE INCLUYEN DALAS Y CASTILLOS HASTA 2.50M DE ALTURA. SIN RECUPERACIN DE TABIQUE O BLOCK.M2CUADRILLA 001 (1 PEON)12.50M2/JORDEM0010DEM. MURO TAB/BLOCK 14 CM. CON/REC.DEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, CON RECUPERACION DE TABIQUE O BLOCK, SIN INCLUIR ACARREOS, SE INCLUYEN DALAS Y CASTILLOS HASTA 2.50M DE ALTURA.M2CUADRILLA 001 (1 PEON)6.50M2/JORDEM0014DEM. CONC. ARMADO EN ESTRUCTURA.DEMOLICION A MANO DE ELEMENTOS, DE CONCRETO ARMADO EN ESTRUCTURA, SIN INCLUIR ACARREOS, CON 20 CM DE ESPESOR MAXIMO Y 2.50 M DE ALTURAM3CUADRILLA 001 (1 PEON)0.65M3/JORDEM0020DEM. PISO CONC. SIMPLE 8-10 CM. ESP.DEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR ACARREOS.M2CUADRILLA 001 (1 PEON)16.67M2/JORDEM0022DEM. PISO CONC. ARMADO 8-10 CM. ESP.DEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR ACARREOS.UnidadCUADRILLA 001 (1 PEON)7.52Unidad/JORDEM0028DEM. APLANADOS MURO/PLAFN 2.5 CM. ESP.DEMOLICION A MANO DE APLANADOS DE MEZCLA, YESO O PASTAS EN MUROS O PLAFONES DE 2.5 CM. DE ESPESOR PROMEDIO. SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURAM2CUADRILLA 001 (1 PEON)25.00M2/JORDEM0029DEM. FALSO PLAFN DE YESO.DEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURA.M2CUADRILLA 001 (1 PEON)19.00M2/JORDEM0043DEM. CONC. ASFLTICO 5-7 CM. ESP.DEMOLICION DE CARPETA DE CONCRETO ASFALTICO DE 5 A 7 CM DE ESPESOR, A MANO, SIN INCLUIR ACARREOS.M2CUADRILLA 001 (1 PEON)22.22M2/JOR

PRELIMINARESLTZ0001LIMPIEZA DEL TERRENO A MANO.LIMPIEZA DEL TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y ACARREO DEL MISMO A 1a. ESTACIN DE 20 M.M2CUADRILLA 001 (1 PEON)27.03M2/JOREXC0001EXCAV. MANUAL CEPAS SUELO TIPO IIEXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA ALTURA DE CEPA DE 2.00 M. NO INCLUYE ACARREO.M3CUADRILLA 001 (1 PEON)2.78M3/JORLTZ0005TRAZO Y NIVELACIN MANUALTRAZO Y NIVELACIN POR MEDIOS MANUALES DEL TERRENO PLANO, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. INCLUYE:MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)100.00M2/JOR

CIMENTACINCIM0001CIM. MANPOSTERIA 60,30 X 80 CM. MORT.1:5CIMENTACION DE MANPOSTERIA DE PIEDRA BRAZA ASENTADA CON MEZCLA MORTERO - ARENA EN PROPORCION 1:5, SEC. 60,30 X 80 CM. INCLUYE ACARREO DE MATERIAL A 1 ESTACION A 20 M. DE DISTANCIA HORIZONTAL.M3CUADRILLA 040 (1ALBANIL+1PEON)2.75M3/JORRELL01CCRELLENO CIM. COMP. BAILARINA 90%RELLENO EN CEPAS CON MATERIAL PRODUCTO DE EXCAVACIN, COMPACTANDO AL 90% PROCTOR, CON COMPACTADOR (BAILARINA), EN CAPAS DE 20 CM.M3CUADRILLA 001 (1 PEON)4.35M3/JORRELL01CMRELLENO CIM. COMP. MANUALRELLENO DE CIMENTACIN A MANO, COMPACTADO CON PISN DE MANO Y AGUA EN CAPAS NO MAYOR DE 20 CM. CON MATERIAL PRODUCTO DE EXCAVACIN.M3CUADRILLA 001 (1 PEON)4.35M3/JOR

CASTILLOS Y COLUMNASCAST001VCASTILLO 15X15 , FC=150, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)10.84M/JORCAST002VCASTILLO 15X15 , FC=200, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)10.84M/JORCAST003VCASTILLO 15X15 , FC=250, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)10.84M/JORCAST004VCASTILLO 15X20 , FC=150, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)9.79M/JORCAST005VCASTILLO 15X20 , FC=200, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)9.79M/JORCAST010VCASTILLO CON SECCION DE 15X30 CM DE CONCCASTILLO CON SECCION DE 15X30 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)9.64M/JORCAST006VCASTILLO 15X20, FC=250, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)9.79M/JORCAST007VCASTILLO 20X20 , FC=150, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)8.74M/JORCAST008VCASTILLO 20X20 , FC=200, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)8.74M/JORCAST009VCASTILLO 20X20, FC=250, 4 VARS. #3, 2 CCASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20 CM, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)8.74M/JOR

CONTRATRABES, TRABES Y CADENAS.DALA001ADALA 15X15 , FC=150, ARMEX 15X15-4, 2 CDALA CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)12.76M/JORDALA002ADALA 15X15 , FC=200, ARMEX 15X15-4, 2 CDALA CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)12.76M/JORDALA003ADALA 15X15 , FC=250, ARMEX 15X15-4, 2 CDALA CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)12.76M/JORDALA004ADALA 15X20, FC=150, ARMEX 15X20-4, 2 CDALA CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)12.12M/JORDALA005ADALA 15X20, FC=200, ARMEX 15X20-4, 2 CDALA CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)12.12M/JORDALA006ADALA 15X20, FC=250, ARMEX 15X20-4, 2 CDALA CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)12.12M/JORDALA007ADALA 20X20, FC=150, ARMEX 15X20-4, 2 CDALA CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)11.48M/JORDALA008ADALA 20X20, FC=200, ARMEX 15X20-4, 2 CDALA CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)11.48M/JORDALA009ADALA 20X20, FC=250, ARMEX 15X20-4, 2 CDALA CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN 2 CARAS.MCUADRILLA 040 (1ALBANIL+1PEON)11.48M/JOR

FIRMESPLA05-100PLANTILLA CONC. SIMPLE F`C =100 KG/CM2PLANTILLA DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)20.00M2/JORPIS05-100FIRME 5 CM, FC 100, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)15.00M2/JORPIS05-150FIRME 5 CM, FC 150, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)15.00M2/JORPIS08-150FIRME 8 CM, FC 150, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 8 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)15.00M2/JORPIS08-200FIRME 8 CM, FC 200, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 8 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)15.00M2/JORPIS10-150FIRME 10 CM, FC 150, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 10 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)15.00M2/JORPIS10-200FIRME 10 CM, FC 200, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 10 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)15.00M2/JORPIS15-150FIRME 15 CM, FC 150, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 15 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)12.00M2/JORPIS15-200FIRME 15 CM, FC 200, RN, AGR. 3/4".FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 15 CM. ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)12.00M2/JOR

MUROSMURLAD7MURO TRR, 7 CM, MOR 1:5, JUNTA 1.5, AC.MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 7 CM. DE ESP. (CAPUCHINO), ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.M2CUADRILLA 040 (1ALBANIL+1PEON)12.00M2/JORMURLAD14MURO TRR, 14 CM, MOR 1:5, JUNTA 1.5, AC.MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 14 CM. DE ESP. ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.M2CUADRILLA 040 (1ALBANIL+1PEON)10.00M2/JORMURLAD28MURO TRR, 28 CM, MOR 1:5, JUNTA 1.5, AC.MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 28 CM. DE ESP. ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.M2CUADRILLA 040 (1ALBANIL+1PEON)6.49M2/JORMURTAB10MURO TAB, 10 CM, MOR 1:5, JUNTA 1.5, AC.MURO DE TABICN DE CONCRETO LIGERO DE 10 1428 DE 10 CM. DE ESP. (CAPUCHINO), ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.M2CUADRILLA 040 (1ALBANIL+1PEON)10.00M2/JORMURTAB14MURO TAB, 14 CM, MOR 1:5, JUNTA 1.5, AC.MURO DE TABICN DE CONCRETO LIGERO DE 101428 DE 14 CM. DE ESP. ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.M2CUADRILLA 040 (1ALBANIL+1PEON)10.00M2/JORMURTAB28MURO TAB, 28 CM, MOR 1:5, JUNTA 1.5, AC.MURO DE TABICN DE CONCRETO LIGERO DE 101428 DE 28 CM. DE ESP. ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA UNA ALTURA DE 3.5 M.M2CUADRILLA 040 (1ALBANIL+1PEON)10.00M2/JORMURPRET15MUR. PRETIL PERIM. 7X14X28, 15 CM.MURO DE PRETIL PERIMETRAL DE TABIQUE DE BARRO RECOCIDO DE 7X14X28 CM, DE 15 CM DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM DE ESPESOR, ACABADO COMUN.MCUADRILLA 040 (1ALBANIL+1PEON)5.00M/JOR

MUROS ESPECIALESMURTABI1MURO LAMBRN DE TABLAROCA TIPO INTERIORM2MURTABE1MURO LAMBRN DE TABLAROCA TIPO INTEMPERIM2MURTABI2MURO DE TABLAROCA A 2 CARAS TIPO INTERIOM2MURTABE2MURO DE TABLAROCA A 2 CARAS TIPO INTEMPEM2MURMIXIDMURO MIXTO TABLAROCA TIPO INTERIOR - DURM2MURMIXEDMURO MIXTO TABLAROCA TIPO INTEMPERIE - DM2MURMIXIEMURO DE TABLAROCA TIPO INTERIOR - INTEMM2MURDUR2MURO A 2 CARAS DE DUROK.M2PLATAB001PLAFN DE TABLAROCAM2PLAPOLI001PLAFN DE POLIESTIRENO DE 1" DE ESP. CONM2DETTAB001FABRICACIN DE DETALLES DE TABLAROCA (ENM2DETTAB002FABRICACIN DE BOQUILLAS.MLMDURINTMURO LAMBRIN DE DUROKM2

ENTREPISOS Y CUBIERTASLOSA10-200LOSA TECHO 10 CM, VAR. #3, FC=200LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c = 200 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO DE REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPOM2LOSA10-250LOSA TECHO 10 CM, VAR. #3, FC=250LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c = 250 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO DE REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPOM2

HERRERA Y CANCELERA

PTA0001SUMINISTRO Y COLOCACIN DE PUERTA DE 0.7SUMINISTRO Y COLOCACIN DE PUERTA DE 0.70 X 2.10 M. INCLUYE: CHAPA MODELO 715 Y PINTURA BASE.PZACUADRILLA 040 (1ALBANIL+1PEON)2.50PZA/JORVENT0001SUMINISTRO Y COLOCACIN DE VENTANA METLSUMINISTRO Y COLOCACIN DE VENTANA METLICA DE 0.70 X 0.60 M. INCLUYE: PINTURA BASE Y BOQUILLAS.PZACUADRILLA 040 (1ALBANIL+1PEON)2.50PZA/JOR

ACABADOS PIS0080PISO DE CERMICA VITROMEX 33X33 CM.SUMINISTRO Y COLOCACIN DE PISO DE CERMICA DE 33X33 CM. VITROMEX MODELO DOS AMRICAS COLOR BLANCO, ASENTADO CON PEGAPISO COLOR GRIS Y JUNTEADOR COLOR GRIS MARCA PERDURA.M2CUADRILLA 040 (1ALBANIL+1PEON)12.00M2/JORPIN0001PINTURA VINILICA EN MUROS Y PLAFONESSUMINISTRO Y APLICACIN DE PINTURA VINLICA EN MUROS Y PLAFN CON YESO, INCLUYENDO UNA MANO DE SELLADOR Y DOS MANOS DE PINTURA CALIDAD BERELINTE COLOR BLANCO Y PREPARACIN DE SUPERFICIE.M2CUADRILLA 060 (1 PINTOR)20.00M2/JORPIN0002SUMINISTRO Y APLICACIN DE PINTURA ESMALSUMINISTRO Y APLICACIN DE PINTURA ESMALTE EN MARCOS HERRERA EN GENERAL, INCLUYE: PREPARACIN DE SUPERFICIE Y DOS MANOS DE PINTURA BERELINTE.M2CUADRILLA 060 (1 PINTOR)21.45M2/JORIMP0001IMPERMEABILIZACIN DE LOSA DE AZOTEASUMINISTRO Y SISTEMA APLICACIN DE IMPERMEABILIZANTE ACRILICO MARCA PASA A BASE DE UNA MANO DE SELLADOR A RAZON DE 0.25 LITROS/M2, MENBRANA DE REFUERZO DE FIBRA DE POLIESTER # 5 , DOS MANOS DE IMPERMEABILIZANTE 5A A RAZON DE 0.5 LITROS/M2, INCLUYE LIMPIEZA GENERAL.M2CUADRILLA 040 (1ALBANIL+1PEON)30.00M2/JORAPL0025EMBOQ. REPELLADO C/CEMENTO Y ARENA 1:6EMBOQUILLADO EN REPELLADO, DE 6 CM. DE ANCHO, CON MORTERO DE CEMENTO Y ARENA PROPORCION DE 1:6, PERFILANDO UNA ARISTA; ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION =20.00 M.MCUADRILLA 040 (1ALBANIL+1PEON)26.71M/JORAPL0022APLANADO PLAFONES C/MORTERO Y ARENA 1:5APLANADO EN PLAFN DE LOSA, PULIDO A LLANA CON MEZCLA DE MORTERO Y ARENA PROPORCION DE 1:5, DE 2.5 CM. DE ESPESOR PROMEDIO.M2CUADRILLA 040 (1ALBANIL+1PEON)9.00M2/JORPSO0001ACABADO ESCOBILLADO INTEGAL PSO CONC.ACABADO ESCOBILLADO INTEGAL PSO CONC.M2CUADRILLA 040 (1ALBANIL+1PEON)45.45M2/JORPSO0002ACABADO PULIDO INTEGRAL PISO CONC.ACABADO PULIDO INTEGRAL PISO CONC.M2CUADRILLA 040 (1ALBANIL+1PEON)30.00M2/JOR

FABRICACION DE MEZCLAS, MORTEROS Y CONCRMEZ0003MORTERO CEMENTO-ARENA 1:4M3MEZ0004MORTERO CEMENTO-ARENA 1:5M3MEZ0005MORTERO CEMENTO-ARENA 1:6M3MEZ0006MORTERO CEMENTO-ARENA 1:7M3MEZ0007MORTERO CEMENTO-ARENA 1:8M3MEZ0009MEZCLA MORTERO-ARENA 1:3M3MEZ0010MEZCLA MORTERO-ARENA 1:4M3MEZ0011MEZCLA MORTERO-ARENA 1:5M3MEZ0012MEZCLA MORTERO-ARENA 1:6M3MEZ0013MEZCLA MORTERO-ARENA 1:7M3MEZ0014MEZCLA MORTERO-ARENA 1:8M3FCO100MCONC. FC=100, RN, AGR MAX. 3/4", MANUAL.CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3CUADRILLA 001 (1 PEON)1.59M3/JORFCO100RCONC. FC=100, RN, AGR MAX. 3/4", REVOLV.CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3CUADRILLA 005 (5 PEONES)15.02M3/JORFCO150MCONC. FC=150, RN, AGR MAX. 3/4", MANUAL.CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA POR MEDIOS MANUALES, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M3CUADRILLA 001 (1 PEON)1.59M3/JORFCO150RCONC. FC=150, RN, AGR MAX. 3/4", REVOLV.CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M3CUADRILLA 005 (5 PEONES)15.02M3/JORFCO200MCONC. FC=200, RN, AGR MAX. 3/4", MANUAL.CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA POR MEDIOS MANUALES, ACARREO MATERIAL PRIMERA ESTACION=20.00MM3CUADRILLA 001 (1 PEON)1.59M3/JORFCO200RCONC. FC=200, RN, AGR MAX. 3/4", REVOLV.CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM3CUADRILLA 005 (5 PEONES)15.02M3/JORFCO250MCONC. FC=250, RN, AGR MAX. 3/4", MANUAL.CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA POR MEDIOS MANUALES, ACARREO MATERIAL PRIMERA ESTACION=20.00MM3CUADRILLA 001 (1 PEON)1.50M3/JORFCO250RCONC. FC=250, RN, AGR MAX. 3/4", REVOLV.CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM3CUADRILLA 005 (5 PEONES)15.00M3/JOR

ACARREOSACR0009ACARREO CARR. SACOS: CEM. MORT. CAL.ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M3CUADRILLA 001 (1 PEON)13.33M3/JORACR0012ACARREO CARR. AGREGADOS MORT. CONCRETOS.ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE AGREGADOS, MORTERO, CONCRETOS.M3CUADRILLA 001 (1 PEON)5.25M3/JORACR0013ACARREO CARR. PIEDRA BRAZA.ACARREO EN CARRETILLA, A 20 M HORIZONTAL, DE PIEDRA BRASA INCLUYENDO CARGA Y DESCARGA.M3CUADRILLA 001 (1 PEON)5.50M3/JORACR0037ACARREO A MANO MADERA P/CIMBRA.ACARREO A MANO A 20 M DE DISTANCIA HORIZONTAL, DE MADERA PARA CIMBRA, INCLUYENDO CARGA Y DESCARGA.MILCUADRILLA 001 (1 PEON)4,347.83MIL/JORACR0082AACARREO EN CAM. A PRIM. KM. VOL. MED.M3

ACERO DE REFUERZO EN ESTRUCTURAAREF2HAB.ARM. DE ACERO DE REF.ESTR. No.2HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4" (ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL PRIMERA ESTACION = 20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.10TON/JORAREF2.5HAB.ARM. DE ACERO DE REF.ESTR. No.2.5HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.2.5 DIAMETRO 5/16", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.12TON/JORAREF3HAB.ARM. DE ACERO DE REF.ESTR. No.3HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES, ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.14TON/JORAREF4HAB.ARM. DE ACERO DE REF.ESTR. No.4HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.4, DIAMETRO 1/2", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES; ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.16TON/JORAREF5HAB.ARM. DE ACERO DE REF.ESTR. No.5HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.5, DIAMETRO 5/8", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES; ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.17TON/JORAREF6HAB.ARM. DE ACERO DE REF.ESTR. No.6HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.6, DIAMETRO 3/4", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES; ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.18TON/JORAREF8HAB.ARM. DE ACERO DE REF.ESTR. No.8HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.8, DIAMETRO 1", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES; ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.22TON/JORAREF10HAB.ARM. DE ACERO DE REF.ESTR. No.10HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.10, DIAMETRO 1 ", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES; ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.25TON/JORAREF12HAB.ARM. DE ACERO DE REF.ESTR. No.12HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.12, DIAMETRO 1 ", SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES; ACARREO MATERIAL PRIMERA ESTACION =20.00 MTONCUADRILLA 040 (1ALBANIL+1PEON)0.28TON/JORMAL66-6/6HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 6/6HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 6/6M2CUADRILLA 040 (1ALBANIL+1PEON)82.10M2/JORMAL66-8/8HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 8/8HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 8/8M2CUADRILLA 040 (1ALBANIL+1PEON)84.03M2/JORMAL66-10/10HAB.ARM. MALLA ELECTROSOLDADA 6X6 10/10HAB.ARM. MALLA ELECTROSOLDADA 6X6 10/10M2CUADRILLA 040 (1ALBANIL+1PEON)98.04M2/JORARM15X15SUM/COL ARMEX 15X15-4 EN ESTRUCT.SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X15-4 EN ESTRUCTURA, INCLUYE DESPERDICIO; ALTURA HASTA 3.00M, ACARREO MATERIAL PRIMERA ESTACION = 20 MMCUADRILLA 040 (1ALBANIL+1PEON)120.05M/JORARM15X20SUM/COL ARMEX 15X20-4 EN ESTRUCT.SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X20-4 EN ESTRUCTURA, INCLUYE DESPERDICIO; ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION = 20.00 MMCUADRILLA 040 (1ALBANIL+1PEON)120.05M/JORARM15X25SUM/COL ARMEX 15X25-4 EN ESTRUCT.SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X25-4 EN ESTRUCTURA, ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION = 20.00 MMCUADRILLA 040 (1ALBANIL+1PEON)120.05M/JOR

CUADRILLASCUAD001CUADRILLA 001(1 PEON)JORCUAD005CUADRILLA 005(5 PEONES)JORCUAD040CUADRILLA 040(1ALBANIL+1PEON)JORCUAD060CUADRILLA 060 (1 PINTOR)JOR

CIMBRASCFZAPCIMB./DESCIM, ACAB. COMN FRONTERAS/ZAP.CIMBRA Y DESCIMBRA ACABADO COMN EN FRONTERAS Y PERALTE DE ZAPATAS DE CIMENTACIN, INCLUYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)7.97M2/JORCDADOCIMB./DESCIM, ACAB. COMN CONTRATRABESCIMBRA Y DESCIMBRA EN CONTRATRABES Y DADOS DE CIMENTACIN, INCLUYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)7.97M2/JORCCADECIMB./DESCIM, ACAB. COMN CADENAS.CIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)14.01M2/JORCCASTCIMB./DESCIM, ACAB. COMN CASTILLOS.CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)14.01M2/JORCCOL30X30CIMB./DESCIM, ACAB. COMN COLUMNAS 30X30CIMBRA Y DESCIMBRA ACABADO COMN CON DUELA, EN COLUMNAS DE 30 X 30 CM. HASTA UNA ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)6.95M2/JORCCOL50X50CIMB./DESCIM, ACAB. COMN COLUMNAS 50X50CIMBRA Y DESCIMBRA ACABADO COMN, CON DUELA EN COLUMNAS DE 50 X 50 CM. HASTA UNA ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.M2CUADRILLA 040 (1ALBANIL+1PEON)6.65M2/JOR

VACIADOSVDACAS150VAC. DALA Y CAST, FC=150, RN. AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)1.33M3/JORVDACAS200VAC. DALA Y CAST, FC=200, RN. AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)1.33M3/JORVDACAS250VAC. DALA Y CAST, FC=250, RN. AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)1.33M3/JORVCL200VAC. COLUMNAS P.B, FC=200, RN, AGR 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE CIMENTACIN Y PLANTA BAJA, FC=200 KG/CM2, R.N. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)2.50M3/JORVCL250VAC. COLUMNAS P.B, FC=250, RN, AGR 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE CIMENTACIN Y PLANTA BAJA, FC=250 KG/CM2, R.N. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)2.50M3/JORVZTL150VAC. ZAP. CIM, FC=150, RN. AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=150 KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JORVZTL200VAC. ZAP. CIM, FC=200, RN. AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=200 KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JORVZTL250VAC. ZAP. CIM, FC=250, RN. AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=250 KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JORVCOL150VAC, COLUMAS S/E, FC=150, RN, AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE SUPERESTRUCTURA, FC=150 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.10M3/JORVCOL200VAC, COLUMAS S/E, FC=200, RN, AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.10M3/JORVCOL250VAC, COLUMAS S/E, FC=250, RN, AGR. 3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.10M3/JORVTRABE200VAC. TRABES S/E, FC=200, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES AISLADAS DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.10M3/JORVTRABE250VAC. TRABES S/E, FC=250, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES AISLADAS DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.10M3/JORVLOSA150VAC.. LOSAS S/E, FC=150, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=150 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)2.50M3/JORVLOSA200VAC.. LOSAS S/E, FC=200, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)2.50M3/JORVLOSA250VAC., LOSAS ,S/E, FC=250, RN. AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)2.50M3/JORVCIM100RVAC.. CIMENTACIN, FC=100, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=100, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JORVCIM150RVAC.. CIMENTACIN, FC=150, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=150, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JORVCIM200RVAC.. CIMENTACIN, FC=200, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=200, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JORVCIM250RVAC.. CIMENTACIN, FC=250, RN, AGR.3/4"VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=250, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3CUADRILLA 040 (1ALBANIL+1PEON)3.24M3/JOR

BSICOS

Tarjetas de anlisis de precios unitarios de Bsicos* BSICOSLista de elementos que componen la BASE de datos que intervienen generalmente en un Anlisis de PU.* Como se muestra en la mayor parte de las tarjetas, la mano de obra es de Albail y pen. Esto es, porque en obra pequea, son ellos los que realizan la mayor parte de los trabajos. Pero para obra grande, es necesario desglosar la mano de obra, con las categoras referentes a cada trabajo. En mi caso, estoy tomando la mano de obra de una obra comn.

MEZ0003MORTERO CEMENTO-ARENA 1:4M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.433630$2,120.00$919.30MPET0040ARENA P/CONCRETOSM30.001.208030$150.00$181.20MAGU0010AGUAM30.000.321600$12.00$3.86

Subtotal: MATERIALES$1,104.36Costo directo$1,104.36INDIRECTO0.1$110.44UTILIDADES0.15$165.65COSTO TOTAL$1,380.45

MEZ0004MORTERO CEMENTO-ARENA 1:5M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.361633$2,120.00$766.66MPET0040ARENA P/CONCRETOSM30.001.234700$150.00$185.21MAGU0010AGUAM30.000.314000$12.00$3.77

Subtotal: MATERIALES$955.63Costo directo$955.63INDIRECTO0.1$95.56UTILIDADES0.15$143.35COSTO TOTAL$1,194.54

MEZ0005MORTERO CEMENTO-ARENA 1:6M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.307455$2,120.00$651.80MPET0040ARENA P/CONCRETOSM30.001.266880$150.00$190.03MAGU0010AGUAM30.000.310800$12.00$3.73

Subtotal: MATERIALES$845.57Costo directo$845.57INDIRECTO0.1$84.56UTILIDADES0.15$126.83COSTO TOTAL$1,056.96

MEZ0006MORTERO CEMENTO-ARENA 1:7M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.255440$2,120.00$541.53MPET0040ARENA P/CONCRETOSM30.001.353500$150.00$203.03MAGU0010AGUAM30.000.302400$12.00$3.63

Subtotal: MATERIALES$748.19Costo directo$748.19INDIRECTO0.1$74.82UTILIDADES0.15$112.23COSTO TOTAL$935.23

MEZ0007MORTERO CEMENTO-ARENA 1:8M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.215270$2,120.00$456.37MPET0040ARENA P/CONCRETOSM30.001.396300$150.00$209.45MAGU0010AGUAM30.000.296400$12.00$3.56

Subtotal: MATERIALES$669.37Costo directo$669.37INDIRECTO0.1$66.94UTILIDADES0.15$100.41COSTO TOTAL$836.72

MEZ0009MEZCLA MORTERO-ARENA 1:3M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0010MORTERO HIDRAULICOTON0.000.429500$1,440.00$618.48MPET0040ARENA P/CONCRETOSM30.001.203700$150.00$180.56MAGU0010AGUAM30.000.356400$12.00$4.28

Subtotal: MATERIALES$803.31Costo directo$803.31INDIRECTO0.1$80.33UTILIDADES0.15$120.50COSTO TOTAL$1,004.14

MEZ0010MEZCLA MORTERO-ARENA 1:4M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMOR0060MORTERO TOLTECATON0.000.341960$1,440.00$492.42MPET0040ARENA P/CONCRETOSM30.001.232597$150.00$184.89MAGU0010AGUAM30.000.341000$12.00$4.09

Subtotal: MATERIALES$681.40Costo directo$681.40INDIRECTO0.1$68.14UTILIDADES0.15$102.21COSTO TOTAL$851.75

MEZ0011MEZCLA MORTERO-ARENA 1:5M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMOR0060MORTERO TOLTECATON0.000.285300$1,440.00$410.83MPET0040ARENA P/CONCRETOSM30.001.264700$150.00$189.71MAGU0010AGUAM30.000.346800$12.00$4.16

Subtotal: MATERIALES$604.70Costo directo$604.70INDIRECTO0.1$60.47UTILIDADES0.15$90.70COSTO TOTAL$755.87

MEZ0012MEZCLA MORTERO-ARENA 1:6M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMOR0060MORTERO TOLTECATON0.000.238900$1,440.00$344.02MPET0040ARENA P/CONCRETOSM30.001.286100$150.00$192.92MAGU0010AGUAM30.000.344400$12.00$4.13

Subtotal: MATERIALES$541.06Costo directo$541.06INDIRECTO0.1$54.11UTILIDADES0.15$81.16COSTO TOTAL$676.33

MEZ0013MEZCLA MORTERO-ARENA 1:7M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMOR0060MORTERO TOLTECATON0.000.218300$1,440.00$314.35MPET0040ARENA P/CONCRETOSM30.001.296800$150.00$194.52MAGU0010AGUAM30.000.338400$12.00$4.06

Subtotal: MATERIALES$512.93Costo directo$512.93INDIRECTO0.1$51.29UTILIDADES0.15$76.94COSTO TOTAL$641.17

MEZ0014MEZCLA MORTERO-ARENA 1:8M3CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMOR0060MORTERO TOLTECATON0.000.187400$1,440.00$269.86MPET0040ARENA P/CONCRETOSM30.001.318200$150.00$197.73MAGU0010AGUAM30.000.332400$12.00$3.99

Subtotal: MATERIALES$471.57Costo directo$471.57INDIRECTO0.1$47.16UTILIDADES0.15$70.74COSTO TOTAL$589.47Anlisis: FCO100M Unidad: M3FCO100MCONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.275000$2,120.00$583.00MPET0040ARENA P/CONCRETOSM30.000.544600$150.00$81.69MPET0170GRAVA P/CONCRETOS 3/4"M30.000.659100$150.00$98.87MAGU0010AGUAM30.000.260400$12.00$3.12MANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR1.590.628931$247.37$155.58

Subtotal: MATERIALES$766.68Subtotal: MANO DE OBRA$155.58Costo directo$922.26INDIRECTO0.1$92.23UTILIDADES0.15$138.34COSTO TOTAL$1,152.83

FCO100RCONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.275000$2,120.00$583.00MPET0040ARENA P/CONCRETOSM30.000.544600$150.00$81.69MPET0170GRAVA P/CONCRETOS 3/4"M30.000.659100$150.00$98.87MAGU0010AGUAM30.000.260400$12.00$3.12SUBCONTRATOSEQGA003REVOLVEDORA MIPSA-KOHLER 1 SACOHR0.000.533330$66.00$35.20MANO DE OBRACUAD005CUADRILLA 005 (5 PEONES)JOR15.020.066578$1,236.86$82.35

Subtotal: MATERIALES$766.68Subtotal: MANO DE OBRA$82.35Subtotal: SUBCONTRATOS$35.20Costo directo$884.23INDIRECTO0.1$88.42UTILIDADES0.15$132.63COSTO TOTAL$1,105.28

FCO150MCONCRETO F'C=150 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.327500$2,120.00$694.30MPET0040ARENA P/CONCRETOSM30.000.538200$150.00$80.73MPET0170GRAVA P/CONCRETOS 3/4"M30.000.652700$150.00$97.91MANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR1.590.628931$247.37$155.58

Subtotal: MATERIALES$872.94Subtotal: MANO DE OBRA$155.58Costo directo$1,028.52INDIRECTO0.1$102.85UTILIDADES0.15$154.28COSTO TOTAL$1,285.64

FCO150RCONCRETO F'C=150 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.327500$2,120.00$694.30MPET0040ARENA P/CONCRETOSM30.000.538200$150.00$80.73MPET0170GRAVA P/CONCRETOS 3/4"M30.000.652700$150.00$97.91SUBCONTRATOSEQGA003REVOLVEDORA MIPSA-KOHLER 1 SACOHR0.000.533300$66.00$35.20MANO DE OBRACUAD005CUADRILLA 005 (5 PEONES)JOR15.020.066578$1,236.86$82.35

Subtotal: MATERIALES$872.94Subtotal: MANO DE OBRA$82.35Subtotal: SUBCONTRATOS$35.20Costo directo$990.48INDIRECTO0.1$99.05UTILIDADES0.15$148.57COSTO TOTAL$1,238.10

FCO200MCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.369770$2,120.00$783.91MPET0040ARENA P/CONCRETOSM30.000.532060$150.00$79.81MPET0170GRAVA P/CONCRETOS 3/4"M30.000.645200$150.00$96.78MANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR1.590.628931$247.37$155.58

Subtotal: MATERIALES$960.50Subtotal: MANO DE OBRA$155.58Costo directo$1,116.08INDIRECTO0.1$111.61UTILIDADES0.15$167.41COSTO TOTAL$1,395.10

FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.369770$2,120.00$783.91MPET0040ARENA P/CONCRETOSM30.000.532060$150.00$79.81MPET0170GRAVA P/CONCRETOS 3/4"M30.000.645200$150.00$96.78SUBCONTRATOSEQGA003REVOLVEDORA MIPSA-KOHLER 1 SACOHR0.000.533330$66.00$35.20MANO DE OBRACUAD005CUADRILLA 005 (5 PEONES)JOR15.020.066578$1,236.86$82.35

Subtotal: MATERIALES$960.50Subtotal: MANO DE OBRA$82.35Subtotal: SUBCONTRATOS$35.20Costo directo$1,078.05INDIRECTO0.1$107.80UTILIDADES0.15$161.71COSTO TOTAL$1,347.56

FCO250MCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.413000$2,120.00$875.56MPET0040ARENA P/CONCRETOSM30.000.537100$150.00$80.57MPET0170GRAVA P/CONCRETOS 3/4"M30.000.639800$150.00$95.97MANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR1.500.666667$247.37$164.92

Subtotal: MATERIALES$1,052.10Subtotal: MANO DE OBRA$164.92Costo directo$1,217.01INDIRECTO0.1$121.70UTILIDADES0.15$182.55COSTO TOTAL$1,521.26

FCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMCEM0060CEMENTO GRIS EN SACOSTON0.000.413000$2,120.00$875.56MPET0040ARENA P/CONCRETOSM30.000.537100$150.00$80.57MPET0170GRAVA P/CONCRETOS 3/4"M30.000.639800$150.00$95.97SUBCONTRATOSEQGA003REVOLVEDORA MIPSA-KOHLER 1 SACOHR0.000.533300$66.00$35.20MANO DE OBRACUAD005CUADRILLA 005 (5 PEONES)JOR15.000.066667$1,236.86$82.46

Subtotal: MATERIALES$1,052.10Subtotal: MANO DE OBRA$82.46Subtotal: SUBCONTRATOS$35.20Costo directo$1,169.75INDIRECTO0.1$116.98UTILIDADES0.15$175.46COSTO TOTAL$1,462.19

ACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR13.330.075019$247.37$18.56

Subtotal: MANO DE OBRA$18.56Costo directo$18.56INDIRECTO0.1$1.86UTILIDADES0.15$2.78COSTO TOTAL$23.20

ACR0012ACARREO EN CARRETILLA, POR CADA 20 M DE DISTANCIA HORIZONTAL, SUBSECUENTES A LOS PRIMEROS, DE AGREGADOS, MORTERO, CONCRETOS.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR5.250.190476$247.37$47.12

Subtotal: MANO DE OBRA$47.12Costo directo$47.12INDIRECTO0.1$4.71UTILIDADES0.15$7.07COSTO TOTAL$58.90

ACR0013ACARREO EN CARRETILLA, A 20 M HORIZONTAL, DE PIEDRA BRASA INCLUYENDO CARGA Y DESCARGA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR5.500.181818$247.37$44.98

Subtotal: MANO DE OBRA$44.98Costo directo$44.98INDIRECTO0.1$4.50UTILIDADES0.15$6.75COSTO TOTAL$56.22

ACR0037ACARREO A MANO A 20 M DE DISTANCIA HORIZONTAL, DE MADERA PARA CIMBRA, INCLUYENDO CARGA Y DESCARGA.MIL

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRACUAD001CUADRILLA 001 (1 PEON)JOR4,347.830.000230$247.37$0.06

Subtotal: MANO DE OBRA$0.06Costo directo$0.06INDIRECTO0.1$0.01UTILIDADES0.15$0.01COSTO TOTAL$0.07

AREF2HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4" (ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL PRIMERA ESTACION = 20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMALA0190ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.)TON0.001.070000$12,000.00$12,840.00MALA0180ALAMBRE RECOCIDO No. 18KG0.0035.500000$13.00$461.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.1010.000000$660.93$6,609.30

Subtotal: MATERIALES$13,301.50Subtotal: MANO DE OBRA$6,609.30Costo directo$19,910.80INDIRECTO0.1$1,991.08UTILIDADES0.15$2,986.62COSTO TOTAL$24,888.50

AREF2.5HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.2.5 DIAMETRO 5/16", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMBAR0009VARILLA No.2.5 (5/16") FY=4200KG/CM2.TON0.001.070000-$13,000.00-$13,910.00MALA0180ALAMBRE RECOCIDO No. 18KG0.0035.500000$13.00$461.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.128.333333$660.93$5,507.75

Subtotal: MATERIALES-$13,448.50Subtotal: MANO DE OBRA$5,507.75Costo directo-$7,940.75INDIRECTO0.1-$794.07UTILIDADES0.15-$1,191.11COSTO TOTAL-$9,925.94

AREF3HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.3 DIAMETRO 3/8", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0009VARILLA No.3 (3/8") FY=4200 KG/CM2.TON0.001.070000$13,000.00$13,910.00MALA0180ALAMBRE RECOCIDO No. 18KG0.0035.500000$13.00$461.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.147.142857$660.93$4,720.93

Subtotal: MATERIALES$14,371.50Subtotal: MANO DE OBRA$4,720.93Costo directo$19,092.43INDIRECTO0.1$1,909.24UTILIDADES0.15$2,863.86COSTO TOTAL$23,865.54

AREF4HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.4 DIAMETRO 1/2", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0012VARILLA No.4 (1/2") FY=4200 KG/CM2TON0.001.080000$13,000.00$14,040.00MALA0180ALAMBRE RECOCIDO No. 18KG0.0035.500000$13.00$461.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.166.250000$660.93$4,130.81

Subtotal: MATERIALES$14,501.50Subtotal: MANO DE OBRA$4,130.81Costo directo$18,632.31INDIRECTO0.1$1,863.23UTILIDADES0.15$2,794.85COSTO TOTAL$23,290.39

AREF5HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.5 DIAMETRO 5/8", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0013VARILLA No.5 (5/8") FY=4200 KG/CM2.TON0.001.090000$13,000.00$14,170.00MALA0180ALAMBRE RECOCIDO No. 18KG0.0025.500000$13.00$331.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.175.882353$660.93$3,887.82

Subtotal: MATERIALES$14,501.50Subtotal: MANO DE OBRA$3,887.82Costo directo$18,389.32INDIRECTO0.1$1,838.93UTILIDADES0.15$2,758.40COSTO TOTAL$22,986.66

AREF6HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.6 DIAMETRO 3/4", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0014VARILLA No.6 (3/4") FY=4200 KG/CM2.TON0.001.100000$13,000.00$14,300.00MALA0180ALAMBRE RECOCIDO No. 18KG0.0025.500000$13.00$331.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.185.555556$660.93$3,671.83

Subtotal: MATERIALES$14,631.50Subtotal: MANO DE OBRA$3,671.83Costo directo$18,303.33INDIRECTO0.1$1,830.33UTILIDADES0.15$2,745.50COSTO TOTAL$22,879.17

AREF8HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.8 DIAMETRO 1", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0015VARILLA No.8 (1") FY=4200 KG/CM2.TON0.001.120500$13,000.00$14,566.50MALA0180ALAMBRE RECOCIDO No. 18KG0.0020.500000$13.00$266.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.224.545455$660.93$3,004.23

Subtotal: MATERIALES$14,833.00Subtotal: MANO DE OBRA$3,004.23Costo directo$17,837.23INDIRECTO0.1$1,783.72UTILIDADES0.15$2,675.58COSTO TOTAL$22,296.54

AREF10HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.10 DIAMETRO 1 ", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0016VARILLA No.10(11/4") FY=4200KG/CM2.TON0.001.120500$13,000.00$14,566.50MALA0180ALAMBRE RECOCIDO No. 18KG0.0020.500000$13.00$266.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.254.000000$660.93$2,643.72

Subtotal: MATERIALES$14,833.00Subtotal: MANO DE OBRA$2,643.72Costo directo$17,476.72INDIRECTO0.1$1,747.67UTILIDADES0.15$2,621.51COSTO TOTAL$21,845.90

AREF12HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.12 DIAMETRO 1 ", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL PRIMERA ESTACION =20.00 MTON

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMVAR0017VARILLA NO.12(11/2") FY=4200KG/CM2.TON0.001.120500$13,000.00$14,566.50MALA0180ALAMBRE RECOCIDO No. 18KG0.0020.500000$13.00$266.50MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR0.283.571429$660.93$2,360.47

Subtotal: MATERIALES$14,833.00Subtotal: MANO DE OBRA$2,360.47Costo directo$17,193.47INDIRECTO0.1$1,719.35UTILIDADES0.15$2,579.02COSTO TOTAL$21,491.83

MAL66-6/6HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 6/6M2CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMALA0180ALAMBRE RECOCIDO No. 18KG0.000.107000$13.00$1.39MMAL0080MALLA ELECTROSOLDADA TECNOMALLA 6X6-6/6M20.001.050000$16.56$17.39MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR82.100.012180$660.93$8.05

Subtotal: MATERIALES$18.78Subtotal: MANO DE OBRA$8.05Costo directo$26.83INDIRECTO0.1$2.68UTILIDADES0.15$4.02COSTO TOTAL$33.54

Anlisis: MAL66-8/8 Unidad: M2MAL66-8/8HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 8/8M2CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAL0090MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8M20.001.030000$16.56$17.06MALA0180ALAMBRE RECOCIDO No. 18KG0.000.107000$13.00$1.39MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR84.030.011901$660.93$7.87

Subtotal: MATERIALES$18.45Subtotal: MANO DE OBRA$7.87Costo directo$26.31INDIRECTO0.1$2.63UTILIDADES0.15$3.95COSTO TOTAL$32.89

MAL66-10/10HAB.ARM. DE MALLA ELECTROSOLDADA 6X6 10/10M2CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAL0050MALLA ELECTROSOLDADATECNOMALLA 6X6-10/10M20.001.050000$16.56$17.39MALA0180ALAMBRE RECOCIDO No. 18KG0.000.107000$13.00$1.39MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR98.040.010200$660.93$6.74

Subtotal: MATERIALES$18.78Subtotal: MANO DE OBRA$6.74Costo directo$25.52INDIRECTO0.1$2.55UTILIDADES0.15$3.83COSTO TOTAL$31.90

ARM15X15SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X15-4 EN ESTRUCTURA, INCLUYE DESPERDICIO; ALTURA HASTA 3.00M, ACARREO MATERIAL PRIMERA ESTACION = 20 MM

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMALA0180ALAMBRE RECOCIDO No. 18KG0.000.007300$13.00$0.09MAAR0016ARMADURA SOLDADA CASTILLO ARMEX 15X15-4MT0.001.130000$19.00$21.47MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR120.050.008330$660.93$5.51

Subtotal: MATERIALES$21.56Subtotal: MANO DE OBRA$5.51Costo directo$27.07INDIRECTO0.1$2.71UTILIDADES0.15$4.06COSTO TOTAL$33.84

ARM15X20SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X20-4 EN ESTRUCTURA, INCLUYE DESPERDICIO; ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION = 20.00 MM

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMALA0180ALAMBRE RECOCIDO No. 18KG0.000.007300$13.00$0.09MAAR0017ARMADURA SOLDADA CASTILLO ARMEX 15X20-4MT0.001.130000$19.20$21.70MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR120.050.008330$660.93$5.51

Subtotal: MATERIALES$21.79Subtotal: MANO DE OBRA$5.51Costo directo$27.30INDIRECTO0.1$2.73UTILIDADES0.15$4.09COSTO TOTAL$34.12

ARM15X25SUMINISTRO Y COLOCACION DE ACERO DE REFUERZO ARMEX 15X25-4 EN ESTRUCTURA, ALTURA HASTA 3.00 M, ACARREO MATERIAL PRIMERA ESTACION = 20.00 MM

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMALA0180ALAMBRE RECOCIDO No. 18KG0.000.009300$13.00$0.12MARM0018ARMADURA SOLDADA CASTILLO ARMEX 15X25-4MT0.001.130000$20.00$22.60MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR120.050.008330$660.93$5.51Subtotal: MATERIALES$22.72Subtotal: MANO DE OBRA$5.51Costo directo$28.23INDIRECTO0.1$2.82UTILIDADES0.15$4.23COSTO TOTAL$35.28

CUAD001CUADRILLA 001 (1 PEON)JORCdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRAMOMM01PEONJOR1.001.000000$218.91$218.91EQUIPO Y HERRAMIENTA%MO001MANDOS INTERMEDIOS Y HERRAMIENTA MENOR.%MO7.690.130000$218.91$28.46

Subtotal: MANO DE OBRA$218.91Subtotal: EQUIPO Y HERRAMIENTA$28.46Costo directo$247.37INDIRECTO0.1$24.74UTILIDADES0.15$37.11COSTO TOTAL$309.22

CUAD005CUADRILLA 005 (5 PEONES)JORCdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRAMOMM01PEONJOR0.205.000000$218.91$1,094.57EQUIPO Y HERRAMIENTA%MO001MANDOS INTERMEDIOS Y HERRAMIENTA MENOR.%MO7.690.130000$1,094.57$142.29

Subtotal: MANO DE OBRA$1,094.57Subtotal: EQUIPO Y HERRAMIENTA$142.29Costo directo$1,236.86INDIRECTO0.1$123.69UTILIDADES0.15$185.53COSTO TOTAL$1,546.08

CUAD40CUADRILLA 040 (1ALBANIL+1PEON)JORCdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRAMOMM30OFICIAL ALBANILJOR1.001.000000$365.98$365.98MOMM01PEONJOR1.001.000000$218.91$218.91EQUIPO Y HERRAMIENTA%MO001MANDOS INTERMEDIOS Y HERRAMIENTA MENOR.%MO7.690.130000$584.89$76.04

Subtotal: MANO DE OBRA$584.89Subtotal: EQUIPO Y HERRAMIENTA$76.04Costo directo$660.93INDIRECTO0.1$66.09UTILIDADES0.15$99.14COSTO TOTAL$826.16

CUAD060CUADRILLA 060 (1 PINTOR)JORCdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRAMOMM32OFICIAL PINTORJOR1.001.000000$365.98$365.98EQUIPO Y HERRAMIENTA%MO001MANDOS INTERMEDIOS Y HERRAMIENTA MENOR.%MO7.690.130000$365.98$47.58

Subtotal: MANO DE OBRA$365.98Subtotal: EQUIPO Y HERRAMIENTA$47.58Costo directo$413.56INDIRECTO0.1$41.36UTILIDADES0.15$62.03COSTO TOTAL$516.95

CFZAPCIMBRA Y DESCIMBRA ACABADO COMN EN FRONTERAS Y PERALTE DE ZAPATAS DE CIMENTACIN, INCLUYE: MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0049MADERA DUELA DE PINO DE 1a. EN CONTACTOPT0.002.400000$0.00$0.00MMAD0044MADERA PINO DE 3a.EN TABLON DE 11/2"X12"PT0.001.050000$0.00$0.00MCLA0021CLAVO DE 2 1/2" A 3 1/2"KG0.000.420000$22.00$9.24MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR7.970.125471$660.93$82.93MATERIALESMCOM0010DIESELLT0.000.780000$20.00$15.60

Subtotal: MATERIALES$24.84Subtotal: MANO DE OBRA$82.93Costo directo$107.77COSTO DIRECTO0.1$10.78UTILIDADES0.15$16.17COSTO TOTAL$134.71

CDADOCIMBRA Y DESCIMBRA EN CONTRATRABES Y DADOS DE CIMENTACIN, INCLUYE: MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0049MADERA DUELA DE PINO DE 1a. EN CONTACTOPT0.002.930000$0.00$0.00MMAD0044MADERA PINO DE 3a.EN TABLON DE 11/2"X12"PT0.002.940000$0.00$0.00MCLA0021CLAVO DE 2 1/2" A 3 1/2"KG0.000.320000$22.00$7.04MCOM0010DIESELLT0.001.100000$20.00$22.00MALA0180ALAMBRE RECOCIDO No. 18KG0.000.057000$13.00$0.74MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR7.970.125471$660.93$82.93

Subtotal: MATERIALES$29.78Subtotal: MANO DE OBRA$82.93Costo directo$112.71INDIRECTO0.1$11.27UTILIDADES0.15$16.91COSTO TOTAL$140.89

CCADECIMBRA Y DESCIMBRA ACABADO COMN EN CADENAS DE DESPLANTE Y CERRAMIENTO DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0044MADERA PINO DE 3a.EN TABLON DE 11/2"X12"PT0.004.110000$0.00$0.00MCLA0021CLAVO DE 2 1/2" A 3 1/2"KG0.000.490000$22.00$10.78MALA0180ALAMBRE RECOCIDO No. 18KG0.000.860000$13.00$11.18MCOM0010DIESELLT0.000.600000$20.00$12.00MMAD0045MADERA PINO DE 3a. EN BARROTE DE 2"X4"PT0.006.310000$0.00$0.00MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR14.010.071378$660.93$47.18

Subtotal: MATERIALES$33.96Subtotal: MANO DE OBRA$47.18Costo directo$81.14INDIRECTO0.1$8.11UTILIDADES0.15$12.17COSTO TOTAL$101.42

CCASTCIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0044MADERA PINO DE 3a.EN TABLON DE 11/2"X12"PT0.003.660000$0.00$0.00MCLA0021CLAVO DE 2 1/2" A 3 1/2"KG0.000.134000$22.00$2.95MALA0180ALAMBRE RECOCIDO No. 18KG0.000.860000$13.00$11.18MCOM0010DIESELLT0.000.600000$20.00$12.00MMAD0045MADERA PINO DE 3a. EN BARROTE DE 2"X4"PT0.001.970000$0.00$0.00MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR14.010.071378$660.93$47.18

Subtotal: MATERIALES$26.13Subtotal: MANO DE OBRA$47.18Costo directo$73.30INDIRECTO0.1$7.33UTILIDADES0.15$11.00COSTO TOTAL$91.63

CCOL30X30CIMBRA Y DESCIMBRA ACABADO COMN CON DUELA, EN COLUMNAS DE 30 X 30 CM. HASTA UNA ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0049MADERA DUELA DE PINO DE 1a. EN CONTACTOPT0.002.759200$0.00$0.00MMAD0045MADERA PINO DE 3a. EN BARROTE DE 2"X4"PT0.002.485900$0.00$0.00MMAD0047MADERA PINO DE 3a. EN POLN DE 4"X4" REGPT0.001.630000$0.00$0.00MCLA0021CLAVO DE 2 1/2" A 3 1/2"KG0.000.306500$22.00$6.74MALA0180ALAMBRE RECOCIDO No. 18KG0.000.240200$13.00$3.12MCOM0010DIESELLT0.000.610000$20.00$12.20MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR6.950.143885$660.93$95.10

Subtotal: MATERIALES$22.07Subtotal: MANO DE OBRA$95.10Costo directo$117.16INDIRECTO0.1$11.72UTILIDADES0.15$17.57COSTO TOTAL$146.45

CCOL50X50CIMBRA Y DESCIMBRA ACABADO COMN, CON DUELA EN COLUMNAS DE 50 X 50 CM. HASTA UNA ALTURA DE 3.50 M. INCLUYE: MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0049MADERA DUELA DE PINO DE 1a. EN CONTACTOPT0.002.570000$0.00$0.00MMAD0045MADERA PINO DE 3a. EN BARROTE DE 2"X4"PT0.001.480000$0.00$0.00MMAD0047MADERA PINO DE 3a. EN POLN DE 4"X4" REGPT0.000.806500$0.00$0.00MCLA0021CLAVO DE 2 1/2" A 3 1/2"KG0.000.306500$22.00$6.74MALA0180ALAMBRE RECOCIDO No. 18KG0.000.240200$13.00$3.12MCOM0010DIESELLT0.000.610000$20.00$12.20MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR6.650.150376$660.93$99.39

Subtotal: MATERIALES$22.07Subtotal: MANO DE OBRA$99.39Costo directo$121.45INDIRECTO0.1$12.15UTILIDADES0.15$18.22COSTO TOTAL$151.82

VDACAS150VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR1.330.751880$660.93$496.94SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO150RCONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M30.001.030000$990.48$1,020.20

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$496.94Subtotal: BASICOS$1,054.99Costo directo$1,552.30INDIRECTO0.1$155.23UTILIDADES0.15$232.84COSTO TOTAL$1,940.37

VDACAS200VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR1.330.751880$660.93$496.94SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$496.94Subtotal: BASICOS$1,145.19Costo directo$1,642.50INDIRECTO0.1$164.25UTILIDADES0.15$246.37COSTO TOTAL$2,053.12

VDACAS250VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR1.330.751880$660.93$496.94SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$496.94Subtotal: BASICOS$1,239.64Costo directo$1,736.95INDIRECTO0.1$173.69UTILIDADES0.15$260.54COSTO TOTAL$2,171.18

VCL200VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE CIMENTACIN Y PLANTA BAJA, FC=200 KG/CM2, R.N. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR2.500.400000$660.93$264.37SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$264.37Subtotal: BASICOS$1,145.19Costo directo$1,409.93INDIRECTO0.1$140.99UTILIDADES0.15$211.49COSTO TOTAL$1,762.41

VCL250VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE CIMENTACIN Y PLANTA BAJA, FC=250 KG/CM2, R.N. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR2.500.400000$660.93$264.37SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$264.37Subtotal: BASICOS$1,239.64Costo directo$1,504.38INDIRECTO0.1$150.44UTILIDADES0.15$225.66COSTO TOTAL$1,880.47

VZTL150VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=150 KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO150RCONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M30.001.030000$990.48$1,020.20

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$1,054.99Costo directo$1,259.29INDIRECTO0.1$125.93UTILIDADES0.15$188.89COSTO TOTAL$1,574.11

VZTL200VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=200 KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$1,145.19Costo directo$1,349.49INDIRECTO0.1$134.95UTILIDADES0.15$202.42COSTO TOTAL$1,686.86

VZTL250VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN ZAPATAS, CONTRATRABES, TRABES DE LIGA, DADOS, LOSAS PLANAS Y MUROS DE CIMENTACIN, FC=250 KG/CM2, R.N. AGR. MAX. 20 MM (3/4"), INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$1,239.64Costo directo$1,443.94INDIRECTO0.1$144.39UTILIDADES0.15$216.59COSTO TOTAL$1,804.92

VCOL150VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE SUPERESTRUCTURA, FC=150 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.100.322581$660.93$213.20SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO150RCONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M30.001.030000$990.48$1,020.20

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$213.20Subtotal: BASICOS$1,047.79Costo directo$1,261.30INDIRECTO0.1$126.13UTILIDADES0.15$189.20COSTO TOTAL$1,576.63

VCOL200VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.100.322581$660.93$213.20SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$213.20Subtotal: BASICOS$1,137.99Costo directo$1,351.50INDIRECTO0.1$135.15UTILIDADES0.15$202.72COSTO TOTAL$1,689.37

VCOL250VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN COLUMNAS DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.100.322581$660.93$213.20SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$213.20Subtotal: BASICOS$1,232.44Costo directo$1,445.95INDIRECTO0.1$144.60UTILIDADES0.15$216.89COSTO TOTAL$1,807.44

Anlisis: VTRABE200 Unidad: M3VTRABE200VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES AISLADAS DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.100.322581$660.93$213.20SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$213.20Subtotal: BASICOS$1,137.99Costo directo$1,351.50INDIRECTO0.1$135.15UTILIDADES0.15$202.72COSTO TOTAL$1,689.37

VTRABE250VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN TRABES AISLADAS DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.100.322581$660.93$213.20SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$213.20Subtotal: BASICOS$1,232.44Costo directo$1,445.95INDIRECTO0.1$144.60UTILIDADES0.15$216.89COSTO TOTAL$1,807.44

VLOSA150VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=150 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR2.500.400000$660.93$264.37SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO150RCONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M30.001.030000$990.48$1,020.20

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$264.37Subtotal: BASICOS$1,047.79Costo directo$1,312.47INDIRECTO0.1$131.25UTILIDADES0.15$196.87COSTO TOTAL$1,640.59

VLOSA200VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=200 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR2.500.400000$660.93$264.37SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$264.37Subtotal: BASICOS$1,137.99Costo directo$1,402.67INDIRECTO0.1$140.27UTILIDADES0.15$210.40COSTO TOTAL$1,753.33

VLOSA250VACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA DE 1 SACO, EN LOSAS PLANAS Y RETICULARES DE SUPERESTRUCTURA, FC=250 KG/CM2, RN. AGR. MAX. 20 MM. (3/4"), INCLUYE: VIBRADO, CURADO Y ACARREO A UNA 1a. ESTACIN DE 20 M. DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.025500$12.00$0.31MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR2.500.400000$660.93$264.37SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.510000$45.00$22.95BASICOSACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65FCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84

Subtotal: MATERIALES$0.31Subtotal: MANO DE OBRA$264.37Subtotal: BASICOS$1,232.44Costo directo$1,497.12INDIRECTO0.1$149.71UTILIDADES0.15$224.57COSTO TOTAL$1,871.40

VCIM100RVACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=100, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSFCO100RCONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.M30.001.030000$884.23$910.75ACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$945.55Costo directo$1,149.91INDIRECTO0.1$114.99UTILIDADES0.15$172.49COSTO TOTAL$1,437.39

VCIM150RVACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=150, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSFCO150RCONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A 1a ESTACION A 20 M.M30.001.030000$990.48$1,020.20ACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$1,054.99Costo directo$1,259.35INDIRECTO0.1$125.94UTILIDADES0.15$188.90COSTO TOTAL$1,574.19

VCIM200RVACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=200, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSFCO200RCONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,078.05$1,110.39ACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$1,145.19Costo directo$1,349.55INDIRECTO0.1$134.95UTILIDADES0.15$202.43COSTO TOTAL$1,686.93

VCIM250RVACIADO DE CONCRETO HECHO EN OBRA CON REVOLVEDORA, EN CIMENTACIN, FC=250, KG/CM2, RESISTENCIA NORMAL, AGR. MAX. 20 MM. (3/4"), INCLUYE: CURADO, ACARREO A UNA 1a. ESTACIN A 20 M. DE DISTANCIA HORIZONTAL, MATERIALES Y MANO DE OBRA.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMAGU0010AGUAM30.000.030500$12.00$0.37MANO DE OBRACUAD040CUADRILLA 040 (1ALBANIL+1PEON)JOR3.240.308642$660.93$203.99SUBCONTRATOSVAGA001VIBRADOR PARA CONCRETO DYNAPAC INC.OP.HR0.000.670000$45.00$30.15BASICOSFCO250RCONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN REVOLVEDORA DE 1 SACO, ACARREO MATERIAL PRIMERA ESTACION=20.00MM30.001.030000$1,169.75$1,204.84ACR0009ACARREO EN CARRETILLA A 20 M DE DISTANCIA HORIZONTAL, DE CEMENTO, MORTERO CALHIDRA, YESO, ETC. ENVASADO EN SACOS, INCLUYENDO CARGA Y DESCARGA.M30.000.250500$18.56$4.65

Subtotal: MATERIALES$0.37Subtotal: MANO DE OBRA$203.99Subtotal: BASICOS$1,239.64Costo directo$1,444.00INDIRECTO0.1$144.40UTILIDADES0.15$216.60COSTO TOTAL$1,805.00

P.U.Tarjetas de anlisis de Urecios UnitariosDEM0001DEMOLICION A MANO DE CIMIENTOS DE PIEDRA BRASA, SIN INCLUIR ACARREOS, HASTA 1.50 M DE PROFUNDIDAD.m3Rendimientos

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE CIMIENTOS DE PIEDRA BRASA, SIN INCLUIR ACARREOS, HASTA 1.50 M DE PROFUNDIDAD.CUAD001CUADRILLA 001 (1 PEON)JOR1.500.666667$247.37$164.921.50

Subtotal: MANO DE OBRA$164.92Costo directo$164.92INDIRECTO0.1$16.49UTILIDADES0.15$24.74COSTO TOTAL$206.14

DEM0002DEMOLICION A MANO DE CIMIENTOS DE CONCRETO ARMADO, SIN INCLUIR ACARREOS Y SIN RECUPERACIN DE ACERO.m3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE CIMIENTOS DE CONCRETO ARMADO, SIN INCLUIR ACARREOS Y SIN RECUPERACIN DE ACERO.CUAD001CUADRILLA 001 (1 PEON)JOR0.601.666667$247.37$412.290.60

Subtotal: MANO DE OBRA$412.29Costo directo$412.29INDIRECTO0.1$41.23UTILIDADES0.15$61.84COSTO TOTAL$515.36

DEM0004DEMOLICION DE MUROS DE ADOBE Y TEPETATE DE 30 A 40 CM DE ESPESOR, A MANO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURAm3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION DE MUROS DE ADOBE Y TEPETATE DE 30 A 40 CM DE ESPESOR, A MANO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURACUAD001CUADRILLA 001 (1 PEON)JOR5.500.181818$247.37$44.985.50BASICOSCYA0001BANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.PZA0.000.181810$50.00$9.09

Subtotal: MANO DE OBRA$44.98Subtotal: BASICOS$9.09Costo directo$54.07INDIRECTO0.1$5.41UTILIDADES0.15$8.11COSTO TOTAL$67.58

DEM0009DEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, SE INCLUYEN DALAS Y CASTILLOS HASTA 2.50M DE ALTURA. SIN RECUPERACIN DE TABIQUE O BLOCK.m2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, SE INCLUYEN DALAS Y CASTILLOS HASTA 2.50M DE ALTURA. SIN RECUPERACIN DE TABIQUE O BLOCK.CUAD001CUADRILLA 001 (1 PEON)JOR12.500.080000$247.37$19.7912.50BASICOSCYA0001BANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.PZA0.000.080000$50.00$4.00

Subtotal: MANO DE OBRA$19.79Subtotal: BASICOS$4.00Costo directo$23.79INDIRECTO0.1$2.38UTILIDADES0.15$3.57COSTO TOTAL$29.74

DEM0010DEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, CON RECUPERACION DE TABIQUE O BLOCK, SIN INCLUIR ACARREOS, SE INCLUYEN DALAS Y CASTILLOS HASTA 2.50M DE ALTURA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE MUROS DE TABIQUE O BLOCK DE 14 CM. DE ESPESOR, CON RECUPERACION DE TABIQUE O BLOCK, SIN INCLUIR ACARREOS, SE INCLUYEN DALAS Y CASTILLOS HASTA 2.50M DECUAD001CUADRILLA 001 (1 PEON)JOR6.500.153846$247.37$38.066.50BASICOSCYA0001BANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.PZA0.000.076920$50.00$3.85

Subtotal: MANO DE OBRA$38.06Subtotal: BASICOS$3.85Costo directo$41.90INDIRECTO0.1$4.19UTILIDADES0.15$6.29COSTO TOTAL$52.38

DEM0014DEMOLICION A MANO DE ELEMENTOS, DE CONCRETO ARMADO EN ESTRUCTURA, SIN INCLUIR ACARREOS, CON 20 CM DE ESPESOR MAXIMO Y 2.50 M DE ALTURAM3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE ELEMENTOS, DE CONCRETO ARMADO EN ESTRUCTURA, SIN INCLUIR ACARREOS, CON 20 CM DE ESPESOR MAXIMO Y 2.50 M DE ALTURACUAD001CUADRILLA 001 (1 PEON)JOR0.651.538462$247.37$380.570.65BASICOSCYA0001BANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.PZA0.001.530000$50.00$76.50

Subtotal: MANO DE OBRA$380.57Subtotal: BASICOS$76.50Costo directo$457.07INDIRECTO0.1$45.71UTILIDADES0.15$68.56COSTO TOTAL$571.34

DEM0020DEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR ACARREOS.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR ACARREOS.CUAD001CUADRILLA 001 (1 PEON)JOR16.670.059988$247.37$14.8416.67

Subtotal: MANO DE OBRA$14.84Costo directo$14.84INDIRECTO0.1$1.48UTILIDADES0.15$2.23COSTO TOTAL$18.55

DEM0022DEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR ACARREOS.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE PISO DE CONCRETO SIMPLE DE 8 A 10 CM DE ESPESOR, SIN INCLUIR ACARREOS.CUAD001CUADRILLA 001 (1 PEON)JOR7.520.132979$247.37$32.907.52

Subtotal: MANO DE OBRA$32.90Costo directo$32.90INDIRECTO0.1$3.29UTILIDADES0.15$4.93COSTO TOTAL$41.12

DEM0028DEMOLICION A MANO DE APLANADOS DE MEZCLA, YESO O PASTAS EN MUROS O PLAFONES DE 2.5 CM. DE ESPESOR PROMEDIO. SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURAM2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE APLANADOS DE MEZCLA, YESO O PASTAS EN MUROS O PLAFONES DE 2.5 CM. DE ESPESOR PROMEDIO. SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURACUAD001CUADRILLA 001 (1 PEON)JOR25.000.040000$247.37$9.8925.00BASICOSCYA0001BANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.PZA0.000.040000$50.00$2.00

Subtotal: MANO DE OBRA$9.89Subtotal: BASICOS$2.00Costo directo$11.89INDIRECTO0.1$1.19UTILIDADES0.15$1.78COSTO TOTAL$14.87

DEM0029DEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50 M DE ALTURA.CUAD001CUADRILLA 001 (1 PEON)JOR19.000.052632$247.37$13.0219.00BASICOSCYA0001BANDAMIO DE CABALLETE FORMADO POR 2 CABALLETES DE 1.10 M DE ALTO Y UN TABLON DE 0.30 X 2.50 X 11/2", PARA AMORTIZARSE SEN 20 USO, EN TRABAJOS DE ALBAILERIA.PZA0.000.052630$50.00$2.63

Subtotal: MANO DE OBRA$13.02Subtotal: BASICOS$2.63Costo directo$15.65INDIRECTO0.1$1.57UTILIDADES0.15$2.35COSTO TOTAL$19.56

DEM0043DEMOLICION DE CARPETA DE CONCRETO ASFALTICO DE 5 A 7 CM DE ESPESOR, A MANO, SIN INCLUIR ACARREOS.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRADEMOLICION DE CARPETA DE CONCRETO ASFALTICO DE 5 A 7 CM DE ESPESOR, A MANO, SIN INCLUIR ACARREOS.CUAD001CUADRILLA 001 (1 PEON)JOR22.220.045005$247.37$11.1322.22

Subtotal: MANO DE OBRA$11.13Costo directo$11.13INDIRECTO0.1$1.11UTILIDADES0.15$1.67COSTO TOTAL$13.92

LTZ0001LIMPIEZA DEL TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y ACARREO DEL MISMO A 1a. ESTACIN DE 20 M.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRALIMPIEZA DEL TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y ACARREO DEL MISMO A 1a. ESTACIN DE 20 M.CUAD001CUADRILLA 001 (1 PEON)JOR27.030.036996$247.37$9.1527.03

Subtotal: MANO DE OBRA$9.15Costo directo$9.15INDIRECTO0.1$0.92UTILIDADES0.15$1.37COSTO TOTAL$11.44

EXC0001EXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA ALTURA DE CEPA DE 2.00 M. NO INCLUYE ACARREO.M3

CdigoConceptoUnidadRend.CantidadCostoImporteMANO DE OBRAEXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA ALTURA DE CEPA DE 2.00 M. NO INCLUYE ACARREO.CUAD001CUADRILLA 001 (1 PEON)JOR2.780.359712$247.37$88.982.78

Subtotal: MANO DE OBRA$88.98Costo directo$88.98INDIRECTO0.1$8.90UTILIDADES0.15$13.35COSTO TOTAL$111.23

LTZ0005TRAZO Y NIVELACIN POR MEDIOS MANUALES DEL TERRENO PLANO, PARA DESPLANTE DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS. INCLUYE:MATERIALES Y MANO DE OBRA.M2

CdigoConceptoUnidadRend.CantidadCostoImporteMATERIALESMMAD0045MADERA PINO DE 3a. EN BARROTE DE 2"X4"PT0.000.027000$0.00$0.00MCEM0050CALHIDRATON0.000.000250$1,680.00$0.42MDUE0001DUELA 3/4" X 4" X 8PT0.000.018000$0.00$0.00MHIL0001HILO DE PLAST.P/TRAZO EN