13. INCIDENT INVESTIGATION
It is a procedure for the management of incidents, accidents and non-
conformities, corrective and preventive action.
For the control of these, which may arise during the execution of the work,
has been established a 'inspection program', with the objective to dene theresponsibilities, indicating the actions to be taken to control the impact
produced.
13.1. Objective
!stablish guidelines for the correct way to report investigate and report
incidents. "escribe how you will investigate and identify incidents, accidents
and nonconformities in the work in order to implement preventive and
corrective measures.
13.2. Scope
#his procedure applies to all activities performed in the work, to dene the
treatment and immediate action is just an incident, accident or
nonconformity.
13.3. Participants
$ !ngineers involved area.$ %ite engineer$ %afety %upervisor$ &aster or work.$ orker injured or (if available). If it is not possible to interview the
injured worker at the time of the investigation, shall thereafter be
made to this.$ #wo workers (eyewitnesses), the area of work involved.
*+#! #he research must be done within hours of the accident / incident
occurred If not, could miss important information by time e0ects.
13.4. esponsibi!ities
%afety %upervisor ill report the incident or accident occurred
1eneral &anager ill take the report and make the steps forcorrective and preventive actions.
%ite engineer ill apply the decisions made by the general manager
13.". Co##$nication an% reportin& o' inci%ents
"epending on the nature of the accident, all employees shall report to their
immediate supervisor any accident and incident occurring in your work area.
$ In principle, it is mandatory to consider the timely reporting of all
potential incidents and accidents which have caused some kind of
loss or damage to persons, e2uipment,
7/24/2019 Parte Pino - Seguridad
2/6
environment or altered the normal course of operations, such events
should be reported to 3ead o4ce within described in this procedure.$ 5ll accidents, including those classied as minor should be collected
and reported tomanagement of +3%-3ead o4ce and 6ustomer to prevent accidents
unreported taken as concealment of information and prevent ourcustomers punish us for lack communication not made at the right
time.$ Failure to take communication and/or sending reports, according to
the table76ommunication Incidents and 5ccidents7, and the application of the
described in thisprocedure will be considered a fault and the appropriate sanctions will
be applied. #his is as a disciplinary measure in the absence of such
notication of accident could hide events.
13.(. Investi&ation
For e0ective rapid and positive response to the emergency will be
considered the 8 steps of initial reaction
#aking control in the scene.
9rovide rst aid care and emergency help.
6ontrolling secondary potential accidents.
Identify sources of evidence in the scene.
9revent evidences alter or be altered.
Investigate to determine the potential for loss. o *otify 6ommand
:ine and 9roject 3ead2uarters.
13.). Consi%erations 'or t*e %eve!op#ent o' t*e +Inci%ent
Investi&ation eport+
#he report brings together all research in a brief summary. %ets the origins,
causes, conse2uences and costs of the event. 9oints out corrective
measures as those responsible for its implementation.
14. P,AN A-DITS
14.1. Objective
%et the internal audit process for +3% &anagement %ystem as well as the
corresponding processes for each of them.
#he audit helps to nd the ;aws in the implementation of the plan of
safety management. 5fter nding the problem, the preventive actions
of potential non-conformities and corrective actions of non-conformities are
taken. It also, allows to identify the points that were not considered in the
plan of safety management plan. #his, +3% management achievescontinuous improvement for future projects to be developed.
7/24/2019 Parte Pino - Seguridad
3/6
14.2. Scope
#his procedure applies to all operational areas and o4ces of the
construction company and all its employees and subcontractors.
#he audit is the implementation of the +3% of the project management plan
will be ade2uately fullled the implementation and maintenance of the plan.
In addition, verify e0ective compliance with the policy and objectives of the
organi??= %tandards$ %tandards, specications and regulatory re2uirements identied by
the organi??=.
#he implementation and maintenance plan +%3 management.
&easures to be taken to improve the management plan @%5.
14.4 esponsibi!ities
14.4.1. A$%itors
#he 5uditor or 5uditors have the following responsibilities
$ 6larify why auditors and circumstances of the audit.$ Aecord all relevant observations (objective evidence) contained in the
audited area, and keep copies of supporting documents.$ Be objective and fair in their assessments.$ 6ollaborate with the lead auditor everything necessary to ensure the
success of the audit.
7/24/2019 Parte Pino - Seguridad
4/6
6onse2uently, auditors should possess su4cient technical knowledge of the
area to be audited, and is preferable to have specic knowledge of the rules
applicable Industrial %afety +3%5% =>>?= and also on audits. 6urrently this
task can develop any certied to perform this type of process or any person
having their sta0 company, which has previously been instructed in audits
&anagement %ystem +3%5% =>??=. 5uditor should have no responsibilityfor the activities audited, must always prevail the concept of independence.
14.4.2. T*e a$%ite%
#he responsibilities of the audited (responsible for the area audited) are as
follows
$ &ake available to the audit team the means necessary for the audit.
$ Facilitate access to facilities and documents relevant to the audit$ 6ooperate with auditors to ensure the success of the audit.$ Implement corrective actions arising from the audit report.
14.". Interna! A$%its
9lanned inspections should be carried out through a workplace
inspection, observation of activities and actions of people in the
workplace work.
eekly safety inspections should be performed in all areas of all sites.
#he %ecurity %upervisor denes +%3 inspection areas, keep a record
of the inspections and the inspection program distributed to all teammembers of the project management.
#he program must specify the nomineeCs inspectors, the area to be
inspected and the date will be held inspection.
#he report must be signed by each of the inspectors and sent to the
designated site administrator.
!ach person assigned to develop an inspection, is responsible for
contacting his fellow inspectors and ensures that inspections are
completed within the time specied in the program.
#he results of all inspections shall be available to all employees in the
camp meetings scheduled in conjunction with the results of corrective
actions taken.
5udits meet
$ If management %%+&5 project is able to achieve the re2uired
performance standard.$ If the organi
7/24/2019 Parte Pino - Seguridad
5/6
5udits should be performed when
#he program suggests.
If the result of a previous audit suggests it does.
#he type of incidents or increased fre2uency of incidents.
14.".1. A$%it Pro&ra##e
14.".1.1. INTENA, A-DITS
#he prevencionist risk of the work performed in conjunction with the
Aesident !ngineer and 9roduction &anager, a monthly audit to assess
compliance with safety standards. #he results of these audits will be
submitted monthly to the #echnical &anagement and Aisk 9revention
"epartment and will be registered with the control panel of the work.
Co##it#ent an% cooperation.
#he project through the 9roject &anager is committed to the
implementation of the 5udit %%+&5 in the project, taking into account
all comments and to make appropriate recommendations with in a
reasonable time according to the risk identied actions.
#he project ensures the absence of actions that could interfere or
in;uence the audit process.
#he administration at all levels understand the purpose and benets
of the audit. #herefore take an open and cooperative attitude with
auditors, responding honestly to 2uestions.
Pro&ra##in& an% Eec$tion.
6osapi %5 through %%+&5 &anagement - audit program for each
particular project depending 9rogram !xecution and implementation
of operations. #he audit plan should dene #he audit scope,
fre2uency and methodology, as well as the responsibilities and
re2uirements for conducting these audits and report the results.
#he execution of audits is the responsibility of the 1roup of 5uditors
which will be allocated according to the schedule. #he execution of
the audit will be divided into the following steps
$ +pening &eeting.
$ Implementation of the audit in the eld.
$ Aeview results.
$ 6losing &eeting.
$ 5udit report.
7/24/2019 Parte Pino - Seguridad
6/6
14.".1.2. ETENA, A-DITS
#he "epartment of Aisk 9revention sporadic performed in order to verify
that the work meets safety standards in all its operations audits. #he results
of these audits will rise to the presidency of the &anagement 6ommittee
Aisk 9revention 6ompany.