METRADO DE ALCANTARILLASPROGRESIVA: 0+280.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.78 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.30 m
8.22 1.60 1.30 17.10 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.10 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 4.40 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.87 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
8.22 1.60 1.30 17.10 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
8.22 -0.64 -5.23 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.23 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 18.75
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.10 1.95 4.10
EMBOQUILLADO SALIDA m²Le1 Lc3
4.40 3.33 14.65
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 9.30
ALCANTARILLA TMC 36" mL
9.30 9.30
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 2+280.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.07 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.00 m
6.92 1.60 1.30 14.39 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 4.50 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.99 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.92 1.60 1.30 14.39 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.92 -0.64 -4.40 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.45 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 14.99
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
4.50 3.33 14.99
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.00
ALCANTARILLA TMC 36" mL
8.00 8.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
NO TIENE CABEZAL DE SALIDAMETRADO DE ALCANTARILLAS
PROGRESIVA: 2+440.00DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 22.08 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.00 m
6.92 1.60 1.30 14.39 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
0.00 0.00 0.00 0.00 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
0.00 0.00 0.00 0.00 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
0.00 0.00 0.00 0.00 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m
0.00 0.00 0.00 0.00 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
0.00 0.00 0.00 0.00 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
0.00 0.00 0.00 0.00 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.99 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.92 1.60 1.30 14.39 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.92 -0.64 -4.40 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 13.72 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 5.13 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
0.00 0.00 0.00 0.00
PARAPETO 2Tc Hc Lc1
0.00 0.00 0.00 0.00
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
0.00 0.00 0.00
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
0.00 0.00 0.00 0.00
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
0.00 0.00 0.00 0.00
CIMIENTO 6Lc1 V P
0.00 0.00 0.00 0.00
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
0.00 0.00 0.00 0.00
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
0.00 0.00 0.00 0.00
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
0.00 0.00 0.00 0.00
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.50 3.33 8.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 17.06
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
0.00 0.00 0.00
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.00 0.00 0.00
AREA CIRCULAR (-)0.00 0.00
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.00 0.00 0.00
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.00 0.00 0.00
TAPAS LATERALES (02 UNIDADES)B Ha
0.00 0.00 0.00
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.00
ALCANTARILLA TMC 36" mL
8.00 8.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
NO TIENE CAJA DE TOMATIENE 02 CABEZAL DE SALIDA
METRADO DE ALCANTARILLASPROGRESIVA: 4+221.99
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 27.96 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.80 m
6.72 1.60 1.30 13.98 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
0.00 0.00 0.00 0.00 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 10.06 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.87 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.09 Le = 4.70 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.50 m
1.72 0.70 0.40 1.93 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.54 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.50 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
0.00 0.00 0.00 0.00 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
0.00 0.00 0.00 0.00 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
0.00 0.00 0.00 0.00 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.70 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.72 1.60 1.30 13.98 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.72 -0.64 -4.28 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 21.46 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 6.77 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
0.00 0.00 0.00 0.00
AREA CIRCULAR (-) (11)0.40
0.00 0.00 0.00
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
0.00 0.00 0.00 0.00
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
0.00 0.00 0.00
LOSA CAJA INGRESO1.20 Lc 0.40
0.00 0.00 0.00 0.00
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
0.00 0.00 0.00 0.00
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
0.00 0.00 0.00 0.00
4.01.05 EMBOQUILLADO DE PIEDRA m² 20.82
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
4.70 1.95 9.17
EMBOQUILLADO SALIDA m²Le1 Lc3
3.50 3.33 11.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 19.47
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
0.00 0.00 0.00
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
0.00 0.00 0.00
AREA CIRCULAR (-) m²0.00 0.00
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.00 0.00
4.01.07 m 7.80
ALCANTARILLA TMC 36" mL
7.80 7.80
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 7+660.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m
6.82 1.60 1.30 14.19 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 4.10 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.82 1.60 1.30 14.19 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.82 -0.64 -4.34 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 16.32
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
4.10 1.95 8.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.50 3.33 8.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.90
ALCANTARILLA TMC 36" mL
7.90 7.90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 8+010.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.24 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.60 m
6.52 1.60 1.30 13.56 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 5.40 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.41 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.52 1.60 1.30 13.56 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.52 -0.64 -4.15 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.22 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 18.86
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
5.40 1.95 10.53
EMBOQUILLADO SALIDA m²Le1 Lc3
2.50 3.33 8.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.60
ALCANTARILLA TMC 36" mL
7.60 7.60
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 8+310.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.49 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.20 m
7.12 1.60 1.30 14.81 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 5.50 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 0.60 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.28 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.12 1.60 1.30 14.81 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.12 -0.64 -4.53 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.57 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 12.72
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
5.50 1.95 10.73
EMBOQUILLADO SALIDA m²Le1 Lc3
0.60 3.33 2.00
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.20
ALCANTARILLA TMC 36" mL
8.20 8.20
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 8+610.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.11 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.50 m
7.42 1.60 1.30 15.43 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 4.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.90 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.71 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.42 1.60 1.30 15.43 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.42 -0.64 -4.72 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.75 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 17.46
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
4.00 1.95 7.80
EMBOQUILLADO SALIDA m²Le1 Lc3
2.90 3.33 9.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.50
ALCANTARILLA TMC 36" mL
8.50 8.50
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 9+610.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.03 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.50 m
6.42 1.60 1.30 13.35 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.95 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.90 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.27 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.42 1.60 1.30 13.35 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.42 -0.64 -4.08 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.16 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 15.41
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.95 1.95 5.75
EMBOQUILLADO SALIDA m²Le1 Lc3
2.90 3.33 9.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.50
ALCANTARILLA TMC 36" mL
7.50 7.50
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 11+903.72
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.07 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.00 m
6.92 1.60 1.30 14.39 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 5.35 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 1.35 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.99 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.92 1.60 1.30 14.39 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.92 -0.64 -4.40 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.45 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 14.93
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
5.35 1.95 10.43
EMBOQUILLADO SALIDA m²Le1 Lc3
1.35 3.33 4.50
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.00
ALCANTARILLA TMC 36" mL
8.00 8.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 12+615.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 32.19 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.50 m
8.42 1.60 1.30 17.51 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 12.16 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
8.42 1.60 1.30 17.51 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
8.42 -0.64 -5.36 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.34 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.50 3.33 8.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 9.50
ALCANTARILLA TMC 36" mL
9.50 9.50
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
NO TIENE CABEZAL DE SALIDAMETRADO DE ALCANTARILLAS
PROGRESIVA: 13+700.00DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 26.03 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.90 m
8.82 1.60 1.30 18.35 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
0.00 0.00 0.00 0.00 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
0.00 0.00 0.00 0.00 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
0.00 0.00 0.00 0.00 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.55 m
0.00 0.00 0.00 0.00 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
0.00 0.00 0.00 0.00 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
0.00 0.00 0.00 0.00 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 12.73 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
8.82 1.60 1.30 18.35 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
8.82 -0.64 -5.61 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 14.84 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 5.13 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
0.00 0.00 0.00 0.00
PARAPETO 2Tc Hc Lc1
0.00 0.00 0.00 0.00
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
0.00 0.00 0.00
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
0.00 0.00 0.00 0.00
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
0.00 0.00 0.00 0.00
CIMIENTO 6Lc1 V P
0.00 0.00 0.00 0.00
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
0.00 0.00 0.00 0.00
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
0.00 0.00 0.00 0.00
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
0.00 0.00 0.00 0.00
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 11.82
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 0.00 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
3.55 3.33 11.82
4.01.06 ENCOFRADO Y DESENCOFRADO m² 17.06
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
0.00 0.00 0.00
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.00 0.00 0.00
AREA CIRCULAR (-)0.00 0.00
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.00 0.00 0.00
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.00 0.00 0.00
TAPAS LATERALES (02 UNIDADES)B Ha
0.00 0.00 0.00
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 9.90
ALCANTARILLA TMC 36" mL
9.90 9.90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 13+776.70
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.70 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.30 m
7.22 1.60 1.30 15.02 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 4.35 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.05 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.42 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.22 1.60 1.30 15.02 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.22 -0.64 -4.59 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.63 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 18.64
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
4.35 1.95 8.48
EMBOQUILLADO SALIDA m²Le1 Lc3
3.05 3.33 10.16
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.30
ALCANTARILLA TMC 36" mL
8.30 8.30
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 13+924.17
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.11 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.50 m
7.42 1.60 1.30 15.43 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 5.15 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.71 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.42 1.60 1.30 15.43 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.42 -0.64 -4.72 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.75 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 17.15
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
5.15 3.33 17.15
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.50
ALCANTARILLA TMC 36" mL
8.50 8.50
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 14+840.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.95 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.90 m
7.82 1.60 1.30 16.27 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.65 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.29 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.82 1.60 1.30 16.27 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.82 -0.64 -4.97 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.99 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 8.82
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.65 3.33 8.82
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.90
ALCANTARILLA TMC 36" mL
8.90 8.90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
NO TIENE CABEZAL DE SALIDA
METRADO DE ALCANTARILLASPROGRESIVA: 16+510.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 25.83 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.80 m
8.72 1.60 1.30 18.14 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
0.00 0.00 0.00 0.00 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
0.00 0.00 0.00 0.00 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
0.00 0.00 0.00 0.00 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m
0.00 0.00 0.00 0.00 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
0.00 0.00 0.00 0.00 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
0.00 0.00 0.00 0.00 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 12.59 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
8.72 1.60 1.30 18.14 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
8.72 -0.64 -5.55 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 14.78 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 5.29 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
0.00 0.00 0.00 0.00
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
0.00 0.00 0.00
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
0.00 0.00 0.00 0.00
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
0.00 0.00 0.00 0.00
CIMIENTO 6Lc1 V P
0.00 0.00 0.00 0.00
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
0.00 0.00 0.00 0.00
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
0.00 0.00 0.00 0.00
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
0.00 0.00 0.00 0.00
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 0.00 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.50 3.33 8.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 17.06
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
0.00 0.00 0.00
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.00 0.00 0.00
AREA CIRCULAR (-)0.00 0.00
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.00 0.00 0.00
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.00 0.00 0.00
TAPAS LATERALES (02 UNIDADES)B Ha
0.00 0.00 0.00
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 9.80
ALCANTARILLA TMC 36" mL
9.80 9.80
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 17+930.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.15 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.00 m
7.92 1.60 1.30 16.47 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.75 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.44 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.92 1.60 1.30 16.47 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.92 -0.64 -5.04 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.05 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 12.49
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
3.75 3.33 12.49
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 9.00
ALCANTARILLA TMC 36" mL
9.00 9.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 18+093.89
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.43 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.65 m
7.57 1.60 1.30 15.75 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.93 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.57 1.60 1.30 15.75 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.57 -0.64 -4.82 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.84 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.50 3.33 8.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.65
ALCANTARILLA TMC 36" mL
8.65 8.65
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 20+030.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.49 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.20 m
7.12 1.60 1.30 14.81 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 1.40 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.20 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.28 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.12 1.60 1.30 14.81 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.12 -0.64 -4.53 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.57 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 13.39
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
1.40 1.95 2.73
EMBOQUILLADO SALIDA m²Le1 Lc3
3.20 3.33 10.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.20
ALCANTARILLA TMC 36" mL
8.20 8.20
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 20+233.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.03 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.50 m
6.42 1.60 1.30 13.35 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.75 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.20 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.27 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.42 1.60 1.30 13.35 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.42 -0.64 -4.08 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.16 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 16.02
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.75 1.95 5.36
EMBOQUILLADO SALIDA m²Le1 Lc3
3.20 3.33 10.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.50
ALCANTARILLA TMC 36" mL
7.50 7.50
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 20+415.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.49 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.20 m
7.12 1.60 1.30 14.81 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.60 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.28 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.12 1.60 1.30 14.81 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.12 -0.64 -4.53 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.57 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 8.66
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
2.60 3.33 8.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.20
ALCANTARILLA TMC 36" mL
8.20 8.20
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 20+600.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m
6.82 1.60 1.30 14.19 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.50 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.65 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.82 1.60 1.30 14.19 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.82 -0.64 -4.34 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 13.70
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.50 1.95 4.88
EMBOQUILLADO SALIDA m²Le1 Lc3
2.65 3.33 8.82
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.90
ALCANTARILLA TMC 36" mL
7.90 7.90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 20+810.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.32 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.60 m
7.52 1.60 1.30 15.64 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 0.00 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.85 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.86 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.52 1.60 1.30 15.64 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.52 -0.64 -4.78 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.81 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 12.82
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
0.00 1.95 0.00
EMBOQUILLADO SALIDA m²Le1 Lc3
3.85 3.33 12.82
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.60
ALCANTARILLA TMC 36" mL
8.60 8.60
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 21+200.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m
6.82 1.60 1.30 14.19 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.75 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 6.35 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.82 1.60 1.30 14.19 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.82 -0.64 -4.34 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 26.51
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.75 1.95 5.36
EMBOQUILLADO SALIDA m²Le1 Lc3
6.35 3.33 21.15
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.90
ALCANTARILLA TMC 36" mL
7.90 7.90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 21+340.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m
6.82 1.60 1.30 14.19 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.75 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.20 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
6.82 1.60 1.30 14.19 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
6.82 -0.64 -4.34 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 12.69
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.75 1.95 5.36
EMBOQUILLADO SALIDA m²Le1 Lc3
2.20 3.33 7.33
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 7.90
ALCANTARILLA TMC 36" mL
7.90 7.90
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 21+840.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.05 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.95 m
7.87 1.60 1.30 16.37 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.90 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.60 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.36 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.87 1.60 1.30 16.37 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.87 -0.64 -5.01 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.02 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 14.31
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.90 1.95 5.66
EMBOQUILLADO SALIDA m²Le1 Lc3
2.60 3.33 8.66
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.95
ALCANTARILLA TMC 36" mL
8.95 8.95
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
METRADO DE ALCANTARILLASPROGRESIVA: 22+150.00
DIAMETRO: 36"
UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA
PARCIAL TOTAL(m.) (m.) (m.)
4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.91 DATOS
ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.40 m
7.32 1.60 1.30 15.23 La = 1.60 m
CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m
1.95 2.00 1.30 5.07 La2 = 1.92 m
CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m
2.47 1.57 1.30 5.03 Lc = 1.35 m
CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m
CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m
1.39 0.78 0.40 0.43 Lc3 = 3.33 m
CIMIENTO 6Lc1 V P Lc4 = 1.18 m
1.60 0.07 0.40 0.04 Le = 2.65 m
CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.75 m
1.72 0.70 0.40 0.96 a = 1.30 m
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m
2.06 0.87 0.15 0.27 B = 0.30 m
VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m
3.13 0.20 0.40 0.25 C1 = 0.70 m
LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m
2.10 1.95 0.40 1.64 D = 0.90 m
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m
2.55 0.50 0.30 0.77 Hc = 1.30 m
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m
1.20 0.30 0.30 0.22 P1 = 0.15 m
4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.57 Tc = 0.15 m
RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m
7.32 1.60 1.30 15.23 p = 3.14
AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m
7.32 -0.64 -4.66 e = 0.20 m
4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.69 Ecua 1 = 1.08 m
4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50
PARAPETO EN SALIDA 1
PARAPETO 1(Lc+Lc1)/2 B Hc
1.48 0.30 1.30 0.58
PARAPETO 2Tc Hc Lc1
0.15 1.30 0.80 0.16
PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2
-0.64 0.40 -0.25
ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2
1.66 0.30 0.95 0.95
CIMIENTO PARAPETO EN SALIDA
CIMIENTO 5(Lc1+Lc4)/2 C2 P
1.39 0.78 0.40 0.43
CIMIENTO 6Lc1 V P
1.60 0.07 0.40 0.04
CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P
1.72 0.70 0.40 0.96
LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1
2.06 0.87 0.15 0.27
VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P
3.13 0.20 0.40 0.25
MUROS PARALELOS A VIA
MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60
1.70 0.40 1.95 2.65
AREA CIRCULAR (-) (11)0.40
-0.64 0.40 -0.25
MUROS PERPENDICULAR A VIA
MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20
1.70 0.30 1.20 1.22
AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30
-0.20 0.30 -0.12
LOSA CAJA INGRESO1.20 Lc 0.40
1.20 1.35 0.40 0.65
VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30
2.55 0.50 0.30 0.77
VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30
1.20 0.30 0.30 0.22
4.01.05 EMBOQUILLADO DE PIEDRA m² 17.66
EMBOQUILLADO ENTRADA m²Le Lc + 0.60
2.65 1.95 5.17
EMBOQUILLADO SALIDA m²Le1 Lc3
3.75 3.33 12.49
4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80
PARAPETO EN CABEZAL SALIDA
PARAPETO 1 (02 UNIDADES)Lc Hc
1.35 1.30 3.51
TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc
0.15 1.30 0.20
AREA CIRCULAR (-)-0.64 -0.64
ALETAS DE SALIDA
TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La
0.95 1.60 3.04
TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1
0.95 1.72 3.27
TAPAS LATERALES (02 UNIDADES)B Ha
0.30 0.60 0.36
MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a
6.40 1.30 8.32
MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a
6.60 1.30 8.58
AREA CIRCULAR (-) m²-0.64 -0.64
AREA CUNETA (-) (04 UNIDADES) m²0.20
0.20 0.80
4.01.07 m 8.40
ALCANTARILLA TMC 36" mL
8.40 8.40
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3(p x D²)/4
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
m3
(p x D²)/4
m3
m3
m3
m3
m3
(p x D²)/4
m3
(p x D²)/4
TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO
RESUMEN DE METRADOS
RUBRO 04.00.00 OBRAS DE ARTE Y DRENAJE
RUBRO 04.01.00 ALCANTARILLAS D = 36''
PARTIDA DESCRIPCION UNIDAD CANTIDAD
04.01.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m³ 786.00
04.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS m³ 285.50
04.01.03 ELIMINACIÓN DE MATERIAL EXCEDENTE MANUAL m³ 585.65
04.01.04 m³ 218.13
04.01.05 EMBOQUILLADO DE PIEDRA 388.21
04.01.06 ENCOFRADO Y DESENCOFRADO 687.08
04.01.07 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO m 226.90
CONCRETO f'c = 175 Kg/cm2
m2
m2