PRESENTASI M.LAUNG

Post on 14-Apr-2017

81 views 2 download

Transcript of PRESENTASI M.LAUNG

F

DAFTAR ISIDAFTAR ISI

I. EQUIPMENT * SPECIFIKASI ALAT BERAT * ALAT SURVEYII.MAN POWERIII.PROGRES * LAND CLEARING * CUT AND FILL * HOULING DAN DUMPING IV . LAMPIRAN

BULLDOZERBULLDOZERI. EQUIPMENTI. EQUIPMENT

A. SPECIFICATION ALAT BERATA. SPECIFICATION ALAT BERAT

Specifications D 85 SS Specifications D 85 SS : : 3 UNIT3 UNIT

Specifications PC 200 :Specifications PC 200 : 2 UNIT 2 UNIT

Specifications MOBIL DUMP Specifications MOBIL DUMP TRUCK : TRUCK : 2 UNIT2 UNIT

Specifications ALAT SURVEYSpecifications ALAT SURVEY

TOPCON seri GPT 7501TOPCON seri GPT 7501

II. MAN POWERII. MAN POWER

TEAM KONTRUKSI PT.DBKSITE MUARA LAUNG

SAFTY MEETING SETIAP AKAN MENGAWALI PEKERJAAN

III. PROGRESIII. PROGRES

* LANDCLEARING* LANDCLEARING

* CUT AND FILL* CUT AND FILL

CUT&FILL DI ROM 2CUT&FILL DI ROM 2

CUT&FILL DI ROM CUT&FILL DI ROM 11

* HOULING AND DUMPING* HOULING AND DUMPING

1. Dumping overburden

COAL SEAM

Make sure safety berm ready

IV.LAMPIRANIV.LAMPIRAN

* LAYDOWN * LAYDOWN AREAAREA

* ROM 1 AREA* ROM 1 AREA

* ROM 2 AREA* ROM 2 AREA

* LINE * LINE CONVEYORCONVEYOR

* LAYOUT M.LAUNG * LAYOUT M.LAUNG

* AREA CUT & FILL* AREA CUT & FILL

TEAM TEAM WORKWORK

TERIMAKASIHTERIMAKASIH

team Kontruksi Muara team Kontruksi Muara LaungLaung

Maret 2011Maret 2011